General plane intelligent arrangement method and device based on standard module and specification requirement judgment

By combining buildings, pipelines and roads into standard modules, and determining the positional relationship between modules according to logical relationships and specification requirements, the problems of low efficiency and low intelligence in the drawing of existing overall plan planning or layout drawings are solved, and intelligent drawing and efficient design data formation are achieved.

CN119885326APending Publication Date: 2025-04-25CHINA NUCLEAR POWER ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411774425.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-04
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

The existing total plan planning or layout drawing methods are inefficient, unable to form associated design data, and the level of intelligence is low.

Method used

By combining buildings, pipelines and roads into standard modules, and determining the positional relationship between modules according to logical relationships and specification requirements, a general plan or layout diagram is formed.

Benefits of technology

The intelligent drawing of total floor plan or layout drawing is realized, efficiency is improved, related design data is formed, and the level of intelligence is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119885326A_ABST
    Figure CN119885326A_ABST
Patent Text Reader

Abstract

The invention discloses a general plane intelligent arrangement method and device based on standard modules and specification requirement judgment, and the method comprises the steps: S1, combining building structures, pipelines and roads into a plurality of standard modules according to the building structures, the pipelines and the roads as well as the related attributes and parameters of the building structures, the pipelines and the roads; s2, according to the logic relationship and the specification requirements, determining the position relationship between the standard modules; and S3, according to the position relationship among the standard modules, forming a project general plane planning or arrangement diagram. The building structures, the pipelines and the roads can be combined into the standard modules, the position relation between the modules is determined according to the logic relation and the specification requirement, and therefore general plane planning or layout drawing intellectualization is achieved, and efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of intelligent planning and design, and specifically relates to a method and device for intelligent layout of a general plane based on standard modules and specification requirements. Background Art

[0002] The master plan intelligent layout method is a method for intelligently generating master plan or layout diagram, which is used for automatic generation of master plan or layout diagram of industrial and civil construction projects.

[0003] Existing master plan or layout drawings are mostly drawn manually by elements, for example, buildings are drawn first, then roads, and then outdoor pipelines. Existing master plan or layout drawing methods have at least the following shortcomings: (1) Manual drawing by elements is inefficient; (2) There is a lack of logical relationship between the elements. When modifying, each element must be modified separately, which cannot be linked and has low efficiency; (3) It is impossible to form associated design data and has a low level of intelligence. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method and device for intelligent layout of the general plan based on standard modules and specification requirements in view of the above-mentioned deficiencies in the prior art, which can combine buildings, pipelines and roads into standard modules, and determine the positional relationship between modules according to logical relationships and specification requirements, thereby realizing intelligent and efficient general plan planning or layout drawing.

[0005] The technical solution of the present invention to solve the above technical problems is:

[0006] According to a first aspect of the present invention, there is provided a method for intelligent layout of a general plan based on standard modules and specification requirements, comprising:

[0007] S1, combining buildings, pipelines and roads into several standard modules according to buildings, pipelines and roads and their related properties and parameters;

[0008] S2, determine the positional relationship between each standard module according to the logical relationship and specification requirements;

[0009] S3, based on the positional relationship between each standard module, form a general plan or layout diagram of the project.

[0010] Optionally, the process of forming the standard module includes the following steps:

[0011] S101, building a single module of a building structure;

[0012] S102, determine whether there are structures around the single module. If so, arrange additional structures around the single module and determine whether the spacing meets the specification requirements. If so, proceed to step S103. If not, adjust the structure position and determine whether the spacing meets the specification requirements again until the specification requirements are met. If not, directly proceed to step S103.

[0013] S103, determining the type and orientation of the corresponding outdoor pipeline according to the interface information of the indoor and outdoor pipelines of the monomer model;

[0014] S104, integrating the types and orientations of the outdoor pipelines determined in step S103 to form a summary of outdoor pipeline information in various orientations of the single module;

[0015] S105, based on the aggregated outdoor pipeline information of the single module in various directions, according to a given principle, determining the arrangement order of the outdoor pipelines in various directions of the single module;

[0016] S106, determine the arrangement spacing of outdoor pipelines in all directions, and the spacing between pipelines and roads and buildings according to the requirements of the specifications;

[0017] S107, integrating the results of step S101 to step S106 to form a standard module including building units, pipelines and roads.

[0018] Optionally, the process of forming the standard module further includes:

[0019] S108, determine whether the standard module formed in step S107 needs to be modified. If so, return to steps S101, S105, and S107 to modify or adjust relevant elements and re-form a standard module including building units, pipelines, and roads. If not, end.

[0020] Optionally, determining the positional relationship between the standard modules includes:

[0021] Based on standard modules, determine the positional relationship between process-related building structures;

[0022] Based on standard modules, determine the positional relationship between non-process related building structures;

[0023] The positional relationship between the standard modules is determined according to the positional relationship between the process-related building structures and the positional relationship between the non-process-related building structures.

[0024] Optionally, the determining of the positional relationship between process-related building structures includes the following steps:

[0025] S201, determine the location of the main buildings and structures on the site according to the site conditions;

[0026] S202, determine the orientation of subordinate structures closely related to the main structures based on the technological relationship;

[0027] S203, constructing a channel at adjacent locations of the main structure and each subordinate structure, and determining the arrangement and spacing of outdoor pipelines and roads in the channel;

[0028] S204, determining the longitudinal arrangement relationship between the main structures and each subordinate structure and the pipelines therebetween;

[0029] S205, determining the lateral position of the subordinate structures according to the foundation layout conditions and the optimal process pipelines of the main structures;

[0030] S206, process pipelines connecting main structures and subordinate structures;

[0031] S207, combining the results of step S201 to step S206, determining the positional relationship between process-related building structures.

[0032] Optionally, the step of determining the positional relationship between process-related building structures further includes the following steps:

[0033] S208, determine whether the relative position relationship between the main structure and the subordinate structure needs to be modified. If so, return to steps S202, S203, S205, and S206 to modify or adjust related elements and redefine the position relationship between process-related building monomers. If not, end.

[0034] Optionally, the determining of the positional relationship between the non-process-related building structures comprises the following steps:

[0035] S301, preliminarily determine the orientation and location of non-process related structures on the site based on the site's external conditions, overall planning and functional zoning design;

[0036] S302, constructing a channel in a position adjacent to the existing building and structure, and determining the arrangement and spacing of outdoor pipelines and roads in the channel;

[0037] S303, determining the longitudinal arrangement relationship between two adjacent structures and the pipelines therebetween;

[0038] S304, determining the lateral position of the non-process-related building or structure according to the foundation arrangement conditions;

[0039] S305, combining the results of step S301 to step S304, determining the positional relationship between the non-process related building structures.

[0040] Optionally, the step of determining the positional relationship between the non-process-related building structures further includes the following steps:

[0041] S306, determine whether the relative position relationship between the non-process related structure and the adjacent structure needs to be modified. If so, return to steps S301, S302, and S304 to modify or adjust the relevant elements and redefine the position relationship between the non-process related structure monomers. If not, end.

[0042] According to a second aspect of the present invention, there is provided a general plan intelligent layout device based on standard modules and specification requirements, comprising:

[0043] An acquisition module is used to acquire buildings, structures, pipelines and roads and their related properties and parameters;

[0044] An analysis module, connected to the acquisition module, for combining the buildings, pipelines and roads into a number of standard modules according to the buildings, pipelines and roads and their related properties and parameters;

[0045] A calculation module, connected to the analysis module, for determining the positional relationship between various standard modules according to the logical relationship and specification requirements;

[0046] The mapping module is connected to the calculation module and is used to form a general plan or layout diagram of the project based on the positional relationship between the various standard modules.

[0047] Optionally, the analysis module includes:

[0048] Modeling unit, used to establish single modules of buildings and structures;

[0049] The structure analysis unit is used to determine whether a structure is set up around the single module. If so, the additional structure is arranged around the single module and whether the spacing meets the requirements of the specification. If not, the structure position is adjusted and the spacing is judged again to meet the requirements of the specification until the requirements are met. If not, the process stops.

[0050] A category and orientation analysis unit, used to determine the category and orientation of the corresponding outdoor pipeline according to the interface information of the indoor and outdoor pipelines of the single model;

[0051] A data sorting unit, used to summarize the types and positions of the outdoor pipelines to form a summary of outdoor pipeline information in various positions of the single module;

[0052] An arrangement analysis unit, used to determine the arrangement order of outdoor pipelines in various directions of the monomer module according to a given principle based on the aggregated outdoor pipeline information in various directions of the monomer module;

[0053] Spacing analysis unit, used to determine the arrangement spacing of outdoor pipelines in all directions, and the spacing between pipelines and roads and buildings according to regulatory requirements;

[0054] The summary unit is used to integrate the processing results of the modeling unit, the structure analysis unit, the category and orientation analysis unit, the data sorting unit, the arrangement analysis unit, and the spacing analysis unit to form a standard module that includes building units, pipelines, and roads.

[0055] Optionally, the analysis module further includes:

[0056] The modification unit is used to determine whether the standard module formed in the summary unit needs to be modified. If so, the relevant elements are modified or adjusted to re-form a standard module including building units, pipelines and roads. If not, the process ends.

[0057] Optionally, the calculation module includes:

[0058] The first calculation submodule is used to determine the positional relationship between process-related building structures;

[0059] The second calculation submodule is used to determine the positional relationship between the non-process related building structures;

[0060] The calculation result summary unit is used to determine the positional relationship between the standard modules according to the positional relationship between the process-related building monomers and the positional relationship between the non-process-related building monomers.

[0061] Optionally, the first calculation submodule includes:

[0062] A first location analysis unit is used to determine the location of the main building structure in the site according to the site conditions;

[0063] The first orientation analysis unit is used to determine the orientation of the subordinate structures closely related to the main structures according to the process relationship;

[0064] The first arrangement and spacing analysis unit is used to construct a channel at adjacent locations between the main building and each subordinate building, and determine the arrangement and spacing of outdoor pipelines and roads in the channel;

[0065] The first longitudinal arrangement analysis unit is used to determine the longitudinal arrangement relationship between the main structure and each subordinate structure and the pipelines therebetween;

[0066] The first lateral position analysis unit is used to determine the lateral position of the subordinate structures according to the layout conditions, the optimization with the process pipelines of the main structures, etc.;

[0067] The first pipeline analysis unit is used to determine the process pipelines between the main structures and the subordinate structures;

[0068] The first summary unit is used to integrate the processing results of the first position analysis unit, the first orientation analysis unit, the first arrangement and spacing analysis unit, the first longitudinal arrangement analysis unit, the first transverse position analysis unit, and the first pipeline analysis unit to determine the positional relationship between the process-related building units.

[0069] Optionally, the first calculation submodule further includes:

[0070] The first modification unit is used to determine whether the relative position relationship between the main structure and the subordinate structure needs to be modified. If so, the relevant elements are modified or adjusted to redefine the position relationship between the process-related structure monomers. If not, the process ends.

[0071] Optionally, the second calculation submodule includes:

[0072] The second location analysis unit is used to preliminarily determine the orientation and location of non-process related structures on the site based on the site's external conditions, overall planning and functional zoning design;

[0073] A second arrangement and spacing analysis unit is used to construct a channel in a position adjacent to an existing building structure and determine the arrangement and spacing of outdoor pipelines and roads in the channel;

[0074] The second longitudinal arrangement analysis unit is used to determine the longitudinal arrangement relationship between two adjacent buildings and the pipelines therebetween;

[0075] A second lateral position analysis unit is used to determine the lateral position of the non-process related building and structure according to the layout conditions;

[0076] The second summarizing unit is used to determine the positional relationship between the non-process-related building structures by integrating the processing results of the second position analysis unit, the second arrangement and spacing analysis unit, the second longitudinal arrangement analysis unit, and the second transverse position analysis unit.

[0077] Optionally, the second calculation submodule further includes:

[0078] The second modification unit is used to determine whether the relative position relationship between the non-process related structure and the adjacent structure needs to be modified. If so, the relevant elements are modified or adjusted to redefine the position relationship between the non-process related structure monomers. If not, the process ends.

[0079] According to a third aspect of the present invention, there is provided a device for intelligent layout of a master plan based on standard modules and specification requirements, characterized in that it comprises a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to run the computer program to implement the method for intelligent layout of a master plan based on standard modules and specification requirements as described above.

[0080] Beneficial effects:

[0081] The method and device for intelligent layout of the master plan based on standard modules and specification requirements of the present invention can combine buildings, pipelines and roads into standard modules, and determine the positional relationship between modules according to logical relationships and specification requirements, thereby realizing intelligent master plan or layout drawing with high efficiency. In addition, the subsequent scheme optimization can be performed on the standard module as a whole, on a part of the standard module, or on an element of several standard modules, such as a pipeline or road. Compared with traditional technologies, it can realize the linkage modification or adjustment of related elements, form related design data, improve the level of intelligence, and make modification convenient and efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0082] Figure 1 It is a flow chart of a method for intelligent layout of a general plan based on standard modules and specification requirements in an embodiment of the present invention;

[0083] Figure 2 is a flow chart of forming a standard module in an embodiment of the present invention;

[0084] Figure 3 It is a flow chart of determining the positional relationship between process-related building structures in an embodiment of the present invention;

[0085] Figure 4 It is a flow chart of determining the positional relationship between non-process-related building structures in an embodiment of the present invention;

[0086] Figure 5 It is a structural schematic diagram of a general plane intelligent layout device based on standard modules and specification requirements in an embodiment of the present invention;

[0087] Figure 6 It is a structural schematic diagram of another general plan intelligent layout device based on standard modules and specification requirements in an embodiment of the present invention.

[0088] In the figure: 11 - acquisition module; 12 - analysis module; 13 - calculation module; 14 - mapping module; 21 - memory; 22 - processor. DETAILED DESCRIPTION

[0089] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings in the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the protection scope of the present invention.

[0090] It should be understood that the specific embodiments and drawings described herein are only used to explain the present invention rather than to limit the present invention.

[0091] It can be understood that, in the absence of conflict, the various embodiments of the present invention and the various features in the embodiments can be combined with each other.

[0092] It can be understood that, for the convenience of description, the drawings of the present invention only show the parts related to the present invention, while the parts irrelevant to the present invention are not shown in the drawings.

[0093] It can be understood that each unit and module involved in the embodiments of the present invention may correspond to only one physical structure, or may be composed of multiple physical structures, or multiple units and modules may be integrated into one physical structure.

[0094] It can be understood that, without conflict, the functions and steps marked in the flowcharts and block diagrams of the present invention may occur in an order different from that marked in the drawings.

[0095] It is understood that the flowcharts and block diagrams of the present invention illustrate the possible architectures, functions, and operations of the systems, devices, equipment, and methods according to the various embodiments of the present invention. Each box in the flowchart or block diagram may represent a unit, module, program segment, or code, which contains executable instructions for implementing the specified functions. Moreover, each box or combination of boxes in the block diagram and flowchart may be implemented by a hardware-based system that implements the specified functions, or may be implemented by a combination of hardware and computer instructions.

[0096] It can be understood that the units and modules involved in the embodiments of the present invention can be implemented by software or hardware. For example, the units and modules can be located in a processor.

[0097] Aiming at the problems of low efficiency and low intelligence level existing in the prior art, the present invention discloses a method for intelligent layout of the general plan based on standard modules and specification requirements, comprising:

[0098] S1, combining buildings, pipelines and roads into several standard modules according to buildings, pipelines and roads and their related properties and parameters;

[0099] S2, determine the positional relationship between each standard module according to the logical relationship and specification requirements;

[0100] S3, based on the positional relationship between each standard module, form a general plan or layout diagram of the project.

[0101] Accordingly, the present invention also discloses a general plane intelligent layout device based on standard modules and specification requirements, comprising:

[0102] An acquisition module is used to acquire buildings, structures, pipelines and roads and their related properties and parameters;

[0103] An analysis module, connected to the acquisition module, for combining the buildings, pipelines and roads into a number of standard modules according to the buildings, pipelines and roads and their related properties and parameters;

[0104] A calculation module, connected to the analysis module, for determining the positional relationship between various standard modules according to the logical relationship and specification requirements;

[0105] The mapping module is connected to the calculation module and is used to form a general plan or layout diagram of the project based on the positional relationship between the various standard modules.

[0106] Alternatively, the present invention also discloses a device for intelligent layout of the overall plan based on standard modules and specification requirements, comprising a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to implement the method for intelligent layout of the overall plan based on standard modules and specification requirements as described above.

[0107] Example 1

[0108] like Figure 1 As shown, this embodiment discloses a method for intelligent layout of a master plan based on standard modules and specification requirements, which is applied to automatically generate a master plan or layout diagram of an industrial or civil building project in a computer system or software. The method includes the following steps:

[0109] S1, combining buildings, pipelines and roads into several standard modules according to buildings, pipelines and roads and their related properties and parameters;

[0110] S2, determine the positional relationship between each standard module according to the logical relationship and specification requirements;

[0111] S3, based on the positional relationship between each standard module, form a general plan or layout diagram of the project.

[0112] In some embodiments, Figure 2 As shown, the process of forming the standard module in step S1 includes the following steps:

[0113] S101, establishing a single module of a building structure. Specifically, it can be newly established according to a single civil engineering model or drawing, or a standardized single model in an existing project can be selected, and the established single model must include indoor and outdoor pipeline interface information;

[0114] S102, according to the process requirements, determine whether a structure is set around the single module. If so, that is, there is a structure, then arrange additional structures (such as fences, pipe racks, etc.) around the single module and determine whether the spacing meets the specification requirements. If so, proceed to step S103. If not, adjust the position of the structure and determine again whether the spacing meets the specification requirements until the specification requirements are met. If not, that is, no structure is set, directly proceed to step S103;

[0115] S103, determining the type of the outdoor pipeline of the corresponding building unit and its orientation relative to the building unit according to the interface information of the indoor and outdoor pipelines of the unit model;

[0116] S104, integrating the types and orientations of the outdoor pipelines of the building units determined in step S103 to form a summary of outdoor pipeline information in various orientations of the unit modules;

[0117] S105, based on the above-summarized outdoor pipeline information of the single module in all directions (i.e., the type and direction of the outdoor pipeline of the single building), according to the given principle, determine the arrangement order of the outdoor pipelines in all directions of the single model, wherein the given principle can be the recommendation of the specification, the experience of similar projects, or the input parameters such as pipeline type (such as cable or sewage or rainwater pipe), material (such as PVC, concrete, cast iron) and cross-sectional information (such as the thickness of the pipe), or the input parameters such as road width and cross-sectional form; in this embodiment, first determine how many types of pipelines there are in the surrounding area, and then arrange the pipelines in sequence according to the order required by the specification.

[0118] S106, according to the requirements of the code on the horizontal distance of pipelines, determine the arrangement spacing of outdoor pipelines in all directions, and the spacing between pipelines and roads and buildings;

[0119] S107, synthesize the results of step S101 to step S106 to form a standard module including building monomers, pipelines and roads. Specifically, assuming that there are 10 buildings in the master plan, repeat steps S101 to S106 10 times. The standard module is a combination of building monomers, pipelines and roads and related attributes and parameters. In actual operation, the method of this embodiment can be written into a computer program, in which the pipelines of the standard module can choose whether to set and whether to display attributes.

[0120] In some embodiments, Figure 2 As shown, step S103 may also be: based on the experience of similar projects, determining the types of other pipelines that have no interface relationship with the building unit and their orientation relative to the building unit.

[0121] In some embodiments, Figure 2 As shown, the process of forming the standard module in step S1 further includes:

[0122] S108, determine whether the standard module formed in step S107 needs to be modified. If so, that is, modification is required, then return to steps S101, S105, and S107 to modify or adjust relevant elements to re-form a standard module including building units, pipelines, and roads. This step is a manual intervention step, and manual adjustment is preferably used; if not, that is, no modification is required, then end.

[0123] In some implementations, determining the positional relationship between the standard modules in step S2 includes:

[0124] Based on the standard module, determine the positional relationship between process-related building structures. For example, there are three types of buildings A, B, and C. A is a food warehouse, B is a canteen, and C is a restaurant. They must be arranged in the order of A followed by B, and B followed by C. However, this is not limited to this. The actual process sequence is stricter than this, so I will not go into details here.

[0125] Based on the standard modules, determine the positional relationship between the monomers of non-process related buildings and structures (i.e., unrelated buildings and structures, for example, the cafeteria and the office area, which have no connection with each other);

[0126] The positional relationship between the standard modules is determined according to the positional relationship between the process-related building structures and the positional relationship between the non-process-related building structures.

[0127] In some embodiments, Figure 3 As shown, the determination of the positional relationship between process-related building structures includes the following steps:

[0128] S201, according to the site conditions, including the conditions and requirements of the topography, earthquake, geology, settlement, planning and environmental protection of the industrial or civil construction project site, determine the location of the main buildings and structures in the site. For example, if the A building must be placed on stone, the site condition requires that the land is stone;

[0129] S202, determine the orientation of subordinate structures closely related to the main structures based on the technological relationship;

[0130] S203, constructing a channel at adjacent locations of two buildings (i.e., the main building and each subordinate building), and determining the arrangement and spacing of outdoor pipelines and roads in the channel;

[0131] S204, determining the longitudinal arrangement relationship (in this article, it means the direction from one structure to another structure, the same below) of two structures (i.e., the main structure and each subordinate structure) and the pipelines therebetween. For example, the canteen described above is the main structure for cooking, and there are scattered structures for cutting vegetables, washing vegetables, and serving vegetables around it;

[0132] S205, determining the horizontal (vertical to the longitudinal direction mentioned above, the same below) position of the subordinate structures based on the layout conditions of the foundation and the optimization of the process pipelines of the main structures;

[0133] S206, process pipelines connecting main structures and subordinate structures;

[0134] S207, combining the results of step S201 to step S206, determining the positional relationship between process-related building structures. Multiple buildings can be arranged on one master plan.

[0135] In some embodiments, Figure 3 As shown, the determination of the positional relationship between the process-related building structures also includes the following steps:

[0136] S208, determine whether the relative position relationship between the main structure and the subordinate structure needs to be modified. If so, it needs to be modified, then return to steps S202, S203, S205, S206, modify or adjust the relevant elements, so as to redefine the position relationship between the process-related building monomers. If not, it does not need to be modified, then end.

[0137] It should be noted that the order of step S204, step S205, and step S206 can be interchanged. After the positional relationship between the process-related building structures is determined, pipeline and road connection and data matching are performed.

[0138] By repeating the above steps S202 to S208, the positional relationship between the two building structures and the linkage modification or adjustment of the related elements related to other processes can be determined.

[0139] In some embodiments, Figure 4 As shown, the determination of the positional relationship between the non-process related building structures includes the following steps:

[0140] S301, preliminarily determine the orientation and location of non-process related structures on the site based on the site's external conditions, overall planning and functional zoning design;

[0141] S302, constructing a channel in a position adjacent to the existing building and structure, and determining the arrangement and spacing of outdoor pipelines and roads in the channel;

[0142] S303, determining the longitudinal arrangement relationship between two adjacent structures (i.e., the non-process-related structure and the adjacent structure) and the pipelines therebetween;

[0143] S304, determining the lateral position of the non-process-related building or structure based on the foundation arrangement conditions and other criteria;

[0144] S305, combining the results of step S301 to step S304, determining the positional relationship between the non-process related building structures.

[0145] In some embodiments, Figure 4 As shown, the determination of the positional relationship between the non-process-related building structures also includes the following steps:

[0146] S306, determine whether the relative position relationship between the non-process related structure and the adjacent structure needs to be modified. If so, that is, modification is required, return to steps S301, S302, and S304 to modify or adjust the relevant elements to redefine the position relationship between the non-process related building monomers. If not, that is, no modification is required, then end.

[0147] It should be noted that the order of step S304 and step S305 can be interchanged. After the positional relationship between the non-process-related building structures is determined, pipeline and road connection and data matching are performed.

[0148] By repeating the above steps S301 to S306, the positional relationship between the two building structures and the linkage modification or adjustment of the related elements related to other processes can be determined.

[0149] The master plan intelligent layout method based on standard modules and specification requirements of this embodiment can combine buildings, pipelines and roads into standard modules, and determine the positional relationship between modules according to logical relationships and specification requirements, so as to realize the intelligent and efficient drawing of master plan or layout. In addition, the subsequent scheme optimization can be performed on the standard module as a whole, on a part of the standard module, or on an element of several standard modules, such as a pipeline or road. Compared with traditional technologies, it can realize the linkage modification or adjustment of related elements, form related design data, improve the level of intelligence, and make modification convenient and efficient.

[0150] Example 2

[0151] like Figure 5 As shown, this embodiment discloses a general plan intelligent layout device based on standard modules and specification requirements, which is used to execute the general plan intelligent layout method based on standard modules and specification requirements described in Example 1, and includes:

[0152] The acquisition module 11 is used to acquire buildings, pipelines and roads and their related attributes and parameters;

[0153] An analysis module 12, connected to the acquisition module 11, is used to combine buildings, pipelines and roads into a number of standard modules according to the buildings, pipelines and roads and their related properties and parameters;

[0154] The calculation module 13 is connected to the analysis module 12 and is used to determine the positional relationship between the standard modules according to the logical relationship and specification requirements;

[0155] The mapping module 14 is connected to the calculation module 13 and is used to form a general plan or layout diagram of the project according to the positional relationship between the various standard modules.

[0156] In some embodiments, the analysis module 12 includes:

[0157] Modeling unit, used to establish the single module of building structure. Specifically, it can be newly built according to the single civil engineering model or drawings, or it can also select the standardized single model in the existing project. In addition, the established single model must include the indoor and outdoor pipeline interface information;

[0158] The structure analysis unit is used to determine whether there are structures around the single module. If so, that is, there are structures, then the additional structures (such as fences, pipe racks, etc.) around the single module are arranged, and it is determined whether the spacing meets the requirements of the specification. If not, the structure position is adjusted, and the spacing is determined again to meet the requirements of the specification until it meets the requirements of the specification. If not, that is, no structure is set, then stop;

[0159] A category and orientation analysis unit, used to determine the category of the corresponding outdoor pipeline and its orientation relative to the building unit according to the interface information of the indoor and outdoor pipelines of the unit model;

[0160] A data sorting unit is used to summarize the types of the outdoor pipelines and their orientation relative to the building unit to form a summary of outdoor pipeline information in various orientations of the unit module;

[0161] The arrangement analysis unit is used to determine the arrangement order of the outdoor pipelines in various directions of the monomer model according to the given principle based on the above-summarized outdoor pipeline information of the monomer module. Specifically, for example, the parameters of the pipelines and roads are input, including the thickness and purpose of the pipelines, the width and purpose of the roads, etc. According to the requirements of the specification (i.e. the given principle), the following are arranged from the building to the outside: cables, communication cables, water supply pipes, and sewage pipes. Among them, different types and thicknesses of pipelines have different spacing requirements, which are not detailed here.

[0162] The spacing analysis unit is used to determine the arrangement spacing of outdoor pipelines in all directions, and the spacing between pipelines and roads and buildings according to the requirements of the horizontal distance of pipelines in the specifications;

[0163] The summary unit is used to integrate the processing results of the modeling unit, the structure analysis unit, the category and orientation analysis unit, the data sorting unit, the arrangement analysis unit, and the spacing analysis unit to form a standard module containing building monomers, pipelines, and roads. The standard module is a combination of building monomers, pipelines, roads, and related attributes and parameters.

[0164] In some embodiments, the category and orientation analysis unit is further used to determine the category of other pipelines that have no interface relationship with the building unit and their orientation relative to the building unit based on experience of similar projects.

[0165] In some embodiments, the analysis module 12 further includes:

[0166] The modification unit is used to determine whether the standard module formed in the summary unit needs to be modified. If so, the relevant elements are modified or adjusted to redefine the positional relationship between the process-related building structures. If not, the process ends.

[0167] In some embodiments, Figure 5 As shown, the calculation module 13 includes:

[0168] The first calculation submodule is used to determine the positional relationship between process-related building structures;

[0169] The second calculation submodule is used to determine the positional relationship between the non-process related building structures

[0170] The calculation result summary unit is used to determine the positional relationship between the standard modules according to the positional relationship between the process-related building monomers and the positional relationship between the non-process-related building monomers.

[0171] In some more specific implementations, the first computing submodule includes:

[0172] The first location analysis unit is used to determine the location of the main buildings and structures on the site according to the site conditions, including the topography, earthquake, geology, settlement, planning and environmental protection conditions and requirements of the industrial or civil construction project site;

[0173] The first orientation analysis unit is used to determine the orientation of the subordinate structures closely related to the main structures according to the process relationship;

[0174] The first arrangement and spacing analysis unit is used to construct a channel at adjacent locations of two buildings (i.e., the main building and each subordinate building) and determine the arrangement and spacing of outdoor pipelines and roads in the channel;

[0175] The first longitudinal arrangement analysis unit is used to determine the longitudinal arrangement relationship between two structures (i.e., the main structure and each subordinate structure) and the pipelines therebetween;

[0176] The first lateral position analysis unit is used to determine the lateral position of the subordinate structures according to the layout conditions such as the foundation and the optimization of the process pipelines of the main structures;

[0177] The first pipeline analysis unit is used to determine the process pipelines between the main structures and the subordinate structures;

[0178] The first summary unit is used to integrate the processing results of the first position analysis unit, the first orientation analysis unit, the first arrangement and spacing analysis unit, the first longitudinal arrangement analysis unit, the first transverse position analysis unit, and the first pipeline analysis unit to determine the positional relationship between the process-related building units.

[0179] In some implementations, the first computing submodule further includes:

[0180] The first modification unit is used to determine whether the relative position relationship between the main building and the subordinate building needs to be modified.

[0181] If so, that is, modification is required, then the relevant elements are modified or adjusted to redefine the positional relationship between the process-related building structures. If not, that is, no modification is required, then the process ends.

[0182] In some implementations, the second computing submodule includes:

[0183] The second location analysis unit is used to preliminarily determine the orientation and location of non-process related structures on the site based on the site's external conditions, overall planning and functional zoning design;

[0184] A second arrangement and spacing analysis unit is used to construct a channel in a position adjacent to an existing building structure and determine the arrangement and spacing of outdoor pipelines and roads in the channel;

[0185] The second longitudinal arrangement analysis unit is used to determine the longitudinal arrangement relationship between two adjacent structures (i.e. the non-process related structure and the adjacent structure) and the pipelines therebetween;

[0186] A second lateral position analysis unit is used to determine the lateral position of the non-process related building and structure according to layout conditions and other criteria;

[0187] The second summarizing unit is used to determine the positional relationship between the non-process-related building structures by integrating the processing results of the second position analysis unit, the second arrangement and spacing analysis unit, the second longitudinal arrangement analysis unit, and the second transverse position analysis unit.

[0188] In some implementations, the second computing submodule further includes:

[0189] The second modification unit is used to determine whether the relative position relationship between the non-process related structure and the adjacent structure needs to be modified.

[0190] If so, that is, modification is required, then the relevant elements are modified or adjusted to redefine the positional relationship between the process-related building structures. If not, that is, no modification is required, then the process ends.

[0191] Example 3

[0192] like Figure 6 As shown, this embodiment discloses a device for intelligent layout of the overall plan based on standard modules and specification requirements, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the method for intelligent layout of the overall plan based on standard modules and specification requirements described in Example 1.

[0193] The memory 21 is connected to the processor 22. The memory 21 may be a flash memory, a read-only memory or other memory. The processor 22 may be a central processing unit or a single-chip microcomputer.

[0194] The general plane intelligent layout device based on standard modules and specification requirements disclosed in Example 2 and Example 3 is used to execute the general plane intelligent layout method based on standard modules and specification requirements described in Example 1, which can combine buildings, pipelines and roads into standard modules, and determine the positional relationship between modules according to logical relationships and specification requirements, thereby realizing intelligent general plane planning or layout drawing with high efficiency. In addition, the subsequent scheme optimization can be performed on the standard module as a whole, on a part of the standard module, or on an element of several standard modules, such as a pipeline or road. Compared with traditional technologies, it can realize the linkage modification or adjustment of related elements, form related design data, improve the level of intelligence, and make modification convenient and efficient.

[0195] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present invention, but the present invention is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.

Claims

1. A general plan intelligent layout method based on standard modules and specification requirements, characterized in that: include: S1, combining buildings, pipelines and roads into several standard modules according to buildings, pipelines and roads and their related properties and parameters; S2, determine the positional relationship between each standard module according to the logical relationship and specification requirements; S3, based on the positional relationship between each standard module, form a general plan or layout diagram of the project.

2. The method for intelligent layout of the general plan based on standard modules and specification requirements according to claim 1 is characterized in that: The formation process of the standard module includes the following steps: S101, building a single module of a building structure; S102, determining whether there are structures around the single module, If yes, then arrange additional structures around the single module and judge whether the spacing meets the specification requirements. If yes, proceed to step S103. If no, adjust the structure position and judge again whether the spacing meets the specification requirements until the specification requirements are met. If not, directly go to step S103; S103, determining the type and orientation of the corresponding outdoor pipeline according to the interface information of the indoor and outdoor pipelines of the monomer model; S104, integrating the types and orientations of the outdoor pipelines determined in step S103 to form a summary of outdoor pipeline information in various orientations of the single module; S105, based on the aggregated outdoor pipeline information of the single module in various directions, according to a given principle, determining the arrangement order of the outdoor pipelines in various directions of the single module; S106, determine the arrangement spacing of outdoor pipelines in all directions, and the spacing between pipelines and roads and buildings according to the requirements of the specifications; S107, integrating the results of step S101 to step S106 to form a standard module including building units, pipelines and roads.

3. The method for intelligent layout of the general plan based on standard modules and specification requirements according to claim 2 is characterized in that: The formation process of the standard module also includes: S108, determining whether the standard module formed in step S107 needs to be modified, If yes, then return to steps S101, S105, S107, modify or adjust the relevant elements, and re-form a standard module including building units, pipelines and roads. If not, then end.

4. The method for intelligent layout of the general plan based on standard modules and specification requirements according to any one of claims 1 to 3, characterized in that: Determining the positional relationship between the standard modules includes: Based on standard modules, determine the positional relationship between process-related building structures; Based on standard modules, determine the positional relationship between non-process related building structures; The positional relationship between the standard modules is determined according to the positional relationship between the process-related building structures and the positional relationship between the non-process-related building structures.

5. The method for intelligent layout of the general plan based on standard modules and specification requirements according to claim 4 is characterized in that: The step of determining the positional relationship between process-related building structures includes the following steps: S201, determine the location of the main buildings and structures on the site according to the site conditions; S202, determine the orientation of subordinate structures closely related to the main structures based on the technological relationship; S203, constructing a channel at adjacent locations of the main structure and each subordinate structure, and determining the arrangement and spacing of outdoor pipelines and roads in the channel; S204, determining the longitudinal arrangement relationship between the main structures and each subordinate structure and the pipelines therebetween; S205, determining the lateral position of the subordinate structures according to the foundation layout conditions and the optimal process pipelines of the main structures; S206, process pipelines connecting main structures and subordinate structures; S207, combining the results of step S201 to step S206, determining the positional relationship between process-related building structures.

6. The method for intelligent layout of the general plan based on standard modules and specification requirements according to claim 5 is characterized in that: The determination of the positional relationship between the process-related building structures also includes the following steps: S208, determining whether the relative position relationship between the main building and the subordinate building needs to be modified. If yes, then return to steps S202, S203, S205, S206, modify or adjust the relevant elements, and redefine the positional relationship between the process-related building structures. If not, then end.

7. The method for intelligent layout of the overall plan based on standard modules and specification requirements according to claim 6 is characterized in that: The step of determining the positional relationship between the non-process related building structures comprises the following steps: S301, preliminarily determine the orientation and location of non-process related structures on the site based on the site's external conditions, overall planning and functional zoning design; S302, constructing a channel in a position adjacent to the existing building and structure, and determining the arrangement and spacing of outdoor pipelines and roads in the channel; S303, determining the longitudinal arrangement relationship between two adjacent structures and the pipelines therebetween; S304, determining the lateral position of the non-process-related building or structure according to the foundation arrangement conditions; S305, combining the results of step S301 to step S304, determining the positional relationship between the non-process related building structures.

8. The method for intelligent layout of the general plan based on standard modules and specification requirements according to claim 7 is characterized in that: The determining of the positional relationship between the non-process related building structures also includes the following steps: S306, determining whether the relative position relationship between the non-process-related structure and the adjacent structure needs to be modified. If yes, then return to steps S301, S302, S304, modify or adjust the relevant elements, and redefine the positional relationship between the non-process related building structures. If not, then end.

9. An intelligent layout device for general plan based on standard modules and specification requirements, characterized in that: include: An acquisition module (11) is used to acquire buildings, structures, pipelines and roads and their related attributes and parameters; An analysis module (12), connected to the acquisition module, for combining buildings, pipelines and roads into a plurality of standard modules according to the buildings, pipelines and roads and their related properties and parameters; A calculation module (13), connected to the analysis module, for determining the positional relationship between the various standard modules according to the logical relationship and specification requirements; A mapping module (14) is connected to the calculation module and is used to form a general plan or layout diagram of the project based on the positional relationship between the various standard modules.

10. The general plan intelligent layout device based on standard modules and specification requirements according to claim 9 is characterized in that: The analysis module comprises: Modeling unit, used to establish single modules of buildings and structures; The structure analysis unit is used to determine whether there are structures around the single module. If yes, then arrange additional structures around the single module and judge whether the spacing meets the requirements of the specification. If not, adjust the structure position and judge whether the spacing meets the requirements of the specification again until it meets the requirements. If not, stop; A category and orientation analysis unit, used to determine the category and orientation of the corresponding outdoor pipeline according to the interface information of the indoor and outdoor pipelines of the single model; A data sorting unit, used to summarize the types and positions of the outdoor pipelines to form a summary of outdoor pipeline information in various positions of the single module; An arrangement analysis unit, used to determine the arrangement order of outdoor pipelines in various directions of the monomer module according to a given principle based on the aggregated outdoor pipeline information in various directions of the monomer module; Spacing analysis unit, used to determine the arrangement spacing of outdoor pipelines in all directions, and the spacing between pipelines and roads and buildings according to regulatory requirements; The summary unit is used to integrate the processing results of the modeling unit, the structure analysis unit, the category and orientation analysis unit, the data sorting unit, the arrangement analysis unit, and the spacing analysis unit to form a standard module that includes building units, pipelines, and roads.

11. The general plan intelligent layout device based on standard modules and specification requirements according to claim 10 is characterized in that: The analysis module further includes: The modification unit is used to determine whether the standard module formed in the summary unit needs to be modified. If so, the relevant elements are modified or adjusted to re-form a standard module including building structures, pipelines and roads. If not, then end.

12. The general plan intelligent layout device based on standard modules and specification requirements according to any one of claims 9 to 11, characterized in that: The computing module comprises: The first calculation submodule is used to determine the positional relationship between process-related building structures; The second calculation submodule is used to determine the positional relationship between the non-process related building structures The calculation result summary unit is used to determine the positional relationship between the standard modules according to the positional relationship between the process-related building monomers and the positional relationship between the non-process-related building monomers.

13. The general plan intelligent layout device based on standard modules and specification requirements according to claim 12 is characterized in that: The first calculation submodule includes: A first location analysis unit is used to determine the location of the main building structure in the site according to the site conditions; The first orientation analysis unit is used to determine the orientation of the subordinate structures closely related to the main structures according to the process relationship; The first arrangement and spacing analysis unit is used to construct a channel at adjacent locations between the main building and each subordinate building, and determine the arrangement and spacing of outdoor pipelines and roads in the channel; The first longitudinal arrangement analysis unit is used to determine the longitudinal arrangement relationship between the main structure and each subordinate structure and the pipelines therebetween; The first lateral position analysis unit is used to determine the lateral position of the subordinate structures according to the layout conditions, the optimization with the process pipelines of the main structures, etc.; The first pipeline analysis unit is used to determine the process pipelines between the main structures and the subordinate structures; The first summary unit is used to integrate the processing results of the first position analysis unit, the first orientation analysis unit, the first arrangement and spacing analysis unit, the first longitudinal arrangement analysis unit, the first transverse position analysis unit, and the first pipeline analysis unit to determine the positional relationship between the process-related building units.

14. The general plan intelligent layout device based on standard modules and specification requirements according to claim 13 is characterized in that: The first calculation submodule further includes: The first modification unit is used to determine whether the relative position relationship between the main building and the subordinate building needs to be modified. If so, modify or adjust the relevant elements and redefine the positional relationship between the process-related building structures. If not, then end.

15. The general plan intelligent layout device based on standard modules and specification requirements according to claim 12 is characterized in that: The second computing submodule includes: The second location analysis unit is used to preliminarily determine the orientation and location of non-process related structures on the site based on the site's external conditions, overall planning and functional zoning design; A second arrangement and spacing analysis unit is used to construct a channel in a position adjacent to an existing building structure and determine the arrangement and spacing of outdoor pipelines and roads in the channel; The second longitudinal arrangement analysis unit is used to determine the longitudinal arrangement relationship between two adjacent buildings and the pipelines therebetween; A second lateral position analysis unit is used to determine the lateral position of the non-process related building and structure according to the layout conditions; The second summarizing unit is used to determine the positional relationship between the non-process-related building structures by integrating the processing results of the second position analysis unit, the second arrangement and spacing analysis unit, the second longitudinal arrangement analysis unit, and the second transverse position analysis unit.

16. The general plan intelligent layout device based on standard modules and specification requirements according to claim 15 is characterized in that: The second calculation submodule further includes: The second modification unit is used to determine whether the relative position relationship between the non-process related structure and the adjacent structure needs to be modified. If so, modify or adjust the relevant elements and redefine the positional relationship between the non-process related building structures. If not, then end.

17. A general plan intelligent layout device based on standard modules and specification requirements, characterized in that: It comprises a memory (21) and a processor (22), wherein the memory stores a computer program, and the processor is configured to run the computer program to implement the method for intelligent layout of a general plan based on standard modules and specification requirements as described in any one of claims 1 to 8.