Power distribution network equipment transaction management and control method and system

By generating and publishing equipment change names and circuit maps before the distribution network equipment changes, the positioning problem caused by the diversified equipment is solved, and accurate and consistent equipment positioning after the equipment changes are achieved.

CN119891514APending Publication Date: 2025-04-25JINING POWER SUPPLY CO OF STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311850117.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

The diversification of distribution network equipment names leads to problems such as indiscriminate distribution network scheduling instructions, uncertain equipment location, and difficult to detect fault ranges.

Method used

Generate the device name before the equipment is changed, and generate the equipment change permission and the equipment change circuit diagram at the same time. After the equipment change is completed, publish the equipment changed circuit diagram to prevent equipment positioning errors caused by untimely change of equipment name.

Benefits of technology

By generating and publishing equipment change names and circuit diagrams in advance, ensure the accuracy and consistency of the name after the equipment change, and avoid device positioning errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119891514A_ABST
    Figure CN119891514A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution network equipment transaction management and control method and system. The method comprises the following steps: acquiring equipment transaction data; generating an equipment change name and an equipment change application according to the equipment transaction data; judging whether the equipment change application and the equipment change name are correct or not; when the equipment change application and the equipment change name are both correct, generating an equipment change permission and a circuit diagram after equipment change, and displaying the equipment change name in the circuit diagram; and after the equipment is changed, issuing a circuit diagram after the equipment is changed. According to the technical scheme, the equipment change name is generated before the equipment is changed, the equipment change permission and the circuit diagram after the equipment is changed are generated at the same time, and the circuit diagram after the equipment is changed is published after the equipment is changed, so that the problem that the equipment name is not changed in time to cause equipment positioning errors is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distribution network control, and in particular to a distribution network equipment abnormality control method and system. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] As the number of substations in urban areas increases, distribution lines with too long a power supply radius often optimize line operation by cutting and modifying lines in order to improve power supply reliability. Changes in power supply lines often result in inconsistent dual names for distribution network equipment, or even the coexistence of multiple names. The diversification of distribution network equipment names will directly lead to practical problems such as non-uniqueness of distribution network dispatching instructions, uncertainty of equipment location, and difficulty in finding fault intervals.

[0004] With the addition, retirement, and replacement of distribution disconnecting equipment and the addition, cutting, modification, and return of distribution lines, the names and numbers of distribution transformers and distribution switches will change accordingly. However, due to untimely changes, problems such as inconsistent equipment names and incorrect pole numbers may occur. Summary of the invention

[0005] In order to solve the above problems, the present invention proposes a distribution network equipment change control method and system, which generates an equipment change name before the equipment is changed, and simultaneously generates an equipment change permit and a circuit diagram after the equipment change. After the equipment change is completed, the circuit diagram after the equipment change is published, thereby preventing the problem of untimely equipment name changes, which leads to equipment positioning errors.

[0006] To achieve the above object, the present invention adopts the following technical solution:

[0007] In the first aspect, a method for abnormal control of distribution network equipment is proposed, comprising:

[0008] Obtain equipment change information;

[0009] Generate equipment change name and equipment change application based on equipment change data;

[0010] Determine whether the equipment change application and equipment change name are correct;

[0011] When the equipment change application and the equipment change name are correct, the equipment change permit and the circuit diagram after the equipment change are generated, and the equipment change name is displayed in the circuit diagram;

[0012] After the equipment change is completed, the circuit diagram after the equipment change is released.

[0013] Secondly, a distribution network equipment abnormality control system is proposed, including:

[0014] The data acquisition module is used to obtain equipment change data; based on the equipment change data, the equipment change name and equipment change application are generated;

[0015] The license generation module is used to determine whether the equipment change application and equipment change name are correct;

[0016] When the equipment change application and the equipment change name are correct, the equipment change permit and the circuit diagram after the equipment change are generated, and the equipment change name is displayed in the circuit diagram;

[0017] The circuit diagram generation module is used to publish the circuit diagram after the equipment change is completed.

[0018] In a third aspect, an electronic device is proposed, comprising a memory and a processor, and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the steps described in a method for controlling abnormal changes in distribution network equipment are completed.

[0019] In a fourth aspect, a computer-readable storage medium is proposed for storing computer instructions. When the computer instructions are executed by a processor, the steps described in a method for abnormal change control of distribution network equipment are completed.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] 1. The present invention generates a device change name before the device is changed, and simultaneously generates a device change permit and a circuit diagram after the device is changed. After the device change is completed, the circuit diagram after the device change is published, thereby preventing the problem of untimely device name changes leading to device positioning errors.

[0022] 2. Before generating the equipment change permit, the present invention also judges the correctness of the equipment change name and the equipment change application. Only when both are judged to be correct will the equipment change permit and the circuit diagram after the equipment change be generated, further ensuring the accuracy of the updated equipment change name after the equipment change.

[0023] 3. The present invention defines the naming rules for each device in the distribution network. The device change name generated by the naming rules can reflect important information such as the location and type of the device.

[0024] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.

[0026] Figure 1 A flowchart of a method disclosed for an embodiment;

[0027] Figure 2 A circuit diagram disclosed in an embodiment. DETAILED DESCRIPTION

[0028] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0029] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0030] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0031] Example 1

[0032] In this embodiment, a method for controlling abnormal changes in distribution network equipment is disclosed, such as Figure 1 As shown, including:

[0033] S1: Obtain equipment change information; generate equipment change name and equipment change application based on the equipment change information.

[0034] This embodiment generates an equipment change plan based on equipment change data;

[0035] Approve the equipment change plan, and after approval, generate the equipment change application and equipment change name.

[0036] The equipment change data includes information such as the equipment change location, the changed equipment type, and the changed equipment type number.

[0037] The equipment change plan generated from the equipment change data includes the equipment change location, the changed equipment type, the changed equipment type number, the equipment change operation procedures and the execution time of the equipment change.

[0038] The device change name generated based on the device change data includes the device change name of the changed device and the device affected by the change. The process of generating the device change name is as follows:

[0039] According to the location of the equipment change, determine the line name, pole number, equipment number, equipment interval number, equipment type and equipment type number of the changed equipment and the equipment affected by the change after the equipment change is completed;

[0040] According to the line name, pole number, equipment number, equipment interval number, equipment type and equipment type number of the equipment, and in accordance with the equipment naming rules, the equipment change name of the changed equipment and the equipment affected by the change is generated. The equipment change name can reflect the equipment location and equipment type.

[0041] The specific naming rules for the equipment are as follows: when the equipment is a line, since the line has a wide geographical area and many branches, in order to facilitate operation and management, the line name generally contains geographical location information or important user information, such as surrounding road names, prominent buildings, influential units and users, etc.; therefore, this embodiment limits the use of more distinctive place names or user names in the line power supply area as line names.

[0042] The trunk line of the line should include most of the equipment and facilities of the entire line, and the branch line should be a part of the entire line. For the trunk line, the equipment change name of the trunk line includes the transmission voltage level of the trunk line and the name of the line it is located in. For the branch line, the equipment change name of the branch line includes the transmission voltage level of the line, the name of the line where the branch line is located, and the name of the branch line at this level. Among them, the more characteristic place names or user names in the power supply area of ​​the branch line at this level are taken as the names of the branch lines at this level.

[0043] When the equipment is a pole-mounted switch, for the trunk section switch, the equipment change name of the trunk section switch includes the line name where the trunk section switch is located, the pole number where it is located, the type number D of the trunk section switch and the type of the trunk section switch.

[0044] For example: Zhangqiao Line 24D primary and secondary fusion circuit breaker, the line name is Zhangqiao Line, the pole number is 24, the type number is D, the type is primary and secondary fusion circuit breaker, which represents the main section switch on pole 24 on Zhangqiao Line, and the type of this switch is primary and secondary fusion circuit breaker.

[0045] Regarding the branch section switch, for the first-level branch section switch, the equipment change name is determined according to the branch T connection position of the switch or according to the installation position of the switch. The equipment change name determined according to the branch T connection position of the switch includes, in sequence: the name of the line where the switch is located, the T connection pole number of the main line where the switch is located, the T connection pole number of the branch line where the switch is located, the type number D of the switch, the name of the branch line where the switch is located, and the type of the switch; the equipment change name determined according to the installation position of the switch includes, in sequence: the name of the line where the switch is located, the name of the branch line where the switch is located, the T connection pole number of the branch line where the switch is located, the type number D of the switch and the type of the switch.

[0046] For example: Zhangqiao Line 37-1D industrial branch primary and secondary fusion circuit breaker, which means that the switch type is: primary and secondary fusion circuit breaker, the industrial branch is T-connected to pole No. 37, and the switch is installed on branch pole No. 1.

[0047] Zhangqiao line industrial branch 1D primary and secondary fusion circuit breaker, representing the switch type: primary and secondary fusion circuit breaker, the industrial branch section switch is installed on branch pole No. 1.

[0048] For multi-level branch segmented lines of one level or above, the name of the equipment change is determined according to the branch T-connection position of the switch or according to the installation position of the switch. The name of the equipment change determined according to the branch T-connection position of the switch includes, in sequence: the name of the line where the switch is located, the T-connection pole number of the main line where the switch is located, the T-connection pole numbers of the branch lines that pass from the main line to the branch line where the switch is located, the T-connection pole number of the branch line where the switch is located, the type number D of the switch, the name of the branch line where the switch is located, and the type of the switch; the name of the equipment change determined according to the installation position of the switch includes, in sequence: the name of the line where the switch is located, the name of the branch line where the switch is located, the T-connection pole number of the branch line where the switch is located, the type number D of the switch and the type of the switch.

[0049] For example: Wangying Line 59-37-23-9D Huchang branch primary and secondary fusion circuit breaker, which means that the Huchang branch section switch type is a primary and secondary fusion circuit breaker, installed on the branch pole No. 9 of the Wangying Line, and it can be known that the upper T-pole numbers are: 23, 37, and 59 respectively.

[0050] The 9D primary and secondary fused circuit breaker of the Huchang branch of the Wangying Line represents the type of the Huchang branch section switch, which is a primary and secondary fused circuit breaker and is installed on pole No. 9 of the branch.

[0051] When the device is a T-connected switch at the head end of a branch, for the T-connected switch at the head end of a first-level branch, the device change name includes: the name of the line where the switch is located, the T-connected pole number of the switch, the switch type number J, the name of the branch line where the switch is located and the switch type.

[0052] For example: Zhangqiao Line 37J industrial branch primary and secondary fusion circuit breaker represents the first opening installed on pole No. 37 of the Zhangqiao Line industrial branch main trunk.

[0053] For the T-connected switch at the head end of a multi-level branch segmented line of one level or above, the equipment change name includes, in sequence: the name of the line where the switch is located, the name of the upper-level branch line where the switch is located, the T-connected pole number of the switch, the switch type number J, the name of the branch line where the switch is located, and the switch type; or, the equipment change name of the switch is determined step by step according to the T-connected position of the switch and the name of the branch line, and the equipment change name includes, in sequence: the name of the line where the switch is located, the T-connected pole numbers of the branch lines that pass from the trunk line to the branch line where it is located, the T-connected pole number of the switch, the switch type number J, the name of the branch line where the switch is located, and the switch type.

[0054] For example: Zhangqiao Line Industrial Branch 15J Binhu Branch primary and secondary fusion circuit breaker represents the first-end T-connected switch of the Binhu branch installed on pole No. 15 of the Zhangqiao Line Industrial Branch.

[0055] The primary and secondary fusion circuit breaker of Binhu branch of Zhangqiao line 24-15J represents the first-end T-connection switch of Binhu branch installed on pole No. 15 of Zhangqiao line, and the upper-level T-connection pole number of pole No. 15 is 24, so the T-connection relationship of Binhu branch of Zhangqiao line can be seen.

[0056] When the device is a tie switch, the device change name of the tie switch includes, in sequence: the name of the first line connected to the switch, the name of the branch line, the T-pole number of the branch line, the switch type number L, the name of the second line connected, the T-pole number of the branch line, the switch type number L and the switch type.

[0057] For example: the primary and secondary integrated interconnecting circuit breaker of Sendar Line 12L and Nanxue Line 12L means that the interconnecting switch is installed on pole No. 12 of Sendar Line and Nanxue Line.

[0058] When the device is a user boundary switch, the naming rules of the device change name of the user decomposition switch are similar to the naming rules of the device change name of the branch head end T connection switch, except that the device change name of the user decomposition switch contains the boundary. Specifically, when the user boundary switch is a first-level user branch boundary switch, the device change name of the switch includes: the line name of the switch, the branch line name of the switch, the T connection pole number of the switch, the switch type number J and the switch type.

[0059] For example: Sunzhuang line 18J Liying No. 1 Middle School boundary fusion circuit breaker.

[0060] When the user boundary switch is a multi-level user branch boundary switch, the equipment change name of the switch includes in sequence: the name of the line where the switch is located, the name of the upper branch line where the switch is located, the T-pole number of the switch, the switch type number J, the name of the branch line where the switch is located and the switch type; or, the equipment change name of the switch is determined step by step according to the T-connection position of the switch and the name of the branch line, and the equipment change name includes in sequence: the name of the line where the switch is located, the T-pole number of the branch line that passes from the trunk line to the branch line where it is located, the T-pole number of the switch, the switch type number J, the name of the branch line where the switch is located and the switch type.

[0061] For example: Sunxing Line 72-4J Hegang drainage and irrigation boundary fusion circuit breaker;

[0062] 4J Hegang drainage and irrigation boundary fusion circuit breaker of Hegang branch of Sunxing line.

[0063] When the equipment is a ring main unit, the equipment change name of the ring main unit includes: the name of the line where the ring main unit is located, the name of the branch where the ring main unit is located, the level number of the trunk line or branch line where the ring main unit is located, the sequence number of the trunk line or branch line where the ring main unit is located, and the type of the ring main unit; when the line where the ring main unit is located is a trunk line, the name of the branch where the ring main unit is located is omitted in the equipment change name. Among them, the trunk line is numbered 1, the first-level branch line is numbered 2, the second-level branch line is numbered 3, .... the N-level branch line is numbered N+1; when it is the first ring main unit in the line, the sequence number is 1, when it is the second ring main unit, the sequence number is 2, ... when it is the n-th ring main unit, the sequence number is n+1.

[0064] Such as: Daizhuang line 101 high standard ring main unit, Jiangzhuang line 101 ring main unit, Jiangzhuang line Xuekou branch 201 ring main unit.

[0065] When the equipment is a ring main unit interval, the equipment change name of the ring main unit interval is determined according to the outgoing or incoming lines of the ring main unit. According to the outgoing lines of the ring main unit, the equipment change name of the ring main unit outgoing lines determined in sequence includes: the rear-end load of the ring main unit, the outgoing lines and the interval number; according to the incoming lines of the ring main unit, the equipment change name of the ring main unit incoming lines determined in sequence includes: the line where the ring main unit is located, the upper power supply, the incoming line and the interval number. When the ring main unit is a head-end ring main unit, the upper power supply is omitted in the equipment change name.

[0066] Among them, the interval numbering is determined as follows: for a ring main unit with a load switch, the interval numbering is determined according to the load switch. Preferably, facing the ring main unit and from left to right, the interval numbers corresponding to the load switches of the ring main unit are 01 and 02, and the interval numbers of other circuit breaker intervals are 11, 12, 13, 14...; when the ring main unit is entirely composed of circuit breakers, the interval numbering is determined according to a single incoming line for less than 5 lines, and the interval numbering is determined according to a double incoming line for 6 lines or more. Preferably, facing the ring main unit and from left to right, the interval numbers corresponding to the incoming lines are 01 and 02, and the interval numbers corresponding to the outgoing lines are 01, 02, 03, 04, 05...

[0067] For example, the 11 outgoing line interval of the 101 ring main unit of Renxing II line, the equipment name is changed to "Ruima Mingmen Community Outgoing Line 11", which means that the rear-end load of the 11 outgoing line cable is Ruima Mingmen Community.

[0068] The 01 incoming line interval of the Renxing II line 102 ring main unit has its equipment name changed to "Renxing II line 101 ring main unit incoming line 01", which means that the upstream power supply of the 01 incoming line cable is the 101 ring main unit.

[0069] The 01 incoming line interval of the 101 ring main unit of the Daizhuang line has its equipment name changed to "Renxing II line incoming line 01", indicating that the opposite side of the 01 incoming line cable is a substation or overhead line.

[0070] In addition, when the character length of the changed name of the device determined according to the device naming principle is limited, the changed name of the device is simplified, and the simplified name is the final changed name of the device. The principles of name evolution include:

[0071] (1)Switch type simplification:

[0072] Simplify the primary and secondary fused circuit breaker to fused circuit breaker, fused switch or fused.

[0073] The magnetically controlled fast-acting circuit breaker is simplified to magnetically controlled circuit breaker, magnetically controlled switch or magnetic control.

[0074] (2) Simplified branch line names:

[0075] For the T-connector switch at the head end of a branch, the branch line name can be omitted, and only the name of the upper-level branch line can be reflected, or multi-level T-connector pole numbers can be used for naming.

[0076] (3) Choose the appropriate naming format:

[0077] For equipment with multiple naming formats, choose a short naming method; the same type of equipment on the same line adopts the same naming format, and ensure that there are no two formats, "Zhangqiao Line 37-1D Industrial Branch Circuit Breaker" and "Zhangqiao Line Industrial Branch 10D Circuit Breaker".

[0078] An example of simplifying the device change name obtained by the naming principle is as follows:

[0079] Original 1: Sendamei Line 12L and Nanxue Line 12L primary and secondary fusion interconnection circuit breaker (42 bytes), simplified to: Sendamei Line 12L and Nanxue Line 12L fusion interconnection switch (34 bytes); Original 2: Zhangqiao Line Industrial Branch 15J Binhu Branch primary and secondary fusion circuit breaker (41 bytes), simplified to: Zhangqiao Line Industrial Branch 15J fusion circuit breaker (27 bytes), or, Zhangqiao Line 24-15J Binhu branch fusion circuit breaker (30 bytes); Original 3: Wangying Line 59-37-23-9D Huchang Branch primary and secondary fusion circuit breaker (41 bytes), simplified to: Wangying Line 59-37-23-9D primary and secondary fusion circuit breaker (33 bytes), or, Wangying Line Huchang Branch 9D primary and secondary fusion circuit breaker (32 bytes), or, Wangying Line Huchang Branch 9D fusion circuit breaker (26 bytes).

[0080] S2: Determine whether the equipment change application and equipment change name are correct.

[0081] The content in the equipment change application is matched with the equipment movement data to determine whether the equipment change application is correct. When the content in the equipment change application matches the equipment change data, the equipment change application is determined to be correct. When the content in the equipment change application does not match the equipment change data, the equipment change application is determined to be incorrect.

[0082] It is determined whether the changed name of the device complies with the naming rules of the device. When the changed name of the device complies with the naming rules of the device, the changed name of the device is determined to be correct. When the changed name of the device does not comply with the naming rules of the device, the changed name of the device is determined to be incorrect.

[0083] S3: When the equipment change application and the equipment change name are correct, an equipment change permit and a circuit diagram after the equipment change are generated, and the equipment change name is displayed in the circuit diagram.

[0084] The generated equipment change permit authorizes the equipment change work.

[0085] The circuit diagram here is generated according to the connection relationship between each line and equipment in the distribution network, which can reflect the connection relationship between each line and equipment in the distribution network. And the generated circuit diagram after the equipment change is only saved in the equipment ledger in the background, and has not been published yet, and cannot be displayed through the display device.

[0086] S4: After the equipment change is completed, the circuit diagram after the equipment change is released.

[0087] When the equipment change is completed and the conditions for power supply are met, the line diagram after the equipment change will be released, and power supply will be directed according to the released line diagram after the equipment change.

[0088] The changed circuit diagram of the equipment can only be displayed on the display device after it is published, and the changed name of the equipment is displayed in the published circuit diagram of the changed equipment, such as Figure 2 As shown, there are multiple locations in the system where the changed names of the equipment can be viewed. The changed names of the equipment in multiple locations must be consistent, especially the changed names of the equipment in the circuit diagram must be consistent with the changed names of the equipment in the equipment ledger.

[0089] Ability to quickly locate the device based on the changed name of the device in the circuit diagram after the device is changed.

[0090] The present embodiment discloses a method for controlling the abnormal changes of distribution network equipment, which realizes the whole process control from the equipment decision to change to the completion of the equipment change and power transmission. Before the change, the equipment change name is determined, and the equipment change name in the circuit diagram is synchronously updated. When the equipment change is completed, the equipment change name is displayed in time, which effectively prevents the problem of equipment positioning errors caused by untimely changes of the equipment name after the equipment change. In addition, before generating the equipment change permission, the present embodiment also judges the correctness of the equipment change name and the equipment change application. Only when both are judged to be correct, will the equipment change permission and the circuit diagram after the equipment change be generated, further ensuring the accuracy of the updated equipment change name after the equipment change.

[0091] This embodiment also defines a naming rule for each device in the distribution network. The device change name generated by the naming rule can reflect important information such as the location of the device and the type of the device.

[0092] Example 2

[0093] In this embodiment, a distribution network equipment abnormality control system is disclosed, including:

[0094] The data acquisition module is used to obtain equipment change data; based on the equipment change data, the equipment change name and equipment change application are generated;

[0095] The license generation module is used to determine whether the equipment change application and equipment change name are correct;

[0096] When the equipment change application and the equipment change name are correct, the equipment change permit and the circuit diagram after the equipment change are generated, and the equipment change name is displayed in the circuit diagram;

[0097] The circuit diagram generation module is used to publish the circuit diagram after the equipment change is completed.

[0098] Example 3

[0099] In this embodiment, an electronic device is disclosed, including a memory and a processor, and computer instructions stored in the memory and running on the processor. When the computer instructions are executed by the processor, the steps described in the distribution network equipment abnormality control method disclosed in Example 1 are completed.

[0100] Example 4

[0101] In this embodiment, a computer-readable storage medium is disclosed for storing computer instructions. When the computer instructions are executed by a processor, the steps described in the method for abnormal change control of distribution network equipment disclosed in Example 1 are completed.

[0102] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for controlling abnormal changes in distribution network equipment, characterized in that: include: Obtain equipment change information; Generate equipment change name and equipment change application based on equipment change data; Determine whether the equipment change application and equipment change name are correct; When the equipment change application and the equipment change name are correct, the equipment change permit and the circuit diagram after the equipment change are generated, and the equipment change name is displayed in the circuit diagram; After the equipment change is completed, the circuit diagram after the equipment change is released.

2. A distribution network equipment abnormality control method according to claim 1, characterized in that: Generate equipment change plan based on equipment change data; Approve the equipment change plan, and after approval, generate the equipment change application and equipment change name.

3. A distribution network equipment abnormality control method according to claim 1, characterized in that: The equipment change name generated based on the equipment change data includes the equipment change name of the changed equipment and the equipment affected by the change.

4. A distribution network equipment abnormality control method according to claim 3, characterized in that: According to the location of the equipment change, determine the line name, pole number, equipment number, equipment interval number, equipment type and equipment type number of the changed equipment and the equipment affected by the change after the equipment change is completed; According to the line name, pole number, equipment number, equipment interval number, equipment type and equipment type number of the equipment, and in accordance with the naming rules of the equipment, the equipment change names of the changed equipment and the equipment affected by the change are generated.

5. A distribution network equipment abnormality control method according to claim 4, characterized in that: When the content in the equipment change application matches the equipment change information, the equipment change application is judged to be correct; when the equipment change name complies with the equipment naming rules, the equipment change name is judged to be correct.

6. A distribution network equipment abnormality control method according to claim 1, characterized in that: After the device name is changed, it can reflect the device location and device type.

7. A distribution network equipment abnormality control method according to claim 1, characterized in that: When the equipment change is completed and the conditions for power supply are met, the circuit diagram after the equipment change will be released.

8. A distribution network equipment abnormality control system, characterized in that: include: Data acquisition module, used to obtain equipment change data; Generate equipment change name and equipment change application based on equipment change data; The license generation module is used to determine whether the equipment change application and equipment change name are correct; When the equipment change application and the equipment change name are correct, the equipment change permit and the circuit diagram after the equipment change are generated, and the equipment change name is displayed in the circuit diagram; The circuit diagram generation module is used to publish the circuit diagram after the equipment change is completed.

9. An electronic device, characterized in that: It includes a memory and a processor, and computer instructions stored in the memory and running on the processor. When the computer instructions are run by the processor, the steps of a distribution network equipment abnormal change control method described in any one of claims 1 to 7 are completed.

10. A computer-readable storage medium, characterized in that: Used to store computer instructions, which, when executed by a processor, complete the steps of a distribution network equipment abnormality control method as described in any one of claims 1-7.

Citation Information

Patent Citations

  • OMS equipment transaction management and control information system supported by GID platform

    CN105447611A

  • Operation and alteration management method for power grid equipment

    CN105550810A

  • Power distribution network damage extent judgment method and system based on time synchronism

    CN108562830A

  • Red-black image updating method and device, equipment and medium

    CN115203876A