Environmental art design system based on BIM technology
By applying BIM technology in environmental art design, a system including data collection, model construction, design analysis and data storage is built, which solves the problems of low data accuracy, poor construction efficiency, lack of quantification and management in traditional design methods, and achieves efficient and accurate design processes and high-quality design results.
Patent Information
- Application Number
- CN202411954192.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-27
- Publication Date
- 2025-04-25
AI Technical Summary
Traditional environmental art design methods have problems such as low data collection accuracy, cumbersome model construction, lack of quantitative indicators for design analysis and chaotic data management, which is difficult to meet the complex and diverse design needs.
The environmental art design system based on BIM technology is adopted, including data acquisition units, model construction units, design analysis units and data storage units. Through preliminary quantification of data, the introduction of parameterized design, deep learning algorithm optimization and blockchain technology storage, the accuracy of data acquisition, the efficiency of model construction, the scientificization of design analysis and the standardization of data management.
It improves data acquisition accuracy and model construction efficiency, realizes rapid acquisition of quantitative design analysis results and efficient data management, and significantly improves design quality and efficiency.
Smart Images

Figure CN119885372A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of application of building information model (BIM) in environmental art design, and more specifically, particularly relates to an environmental art design system based on BIM technology. Background Art
[0002] With the acceleration of urbanization and the continuous improvement of people's requirements for the quality of living environment, environmental art design has become increasingly important in shaping comfortable, beautiful and functional spaces. Traditional environmental art design methods usually rely on the designer's experience, hand-drawn sketches and simple two-dimensional or three-dimensional modeling software, which has many limitations in data collection, model construction, design analysis and data management.
[0003] In the data collection stage, traditional methods often have low accuracy and cannot accurately obtain key information such as space size, material properties, and pedestrian flow, resulting in an insufficiently solid design foundation. The model building process is cumbersome and time-consuming, and it is difficult to respond to design modifications in real time, which limits the designer's creativity and efficiency. Design analysis relies heavily on subjective judgment, lacks quantitative indicators and scientific evaluation methods, and is difficult to accurately evaluate the pros and cons of design solutions. In addition, data storage is scattered and chaotic, and it is difficult to find and manage, which can easily cause data loss or damage, affecting the continuity and reliability of design work.
[0004] In recent years, Building Information Modeling (BIM) technology has made significant progress in the field of architectural design, but its application in environmental art design still needs to be further deepened and optimized. In order to overcome the shortcomings of traditional design methods, meet the increasingly complex and diverse needs of environmental art design, and improve design efficiency and quality, it is necessary to develop an innovative environmental art design system based on BIM technology to achieve accurate data collection, efficient model construction, scientific design analysis, and standardized data management. Summary of the invention
[0005] In order to solve the above technical problems, the present invention provides an environmental art design system based on BIM technology to solve the above problems.
[0006] An environmental art design system based on BIM technology, comprising a data acquisition unit, a model building unit, a design analysis unit and a data storage unit, wherein the environmental data collected by the data acquisition unit includes space size D, material attribute M, human flow P and environmental noise value N, and the collected data is preliminarily quantified by formula F1=0.25D+0.4M+0.2P+0.15N;
[0007] The model construction unit constructs an initial BIM model based on the quantified data. The construction process follows the formula V = k × F1, where k is the construction coefficient, k > 0, and the concept of parametric design is introduced during model construction to improve the adjustability of the model.
[0008] Preferably, the design analysis unit analyzes the initial BIM model and calculates the evaluation value through the formula E = a × S + b × C + c × A, where E is the evaluation value, S is the space utilization efficiency, C is the cost, A is the artistic innovation, a, b, and c are preset weights, and 0 < a < 1, 0 < b < 1, 0 < c < 1, a + b + c = 1. At the same time, the design analysis unit uses deep learning algorithms to generate automatic optimization suggestions for the model.
[0009] Preferably, the data storage unit is used to store the collected data, the constructed model, and the analysis results. The storage capacity is at least 10000GB. The data storage follows the formula T = c × N + d × L + e × B, where T is the storage time, N is the data volume, L is the data length, B is the number of data backups, and c, d, and e are storage coefficients, and c > 0, d > 0, e > 0. The data storage unit uses blockchain technology to ensure the security and immutability of the data.
[0010] Preferably, in the data collection unit, the collection accuracy of the spatial dimensions reaches 0.005 meters, the classification of material properties is not less than 30 types, the statistical error of the pedestrian flow does not exceed 5%, and the collection accuracy of the environmental noise value is 1 decibel.
[0011] Preferably, the time taken by the model construction unit to construct the initial BIM model does not exceed 20 minutes, and it can be synchronously updated according to the user's real-time modifications, with an update delay not exceeding 1 second.
[0012] Preferably, the design analysis unit gives the evaluation results within 5 minutes. The evaluation results include detailed quantitative indicators and visual charts, and can simulate the design effects at different time periods.
[0013] Preferably, the data reading speed of the data storage unit is not lower than 800MB / s, the data compression ratio is not lower than 50%, and it has the function of automatically cleaning expired data.
[0014] Preferably, the data collection unit supports both automatic collection and manual input methods, and the accuracy of automatic collection is not lower than 98%. At the same time, it supports multi-source data fusion, including geographical information data and meteorological data.
[0015] Preferably, the model construction unit can display the construction progress in real time, and the error of the progress display does not exceed 3%. It can also export model files in multiple formats, such as OBJ, FBX, etc.
[0016] Preferably, the design analysis unit has the function of performing comparative analysis with historical design cases, with no less than 100 groups of comparative data, and can automatically identify the advantages and disadvantages of similar design projects to provide a reference for the current design.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] 1. Improve data collection accuracy: The data collection unit of the present invention can accurately collect multiple data such as space dimensions, material properties, human flow and environmental noise values. The space dimension collection accuracy can reach 0.005 meters, the human flow statistical error does not exceed 5%, and the environmental noise value collection accuracy is 1 decibel, providing an accurate and comprehensive data basis for environmental art design.
[0019] 2. Accelerate model construction: The model construction unit can complete the construction of the initial BIM model within 20 minutes, and can quickly synchronize and update according to the user's real-time modifications. The update delay is as low as less than 1 second, which greatly improves the design efficiency and shortens the design cycle.
[0020] 3. Accurate design analysis: The design analysis unit uses innovative formulas and algorithms to provide quantitative evaluation results in multiple dimensions, including space utilization efficiency, cost, and artistic innovation, within 5 minutes. It can also simulate the design effects in different scenarios, providing a scientific and accurate basis for design decisions.
[0021] 4. Optimize data storage: The data storage unit has a large storage capacity of at least 10,000GB, a data reading speed of no less than 500MB / s, a high compression ratio, and uses blockchain technology to ensure data security and non-tamperability, achieving efficient and secure data management.
[0022] 5. Enhance design flexibility: Introducing parametric design concepts in the model building process, supporting real-time modification and synchronous updates, allowing designers to adjust design plans more flexibly to meet diverse design needs.
[0023] 6. Improve design innovation: Use deep learning algorithms to automatically generate optimization suggestions, combined with artistic innovation evaluation, to help inspire designers’ creativity and enhance the uniqueness and artistry of design works.
[0024] 7. Ensure data security: The data storage unit adopts blockchain technology to effectively prevent data tampering and loss, ensuring the integrity and reliability of data during the design process.
[0025] 8. Improve industry competitiveness: Compared with traditional design methods, this invention significantly improves the efficiency and quality of environmental art design, and can help design teams stand out in market competition and undertake more high-quality design projects.
[0026] 9. Promote sustainable development: Through precise data analysis and optimized design, while meeting artistic requirements, it can better consider resource utilization and cost control, and promote the sustainable development of environmental art design. Brief Description of the Drawings
[0027] Figure 1 It is a schematic diagram of the system of the present invention. Detailed Embodiments
[0028] The following further describes the embodiments of the present invention in detail in conjunction with the drawings and embodiments. The following embodiments are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0029] The environmental art design system based on BIM technology plays an increasingly important role in the modern design field. The system provided by the present invention significantly improves the efficiency and quality of environmental art design through innovative data collection, model construction, design analysis, and data storage methods.
[0030] An environmental art design system based on BIM technology includes a data collection unit, a model construction unit, a design analysis unit, and a data storage unit. The environmental data collected by the data collection unit includes spatial dimension D, material property M, pedestrian flow P, and environmental noise value N. The collected data is preliminarily quantified through the formula F1 = 0.25D + 0.4M + 0.2P + 0.15N.
[0031] The model construction unit constructs an initial BIM model according to the quantified data, and the construction process follows the formula V = k × F1, where k is a construction coefficient and k > 0.
[0032] The design analysis unit analyzes the initial BIM model, calculates the evaluation value through the formula E = a × S + b × C + c × A, where E is the evaluation value, S is the space utilization efficiency, C is the cost, A is the artistic innovation, a, b, c are preset weights, and 0 < a < 1, 0 < b < 1, 0 < c < 1, a + b + c = 1. At the same time, the design analysis unit uses a deep learning algorithm to generate automatic optimization suggestions for the model.
[0033] The data storage unit stores the collected data, the constructed model, and the analysis results. The storage capacity is at least 10000GB. The data storage follows the formula T = c × N + d × L + e × B, where T is the storage time, N is the data volume, L is the data length, B is the number of data backups, c, d, e are storage coefficients, and c > 0, d > 0, e > 0. The data storage unit uses blockchain technology.
[0034] In the data collection unit, the collection accuracy of spatial dimensions reaches 0.005 meters, the classification of material properties is no less than 30 types, the statistical error of pedestrian flow does not exceed 5%, the collection accuracy of environmental noise value is 1 decibel, and the model construction unit takes no more than 20 minutes to build the initial BIM model, and can be updated synchronously according to the user's real-time modifications, with an update delay of no more than 1 second.
[0035] The design analysis unit gives the evaluation results within 5 minutes. The evaluation results include detailed quantitative indicators and visual charts, and can simulate the design effects in different time periods. The data storage unit has a data reading speed of not less than 800MB / s, a data compression ratio of not less than 50%, and has the function of automatically cleaning up expired data. The data acquisition unit supports both automatic acquisition and manual input, and the accuracy of automatic acquisition is not less than 98%. It also supports multi-source data fusion, including geographic information data and meteorological data. The model construction unit displays the construction progress in real time, and the error of the progress display does not exceed 3%, and model files in multiple formats can be exported. The design analysis unit has the function of comparative analysis with historical design cases, with no less than 100 groups of comparative data.
[0036] The application and effect of the present invention will be described in detail below through specific embodiments, and compared with the traditional design method.
[0037] Example 1, urban park landscape design:
[0038] Data collection:
[0039] Using laser rangefinders and 3D scanners, the spatial dimensions of the park, including terrain undulations, road widths, and building heights, were accurately captured with an accuracy of 0.005 meters.
[0040] Classify and record the properties of various materials in the park, such as stone, wood, metal, etc., with more than 30 categories;
[0041] The flow of people in different time periods is counted by crowd flow monitoring equipment, and the statistical error is controlled within 5%;
[0042] A noise monitor is used to collect environmental noise values with an accuracy of 1 decibel.
[0043] Model construction:
[0044] Based on the collected data, the model building unit built the initial BIM model within 18 minutes. Parametric design was introduced into the model, such as adjustable plant layout and number of seats;
[0045] During the design process, the model is modified in real time according to customer needs, and the synchronization update delay is only 0.5 seconds;
[0046] Design Analysis:
[0047] The design analysis unit gave the evaluation results within 4 minutes, including a space utilization efficiency of 85%, a cost budget of 5 million yuan, and an artistic innovation score of 80 points (out of 100 points);
[0048] Simulate park landscape effects in different seasons and time periods, such as shading effects in summer and lighting effects at night.
[0049] Data Storage:
[0050] All data and models are stored in a data storage unit with a storage capacity of 8000GB;
[0051] The data reading speed reaches 700MB / s and the compression ratio is 45%.
[0052] Example 2, Commercial Pedestrian Street Design:
[0053] Data collection:
[0054] High-precision GPS equipment and image recognition technology are used to obtain the spatial dimensions and material properties of the pedestrian street. The spatial dimension acquisition accuracy reaches 0.004 meters, and the material property classification reaches 35 types;
[0055] Use smart surveillance cameras to count the flow of people, with an error of no more than 4%;
[0056] Noise sensors are installed to collect environmental noise values with an accuracy of 0.8 decibels.
[0057] Model construction:
[0058] The model building unit completes the initial BIM model building within 15 minutes and can respond to the designer’s changes to the store layout and facade in real time, with an update delay of no more than 0.8 seconds;
[0059] Design Analysis:
[0060] The design analysis unit gave an evaluation report within 3 minutes, with a space utilization efficiency of 90%, a cost of 8 million yuan, and an artistic innovation score of 85 points;
[0061] Simulate the atmosphere and visual effects of the pedestrian street under different weather conditions.
[0062] Data Storage:
[0063] The data storage unit stores all the data of this design, with a total capacity of 9000GB;
[0064] The data reading speed is 750MB / s and the compression ratio is 50%.
[0065] Example 3, residential area landscape design:
[0066] Data collection:
[0067] The combination of drone mapping and ground measurement was used to obtain the topography, green area and public facilities size of the community, with a spatial dimension accuracy of 0.006 meters;
[0068] Detailed record of the properties of various materials in the community, with 32 types of material classifications;
[0069] Through the access control system and mobile devices to locate and count the flow of people, the error is controlled within 3%;
[0070] The environmental noise value is collected with the help of professional noise detection equipment with an accuracy of 1.2 decibels.
[0071] Model construction:
[0072] The model building unit generates the initial BIM model within 19 minutes and supports dynamic adjustment of community landscape elements such as fountains and sculptures, with an update delay of 0.6 seconds.
[0073] Design Analysis:
[0074] The design analysis unit gave the evaluation results within 4.5 minutes, with a space utilization efficiency of 88%, a cost budget of 6 million yuan, and an artistic innovation score of 78 points;
[0075] Simulate the changes in light and shadow and residents' activities in the community at different time periods.
[0076] Data Storage:
[0077] The data storage unit stores relevant data, with a capacity of 7500GB;
[0078] The data reading speed is about 650MB / s, and the compression ratio is 48%.
[0079] In order to more intuitively demonstrate the advantages of the environmental art design system based on BIM technology of the present invention, the following comparison is set to compare with the traditional design method.
[0080] Comparative Example 1, Traditional Urban Park Landscape Design:
[0081] Data collection:
[0082] Using conventional measuring tools, such as tape measures and levels, the spatial dimension acquisition accuracy is about 0.1 meters;
[0083] The material attribute classification is relatively rough, with about 10 types;
[0084] The flow of people is estimated manually, which has a large error of about 20%;
[0085] Ambient noise values were not collected.
[0086] Model construction:
[0087] It took about 2 days to build the model based on hand sketches and simple 3D modeling software;
[0088] The model is difficult to modify and cannot be updated in real time.
[0089] Design Analysis:
[0090] The evaluation relies on the designer's experience, lacks quantitative indicators and simulation effects, and takes a long time, about 1 week.
[0091] Data Storage:
[0092] Data is stored in a decentralized manner in the form of paper files and electronic documents, making it difficult to find and manage.
[0093] Comparative Example 2, Traditional Commercial Pedestrian Street Design:
[0094] Data collection:
[0095] Mainly relying on manual measurement, the spatial dimension accuracy is about 0.08 meters;
[0096] There are about 15 types of material attributes;
[0097] The flow of people is counted through sampling survey, with an error of about 15%;
[0098] Ambient noise values were not systematically collected.
[0099] Model construction:
[0100] Using general 3D modeling software, it took about 3 days to build the initial model;
[0101] Model modification is complicated and updates are not timely.
[0102] Design Analysis:
[0103] The evaluation mainly relies on qualitative analysis and takes about 10 days, which makes it difficult to accurately evaluate the efficiency of space utilization and artistic innovation.
[0104] Data Storage:
[0105] Data storage is chaotic and lacks unified management.
[0106] Comparative Example 3, Traditional Residential Community Landscape Design:
[0107] Data collection:
[0108] With the help of simple measuring tools, the spatial dimension accuracy is about 0.07 meters;
[0109] There are about 12 types of material attributes;
[0110] The method of counting people flow is inaccurate, with an error of about 18%;
[0111] No environmental noise value was collected.
[0112] Model construction:
[0113] Using traditional modeling techniques, it takes about 2.5 days to build the model;
[0114] Model adjustments are difficult and updates are slow.
[0115] Design Analysis:
[0116] It mainly relies on subjective judgment, the evaluation period is about 8 days, and it is impossible to provide quantitative evaluation results. Data storage:
[0117] Data storage is scattered and prone to loss and damage.
[0118]
[0119]
[0120]
[0121] From the above data comparison, it can be seen that the environmental art design system based on BIM technology of the present invention is obviously superior to the traditional design method in terms of data collection accuracy, model construction efficiency, design analysis speed and accuracy, and data management.
[0122] In the implementation, it is possible to accurately collect various environmental data, quickly build and update the BIM model in real time, and provide quantitative design analysis results in a short time, providing designers with accurate and efficient design tools. At the same time, powerful data storage and management functions ensure the security and convenience of data.
[0123] In the comparison example, the traditional design method has problems such as low data collection accuracy, difficulty in model construction and modification, lack of quantitative indicators and long time consumption in design analysis, and chaotic data storage and management, which seriously affect the design quality and efficiency.
[0124] In terms of data collection, high-precision spatial dimension measurement, rich and detailed material attribute classification, accurate human flow statistics and inclusion of environmental noise values provide comprehensive and accurate basic information for design. This is in sharp contrast to the rough data collection methods in traditional design methods, overcoming the defects of inaccurate and incomplete data in traditional methods, making the design basis more scientific and reliable.
[0125] In the model building phase, the system of the present invention realizes fast and efficient model generation and can respond to modifications in real time, greatly shortening the design cycle and improving work efficiency. The drawbacks of the traditional design of long modeling process and difficulty in real-time updating have been fundamentally improved here, and designers can explore and optimize design solutions more flexibly to meet customer demand changes in a timely manner.
[0126] In terms of design analysis, this system can provide quantitative evaluation results in multiple dimensions including space utilization efficiency, cost budget and artistic innovation in a short period of time, and simulate various scenarios at the same time, providing strong support for design decisions. In contrast, traditional design mainly relies on experience and subjective judgment, lacks accurate quantitative evaluation and simulation effect display, resulting in insufficient scientificity and accuracy of design decisions.
[0127] In terms of data storage, the system of the present invention not only has large-capacity storage capacity, but also achieves high-speed reading and high compression ratio, while ensuring data security and convenient management. The traditional data storage method is scattered and chaotic, which is not only difficult to find and manage, but also prone to the risk of data loss and damage.
[0128] In general, the environmental art design system of the present invention has achieved full process optimization and innovation from data collection to design analysis to results display and data storage by relying on the powerful functions of BIM technology. It has brought a new working mode and higher design quality to the field of environmental art design, and can better meet customers' diverse and high-quality needs for environmental art design.
[0129] In the future development, with the continuous advancement and application expansion of BIM technology, the system of the present invention is expected to further integrate more advanced technologies, such as artificial intelligence-assisted design, virtual reality immersive experience, etc., to create more possibilities for environmental art design. At the same time, we also expect that this system can be applied and verified in a wider range of practical projects, and continuously promote the environmental art design industry to move towards digitalization, intelligence, and efficiency, and contribute to creating a better living environment and urban landscape.
[0130] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. An environmental art design system based on BIM technology, comprising a data acquisition unit, a model building unit, a design analysis unit and a data storage unit, characterized in that: The environmental data collected by the data acquisition unit includes the spatial dimension D, material property M, pedestrian flow P, and environmental noise value N. The collected data is preliminarily quantified through the formula F1 = 0.25D + 0.4M + 0.2P + 0.15N; The model construction unit constructs an initial BIM model based on the quantified data. The construction process follows the formula V = k × F1, where k is the construction coefficient and k > 0.
2. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: The design analysis unit analyzes the initial BIM model and calculates the evaluation value through the formula E = a × S + b × C + c × A, where E is the evaluation value, S is the space utilization efficiency, C is the cost, A is the artistic innovation, and a, b, c are preset weights, and 0 < a < 1, 0 < b < 1, 0 < c < 1, a + b + c = 1. At the same time, the design analysis unit uses deep learning algorithms to generate automatic optimization suggestions for the model.
3. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: The data storage unit stores the collected data, constructed models, and analysis results. The storage capacity is at least 10000GB. The data storage follows the formula T = c × N + d × L + e × B, where T is the storage time, N is the data volume, L is the data length, B is the number of data backups, and c, d, e are storage coefficients, and c > 0, d > 0, e > 0. The data storage unit uses blockchain technology.
4. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: In the data acquisition unit, the acquisition accuracy of the spatial dimension reaches 0.005 meters, the classification of material properties is not less than 30 types, the statistical error of the pedestrian flow does not exceed 5%, and the acquisition accuracy of the environmental noise value is 1 decibel.
5. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: The time for the model construction unit to construct the initial BIM model does not exceed 20 minutes, and it can be synchronously updated according to the user's real-time modification, and the update delay does not exceed 1 second.
6. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: The design analysis unit gives the evaluation results within 5 minutes. The evaluation results include detailed quantitative indicators and visualization charts, and can simulate the design effects at different time periods.
7. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: The data reading speed of the data storage unit is not less than 800MB / s, the data compression ratio is not less than 50%, and it has the function of automatically cleaning expired data.
8. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: The data acquisition unit supports two methods: automatic acquisition and manual input, and the accuracy of automatic acquisition is not less than 98%. At the same time, it supports multi-source data fusion, including geographic information data and meteorological data.
9. The environmental art design system based on BIM technology as claimed in claim 1, characterized in that: The model construction unit displays the construction progress in real time, and the error of the progress display does not exceed 3%, and it can export model files in multiple formats.