Multi-cabin combined assembly type prefabricated working well and assembly method
Through the design of a multi-cabin combined prefabricated work well, the well body is tightly fixed by using sockets, socket blocks and installation holes, solving the problems of long construction cycles and narrow application scope in the existing technology, and achieving faster, flexible and safe well construction.
Patent Information
- Application Number
- CN202411642503.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-18
- Publication Date
- 2025-05-16
AI Technical Summary
Existing cable inspection wells require on-site pouring, resulting in extended construction cycles, consuming a lot of time and human resources, and are susceptible to environmental factors, and have a low scope of application.
A multi-cabin combination prefabricated work well is adopted, including the end well body and the intermediate well body. The tight fixing between the well bodies is achieved through sockets, socket blocks and installation holes. Combined with the embedded iron sheet, grounding ring and protective iron ring, it is designed into an adjustable structure to adapt to different environments.
Reduce construction period, improve the scope of application of wells, provide a safer maintenance environment, and reduce construction costs and human resource consumption.
Smart Images

Figure CN120006771A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of work wells, and in particular to a multi-chamber combined assembled prefabricated work well and an assembly method. Background Art
[0002] As a kind of infrastructure, construction wells are actually everywhere in our daily lives. Whether it is the bustling streets of the city or the quiet alleys of the countryside, construction wells play an important role silently. They are usually hidden underground and unnoticed, but they are an indispensable part of the operation of the city. Construction wells not only provide protection and support for underground pipelines, but also ensure the normal operation of important facilities such as electricity, communications, and water supply.
[0003] Nowadays, cable inspection wells usually need to be cast on site, which not only prolongs the construction period of the project, but also consumes a lot of time and human resources. In addition, the inspection wells cast on site are easily affected by environmental factors, which limits their application scope and makes their adaptability relatively low. Summary of the invention
[0004] The present invention provides a multi-chamber combined assembled prefabricated work well and an assembly method, which can reduce the construction period, increase the scope of application according to the required situation and provide safer protection for operators.
[0005] To achieve the above-mentioned purpose, a multi-compartment combined assembled prefabricated working well is provided, which includes an end well body and an intermediate well body. One side of the end well body is provided with an installation port compatible with the cable row pipe, and the other side of the end well body is provided with a connecting part, and the connecting part includes a socket slot or a socket block. The two ends of the intermediate well body are respectively equipped with a socket slot and a socket block. The internal corners of the end well body and the intermediate well body are chamfered, and installation holes are provided near the chamfers. The intermediate well body is composed of multiple or single parts, and the two ends of a single or several intermediate well bodies are connected to the end well bodies at both ends by socket blocks and socket slots, and long bolts are inserted into the installation holes to achieve tight fixation between the well bodies to form a whole. The inner side surfaces of the end well bodies and the intermediate well bodies are fixedly connected with embedded iron sheets, and the upper surfaces of the embedded iron sheets are provided with threaded holes. A connecting plate is fixedly connected to the embedded iron sheet, and a number of racks for placing cables are fixed on the connecting plate.
[0006] Moreover, sealing grooves are provided at the sockets of the end well bodies and the middle well body, and waterproof sealing rings are embedded in the sealing grooves.
[0007] Moreover, a protective iron ring is fixedly connected to the middle of the upper surface of the end well body and the middle well body, a hole is set at the protective iron ring, a rotating shaft is rotatably connected near the hole, a manhole cover is fixedly connected to the middle of the rotating shaft, and a handle is fixedly connected to the upper surface of the manhole cover.
[0008] Moreover, grounding rings are arranged inside the end well body and the middle well body.
[0009] Moreover, water collecting grooves are arranged on the inner upper surfaces of the end well bodies and the middle well bodies.
[0010] Moreover, the four corners of the upper surfaces of the end well body and the middle well body are fixedly connected with lifting rings.
[0011] A multi-chamber combined assembly type prefabricated work well and an assembly method, comprising the following steps:
[0012] Step 1: Prefabricate multiple end well bodies and multiple middle well bodies in the factory, and connect the lifting rings with a crane for lifting and transfer;
[0013] Step 2: According to the required length of the working well, hoisting and splicing are carried out on site. Under certain circumstances, the two ends of a single or several intermediate well bodies are connected to the end well bodies at both ends through socket blocks and socket sockets, and long bolts are inserted into the mounting holes to achieve tight fixation between the well bodies to form a whole.
[0014] Step 3: If the inside needs to be inspected, the worker can operate the handle, and then the shaft drives the manhole cover to rotate to open the manhole cover; then the worker inspects and maintains the cables on the rack.
[0015] Beneficial effects of the present invention: By carefully designing the socket, socket block, middle well body, mounting hole, embedded iron sheet, grounding ring and protective iron ring, we can increase the number of middle well bodies and connect and install them with the end well bodies through the socket, socket block and mounting hole. This design can not only adjust the scale of the structure, but also flexibly adjust the structure by reducing the number of middle well bodies in the face of narrow environments, thereby expanding its scope of application. In addition, the grounding ring and protective iron ring on the embedded iron sheet provide a safer maintenance environment for maintenance personnel.
[0016] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments;
[0018] Figure 1 It is a schematic diagram of the overall structure of the multi-chamber combined assembly type prefabricated working well of the present invention;
[0019] Figure 2 It is a schematic diagram of the exploded structure of the multi-chamber combined assembly type prefabricated working well of the present invention;
[0020] Figure 3 It is a schematic diagram of the middle well body structure of the multi-chamber combined assembled prefabricated well of the present invention.
[0021] Legend:
[0022] 1. End well body; 2. Installation port; 3. Lifting ring; 4. Protective iron ring; 5. Handle; 6. Well cover; 7. Connecting plate; 8. Shelf; 9. Middle well body; 10. Installation hole; 11. Sealing groove; 12. Water collecting trough; 13. Chamfered shape; 14. Bolt installation groove; 15. Grounding ring; 16. Threaded hole. DETAILED DESCRIPTION
[0023] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.
[0024] Reference Figures 1 to 3 The multi-cabin combined assembly prefabricated well of the embodiment of the present invention includes an end well body and an intermediate well body 1. One side of the end well body is provided with an installation port adapted to the cable row pipe, and the other side of the end well body is provided with a connection portion, and the connection portion includes a socket or a socket block. The two ends of the intermediate well body 9 are respectively equipped with a socket and a socket block, which makes the installation process easier. The intermediate well body 9 can be composed of multiple or single. According to the needs of the site, the number of intermediate well bodies 9 is increased and the length is changed. The two ends of a single or several intermediate well bodies 9 are connected to the end well bodies 1 at both ends through the socket blocks and the sockets, thereby forming a whole. The four corners of the upper surface of the end well body 1 and the middle well body 9 are fixedly connected with lifting rings 3, and the middle part of the upper surface is fixedly connected with a protective iron ring 4, a hole is provided at the protective iron ring 4, the protective iron ring 4 is rotatably connected with a rotating shaft near the hole, a manhole cover 6 is fixedly connected to the middle part of the rotating shaft, a handle 5 is fixedly connected to the upper surface of the manhole cover 6, the inner side surface of the end well body 1 and the middle well body 9 is fixedly connected with an embedded iron sheet 14, the upper surface of the embedded iron sheet 14 is provided with a threaded hole 16, and the embedded iron sheet 14 is fixedly connected with a connecting plate 7.
[0025] The design of the lifting ring 3 allows the prefabricated manhole to be lifted and placed at a desired location. When a worker needs to go down the manhole, he only needs to pull the handle 5, and the rotating shaft 13 rotates accordingly, thereby reducing the effort required to lift the manhole cover 6, making it easier to open the manhole cover 6.
[0026] The embedded iron sheet 14 is fixedly installed with the connecting plate 7 through the threaded holes 16, and the rack 8 fixed by the connecting plate 7 is convenient for placing the cables.
[0027] The inner corners of the end well body 1 and the middle well body are chamfered 13, and a mounting hole 10 is provided near the chamfer. The sockets of the end well body 1 and the middle well body 9 are provided with sealing grooves 11, and waterproof sealing rings are embedded in the sealing grooves.
[0028] The side surface of the connecting plate 7 is fixedly connected with a rack 8, and the number of racks 8 is multiple. The mounting hole 10 is for inserting long bolts during the installation process, and a tight fixed connection between the well bodies is achieved through the socket block and the socket. The waterproof sealing ring at the connection part can effectively block the infiltration of external moisture and protect the working well and its affiliated structures from damage. The grounding ring 15 in the well body is designed to connect the grounding wire to guide the current to be safely conducted to the ground below, ensuring the safety of the maintenance personnel in the well. In addition, the protective iron ring 4 on the top also plays the role of conducting the current into the ground to prevent the current from causing harm to the maintenance personnel.
[0029] The upper surfaces of the end well bodies 1 and the middle well bodies 9 are provided with water collecting troughs 12. The water collecting troughs 12 can prevent water accumulation in the wells, and the devices thereof can discharge the accumulated water to ensure the stability of the environment in the wells.
[0030] This embodiment also provides a multi-chamber combined assembly type prefabricated work well and an assembly method, comprising the following steps:
[0031] Step 1: Prefabricate multiple end well bodies and multiple middle well bodies in the factory, and connect the lifting rings with a crane for lifting and transfer;
[0032] Step 2: According to the required length of the working well, hoisting and splicing are carried out on site. Under certain circumstances, the two ends of a single or several intermediate well bodies are connected to the end well bodies at both ends through socket blocks and socket sockets, and long bolts are inserted into the mounting holes to achieve tight fixation between the well bodies to form a whole.
[0033] Step 3: If the inside needs to be inspected, the worker can operate the handle, and then the shaft drives the manhole cover to rotate to open the manhole cover; then the worker inspects and maintains the cables on the rack.
[0034] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.
Claims
1. A multi-chamber assembled prefabricated work well, characterized by: It includes an end well body and an intermediate well body. One side of the end well body is provided with an installation port that is compatible with the cable drainage pipe, and the other side of the end well body is provided with a connecting part, and the connecting part includes a socket slot or a socket block. The two ends of the intermediate well body are respectively equipped with a socket slot and a socket block. The internal corners of the end well body and the intermediate well body are chamfered, and installation holes are provided near the chamfers. The intermediate well body is composed of multiple or single parts. The two ends of a single or several intermediate well bodies are connected to the end well bodies at both ends through socket blocks and socket slots, and long bolts are inserted into the installation holes to achieve tight fixation between the well bodies to form a whole. The inner side surfaces of the end well body and the intermediate well body are fixedly connected with embedded iron sheets, and the upper surfaces of the embedded iron sheets are provided with threaded holes. A connecting plate is fixedly connected to the embedded iron sheet, and several racks for placing cables are fixed on the connecting plate.
2. The multi-chamber assembled prefabricated working well according to claim 1 is characterized in that: The sockets of the end well bodies and the middle well bodies are provided with sealing grooves, and waterproof sealing rings are embedded in the sealing grooves.
3. The multi-chamber assembled prefabricated working well according to claim 1 is characterized in that: The end well body and the middle well body are fixedly connected with a protective iron ring in the middle of the upper surface, the protective iron ring is provided with a hole, a rotating shaft is rotatably connected near the hole, a well cover is fixedly connected to the middle of the rotating shaft, and a handle is fixedly connected to the upper surface of the well cover.
4. The multi-chamber assembled prefabricated working well according to claim 1 is characterized in that: The end well body and the middle well body are both provided with grounding rings.
5. The multi-chamber assembled prefabricated working well according to claim 1 is characterized in that: The inner upper surfaces of the end well bodies and the middle well bodies are provided with water collecting grooves.
6. The multi-chamber assembled prefabricated working well according to claim 1 is characterized in that: The four corners of the upper surfaces of the end well body and the middle well body are fixedly connected with lifting rings.
7. A multi-chamber combined assembly type prefabricated work well and an assembly method, comprising the following steps: Step 1: Prefabricate multiple end well bodies and multiple middle well bodies in the factory, and connect the lifting rings with a crane for lifting and transfer; Step 2: According to the required length of the working well, hoisting and splicing are carried out on site. Under certain circumstances, the two ends of a single or several intermediate well bodies are connected to the end well bodies at both ends through socket blocks and socket sockets, and long bolts are inserted into the mounting holes to achieve tight fixation between the well bodies to form a whole. Step 3: If the inside needs to be inspected, the worker can operate the handle, and then the shaft drives the manhole cover to rotate to open the manhole cover; then the worker inspects and maintains the cables on the rack.