Bead tube processing device

By designing an automated bead tube processing device, using the combination of fixed needle, worm and cutter, the existing bead tube cutting efficiency and major safety hazards are solved, and an efficient and safe automatic cutting process is achieved.

CN119912149AInactive Publication Date: 2025-05-02ZHEJIANG MAYA MECHANICAL & ELECTRICAL TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202510282138.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-10
Publication Date
2025-05-02
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing bead tubes need manual operation when cutting and cutting, resulting in low processing efficiency, high safety risks and easy arm scratches.

Method used

A bead tube processing device is designed, including a first fixing seat assembly, a second fixing seat assembly and a pipe cutting assembly. By combining the fixing needle and the worm, the material pipe can rotate and automatically cut under the action of a cutting knife to form a pipe bead.

Benefits of technology

The automated bead tube cutting process is realized, which improves processing efficiency, reduces the labor intensity of the operator, and avoids the safety hazards caused by manual cutting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119912149A_ABST
    Figure CN119912149A_ABST
Patent Text Reader

Abstract

According to the bead tube machining device, a plurality of material tubes are placed on a first fixing base and a second fixing base assembly, one end of each material tube is located on the first fixing base, the other end of each material tube is located on the second fixing base assembly, and a tube cutting assembly can cut all the material tubes at the same time, so that tube beads are obtained. Therefore, safety accidents caused by manual cutting can be avoided, the labor intensity of operators is reduced, and the processing and production efficiency of bead tubes is improved. The bead tubes can be moved manually or by other mechanical structures, so that bead tubes with different lengths can be processed and produced according to requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention generally relates to the technical field of computer embroidery machines, and in particular to a bead tube processing device. Background Art

[0002] Beaded tube embroidery is a special embroidery technique used in the field of computer embroidery machines. Beaded tubes (slender tubular decorative objects) are added during the embroidery process to enhance the three-dimensional effect and decorative effect of the pattern. This technique is widely used in high-end clothing, home textiles, handicrafts and other fields. The addition of beaded tubes gives the embroidery pattern a significant three-dimensional effect and enhances the visual impact; the gloss and texture of the beaded tubes add a sense of luxury and artistry to the embroidery work; in addition, the beaded tubes are made of materials such as metal, plastic or glass, and have strong wear resistance and durability.

[0003] In the related art, when cutting and trimming glass bead tubes, they are cut and segmented manually, which has low processing efficiency, is time-consuming and labor-intensive, and is easy to scratch the arms and cause safety accidents. Summary of the invention

[0004] The invention provides a bead tube processing device, comprising a first fixing seat assembly, a second fixing seat assembly and a tube cutting assembly.

[0005] The first fixing seat assembly includes a first fixing seat, on which a plurality of fixing pins are arranged along the same direction, the fixing pins are used to plug the ends of the material tubes, and the self-rotation of the fixing pins drives the self-rotation of the material tubes. The first fixing seat assembly and the second fixing seat assembly are arranged at intervals in the first direction, the first direction is perpendicular to the arrangement direction of the fixing pins, and the second fixing seat assembly supports the material tubes corresponding to each fixing pin. The tube cutting assembly is arranged corresponding to the second fixing seat assembly, and the tube cutting assembly includes a plurality of cutters arranged along the same direction, the cutters correspond to the fixing pins one by one, the arrangement direction of the cutters is parallel to the arrangement direction of the fixing pins, and the cutters cooperate with the second fixing seat assembly to cut the material tubes to form tube beads.

[0006] As an achievable method, the second fixed seat assembly includes an auxiliary support seat, on which a plurality of auxiliary support columns are arranged along the same direction, the auxiliary support columns correspond one-to-one to the fixed needles, the arrangement direction of the auxiliary support columns is parallel to the arrangement direction of the fixed needles, and the auxiliary support columns are provided with support grooves adapted to the material tube.

[0007] As an implementable manner, the cutter and the auxiliary support column are arranged correspondingly up and down.

[0008] As an implementable manner, the cutter elastically cuts the material pipe, and / or the auxiliary support column elastically supports the material pipe.

[0009] As an implementable manner, a first direction driving mechanism is further included, and the first direction driving mechanism enables the first fixing seat to move in the first direction to approach or move away from the auxiliary supporting seat.

[0010] As an implementable manner, the first direction driving mechanism includes a ball screw mechanism, which includes a matching screw and a nut. The length of the screw is set along the first direction. The screw rotates, and the nut causes the first fixed seat to reciprocate in the first direction.

[0011] As an implementable manner, the first fixing seat assembly further includes a worm and a turbine. The fixing needle is sleeved with the turbine. The turbine is meshed with the worm to enable the fixing needle to rotate.

[0012] As an achievable method, the first fixing seat assembly further includes a worm and a turbine. The turbine is sleeved on the fixing needle, and the turbine is meshed with the worm so that a first cavity is provided inside the first fixing seat of the fixing needle. The length direction of the first cavity is parallel to the arrangement direction of the fixing needle, and the worm is arranged in the first cavity.

[0013] The fixing needle passes through the first cavity along the first direction, the first fixing needle is perpendicular to the worm, and the turbine is installed at the position of the first fixing needle located in the first cavity.

[0014] As an implementable manner, a first support seat is further included. The first support seat is located between the first fixing seat and the auxiliary support seat, and the first support seat is used to support the middle part of the material pipe.

[0015] As an implementable manner, the first supporting seat can reciprocate in the vertical direction.

[0016] In the above scheme, in this embodiment, multiple material tubes are placed on the first fixed seat and the second fixed seat assembly, one end of each material tube is located on the first fixed seat, and the other end is located on the second fixed seat assembly. The tube cutting assembly can cut each material tube at the same time to obtain tube beads. This can avoid safety accidents caused by manual cutting, reduce the labor intensity of the operator, and improve the processing and production efficiency of the bead tube. The bead tube can be moved by manual or other mechanical structures to process and produce bead tubes of different lengths according to demand. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings: Figure 1 A structural schematic diagram of a bead tube processing device provided by an embodiment of the present invention; Figure 2 Schematic diagram of the explosion on the left side of the bead tube processing device provided in an embodiment of the present invention Figure 1 ; Figure 3 Schematic diagram of the explosion on the left side of the bead tube processing device provided in an embodiment of the present invention Figure 2 ; Figure 4 for Figure 3 A schematic diagram of a local A enlargement; Figure 5 for Figure 3 A local D enlarged schematic diagram; Figure 6 A schematic diagram of the structure of a scraper provided in an embodiment of the present invention; Figure 7 A schematic diagram of the auxiliary component structure provided by an embodiment of the present invention; Figure 8 A schematic diagram of the positions of the auxiliary component, the first fixed seat component, the material box and the material extraction head mechanism provided in an embodiment of the present invention; Fig. 9 A cross-sectional schematic diagram of a first fixing seat assembly provided in an embodiment of the present invention; Fig.10 Schematic diagram of the explosion on the right side of the bead tube processing device provided in an embodiment of the present invention Figure 1 ; Fig.11 Schematic diagram of the explosion on the right side of the bead tube processing device provided in an embodiment of the present invention Figure 2 ; Fig.12 A schematic diagram of the positions of the pipe cutting assembly and the second fixing seat assembly provided in an embodiment of the present invention; Fig.13 A schematic diagram of the structure of a cutter portion provided by an embodiment of the present invention; Fig.14 An exploded schematic diagram of a cutter portion provided by an embodiment of the present invention; Fig.15 for Fig.13 Schematic cross-sectional view of ; Fig.16 for Fig.15 A local C enlarged schematic diagram; Fig.17 A schematic diagram of the right side of a bead tube processing device provided by an embodiment of the present invention; Fig.18 for Fig.17 Explosion diagram of Fig.19 for Fig.18 A partial enlarged schematic diagram of B; Fig. 20 A schematic diagram of the structure of a connecting socket provided in an embodiment of the present invention; Fig.21A schematic diagram of the receiving hopper structure provided in an embodiment of the present invention; Fig. 22 Schematic diagram of the arrangement structure on the frame body provided in an embodiment of the present invention Figure 1 ; Fig.23 Schematic diagram of the arrangement structure on the frame body provided in an embodiment of the present invention Figure 2 ; Fig.24 A schematic diagram of the structure of the frame body provided by an embodiment of the present invention; A first fixing seat assembly 10, a first fixing seat 11, a first cavity 111, a fixing needle 12, a worm 13, and a turbine 14; Auxiliary component 20, third friction roller 21, second swinging part 22, first shielding plate 23, auxiliary support seat 24, synchronous belt component 25, driving pulley 251, driven pulley 252; A material pulling head mechanism 30, a first friction roller 31, and a second friction roller 32; The material box assembly 40, the material box cover 41, the material box 42, the scraper assembly 43, the scraper member 431, the scraper end surface 4311, the leakage hole 4312, and the connecting shaft 432; The pipe cutting assembly 50, the cutter portion 51, the support beam 511, the cutter structure 512, the support member 5121, the mounting cavity 51211, the cutter mounting member 5122, the cutter mounting groove 51221, the second air pipe 5123, the pressing member 5124, the cutter 5125, the first telescopic mechanism 513, the second telescopic mechanism 514, the second linear guide mechanism 515, and the first swinging portion 52; The second fixed seat assembly 60, the auxiliary support column 61, the support groove 611, the auxiliary support seat 62, the connecting frame 63, the first linear guide mechanism 64, the connecting seat 65, the through elongated hole 651, the second fixed seat installation area 652, and the second fixed seat 66; The first main frame 70a, the first mounting groove 71, the second mounting groove 72, the first mounting portion 73, the second mounting portion 74, the frame body 75, and the second main frame 70b; The second support seat 81 , the first support seat 82 , the heating assembly 83 , the glue connecting plate 84 , and the material receiving hopper 90 . DETAILED DESCRIPTION

[0018] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It is also necessary to explain that, for ease of description, only the parts related to the invention are shown in the accompanying drawings.

[0019] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0020] It should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like used above to indicate orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0021] like Figure 1-Figure 24 The bead tube processing device comprises a first fixed seat assembly 10, a second fixed seat assembly 60, a tube cutting assembly 50 and a first main frame 70a. The first fixed seat assembly 10 and the second fixed seat assembly 60 are located on the first main frame 70a.

[0022] The first fixing seat assembly comprises a first fixing seat 11 , on which a plurality of fixing pins 12 are arranged along the same direction. The fixing pins 12 are used for plugging the ends of the material tubes. The fixing pins 12 rotate by themselves, driving the material tubes to rotate by themselves.

[0023] The first fixing seat assembly 10 and the second fixing seat assembly 60 are spaced apart in a first direction, the first direction is perpendicular to the arrangement direction of the fixing needles 12 , and the second fixing seat assembly 60 supports the material tube corresponding to each fixing needle 12 .

[0024] The tube cutting assembly 50 is arranged corresponding to the second fixed seat assembly 60. The tube cutting assembly 50 includes a plurality of cutters 5125 arranged along the same direction. The cutters 5125 correspond one-to-one to the fixed needles 12. The arrangement direction of the cutters 5125 is parallel to the arrangement direction of the fixed needles 12. The cutters 5125 cooperate with the second fixed seat assembly 60 to cut the material tube to form a tube bead.

[0025] In this embodiment, multiple material tubes are placed on the first fixed seat 11 and the second fixed seat assembly 60, one end of each material tube is located at the first fixed seat 11, and the other end is located at the second fixed seat assembly 60. The tube cutting assembly 50 can cut each material tube at the same time to obtain tube beads. This can avoid safety accidents caused by manual cutting, reduce the labor intensity of the operator, and improve the processing and production efficiency of the bead tube. The bead tube can be moved by manual or other mechanical structures to process and produce bead tubes of different lengths according to demand.

[0026] At least in conjunction with the accompanying drawings Figure 1-Figure 24 , describe the bead tube processing device: like Fig.24 As shown, the first main frame 70a includes a frame body 75, a first mounting portion 73 is provided at the left end of the frame body 75, and the first fixed seat assembly 10 is located at the first mounting portion 73; a second mounting portion 74 is provided at the right end of the frame body 75, and the second fixed seat assembly 60 is located at the second mounting portion 74; a first mounting groove 71 is provided on the right side of the frame body 75, and a second mounting groove 72 is provided on the left side of the frame body 75, and a first direction driving mechanism is respectively provided in the second mounting groove 72 and the first mounting groove 71, and the first direction driving mechanism has a power output end, and the power output end reciprocates in the first direction, which is the left and right direction. The first direction driving mechanism enables the first fixed seat 11 to move in the left and right directions, and the first fixed seat 11 can be close to or away from the second fixed seat 66. For example, the first direction driving mechanism can be, but is not limited to, a ball screw mechanism, and the ball screw mechanism includes a matching screw rod and a nut, the length of the screw rod is set along the left and right directions, the screw rod is located in the first mounting groove 71 or / and the second mounting groove 72, and the nut can reciprocate along the length direction of the screw rod. The screw rod rotates, and the nut drives the first fixing seat 11 to reciprocate in the left and right directions.

[0027] At least Figure 3 , Figure 4 and Fig. 9 As shown, the first fixing seat assembly 10 includes a first fixing seat 11, a fixing needle 12, a worm 13 and a turbine 14. The first fixing seat 11 arranges a plurality of fixing needles 12 at equal intervals in the front-to-back direction, the length of the fixing needles 12 extends in the left-to-right direction, and the cross-section of the fixing needles 12 can be, but is not limited to, circular. A first cavity 111 is provided inside the first fixing seat 11, the length of the first cavity 111 extends in the front-to-back direction, and the fixing needles 12 pass through the first cavity 111.

[0028] The worm 13 is disposed in the first cavity 111, and the length direction of the worm 13 is the same as the length direction of the first cavity 111. Each fixed needle 12 corresponds to a turbine 14. Fig. 9As shown, a turbine 14 is installed at the position of the fixed needle 12 located in the first cavity 111. Of course, it is understandable that a turbine part can be provided on each fixed needle 12, that is, the fixed needle 12 and the turbine 14 are integrally formed. In this way, the worm 13 cooperates with each turbine 14, and the worm 13 rotates to drive each fixed needle 12 to rotate. In this way, the self-rotation of the material tube can make the cutting process smooth, reduce burrs and splashes generated during the cutting process, and improve the cutting quality; it can effectively prevent the surface of the material tube from being scratched or damaged; it can reduce the wear of the cutting tool, and at the same time make the cutting process smooth and improve the cutting efficiency.

[0029] The second fixed seat assembly 60 includes an auxiliary support seat 62, on which a plurality of auxiliary support columns 61 are arranged along the same direction. The auxiliary support columns 61 correspond one-to-one to the fixed needles 12, and the arrangement direction of the auxiliary support columns 61 is parallel to the arrangement direction of the fixed needles 12. The auxiliary support columns 61 are provided with support grooves 611 adapted to the material tube.

[0030] Among them, Figure 17-Figure 19 As shown, the second fixing seat assembly 60 includes an auxiliary support seat 62 and a second fixing seat 66. The first fixing seat 11, the second fixing seat 66, and the auxiliary support seat 62 are arranged in sequence from left to right. The second fixing seat 66 is provided with a second groove adapted to the material pipe, and the second fixing seat 66 is provided with a plurality of second grooves. The auxiliary support columns 61 correspond to the second grooves one by one, and the arrangement direction of the second grooves is parallel to the arrangement direction of the auxiliary support columns 61. Each end of the material pipe extends out of the second fixing seat 66, and the auxiliary support column 61 is located below the suspended part of the material pipe. Among them, the auxiliary support column 61 is arranged in the vertical direction.

[0031] like Fig.19 As shown, a second cavity extending in the front-to-back direction is provided in the auxiliary support seat 62, and the auxiliary support column 61 passes through the second cavity, and the lower end of the auxiliary support column 61 is located in the second cavity. A spring is sleeved at the lower end of the auxiliary support column 61, and the spring is located in the second cavity, so that the auxiliary support column 61 is installed on the auxiliary support seat 62 through the spring, so that the auxiliary support column 61 elastically supports the material tube.

[0032] Furthermore, the auxiliary support seat 62 can reciprocate in the vertical direction.

[0033] like Fig.18 As shown, the second fixed seat assembly 60 also includes a connecting frame 63, a first linear guide mechanism 64 and a connecting seat 65. Fig. 20 As shown, the connecting seat 65 is provided with a through long hole 651 and a second fixing seat installation area 652. The second fixing seat 66 is fixedly connected to the second fixing seat installation area 652. It should be noted that the second main frame 70b is connected to the right end of the first main frame 70a, and the second main frame 70b is located at the second installation portion 74. The connecting seat 65 is fixedly connected to the second main frame 70b.

[0034] The first linear guide mechanism 64 includes a sliding block and a guide rail that are slidably matched, the guide rail is arranged in the vertical direction, the guide rail is fixedly connected to the second main frame body 70b, the sliding block is connected to the connecting frame 63, the connecting frame 63 is fixedly connected to the auxiliary support seat 62, and each auxiliary support column 61 is located in the through-long strip hole 651. Based on the first linear guide mechanism 64, the auxiliary support seat 62 can reciprocate in the vertical direction, thereby driving the auxiliary support column 61 to reciprocate in the vertical direction.

[0035] The tube cutting assembly 50 includes a cutter 5125. The cutter 5125 can move and has a seventh switching position and an eighth switching position. The cutter 5125 is arranged close to the second fixed seat assembly 60, and the cutter 5125 cuts the material tube to form a tube bead; when the cutter 5125 is in the eighth switching position, the cutter 5125 is arranged away from the second fixed seat assembly 60, and the cutter 5125 is located above the second fixed seat assembly 60.

[0036] like Fig.10 As shown, the pipe cutting assembly 50 includes a cutter portion 51 and a first swinging portion 52, and the cutter portion 51 includes a support member 5121 and a cutter mounting member 5122. The first swinging portion 52 is connected to the support member 5121, and the first swinging portion 52 swings to drive the support member 5121 to swing, and the cutter mounting member 5122 is connected to the support member 5121, and the cutter mounting member 5122 is provided with a cutter mounting groove 51221, and the cutter 5125 is mounted in the cutter mounting groove 51221 through a rotating shaft, and the cutter 5125 can rotate around the rotating shaft. When the cutter 5125 is in the seventh switching position, the support member 5121 can reciprocate in the vertical direction to drive the cutter 5125 to reciprocate in the vertical direction.

[0037] The cutter portion 51 is described in detail below: like Fig.13 and Fig.14 As shown, the cutter portion 51 includes a support beam 511, a cutter structure 512, a first telescopic mechanism 513, a second telescopic mechanism 514 and a second linear guide mechanism 515. The cutter structure 512 is movably connected to the support beam 511 through the second linear guide mechanism 515. When the cutter 5125 is in the seventh switching position, the cutter structure 512 can reciprocate in the vertical direction, thereby driving the cutter 5125 of the cutter structure 512 to reciprocate in the vertical direction. Among them, the movable end of the second telescopic mechanism 514 is connected to the cutter structure 512, and the second telescopic mechanism 514 can be a hydraulic or cylinder mechanism, a linear motor mechanism, a screw and nut mechanism, etc., which is not limited in this embodiment.

[0038] like Fig.15As shown, the cutter structure 512 includes a support member 5121, a cutter mounting member 5122, a second air pipe 5123, a pressing member 5124 and a cutter 5125. The support member 5121 can be but is not limited to a plate shape, and the movable end of the second telescopic mechanism 514 is connected to the support member 5121.

[0039] like Fig.16 As shown, the cutter mounting member 5122 is provided with a cutter mounting groove 51221 extending in the front-rear direction, and the cutter 5125 is mounted in the cutter mounting groove 51221 via a rotating shaft. The cutter 5125 is arc-shaped or circular, and the cutter 5125 can rotate around the rotating shaft when in contact with the material pipe. Among them, the cutter 5125 corresponds to the auxiliary support column 61 mentioned above, and the cutter mounting member 5122 is threadedly connected to the support member 5121 via a fastener, and the cutter mounting member 5122 is arranged at the lower end of the support member 5121.

[0040] like Fig.15 and Fig.16 As shown, the second air pipe 5123 is connected to the support member 5121, and the second air pipe 5123 is arranged at the lower end of the support member 5121, so that the second air pipe 5123 can swing with the cutter 5125. A second air hole is opened on the second air pipe 5123, and when the cutter 5125 is in the seventh switching position, the second air hole faces the cutter 5125. When the cutter 5125 cuts the material pipe and generates dust particles, the gas based on the second air hole is continuously blown to the cutter 5125, thereby preventing the dust particles from falling into the above-mentioned second groove, which helps to prevent the dust particles from affecting the material pipe when a new material pipe is placed in the second groove later.

[0041] like Fig.15 and Fig.16 As shown, the pressing member 5124 may be, but is not limited to, plate-shaped, and may be made of an elastic material, such as a rubber material, a silicone material, a plastic material, and the like. An installation cavity 51211 is provided inside the support member 5121, and the pressing member 5124 is located in the installation cavity 51211, and is arranged near the lower end of the support member 5121. The first telescopic mechanism 513 is at least partially located in the installation cavity 51211, and the movable end of the first telescopic mechanism 513 is connected to the pressing member 5124. In this way, on the one hand, the pressing member 5124 swings with the cutter 5125, and when the cutter 5125 is in the seventh switching position, the pressing member 5124 can elastically press the material tube; on the other hand, when the cutter 5125 is in the seventh switching position, the pressing member 5124 can reciprocate in the vertical direction relative to the support member 5121 through the first telescopic mechanism 513, so as to further adjust the elastic force of the pressing member 5124 on the material tube.

[0042] In addition, at least Fig. 22 and Fig.23As shown, the bead tube processing device also includes a first support seat 82. The first fixed seat 11, the first support seat 82, the second fixed seat 66, and the auxiliary support seat 62 are arranged in sequence from left to right. The first support seat 82 supports the middle part of the material tube.

[0043] The first support seat 82 can reciprocate in the vertical direction, so that when the first direction driving mechanism causes the first fixing seat 11 to reciprocate in the left-right direction, interference between the first support seat 82 and the first fixing seat 11 can be avoided.

[0044] At least in conjunction with the accompanying drawings Figure 1-Figure 24 , describe the working steps of the bead tube processing device: S111, each fixed needle 12 on the first fixed seat 11 is provided with a material tube, such as Figure 4 As shown, the left end of the material tube is plugged into the fixed needle 12. Fig.19 As shown, the right end of the material tube is arranged in the second groove of the second fixing seat 66, and at the same time, the support groove 611 of each auxiliary support column 61 supports a material tube. At the current moment, each cutter 5125 is in the eighth switching position, such as Fig.11 As shown, such a configuration helps to prevent the material tube from accidentally colliding with the support beam 511 of the cutter portion 51 when the material tube is placed in the second groove; S112, the worm 13 cooperates with each turbine 14, and the worm 13 rotates, so that each turbine 14 rotates, thereby causing each fixed needle 12 to rotate, so that each material tube rotates; S113, the first direction driving mechanism drives the first fixing seat assembly 10 to move rightward by a first preset distance, and the first fixing seat 11 approaches the second fixing seat 66, wherein the first preset distance controls the length of the first bead tube; S114, under the action of the first swinging part 52, the cutter 5125 switches from the eighth switching position to the seventh switching position. Based on the action of the first linear guide mechanism 64, the auxiliary support seat 62 moves upward in the vertical direction, driving the auxiliary support column 61 to move upward, so that the auxiliary support column 61 applies an upward force to the material tube. At the same time, based on the action of the second linear guide mechanism 515, the cutter structure 512 moves downward in the vertical direction, driving the pressing member 5124 and the cutter 5125 to move downward, the pressing member 5124 presses the material tube, and the cutter 5125 applies a downward force to the material tube. Fig.19As shown, the cutter 5125 and the auxiliary support column 61 are arranged vertically opposite to each other, and the material tube is sandwiched between them. During the cutting process, the force applied by the cutter 5125 and the auxiliary support column 61 to the material tube can prevent the material tube from vibrating or shifting, so that the material tube remains stable, which helps to make the position of the cut of the material tube flat, thereby ensuring the accuracy of the size of the first bead tube; because the auxiliary support column 61 elastically supports the material tube, the auxiliary support column 61 can prevent the material tube from vibrating or shifting on the one hand, and on the other hand, avoid affecting the self-rotation of the material tube. The setting of the pressing member 5124 further improves the stability of the material tube, and because the pressing member 5124 is made of elastic material, it does not affect the self-rotation of the material tube.

[0045] S115. When the cutter 5125 cuts the material tube, the second air hole faces the cutter 5125, so that dust particles generated by cutting are kept away from the second groove of the second fixing seat 66, thereby preventing the dust particles from falling into the second groove.

[0046] S116, after acquiring the first bead tube, the support beam 511 still maintains the position corresponding to step S114. Based on the action of the first linear guide mechanism 64, the auxiliary support seat 62 moves downward in the vertical direction, driving the auxiliary support column 61 to move downward, and the auxiliary support column 61 returns to the initial position and breaks contact with the material tube; based on the action of the second linear guide mechanism 515, the cutter structure 512 moves upward in the vertical direction, driving the pressing member 5124 and the cutter 5125 to move upward, and the pressing member 5124 and the cutter 5125 return to the initial position and break contact with the material tube; in addition, the second air hole stops blowing air to the cutter 5125; S117, the first direction driving mechanism causes the first fixing seat assembly 10 to continue to move rightward by a second preset distance, and the first fixing seat 11 continues to approach the second fixing seat 66. The second preset distance controls the length of the second bead tube, and the length of the second bead tube may be equal to the length of the first bead tube, or may be different from the length of the first bead tube; S118, repeat S114, S115, S116 until the Nth bead tube, N is a positive integer, and the entire material tube is cut; S119, the cutter 5125 of the cutter part 51 is switched from the seventh switching position to the eighth switching position under the action of the first swinging part 52. In the current position, the support beam 511 and the cutter 5125 are arranged away from the second fixing seat 66; S120, each fixing needle 12 on the first fixing seat 11 is reset to another material tube, refer to the description of S111, so it will not be repeated.

[0047] It should be noted that the embodiment of the present application does not limit the order of execution of the above steps S111, S112, S113, S114, S115, and S116. In some embodiments, the cutter 5125 elastically cuts the material tube, and the second fixed seat assembly 60 non-elasticly supports the material tube; or, in other embodiments, the cutter 5125 elastically cuts the material tube, and the second fixed seat assembly 60 elastically supports the material tube.

[0048] In this way, during the cutting process, the material tube is elastically cut by the cutter 5125, and / or the auxiliary support column 61 elastically supports the material tube. The force applied by the cutter 5125 and the auxiliary support column 61 to the material tube can prevent the material tube from vibrating or shifting, so that the material tube remains stable, and helps to flatten the position of the cut of the material tube, thereby ensuring the accuracy of the bead tube size. Since the auxiliary support column 61 elastically supports the material tube and the cutter 5125 elastically cuts the material tube, the auxiliary support column 61 or the cutter 5125 can avoid the material tube from vibrating or shifting on the one hand, and avoid affecting the rotation of the material tube on the other hand. The setting of the pressure piece 5124 further improves the stability of the material tube, and since the pressure piece 5124 is made of elastic material, it does not affect the rotation of the material tube.

[0049] In the above step S118, each fixing needle 12 on the first fixing seat 11 will have a cut material head left, and the material head on the fixing needle 12 needs to be manually removed so that the bead tube processing device can load a new material tube. However, due to the large number of fixing needles 12, the process of manually removing the material head is cumbersome and wastes a lot of time, thereby affecting the working efficiency of the bead tube processing device.

[0050] Based on this, the bead tube processing device of the present application further includes a material head extraction mechanism 30. A fixed needle 12 is provided on the first fixed seat 11, and the fixed needle 12 is used to plug the end of the material tube. The fixed needle 12 cooperates with the material head extraction mechanism 30 to allow the material head located on the fixed needle 12 to be detached from the fixed needle 12. In this way, the material heads on each fixed needle 12 can be automatically removed, avoiding manual removal of the material heads, reducing the labor intensity of the operator, shortening the time for collecting the material heads, and improving the processing efficiency of the bead tube.

[0051] In detail, the first fixed seat 11 can rotate and have a first switching position and a second switching position. When the first fixed seat 11 is in the first switching position, the length of the fixed needle 12 is set along the first direction; when the first fixed seat 11 is in the second switching position, the length of the fixed needle 12 is set along the vertical direction or tilted, and the fixed needle 12 cooperates with the material head pulling mechanism 30 to make the material head on the fixed needle 12 detach from the fixed needle 12.

[0052] Among them, Figure 4As shown, the first fixed seat 11 is fixedly connected to the rotating plate, and the rotating plate drives the rotating shaft plate to rotate through the relevant mechanism, so that the first fixed seat 11 switches between the first switching position and the second switching position. When the first fixed seat 11 is in the first switching position, the length of the fixed needle 12 is set in the left-right direction; when the second fixed seat 11 is in the second switching position, the length of the fixed needle 12 is set in the vertical direction. The relevant mechanism can be a belt mechanism, a sprocket mechanism, a gear mechanism, etc., which is not limited in this embodiment.

[0053] like Figure 8 , Fig. 22 and Fig.23 As shown, a material pulling head mechanism 30 is installed on the first mounting portion 73, and the material pulling head mechanism 30 is located below the first fixed seat 11. The material pulling head mechanism 30 includes a first friction roller 31 and a second friction roller 32, and the axis of the first friction roller 31 is parallel to the axis of the second friction roller 32, and the axes of the two extend in the front-to-back direction.

[0054] At least one of the first friction roller 31 and the second friction roller 32 rotates, and the side surfaces of the first friction roller 31 and the second friction roller 32 are frictionally matched with the material heads on the fixed needle 12. The material heads on each fixed needle 12 can be clamped between the first friction roller 31 and the second friction roller 32 to apply a downward force to the material heads so that the material heads are separated from the fixed needle 12. If both the first friction roller 31 and the second friction roller 32 rotate, their rotation directions are opposite.

[0055] Furthermore, a friction layer is provided on the outer side of the first friction roller 31 and the second friction roller 32, and the friction layer includes a spiral pattern. Since the surface of the material tube is smooth, it is not conducive to the two friction rollers to clamp it. The spiral pattern can significantly increase the friction between the friction roller and the material tube, and can improve the friction roller's force in picking up and squeezing the material tube.

[0056] Further, the first friction roller 31 and the second friction roller 32 reciprocate synchronously in a second direction, and the second direction is perpendicular to the first direction.

[0057] like Figure 8 , Fig. 22 and Fig.23 As shown, the second direction is the front-to-back direction. The first friction roller 31 and the second friction roller 32 synchronously swing back and forth in the front-to-back direction. In this way, the contact surface between the material head and the fixed needle 12 can be continuously changed, thereby reducing the friction between the material head and the fixed needle 12; the force direction and angle of the material head can be changed, making the extraction action more flexible.

[0058] Furthermore, the distance between the axis of the first friction roller 31 and the axis of the second friction roller 32 is adjustable. In this way, the material pulling head mechanism 30 can be adapted to material heads of different diameters.

[0059] Furthermore, the first friction roller 31 and the second friction roller 32 can reciprocate in the vertical direction. In this way, the first friction roller 31 and the second friction roller 32 can adjust their heights according to the length of the slug to ensure that the first friction roller 31 and the second friction roller 32 can clamp slugs of different lengths.

[0060] It should be noted that between steps S118 and S119 , or between steps S119 and S120 , the material head removal mechanism 30 is performed to remove the material head.

[0061] In the above step S111, the material tube needs to be manually plugged into the fixing needle 12. However, due to the large number of fixing needles 12, the process of manually plugging the material tube is cumbersome and wastes a lot of time, thereby affecting the working efficiency of the bead tube processing device.

[0062] Based on this, the bead tube processing device of the present application further includes a second support seat 81 and an auxiliary component 20. The second support seat 81 is used to support the end of the material tube. The second support seat 81 and the first fixing seat 11 are spaced apart in the first direction, such as Figure 1 As shown, the first fixing seat 11, the second supporting seat 81, and the first supporting seat 82 are arranged in sequence from left to right. The auxiliary component 20 cooperates with one end of the material tube to make the material tube approach the fixing needle 12 until the material tube is sleeved on the fixing needle 12. In this way, each fixing needle 12 can be automatically plugged with a material tube, avoiding manual plugging of the material tube, reducing the labor intensity of the operator, shortening the time of plugging the material tube, and improving the processing efficiency of the bead tube.

[0063] Among them, Figure 2 and Figure 3 and Figure 7 and Figure 8 As shown, the auxiliary component 20 includes a third friction roller 21, and the third friction roller 21 can move and has a third switching position and a fourth switching position. The third friction roller 21 is in the third switching position, the third friction roller 21 is arranged close to the second support seat 81, the third friction roller 21 rotates, and the side surface of the third friction roller 21 frictionally cooperates with one end of the material tube so that the material tube is inserted into the fixed needle 12; the third friction roller 21 is in the fourth switching position, the third friction roller 21 is arranged away from the second support seat 81, and the third friction roller 21 is disengaged from one end of the material tube.

[0064] In detail, Figure 22-Figure 24 As shown, the second support seat 81 has a plurality of third grooves arranged in the front-to-back direction, and the third grooves are adapted to the material tubes, which helps to stabilize the position of the material tubes, so that each material tube is correspondingly arranged with a fixing needle 12 .

[0065] like Figure 2 and Figure 3As shown, the auxiliary assembly 20 includes a third friction roller 21, a second swinging portion 22, an auxiliary support seat 24 and a synchronous belt assembly 25. The second swinging portion 22 is connected to the auxiliary support seat 24, and at the same time, the first fixed seat 11 is also connected to the auxiliary support seat 24. In the first direction driving mechanism, the nut is connected to the auxiliary support seat 24. The screw rod rotates, and the nut drives the first fixed seat 11 and the auxiliary support seat 24 to reciprocate in the left and right directions.

[0066] The second swinging portion 22 enables the third friction roller 21 to switch between the third switching position and the fourth switching position. Figure 8 As shown, when the third friction roller 21 is in the third switching position, the third friction roller 21 is located directly above the second support seat 81, and the left end of the material tube is clamped between the third friction roller 21 and the second support seat 81. Under the action of the third friction roller 21, the material tube moves to the left, and the material tube approaches the fixed needle 12 until the material tube is inserted into the fixed needle 12. After the material tube is inserted into the fixed needle 12, the third friction roller 21 switches from the third switching position to the fourth switching position. At this moment, Figure 7 or Figure 8 As shown, the third friction roller 21 is arranged away from the second support seat 81 , and the third friction roller 21 is located above the first fixed seat 11 or the second support seat 81 .

[0067] The synchronous belt assembly 25 includes a driving pulley 251 and a driven pulley 252. The driving pulley 251 is mounted on the output shaft of the driving motor, the driving motor is mounted on the second swinging part 22, and the driven pulley 252 is coaxially arranged with the third friction roller 21, and the driven pulley 252 drives the third friction roller 21 to rotate.

[0068] Considering the material and strength of the material tube, the material tube is prevented from being squeezed and deformed during the plugging process. Therefore, the motion trajectory of the third friction roller 21 is selected to be arc-shaped. The arc trajectory is smoother than the straight trajectory, and can effectively reduce the impact and vibration during the movement. At the same time, the arc trajectory can achieve high-precision motion control.

[0069] Furthermore, when the third friction roller 21 is in the fourth switching position, the third friction roller 21, the first fixed seat 11 and the second support seat 81 are orthographically projected on the same horizontal plane, there is an overlapping area between the projection of the third friction roller 21 and the projection of the first fixed seat 11, and there is a gap between the projection of the third friction roller 21 and the projection of the second support seat 81. In this way, in the above step S111 or S120, when placing the material tube, accidental collision between the material tube and the third friction roller 21 can be avoided.

[0070] Furthermore, the second support seat 81 can reciprocate in the vertical direction. In this way, when the first direction driving mechanism causes the first fixing seat 11 to reciprocate in the left and right directions, the second support seat 81 can be prevented from interfering with the first fixing seat 11. When the third friction roller 21 is in the third switching position, the axis of the third groove and the axis of the fixing needle 12 of the first fixing seat 11 are located on the same straight line.

[0071] Furthermore, a rubber layer or a silicone layer is provided on the outer side of the third friction roller 21. The rubber layer or the silicone layer can increase the friction between the third friction roller 21 and the material tube, and can further enable the material tube to be inserted into the fixing needle.

[0072] In actual applications, when the material tube is inserted into the fixing needle 12, there is a problem that the material tube is not firmly inserted, which affects the subsequent cutting.

[0073] Based on this, Figure 3 As shown, the bead tube processing device of the present application also includes a material box assembly 40, and the material box assembly 40 includes a material box 42, and a bonding material is provided in the material box 42. The material box 42 cooperates with the fixing needle 12 so that the fixing needle 12 contacts the bonding material. In this way, before the material tube is plugged into the fixing needle 12, a bonding material is provided on the fixing needle 12, and the bonding material can improve the strength of the material tube connected to the fixing needle 12, avoid the problem of loose plugging of the material tube, and thus help the subsequent cutting process, such as ensuring the stability of the material tube, helping the material tube cut position to be flat, and ensuring the accuracy of the bead tube size.

[0074] The material box 42 moves in the first direction to have a fifth switching position and a sixth switching position. When the material box 42 is in the fifth switching position, the material box 42 is located below the first fixing seat 11; when the material box 42 is in the sixth switching position, the material box 42 is located away from the first fixing seat 11.

[0075] like Fig. 22 and Fig.23 As shown, the material box assembly 40 includes a material box cover 41 and a material box 42 located in the material box cover 41. The material box cover 41 is fixedly connected to the first mounting portion 73, and the material box 42 moves in the left and right directions to have a fifth switching position and a sixth switching position. Figure 5As shown, when the material box 42 is in the sixth switching position, the material box 42 is located in the material box cover 41; when the material box 42 is in the fifth switching position, the material box 42 moves from the material box cover 41 to the bottom of the fixing seat 11. At this moment, the first fixing seat 11 switches from the first switching position to the second switching position, the fixing needle 12 cooperates with the material box 42, and the end of the fixing needle 12 is bonded to the adhesive in the material box 42. Then, the first fixing seat 11 switches from the second switching position to the first switching position, and then the fixing needle 12 is plugged into the material tube. In this way, each fixing needle 12 is provided with adhesive, and based on the joint action of the third friction roller 21 and the second support seat 81, the material tube is stably plugged into the fixing needle 12.

[0076] It should be noted that if Figure 8 As shown, when the material box 42 moves in the left-right direction, since the first friction roller 31 and the second friction roller 32 can reciprocate in the vertical direction, the interference problem between the material box 42 and the first friction roller 31 and the second friction roller 32 can be avoided.

[0077] In addition, the material box assembly 40 also includes a scraper assembly 43, which includes a scraper member 431 and a connecting shaft 432 connected to the scraper member 431. The connecting shaft 432 is connected to the material box 42 so that the scraper member 431 is located in the material box 42, wherein the axis of the connecting shaft 432 extends in the front-to-back direction.

[0078] like Figure 5 and Figure 6 As shown, the scraper 431 includes a scraper end surface 4311 and a material leakage hole 4312 arranged near the scraper end surface 4311. The length direction of the scraper 431 is parallel to the axis direction of the connecting shaft 432. The connecting shaft 432 is rotatably connected to the material box 42, and the connecting shaft 432 can be driven by a motor, a hydraulic drive, a pneumatic drive, etc. to rotate the connecting shaft 432, and the connecting shaft 432 drives the scraper 431 to rotate.

[0079] In this way, during the movement of the material box 42, the scraper end surface 4311 scrapes and levels the solid-liquid phase change material end surface in the material box 42, avoiding the unevenness of the solid-liquid phase change material end surface and affecting the adhesion of the solid-liquid phase change material to the end of the fixed needle 12; during the scraping and leveling process, the solid-liquid phase change material passes through the leakage hole 4312. The setting of the leakage hole 4312 can reduce the contact area between the scraper 431 and the solid-liquid phase change material, making the scraping and leveling more labor-saving, controlling the scraping and leveling force, and improving the flatness; it helps to discharge excess solid-liquid phase change material and avoid accumulation that affects the scraping and leveling effect. As the solid-liquid phase change material is consumed, it decreases. When the scraper 431 cannot scrape the solid-liquid phase change material end surface, the distance between the scraper end surface 4311 and the solid-liquid phase change material end surface is reduced by rotating the connecting shaft 432.

[0080] Furthermore, a heating component 83 is included. The heating component 83 conducts heat transfer with the fixing needle 12 of the first fixing seat 11 in the first switching position.

[0081] Among them, Figure 8 As shown, the heating component 83 is connected to the second support base 81. The heating component 83 is located between the second support base 81 and the first fixing base 11. The solid-liquid phase change material is heated and the viscosity decreases.

[0082] like Figure 8 , Fig. 22 and Fig.23 As shown, the heating assembly 83 includes a first air pipe, which is fixedly connected to the second support seat 81, and is located directly below the fixing pin 12 of the first fixing seat 11 in the first switching position. The first air pipe is provided with a plurality of first air holes arranged in the front-to-back direction, and each first air hole corresponds to a fixing pin 12. Gas is provided in the first air pipe, and the first air holes discharge the gas, and the gas burns and heats the fixing pin 12. The fixing pin 12 with a higher temperature melts the solid-liquid phase change material so that the end of the fixing pin 12 is fully provided with the solid-liquid phase change material, which can further ensure the stability of the material pipe plugging the fixing pin 12.

[0083] In addition, if Figure 8 As shown, the second support seat 81 is also connected to a glue plate 84, and the glue plate 84 is located below the first air pipe. This can prevent the solid-liquid phase change material accidentally dropped from the fixing needle 12 from affecting other mechanisms, such as the first friction roller 31 and the second friction roller 32.

[0084] Considering that there is a risk of damaging the third friction roller 21 during the process of the first gas pipe discharging the gas to heat the fixed needle 12, the auxiliary component 20 further includes a first baffle plate 23, which is connected to the second swinging portion 22 through a related connecting member, so that the first baffle plate 23 moves with the third friction roller 21.

[0085] like Figure 8 As shown, when the third friction roller 21 is in the third switching position, the first shielding plate 23 is located between the first air hole and the third friction roller 21, and is arranged close to the side of the third friction roller 21. In this way, the first shielding plate 23 can shield the influence of the flame on the third friction roller 21, thereby ensuring the integrity of the third friction roller 21.

[0086] Before step S111 is performed, the end of the fixed needle 12 is bonded to the solid-liquid phase change material, and the process may include the following steps: S211, the first air hole of the first air pipe discharges gas, and the combustion of the gas heats the fixing needle 12 of the first fixing seat 11 in the first switching position; S212, the second support seat 81 moves downward in the vertical direction to prevent the first air pipe from interfering with the moving fixed needle 12; at the same time, the first friction roller 31 and the second friction roller 32 move downward in the vertical direction to prevent the material box 42 from interfering with the first friction roller 31 and the second friction roller 32; S213, the material box 42 moves rightward from the material box cover 41 until the material box 42 moves to the fifth switching position, that is, the material box 42 moves to below the first fixed seat 11; S214, the first fixing seat 11 switches from the first switching position to the second switching position, the fixing needle 12 moves downward from the horizontal position, the fixing needle 12 cooperates with the material box 42, and the end of the fixing needle 12 is bonded to the adhesive in the material box 42; S215, the first fixing seat 11 switches from the second switching position to the first switching position, the fixing needle 12 returns to the horizontal position, and then the step S111 is executed.

[0087] It should be noted that, considering that in the process of removing the material head under the action of the first friction roller 31 and the second friction roller 32, the material head is affected by the adhesive. Therefore, between steps S118 and S119, or between steps S119 and S120, in the process of removing the material head by the material head removal mechanism 30, before the material head is removed, the first gas pipe discharges gas again to heat the fixed needle 12 with the material head, and the adhesive is heated and the viscosity is reduced, so that it is convenient for the first friction roller 31 and the second friction roller 32 to remove the material head.

[0088] At least Fig. 9 , Fig. 22 and Fig.23 As shown, the bead tube processing device also includes a receiving hopper 90 , which is installed close to the second mounting portion 74 , and the receiving hopper 90 is correspondingly arranged with the connecting seat 65 so that the bead tubes can be completely recovered through the receiving hopper 90 .

[0089] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other.

Claims

1. A bead tube processing device, characterized in that: include: A first fixing seat assembly (10) comprises a first fixing seat (11), a plurality of fixing pins (12) arranged on the first fixing seat (11) along the same direction, the fixing pins (12) being used to plug into the end of a material pipe, and the fixing pins (12) driving the material pipe to rotate when rotating; a second fixing seat assembly (60), wherein the first fixing seat assembly (10) and the second fixing seat assembly (60) are arranged at intervals in a first direction, the first direction being perpendicular to the arrangement direction of the fixing needles (12), and the second fixing seat assembly (60) supports the material tube corresponding to each fixing needle (12); A tube cutting assembly (50), wherein the tube cutting assembly (50) is arranged corresponding to the second fixing seat assembly (60), and the tube cutting assembly (50) comprises a plurality of cutters (5125) arranged in the same direction, wherein the cutters (5125) correspond one to one with the fixing needles (12), and the arrangement direction of the cutters (5125) is parallel to the arrangement direction of the fixing needles (12), and the cutters (5125) cooperate with the second fixing seat assembly (60) to cut the material tube to form a tube bead.

2. The bead tube processing device according to claim 1, characterized in that: The second fixing seat assembly (60) comprises an auxiliary support seat (62), on which a plurality of auxiliary support columns (61) are arranged along the same direction, the auxiliary support columns (61) corresponding to the fixing needles (12) one by one, the arrangement direction of the auxiliary support columns (61) being parallel to the arrangement direction of the fixing needles (12), and the auxiliary support columns (61) being provided with support grooves (611) adapted to the material tube.

3. The bead tube processing device according to claim 2, characterized in that: The cutting knife (5125) and the auxiliary support column (61) are arranged correspondingly up and down.

4. The bead tube processing device according to claim 3, characterized in that: The cutter (5125) elastically cuts the material tube, and / or the auxiliary support column (61) elastically supports the material tube.

5. The bead tube processing device according to claim 1, characterized in that: It also comprises a first direction driving mechanism, wherein the first direction driving mechanism enables the first fixing seat (11) to move in the first direction to approach or move away from the auxiliary supporting seat (62).

6. The bead tube processing device according to claim 5, characterized in that: The first direction driving mechanism comprises a ball screw mechanism, the ball screw mechanism comprises a matching screw rod and a nut, the length of the screw rod is arranged along the first direction, the screw rod rotates, and the nut causes the first fixing seat (11) to reciprocate in the first direction.

7. The bead tube processing device according to claim 1, characterized in that: The first fixing seat assembly (10) further comprises a worm (13) and a turbine (14); the fixing needle (12) is sleeved with the turbine (14); the turbine (14) meshes with the worm (13) to enable the fixing needle (12) to rotate.

8. The bead tube processing device according to claim 7, characterized in that: A first cavity (111) is provided inside the first fixing seat (11), the length direction of the first cavity (111) is parallel to the arrangement direction of the fixing pins (12), and the worm (13) is arranged in the first cavity (111). The fixing needle (12) passes through the first cavity (111) along the first direction, the first fixing needle (12) is perpendicular to the worm (13), and the turbine (14) is installed at the position of the first fixing needle (12) in the first cavity (111).

9. The bead tube processing device according to claim 1, characterized in that: It also includes a first support seat (82), the first support seat (82) is located between the first fixed seat (11) and the auxiliary support seat (62), and the first support seat (82) is used to support the middle part of the material pipe.

10. The bead tube processing device according to claim 9, characterized in that: The first support seat (82) is capable of reciprocating in a vertical direction.

Citation Information

Cited By

  • Novel feeding mechanism of bead tube processing device

    CN224363015U

  • Feeding mechanism of bead tube processing device

    CN224378464U