TOB boundary full-process implementation management method, system, equipment and medium

By providing a full-process implementation management method in TOB boundary management, including the creation of isolated operation orders and shared boundary detection, the problem of increasing difficulty in handing over boundary management in the existing technology is solved, and efficient boundary management and approval processes are achieved.

CN119941187APending Publication Date: 2025-05-06CGN CANGNAN NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510107680.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-05-06

AI Technical Summary

Technical Problem

The existing SAP WCM can only meet the business management of the unit after commercial operation. The listing, delisting and debugging of the transfer boundary during the transfer and production phase cannot achieve online programmatic management, resulting in a significant increase in the difficulty of transfer boundary management.

Method used

Provide a full-process implementation management method for TOB boundaries, including obtaining isolation transfer applications and new boundary instructions, creating isolation operation orders, conducting shared boundary detection of new boundary instructions, and performing on-site listing operations when there is no shared boundary, and updating the implementation status of the isolation operation order.

Benefits of technology

It realizes a rapid judgment on the isolation boundary whether there is a shared boundary, reduces the workload of repeated listings/delistings on site, saves time, improves work efficiency, and improves centralized management and approval efficiency of boundary instructions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119941187A_ABST
    Figure CN119941187A_ABST
Patent Text Reader

Abstract

The invention provides a TOB boundary full-process implementation management method, system and device and a medium, and relates to the technical field of isolation handover management, and the method comprises the following steps: obtaining an isolation handover application and a new boundary instruction; creating an isolation operation list based on the isolation handover application and the newly added boundary instruction; performing shared boundary detection on a newly added boundary instruction in the isolation operation sheet; and when the boundary adding instruction does not have the shared boundary, performing on-site listing operation of a boundary card corresponding to the boundary adding instruction, and updating the implementation state of the isolation operation sheet corresponding to the boundary adding instruction. According to the implementation management method, system, equipment and medium provided by the invention, the links of content management, data transmission, field execution, post recording, feedback and the like are effectively optimized and improved, the information system integration and optimization of the power station are realized, and the informatization operation and maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of isolation and transfer management, and in particular to a TOB (isolation and transfer) boundary full-process implementation management method, system, equipment and medium. Background Art

[0002] TOB (Transfer from Isolation) refers to the transfer of the responsibility for the isolation management of the system when the system is transferred from installation to commissioning. When non-operation personnel perform work that requires a work permit (WCA) at the isolation office on a system or equipment that has been TOB but not TOTO (Temporary Transfer from Operation), the Operation Department can apply for a work permit for the work at the request of the person in charge of the work. The work permit indicates that the safety conditions required for the work have been met and the powers and responsibilities between the person in charge of the work and the Operation Department have been clearly defined.

[0003] The existing SAP WCM (work clearance management module) can only meet the business management of units after commercial operation, while the listing, delisting and commissioning of the handover boundary during the handover and production stage cannot be managed online in a procedural manner, which greatly increases the difficulty of handover boundary management. Summary of the invention

[0004] In view of the shortcomings of the prior art mentioned above, the purpose of the present invention is to provide a TOB boundary full-process implementation management method, system, equipment and medium, which is used to solve the problem that SAP WCM in the prior art can only meet the business management of the unit after commercial operation, but the listing, delisting and debugging of the handover boundary in the handover and production stage cannot be managed online in a procedural manner, resulting in a significant increase in the difficulty of handover boundary management.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a TOB boundary full-process implementation management method, including the following steps: obtaining an isolation transfer application and a new boundary instruction; creating an isolation operation form based on the isolation transfer application and the new boundary instruction; performing a shared boundary detection on the new boundary instruction in the isolation operation form; when the new boundary instruction does not have a shared boundary, performing an on-site signboard operation of the boundary sign corresponding to the new boundary instruction, and updating the implementation status of the isolation operation form corresponding to the new boundary instruction; obtaining a change instruction for the new boundary instruction, changing the new boundary instruction in the isolation operation form to a boundary modification instruction, and changing the implementation status of the isolation operation form corresponding to the new boundary instruction to the implementation status of the isolation operation form corresponding to the boundary modification instruction.

[0006] In one embodiment of the present invention, creating an isolation operation sheet includes: generating a work permit and an isolation operation sheet thereof according to the isolation transfer application and the debugging information of the newly added boundary instruction.

[0007] In one embodiment of the present invention, a shared boundary detection is performed on the newly added boundary instruction in the isolation operation sheet, including: determining whether there is a shared boundary instruction in the shared operation sheet that is consistent with the newly added boundary instruction in the isolation operation sheet, and if so, generating a change instruction for the newly added boundary instruction.

[0008] In one embodiment of the present invention, a change instruction for a newly added boundary instruction is obtained, the newly added boundary instruction in the isolation operation sheet is changed into a boundary modification instruction, and the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction is changed to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, including: when the newly added boundary instruction has a shared boundary, obtaining a shared instruction for the newly added boundary instruction; based on the shared implementation status of the shared operation sheet corresponding to the shared boundary, the newly added boundary instruction in the isolation operation sheet is shared with the shared instruction in the shared operation sheet, and the shared implementation status of the shared operation sheet is used as the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction.

[0009] In one embodiment of the present invention, a change instruction for a newly added boundary instruction is obtained, the newly added boundary instruction in the isolation operation sheet is changed into a boundary modification instruction, and the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction is changed to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, including: obtaining an upgrade instruction for the initial version boundary including the newly added boundary instruction and other boundary instructions; upgrading the newly added boundary instruction and other boundary instructions in the initial version boundary to obtain the upgraded boundary modification instruction and its upgraded version boundary; comparing the difference information between the newly added boundary instruction and the boundary modification instruction, and sending the difference information to an upgrade difference database between the initial version boundary and the upgraded version boundary for upgrade check; after the upgrade check is passed, updating the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction.

[0010] In one embodiment of the present invention, the upgrade process includes: directly modifying and upgrading the newly added boundary instructions and / or other boundary instructions in the initial version boundary, merging the initial version boundary with other initial version boundaries to expand the version and modifying and upgrading, and the modification and upgrading includes deleting, changing and adding boundary instructions.

[0011] In one embodiment of the present invention, a change instruction for a newly added boundary instruction is obtained, the newly added boundary instruction in the isolation operation sheet is changed into a boundary modification instruction, and the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction is changed to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, including: after the isolation handover boundary debugging including the newly added boundary instruction and other boundary instructions is completed, according to the conversion application of the isolation handover boundary to the temporary operation handover, a boundary conversion instruction for the newly added boundary instruction is obtained; the newly added boundary instruction in the isolation handover boundary is converted into a boundary modification instruction, and a conflict check is performed on the boundary modification instruction of the temporary operation handover after the boundary conversion; after the conflict check passes, the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction in the isolation handover boundary is updated to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction of the temporary operation handover after the boundary conversion.

[0012] The present invention also provides a TOB boundary full-process implementation management system, including: an application information acquisition unit, used to obtain isolation transfer applications and new boundary instructions; an operation order creation unit, used to create an isolation operation order based on the isolation transfer application and the new boundary instructions; a shared detection unit, used to perform shared boundary detection on the new boundary instructions in the isolation operation order; an implementation status update unit, used to perform on-site hanging operations of the boundary signs corresponding to the new boundary instructions when there is no shared boundary for the new boundary instructions, and update the implementation status of the isolation operation order corresponding to the new boundary instructions; and an implementation status change unit, used to obtain change instructions for the new boundary instructions, change the new boundary instructions in the isolation operation order to boundary modification instructions, and change the implementation status of the isolation operation order corresponding to the new boundary instructions to the implementation status of the isolation operation order corresponding to the boundary modification instructions.

[0013] The present invention also provides an electronic device, which includes: one or more processors; a storage device for storing one or more programs, and when the one or more programs are executed by one or more processors, the electronic device implements the aforementioned TOB boundary full-process implementation management method.

[0014] The present invention further provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor of a computer, the computer executes the aforementioned TOB boundary full-process implementation management method.

[0015] As described above, a TOB boundary full-process implementation management method, system, equipment and medium of the present invention have the following beneficial effects: by creating an isolation operation sheet according to the isolation transfer application and the newly added boundary instruction, and by performing a shared boundary detection on the newly added boundary instruction in the isolation operation sheet, it is possible to quickly determine whether there is a shared boundary (that is, whether there is sharing / whether it can be shared) in the isolation state of the isolation boundary, so as to achieve that when there is no shared boundary, the implementation status of the isolation operation sheet is updated online according to the process, and the listing / delisting operation of the offline isolation site is performed at the same time. When there is a shared boundary, it is only necessary to update the implementation status of the online isolation operation sheet, which reduces the repetitive workload caused by repeated listing / delisting on site, saves time and improves work efficiency. And further, it also realizes the change instructions according to the newly added boundary instructions such as expansion and conversion, which can improve the modification and inspection and approval efficiency of the newly added boundary instructions in the isolation operation sheet, while improving the centralized management of the boundary instructions with a large number of isolation information, large amount and complexity. While meeting the functions of transfer management boundary row application, listing, delisting, and debugging ticket management, it optimizes and improves content management, data transmission, on-site execution, post-event recording and feedback, reducing the cost of information operation and maintenance and management, and ensuring the security and stability of the boundary status. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of a flow chart of a management method for implementing the present invention provided in an embodiment of the present invention.

[0017] Figure 2 Shown is a structural block diagram of an implementation management system provided by an embodiment of the present invention.

[0018] Figure 3 Shown is a structural schematic diagram of an electronic device according to an embodiment of the present invention.

[0019] Component number description

[0020] The electronic device 1 includes an implementation management system 11 , a memory 12 , a processor 13 , an application information acquisition unit 111 , an operation sheet creation unit 112 , a sharing detection unit 113 , an implementation status update unit 114 , and an implementation status change unit 115 . DETAILED DESCRIPTION

[0021] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0022] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0023] In the following description, numerous details are discussed to provide a more thorough explanation of the embodiments of the present invention. However, it is obvious to those skilled in the art that the embodiments of the present invention can be implemented without these specific details. In other embodiments, well-known structures and devices are shown in the form of block diagrams rather than in detail to avoid making the embodiments of the present invention difficult to understand.

[0024] See also Figure 1 In one embodiment of the present invention, the present invention provides a TOB boundary full process implementation management method, comprising the following steps:

[0025] Step S10: Obtaining an isolation transfer application and a new boundary instruction.

[0026] Step S20: creating an isolation operation sheet based on the isolation transfer application and the new boundary instruction.

[0027] Step S30: performing shared boundary detection on the newly added boundary instructions in the isolation operation sheet.

[0028] Step S40: When the newly added boundary instruction does not have a shared boundary, an on-site posting operation of the boundary sign corresponding to the newly added boundary instruction is performed, and the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction is updated.

[0029] Step S50: Obtain a change instruction for the newly added boundary instruction, change the newly added boundary instruction in the isolation operation sheet to a boundary modification instruction, and change the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction.

[0030] In this embodiment, through step S10: obtaining the isolation transfer application and the new boundary instruction, it can be seen that in the process of implementing the management of the entire TOB boundary process, it is necessary to first create the isolation transfer application and the new boundary instruction. It can be created manually, of course, it can also be automatically created by inputting data into the isolation transfer application template and the new boundary instruction template. Specifically, when implementing the management, it is necessary to first obtain the created isolation transfer application and the new boundary instruction, so as to further create an isolation operation form based on the isolation transfer application and the new boundary instruction, so as to realize the creation of the isolation operation form according to the TOB boundary application.

[0031] Through step S20: creating an isolation operation form based on the isolation transfer application and the new boundary instructions, it can be seen that after obtaining the isolation transfer application and the new boundary instructions, the isolation operation form can be created according to the isolation transfer application and the new boundary instructions, and then conflict verification and approval can be carried out according to the obtained isolation operation form, and after the approval is completed, the corresponding isolation operation form is printed out to implement on-site isolation of the corresponding isolation boundary.

[0032] Through step 30: performing shared boundary detection on the newly added boundary instruction in the isolation operation sheet, it can be seen that the newly added boundary instruction is included in the created isolation operation sheet. When performing shared boundary detection, it is determined whether there is a shared boundary instruction consistent with the newly added boundary instruction among all the boundary instructions in the isolation transfer boundary. If so, the shared boundary instruction corresponding to the shared boundary instruction is used as the implementation status of the isolation operation sheet of the newly added boundary instruction. If not, the implementation status of the isolation operation sheet is established through the isolation operation sheet corresponding to the newly added boundary instruction, and the implementation is carried out on-site. Of course, when creating other boundary instructions, the implementation status of the isolation operation sheet established when there is no shared boundary can be used as the shared implementation status of the newly created other boundary instructions. Through the above steps, the repetitive workload caused by repeated listing or delisting on site can be effectively reduced, saving time and improving work efficiency.

[0033] Through step S40: when there is no shared boundary for the newly added boundary instruction, the on-site hanging operation of the boundary sign corresponding to the newly added boundary instruction is performed, and the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction is updated. It can be seen that when performing shared boundary detection, if there is no shared boundary for the newly added boundary instruction, it means that there is no boundary instruction identical to the newly added boundary instruction in the transferred isolation boundary. Therefore, a new boundary state can be formed by performing on-site hanging of the boundary sign of the newly added boundary instruction. Subsequently, if there are other newly added boundary instructions identical to the newly added boundary instruction, the boundary sign of the newly added boundary instruction can be directly used without the need to perform on-site hanging operation to reduce the workload during hanging.

[0034] Through step S50: obtaining a change instruction for the newly added boundary instruction, changing the newly added boundary instruction in the isolation operation sheet to a boundary modification instruction, and changing the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, it can be seen that the obtained change instruction can be an instruction when the newly added boundary instruction has a shared boundary. When the obtained change instruction is an instruction when the newly added boundary instruction has a shared boundary, it can be implemented directly using the boundary sign corresponding to the boundary sharing for offline on-site implementation and only adding the newly added boundary instruction and the isolation operation sheet to the online system, reducing the repetitive workload caused by repeated listing / delisting on-site, saving time and improving work efficiency. Of course, the change instruction can also be a boundary upgrade processing instruction, or a boundary conversion processing instruction corresponding to the conversion of the boundary from isolation transfer to temporary operation transfer. According to the above-mentioned boundary upgrade processing instruction or boundary conversion processing instruction, it is possible to efficiently realize online management during boundary modification, reduce information operation and maintenance and management costs, and also ensure stability and risk controllability during boundary modification.

[0035] In one embodiment of the present invention, both the online management and offline implementation of the newly added isolation boundary need to be carried out through the isolation operation sheet. Specifically, creating an isolation operation sheet includes: generating a work permit and its isolation operation sheet according to the debugging information of the isolation transfer application and the newly added boundary instruction. In this embodiment, the corresponding work permit can be generated by calling the boundary instruction input by debugging. And, the isolation boundary input by debugging is further called to select and determine the isolation boundary, and the corresponding isolation operation sheet is generated in combination with the information of the work permit. Of course, it is also possible to directly generate an isolation operation sheet first, and then further generate the work permit according to the partial information corresponding to the work permit in the isolation operation sheet. Among them, the work permit indicates that the safety conditions required for the work are in place, and the powers and responsibilities between the person in charge of the work and the operation department have been clearly defined.

[0036] In one embodiment of the present invention, when the isolation operation sheet and the newly added isolation boundary therein are isolated and implemented offline and online, it is necessary to further perform shared boundary detection to simplify the isolation implementation process when the newly added boundary instruction has a shared boundary. Specifically, the newly added boundary instruction in the isolation operation sheet is subjected to shared boundary detection, including: determining whether there is a shared boundary instruction in the shared operation sheet that is consistent with the newly added boundary instruction in the isolation operation sheet, and if so, generating a change instruction for the newly added boundary instruction. In this embodiment, when performing shared boundary detection, the newly added boundary instruction is subjected to consistency query of all boundary instructions in the isolation transfer boundary, and if an existing boundary instruction in the isolation transfer boundary that is consistent with the newly added boundary instruction is found, the existing boundary instruction can be used as a shared boundary instruction, directly as the implementation state of the newly added boundary instruction, so as to reduce the repeated workload caused by repeated listing / delisting on site, save time and improve work efficiency. If no existing boundary instruction is found as a shared boundary instruction, the newly added boundary instruction is added to the system as a new boundary instruction for online isolation implementation, and the corresponding boundary sign listing implementation operation is performed offline.

[0037] In one embodiment of the present invention, when modifying the newly added change instruction and adjusting the state of the isolation operation form based on the change instruction, the change instruction can be a shared instruction when the newly added boundary instruction has a shared boundary. Specifically, a change instruction for the newly added boundary instruction is obtained, the newly added boundary instruction in the isolation operation form is changed to a boundary modification instruction, and the implementation state of the isolation operation form corresponding to the newly added boundary instruction is changed to the implementation state of the isolation operation form corresponding to the boundary modification instruction, including: when the newly added boundary instruction has a shared boundary, a shared instruction for the newly added boundary instruction is obtained; based on the shared implementation state of the shared operation form corresponding to the shared boundary, the newly added boundary instruction in the isolation operation form is shared with the shared instruction in the shared operation form, and the shared implementation state of the shared operation form is used as the implementation state of the isolation operation form corresponding to the newly added boundary instruction.

[0038] In this embodiment, when the change instruction is a sharing instruction, it means that only online sharing operation is required, that is, the new boundary instruction is shared with the shared boundary instruction of the shared operation sheet corresponding to the shared boundary being isolated and implemented online, that is, the new boundary instruction is also the shared boundary instruction, therefore, the new boundary instruction / shared boundary instruction can also be further explained as the boundary modification instruction. And after sharing, the implementation status of the isolated operation sheet of the new boundary instruction is shared with the shared implementation status of the shared operation sheet, that is, the shared implementation status of the shared operation sheet is used as the implementation status of the isolated operation sheet corresponding to the new boundary instruction.

[0039] In one embodiment of the present invention, when modifying the newly added change instruction and adjusting the state of the isolation operation sheet based on the change instruction, the change instruction may be an upgrade instruction for upgrading the upgraded version boundary of the initial version boundary when the isolation is transferred. Specifically, a change instruction for the newly added boundary instruction is obtained, the newly added boundary instruction in the isolation operation sheet is changed into a boundary modification instruction, and the implementation state of the isolation operation sheet corresponding to the newly added boundary instruction is changed into the implementation state of the isolation operation sheet corresponding to the boundary modification instruction, including: obtaining an upgrade instruction for the initial version boundary including the newly added boundary instruction and other boundary instructions; upgrading the newly added boundary instruction and other boundary instructions in the initial version boundary to obtain the upgraded boundary modification instruction and its upgraded version boundary; comparing the difference information between the newly added boundary instruction and the boundary modification instruction, and sending the difference information to the upgrade difference database between the initial version boundary and the upgraded version boundary for upgrade check; after the upgrade check is passed, the implementation state of the isolation operation sheet corresponding to the newly added boundary instruction is updated to the implementation state of the isolation operation sheet corresponding to the boundary modification instruction.

[0040] In the present embodiment, when the change instruction is an upgrade instruction, the upgrade processing of the initial edition boundary to the upgraded board boundary can be realized through the upgrade instruction. During the upgrade processing, it can be the upgrade processing of the newly added boundary instruction and other boundary instructions in the initial edition boundary. When the newly added boundary instruction is upgraded, the difference information between the newly added boundary instruction and the boundary modification instruction after the upgrade processing is completed is compared. And the difference information is added to the upgrade difference database between the initial edition boundary and the upgraded edition boundary, and the upgrade difference database also includes other difference information formed when other boundary instructions are upgraded. After the upgrade processing, an upgrade check is performed to prevent the existence of boundary conflicts with other boundary instructions after the boundary instruction is upgraded. After the upgrade check is passed, the implementation status of the isolation operation sheet corresponding to the boundary modification instruction will be obtained, so it is also necessary to update the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction.

[0041] Further, the upgrade process includes: directly modifying and upgrading the newly added boundary instructions and / or other boundary instructions in the first edition boundary, merging the first edition boundary with other first edition boundaries to expand the version and modifying and upgrading, and the modification and upgrading include deleting, changing and adding boundary instructions. In this embodiment, during the upgrade process, it can be a direct modification of the boundary instructions in the first edition boundary, of course, it can also be a modification of the boundary instructions after merging the first edition boundary with other first edition boundaries to complete the expansion. Specifically, when directly modifying the boundary instructions in the first edition boundary, it can be a direct modification of the newly added boundary instructions in the first edition boundary, of course, it can also be a direct modification and upgrading of other boundary instructions, or it can be a direct modification and upgrading of the newly added boundary instructions and other boundary instructions at the same time. After merging the first edition boundary with other first edition boundaries to complete the expansion, the boundary instructions are modified. Similarly, after the merger is completed and the expansion is completed, the newly added boundary instructions can be modified separately, other boundary instructions can be modified, or the newly added boundary instructions and other boundary instructions can be modified at the same time. When modifying the boundary instructions, it can be operations such as deleting, changing and adding boundary instructions according to the actual implementation scenario and relevant requirements.

[0042] In one embodiment of the present invention, when modifying the newly added change instruction and adjusting the state of the isolation operation sheet based on the change instruction, the change instruction may be a conversion instruction from the isolation handover to the temporary operation handover. Specifically, a change instruction for the newly added boundary instruction is obtained, the newly added boundary instruction in the isolation operation sheet is changed to a boundary modification instruction, and the implementation state of the isolation operation sheet corresponding to the newly added boundary instruction is changed to the implementation state of the isolation operation sheet corresponding to the boundary modification instruction, including: after the isolation handover boundary debugging including the newly added boundary instruction and other boundary instructions is completed, according to the conversion application of the isolation handover boundary to the temporary operation handover, the boundary conversion instruction for the newly added boundary instruction is obtained; the newly added boundary instruction in the isolation handover boundary is converted into a boundary modification instruction, and a conflict check is performed on the boundary modification instruction of the temporary operation handover after the boundary conversion; after the conflict check passes, the implementation state of the isolation operation sheet corresponding to the newly added boundary instruction at the isolation handover boundary is updated to the implementation state of the isolation operation sheet corresponding to the boundary modification instruction of the temporary operation handover after the boundary conversion.

[0043] In this embodiment, after the newly added boundary instructions and other boundary instructions of the isolated transfer are debugged by the debugging party, the newly added boundary instructions and other boundary instructions can be isolated and converted from the isolation transfer boundary to the temporary operation transfer boundary at the same time according to the boundary conversion instruction. And after the conversion, the newly added boundary instructions will be changed to boundary modification instructions through operations such as deletion, change and addition, and then a conflict check will be performed to ensure that the risk during the boundary conversion is controllable. When the conflict check is completed and confirmed to be correct, according to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, it is also necessary to update the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction online to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction of the temporary operation transfer.

[0044] In one embodiment of the present invention, when a new boundary instruction is submitted for application, it needs to be approved, and the new boundary instruction may be modified before and after the approval. Therefore, the modification of the new boundary instruction includes: modification before submission to the isolation approval platform, and modification after submission to the isolation approval platform and after the approval is returned.

[0045] like Figure 2 As shown, in one embodiment of the present invention, the present invention also provides a TOB boundary full-process implementation management system 11, including: an application information acquisition unit 111, used to obtain an isolation transfer application and a new boundary instruction; an operation order creation unit 112, used to create an isolation operation order based on the isolation transfer application and the new boundary instruction; a shared detection unit 113, used to perform a shared boundary detection on the new boundary instruction in the isolation operation order; an implementation status update unit 114, used to perform an on-site hanging operation of the boundary sign corresponding to the new boundary instruction when there is no shared boundary for the new boundary instruction, and update the implementation status of the isolation operation order corresponding to the new boundary instruction; and an implementation status change unit 115, used to obtain a change instruction for the new boundary instruction, change the new boundary instruction in the isolation operation order to a boundary modification instruction, and change the implementation status of the isolation operation order corresponding to the new boundary instruction to the implementation status of the isolation operation order corresponding to the boundary modification instruction.

[0046] In this embodiment, in the TOB boundary full-process implementation management process of the present invention, after the isolation transfer application information and the newly added boundary instruction information are entered, the corresponding isolation transfer application and the newly added boundary instruction can be obtained through the application information acquisition unit 111. Through the operation form creation unit 112, it can be further realized that the isolation transfer application and the newly added boundary instruction are used to create an isolation operation form, so as to perform online and offline isolation implementation operations through the isolation operation form. Specifically, through the shared detection unit 113, it can be realized to detect whether there is a shared boundary for the newly added boundary instruction, and then if there is no shared boundary, the implementation state of the isolation operation form corresponding to the online newly added boundary instruction is created through the implementation state update unit 114, and the boundary sign of the offline newly added boundary instruction is hung. The implementation state change unit 115 can be realized by changing the instruction, implementing the change of the newly added boundary instruction to the boundary modification instruction, and changing the implementation state of the isolation operation form corresponding to the newly added boundary instruction to the implementation state of the isolation operation form corresponding to the boundary modification instruction. When the change instruction is an instruction for adding a new boundary instruction and there is a shared boundary, it is possible to directly use the boundary sign corresponding to the boundary sharing for offline on-site implementation and only add the new boundary instruction and isolation operation sheet to the online system, thereby reducing the repetitive workload caused by repeated listing / delisting on site, saving time and improving work efficiency. Of course, the change instruction can also be a boundary upgrade processing instruction, or a boundary conversion processing instruction corresponding to the conversion of the boundary from isolation handover to temporary operation handover. According to the above-mentioned boundary upgrade processing instruction or boundary conversion processing instruction, it is possible to efficiently implement online management of boundary modifications, reduce information operation and maintenance and management costs, and ensure stability and risk controllability during boundary modifications.

[0047] It should be noted that the implementation management system 11 provided in the above embodiment and the implementation management method provided in the above embodiment belong to the same concept, wherein the specific manner in which each module and unit performs operations has been described in detail in the method embodiment, and will not be repeated here. In actual application, the implementation management system 11 provided in the above embodiment can allocate the above functions to different functional modules as needed, that is, divide the internal structure of the device into different functional modules to complete all or part of the functions described above, and this is not limited here.

[0048] See also Figure 3 The electronic device 1 may include a memory 12, a processor 13 and a bus, and may also include a computer program stored in the memory 12 and executable on the processor 13, such as a TOB boundary full-process implementation management program.

[0049] Among them, the memory 12 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, mobile hard disk, multimedia card, card-type memory (for example: SD or DX memory, etc.), magnetic memory, disk, optical disk, etc. In some embodiments, the memory 12 can be an internal storage unit of the electronic device 1, such as a mobile hard disk of the electronic device 1. In other embodiments, the memory 12 can also be an external storage device of the electronic device 1, such as a plug-in mobile hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 1. Further, the memory 12 can also include both an internal storage unit of the electronic device 1 and an external storage device. The memory 12 can not only be used to store application software and various types of data installed in the electronic device 1, such as the code for implementing the management of the entire process of the TOB boundary, etc., but can also be used to temporarily store data that has been output or is to be output.

[0050] In some embodiments, the processor 13 may be composed of an integrated circuit, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and a combination of various control chips. The processor 13 is the control core (Control Unit) of the electronic device 1, and uses various interfaces and lines to connect the various components of the entire electronic device 1, and executes or executes the programs or modules stored in the memory 12 (such as the TOB boundary full process implementation management program, etc.), and calls the data stored in the memory 12 to execute various functions of the electronic device 1 and process data.

[0051] The processor 13 executes the operating system and various installed applications of the electronic device 1. The processor 13 executes the applications to implement the steps in the TOB boundary full process implementation management method.

[0052] Exemplarily, the computer program may be divided into one or more modules, which are stored in the memory 12 and executed by the processor 13 to complete the present application. The one or more modules may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program in the electronic device 1. For example, the computer program may be divided into an application information acquisition unit 111, an operation form creation unit 112, a sharing detection unit 113, an implementation status update unit 114, and an implementation status change unit 115.

[0053] The above-mentioned integrated unit implemented in the form of a software function module can be stored in a computer-readable storage medium, and the computer-readable storage medium can be non-volatile or volatile. The above-mentioned software function module is stored in a storage medium, including several instructions for enabling a computer device (which can be a personal computer, a computer device, or a network device, etc.) or a processor to perform some functions of the TOB boundary full-process implementation management method described in each embodiment of the present application.

[0054] In summary, the present invention discloses a TOB boundary full-process implementation management method, system, equipment and medium, which creates an isolation operation sheet according to the isolation transfer application and the newly added boundary instruction, and performs a shared boundary detection on the newly added boundary instruction in the isolation operation sheet, so as to quickly determine whether there is a shared boundary (that is, whether there is sharing / whether it can be shared) in the isolation state of the isolation boundary, so as to achieve that when there is no shared boundary, the implementation status of the isolation operation sheet is updated online according to the process, and the listing / delisting operation of the offline isolation site is performed at the same time. When there is a shared boundary, it is only necessary to update the implementation status of the online isolation operation sheet, which reduces the repetitive workload caused by repeated listing / delisting on site, saves time and improves work efficiency. And further, it also realizes the change instructions according to the newly added boundary instructions such as expansion and conversion, which can improve the modification and inspection and approval efficiency of the newly added boundary instructions in the isolation operation sheet, while improving the centralized management of the boundary instructions with a large amount of isolation information and complexity. While meeting the functions of handover management boundary row application, listing, delisting, and ticket management, the content management, data transmission, on-site execution, post-event recording and feedback are optimized and improved, reducing the cost of information operation and maintenance and management, and ensuring the security and stability of the boundary state. Therefore, the present invention effectively overcomes the various shortcomings of the prior art and has a high industrial utilization value.

[0055] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A TOB boundary full process implementation management method, characterized in that: The steps include: Obtain quarantine transfer applications and new border instructions; Creating an isolation operation sheet based on the isolation transfer application and the newly added boundary instruction; Performing shared boundary detection on the newly added boundary instructions in the isolation operation sheet; When there is no shared boundary for the newly added boundary instruction, an on-site sign-hanging operation of the boundary sign corresponding to the newly added boundary instruction is performed, and the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction is updated; Obtain a change instruction for the newly added boundary instruction, change the newly added boundary instruction in the isolation operation sheet to a boundary modification instruction, and change the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction.

2. The TOB boundary full process implementation management method according to claim 1 is characterized by: Create an isolation operation sheet, including: Based on the debugging information of the isolation transfer application and the newly added boundary instructions, a work permit and the isolation operation sheet described therein are generated.

3. The TOB boundary full process implementation management method according to claim 1 is characterized by: Performing shared boundary detection on the newly added boundary instruction in the isolation operation sheet includes: It is determined whether there is a shared boundary instruction in the shared operation sheet that is consistent with the newly added boundary instruction in the isolated operation sheet. If so, a change instruction for the newly added boundary instruction is generated.

4. The TOB border full-process implementation management method according to any one of claims 1 to 3, characterized in that: Obtaining a change instruction for the newly added boundary instruction, changing the newly added boundary instruction in the isolation operation sheet into a boundary modification instruction, and changing the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction into the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, including: When a new boundary instruction has a shared boundary, obtaining a shared instruction for the new boundary instruction; Based on the shared implementation status of the shared operation sheet corresponding to the shared boundary, the newly added boundary instruction in the isolated operation sheet is shared with the shared instruction in the shared operation sheet, and the shared implementation status of the shared operation sheet is used as the implementation status of the isolated operation sheet corresponding to the newly added boundary instruction.

5. The TOB boundary full-process implementation management method according to any one of claims 1-3 is characterized in that: Obtaining a change instruction for the newly added boundary instruction, changing the newly added boundary instruction in the isolation operation sheet into a boundary modification instruction, and changing the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction into the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, including: Obtaining an upgrade instruction for the initial version of the boundary including the newly added boundary instruction and other boundary instructions; Upgrading the newly added boundary instructions and other boundary instructions in the initial version boundary to obtain the upgraded boundary modification instructions and the upgraded version boundary; Compare the difference information between the newly added boundary instruction and the boundary modification instruction, and send the difference information to an upgrade difference database between the initial version boundary and the upgraded version boundary for upgrade checking; After the upgrade check is passed, the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction will be updated to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction.

6. The TOB boundary full-process implementation management method according to claim 5 is characterized by: The upgrade process includes: directly modifying and upgrading the newly added boundary instructions and / or other boundary instructions in the first edition boundary, merging the first edition boundary with other first edition boundaries to expand the version and modifying and upgrading, and the modification and upgrading includes deleting, changing and adding boundary instructions.

7. The TOB boundary full-process implementation management method according to any one of claims 1-3 is characterized in that: Obtaining a change instruction for the newly added boundary instruction, changing the newly added boundary instruction in the isolation operation sheet into a boundary modification instruction, and changing the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction into the implementation status of the isolation operation sheet corresponding to the boundary modification instruction, including: After the isolation handover boundary debugging including the newly added boundary instruction and other boundary instructions is completed, according to the conversion application of the isolation handover boundary to the temporary operation handover, a boundary conversion instruction for the newly added boundary instruction is obtained; Converting the newly added boundary instruction in the isolation handover boundary into the boundary modification instruction, and performing a conflict check on the boundary modification instruction of the temporary operation handover after the boundary conversion; After the conflict check is passed, the implementation status of the isolation operation sheet corresponding to the newly added boundary instruction at the isolation transfer boundary is updated to the implementation status of the isolation operation sheet corresponding to the boundary modification instruction of the temporary operation transfer after the boundary conversion.

8. A TOB boundary full process implementation management system, characterized in that: include: An application information acquisition unit, used to acquire an isolation transfer application and a new border instruction; An operation sheet creation unit, configured to create an isolation operation sheet based on the isolation transfer application and the new boundary instruction; A sharing detection unit, used for performing sharing boundary detection on the newly added boundary instruction in the isolation operation sheet; An implementation status updating unit, used for, when a newly added boundary instruction does not have a shared boundary, performing an on-site sign-hanging operation of a boundary sign corresponding to the newly added boundary instruction, and updating an implementation status of the isolation operation sheet corresponding to the newly added boundary instruction; as well as An implementation status change unit is used to obtain a change instruction for the newly added boundary instruction, change the newly added boundary instruction in the isolation operation form into a boundary modification instruction, and change the implementation status of the isolation operation form corresponding to the newly added boundary instruction into the implementation status of the isolation operation form corresponding to the boundary modification instruction.

9. An electronic device, characterized in that: The electronic device comprises: one or more processors; A storage device for storing one or more programs, which, when executed by the one or more processors, enables the electronic device to implement the TOB boundary full-process implementation management method as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed by a processor of a computer, the computer is caused to execute the TOB boundary full-process implementation management method described in any one of claims 1 to 7.