Continuous quick-steaming salt-free reactive dyeing method

By designing wastewater treatment steps in continuous fast-evaporation salt-free active dyeing technology, the primary filtration, pH pH neutralization and harmonization treatment and secondary filtration are used to solve the problem of poor wastewater treatment and achieve environmental protection and water conservation and energy-saving effects.

CN120061149AInactive Publication Date: 2025-05-30ZHEJIANG PROVINCE JIAHUA PRINTING & DYEING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510149131.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-11
Publication Date
2025-05-30
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing continuous fast steaming and salt-free active dyeing technology, wastewater treatment is poor, resulting in environmental pollution and waste of water sources, affecting environmental protection and water conservation and energy-saving measures.

Method used

A continuous fast steaming, salt-free active dyeing method is designed, including material preparation, pretreatment, dyeing liquid preparation, dyeing treatment, drying treatment and wastewater treatment. In the wastewater treatment step, the wastewater is treated and reused by primary filtration, pH pH neutralization and pH secondary filtration.

Benefits of technology

By effectively treating wastewater, environmental pollution and water source waste caused by direct discharge of wastewater are avoided, and environmental protection and water-saving and energy-saving measures for the continuous fast steaming and salt-free active dyeing process are improved.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention provides a continuous quick-steaming salt-free reactive dyeing method, and relates to the technical field of continuous quick-steaming salt-free reactive dyeing, and the method comprises the following steps: material preparation: selecting a raw material needing continuous quick-steaming salt-free reactive dyeing treatment as a standby material; according to the invention, wastewater treatment is designed, after continuous quick-steaming salt-free reactive dyeing treatment of the raw materials is completed, wastewater generated in the dyeing treatment process of the raw materials is treated, and primary filtration, pH neutralization and regulation treatment and secondary filtration are carried out on the wastewater in the treatment tank, so that the wastewater has good treatment measures; the phenomena of environment pollution and water source waste caused by direct discharge of the wastewater are avoided, the treatment measures of the wastewater are improved, the probability of water source waste is reduced, the environment-friendly, water-saving and energy-saving measures for continuous quick-steaming salt-free reactive dyeing treatment of raw materials are improved, and the clean production measures for continuous quick-steaming salt-free reactive dyeing treatment are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of continuous rapid steaming salt-free reactive dyeing, and particularly to a continuous rapid steaming salt-free reactive dyeing method. Background Art

[0002] In the prior art, the existing continuous rapid steaming salt-free reactive dyeing method has a relatively wide range of applications in life. During the dyeing process of the common continuous rapid steaming salt-free reactive dyeing method, wastewater is inevitably generated. When treating the generated wastewater, most of them do not have relatively good treatment measures. After the continuous rapid steaming salt-free reactive dyeing is completed, most of the generated wastewater is directly discharged externally. Most of the directly discharged wastewater is polluting. When the wastewater is directly discharged, it is very easy to cause environmental pollution. And when the wastewater is directly discharged, if continuous rapid steaming salt-free reactive dyeing treatment is carried out again, water source needs to be added again, resulting in the continuous rapid steaming salt-free reactive dyeing treatment not having good water-saving and energy-saving measures, seriously affecting the environmental protection, water-saving and energy-saving measures of the continuous rapid steaming salt-free reactive dyeing treatment. Summary of the Invention

[0003] The purpose of the present invention is to solve the disadvantages existing in the prior art. Most of the wastewater generated during the common continuous rapid steaming salt-free reactive dyeing treatment does not have good treatment measures. Most of them are directly discharged externally, which is very easy to cause environmental pollution and waste of water source, seriously affecting the environmental protection, water-saving and energy-saving measures of the continuous rapid steaming salt-free reactive dyeing treatment.

[0004] In order to achieve the above purpose, the present invention adopts the following technical scheme: a continuous rapid steaming salt-free reactive dyeing method, including the following steps: S1. Material preparation, which is the step of selecting the raw materials to be subjected to continuous rapid steaming salt-free reactive dyeing treatment as standby materials; S2. Pretreatment, which is the step of pretreating the selected standby raw materials; S3. Dye liquor preparation, which is the step of preparing the corresponding required dye liquor before dyeing the raw materials; S4. Dyeing treatment, which is the step of dyeing the raw materials with the prepared dye liquor; S5. Drying treatment, which is the step of drying the raw materials after the dyeing treatment is completed; S6. Wastewater treatment, which is the step of treating the wastewater after the raw materials are completed with the dyeing treatment; S7. Inspection, which is the step of inspecting the effect of the raw materials after the dyeing is completed; S8. Packaging, which is the step of packaging the raw materials after the inspection treatment is completed.

[0005] As a preferred embodiment, in step S1, according to the information of the articles to be subjected to continuous rapid steaming and salt-free reactive dyeing treatment as required, the corresponding polyester-cotton blended fabric is selected as the standby raw material. After the raw materials are selected, they are neatly arranged. During the arrangement process, check whether the selected raw materials are complete, check whether there are missing parts in the raw materials, observe whether there is a lack of luster on the surface of the raw materials, check whether the raw materials are affected by dust, and classify and place the defective raw materials and the intact raw materials separately.

[0006] By adopting the above technical solution, through the design of raw material preparation, the raw materials to be subjected to continuous rapid steaming and salt-free reactive dyeing treatment are selected in advance, which is convenient for subsequent processing of the raw materials, avoids the phenomenon that the efficiency of the dyeing treatment is affected due to the raw materials during the treatment, and improves the dyeing treatment efficiency of the raw materials.

[0007] As a preferred embodiment, in step S2, the intact raw materials are pre-treated. After the raw materials are classified and placed, singeing, desizing, scouring, bleaching, mercerizing and pre-setting are carried out. During the pre-treatment process of the intact raw materials, the defective raw materials are repaired. If there are still problems with the defective raw materials after repair, the raw materials that still have problems after repair are removed, and the intact raw materials after repair are pre-treated immediately after the previous intact raw materials.

[0008] By adopting the above technical solution, through the design of pre-treatment, the raw materials are pre-treated after the raw materials are selected, reducing the probability of defective raw materials appearing in the subsequent processing procedures, and improving the quality of the raw materials used in the dyeing treatment.

[0009] As a preferred embodiment, in step S3, the required dye liquor is prepared according to the selected raw materials and the dyes required for dyeing. The dye liquor is prepared in the padding equipment. Before preparing the dye liquor, water needs to be added to the inside of the padding equipment in advance to facilitate the normal preparation of the dye liquor. After the dye liquor is prepared, the dye liquor waits for the input of the raw materials in the padding equipment.

[0010] By adopting the above technical solution, through the design of dye liquor preparation, the relevant required dye liquor is prepared in the padding equipment in advance, avoiding the phenomenon of preparing the dye liquor when the raw materials start to be dyed, improving the preparation efficiency of the dye liquor, and improving the dyeing efficiency of the raw materials.

[0011] As a preferred embodiment, in step S4, the pretreated raw material is padded in a padding device, and the raw material comes into contact with the dye liquor in the padding device and is padded in the dye liquor. The padding device is started to continuously pad the raw material. During the padding process of the raw material and the dye liquor, the steaming device is adjusted according to the environment required for the steaming of the raw material, and the corresponding temperature and time required for the steaming of the raw material by the steaming device are adjusted. After the steaming temperature and steaming time of the steaming device are both adjusted, the raw material that has completed continuous padding is taken out of the padding device and put into the steaming device. The raw material is steamed in the steaming device until the steaming treatment of the raw material is completed. The raw material that has completed the steaming treatment is taken out of the steaming device, and the raw material is washed by a washing device until the raw material completes the continuous rapid steaming salt-free reactive dyeing treatment.

[0012] By adopting the above technical solutions, through the design of the dyeing treatment, the raw material completes the continuous rapid steaming salt-free reactive dyeing treatment by continuous padding treatment, steaming treatment and washing treatment, so that the raw material has good continuous rapid steaming salt-free reactive dyeing treatment measures and improves the dyeing efficiency of the raw material.

[0013] As a preferred embodiment, in step S5, the raw material that has completed the washing treatment is taken out of the washing device, and the raw material is put into a relevant drying device for drying after being taken out. Before the raw material is put into the drying device, it is necessary to adjust the drying temperature and drying time of the drying device. The drying device is adjusted accordingly according to the drying temperature data and drying time data required for the drying of the raw material. After the adjustment of the drying device is completed, the raw material can be put into the drying device for drying treatment. After the raw material is put in, the drying device is started to dry the raw material until the raw material is dried by the drying device.

[0014] By adopting the above technical solutions, through the design of the drying treatment, the drying device is used to dry the raw material that has completed the washing treatment, so that the raw material has good timely drying measures after completing the continuous rapid steaming salt-free reactive dyeing treatment, avoiding the phenomenon that the continuous rapid steaming salt-free reactive dyeing treatment effect of the raw material is poor due to the raw material remaining wet for a long time after being washed, improving the efficiency of timely drying of the raw material, and improving the effect of the continuous rapid steaming salt-free reactive dyeing treatment of the raw material.

[0015] As a preferred embodiment, in step S6, after the raw material is taken out of the washing device, the wastewater generated in the padding device, the steaming device and the washing device is discharged externally. The wastewater is discharged into a relevant wastewater treatment pool, and the wastewater is treated in the treatment pool until the wastewater treatment is completed. The treated wastewater is discharged externally from the treatment pool, and the discharged water source is re-discharged into the interiors of the padding device, the steaming device and the washing device; 6.1) Primary filtration. The primary filtration is a step of performing primary sedimentation filtration on wastewater in a treatment tank. The wastewater undergoes sedimentation filtration in the wastewater treatment tank. Before the wastewater undergoes sedimentation filtration, it is necessary to adjust the temperature of the treatment tank so that the temperature in the treatment tank can meet the requirements for the generation of relevant precipitates in the wastewater. 6.2) Preparation of the conditioning liquid. The preparation of the conditioning liquid is a step of preparing a relevant pH neutralization conditioning liquid according to the components of the wastewater. Use a relevant pH value detection instrument to test the wastewater in the treatment tank to obtain relevant data of the wastewater, and prepare the relevant conditioning liquid according to the obtained data information. 6.3) pH neutralization and conditioning treatment. The pH neutralization and conditioning treatment is a step of performing neutralization and conditioning treatment on the wastewater in the treatment tank. After the wastewater completes sedimentation filtration in the treatment tank, the pH neutralization and conditioning treatment of the wastewater begins. Pour the prepared conditioning liquid into the treatment tank. The conditioning liquid comes into contact with the wastewater in the treatment tank, and the wastewater undergoes pH neutralization and conditioning treatment in the treatment tank with the help of the conditioning liquid. 6.4) Secondary filtration. The secondary filtration is a step of performing secondary sedimentation filtration on the wastewater in the treatment tank. After the wastewater completes the pH neutralization and conditioning treatment, the wastewater is again subjected to sedimentation filtration in the treatment tank. When the treatment tank performs secondary sedimentation filtration on the wastewater, temperature adjustment is not required, and it can be directly filtered. The treatment tank filters the precipitates generated during the pH neutralization and conditioning treatment of the wastewater. 6.5) Reuse. The reuse is a step of reusing the treated wastewater. The wastewater that has completed sedimentation filtration is discharged from the treatment tank, and the discharged water source enters the padding equipment, steaming equipment, and washing equipment again for use by the padding equipment, steaming equipment, and washing equipment.

[0016] By adopting the above technical solutions, through the design of wastewater treatment, when the raw material completes the continuous rapid steaming and salt-free reactive dyeing treatment, the wastewater generated during the dyeing treatment of the raw material is treated, enabling the wastewater to have good treatment measures, avoiding the phenomenon of direct discharge of wastewater to the outside, which causes environmental pollution and water source waste, improving the wastewater treatment measures, reducing the probability of water source waste, and enhancing the environmental protection and water-saving and energy-saving measures of the continuous rapid steaming and salt-free reactive dyeing treatment of the raw material.

[0017] As a preferred implementation manner, in step S7, the raw material after drying treatment is inspected. Use a detection instrument to detect whether the various data of the raw material after continuous rapid steaming and salt-free reactive dyeing treatment meet the standards. If all the data meet the standards, it indicates that the raw material meets the required standards after dyeing treatment.

[0018] By adopting the above technical solutions, through design inspection, the raw materials after a series of processing are inspected, and the final various data of the raw materials are inspected to ensure that all the data of the raw materials meet the standards, improve the inspection measures for the raw materials after continuous rapid steaming and salt-free reactive dyeing, and improve the quality effect of the raw materials after continuous rapid steaming and salt-free reactive dyeing.

[0019] As a preferred embodiment, in step S8, the inspected raw materials are packaged by packaging equipment, and after the packaging of the inspected raw materials is completed, they are stored.

[0020] By adopting the above technical solutions, through design packaging, the inspected raw materials are packaged by packaging equipment, reducing the probability of the dyed raw materials being stored naked, and improving the storage measures for the raw materials after continuous rapid steaming and salt-free reactive dyeing treatment.

[0021] Compared with the prior art, the advantages and positive effects of the present invention are as follows: In the present invention, through the design of wastewater treatment, when the raw materials are completed with continuous rapid steaming and salt-free reactive dyeing treatment, the wastewater generated during the dyeing treatment of the raw materials is treated. The wastewater is filtered once and the pH value is neutralized and adjusted in the treatment tank, and then filtered a second time, so that the wastewater has good treatment measures, avoiding the phenomenon of direct discharge of wastewater causing environmental pollution and water source waste, improving the treatment measures for wastewater, reducing the probability of water source waste, improving the environmental protection and water-saving and energy-saving measures for the continuous rapid steaming and salt-free reactive dyeing treatment of raw materials, and improving the clean production measures for the continuous rapid steaming and salt-free reactive dyeing treatment. Specific Embodiment

[0022] Next, the technical solutions of the present invention will be clearly and completely described in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention. Embodiment

[0023] The present invention provides a technical solution: a continuous rapid steaming salt-free reactive dyeing method, which includes the following steps: Material preparation, which is the step of selecting the raw materials to be subjected to continuous rapid steaming salt-free reactive dyeing treatment as spare materials. According to the information of the items to be subjected to continuous rapid steaming salt-free reactive dyeing treatment, the corresponding polyester-cotton blended fabric is selected as the spare raw material. After the raw materials are selected, they are neatly arranged. During the arrangement process, check whether the selected raw materials are complete, check whether there are missing parts in the raw materials, observe whether there is a lack of luster on the surface of the raw materials, check whether the raw materials are affected by dust, and classify and place the defective raw materials and the intact raw materials. By designing the material preparation, the raw materials to be subjected to continuous rapid steaming salt-free reactive dyeing treatment are selected in advance, so as to facilitate the subsequent treatment of the raw materials, avoid the phenomenon that the raw materials affect the dyeing treatment efficiency during the treatment, and improve the dyeing treatment efficiency of the raw materials; Pretreatment, which is the step of pretreating the selected spare raw materials. Pretreat the intact raw materials. After the raw materials are classified and placed, singeing, desizing, scouring, bleaching, mercerizing and pre-setting are carried out. During the pretreatment of the intact raw materials, the defective raw materials are repaired. If the defective raw materials still have problems after being repaired, the raw materials that still have problems after being corrected are removed, and the intact raw materials after being repaired are pretreated immediately after the previous intact raw materials. By designing the pretreatment, the raw materials are pretreated after the raw materials are selected, reducing the probability of defective raw materials appearing in the subsequent processing procedures, and improving the quality of the raw materials used in the dyeing treatment; Dye liquor preparation, which is the step of preparing the corresponding dye liquor required before dyeing the raw materials. Prepare the required dye liquor according to the selected raw materials and the dyes required for dyeing. Prepare the dye liquor in the padding equipment. Before preparing the dye liquor, it is necessary to add water to the inside of the padding equipment in advance to facilitate the normal preparation of the dye liquor. After the dye liquor is prepared, the dye liquor waits for the input of the raw materials in the padding equipment. By designing the dye liquor preparation, the relevant required dye liquor is prepared in the padding equipment in advance, avoiding the phenomenon of preparing the dye liquor when the raw materials start to be dyed, improving the preparation efficiency of the dye liquor, and improving the dyeing efficiency of the raw materials;Dyeing treatment, the dyeing treatment is a step of dyeing the raw material with the prepared dye solution, the raw material that has completed the pretreatment is immersed in the immersion and rolling equipment, the raw material is in contact with the dye solution in the immersion and rolling equipment, and is immersed in the dye solution, the immersion and rolling equipment is started to continuously immerse the raw material, in the process of immersing the raw material and the dye solution, the steaming equipment is adjusted according to the environment required for steaming the raw material, and the corresponding temperature and time required for steaming the raw material by the steaming equipment are adjusted. After the steaming temperature and steaming time of the steaming equipment have been adjusted, the raw material that has completed continuous immersion is taken out of the immersion and rolling equipment and put into the steaming equipment, the raw material is steamed in the steaming equipment until the steaming treatment of the raw material is completed, and the completed The steamed raw materials are taken out from the steaming equipment, and the raw materials are washed with water by the washing equipment until the raw materials complete the continuous rapid steaming salt-free active dyeing treatment. The dyeing treatment is designed so that the raw materials are subjected to continuous padding treatment, steaming treatment and water washing treatment to complete the continuous rapid steaming salt-free active dyeing treatment, so that the raw materials have good continuous rapid steaming salt-free active dyeing treatment measures, thereby improving the dyeing efficiency of the raw materials; the drying treatment is a step of drying the raw materials that have completed the dyeing treatment, the raw materials that have completed the water washing treatment are taken out from the water washing equipment, and the raw materials are put into the relevant drying equipment for drying after being taken out. Before the raw materials are put into the drying equipment, the drying temperature of the drying equipment needs to be adjusted. The degree and drying time are adjusted, and the drying equipment is adjusted accordingly according to the drying temperature data and drying time data required for raw material drying. The raw materials can be put into the drying equipment for drying only after the drying equipment adjustment is completed. After the raw materials are put in, the drying equipment is started to dry the raw materials until the raw materials are dried by the drying equipment. By designing the drying process, the drying equipment is used to dry the raw materials that have completed the water washing process, so that the raw materials have good and timely drying measures after completing the continuous speed steaming and salt-free active dyeing process, avoiding the phenomenon that the continuous speed steaming and salt-free active dyeing process of the raw materials is poor due to the raw materials remaining in a wet state for a long time after the water washing process, and improving the timeliness of the raw materials. The efficiency of drying is improved to improve the effect of continuous speed steaming and salt-free active dyeing of raw materials; inspection, the inspection is a step of inspecting the effect of the raw materials after dyeing, the raw materials after drying are inspected, and the various data of the raw materials after continuous speed steaming and salt-free active dyeing are detected by a detection instrument to determine whether they meet the standards. If all the data meet the standards, it means that the raw materials meet the required standards after dyeing. Through design inspection, the raw materials after a series of processing are inspected, and the final data of the raw materials are inspected to ensure that all the data of the raw materials meet the standards, improve the inspection measures of the raw materials after continuous speed steaming and salt-free active dyeing, and improve the quality effect of the raw materials after continuous speed steaming and salt-free active dyeing;Packaging, which is the step of packaging the raw materials after the inspection process is completed. The inspected raw materials are packaged using packaging equipment. After the packaging of the inspected raw materials is completed, they are stored. By designing the packaging and using packaging equipment to package the inspected raw materials, the probability of the raw materials after the dyeing process being stored naked is reduced, and the storage measures for the raw materials after the continuous rapid steaming salt-free reactive dyeing process are improved.;

[0024] Wastewater treatment, which is a step of treating wastewater after the raw material has completed the dyeing process. After the raw material is taken out of the washing equipment, the wastewater generated in the padding equipment, steaming equipment, and washing equipment is discharged externally. The wastewater is discharged into the relevant wastewater treatment pool, and the wastewater treatment is carried out in the treatment pool until the wastewater treatment is completed. The treated wastewater is discharged externally from the treatment pool, and the discharged water source is re-introduced into the padding equipment, steaming equipment, and washing equipment; Primary filtration, which is a step of performing primary sedimentation filtration treatment on the wastewater in the treatment pool. The wastewater undergoes sedimentation filtration in the wastewater treatment pool. Before the wastewater undergoes sedimentation filtration, the temperature of the treatment pool needs to be adjusted so that the temperature in the treatment pool can meet the generation of relevant precipitates in the wastewater; Preparation of the conditioning liquid, which is a step of preparing the relevant pH neutralizing conditioning liquid according to the wastewater composition. Use the relevant pH value detection instrument to test the wastewater in the treatment pool to obtain relevant wastewater data, and prepare the relevant conditioning liquid according to the obtained data information; pH acidity and alkalinity neutralizing conditioning treatment, which is a step of performing neutralizing conditioning treatment on the wastewater in the treatment pool. After the wastewater has completed sedimentation filtration in the treatment pool, the pH acidity and alkalinity neutralizing conditioning treatment of the wastewater begins. Pour the prepared conditioning liquid into the treatment pool, and the conditioning liquid comes into contact with the wastewater in the treatment pool. The wastewater undergoes pH acidity and alkalinity neutralizing conditioning treatment in the treatment pool with the help of the conditioning liquid; Secondary filtration, which is a step of performing secondary sedimentation filtration on the wastewater in the treatment pool. After the wastewater has completed the pH acidity and alkalinity neutralizing conditioning treatment, the wastewater is sedimentation-filtered again in the treatment pool. When the treatment pool performs sedimentation filtration on the wastewater again, temperature adjustment is not required, and it can be directly filtered. The treatment pool filters the precipitates generated during the pH acidity and alkalinity neutralizing conditioning treatment of the wastewater; Reuse, which is a step of reusing the treated wastewater. The wastewater that has completed sedimentation filtration is discharged from the treatment pool, and the discharged water source enters the padding equipment, steaming equipment, and washing equipment again for use by the padding equipment, steaming equipment, and washing equipment. By designing the wastewater treatment, when the raw material has completed the continuous rapid steaming salt-free reactive dyeing process, the wastewater generated during the raw material dyeing process is treated, enabling the wastewater to have good treatment measures, avoiding the phenomenon of direct external discharge of wastewater causing environmental pollution and water source waste, improving the wastewater treatment measures, reducing the probability of water source waste, and improving the environmental protection, water-saving, and energy-saving measures of the raw material continuous rapid steaming salt-free reactive dyeing process; Working principle of this embodiment: During processing, select the corresponding polyester-cotton blended fabric as the spare raw material according to the item information that requires continuous rapid steaming and salt-free reactive dyeing treatment. After the raw materials are selected, arrange them neatly. During the arrangement process, check whether the selected raw materials are complete, check whether there are missing parts in the raw materials, observe whether there is a lack of luster on the surface of the raw materials, and check whether the raw materials are affected by dust. Classify and place the defective raw materials and the intact raw materials separately. After the raw materials are classified and placed, singeing, desizing, scouring, bleaching, mercerizing, and pre-setting are carried out. During the pretreatment of the intact raw materials, repair the defective raw materials. If the defective raw materials still have problems after repair, remove the raw materials that still have problems after correction. The intact raw materials after repair are pretreated immediately after the previous intact raw materials. Prepare the dye liquor in the padding equipment. Before preparing the dye liquor, it is necessary to add water to the inside of the padding equipment in advance to facilitate the normal preparation of the dye liquor. After the dye liquor is prepared, the dye liquor waits for the input of the raw materials in the padding equipment. The raw materials come into contact with the dye liquor in the padding equipment and are padded in the dye liquor. Start the padding equipment to continuously pad the raw materials. During the padding process of the raw materials and the dye liquor, adjust the steaming equipment according to the environment required during the steaming of the raw materials, and adjust the corresponding temperature and time required for steaming the raw materials by the steaming equipment. After the steaming temperature and steaming time of the steaming equipment are adjusted, take out the raw materials that have completed continuous padding from the padding equipment and put them into the steaming equipment. The raw materials are steamed in the steaming equipment until the steaming treatment of the raw materials is completed. Take out the raw materials that have completed the steaming treatment from the steaming equipment and wash the raw materials with a water washing equipment until the raw materials complete the continuous rapid steaming and salt-free reactive dyeing treatment. Take out the raw materials that have completed the water washing treatment from the water washing equipment. After the raw materials are taken out, put them into the relevant drying equipment for drying. Before the raw materials are put into the drying equipment, it is necessary to adjust the drying temperature and drying time of the drying equipment, and adjust the drying equipment accordingly according to the drying temperature data and drying time data required for drying the raw materials. After the drying equipment is adjusted, the raw materials can be put into the drying equipment for drying treatment. After the raw materials are put in, start the drying equipment to dry the raw materials until the raw materials are dried by the drying equipment. After the raw materials are taken out from the water washing equipment, discharge the wastewater generated in the padding equipment, steaming equipment, and water washing equipment to the outside. The wastewater is discharged into the relevant wastewater treatment pool, and the wastewater is treated in the treatment pool until the wastewater treatment is completed. The treated wastewater is discharged from the treatment pool to the outside, and the discharged water source is re-discharged into the inside of the padding equipment, steaming equipment, and water washing equipment. Inspect the raw materials that have completed the drying treatment, and use a detection instrument to detect whether the various data of the raw materials after continuous rapid steaming and salt-free reactive dyeing treatment meet the standards. If all the data meet the standards, it means that the raw materials meet the required standards after dyeing treatment. Package the raw materials that have completed the inspection with packaging equipment, and store the raw materials after packaging is completed.

[0025] This embodiment is substantially the same as the method of Embodiment 1 provided, and the main difference is that: in step S6, wastewater treatment is not performed.

[0026] This embodiment is substantially the same as the method of Embodiment 1 provided, and the main difference is that: in step S6, filtration treatment is not performed.

[0027] This embodiment is substantially the same as the method of Embodiment 1 provided, and the main difference is that: in step S6, blending treatment is not performed.

[0028] Respectively take equal amounts of the wastewater pollution, impurity content rate, and purity rate results provided in Embodiment 1 and Comparative Examples 1 to 3: Polluting Impurity content rate Purification rate Example 1 28.9% 10.9% 95.9% Comparative Example 1 95% 85.9% 72% Comparative Example 2 70% 62% 89% Comparative Example 3 48.9% 38.9% 92% It can be seen from the analysis of the relevant data in the above tables that through the designed wastewater treatment of the present invention, after the raw materials are subjected to continuous rapid steaming and salt-free reactive dyeing treatment, the wastewater generated during the raw material dyeing treatment process is treated. In the treatment pool, the wastewater is subjected to primary filtration, pH neutralization and blending treatment, and secondary filtration, so that the wastewater has good treatment measures, avoiding the phenomenon of direct discharge of wastewater to the outside, causing environmental pollution and water source waste, improving the wastewater treatment measures, reducing the probability of water source waste, improving the environmental protection, water saving and energy saving measures of the continuous rapid steaming and salt-free reactive dyeing treatment of raw materials, and improving the clean production measures of the continuous rapid steaming and salt-free reactive dyeing treatment.

[0029] The above is only the preferred embodiment of the present invention, and it is not a limitation of the present invention in other forms. Any person skilled in the art may use the disclosed technical content to make changes or modifications into equivalent embodiments with equivalent changes and apply them to other fields. However, as long as it does not depart from the technical solution content of the present invention, any simple modification, equivalent change, and modification made to the above embodiments based on the technical essence of the present invention still belong to the protection scope of the technical solution of the present invention.

Claims

1. A continuous rapid steaming salt-free active dyeing method, characterized in that: The following steps are involved: S1, preparing materials, the material preparation is a step of selecting raw materials that need to be subjected to continuous rapid steaming and salt-free active dyeing treatment as standby materials; S2, pretreatment, wherein the pretreatment is a step of pretreating the selected spare raw materials; S3, dye liquor preparation, the dye liquor preparation is the step of preparing the corresponding dye liquor required before dyeing the raw materials; S4, dyeing treatment, wherein the dyeing treatment is a step of dyeing the raw material using the prepared dye solution; S5, drying treatment, the drying treatment is a step of drying the raw materials after the dyeing treatment; S6, wastewater treatment, wherein the wastewater treatment is a step of treating the wastewater after the raw materials have completed the dyeing process; S7, inspection, the inspection is a step of inspecting the dyed raw materials; S8, packaging, the packaging is the step of packaging the raw materials after the inspection process is completed.

2. The continuous rapid steaming salt-free active dyeing method according to claim 1, characterized in that: In the step S1, the corresponding polyester-cotton blended fabric is selected as the spare raw material according to the information of the article to be subjected to the continuous rapid steaming and salt-free active dyeing treatment, and the raw materials are neatly arranged after the selection is completed. During the arrangement process, it is checked whether the selected raw materials are complete, whether there are any missing parts of the raw materials, whether the surface of the raw materials is glossy, and whether the raw materials are affected by dust, and the defective raw materials and the intact raw materials are classified and placed.

3. The continuous rapid steaming salt-free active dyeing method according to claim 1, characterized in that: In the step S2, the intact raw materials are pre-processed. After the raw materials are classified and placed, they are singed, de-boiled, bleached, mercerized and pre-shaped. During the pre-processing of the intact raw materials, the raw materials with defects are trimmed. If the raw materials with defects still have problems after trimming, the raw materials that still have problems after correction are discarded, and the intact raw materials after trimming are pre-processed immediately after the previously intact raw materials.

4. The continuous rapid steaming salt-free active dyeing method according to claim 1, characterized in that: In the step S3, the required dye solution is prepared according to the selected raw materials and the dyes required for dyeing, and the dye solution is prepared in the padding equipment. Before the dye solution is prepared, water source needs to be added to the inside of the padding equipment in advance to facilitate the normal preparation of the dye solution. After the dye solution is prepared, the dye solution waits for the input of raw materials in the padding equipment.

5. The continuous rapid steaming salt-free active dyeing method according to claim 1, characterized in that: In the step S4, the raw material that has completed the pretreatment is immersed in the immersion and rolling equipment, the raw material is in contact with the dye solution in the immersion and rolling equipment, and is immersed in the dye solution. The immersion and rolling equipment is started to continuously immerse the raw material. During the immersion of the raw material and the dye solution, the steaming equipment is adjusted according to the environment required for steaming the raw material, and the corresponding temperature and time required for steaming the raw material by the steaming equipment are adjusted. After the steaming temperature and steaming time of the steaming equipment have been adjusted, the raw material that has completed continuous immersion is taken out of the immersion and rolling equipment and put into the steaming equipment. The raw material is steamed in the steaming equipment until the steaming treatment of the raw material is completed. The raw material that has completed the steaming treatment is taken out of the steaming equipment, and the raw material is washed with water using a water washing equipment until the raw material completes the continuous rapid steaming salt-free active dyeing treatment.

6. The continuous rapid steaming salt-free active dyeing method according to claim 1, characterized in that: In the step S5, the raw materials that have completed the water washing treatment are taken out of the water washing equipment, and after being taken out, the raw materials are put into the relevant drying equipment for drying. Before the raw materials are put into the drying equipment, the drying temperature and drying time of the drying equipment need to be adjusted. The drying equipment is adjusted accordingly according to the drying temperature data and drying time data required for the drying of the raw materials. Only after the adjustment of the drying equipment is completed, the raw materials can be put into the drying equipment for drying treatment. After the raw materials are put into, the drying equipment is started to dry the raw materials until the raw materials are dried by the drying equipment.

7. The continuous rapid steaming salt-free active dyeing method according to claim 1, characterized in that: In the step S6, after the raw material is taken out from the water washing device, the wastewater generated in the padding device, the steaming device and the water washing device is discharged to the outside, and the wastewater is discharged into the relevant wastewater treatment tank, and the wastewater is treated in the treatment tank until the wastewater is completely treated, and the treated wastewater is discharged from the treatment tank to the outside, and the discharged water source is discharged into the padding device, the steaming device and the water washing device again; 6.1) Primary filtration, which is a step in which the wastewater is subjected to a sedimentation and filtration treatment in a treatment tank. Before the wastewater is subjected to sedimentation and filtration, the temperature of the treatment tank needs to be adjusted so that the temperature in the treatment tank can meet the requirements for the wastewater to produce relevant sediments; 6.2) Preparation of blending solution, wherein the preparation of blending solution is a step of preparing relevant pH neutralization blending solution according to the wastewater composition, using relevant pH value detection instruments to test the wastewater in the treatment pool, obtaining wastewater related data, and preparing relevant blending solution according to the obtained data information; 6.3) pH neutralization and conditioning treatment. The pH neutralization and conditioning treatment is a step of neutralizing and conditioning the wastewater in the treatment tank. After the wastewater has completed sedimentation and filtration in the treatment tank, the pH neutralization and conditioning treatment of the wastewater begins. The prepared conditioning solution is poured into the treatment tank. The conditioning solution contacts the wastewater in the treatment tank. The wastewater is treated with pH neutralization and conditioning treatment in the treatment tank with the aid of the conditioning solution. 6.4) Secondary filtration, the secondary filtration is the step of secondary sedimentation filtration of wastewater in the treatment tank. After the wastewater has completed the pH neutralization and reconciliation treatment, the wastewater is again subjected to sedimentation filtration in the treatment tank. When the treatment tank again performs sedimentation filtration on the wastewater, temperature adjustment is not required, and direct filtration is sufficient. The treatment tank filters the precipitate generated during the pH neutralization and reconciliation treatment of the wastewater; 6.5) Reuse, the reuse is the step of reusing the treated wastewater, the wastewater after sedimentation and filtration is discharged from the treatment pool, and the discharged water source enters the padding equipment, steaming equipment and water washing equipment again for use by the padding equipment, steaming equipment and water washing equipment.

8. The continuous rapid steaming salt-free reactive dyeing method according to claim 1, characterized in that: In step S7, the raw materials that have completed the drying process are inspected, and a detection instrument is used to detect whether various data of the raw materials after continuous rapid steaming and salt-free active dyeing are up to standard. If all data are up to standard, it means that the raw materials meet the required standards after dyeing.

9. The continuous rapid steaming salt-free reactive dyeing method according to claim 1, characterized in that: In the step S8, the inspected raw materials are packaged using packaging equipment, and the inspected raw materials are stored after packaging.