Brush expanding and supporting device and method for large-diameter main draw shaft in ore pass breaking system

By using equipment and methods such as reverse well drilling rigs, sealing disks, double-layer hanging disk devices in the slip system, the main slip shaft is expanded and supported, and the problems of low construction safety coefficient, low efficiency and high cost in the existing construction methods are solved, and more efficient, safe and economical construction results are achieved.

CN120007269APending Publication Date: 2025-05-16CHINA HUAYE GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510077315.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2025-05-16

AI Technical Summary

Technical Problem

The existing underground mine shaft expansion construction methods have problems such as low construction safety factor, low efficiency and high cost.

Method used

It is provided with a main shaft swing expansion and support device for a broken system, including a reverse well drilling rig, a sealing disk, a double-layer hanging disk device, a wheel platform, a derrick, a lifting system and a support tool. The main shaft swing expansion and support are provided through these equipment and methods.

Benefits of technology

It improves the construction safety factor, improves construction efficiency, reduces costs, and ensures the stability and safety of the main shaft.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120007269A_ABST
    Figure CN120007269A_ABST
Patent Text Reader

Abstract

The invention provides a large-diameter main draw shaft expanding and brushing supporting device and method in a draw breaking system, the device comprises a raise boring machine, a sealing disc, a double-layer hanging scaffold device, a head sheave platform, a derrick, a lifting system and a supporting tool, the raise boring machine is used for expanding and brushing a shaft of a main draw shaft through downward tunneling; the sealing disc is used for sealing a lifting wellhead of the main draw shaft; the double-layer hanging scaffold device is used as a construction platform for expanding and brushing a shaft of the main draw shaft; the head sheave platform and the derrick are connected with the lifting system, and construction materials and constructors needed for expanding and brushing a shaft of the main draw shaft are transported to the construction platform. And the supporting tool is used for permanently supporting the expanded and brushed main draw shaft. By means of the method, the problems of low construction safety coefficient, low efficiency, high cost and the like can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of chute construction, and in particular to a large-diameter main chute expansion and brush support device and method in a chute breaking system. Background Art

[0002] At present, there are several methods for expanding underground mine chutes in my country, such as reverse drilling, deep hole blasting, and reverse excavation. However, the above construction methods have many disadvantages. For example, in reverse excavation of chutes, the space above the lower mouth of the chute is too small, and floating stones falling from the chute wall can easily fall and injure people, resulting in a low safety factor and difficult safety protection. At the same time, there are also problems such as low construction efficiency and high cost. Summary of the invention

[0003] In view of the above problems, the purpose of the present invention is to provide a large-diameter main chute expansion brush support device and method in a chute breaking system to solve the problems of low construction safety factor, low efficiency and high cost.

[0004] The present invention provides a main chute expansion and brush support device for a chute breaking system, comprising: a raise drilling rig, a sealing plate, a double-layer hanging plate device, a sheave platform, a derrick, a lifting system and a support tooling, wherein:

[0005] The raise boring machine is used to expand the shaft of the main chute by digging downward;

[0006] The sealing plate is used to seal the lifting wellhead of the main chute;

[0007] The double-layer hanging plate device is used as a construction platform for expanding the shaft of the main chute;

[0008] The sheave platform and the derrick are connected to the lifting system, and transport construction materials and construction personnel required for expanding the shaft of the main chute to the construction platform;

[0009] The supporting tooling is used for permanent support of the main chute after expansion.

[0010] Preferably, the double-layer hanging plate device comprises a double-layer hanging plate and a support column arranged between the double-layer hanging plates, wherein:

[0011] The double-layer hanging plate comprises an upper hanging plate and a lower hanging plate, and the upper hanging plate and the lower hanging plate both comprise a round beam, a main beam and a secondary beam arranged on the round beam, wherein:

[0012] The main beam and the auxiliary beam are welded, the main beam, the auxiliary beam and the round beam form a circular frame, and a patterned plate is laid on the circular frame;

[0013] The patterned plate is provided with reserved holes for wind and water pipes, reserved holes for shotcrete pipes and reserved holes for hanging buckets.

[0014] Preferably, the support columns are arranged between the upper hanging tray and the lower hanging tray, and the support columns are fixed to the main beams of the upper hanging tray and the lower hanging tray, wherein a ladder is arranged on the support columns.

[0015] Preferably, movable wing plates are respectively provided on the upper hanging tray and the lower hanging tray, and the movable wing plates are used to increase the size of the upper hanging tray and the lower hanging tray; wherein,

[0016] The movable wing plate is provided with a buckle, and the movable wing plate is fixed to the wall through the buckle.

[0017] Preferably, the double-layer hanging plate is connected to the sheave platform arranged on the derrick through a herringbone support rope.

[0018] Preferably, the sheave platform comprises a sheave base, a main beam and a secondary beam arranged on the sheave base, the main beam and the secondary beam are welded to each other by full welding, and the sheave base is connected to the secondary beam by bolts;

[0019] The main beam on the sheave base is fixed in the tunnel of the main chute by the anchor rod.

[0020] Preferably, the derrick comprises an upper column, a lower column, a scissor brace arranged between the upper columns and between the lower columns, and a diagonal brace for supporting the upper columns, wherein:

[0021] The angle between the diagonal brace and the upper column is 3° to 4°;

[0022] The upper column and the lower column are fixed by welding with steel plates;

[0023] The upper column is welded to the sheave platform via a steel plate;

[0024] The lower column is installed in a hole reserved at the wellhead, fixed to the ground by round steel anchor rods, and then poured with concrete.

[0025] Preferably, the lifting system includes a winch and a stabilizer, wherein:

[0026] The winch is used to lift the bucket suspended on the derrick;

[0027] The stabilizing vehicle is used to lift the double-layer hanging plate;

[0028] Wherein, the winch and the stabilizing vehicle suspend the bucket and the double-layer hanging plate respectively through non-rotating wire ropes.

[0029] Preferably, the winch and the stabilizer are respectively fixed to the ground through a base and poured with concrete.

[0030] The present invention also provides a main chute expansion and brushing support method for a chute breaking system, which uses the main chute expansion and brushing support device for the chute breaking system to expand and brush support the main chute, and the method comprises:

[0031] S1: Use a raise boring machine to dig down to expand the shaft of the main chute;

[0032] S2: Arrange the sealing plate at the wellhead of the main chute;

[0033] S3: installing a double-layer hanging plate device above the sealing plate;

[0034] S4: installing the overhead sheave platform and the derrick in the tunnel of the main chute;

[0035] S5: installing the lifting system on one side of the overhead sheave platform and the derrick, and connecting the lifting system with the overhead sheave platform and the derrick;

[0036] S6: Providing construction materials to the double-layer hanging plate device through the lifting system, so that the raise boring machine further expands the shaft of the main chute;

[0037] S7: After the shaft of the main chute is expanded to a preset size, the main chute is supported from bottom to top.

[0038] It can be seen from the above technical scheme that the main chute expansion and brush support device and method of the chute breaking system provided by the present invention, by setting a double-layer sealing plate, enables the upper hanging plate to play a safety protection role when personnel are working on the lower hanging plate; movable wing plates are set on the double-layer sealing plate to increase the size of the upper hanging plate and the lower hanging plate, and reduce the gap between the wall and the sealing plate, thereby playing a safety role.

[0039] In order to achieve the above and related purposes, one or more aspects of the present invention include the features that will be described in detail later. The following description and the accompanying drawings describe some exemplary aspects of the present invention in detail. However, these aspects indicate only some of the various ways in which the principles of the present invention can be used. In addition, the present invention is intended to include all these aspects and their equivalents. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] By referring to the following description in conjunction with the accompanying drawings, and with a more comprehensive understanding of the present invention, other objects and results of the present invention will become more apparent and easy to understand. In the accompanying drawings:

[0041] Figure 1Schematic diagram of the construction of main chute expansion and brush support of the chute breaking system according to an embodiment of the present invention;

[0042] Figure 2 A schematic diagram of the structure of a double-layer hanging plate device according to an embodiment of the present invention;

[0043] Figure 3 A schematic diagram of the installation of a lifting system according to an embodiment of the present invention;

[0044] Figure 4 A schematic diagram of a derrick installation according to an embodiment of the present invention;

[0045] Figure 5 The present invention is a schematic flow chart of a main chute expansion and brush support method for a chute breaking system according to an embodiment of the present invention.

[0046] Reference numerals include:

[0047] 1. Double-layer hoisting platform device, 2. First ore unloading chamber, 3. Second ore unloading chamber, 4. Horizontal slag discharge chamber, 5. Winch wire rope, 6. Steady car wire rope, 7. Crushing chamber, 8. Round beam, 9. Auxiliary beam, 10. Main beam, 11. Reserved holes for Fengshui pipes, 12. Reserved holes for shotcrete pipes, 13. Reserved holes for buckets, 14. Upper hoisting platform, 15. Lower hoisting platform, 16. Support column, 17. Ladder, 19. Movable wing plate, 20. Bucket, 21. Sheave platform, 22. Derrick, 23. Winch, 24. Steady car.

[0048] The same reference numerals throughout the drawings indicate similar or corresponding features or functions. DETAILED DESCRIPTION

[0049] In the following description, for the purpose of illustration, in order to provide a comprehensive understanding of one or more embodiments, many specific details are set forth. However, it is apparent that these embodiments may also be implemented without these specific details. In other examples, for ease of describing one or more embodiments, known structures and devices are shown in the form of block diagrams.

[0050] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0051] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0052] In order to illustrate the structure of the main chute expansion brush support device of the chute breaking system provided by the present invention, Figures 1 to 4 The structure of the main chute expansion and brush support device of the chute breaking system is illustrated from different angles. Specifically, Figure 1 It shows the main chute expansion and brush support construction structure of the chute breaking system according to an embodiment of the present invention; Figure 2 The structure of a double-layer hanging plate device according to an embodiment of the present invention is shown; Figure 3 The installation structure of the lifting system according to an embodiment of the present invention is shown; Figure 4 The present invention is a derrick installation structure according to an embodiment of the present invention.

[0053] like Figures 1 to 4 As shown together, the main chute expansion and brushing support device of the chute breaking system provided by the present invention includes: a raise drilling rig, a double-layer sealing plate 1, a sheave platform 21, a derrick 22, a lifting system and a supporting tool, wherein the raise drilling rig is used to expand and brush the shaft of the main chute by excavating downward; the double-layer sealing plate is used as a construction platform for expanding and brushing the shaft of the main chute; the sheave platform 21 and the derrick 22 are connected to the lifting system, and transport the construction materials and construction personnel required for expanding and brushing the shaft of the main chute to the construction platform; the supporting tool is used to permanently support the main chute after expansion and brushing.

[0054] Specifically, in order to facilitate the up and down movement of workers and materials and for safety reasons, a sealing plate is arranged at the hoisting wellhead. The sealing plate includes a main beam, a secondary beam and a patterned plate. The main beam of the sealing plate is made of 25a I-beam, and the secondary beam of the sealing plate is made of 16 channel steel. Reserved holes for wind and water pipes and reserved holes for shotcrete pipes are provided on the patterned plate of the sealing plate to close the wellhead, and a safety guardrail is installed at the hoisting wellhead.

[0055] exist Figure 2 In the illustrated embodiment, the double-layer hanging plate device 1 includes a double-layer hanging plate, a support column 16 arranged between the double-layer hanging plates, and a guardrail arranged below the double-layer hanging plate, wherein the double-layer hanging plate includes an upper hanging plate 14 and a lower hanging plate 15, and the upper hanging plate 14 and the lower hanging plate 15 both include a round beam 8, a main beam 10 and a secondary beam 9 arranged on the round beam 8, wherein the main beam 10 and the secondary beam 9 are welded, and the main beam 10, the secondary beam 9 and the round beam 8 form a circular skeleton, and a patterned plate is laid on the circular skeleton; reserved holes 11 for Feng Shui pipes, reserved holes 12 for spraying pipes and reserved holes 13 for buckets are arranged on the patterned plates, which correspond to the reserved holes for Feng Shui pipes and the reserved holes for spraying pipes on the sealing plate.

[0056] Each of the support columns 16 is arranged between the upper hanging plate 14 and the lower hanging plate 15, and the support columns 16 are fixed to the main beams 10 of the upper hanging plate 14 and the lower hanging plate 15, wherein a ladder 17 is arranged on the support columns 16. The upper hanging plate 14 and the lower hanging plate 15 are respectively provided with movable wing plates 19, and the movable wing plates 19 are used to increase the size of the upper hanging plate 14 and the lower hanging plate 15; buckles 20 are arranged on the movable wing plates 19, and the movable wing plates 19 are fixed to the wall through the buckles 20. The double-layer hanging plate is connected to the sheave platform 21 arranged on the derrick 22 through a herringbone support rope.

[0057] In the embodiment of the present invention, considering the safety of shaft construction, the hanging platform is arranged as a double-layer hanging platform, and the distance between the two hanging platforms is 4m. The main beam of the hanging platform uses I16 I-beam, the secondary beam uses 16 channel steel, the support column uses I16 I-beam, the round beam uses 16 channel steel, the plate surface uses 4mm patterned plate, the support column 16 is connected to the main beam of the upper hanging platform 14 and the lower hanging platform 15 by welding and bolting, and a ladder 17 is welded on one of the support columns to facilitate the construction personnel to go up and down. Angle steel is welded at both ends of the main beam and the secondary beam as the bolt connection part, the main beam and the ring beam are directly welded, and the connection between the ring beam and the main frame must be firm, and welding reinforcement is required after tightening with bolts.

[0058] Among them, the double-layer hanging plate device 1 is converted in time according to the well construction section. After the lower section of the well is converted, the size of the hanging plate becomes larger, and it is necessary to set a movable wing plate 19 on each hanging plate. The movable wing plate 19 should be retracted during the movement of the hanging plate to prevent the accident of the movable wing plate hanging on the side. Four buckles 20 are welded on the four middle steering wheels of the movable wing plate 19. When the hanging plate swings at the construction site, four φ40×3.5mm steel pipes are added to the buckle 20 to fix it to the wall to achieve stability.

[0059] exist Figure 3 and Figure 4 In the illustrated embodiment, the sheave platform 21 includes a sheave base, a main beam and a secondary beam arranged on the sheave base, the main beam and the secondary beam are welded to each other by full welding, and the sheave base is connected to the secondary beam by bolts; the main beam on the sheave base is fixed in the tunnel of the main chute by the anchor rod.

[0060] Specifically, eight anchor rods are constructed at designated locations on both sides of the tunnel in strict accordance with the design height to fix the main beam of the overhead sheave platform. The anchor rods are made of φ36mm round steel, with an anchoring depth of 1.5m and an exposed length of 0.5m. Anchoring agents are used for anchoring. The main beam of the overhead sheave platform 21 is made of I28mm I-beam, and the secondary beam of the overhead sheave platform 21 is made of I28mm I-beam. The main beam of the overhead sheave platform 21 and the anchor rods are welded with 10mm thick steel plates and connected with high-strength bolts. The main beam of the overhead sheave platform 21 and the secondary beam of the overhead sheave platform 21 are fully welded and reinforced with high-strength bolts; and the overhead sheave base and the secondary beam of the overhead sheave platform 21 are connected with high-strength bolts.

[0061] exist Figure 3 and Figure 4 In the illustrated embodiment, the derrick 22 comprises upper columns, lower columns, scissor braces arranged between the upper columns and between the lower columns, and diagonal braces for supporting the upper columns, wherein the angle between the diagonal braces and the upper columns is 3° to 4°; the upper columns and the lower columns are fixed by welding with steel plates; the upper columns are welded to the sheave platform by steel plates; the lower columns are installed in holes reserved at the wellhead, fixed to the ground by round steel anchor rods, and then poured with concrete. Specifically, the columns of the derrick are made of I16mm I-beams with full welding, and the two sections of the columns are firmly welded to the 16mm thick steel plate. The upper section of the column is fully welded to the I28mm I-beam of the sheave platform 21 through the steel plate and then connected with bolts. The lower section of the column is buried in the reserved hole at the wellhead, fixed to the ground with φ36mm round steel anchor rods and poured with concrete. The anchoring depth is 1.5m. [16 channel steel is used as scissor braces between the columns and is firmly welded. In order to ensure the force balance of the derrick, I16 I-beams are used as diagonal braces for the derrick on one side of the winch. The angle between the column and the diagonal brace should not be too large, 3° to 4° is appropriate. The diagonal brace and the column are reinforced by welding φ159mm steel pipes to ensure that the derrick and the sheave platform are firm and reliable as a whole.

[0062] In addition, during the construction process, the fixing method of the well wall pipeline is as follows: the air supply pipe for construction is φ25×3.5mm, the water supply pipe is φ25×2.5mm, and the ash pipe is φ159mm seamless steel pipe. The wellhead uses a 24.5mm steel wire rope to suspend the upper end of the pipeline and fix it through the end wall anchor rod and the column of the well frame. The well uses a Φ36mm round steel anchor rod with a high-strength bolt to support the pipeline flange, with an interval of 6 meters, and the anchor rod anchoring depth is not less than 500mm. The concrete conveying pipeline must be vertical, and the flange of the coupling is perpendicular to the axis of the steel pipe, otherwise it will cause rapid wear of the steel pipe. During the construction process, all pipelines are regularly inspected, and if tilted or damaged, they are immediately corrected and repaired. The upper end of the lighting, signal, and blasting cables are fixed with steel wire ropes. Since it is difficult to replace the pipeline in the wellbore, a screen is set at the uppermost entrance of the conveying pipe to prevent large-sized stones and debris from clogging the pipeline. Among them, hanging anchor rods are constructed at appropriate locations in the wellhead tunnel. The anchor rods are made of φ22 round steel with a length of about 1m. Lighting, signal and blasting cables are also fixed on the wire rope.

[0063] exist Figure 3 and Figure 4 In the illustrated embodiment, the lifting system includes a winch 23 and a stabilizing car 24, wherein the winch 23 is used to lift the bucket suspended on the derrick; the stabilizing car 24 is used to lift the double-layer hanging plate; wherein the winch 23 and the stabilizing car 23 respectively suspend the bucket and the double-layer hanging plate through non-rotating wire ropes. The winch 23 and the stabilizing car 24 are respectively fixed to the ground through a base and poured with concrete. Specifically, the winch suspends the bucket as a means of getting people up and down, while lowering steel bars and manganese steel plates to transport construction materials to the hanging plate. The suspended hanging plate is lifted by two JZ-16 / 1000 stabilizing cars. Before installing the winch 23 and the stabilizing vehicle 24, the ground is cleaned to a hard bottom at the designated location, and C25 concrete with a thickness of not less than 500mm is poured as the foundation. The base of the winch 23 and the stabilizing vehicle 24 is made of I16mm I-beam, and is firmly connected to the winch 23 and the stabilizing vehicle 24 by welding and bolting. Anchors are arranged around them for reinforcement and concrete pouring to form a whole. The anchors are made of φ36mm round steel with an anchoring depth of 1.5m. The upper part is made into a hook shape to fix the winch 23 and the stabilizing vehicle 24. The winch wire rope 5 is 18*7-20-1670 non-rotating wire rope, and the stabilizing vehicle wire rope 6 is 18*7-24.5-1670 non-rotating wire rope.

[0064] Corresponding to the above device, the present invention also provides a main chute expansion and brush support method for a crushing system. Figure 5 The flowchart of the main chute expansion and brush support method of the crushing system according to an embodiment of the present invention is shown.

[0065] like Figure 5As shown, the main chute expansion and brushing support method of the chute system provided by the present invention adopts the main chute expansion and brushing support device of the chute system to expand and brush the main chute, and the method comprises:

[0066] S1: Use a raise boring machine to dig down to expand the shaft of the main chute;

[0067] S2: Arrange the sealing plate at the wellhead of the main chute;

[0068] S3: installing a double-layer hanging plate device above the sealing plate;

[0069] S4: installing the overhead sheave platform and the derrick in the tunnel of the main chute;

[0070] S5: installing the lifting system on one side of the overhead sheave platform and the derrick, and connecting the lifting system with the overhead sheave platform and the derrick;

[0071] S6: Providing construction materials to the double-layer hanging plate device through the lifting system, so that the raise boring machine further expands the shaft of the main chute;

[0072] S7: After the shaft of the main chute is expanded to a preset size, the main chute is supported from bottom to top.

[0073] Figure 5 Combination Figure 1 As shown, the main chute is connected with the first unloading chamber 2, the second unloading chamber 3, the horizontal slag chamber 4, and the crushing chamber 7. This method is completed in three stages. The first stage: use a 1.5m raise boring machine to dig downward and penetrate the crushing chamber. The construction first uses the main hoist to expand the 1.5m raise boring machine into a 3m shaft.

[0074] The second stage: rearrange the sealing plate, install the sheave platform, derrick, hoisting winch and other lifting systems. The installation of the derrick, sheave platform and hoisting winch needs to consider the installation of the stabilizing car in the later stage. The operators enter from a main chute chamber and install the derrick and sealing plate at the wellhead of the chamber to meet the operation of personnel and materials. Install the lifting plate and stabilizing car to expand the design section again. Expand from a 3m small well to the designed shaft, and use the one-time blasting well method. At the same time, the lower inclined chute of the upper slag discharge chamber of the small section excavation is connected with the main chute.

[0075] The third stage: support. After the shaft is enlarged, permanent support is carried out from bottom to top. The inclined chute and the chamber connecting tunnel support are completed together. After the shaft engineering support is completed, a measure plate is set up at the bottom of the main chute unloading chute to close the shaft. After the lifting system is removed, the slag chamber and the main chute unloading chute are constructed.

[0076] As for the embodiment of the main chute expansion and brush support method of the crushing system provided by the present invention, since it is basically similar to the embodiment of the main chute expansion and brush support device of the crushing system, the relevant parts refer to the partial description of the equipment embodiment and will not be repeated here.

[0077] The above descriptions are only optional embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention's specification and drawings, or directly / indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.

Claims

1. A main chute expansion and brush support device for a chute breaking system, comprising: Raise drilling rig, sealing plate, double-layer hoisting device, overhead platform, derrick, lifting system and supporting tooling, including: The raise boring machine is used to expand the shaft of the main chute by digging downward; The sealing plate is used to seal the wellhead of the main chute; The double-layer hanging plate device is used as a construction platform for expanding the shaft of the main chute; The sheave platform and the derrick are connected to the lifting system, and transport construction materials and construction personnel required for expanding the shaft of the main chute to the construction platform; The supporting tooling is used for permanent support of the main chute after expansion.

2. The main chute expansion and brush support device of the chute breaking system according to claim 1 is characterized in that: The double-layer hanging plate device comprises a double-layer hanging plate and a support column arranged between the double-layer hanging plates, wherein: The double-layer hanging plate comprises an upper hanging plate and a lower hanging plate, and the upper hanging plate and the lower hanging plate both comprise a round beam, a main beam and a secondary beam arranged on the round beam, wherein: The main beam and the auxiliary beam are welded, the main beam, the auxiliary beam and the round beam form a circular frame, and a patterned plate is laid on the circular frame; The patterned plate is provided with reserved holes for wind and water pipes, reserved holes for shotcrete pipes and reserved holes for hanging buckets.

3. The main chute expansion and brush support device of the chute breaking system according to claim 2 is characterized in that: The support columns are arranged between the upper hanging tray and the lower hanging tray, and the support columns are fixed to the main beams of the upper hanging tray and the lower hanging tray, wherein a ladder is arranged on the support columns.

4. The main chute expansion and brush support device of the chute breaking system according to claim 3 is characterized in that: The upper hanging tray and the lower hanging tray are respectively provided with movable wing plates, and the movable wing plates are used to increase the size of the upper hanging tray and the lower hanging tray; wherein, The movable wing plate is provided with a buckle, and the movable wing plate is fixed to the wall through the buckle.

5. The main chute expansion and brush support device of the chute breaking system according to claim 4 is characterized in that: The double-layer hanging plate is connected to the sheave platform arranged on the derrick through a herringbone supporting rope.

6. The main chute expansion and brush support device of the chute breaking system according to claim 1 is characterized in that: The sheave platform comprises a sheave base, a main beam and a secondary beam arranged on the sheave base, the main beam and the secondary beam are welded to each other by full welding, and the sheave base is connected to the secondary beam by bolts; The main beam on the sheave base is fixed in the tunnel of the main chute by the anchor rod.

7. The main chute expansion and brush support device of the chute breaking system according to claim 6 is characterized in that: The derrick comprises an upper column, a lower column, a scissor brace arranged between the upper columns and between the lower columns, and a diagonal brace for supporting the upper columns, wherein: The angle between the diagonal brace and the upper column is 3 to 4 degrees; The upper column and the lower column are fixed by welding with steel plates; The upper column is welded to the sheave platform via a steel plate; The lower column is installed in a hole reserved at the wellhead, fixed to the ground by round steel anchor rods, and then poured with concrete.

8. The main chute expansion and brush support device of the chute breaking system according to claim 7 is characterized in that: The lifting system includes a winch and a stabilizing vehicle, wherein: The winch is used to lift the bucket suspended on the derrick; The stabilizing vehicle is used to lift the double-layer hanging plate; Wherein, the winch and the stabilizing vehicle suspend the bucket and the double-layer hanging plate respectively through non-rotating wire ropes.

9. The main chute expansion and brush support device of the chute breaking system according to claim 8, characterized in that: The winch and the stabilizing vehicle are respectively fixed on the ground through a base and poured with concrete.

10. A main chute expansion and brushing support method for a chute breaking system, characterized in that: The main chute is expanded and brushed supported by using the main chute expansion and brushing support device of the chute breaking system according to any one of claims 1 to 9, and the method comprises: S1: Use a raise boring machine to dig down to expand the shaft of the main chute; S2: Arrange the sealing plate at the wellhead of the main chute; S3: installing a double-layer hanging plate device above the sealing plate; S4: installing the overhead sheave platform and the derrick in the tunnel of the main chute; S5: installing the lifting system on one side of the overhead sheave platform and the derrick, and connecting the lifting system with the overhead sheave platform and the derrick; S6: Providing construction materials to the double-layer hanging plate device through the lifting system, so that the raise boring machine further expands the shaft of the main chute; S7: After the shaft of the main chute is expanded to a preset size, the main chute is supported from bottom to top.