TOB-to-TOTO boundary conversion method and system and storage medium

By collecting and querying the application form number and content of the TOB boundary, creating and modifying the application form number and content of the TOTO boundary, the problem of large amount of tasks and low efficiency in the handover process of TOB to the TOTO boundary is solved, and more efficient boundary handover management is achieved.

CN119941178APending Publication Date: 2025-05-06CGN CANGNAN NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510107659.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-05-06

AI Technical Summary

Technical Problem

During the boundary handover process of TOB to TOTO, due to the large number of TOB boundary equipment and complex boundary instructions, the workload of TOTO application is large, which affects the handover process.

Method used

By collecting the application form number of the TOB boundary, querying its application content, and creating the application form number of the TOTO boundary based on this, modifying the application form content of the TOB boundary is the application content of the TOTO boundary, and determining whether the modified TOTO boundary meets the boundary conflict requirements. If it is satisfied, confirm the conversion.

Benefits of technology

It reduces the difficulty of creating TOTO boundaries, saves the labor cost of repeated entry of application content, improves the efficiency of boundary handover management, and ensures the effectiveness of boundary instructions after boundary conversion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119941178A_ABST
    Figure CN119941178A_ABST
Patent Text Reader

Abstract

The invention provides a TOB-to-TOTO boundary conversion method and system and a storage medium, and relates to the technical field of isolation handover management, and the boundary conversion method comprises the following steps: collecting an application form number of a TOB boundary after instruction debugging is completed, and querying to obtain application content of the TOB boundary; based on the application form number of the TOB boundary, creating the application form number of the TOTO boundary, and modifying the application content of the TOB boundary into the application content of the TOTO boundary; and judging whether the TOTO boundary after modification of the application content meets a boundary conflict requirement or not, and if yes, confirming that the conversion from the TOB boundary to the TOTO boundary is completed. According to the boundary conversion method and system and the storage medium provided by the invention, the creation and conversion of the TOTO boundary can be quickly completed according to the application form number and the application content of the TOB boundary after debugging of each TOB boundary is completed, and the TOTO boundary transfer efficiency is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of isolation handover management, and in particular to a method, system and storage medium for boundary conversion of TOB (handover on isolation) to TOTO (temporary operation handover). Background Art

[0002] TOB Isolation Handover is the handover of the isolation management responsibility of the system when the system is transferred from installation to commissioning. TOTO Temporary Operation Handover means that after the system and equipment are tested and verified to meet the design requirements and meet the temporary operation conditions, the TOTO certificate is signed, and the boundary isolation and work permit management responsibilities are handed over to the operation department.

[0003] In the existing TOB to TOTO boundary handover, since there are many TOB boundary devices and the corresponding boundary instructions are also relatively complex, if the handover is carried out after the debugging of all TOB boundaries and their boundary devices is completed, it is easy to cause a relatively large amount of work tasks when creating a TOTO application, thereby affecting the handover process. Summary of the invention

[0004] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a TOB to TOTO boundary conversion method, system and storage medium, which are used to solve the problem that when performing TOB to TOTO boundary handover in the prior art, there are many TOB boundary devices and the corresponding boundary instructions are also relatively complicated. If the handover is performed after the debugging of all TOB boundaries and their boundary devices is completed, it is easy to cause a relatively large amount of work tasks when creating a TOTO application, thereby affecting the handover process.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a TOB-to-TOTO boundary conversion method, comprising the following steps: collecting the application number of the TOB boundary after instruction debugging, and querying to obtain the application content of the TOB boundary; based on the application number of the TOB boundary, creating the application number of the TOTO boundary, and modifying the application content of the TOB boundary to the application content of the TOTO boundary; judging whether the TOTO boundary after the application content is modified meets the boundary conflict requirements, and if so, confirming the completion of the conversion of the TOB boundary to the TOTO boundary.

[0006] In one embodiment of the present invention, before collecting the application number of the TOB boundary after the instruction debugging is completed, it includes: selecting the input information of the planned factory, unit, system name, and the title of the handover description, and creating an application for boundary conversion of the TOB boundary to the TOTO boundary.

[0007] In one embodiment of the present invention, before creating an application for performing boundary conversion on a TOB boundary to a TOTO boundary, it is confirmed that the TOB boundary is always in an open state.

[0008] In one embodiment of the present invention, the application number of the TOB boundary after instruction debugging is completed is collected, including: obtaining the debugging completion signal of each boundary instruction from the debugging party according to the set number of boundary instructions corresponding to the TOB boundary, and after the debugging of each boundary instruction is completed, controlling the application number of the TOB boundary corresponding to the collection boundary instruction.

[0009] In one embodiment of the present invention, querying and obtaining the application content of the TOB boundary includes: querying and obtaining the application content interface of the TOB boundary based on the input information of the application order number of the TOB boundary; wherein the application content displayed on the application content interface includes the project number, equipment code, description, status, version and instruction type.

[0010] In one embodiment of the present invention, an application number for a TOTO boundary is created based on an application number for a TOB boundary, including: deleting the part of the version number corresponding to the TOB boundary in the application number, and replacing it with the version number of the TOTO boundary, to obtain an application number corresponding to the TOTO boundary.

[0011] In one embodiment of the present invention, the application content of the TOB boundary is modified to the application content of the TOTO boundary, including: according to the relevant requirements of the TOTO boundary, the application content of the TOB boundary is modified by changing the instruction, and after the application number of the TOTO boundary is created, the application content of the TOTO boundary is updated; including adding instructions, deleting instructions, canceling deletion and modifying instructions, and the updated application content includes the reason for modifying the application content of the TOB boundary.

[0012] In one embodiment of the present invention, it is determined whether the TOTO boundary after the application content is modified meets the boundary conflict requirements. If so, it is confirmed that the conversion of the TOB boundary to the TOTO boundary is completed, including: when the application content of the TOTO boundary is modified, it is simulated to determine whether the application content of the TOTO boundary has a boundary conflict with other isolation management types. If so, the message corresponding to each boundary conflict is output, and the message includes a message number, a message text, a message type and a message type description.

[0013] The present invention also provides a TOB to TOTO boundary conversion system, comprising: a boundary query unit, the boundary query unit collects the application number of the TOB boundary after instruction debugging, and queries to obtain the application content of the TOB boundary; a boundary modification unit, the boundary modification unit creates the application number of the TOTO boundary based on the application number of the TOB boundary, and modifies the application content of the TOB boundary to the application content of the TOTO boundary; and a conversion analysis unit, the conversion analysis unit determines whether the TOTO boundary after the application content is modified meets the boundary conflict requirements, and if so, confirms that the conversion of the TOB boundary to the TOTO boundary is completed.

[0014] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method.

[0015] Beneficial effects of the present invention: The present invention proposes a TOB to TOTO boundary conversion method, system and storage medium. After all boundary instructions of the TOB boundary are debugged, and when creating a TOTO boundary application, the application number of the TOB boundary is entered into the boundary conversion system to quickly query the application content of the TOB boundary. And by using the application number of the TOB boundary, it is possible to quickly adjust the application number when the TOTO boundary is created, so that the application content of the TOB boundary can be directly obtained with the modified application number of the TOTO boundary to enter the application content of the TOTO boundary. And further, according to the relevant requirements of the TOTO boundary, it is possible to modify the application content of the TOB boundary and quickly create the application content of the TOTO boundary, thereby reducing the difficulty of creating the TOTO boundary, saving the labor cost of repeatedly entering the application content when the TOTO boundary is created, and improving the efficiency of boundary transfer management. And by checking the boundary conflict of the TOTO boundary, the validity of the boundary instruction after the boundary conversion can also be guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The flowchart of the boundary conversion method of the present invention is shown in FIG.

[0017] Figure 2 A schematic diagram of an interface display frame for initiating a boundary conversion application according to the present invention.

[0018] Figure 3 A block diagram of the display interface for boundary conflict simulation of the present invention.

[0019] Figure 4 A block diagram of the display interface for creating a TOTO boundary application process when converting a TOB boundary to a TOTO boundary in the present invention.

[0020] Figure 5A block diagram of the display interface for the application content modification submission process of the TOTO boundary of the present invention.

[0021] Figure 6 A block diagram of the display interface for the process of modifying and saving the application content of the TOTO boundary of the present invention.

[0022] Figure 7 This is a block diagram of the display interface after the modification of the TOTO boundary of the present invention.

[0023] Figure 8 FIG. 4 is an architecture diagram of the boundary conversion system of the present invention. DETAILED DESCRIPTION

[0024] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0025] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0026] In the following description, numerous details are discussed to provide a more thorough explanation of the embodiments of the present invention. However, it is obvious to those skilled in the art that the embodiments of the present invention can be implemented without these specific details. In other embodiments, well-known structures and devices are shown in the form of block diagrams rather than in detail to avoid making the embodiments of the present invention difficult to understand.

[0027] See also Figure 1 In one embodiment of the present invention, the present invention provides a TOB-to-TOTO boundary conversion method, comprising the following steps: collecting the application number of the TOB boundary after instruction debugging, and querying to obtain the application content of the TOB boundary; based on the application number of the TOB boundary, creating the application number of the TOTO boundary, and modifying the application content of the TOB boundary to the application content of the TOTO boundary; judging whether the TOTO boundary after the application content is modified meets the boundary conflict requirements, and if so, confirming the completion of the conversion of the TOB boundary to the TOTO boundary.

[0028] In this implementation, through the steps: collecting the application number of the TOB boundary after the instruction debugging is completed, querying and obtaining the application content of the TOB boundary, it can be seen that when TOB performs boundary conversion on TOTO, after the boundary instruction debugging of the TOB boundary is completed, by inputting the application number corresponding to the boundary instruction into the boundary conversion system, the boundary conversion system will query the application content of the TOB boundary according to the obtained application number of the TOB boundary. Then, it can be realized that according to the application number of the TOB boundary, the list of corresponding application contents can be quickly retrieved, so as to modify the boundary information in the TOTO stage. Through the steps: based on the application number of the TOB boundary, the application number of the TOTO boundary is created, and the application content of the TOB boundary is modified to the application content of the TOTO boundary. It can be seen that after obtaining the application number and application content of the TOB boundary, the application number of the TOTO boundary is created based on the application number of the TOB boundary. In other words, the application number of the TOTO boundary is created based on the application number of the TOB boundary. At the same time, after obtaining the corresponding application content according to the application number of the TOB boundary, and after modifying the TOTO boundary based on the TOB boundary, the application content of the TOB boundary can also be replaced with the application content of the TOTO boundary. Moreover, the application content can be modified and processed based on the replaced application content according to the relevant requirements of the TOTO boundary. Through the above steps, it is possible to use the TOB boundary after the application creation has been completed, and directly convert it into the TOTO boundary after it has completed the debugging of the debugging party, thereby reducing the difficulty of creating the TOTO boundary, saving the labor cost of repeatedly entering the application content when creating the TOTO boundary, and improving the efficiency of boundary transfer management. Through the steps: judging whether the TOTO boundary after the application content is modified meets the boundary conflict requirements, if it does, confirming the completion of the conversion of the TOB boundary to the TOTO boundary, it can be seen that after completing the creation of the TOTO boundary application, it is necessary to further judge whether there is a boundary conflict. If the TOTO boundary can still meet the requirements of boundary conflicts after the application content is modified, then the conversion of the TOB boundary to the TOTO boundary is confirmed to be completed, and then, for example, paper boundary instructions are printed and submitted to the isolation application for review by the isolation manager (isolation management personnel). If the boundary conflict is not met, further processing plans are determined, such as re-modifying the boundary content, so that the TOTO boundary meets the requirements of the boundary conflict. Through the above steps, when converting the TOB boundary to the TOTO boundary, it can be achieved to promptly determine whether there is a conflict in other boundary types to ensure the rationality of the boundary conversion.

[0029] In one embodiment of the present invention, before inputting the reference number (that is, the application number of the TOB boundary), it is also necessary to select and enter other information about the TOB boundary, so as to realize the classification selection of the TOB boundary. Specifically, before collecting the application number of the TOB boundary after the instruction debugging is completed, it includes: selecting the input information of the title of the planned plant, unit, system name, and the handover description, and creating an application for the TOB boundary to convert the TOTO boundary. In this embodiment, when creating a TOTO boundary based on the TOB boundary, it is also necessary to create an application for the TOTO boundary. That is to say, by selecting the title of the planned plant, unit, system name, and the handover description in turn, and then selecting to create a TOTO application, the application number of the TOB boundary is entered into the boundary conversion system, so that when the application number is obtained, the relevant application content is directly displayed.

[0030] See also Figure 2 In a preferred embodiment, in the TOTO application initiation interface, by selecting the TOTO application, filling in the planned factory, unit, system name, title, reference number (that is, application number) and annotation content, it is possible to query the application content of the TOB boundary below the "icon", "project number", "equipment code", "description", etc.

[0031] In one embodiment of the present invention, before creating an application for boundary conversion between a TOB boundary and a TOTO boundary, it is confirmed that the TOB boundary is always in an open state. In this embodiment, when a TOTO application is created, it is necessary to ensure that the TOB boundary is not closed in the system, so that when the TOB boundary is in an open state, the application number and corresponding application content of the TOB boundary can be quickly found, so as to realize the conversion of the TOT boundary.

[0032] In one embodiment of the present invention, before entering the application number of the TOB boundary, it is also necessary to ensure whether the boundary instructions of the TOB boundary have been debugged, and the conversion of the TOTO boundary can be performed only after all the debugging of the boundary instructions has been completed. Specifically, the application number of the TOB boundary after the instruction debugging is completed includes: according to the set number of boundary instructions corresponding to the TOB boundary, obtaining the debugging completion signal of each boundary instruction from the debugging party, and after all the boundary instructions have been debugged, controlling the application number of the TOB boundary corresponding to the boundary instruction. In this embodiment, each TOB boundary corresponds to different numbers and types of boundary instructions. Therefore, before entering the application number of the TOB boundary, it is also necessary to ensure that the boundary instructions corresponding to the TOB boundary application number have all been debugged by the debugging party, and after determining that all the debugging of the boundary instructions has been completed, then control the acquisition of the corresponding TOB boundary application number to retrieve the application content of the corresponding TOB boundary, and create and modify the TOTO boundary with the boundary application number and application content.

[0033] In one embodiment of the present invention, the application content of the TOB boundary and the application number of the TOB boundary are one-to-one corresponding. Specifically, querying and obtaining the application content of the TOB boundary includes: querying and obtaining the application content interface of the TOB boundary according to the input information of the application number of the TOB boundary; wherein the application content displayed on the application content interface includes the project number, equipment code, description, status, version and instruction type. In this embodiment, after obtaining the application content interface of the TOB boundary, application content such as the project number, equipment code, description, status, version and instruction type will be obtained, so as to facilitate the corresponding boundary content modification according to the application content of the TOB boundary viewed and the relevant requirements of the TOTO boundary application content, such as change, deletion, addition and other modification methods.

[0034] In one embodiment of the present invention, in order to improve the efficiency of creating a TOTO boundary, after the boundary instruction of the TOB boundary is debugged, the application number of the TOB boundary can be directly modified to the application number of the TOTO boundary. Specifically, based on the application number of the TOB boundary, the application number of the TOTO boundary is created, including: deleting the part of the version number corresponding to the TOB boundary in the application number, and replacing it with the version number of the TOTO boundary, to obtain the application number corresponding to the TOTO boundary. In this embodiment, in the application number of the TOB boundary, there will be a version number that is specific to the TOB boundary, such as the application number of "TOB××××". When converting the application number of the TOB boundary to the application number of the TOTO boundary, the application number of "TOB××××" can be directly replaced and modified to the application number of "TOTO××××", so that the application number of the TOTO boundary can be quickly created by only modifying the version number part.

[0035] In one embodiment of the present invention, after the application content of the TOB boundary is obtained through query, the application content of the TOB boundary can be used to convert the application number of the TOB boundary to the application number of the TOTO boundary, thereby completing the conversion of the application content of the TOB boundary to the application content of the TOTO boundary. Specifically, the application content of the TOB boundary is modified to the application content of the TOTO boundary, including: modifying the application content of the TOB boundary through a change instruction according to the relevant requirements of the TOTO boundary, and updating the application content of the TOTO boundary after the application number of the TOTO boundary is created; wherein, it includes a new instruction, a deletion instruction, a cancellation deletion and a modification instruction, and the updated application content includes the modification reason when modifying the application content of the TOB boundary. In this embodiment, after the application content of the TOB boundary is converted into the application content of the TOTO boundary, in order to ensure that the application content meets the relevant requirements of the TOTO boundary, the application content can also be directly modified, such as adding new instructions, deleting instructions, canceling deletions and modifying instructions, etc., to adjust the application content after the TOB boundary is converted into the TOTO boundary, and after the application content is modified, the relevant modification reasons will be further updated for record.

[0036] In one embodiment of the present invention, after converting the TOB boundary to the TOTO boundary, it is necessary to further determine whether the application content of the converted TOTO boundary or the application content of the converted and modified TOTO boundary meets the boundary conflict requirements to determine whether the current TOTO boundary can be implemented. Specifically, it is determined whether the TOTO boundary after the application content is modified meets the boundary conflict requirements. If so, it is confirmed that the conversion of the TOB boundary to the TOTO boundary is completed, including: when the application content of the TOTO boundary is modified, simulate and determine whether the application content of the TOTO boundary has a boundary conflict with other isolation management types. If so, output the message corresponding to each boundary conflict, and the message includes a message number, a message text, a message type, and a message type description.

[0037] In an embodiment, when a TOTO boundary is created by converting a TOB boundary to a TOTO boundary, the TOTO boundary is first modified by the application number and application content of the TOB boundary, and after the modification is completed, it is also necessary to determine whether the current TOTO boundary has a boundary conflict based on the boundary conflict requirements of the TOTO boundary. If there is no boundary conflict, the paper boundary instruction can be directly printed according to the TOTO boundary that has been created, and the isolation application form can be submitted to the isolation manager for review. Specifically, in the isolation boundary management process, there are multiple isolation management types, such as maintenance isolation, PA administrative isolation, PA operation isolation, TOB isolation transfer, TOTO temporary operation transfer, etc. When determining whether the boundary conflict requirements are met, it is necessary to determine whether the TOTO, that is, the temporary operation transfer boundary, has a boundary conflict with the maintenance isolation, PA administrative isolation, PA operation isolation, TOB isolation transfer, etc. If there is a boundary conflict, the corresponding message at the time of the conflict is output, and the message includes the message number, message text, message type, and message type description.

[0038] See also Figure 3In a preferred embodiment, for example, when the TOB ticket number is changed to TOTO's ticket number TO200789A, the planned factory is selected as 5120, the unit is selected as unit 2, the system name is RCP, the status is created, the title is the plant laboratory ventilation system, the reference number is FB200789A, the applicant is P620328 Wang WW, and the application date is 2022.12.01, click on the simulated conflict check, and the TOB / TOTO application modification interface will pop up. At the top of the modification interface box are the message number, message text, message type and message type description. Message numbers include 1 to 11; the message texts corresponding to the message numbers from top to bottom include: There is an edge conflict between the isolation boundary CN-2-07-RCP-834VP and WCD 030000017392, and the status needs to be changed to Remove the card (IS); There is an edge conflict between the isolation boundary CN-2-07-RCP-834VP and WCD 030000017395, and the status needs to be changed to Remove the card (IS); The isolation boundary CN-2-07-RCP-834VP has been forced to merge because 30000017392 has been listed, the status is RT / CLOSED / ETG; The isolation boundary CN-2-07-RCP-834VP has been forced to merge because 30000017395 has been listed, the status is RT / CLOSED / ETG; The isolation boundary CN-2-07-RCP-835VP and WCD 030000017391 There is an edge conflict, the status needs to be changed to Remove Card (IS); Isolate the boundary CN-2-07-RCP-835VP and WCD 030000017392 There is an edge conflict, the status needs to be changed to Remove Card (IS); Isolate the boundary CN-2-07-RCP-835VP and WCD 030000017395 has an edge conflict, and the status needs to be changed to remove the card (IS); the isolation boundary CN-2-07-RCP-835VP has been listed because 30000017392 has been listed, the status is RT / CLOSED / ETG, and it has been forced to merge; the isolation boundary CN-2-07-RCP-835VP has been listed because 30000017395 has been listed, the status is RT / CLOSED / ETG, and it has been forced to merge; the isolation boundary CN-2-07-RCP-835VP has been listed in 30000017391, the status is RT / CLOSED / ETG; the isolation boundary CN-2-07-RCP-854VP has been listed in 30000017462, the status is RT / CLOSED / ETG. The message type is displayed from top to bottom as a yellow triangle corresponding to the message number, and the message type description is warning.

[0039] See also Figure 4In a preferred embodiment, when applying for TOTO, select 5120 as the planned plant, select unit 2, the system name is RCP, the title is the plant laboratory ventilation system, the reference number is FB200789A, the applicant is P620328 Wang WW, and the application date is 2022.12.01. Then, when modifying the application number of the TOTO boundary, select "Create" in the status bar, and then set the ticket number to correspond to the TOTO boundary according to the reference number FB200789A, that is, "TO200789A", so that the application content of TOB can be brought out, such as Figure 3 There are two types of application contents obtained, namely, one with project number 10, equipment code CN-2-07-RCP-854VP, description as temperature at the leakage point of the stack shell seal, status as CLOSED, version as A, instruction as equipment instruction, and no reason for modification; the other with project number 20, equipment code CN-2-07-RCP-853VP, description as voltage regulator heating control regulator, status as CLOSED, version as A, instruction as equipment instruction, and no reason for modification.

[0040] See also Figure 5 In a preferred embodiment, when a TOTO border application is submitted, the application content can be modified. For example, when the reference number is FB200789A, the ticket number TO200789A is directly imported. The TOB application content obtained is as follows: Figure 3 On the basis of the two types of application contents, a new one was added with project number 30, equipment code CN-2-07-RCP-854VP, description DRAIN-VENT VLV, status TO_IS (forced fusion), version A, instruction device instruction, and modification reason CANCEL; the other one has project number 30, equipment code CN-2-07-RCP-855VP, description DRAIN-VENTVLV, status TO_IS, version A, instruction device instruction, and modification reason CANCEL.

[0041] See also Figure 6 In a preferred embodiment, when the TOTO boundary application is saved and no boundary conflict occurs, the boundary instruction information of the TOTO boundary will pop up, such as message number 1, message text "Isolation boundary CN-2-07-RCP-831VP has been listed in 30000017351, and the status is RT / CLOSED / ETG", the message type is a yellow triangle, and the message type description is "Warning", and another example is message number 2, message text "Isolation boundary CN-2-07-RCP-832VP has been listed in 30000017351, and the status is RT / CLOSED / ETG", the message type is a yellow triangle, and the message type description is "Warning".

[0042] See also Figure 7 In a preferred embodiment, when a TOT application is saved, the displayed application content includes four columns of information, namely, the first column: the project number is 10, the equipment code is CN-2-07-RCP-854VP, the description is the temperature at the leakage point of the stack shell seal, the status is CLOSED, the version is version A, the instruction is the equipment instruction, and the reason for modification is none. The second column: the project number is 20, the equipment code is CN-2-07-RCP-853VP, the description is the stabilizer heating control regulator, the status is CLOSED, the version is version A, the instruction is the equipment instruction, and the reason for modification is none. The third column: the project number is 30, the equipment code is CN-2-07-RCP-854VP, the description is DRAIN-VENT VLV, the status is TO_IS (forced fusion), the version is version A, the instruction is the equipment instruction, and the reason for modification is CANCEL. The fourth column: Project number is 30, Equipment code is CN-2-07-RCP-855VP, Description is DRAIN-VENT VLV, Status is TO_IS, Version is A, Instruction is Equipment Instruction, Modification reason is CANCEL. When saving TOTO, the instruction status will be automatically set to TO_IS for the forced fusion boundary.

[0043] like Figure 8 As shown, in one embodiment of the present invention, the present invention also provides a TOB to TOTO boundary conversion system, including: a boundary query unit, the boundary query unit collects the application number of the TOB boundary after instruction debugging, and queries to obtain the application content of the TOB boundary; a boundary modification unit, the boundary modification unit creates the application number of the TOTO boundary based on the application number of the TOB boundary, and modifies the application content of the TOB boundary to the application content of the TOTO boundary; and a conversion analysis unit, the conversion analysis unit determines whether the TOTO boundary after the application content is modified meets the boundary conflict requirements, and if so, confirms that the conversion of the TOB boundary to the TOTO boundary is completed.

[0044] In this embodiment, during the TOB-TOTO boundary conversion process, after the boundary instructions of the TOB boundary are debugged, and when the application number of the TOB boundary is entered into the boundary conversion system, the boundary query unit can be used to retrieve the application content corresponding to the application number according to the obtained application number. Then, the application number of the TOB boundary is directly modified to the application number of the TOTO boundary through the boundary modification unit, and this modification is completed on the basis of the application number of the TOB boundary. After the application number of the TOTO boundary is modified, when the application content of the TOB boundary is obtained, the application content of the TOB boundary can be further modified to the application content of the TOTO boundary. After the modification is completed, the conversion analysis unit is used to further determine whether the created TOTO boundary meets the relevant requirements of the boundary conflict. If it meets, the paper printing and review of the boundary instructions are directly performed. If it does not meet, the boundary instructions are adjusted again. Through the above-mentioned boundary conversion system, it is possible to quickly retrieve the list of corresponding application contents according to the application number using the TOB boundary, so as to modify the boundary information in the TOTO stage. And when modifying, by using the TOB boundary after the application creation has been completed, it is directly converted to the TOTO boundary after the debugging of the debugging party, thereby reducing the difficulty of creating the TOTO boundary, saving the labor cost of repeatedly entering the application content when creating the TOTO boundary, and improving the efficiency of boundary transfer management. Moreover, by checking the boundary conflict of the TOTO boundary, the validity of the boundary instruction after the boundary conversion can also be guaranteed.

[0045] The present invention further provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to execute the above method.

[0046] In summary, the present invention enters the application number of the TOB boundary into the boundary conversion system after all boundary instructions of the TOB boundary are debugged and when creating the TOTO boundary application, so as to quickly query the application content of the TOB boundary. And by using the application number of the TOB boundary, it is possible to quickly adjust the application number when the TOTO boundary is created, so as to directly obtain the application content of the TOB boundary with the modified application number of the TOTO boundary to enter the application content of the TOTO boundary. And further, according to the relevant requirements of the TOTO boundary, it is possible to modify the application content of the TOB boundary and quickly create the application content of the TOTO boundary, thereby reducing the difficulty of creating the TOTO boundary, saving the labor cost of repeatedly entering the application content when the TOTO boundary is created, and improving the efficiency of boundary transfer management. And by checking the boundary conflict of the TOTO boundary, the validity of the boundary instruction after the boundary conversion can also be guaranteed. Therefore, the present invention effectively overcomes the various shortcomings in the prior art and has a high industrial utilization value.

[0047] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A TOB to TOTO boundary conversion method, characterized in that: The steps include: Collect the application number of the TOB boundary where the instruction debugging is completed, and query to obtain the application content of the TOB boundary; Based on the application number of the TOB boundary, create an application number of the TOTO boundary, and modify the application content of the TOB boundary to the application content of the TOTO boundary; It is determined whether the TOTO boundary after the application content is modified meets the boundary conflict requirement. If so, it is confirmed that the conversion of the TOB boundary to the TOTO boundary is completed.

2. The TOB to TOTO boundary conversion method according to claim 1, characterized in that: Before collecting the application number of the TOB boundary where the instruction debugging is completed, include: Select the input information of the planned plant, unit, system name, and the title of the handover description, and create an application for boundary conversion of the TOB boundary to the TOTO boundary.

3. The TOB to TOTO boundary conversion method according to claim 1, characterized in that: Before creating an application for performing boundary conversion on the TOB boundary to the TOTO boundary, it is confirmed that the TOB boundary is always in an open state.

4. The TOB to TOTO boundary conversion method according to claim 1, characterized in that: Collect the application number of the TOB boundary where the instruction debugging is completed, including: According to the set number of boundary instructions corresponding to the TOB boundary, the debugging completion signal of each boundary instruction from the debugging party is obtained, and after the debugging of each boundary instruction is completed, the application number of the TOB boundary corresponding to the boundary instruction is controlled and collected.

5. The TOB to TOTO boundary conversion method according to claim 1, characterized in that: The query obtains the application content of the TOB boundary, including: According to the input information of the application order number of the TOB boundary, the application content interface of the TOB boundary is queried and obtained; wherein the application content displayed on the application content interface includes project number, equipment code, description, status, version and instruction type.

6. The TOB to TOTO boundary conversion method according to claim 1, characterized in that: Based on the application number of the TOB boundary, create an application number of the TOTO boundary, including: The part of the version number corresponding to the TOB boundary in the application number is deleted and replaced with the version number of the TOTO boundary to obtain the application number corresponding to the TOTO boundary.

7. The TOB to TOTO boundary conversion method according to claim 1 or 6, characterized in that: Modify the application content of the TOB boundary to the application content of the TOTO boundary, including: According to the relevant requirements of the TOTO boundary, the application content of the TOB boundary is modified through change instructions, and after the application number of the TOTO boundary is created, the application content of the TOTO boundary is updated; including new instructions, deletion instructions, cancellation of deletion and modification instructions, and the updated application content includes the modification reasons when modifying the application content of the TOB boundary.

8. The TOB to TOTO boundary conversion method according to claim 1, characterized in that: Determine whether the TOTO boundary after the modification of the application content meets the boundary conflict requirement. If so, confirm that the conversion of the TOB boundary to the TOTO boundary is completed, including: When the application content of the TOTO boundary is modified, a simulation is performed to determine whether the application content of the TOTO boundary has a boundary conflict with other isolation management types. If so, a message corresponding to each boundary conflict is output, and the message includes a message number, a message text, a message type, and a message type description.

9. A TOB to TOTO boundary conversion system, characterized in that: include: A boundary query unit, wherein the boundary query unit collects the application number of the TOB boundary after the instruction debugging is completed, and queries to obtain the application content of the TOB boundary; a boundary modification unit, wherein the boundary modification unit creates an application number for a TOTO boundary based on the application number for the TOB boundary, and modifies the application content of the TOB boundary into the application content of the TOTO boundary; and The conversion analysis unit determines whether the TOTO boundary after the application content is modified meets the boundary conflict requirement, and if so, confirms that the conversion of the TOB boundary to the TOTO boundary is completed.

10. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and the computer program is used to execute the method according to any one of claims 1 to 8.