A performance testing method for explosion-proof equipment in hazardous explosion locations

By introducing multidimensional test indicators and precise mathematical models, the problem of inaccurate evaluation of explosion-proof equipment during sudden temperature changes in existing technologies has been solved, enabling comprehensive and scientific evaluation of equipment in extreme environments and improving the accuracy and reliability of testing.

CN120102186BActive Publication Date: 2026-11-17JUNZHONG EXPLOSION-PROOF TECH (SHANGHAI) CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510480979.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-04-17
Publication Date
2026-11-17
Estimated Expiration
2045-04-17

AI Technical Summary

Technical Problem

Existing performance testing methods for explosion-proof equipment cannot accurately simulate the actual performance of the equipment during sudden temperature changes in explosive hazardous locations, resulting in inaccurate assessments. In particular, they neglect the dynamic response and energy transfer of the equipment during temperature jumps, failing to fully reflect the equipment's performance in extreme environments.

Method used

A multi-dimensional testing index system is adopted, including temperature jump amplitude, energy conversion scalar and time parameters. Combined with piecewise temperature state function, bidirectional conversion trigger and smooth switching mechanism, partitioned cavity structure and accurate energy release distribution model, the continuity and accuracy of the testing process are ensured through precise mathematical model and data acquisition method.

Benefits of technology

It provides a precise and quantifiable testing method that can comprehensively evaluate the response capability of explosion-proof equipment in extreme temperature environments, improve the reference value and reliability of test data, and ensure the safety and reliability of equipment in extreme environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120102186B_ABST
    Figure CN120102186B_ABST
Patent Text Reader

Abstract

This invention relates to the field of performance testing technology for explosion-proof equipment in hazardous locations, and discloses a performance testing method for explosion-proof equipment in hazardous locations. By setting the initial and target temperatures, the method ensures that the performance of the explosion-proof equipment under extreme cooling and high-temperature environments is accurately reflected. The setting of the temperature jump amplitude and energy conversion scalar directly relates temperature changes and energy conversion, providing a clear numerical basis for subsequent energy transfer calculations. The setting of the total duration of temperature abrupt changes and the duration of linear jumps ensures that temperature changes are instantaneous and controllable, improving the rigor of the test and enabling the assessment of the equipment's extreme tolerance capabilities in a very short time. By selecting a differential interval, the method ensures accurate temperature rate calculation, solving the problems of insufficient data acquisition intervals and inaccurate temperature rate calculations in existing technologies, and providing reliable data support for subsequent evaluations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of performance testing technology for explosion-proof equipment in hazardous locations, specifically to a performance testing method for explosion-proof equipment in hazardous locations. Background Technology

[0002] Performance testing of explosion-proof equipment is a crucial step in ensuring its safe operation in hazardous locations. With the increasing emphasis placed on the safety performance of explosion-proof equipment in industries such as chemical, power, and mining, testing the equipment's impact resistance, high-temperature resistance, and low-temperature resistance under extreme environments has become particularly important. Existing performance testing methods for explosion-proof equipment largely rely on standardized environmental simulations, and the test conditions are typically relatively stable temperature conditions or slowly changing temperature scenarios. However, in real-world applications, equipment often encounters sudden and drastic temperature changes, especially in hazardous environments where it must withstand rapid temperature changes from extremely low to ultra-high temperatures within a very short time. Therefore, traditional testing methods cannot fully reflect the true performance of explosion-proof equipment in extreme environments.

[0003] Current technologies primarily rely on testing for stable temperature changes. However, in actual explosion-hazardous environments, the temperature changes faced by explosion-proof equipment often occur instantaneously. In such situations, equipment needs to rapidly adapt to extreme changes from ultra-low temperatures to high temperatures, but existing testing methods fail to effectively simulate this process, leading to inaccurate assessments of the equipment's ability to cope with sudden extreme temperature environments. In existing testing methods, temperature and energy transfer processes are often estimated using empirical formulas, while data acquisition relies on intermittent measurements. This approach not only results in poor data consistency but also fails to capture the subtle responses of the equipment during instantaneous temperature changes. The impact of minute changes during temperature jumps on the equipment is often ignored, making it impossible to comprehensively and accurately assess the equipment's performance under extreme conditions. Many current testing methods do not provide detailed mathematical models for energy transfer during temperature transitions but instead rely on simple assumptions and imprecise qualitative analysis. This makes the test results often fail to accurately reflect the true energy transfer characteristics of the equipment during rapid temperature changes, especially in environments with instantaneous changes, where energy transfer and accumulation processes are complex and dynamically change rapidly. Existing energy transfer models fail to meet the requirements for high-precision testing. For large explosion-proof equipment, existing testing technologies often fail to account for temperature differences within the equipment's internal space. Most testing methods lack precise division of the cavity space, ignoring the varying temperature and energy levels that may affect the equipment in different areas. This is particularly problematic for equipment with complex shapes and multi-regional structures, where existing methods cannot accurately capture the temperature response of different parts, leading to inaccurate test data. Current methods typically rely on a single time parameter, neglecting the different impacts of each time stage during temperature transitions. Overly simplistic test cycles often fail to adequately record and analyze each stage of the equipment's response. Furthermore, data processing methods are often simplistic, typically using simple averages or maximum values ​​to evaluate equipment performance, lacking a comprehensive quantification of the equipment's dynamic response, resulting in an inaccurate assessment of the equipment's true performance under extreme conditions.

[0004] Therefore, this case aims to propose a performance testing method for explosion-proof equipment in hazardous locations, providing an accurate, quantifiable, and comprehensive method for testing the performance of explosion-proof equipment, ensuring that the equipment can maintain safe and reliable operation in the extreme temperature environment of hazardous locations, and has important practical application value. Summary of the Invention

[0005] This invention provides a performance testing method for explosion-proof equipment in hazardous locations, thereby helping to solve the problems mentioned in the background art.

[0006] This invention provides the following technical solution: a performance testing method for explosion-proof equipment in hazardous locations, comprising: Set the initial test temperature to ; Set the target test temperature as ; Set the temperature jump amplitude to ; Set the energy conversion scalar corresponding to the temperature jump as follows: ; The total duration of the entire temperature change process is set to... ; The actual duration of the linear temperature jump is set to... ; Choose the differential interval as .

[0007] Optionally, this also includes the construction of the temperature conversion system structure and mathematical model, specifically: Set temperature state function Specifically: ; in, This is a general time variable, with the unit being seconds, applicable to all time-related functions; This is the starting moment of the temperature transition, and ; Set the temperature change rate function as follows: ; During the transition phase, the linear property yields: ; Output temperature , ;in, , which is a small error term in the temperature control system.

[0008] Optionally, it also includes a bidirectional conversion triggering and smooth switching mechanism, specifically: Set trigger function for: ; in, , indicating that the temperature is from arrive The dividing point; Set a time smoothing function for: ; in, , is the smooth transition time interval; Set the smoothing temperature expression as follows: .

[0009] Optionally, it also includes a partitioned cavity structure, specifically: Take any vertex of the cavity as the origin, and use the longer side of the cavity containing the origin as... The axis will be along The direction of the axis away from the origin is denoted as Positive axis direction; take the width of the cavity where the origin is located as the positive axis direction. The axis will be along The direction of the axis away from the origin is denoted as Positive direction of the axis; where The range of axis coordinates is , The range of axis coordinates is Use the origin, shaft and Establish a Cartesian coordinate system using axes; The cavity is a controlled space area used for testing explosion-proof equipment, and the cavity has a length meters and width A rectangular space of meters, the initial temperature state inside the cavity is low. This indicates that the equipment was in a low-temperature environment at the start of the test; exist The dividing position is set in the positive direction of the axis. rice; when When set to a low-temperature zone, the temperature within the zone is fixed at [temperature value]. ; when When set to the high-temperature zone, a smooth temperature expression is used. Calculate the temperature.

[0010] Optionally, it also includes establishing a spatial energy release distribution model, specifically including: Set temperature distribution indicator function for: ; The temperature distribution model is constructed as follows: ; The spatial energy release distribution function is set as follows: ; in, , where is a fixed release coefficient.

[0011] Optionally, it also includes methods for calculating energy transfer processes and temperature transients, specifically: Set the temperature transfer function for: ; Set the temperature transient expression as follows: ; The expression for the transient rate of temperature change is set as follows: ; but, ; Set position indicator function for: ; Use position indicator function Confining energy transfer to a high-temperature region, specifically: .

[0012] Optionally, it also includes setting the test cycle, specifically: The test cycle is set as follows: ; in, This refers to the time the temperature is maintained. Initial moment: when At that time, the temperature inside the entire cavity was... ; Temperature jump start: self It begins to enter a smooth transition phase; Reaching a high temperature state: At that time, the high temperature state was Region establishment; High-temperature maintenance phase: The high-temperature state is maintained until... This completes a full testing cycle.

[0013] Optionally, data collection is also included, specifically: Set the temperature integral recording function for: ; exist Interval: ; exist Interval: ; The calculation yields: ; exist Interval: ; The total score is: ; Set the sampling interval to ; Set the sampling time to ,in , ; Set the sampling and recording function as follows: ; The discrete sampling dataset is composed of all sampling points: ; Discrete sampled dataset Stored in the database.

[0014] The present invention has the following beneficial effects: 1. Construct a multi-dimensional testing index system that includes not only static temperature data and temperature jump amplitude, but also incorporates time parameters. and This system, along with energy conversion scalars, forms a complete quantitative description of extreme temperature fluctuations. The newly defined index system directly maps to the energy shocks that equipment can withstand, reflecting the direct relationship between temperature changes and energy conversion. It provides a unified and accurate testing standard for equipment response under instantaneous extreme conditions; ensures that all set values ​​are fixed and clear, avoiding the uncertainty caused by empirical parameters in traditional testing; addresses the safety deficiencies of explosion-proof equipment under extreme temperature shocks by providing rigorous and quantitative testing parameters; and makes the testing environment closer to the instantaneous temperature changes that equipment may actually encounter, enhancing the reference value and reliability of the test data. While most existing technologies focus on testing under stable temperature or slow-changing conditions, this solution utilizes extremely short temperature jumps and corresponding energy conversions to solve the problem of insufficient rapid response capability in testing.

[0015] 2. Created a piecewise temperature state function The temperature change is strictly divided into three stages: low temperature, linear transition, and high temperature, and a deterministic mathematical expression is adopted, introducing a temperature change rate function. This method calculates the linear rate of temperature rise during the rapid change phase, ensuring the overall energy transfer process is quantifiable. It accurately describes the dynamic temperature change process, providing a precise mathematical foundation for subsequent energy transfer and data acquisition. Employing a novel mathematical expression method avoids the drawbacks of traditional methods relying on empirical parameters, making the temperature change process calculation more deterministic and reproducible. It addresses the issues of discontinuous temperature conversion processes and imprecise data in traditional temperature testing, ensuring accurate temperature representation at every moment during the rapid change process. While existing methods often use simple approximations or empirical formulas, this approach introduces precise definitions and rigorous calculations for temperature segmentation and rate calculation, resulting in higher accuracy and scientific rigor.

[0016] 3. Custom trigger function Clearly distinguish the critical points for the transition between low and high temperature states, and independently design a time smoothing function. This ensures a linear and smooth temperature change during the conversion process, generating a continuous temperature curve. Through... This method expresses a smooth temperature transition process, eliminating data acquisition distortion and signal discontinuity caused by instantaneous temperature jumps in traditional methods. It improves upon the errors and equipment shocks that may occur during testing due to rapid temperature changes, making temperature switching both rapid and smooth, facilitating the capture and recording of the equipment's true response; ensuring data continuity for accurate evaluation of test results. It solves the problems of discontinuous temperature switching, interrupted data acquisition, and high signal noise in traditional testing, ensuring a true reflection of the equipment's operating status under emergency conditions. Existing technologies often use simple switching control, while this solution achieves smooth temperature transitions through a self-developed smoothing function, making the system response smoother and more continuous, improving the scientific rigor of the test and data quality.

[0017] 4. In the standard Cartesian coordinate system, using shaft and The axis establishes a two-dimensional spatial description, and the cavity is finely partitioned; the temperature distribution indication function is defined in detail. The cavity is clearly divided into a low-temperature zone and a high-temperature zone; the temperature state in each zone is calculated using different but specific mathematical methods: the low-temperature zone directly uses a constant value. In high-temperature regions, a time smoothing function is used. Modulation temperature from arrive The changes are reflected in the temperature distribution model. This solution addresses the problems of insufficient detail in describing temperature distribution within the cavity and the resulting confusion in temperature states in traditional testing. It provides precise partitioning and corresponding calculation models, ensuring a clear spatial correspondence between temperature and energy distribution, which helps identify potential weaknesses in localized areas of the equipment. Specifically addressing the issue of localized weaknesses in explosion-proof equipment testing where different areas may be affected by varying temperatures, this solution precisely partitions the cavity interior, ensuring independent measurement and recording of temperature states and energy release in different areas. Traditional methods often only treat the cavity temperature as uniform overall, failing to finely distinguish temperature differences within regions; this solution, through precisely defined spatial partitioning, temperature distribution functions, and energy release expressions, significantly improves the resolution and practicality of the test.

[0018] 5. Set the temperature transfer function Used to describe the linear proportion of temperature rise within a smooth temperature jump range, and further through The transient temperature is explicitly expressed; the energy transfer is calculated using a direct integration method, and the position indication function is utilized. By confining energy transfer to the high-temperature region, a complete and closed energy transfer model is formed. This method enables precise calculation of the rate of energy change and the amount of energy transferred during rapid, instantaneous temperature changes, facilitating the assessment of the energy tolerance and release capabilities of explosion-proof equipment. It resolves the uncertainty inherent in traditional temperature transfer calculations, which struggle to accurately describe the instantaneous rate of temperature change and energy transfer, ensuring high signal-to-noise ratio and scientific validity in the test data. While existing technologies typically rely on empirical models or nonlinear weighting parameters, this solution employs a novel, self-developed method of integration and derivative calculations, making energy transfer calculations more intuitive and accurate, suitable for dynamic response testing over extremely short timeframes.

[0019] 6. A complete testing cycle was designed. The test process clearly defines the temperature jump and high-temperature holding phases, forming a self-consistent closed-loop test procedure; a fixed discrete sampling interval is adopted. Building continuous datasets Record function through temperature integral Precise quantification of temperature throughout the entire testing cycle ensures the continuity and accuracy of temperature data, providing detailed data for assessing the dynamic response of explosion-proof equipment under extreme environments. The discrete sampling method guarantees simple data processing, accurate results, and ease of subsequent multidimensional data analysis. It solves the problems of inconsistent data sampling intervals, missing data, or discontinuity in traditional testing, making test results more convincing and comparable, and contributing to equipment safety assessment. Existing sampling methods may suffer from insufficient sampling rates or data segmentation issues; however, this solution ensures detailed recording and repeatability of data throughout the entire cycle through high-frequency sampling and complete integration methods, significantly improving the quality of test data. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the process of the present invention. Detailed Implementation

[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0022] Example, refer to Figure 1 A performance testing method for explosion-proof equipment in hazardous locations, comprising: Set the initial test temperature to This indicates the temperature state of the explosion-proof equipment under extreme cooling conditions during testing. Set the target test temperature as This indicates the temperature state of the equipment after it has been subjected to extreme high-temperature shock. Set the temperature jump amplitude to These values ​​serve as the basis for subsequent energy conversion and temperature transfer calculations. Set the energy conversion scalar corresponding to the temperature jump as follows: This represents a constant value equivalent to energy conversion during a rapid temperature change; The total duration of the entire temperature change process is set to... The regulations stipulate that temperature conversion should be completed in a very short time to test the equipment's ability to respond to instantaneous extreme environments; The actual duration of the linear temperature jump is set to... The time of the linear temperature rise phase is limited to ensure that the transformation process has clear and controllable dynamic characteristics; Choose the differential interval as This ensures accurate temperature rate calculations; the constructed index system not only defines temperature and time parameters but also introduces energy conversion scalars. Multi-dimensional indicators ensure that the structure and safety performance of explosion-proof equipment are tested during instantaneous extreme energy freezing and melting processes.

[0023] By setting the initial and target temperatures, the explosion-proof equipment testing is ensured to be conducted under extreme cooling and high-temperature environments, realistically reflecting the equipment's actual performance under extreme temperature conditions. This step solves the problem that traditional testing methods can only simulate slow temperature changes, allowing for effective verification of the equipment's response under instantaneous extreme temperature shocks. Secondly, the setting of the temperature jump amplitude and energy conversion scalar establishes a direct correlation between temperature change and energy conversion, providing a clear numerical basis for subsequent energy transfer calculations and avoiding the fuzzy and empirical shortcomings of existing methods. This setting ensures the scientific rigor and accuracy of the energy transfer process. The setting of the total duration of rapid temperature changes and the duration of linear temperature jumps further ensures the instantaneity and controllability of temperature changes, greatly increasing the stringency of the testing conditions and enabling the equipment's extreme tolerance capabilities to be realistically verified in a very short time. This solves the problem that traditional methods cannot accurately assess the equipment's response speed due to excessively slow temperature changes, while ensuring a comprehensive evaluation of the equipment's response time during the testing process. Finally, by selecting a differential interval, the accuracy of the temperature rate calculation is ensured. This design addresses the shortcomings of existing technologies, such as insufficiently precise data acquisition intervals and inaccurate temperature change rate calculations. It ensures more continuous and accurate data throughout the testing process, providing a reliable basis for subsequent equipment evaluation. In summary, this solution, through a series of precise settings, overcomes the deficiencies of traditional testing methods, enabling more comprehensive and accurate performance testing of explosion-proof equipment in extreme environments, thereby improving the safety and reliability of the equipment.

[0024] It also includes the construction of the temperature conversion system structure and mathematical model, specifically: Set temperature state function Specifically: Describe temperature over time The changes are divided into three stages: initial low temperature, linear jump, and high temperature stability, to ensure that the temperature data are calculated strictly according to the predetermined formula in each stage. in, It is a general time variable, with the unit being seconds, applicable to all time-related functions, and used as the independent variable in dynamic processes; This is the starting moment of the temperature transition, and The starting point of the calibrated temperature rise curve; Set the temperature change rate function as follows: ; Calculates the change in temperature per unit time, especially providing a constant rate during temperature jumps. To ensure that energy transfer calculations are accurate; During the transition phase, the linear property yields: ; Output temperature , ;in, This represents a small error term in the temperature control system. As the actual output temperature, ensure that the temperature state received by the device is completely consistent with the design target.

[0025] By setting temperature state function, temperature change rate function, and output temperature function, this scheme can accurately describe the dynamic changes of temperature throughout the entire testing process. Especially during the rapid temperature change phase, all temperature data are strictly calculated according to predetermined formulas, ensuring the continuity, controllability, and accuracy of temperature during the test. First, the temperature state function divides temperature change into three stages: initial low temperature, linear jump, and high temperature stability. This staged setting solves the problem of traditional testing methods failing to accurately simulate instantaneous temperature jumps. By clearly defining each stage, the temperature change process can be precisely controlled, ensuring that the temperature change in each stage conforms to actual testing requirements and avoiding discontinuous or uneven transitions during temperature changes. Through this step, the test can more realistically reflect the response characteristics of the equipment in extreme environments. Second, setting the temperature change rate function, especially during the temperature jump phase, ensures the accurate calculation of the temperature change rate per unit time, particularly the fixed rate during rapid changes. This setting effectively solves the inaccuracies in calculating the temperature change rate in existing technologies, avoiding errors caused by inaccurate temperature change rates in energy transfer calculations. In this way, the energy transfer calculation during temperature jumps is more accurate, making the test results more reliable. Finally, the output temperature function was set incorporating small error terms in the temperature control system. This ensures that the actual output temperature is completely consistent with the design target temperature. This step eliminates errors caused by insufficient equipment control precision during testing, ensuring that the temperature received by the equipment is completely consistent with the design target. This not only improves testing accuracy but also enhances the reliability of equipment performance evaluation. In summary, the above steps, by ensuring precise control and accurate calculation of the temperature change process, solve the problems of inaccurate temperature control and discontinuous data acquisition in existing testing methods, effectively improving the accuracy and reliability of test results. This has significant practical implications for the safety assessment of explosion-proof equipment, providing a more scientific and reliable basis for the equipment's performance in practical applications.

[0026] It also includes a bidirectional conversion triggering and smooth switching mechanism, specifically: Set trigger function for: Achieving temperature status at The switching on and off at different times clearly distinguishes between the instantaneous states of low-temperature and high-temperature startup; in, , indicating that the temperature is from arrive The dividing point; determining the dividing moment of the temperature switching process, used to trigger the state transition between the low temperature zone and the high temperature zone; Set a time smoothing function for: During the temperature switching process, the temperature value changes from... Smooth transition to The key lies in eliminating the discontinuity caused by mutations and ensuring the linear change of dynamic transitions; in, , which is the smooth transition time interval, used for smoothing the temperature switching process; define the linear smoothing interval to ensure a smooth transition of temperature from low to high temperature and eliminate discontinuous jumps; Set the smoothing temperature expression as follows: During the temperature transition, it provides continuous and smooth temperature calculation results for equipment condition testing and subsequent energy calculations. make sure The temperature transitions smoothly and continuously within seconds.

[0027] By setting a bidirectional transition trigger function, a time smoothing function, and a smoothed temperature expression, this solution effectively achieves a smooth switching of temperature states, ensuring that the equipment does not experience abrupt changes or discontinuities during extreme temperature variations, thereby improving the accuracy of test results and the reliability of equipment performance. Firstly, by setting a trigger function to clearly define the switching time from the low-temperature zone to the high-temperature zone, this step effectively solves the problems of unclear temperature state switching and ambiguous transitions in existing technologies. The trigger function can accurately pinpoint the boundary point of temperature jumps, ensuring that the temperature transitions from the low-temperature zone to the high-temperature zone at the appropriate time. Switch to This setup avoids the instability issues caused by abrupt temperature changes in traditional methods, providing a stable foundation for subsequent temperature control and energy calculations. Secondly, the use of a time smoothing function ensures a linear and smooth transition from low to high temperatures. This design significantly addresses the abrupt changes during temperature switching, ensuring the device is not affected by discontinuous jumps during temperature changes. In traditional methods, rapid temperature changes often lead to data oscillations, affecting the device's true response. The time smoothing function allows for a smooth temperature transition throughout the switching process, avoiding errors in device performance evaluation caused by temperature jumps. Furthermore, the smoothed temperature expression further optimizes the temperature transition process, providing continuous and seamless data within the smooth transition range. This not only improves the accuracy of device response evaluation under extreme conditions but also provides reliable and continuous data for subsequent energy transfer and temperature calculations. By ensuring a smooth temperature transition, errors caused by jumps in traditional testing are avoided, ensuring high reliability of test results. In summary, this solution, by precisely controlling the temperature change process, particularly the smooth transition during temperature switching, solves the problems of abrupt changes and data discontinuities caused by drastic temperature variations in traditional methods. This ensures a more scientific and accurate testing process for explosion-proof equipment in extreme environments. These improvements not only enhance the accuracy of performance evaluation under extreme conditions but also strengthen the safety and stability of explosion-proof equipment in practical use.

[0028] It also includes a partitioned cavity structure, specifically: Take any vertex of the cavity as the origin, and use the longer side of the cavity containing the origin as... The axis will be along The direction of the axis away from the origin is denoted as Positive axis direction; take the width of the cavity where the origin is located as the positive axis direction. The axis will be along The direction of the axis away from the origin is denoted as Positive direction of the axis; where The range of axis coordinates is , The range of axis coordinates is Use the origin, shaft and Establish a Cartesian coordinate system using axes; The cavity is a controlled space area used for testing explosion-proof equipment, and the cavity has a length meters and width A rectangular space of meters, the initial temperature state inside the cavity is low. This indicates that the equipment was in a low-temperature environment at the start of the test; exist The dividing position is set in the positive direction of the axis. rice; when When set to a low-temperature zone, the temperature within the zone is fixed at [temperature value]. ; when When set to the high-temperature zone, a smooth temperature expression is used. Calculate the temperature.

[0029] To achieve physical zone control, this solution involves [the following] within the cavity. The implementation plan for the regional electromagnetic energy field isolation module includes: Module principle: Utilizing high-frequency nonlinear microwave pulses and a controlled ion beam, in A short-term heat insulation zone is created nearby; Operating steps: Approximately 0.001 seconds before the temperature jump, the module is activated via a dedicated controller; the module then... The region generates a transient thermal barrier to prevent the diffusion of localized high-temperature energy from the high-temperature zone to the low-temperature zone; this barrier operates continuously throughout the entire temperature jump and high-temperature hold-up period, lasting at least 0.015 seconds, to ensure the temperature of the low-temperature zone. It remains stable over a long period, while the high-temperature zone gradually heats up according to a predetermined function.

[0030] The use of this module allows for a significant temperature difference between the high-temperature and low-temperature zones despite intense molecular thermal diffusion within the cavity, thus enabling individual control of the high-temperature zone.

[0031] By designing a partitioned cavity structure and utilizing a Cartesian coordinate system for spatial division, this scheme effectively solves the problems of uneven temperature distribution and unclear temperature change zones within the cavity in existing technologies. This ensures accurate testing of the temperature response of explosion-proof equipment in different zones, thereby improving the accuracy and reliability of equipment performance evaluation. First, any vertex of the cavity is taken as the origin, and the long and short sides of the cavity containing the origin are used as... shaft and The Cartesian coordinate system was clearly established along the axis. This step solves the problem of unclear spatial partitioning of the cavity in existing technologies. The establishment of the Cartesian coordinate system allows for clear coordinate and digitization of the temperature distribution in different regions within the cavity, providing a precise spatial reference for subsequent temperature calculations. Through this step, temperature and energy transfer processes are no longer abstract but can be accurately calculated based on spatial coordinates, thus avoiding temperature calculation errors caused by the lack of a coordinate system in traditional methods. Secondly, a boundary position was set along the positive axis, and the specific boundaries between the low-temperature and high-temperature zones were defined, ensuring clear temperature states in the low-temperature and high-temperature zones during testing and avoiding ambiguity during temperature transitions. In the low-temperature zone, the temperature within the zone is fixed at [temperature value missing]. In the high-temperature zone, the temperature is calculated using a smoothed temperature expression. This design effectively solves the problem of inaccurate temperature zone division in existing technologies, ensuring that temperature changes in both high and low-temperature zones meet actual testing requirements, resulting in higher comparability and accuracy of test data across different zones. By setting clear boundary locations and zone temperature control, this solution ensures that temperature changes in different zones of the equipment can be independently calculated and analyzed. This refined zoning design effectively simulates different temperature zones that the equipment may encounter in actual applications, avoiding test errors caused by neglecting regional differences in existing technologies. Furthermore, the application of the smoothed temperature expression makes the transition from low-temperature to high-temperature zones smoother, further improving the consistency of test data and avoiding errors caused by sudden temperature changes. In summary, this solution, through precise spatial zoning design and temperature state division, solves the problems of unclear temperature distribution and ambiguous zone division within the cavity in traditional testing methods. Through this method, the temperature response of explosion-proof equipment in different zones is comprehensively and accurately evaluated, thereby improving the reliability of the test and the safety of the equipment, providing a more realistic and scientific basis for the performance of the equipment in extreme temperature environments.

[0032] It also includes establishing a spatial energy release distribution model, specifically including: Set temperature distribution indicator function for: The cavity is clearly divided into two regions. The temperature distribution model is constructed as follows: ; Calculate the temperature state in the two regions within the cavity separately. In the low-temperature region, due to The temperature calculation result is constant. In the high-temperature region, according to the time smoothing function Depend on Gradient to ; The spatial energy release distribution function is set as follows: ; in, , which is a fixed release coefficient; this formula explicitly stipulates that energy release in the low-temperature region is related to... Correspondingly, in the high-temperature region, energy release changes linearly with increasing temperature.

[0033] By establishing a spatial energy release distribution model and combining it with a temperature distribution indicator function and a temperature distribution model, this solution effectively solves the problems of unclear temperature and energy distribution within the cavity and inaccurate calculation of regional energy release in existing technologies. The model design ensures that the energy transfer and release process of the device can be accurately calculated in different temperature regions, thereby improving the scientific rigor and accuracy of the test. First, a temperature distribution indicator function is set, clearly dividing the cavity into two regions: a low-temperature region and a high-temperature region, thus solving the problem of inaccurate description of temperature changes in different regions within the cavity in traditional methods. Through this step, the temperature changes within the cavity are clearly defined spatially. In the low-temperature region, the temperature remains constant. In the high-temperature region, the temperature gradually decreases according to a time-smoothing function. Gradient to This precise division of temperature changes ensures the accurate distribution of temperature throughout the cavity. Secondly, a temperature distribution model is constructed, which calculates the temperature state in two regions within the cavity separately, avoiding the inaccurate temperature region calculations found in existing technologies. By clearly defining the temperature region division and its variation patterns, the temperature calculation results remain consistent in the low-temperature region. In the high-temperature region, the temperature changes smoothly according to a time function. This process better reflects the actual response of equipment in extreme environments, resulting in higher accuracy and realism in the temperature distribution model. Furthermore, by setting a spatial energy release distribution function and incorporating temperature changes, it is possible to calculate the energy release in different regions within the cavity. In the low-temperature region, the energy release remains constant, consistent with the low-temperature state. Correspondingly, in the high-temperature zone, energy release changes linearly with increasing temperature, fully considering the direct impact of temperature changes on energy transfer. This design effectively solves the problem of ambiguous correlation between temperature and energy release in traditional methods, ensuring that the energy release process is closely related to temperature changes and accurately reflects the energy response of the equipment in different temperature zones. Through these steps, this solution successfully eliminates the problems of inaccurate energy distribution calculations and unclear temperature zone divisions in existing technologies, ensuring that the relationship between temperature and energy release is accurately quantified and recorded during testing. This further improves the reliability of test data, providing a more accurate and scientific basis for the performance evaluation of explosion-proof equipment in extreme environments. These improvements make the testing process more realistic and accurate, and enable a comprehensive evaluation of the safety and stability of the equipment under different temperature conditions.

[0034] It also includes methods for calculating energy transfer processes and temperature transients, specifically: Set the temperature transfer function for: Characterizing the temperature change from linear smooth transition time period Go to The proportion of change; Set the temperature transient expression as follows: ; directly represents the linear increase of temperature over time within a smooth interval; ensures that when hour, ;when hour, ; The expression for the transient rate of temperature change is set as follows: It describes the rate of temperature change during a transition phase, serving as a direct basis for the energy transfer rate. but, ; Set position indicator function for: It is used to combine spatial information to apply temperature jump calculations in high-temperature regions, while maintaining a constant temperature in low-temperature regions. ; Use position indicator function Confining energy transfer to a high-temperature region, specifically: ;when At that time, due to Equipment temperature maintained ;and At that time, the temperature is according to Transient changes are made to complete the energy transfer.

[0035] By setting the temperature transfer function, temperature transient expression, temperature transient rate expression, and position indication function, this scheme can accurately characterize the temperature change and energy transfer process during a temperature jump, ensuring that the equipment's response in extreme temperature environments can be accurately evaluated. Firstly, by setting the temperature transfer function, the temperature change from... arrive The proportional change. This setting solves the problem of abrupt or discontinuous temperature jumps in existing technologies, ensuring that the temperature change process exhibits linear growth within the smooth jump phase, avoiding instability caused by abrupt changes. In this way, the temperature change conforms to the response of the device under rapid temperature changes in a real environment, thus providing a more scientific temperature simulation. Secondly, a transient temperature expression is set, through the formula... It accurately describes the linear increase of temperature over time within a smooth range, ensuring a more realistic response of the device during temperature jumps. By setting upper and lower limits for temperature transients, the temperature is controlled within a time frame. arrive The temperature exhibits a continuous linear change, avoiding the discontinuities or uneven transitions encountered in traditional methods during temperature jumps. This ensures the device maintains a stable response to temperature changes at every moment. Furthermore, an expression for the transient rate of temperature change is established, using the formula... This allows for the description of the rate of temperature change during abrupt transitions. This setting resolves the problem of inaccurate temperature change rate calculations in existing technologies, providing an accurate basis for subsequent energy transfer calculations. By ensuring accurate calculation of the temperature change rate, the accuracy of the energy transfer process can be guaranteed, avoiding energy calculation deviations caused by incorrect temperature rate estimations. Finally, a position indication function is set. This is used to combine spatial information to ensure that temperature jumps are applied only in high-temperature regions, while maintaining a constant temperature in low-temperature regions. This design effectively solves the problem of inaccurate temperature region division in existing technologies, avoiding errors caused by unclear region division during temperature jump calculations. By confining energy transfer to the high-temperature region, the temperature undergoes a transient change according to a smooth temperature expression in the high-temperature region, while remaining constant in the low-temperature region, thus ensuring the scientific accuracy of the energy transfer process. In summary, the above settings, through precise control of the temperature jump process, transient rate, and energy transfer, solve the problems of temperature discontinuity and inaccurate energy calculations in existing technologies. Through these steps, the temperature and energy changes during the testing process can better reflect the equipment response in the actual environment, making the test results more scientific and reliable, and providing a more accurate basis for the performance evaluation of explosion-proof equipment in extreme temperature environments. This series of improvements significantly improves the accuracy of test data, ensuring the safety and stability of the equipment in practical applications.

[0036] This also includes setting the test cycle, specifically: The test cycle is set as follows: The test process is defined as a complete test, including the temperature jump and high temperature holding phases. in, This refers to the time the temperature is maintained. Initial moment: when At that time, the temperature inside the entire cavity was... ; Temperature jump start: self It begins to enter a smooth transition phase; Reaching a high temperature state: At that time, the high temperature state was Region establishment; High-temperature maintenance phase: The high-temperature state is maintained until... This completes a full testing cycle.

[0037] By setting a test cycle and specifying a complete test process, including temperature jump and high-temperature holding phases, this solution effectively solves the problems of inaccurate test cycle design and unclear temperature change phase division in existing technologies. The specific cycle setting ensures that the performance testing of explosion-proof equipment in extreme temperature environments is more scientific and systematic, thereby improving the accuracy and reliability of test results. First, by setting a test cycle and clearly defining each phase of the test process, including temperature jump and high-temperature holding, a time framework is provided for the entire test process. This step solves the problem of overly simplistic or incomplete test cycle settings in existing technologies. Traditional methods typically set the test cycle to a fixed duration, ignoring the different effects of different temperature phases on the equipment, resulting in test results that cannot fully reflect the dynamic response of the equipment in complex environments. By setting the test cycle in stages, the temperature changes that the equipment may encounter in actual operation can be simulated more accurately. Second, specifying the high-temperature holding time ensures that the equipment can maintain the high temperature for a specified period after reaching the high-temperature state. This design effectively solves the problems of unstable high-temperature state maintenance and failure to fully assess the long-term endurance of the equipment in high-temperature environments in existing technologies. The high-temperature holding phase ensures that the equipment, after undergoing a temperature jump, can be fully tested for its heat resistance and stability at high temperatures, avoiding distorted test results due to insufficient test time or uneven temperature changes. By setting the initial time, determining the temperature jump start time, and defining the establishment time of the high-temperature state, this solution ensures the sequential and standardized nature of the testing process, avoiding the problems of unclear test procedures and ambiguous time nodes in existing methods. These settings make the testing process more rigorous and systematic, thereby improving the scientific rigor of the test. Finally, setting the end time of the high-temperature holding phase ensures that the high-temperature state can continue until the end of the specified test cycle, preventing insufficient testing of the equipment's performance due to insufficient test time. By ensuring the continuity of the high-temperature state, the test can comprehensively evaluate the stability of the equipment under long-term high-temperature conditions, avoiding errors caused by the equipment not being fully stable at the end of the test. In summary, this solution, by setting a clear test cycle, dividing the temperature jump and high-temperature holding phases, and clarifying the time nodes of each phase, solves the problems of incomplete test cycle settings and unclear temperature change phase divisions in existing technologies. This precise cycle setting ensures a comprehensive and accurate assessment of the equipment's response to extreme temperature variations, providing reliable and scientific data support for the performance of explosion-proof equipment in extreme environments. This series of improvements significantly enhances the accuracy and reliability of testing, ensuring the safety and durability of the equipment in practical applications.

[0038] It also includes data collection, specifically: Set the temperature integral recording function for: Used to record the temperature integral value throughout the entire test cycle, segmented calculation ensures data integrity and facilitates subsequent result analysis; exist Interval: ; exist Interval: ; The calculation yields: ; exist Interval: ; The total score is: ; Set the sampling interval to Specify the time step for discrete sampling to ensure data sampling accuracy and continuity; Set the sampling time to ,in , ; serves as a time marker for each discrete data sampling point; Set the sampling and recording function as follows: This is used to record the temperature of each sampling point multiplied by the sampling interval to form a discrete dataset. The discrete sampling dataset is composed of all sampling points: To ensure that temperature change data is collected completely, continuously, and accurately throughout the entire testing cycle for subsequent data analysis and verification; Discrete sampled dataset Stored in the database.

[0039] By setting a temperature integral recording function, defining the sampling interval and sampling time, and constructing a discrete sampling dataset, this scheme ensures the integrity, continuity, and accuracy of temperature data throughout the entire test cycle, thus providing reliable data support for subsequent equipment performance analysis. First, by setting the temperature integral recording function, the temperature integral values ​​throughout the entire test cycle are calculated in segments, ensuring data integrity. This step solves the problem of data omissions or discontinuities caused by excessively long or short data acquisition cycles in existing technologies. Traditional methods typically rely only on single instantaneous temperature records, failing to reflect the changes at every moment during rapid temperature fluctuations. The temperature integral recording function ensures accurate recording of temperature changes at each stage, providing reliable historical temperature data for subsequent data analysis. Second, by setting the sampling interval and sampling time, this scheme ensures data sampling accuracy and continuity. Setting the sampling interval to a fixed time step ensures accurate capture of temperature changes at each time point throughout the entire test cycle. This setting solves the problems of unstable sampling frequency and uneven data intervals in existing technologies, enabling a high-precision discrete representation of the temperature change process. By precisely controlling the time step, accurate recording of temperature changes is ensured, avoiding data distortion caused by insufficient sampling. By setting the sampling and recording function, the product of temperature and time interval at each sampling point is recorded, forming a discrete dataset. This operation ensures that each data point corresponds to a precise time marker, allowing for a comprehensive and accurate reflection of temperature changes during the test. In traditional methods, data recording often misses critical temperature information or fails to accurately mark time points, resulting in discontinuous data and hindering effective analysis. This precise sampling method ensures high integrity and accuracy of the test data. Finally, by constructing a discrete sampling dataset from all sampling points and storing it in a database, complete acquisition and long-term storage of temperature data throughout the entire test cycle are ensured. This step solves the problem of non-standard data storage and management in existing technologies, ensuring that data can not only be used immediately but also provide reliable support for subsequent analysis and verification. In summary, by precisely setting the sampling interval, sampling time, and recording function, complete acquisition and high-precision recording of temperature data throughout the test cycle are ensured, solving the problems of discontinuous data and insufficient accuracy in traditional methods. These improvements not only enhanced the accuracy and continuity of data collection, but also provided reliable data for subsequent performance analysis and equipment evaluation, significantly improving the credibility and scientific rigor of the test results.

[0040] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0041] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for testing the performance of an explosion-protected device in an explosion-hazardous area, characterized in that include: The test initial temperature is set to ; Set the test target temperature to ; The temperature jump amplitude is set to ; The energy conversion scalar corresponding to the temperature jump is set as ; The total duration of the entire temperature change process is set to... ; The actual duration of the linear temperature jump is set to... ; Choose the differential interval as ; Set temperature state function Specifically: ; in, It is a general time variable, with the unit being seconds, and is applicable to all time-related functions; This is the starting moment of the temperature transition, and ; Set the temperature change rate function as follows: ; During the transition phase, the linear property yields: ; Output temperature , ;in, , which is a small error term in the temperature control system; Set trigger function for: ; in, , indicating that the temperature is from arrive The dividing point; Set a time smoothing function for: ; in, , is the smooth transition time interval; Set the smoothing temperature expression as follows: ; Take any vertex of the cavity as the origin, and use the longer side of the cavity containing the origin as... The axis will be along The direction of the axis away from the origin is denoted as Positive axis direction; take the width of the cavity where the origin is located as the positive axis direction. The axis will be along The direction of the axis away from the origin is denoted as Positive direction of the axis; where The range of axis coordinates is , The range of axis coordinates is Use the origin, shaft and Establish a Cartesian coordinate system using axes; The cavity is a controlled space area used for testing explosion-proof equipment, and the cavity has a length meters and width A rectangular space of meters, the initial temperature state inside the cavity is low. This indicates that the equipment was in a low-temperature environment at the start of the test; exist The dividing position is set in the positive direction of the axis. rice; when When set to a low-temperature zone, the temperature within the zone is fixed at [temperature value]. ; when When set to the high-temperature zone, a smooth temperature expression is used. Calculate the temperature; Set temperature distribution indicator function for: ; The temperature distribution model is constructed as follows: ; The spatial energy release distribution function is set as follows: ; in, , is a fixed release coefficient; Set the temperature transfer function for: ; Set the temperature transient expression as follows: ; The expression for the transient rate of temperature change is set as follows: ; but, ; Set position indicator function for: ; Use position indicator function Confining energy transfer to a high-temperature region, specifically: 。 2. The performance testing method for explosion-proof equipment in hazardous locations according to claim 1, characterized in that, This also includes setting the test cycle, specifically: The test cycle is set as follows: ; in, This refers to the time the temperature is maintained. Initial moment: when At that time, the temperature inside the entire cavity was... ; Temperature jump start: self It begins to enter a smooth transition phase; Reaching a high temperature state: At that time, the high temperature state was Region establishment; High-temperature maintenance phase: The high-temperature state is maintained until... This completes a full testing cycle.

3. The performance testing method for explosion-proof equipment in hazardous locations according to claim 2, characterized in that, It also includes data collection, specifically: Set the temperature integral recording function for: ; exist Interval: ; exist Interval: ; The calculation yields: ; exist Interval: ; The total score is: ; Set the sampling interval to ; Set the sampling time to ,in , ; Set the sampling and recording function as follows: ; The discrete sampling dataset is composed of all sampling points: ; Discrete sampled dataset Stored in the database.

Citation Information

Patent Citations

  • Parallel capacitor bank early failure early-warning method based on dispersion mutation

    CN109212364A

  • Detonation / deflagration precursor detection of gases, vapors, aerosols, and mixtures thereof

    US6001308A