Intelligent construction informatization comprehensive management cloud platform based on BIM and GIS
By integrating BIM and GIS technologies in the construction industry, the intelligent construction information-based comprehensive management cloud platform has been developed, and the problem of insufficient data integration and real-time monitoring capabilities in the existing technology has been solved, efficient project management and real-time monitoring of construction sites have been achieved, and management quality and safety level have been improved.
Patent Information
- Application Number
- CN202411901330.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-04-25
AI Technical Summary
The lack of effective data integration and real-time monitoring capabilities in the construction industry in the existing technology has led to inefficient project management, difficulty in cost control, and frequent safety and quality problems.
By integrating BIM and GIS technologies, an intelligent construction information-based comprehensive management cloud platform is developed to achieve in-depth data integration and real-time monitoring. The platform includes a data processing center, data fusion module, intelligent decision support system, real-time monitoring module, project management module and mobile applications, and provides functions such as three-dimensional visualization, spatial analysis, construction progress prediction, real-time monitoring and refined management.
It improves the efficiency and quality of project management, realizes real-time monitoring and digital twins at the construction site, reduces costs, improves the level of safety management, and improves the efficiency and response speed of on-site management through mobile applications.
Smart Images

Figure CN119886420A_ABST
Abstract
Description
Technical Field
[0001] The present invention provides a comprehensive management cloud platform, which belongs to the technical field of intelligent construction, and in particular relates to an intelligent construction information comprehensive management cloud platform based on BIM and GIS. Background Art
[0002] The intelligent construction information integrated management cloud platform is an online system that integrates a variety of information technologies, aiming to provide comprehensive management solutions for the construction industry. Through cloud computing technology, the platform integrates project management, resource scheduling, construction monitoring, data analysis and decision support functions into a unified interface to achieve information management of the entire project life cycle. It supports remote monitoring of construction sites, optimizes resource allocation, improves construction efficiency and quality, and reduces costs and risks.
[0003] With the rapid development of the construction industry, traditional construction management methods can no longer meet the needs of modern project management. Existing technical solutions often lack effective data integration and real-time monitoring capabilities, resulting in inefficient project management, difficult cost control, and frequent safety and quality issues. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides an intelligent construction information comprehensive management cloud platform based on BIM and GIS. The platform realizes deep integration and real-time monitoring of data by integrating BIM and GIS technologies, thereby improving the efficiency and quality of project management.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a BIM and GIS-based intelligent construction information integrated management cloud platform, the platform comprising:
[0006] An integrated data processing center for storing and managing BIM model data and GIS spatial data;
[0007] Data fusion module, used to deeply integrate BIM model data and GIS spatial data to achieve three-dimensional visualization and spatial analysis;
[0008] Intelligent decision support system, which is used to provide prediction and optimization suggestions on construction progress, cost, quality and safety based on fused data;
[0009] Real-time monitoring module, which is used to collect real-time data of the construction site through IoT technology and associate it with the BIM model to realize the digital twin of the construction site;
[0010] The project management module is used to manage drawings, contracts, progress and other information during the construction process, and is associated with the BIM model to achieve refined management of the construction process;
[0011] Mobile applications are used by field personnel to access the platform through mobile devices to collect field data and receive task instructions to improve field management efficiency.
[0012] Preferably: the data fusion module includes:
[0013] Coordinate conversion tool, used to convert spatial data from different sources into a unified coordinate system to achieve accurate data overlay;
[0014] Data matching algorithm is used to identify and match components in the BIM model with geographic features in GIS data to achieve seamless data integration.
[0015] Preferably: the intelligent decision support system comprises:
[0016] Predictive models to predict problems that may arise during construction based on historical data and current trends;
[0017] The optimization algorithm is used to propose optimization suggestions for construction plans to reduce construction changes, shorten construction periods, control costs, and improve project construction quality.
[0018] Preferably: the real-time monitoring module includes:
[0019] IoT monitoring system, used to monitor personnel, equipment, materials, safety, quality, and environment at the construction site, and provide real-time feedback of monitoring data;
[0020] AI recognition system is used to analyze monitoring data, automatically identify potential risks and problems, and generate early warnings.
[0021] Preferably: the project management module includes:
[0022] Document management system, which is used to store and manage all documents generated during the construction process and associate them with components in the BIM model to enable rapid retrieval and use of documents;
[0023] Progress tracking system, used to track construction progress and compare it with the progress of components in the BIM model to ensure that construction proceeds as planned.
[0024] Preferably: the mobile application includes:
[0025] On-site data collection tools, used by on-site personnel to collect construction data through mobile devices and upload it to the cloud platform in real time;
[0026] Task scheduling system is used to distribute tasks and instructions to field personnel and track the execution of tasks.
[0027] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0028] The present invention improves the efficiency and quality of project management and reduces costs. It realizes real-time monitoring and digital twinning of the construction site and improves the level of safety management. Through mobile applications, it improves the work efficiency and response speed of on-site personnel. Through the deep integration of BIM and GIS data, it realizes more accurate spatial analysis and decision support.
[0029] Other advantages, objectives and features of the present invention will be set forth in part in the following description and, in part, will be apparent to those skilled in the art based on an examination of the following or may be taught from the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 This is a schematic diagram of the overall architecture of an intelligent construction information integrated management cloud platform based on BIM and GIS in the present invention;
[0031] Figure 2 This is a workflow diagram of a data fusion module of an intelligent construction information integrated management cloud platform based on BIM and GIS in the present invention;
[0032] Figure 3 This is a functional block diagram of an intelligent decision support system for an intelligent construction information integrated management cloud platform based on BIM and GIS in the present invention;
[0033] Figure 4 This is a system architecture diagram of a real-time monitoring module of an intelligent construction information integrated management cloud platform based on BIM and GIS in the present invention;
[0034] Figure 5 This is a user interface schematic diagram of a project management module of an intelligent construction information integrated management cloud platform based on BIM and GIS in the present invention. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] It should be noted that the terms “vertical”, “horizontal”, “up”, “down”, “left”, “right” and similar expressions used in this document are only for illustrative purposes and do not represent the only implementation method.
[0037] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs; the terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention; the term "and / or" used herein includes any and all combinations of one or more related listed items.
[0038] like Figure 1 and Figure 2 As shown in the figure, the integrated data processing center is used to store and manage BIM model data and GIS spatial data; the data fusion module is used to deeply fuse BIM model data and GIS spatial data to achieve three-dimensional visualization and spatial analysis; the intelligent decision support system is used to provide predictions and optimization suggestions for construction progress, cost, quality and safety based on the fused data; the real-time monitoring module is used to collect real-time data of the construction site through the Internet of Things technology and associate it with the BIM model to realize the digital twin of the construction site; the project management module is used to manage the drawings, contracts, progress and other information during the construction process, and associate it with the BIM model to achieve refined management of the construction process; the mobile application is used for on-site personnel to access the platform through mobile devices to collect on-site data and receive task instructions to improve on-site management efficiency.
[0039] In this implementation scheme, the data fusion module ensures the precise matching and integration of BIM and GIS data through advanced algorithms, so that the platform can provide accurate spatial analysis and decision support. The intelligent decision support system uses big data analysis and machine learning technology to monitor and predict the key indicators of the project in real time, thereby helping project managers make more scientific decisions. The real-time monitoring module collects information such as environment, equipment status and operation progress in real time through sensors and cameras deployed at the construction site, and processes and analyzes it through the cloud platform to ensure construction safety and quality control. The project management module realizes the centralized storage and rapid retrieval of project documents, as well as the real-time tracking and adjustment of construction progress through integrated project management tools, greatly improving the efficiency and transparency of project management. The mobile application provides a convenient interface for field staff, enabling them to access project information, submit field reports and receive updated task instructions anytime and anywhere, thereby realizing instant response and flexible scheduling of field management. In actual applications, the platform can be deployed through the infrastructure of cloud service providers, ensuring high availability and scalability of data processing. At the same time, the security design of the platform follows industry standards, including data encryption, access control and audit logs, to protect the integrity and privacy of project data. In addition, the platform also provides an API interface, allowing third-party applications and services to integrate with the platform, further expanding the platform's functionality and application scope.
[0040] like Figure 3 , 4As shown in Figure 5, the data fusion module includes a coordinate conversion tool for converting spatial data from different sources into a unified coordinate system to achieve accurate data superposition; a data matching algorithm for identifying and matching components in the BIM model with geographic features in GIS data to achieve seamless data integration. The intelligent decision support system includes a prediction model for predicting possible problems in the construction process based on historical data and current trends; an optimization algorithm for proposing optimization suggestions for the construction plan to reduce construction changes, shorten construction periods, control costs, and improve project construction quality. The real-time monitoring module includes an IoT monitoring system for monitoring personnel, equipment, materials, safety, quality, and environment at the construction site, and providing real-time feedback on monitoring data; an AI recognition system for analyzing monitoring data, automatically identifying potential risks and problems, and generating warnings. The project management module includes a document management system for storing and managing all documents generated during the construction process, and associating them with components in the BIM model to achieve rapid retrieval and use of documents; a progress tracking system for tracking construction progress and comparing it with the progress of components in the BIM model to ensure that construction proceeds as planned. Mobile applications include field data collection tools, which are used by field personnel to collect construction data through mobile devices and upload them to the cloud platform in real time; task scheduling systems, which are used to distribute tasks and instructions to field personnel and track the execution of tasks.
[0041] In this implementation scheme, the coordinate conversion tool of the data fusion module can process various spatial data formats to ensure that data from different sources can be accurately superimposed in the same coordinate system, which is crucial for subsequent spatial analysis and decision-making. The data matching algorithm automatically matches the components in the BIM model with the geographic features in the GIS data through intelligent recognition technology, greatly improving the efficiency and accuracy of data integration. The prediction model in the intelligent decision support system can analyze historical construction data and current construction trends, predict possible delays, cost overruns, safety accidents and other problems, and provide timely warnings. The optimization algorithm proposes specific construction plan optimization suggestions based on the prediction results and project goals to help project managers make more reasonable decisions. The IoT monitoring system in the real-time monitoring module collects various data from the construction site in real time through sensors and monitoring equipment deployed at the construction site, and processes and analyzes them through the cloud platform. The AI recognition system uses advanced image recognition and data analysis technology to automatically identify abnormal situations in the monitoring data, such as safety hazards, quality problems, etc., and generates warning information in a timely manner to remind project managers to take corresponding measures. The document management system in the project management module provides a centralized storage and management system for project documents, making the management of project documents more standardized and efficient. The progress tracking system integrates with the BIM model to update the construction progress in real time and compare it with the planned progress to ensure that the project is progressing as planned. The mobile application provides a convenient mobile work platform for on-site personnel. The on-site data collection tool enables on-site personnel to quickly collect construction data and upload it to the cloud platform in real time, improving the efficiency of data collection. The task scheduling system enables on-site personnel to receive task instructions in a timely manner and provide feedback on task execution, improving the response speed and flexibility of on-site management.
[0042] When in use, the BIM model data and GIS spatial data are first stored and managed through the integrated data processing center, and then the data fusion module deeply fuses these data, and uses the coordinate conversion tool to convert the spatial data from different sources into a unified coordinate system to achieve accurate superposition, and uses the data matching algorithm to identify and match the components in the BIM model with the geographic features in the GIS data to achieve seamless integration; then, the intelligent decision support system provides predictions and optimization suggestions for construction progress, cost, quality and safety based on the fused data. The prediction model analyzes historical data and current trends to predict possible problems during the construction process, and the optimization algorithm proposes construction plan optimization suggestions to reduce construction changes, shorten construction period, control costs, and improve project construction quality; at the same time, the real-time monitoring module collects real-time data from the construction site through the Internet of Things technology, and associates it with the BIM model to realize the digital twin of the construction site. The Internet of Things monitoring system monitors the personnel, equipment, materials, safety, quality, and environment of the construction site, and feeds back the monitoring data in real time, and the AI recognition system analyzes the monitoring data The BIM module can automatically identify potential risks and problems and generate early warnings. In addition, the project management module manages drawings, contracts, progress and other information during the construction process, and associates them with the BIM model to achieve refined management of the construction process. The document management system stores and manages all documents generated during the construction process, and associates them with components in the BIM model to achieve rapid retrieval and use of documents. The progress tracking system tracks the construction progress and compares it with the progress of components in the BIM model to ensure that the construction proceeds as planned. Finally, the mobile application provides on-site personnel with on-site data collection tools and task scheduling systems, enabling them to collect construction data through mobile devices and upload it to the cloud platform in real time, as well as receive task instructions and provide feedback on task execution, thereby improving on-site management efficiency. The entire platform is deployed through the infrastructure of the cloud service provider to ensure high availability and scalability of data processing, and follows industry-standard security designs to protect the integrity and privacy of project data. At the same time, it provides an API interface to allow third-party applications and services to be integrated with the platform, further expanding the platform's functions and application scope.
[0043] Although the present invention has been disclosed as above in the form of a preferred embodiment, it is not intended to limit the present invention. Anyone familiar with this technology can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the scope of protection of the present invention should be based on the definition of the claims.
Claims
1. A BIM and GIS-based intelligent construction information integrated management cloud platform, characterized by: The platform includes: An integrated data processing center for storing and managing BIM model data and GIS spatial data; Data fusion module, used to deeply integrate BIM model data and GIS spatial data to achieve three-dimensional visualization and spatial analysis; Intelligent decision support system, used to provide prediction and optimization suggestions for construction progress, cost, quality and safety based on fused data; real-time monitoring module, used to collect real-time data of the construction site through IoT technology and associate it with the BIM model to realize the digital twin of the construction site; The project management module is used to manage drawings, contracts, progress and other information during the construction process, and is associated with the BIM model to achieve refined management of the construction process; Mobile applications are used by field personnel to access the platform through mobile devices to collect field data and receive task instructions to improve field management efficiency.
2. According to claim 1, a BIM and GIS-based intelligent construction information integrated management cloud platform is characterized by: The data fusion module comprises: Coordinate conversion tools are used to convert spatial data from different sources into a unified coordinate system to achieve accurate data overlay; data matching algorithms are used to identify and match components in the BIM model with geographic features in GIS data to achieve seamless data integration.
3. According to the BIM and GIS-based intelligent construction information integrated management cloud platform of claim 1, it is characterized by: The intelligent decision support system comprises: Predictive models to predict problems that may arise during construction based on historical data and current trends; The optimization algorithm is used to propose optimization suggestions for construction plans to reduce construction changes, shorten construction periods, control costs, and improve project construction quality.
4. The BIM and GIS-based intelligent construction information integrated management cloud platform according to claim 1, characterized in that: The real-time monitoring module includes: IoT monitoring system, used to monitor personnel, equipment, materials, safety, quality, and environment at the construction site, and provide real-time feedback of monitoring data; AI recognition system is used to analyze monitoring data, automatically identify potential risks and problems, and generate early warnings.
5. The BIM and GIS-based intelligent construction information integrated management cloud platform according to claim 1, characterized in that: The project management module includes: Document management system, which is used to store and manage all documents generated during the construction process and associate them with components in the BIM model to enable rapid retrieval and use of documents; Progress tracking system, used to track construction progress and compare it with the progress of components in the BIM model to ensure that construction proceeds as planned.
6. The BIM and GIS-based intelligent construction information integrated management cloud platform according to claim 1, characterized in that: The mobile application includes: On-site data collection tools, used by on-site personnel to collect construction data through mobile devices and upload it to the cloud platform in real time; Task scheduling system is used to distribute tasks and instructions to field personnel and track the execution of tasks.