Intelligent three-dimensional warehouse management method, system, equipment and medium

Through intelligent library management methods and systems, the problems of manual dependence and irregular inventory management in the storage management of power metering equipment are solved, and the equipment is automatically stored, real-time data collection and intelligent out-of-warehouse is realized, and management efficiency and data accuracy are improved.

CN119919050APending Publication Date: 2025-05-02GUIZHOU POWER GRID CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411741490.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-05-02

AI Technical Summary

Technical Problem

The existing management methods for power metering equipment storage are highly dependent on manual operations, are inefficient, are susceptible to human factors, and lack unified inventory management standards, resulting in unclear equipment classification and random storage locations, which can easily lead to equipment loss, damage or expiration.

Method used

The intelligent warehouse management method is adopted to receive warehouse entry tasks through the intelligent warehouse warehouse storage management system (WMS), and the power metering equipment is automatically stored, collected and uploaded in real time, realizing automatic identification, classification, positioning and inventory of the equipment, and perform corresponding operations during the outbound process.

Benefits of technology

It realizes the automation and intelligence of the storage management of electrical energy metering equipment, improves the efficiency of information entry, reduces human errors, reduces manual dependence, improves management efficiency, and reduces the risk of equipment loss, damage or expired.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119919050A_ABST
    Figure CN119919050A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent three-dimensional warehouse management method, system, equipment and medium, and relates to the technical field of warehouse management, and the method comprises the steps: an intelligent three-dimensional warehouse warehouse management system WMS receives a warehouse-in task issued by a metering production scheduling platform, carries out the warehouse-in action of electric energy metering equipment, and removes abnormal equipment during warehouse-in; after warehousing, collecting electric energy metering equipment data in real time, and uploading the equipment data to a WMS and a metering production scheduling platform; when an ex-warehouse instruction issued by the metering production scheduling platform is sent to the WMS, the system carries out ex-warehouse action, positions the electric energy metering equipment needing ex-warehouse for ex-warehouse, and uploads equipment data to update inventory data; the WMS monitors the operation condition of the system and the working condition of hardware equipment in real time, and gives an alarm when the system and the equipment are abnormal. By introducing an advanced informatization technology, digitization and automation of warehousing management of the electric energy metering equipment are realized, the system can automatically input, update and share equipment information, and the efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of warehouse management, and in particular to an intelligent vertical warehouse management method, system, equipment and medium. Background Art

[0002] As a core component of the operation of power grid companies, electric energy metering equipment undertakes important functions of electric energy metering, data collection, transmission and processing. Accurate and reliable electric energy metering is the cornerstone of ensuring fair transactions in the power market, improving the efficiency of power grid operation, and achieving energy conservation and emission reduction goals. Electric energy metering equipment is not only related to the economic benefits of power grid companies, but also directly affects the vital interests of power users.

[0003] The storage management of electric energy metering equipment is the starting point of the equipment life cycle management, and is also the key link to ensure equipment quality, trace equipment information, and optimize inventory configuration. Efficient and standardized storage management can ensure the timely supply of equipment, reduce inventory costs, and improve equipment utilization. At the same time, it provides solid data support for subsequent installation, maintenance, and repair work.

[0004] However, the existing storage management method of electric energy metering equipment still has many drawbacks and shortcomings:

[0005] Low level of informatization: Many power grid companies still use traditional manual records or simple electronic spreadsheet management, which makes information entry inefficient, error-prone, and difficult to achieve real-time sharing and updating of data.

[0006] Chaotic inventory management: The lack of unified inventory management standards leads to unclear equipment classification and random storage locations, which can easily cause equipment to be lost, damaged or expired.

[0007] Difficult to trace: Equipment information records are incomplete and non-standard. Once quality problems occur or the equipment history needs to be traced, it is often difficult to locate and query quickly.

[0008] High dependence on manual labor: The warehousing management process is highly dependent on manual operations, which is not only inefficient but also easily affected by human factors, increasing management risks.

[0009] Insufficient intelligence: There is a lack of intelligent warehousing management methods, which makes it impossible to realize automatic identification, classification, positioning and inventory of equipment, and it is difficult to adapt to the modern power grid companies' requirements for refined and intelligent equipment management.

[0010] In view of the many drawbacks and shortcomings of the above-mentioned existing storage management, the present invention aims to provide an intelligent vertical storage management method, system, equipment and medium to solve the problems existing in the prior art and improve the efficiency, accuracy and intelligence level of storage management of electric energy metering equipment. The present invention introduces advanced information technology, automation equipment and intelligent algorithms to achieve automatic identification, classified storage, real-time monitoring and intelligent tracing of electric energy metering equipment, providing power grid companies with an efficient, standardized and intelligent vertical storage management solution. Summary of the invention

[0011] In view of the above-mentioned problems, the present invention is proposed.

[0012] Therefore, the problem to be solved by the present invention is that the existing storage management method of electric energy metering equipment is highly dependent on manual operation, which is not only inefficient but also easily affected by human factors, increasing management risks. In addition, there is a lack of unified inventory management standards, resulting in unclear equipment classification and random storage locations, which can easily cause equipment loss, damage or expiration.

[0013] To solve the above technical problems, the present invention provides the following technical solutions: an intelligent vertical warehouse management method, which comprises: an intelligent vertical warehouse storage management system WMS receives the warehousing task issued by the metering production scheduling platform, performs warehousing action on the electric energy metering equipment, and removes abnormal equipment during warehousing; after warehousing, the electric energy metering equipment data is collected in real time, and the equipment data is uploaded to the WMS and the metering production scheduling platform; when the metering production scheduling platform issues an outbound instruction to the WMS, the system performs an outbound action, the system locates the electric energy metering equipment that needs to be outbound, and uploads the equipment data to update the inventory data; the WMS monitors the system operation status and the working status of the hardware equipment in real time, and issues an alarm when the system and equipment are abnormal.

[0014] As a preferred solution of the intelligent vertical warehouse management method described in the present invention, the warehousing action of the electric energy metering equipment includes: after the electric energy metering equipment arrives, inspection and confirmation, information entry and verification and task formulation are carried out in the front warehouse operation area, and when the WMS receives the warehousing instruction from the metering production scheduling platform, it is prepared for warehousing; the WCS system in front of the warehouse takes the whole stack of electric energy metering equipment as a turnover box stack for online operation, and the turnover box stack after going online is disassembled into single turnover boxes by a depalletizer to enter the identity identification process, or the whole turnover box stack directly enters the identity identification process; each whole stack of equipment is transported to the identity identification station through a conveyor line, and the equipment information and turnover box information are collected and identified, and at the same time, compared and verified with the arrival information provided by the supplier; after successful verification, the information is uploaded to the metering production scheduling platform, and the electric energy metering equipment is transmitted to the air shower dust removal station, and at the same time, the electric energy metering equipment in the single box or the whole stack of turnover boxes are subjected to air shower dust removal to remove dust inside and outside the turnover box, and stacking is carried out after completion.

[0015] As a preferred solution of the intelligent vertical warehouse management method described in the present invention, the warehousing action of the electric energy metering equipment also includes that the single box equipment after dust removal is transported to the palletizing station, stacked into n boxes / pallets of turnover boxes by the palletizer, and transported to the platform designated by the WMS. If the whole pallet of equipment is put into storage, it does not need to be palletized and is directly transported to the designated platform. Finally, the corresponding stacker picks up the goods and stores them in the designated cargo position to complete the physical warehousing operation of the equipment.

[0016] As a preferred solution of the intelligent vertical warehouse management method described in the present invention, the above-mentioned elimination of abnormal equipment includes comparing and verifying the equipment information and turnover box information with the arrival information provided by the supplier during identity recognition. If the first verification fails, a second verification is performed. If the second verification still fails, the goods are transported to the abnormal processing station for manual processing. The damaged electric energy metering equipment that does not match the input arrival information is manually processed at the abnormal processing station and then re-entered into the warehouse. The electric energy metering equipment that ultimately fails to be successfully entered into the warehouse is eliminated.

[0017] As a preferred solution of the intelligent vertical warehouse management method described in the present invention, the real-time collection of electric energy metering equipment data and uploading of the equipment data to the WMS and the metering production scheduling platform include: starting the sensor installed on the electric energy metering equipment to start real-time data collection, the sensor reads the status, position and environmental parameters of the equipment, and pre-processes the collected raw data; integrating the pre-processed data into a unified data packet, adding a unique identifier to the data packet, and encrypting the data packet, selecting a transmission protocol according to the data type and transmission requirements to establish a connection with the WMS through the transmission layer, and sending the encrypted data packet to the WMS; after receiving the data packet, the WMS sends a confirmation signal back to the transmission layer, decrypts the received data packet, and restores the original data. The WMS allocates the data to the corresponding storage location according to the data type and importance, and writes the decrypted data to the designated storage location; the WMS determines whether the data needs to be synchronized with the metering production scheduling platform. If synchronization is required, the WMS sends a synchronization instruction to the metering production scheduling platform, and the metering production scheduling platform performs a data synchronization operation after receiving the instruction.

[0018] As a preferred solution of the intelligent vertical warehouse management method described in the present invention, the system performs the outbound action, including: the metrology production scheduling platform issues an outbound instruction to the WMS, the intelligent vertical warehouse locks the goods to be outbound through the storage optimization algorithm according to the outbound task information and the collected goods location information stored in the warehouse area, the stacker runs to the designated cargo position according to the WMS instruction, takes the locked goods from the shelf, and transports them to the front area of ​​the warehouse; the information of the goods transported out of the warehouse is checked through the identity recognition station on the outbound channel in the front area of ​​the warehouse to verify the consistency between the outbound physical object and the outbound task, and after successful verification, the goods are transported to the corresponding exit to complete the outbound operation; after completing the outbound loading action, the WMS exchanges information with the metrology production scheduling platform, uploads the outbound equipment information to the metrology production scheduling platform, and updates the inventory data.

[0019] As a preferred solution of the intelligent vertical warehouse management method described in the present invention, the alarm is issued when the system and equipment are abnormal, including that the intelligent vertical warehouse storage management system monitors the system operation status of the main control and sub-control and the working status of the underlying hardware equipment and components in real time. When the system and equipment are abnormal, the abnormal alarm information is uploaded and sent to the measurement and production scheduling platform. After receiving the abnormal alarm information, the measurement and production scheduling platform pushes the alarm information to the three-dimensional simulation system for intuitive display. The three-dimensional simulation system performs linkage switching between simulation screen and video monitoring for the abnormal equipment, and performs three-level linkage of the on-site alarm information, simulation screen and video scene. If the alarm information is that the stacker is abnormal, the video information of the stacker camera is automatically collected and uploaded to the display screen of the sub-control room.

[0020] Another object of the present invention is to provide an intelligent vertical warehouse management system, which can automatically perform the storage and in-and-out operations of electric energy metering equipment.

[0021] To solve the above technical problems, the present invention provides the following technical solutions: a system of an intelligent vertical warehouse management method, comprising: a warehousing module, an equipment data acquisition module, an outbound module and a monitoring module; the intelligent vertical warehouse storage management system WMS receives the warehousing task issued by the metering production scheduling platform, the warehousing module performs warehousing action on the electric energy metering equipment, and removes abnormal equipment during warehousing; after warehousing, the equipment data acquisition module collects the electric energy metering equipment data in real time, and uploads the equipment data to the WMS and the metering production scheduling platform; when the outbound instruction issued by the metering production scheduling platform is sent to the WMS, the outbound module performs the outbound action, locates the electric energy metering equipment to be outbound for outbound delivery, and uploads the equipment data to update the inventory data; the monitoring module monitors the system operation status and the working status of the hardware equipment in real time, and issues an alarm when the system and equipment are abnormal.

[0022] A computer device includes a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned intelligent vertical library management method when executing the computer program.

[0023] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the intelligent vertical library management method as described above.

[0024] The beneficial effects of the present invention are as follows: the existing warehousing management process is highly dependent on manual operation, and adopts traditional manual records or simple electronic spreadsheet management. The information entry efficiency is low, prone to errors, and it is difficult to achieve real-time sharing and updating of data. It is not only inefficient, but also easily affected by human factors. The present invention realizes the digitization and automation of the warehousing management of electric energy metering equipment by introducing advanced information technology. The system can automatically enter, update and share equipment information, greatly improves the efficiency of information entry, reduces human errors, and realizes real-time sharing and updating of data. It also reduces the manual operation links in the warehousing management process, and realizes automatic identification, classification, positioning and inventory of equipment through automation and intelligent means. This reduces manual dependence, improves management efficiency, and reduces management risks caused by human factors.

[0025] The existing inventory management scheme lacks a unified inventory management standard, resulting in unclear equipment classification and random storage locations, which can easily cause equipment to be lost, damaged or expired. The invention establishes a unified inventory management standard, which ensures clear equipment classification and standardized storage locations through a systematic classification and positioning mechanism. This not only avoids the problem of equipment loss, damage or expiration, but also improves the orderliness and traceability of inventory management. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0027] Figure 1 This is a general flow chart of an intelligent vertical library management method in Example 1.

[0028] Figure 2 This is a process flow chart of an intelligent vertical warehouse management method in Example 1.

[0029] Figure 3 This is a module structure diagram of an intelligent vertical warehouse management system in Example 2. DETAILED DESCRIPTION

[0030] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0031] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0032] Example 1, reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and which provides an intelligent vertical library management method including: Figure 1 As shown:

[0033] S1. The intelligent vertical warehouse management system WMS receives the warehousing tasks issued by the metering production scheduling platform, performs warehousing operations on the electric energy metering equipment, and removes abnormal equipment during warehousing.

[0034] After the electric energy metering equipment arrives, it will be inspected and confirmed, information will be entered and checked, and tasks will be formulated in the pre-warehouse operation area. When the WMS receives the warehousing instruction from the metering production scheduling platform, it will be ready for warehousing.

[0035] The WCS system in front of the warehouse takes the whole stack of electric energy metering equipment as a turnover box stack for online operation. After going online, the turnover box stack is split into single turnover boxes by the depalletizer and enters the identity recognition process, or the entire turnover box stack directly enters the identity recognition process.

[0036] Each whole-pallet device is transported to the identification station through the conveyor line, and the equipment information and turnover box information are collected and identified, and compared and verified with the arrival information provided by the supplier.

[0037] If the first verification fails, a second verification will be performed. If the second verification still fails, the goods will be transported to the abnormal processing station for manual processing. The electric energy metering equipment that is damaged or inconsistent with the entered arrival information will be manually processed at the abnormal processing station and then put back into storage. The electric energy metering equipment that ultimately fails to be successfully put into storage will be eliminated.

[0038] After successful verification, the information will be uploaded to the metering production scheduling platform, and the electric energy metering equipment will be transmitted to the air shower dust removal station. At the same time, the electric energy metering equipment in a single box or the entire stack of turnover boxes will be subjected to air shower dust removal to remove dust inside and outside the turnover box. After completion, palletizing will be carried out.

[0039] After dust removal, the single-box equipment is transported to the palletizing station, stacked into n boxes / pallets of turnover boxes by the palletizer, and transported to the platform designated by the WMS. If the whole pallet of equipment is put into storage, it can be directly transported to the designated platform without palletizing. Finally, the corresponding stacker picks up the goods and stores them in the designated cargo location, completing the physical storage operation of the equipment.

[0040] Further explanation: n is generally 6 boxes / pallet. If it is a low-voltage current transformer, it is 3 boxes / pallet. If it is a communication module, it is 10 boxes / pallet.

[0041] S2. After storage, the data of electric energy metering equipment is collected in real time and uploaded to WMS and metering production scheduling platform.

[0042] After storage, the sensors installed on the electric energy metering equipment are started to collect real-time data. The sensors read the status, location and environmental parameters of the equipment and pre-process the collected raw data.

[0043] Integrate the preprocessed data into a unified data packet, add a unique identifier to the data packet, and encrypt the data packet. According to the data type and transmission requirements, select the transmission protocol to establish a connection with the WMS through the transport layer, and send the encrypted data packet to the WMS.

[0044] After receiving the data packet, WMS sends a confirmation signal back to the transport layer, decrypts the received data packet, and restores the original data. WMS allocates it to the corresponding storage location based on the data type and importance, and writes the decrypted data to the designated storage location.

[0045] WMS determines whether the data needs to be synchronized with the metrology and production scheduling platform. If synchronization is required, WMS sends a synchronization instruction to the metrology and production scheduling platform. After receiving the instruction, the metrology and production scheduling platform executes the data synchronization operation.

[0046] S3. When the metering production scheduling platform issues a delivery instruction to the WMS, the system performs the delivery action, locates the electric energy metering equipment to be delivered, and uploads the equipment data to update the inventory data.

[0047] The metering production scheduling platform issues outbound instructions to the WMS. The intelligent vertical warehouse locks the goods to be shipped based on the outbound task information and the collected location information of the goods stored in the warehouse area through the storage optimization algorithm. The stacker runs to the designated cargo location according to the WMS instructions, takes the locked goods from the shelf, and transports them to the front area of ​​the warehouse.

[0048] The information of the goods being transported out of the warehouse is checked through the identity recognition station on the outbound channel in the front area of ​​the warehouse to verify the consistency between the actual outbound goods and the outbound task. After successful verification, the goods are transported to the corresponding exit to complete the outbound operation.

[0049] After the outbound loading is completed, the WMS exchanges information with the metering production scheduling platform, uploads the outbound equipment information to the metering production scheduling platform, and updates the inventory data. Figure 2 shown.

[0050] S4. WMS monitors the system operation status and hardware equipment working status in real time, and issues an alarm when the system and equipment are abnormal.

[0051] The intelligent vertical warehouse management system monitors the system operation status of the main control and sub-control as well as the working status of the underlying hardware equipment and components in real time. When the system and equipment are abnormal, the abnormal alarm information will be uploaded and sent to the measurement and production scheduling platform. After receiving the abnormal alarm information, the measurement and production scheduling platform will push the alarm information to the three-dimensional simulation system for intuitive display. The three-dimensional simulation system will perform linkage switching between simulation images and video monitoring for abnormal equipment, realizing three-level linkage of on-site alarm information, simulation images and video scenes. A camera is installed on the stacker, which can automatically collect video information and upload it to the sub-control room display screen when the stacker alarms; and it supports manual triggering of inspections under normal working conditions.

[0052] Example 2, reference Figure 3 , which is the second embodiment of the present invention, and is different from the first embodiment in that: a system of an intelligent vertical warehouse management method includes a warehousing module 100, an equipment data collection module 200, an outbound module 300 and a monitoring module 400; the intelligent vertical warehouse storage management system WMS receives the warehousing task issued by the metering production scheduling platform, and the warehousing module 100 performs warehousing action on the electric energy metering equipment, and removes abnormal equipment during warehousing; after warehousing, the equipment data collection module 200 collects the data of the electric energy metering equipment in real time, and uploads the equipment data to the WMS and the metering production scheduling platform; when the outbound instruction issued by the metering production scheduling platform is sent to the WMS, the outbound module 300 performs the outbound action, locates the electric energy metering equipment to be outbound for outbound, and uploads the equipment data to update the inventory data; the monitoring module 400 monitors the system operation status and the working status of the hardware equipment in real time, and issues an alarm when the system and equipment are abnormal.

[0053] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.

[0054] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0055] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0056] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0057] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. An intelligent vertical warehouse management method, characterized by: include, The intelligent warehouse management system WMS receives the warehousing tasks issued by the metering production scheduling platform, performs warehousing actions for the electric energy metering equipment, and removes abnormal equipment during warehousing; After storage, the data of electric energy metering equipment is collected in real time and uploaded to WMS and metering production scheduling platform; When the delivery instruction from the metering production scheduling platform reaches the WMS, the system performs the delivery action, locates the electric energy metering equipment to be delivered, and uploads the equipment data to update the inventory data; WMS monitors the system operation and hardware equipment working conditions in real time, and issues alarms when the system and equipment are abnormal.

2. The intelligent vertical warehouse management method according to claim 1, characterized in that: The warehousing action of the electric energy metering equipment includes, after the electric energy metering equipment arrives, checking and confirming, entering and checking information, and formulating tasks in the pre-warehouse operation area, and preparing for warehousing when the WMS receives the warehousing instruction from the metering production scheduling platform; The WCS system in front of the warehouse takes the whole stack of electric energy metering equipment as the turnover box stack for online operation. After the turnover box stack is online, it is split into single turnover boxes by the depalletizer and enters the identity recognition process, or the whole turnover box stack directly enters the identity recognition process; Each whole-pallet device is transported to the identification station through the conveyor line, where the device information and turnover box information are collected and identified, and compared and verified with the arrival information provided by the supplier; After successful verification, the information will be uploaded to the metering production scheduling platform, and the electric energy metering equipment will be transmitted to the air shower dust removal station. At the same time, the electric energy metering equipment in a single box or the entire stack of turnover boxes will be subjected to air shower dust removal to remove dust inside and outside the turnover box. After completion, palletizing will be carried out.

3. An intelligent vertical warehouse management method as claimed in claim 2, characterized in that: The warehousing of the electric energy metering equipment also includes that the single box equipment after dust removal is transported to the palletizing station, stacked into n boxes / pallets of turnover boxes by the palletizer, and transported to the platform designated by the WMS. If the whole pallet of equipment is to be stored, it does not need to be palletized and is directly transported to the designated platform. Finally, the corresponding stacker picks up the goods and stores them in the designated cargo location to complete the physical warehousing operation of the equipment.

4. The intelligent vertical warehouse management method according to claim 3, characterized in that: The elimination of abnormal equipment includes comparing and verifying the equipment information and turnover box information with the arrival information provided by the supplier during identity recognition. If the first verification fails, a second verification is performed. If the second verification still fails, the goods are transported to the abnormal processing station for manual processing. The damaged electric energy metering equipment or the electric energy metering equipment that does not match the input arrival information is manually processed at the abnormal processing station and then put back into storage. The electric energy metering equipment that ultimately fails to be successfully put into storage is eliminated.

5. The intelligent vertical warehouse management method according to claim 4, characterized in that: The real-time collection of electric energy metering equipment data and uploading of the equipment data to the WMS and the metering production scheduling platform includes starting the sensor installed on the electric energy metering equipment to start real-time data collection, the sensor reading the state, position and environmental parameters of the equipment, and preprocessing the collected raw data; Integrate the preprocessed data into a unified data packet, add a unique identifier to the data packet, and encrypt the data packet. According to the data type and transmission requirements, select the transmission protocol to establish a connection with the WMS through the transport layer, and send the encrypted data packet to the WMS; After receiving the data packet, WMS sends a confirmation signal back to the transport layer, decrypts the received data packet, and recovers the original data. WMS allocates it to the corresponding storage location according to the data type and importance, and writes the decrypted data to the designated storage location; WMS determines whether the data needs to be synchronized with the metrology and production scheduling platform. If synchronization is required, WMS sends a synchronization instruction to the metrology and production scheduling platform. After receiving the instruction, the metrology and production scheduling platform executes the data synchronization operation.

6. An intelligent vertical warehouse management method as claimed in claim 5, characterized in that: The system performs outbound actions including: the metering production scheduling platform issues outbound instructions to the WMS; the intelligent vertical warehouse locks the goods to be outbound through the storage optimization algorithm according to the outbound task information and the location information of the goods stored in the warehouse area; the stacker runs to the designated cargo location according to the WMS instruction, takes the locked goods from the shelf, and transports them to the front area of ​​the warehouse; The information of the goods being transported out of the warehouse is checked at the identity recognition station on the outbound channel in the front warehouse area to verify the consistency between the physical goods being transported out of the warehouse and the outbound task. After successful verification, the goods are transported to the corresponding exit to complete the outbound operation; After completing the outbound loading and unloading operations, the WMS exchanges information with the measurement and production scheduling platform, uploads the outbound equipment information to the measurement and production scheduling platform, and updates the inventory data.

7. An intelligent vertical warehouse management method as claimed in claim 6, characterized in that: When the system and equipment are abnormal, the alarm is issued, including that the intelligent vertical warehouse storage management system monitors the system operation status of the main control and sub-control and the working status of the underlying hardware equipment and components in real time. When the system and equipment are abnormal, the abnormal alarm information is uploaded and sent to the measurement and production scheduling platform. After receiving the abnormal alarm information, the measurement and production scheduling platform pushes the alarm information to the three-dimensional simulation system for intuitive display. The three-dimensional simulation system performs linkage switching of simulation screen and video monitoring for the abnormal equipment, and performs three-level linkage of the on-site alarm information, simulation screen and video scene. If the alarm information is that the stacker is abnormal, the video information of the stacker camera is automatically collected and uploaded to the display screen of the sub-control room.

8. A system using an intelligent vertical warehouse management method as claimed in any one of claims 1 to 7, characterized in that: It comprises a storage module (100), an equipment data acquisition module (200), a storage module (300) and a monitoring module (400); The intelligent vertical warehouse storage management system WMS receives the warehousing task issued by the metering production scheduling platform, and the warehousing module (100) performs warehousing actions on the electric energy metering equipment, and removes abnormal equipment during warehousing; After storage, the equipment data collection module (200) collects the electric energy metering equipment data in real time and uploads the equipment data to the WMS and the metering production scheduling platform; When the delivery instruction issued by the metering production scheduling platform reaches the WMS, the delivery module (300) performs the delivery action, locates the electric energy metering equipment to be delivered, and uploads the equipment data to update the inventory data; The monitoring module (400) monitors the system operation status and the working status of the hardware equipment in real time, and issues an alarm when the system and equipment are abnormal.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the intelligent vertical library management method described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of an intelligent vertical library management method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Material warehouse-in and warehouse-out device and system thereof

    CN112249574A

  • Storage material management system

    CN113869472A

  • Intelligent three-dimensional storage shelf goods allocation distribution system and method thereof

    CN114004571A

  • Warehouse logistics management method and system

    CN114169838A

  • Scene perception system and method for digital twin electric power measurement intelligent three-dimensional warehouse

    CN114781955A