Grouting construction method and device for curtains of canyon accumulation bodies capable of enhancing structural strength

By constructing a geological model and monitoring grouting parameters in real time, the problems of uneven strength and temperature change conditions of grouting structures under the complex geological environment of canyon accumulation are solved, and the integrity and permeability of the curtain body structure are improved, reducing repair costs and construction periods.

CN120180570AActive Publication Date: 2025-06-20SINOHYDRO BUREAU 1 CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510660042.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-22
Publication Date
2025-06-20
Estimated Expiration
2045-05-22

AI Technical Summary

Technical Problem

In the complex geological environment of canyon accumulation, traditional curtain grouting construction methods are difficult to achieve precise control of grouting parameters, resulting in uneven diffusion of slurry, uneven structural strength, and temperature change conditions affect the performance of slurry, making it difficult to meet construction needs.

Method used

By obtaining the geotechnical porosity, permeability and temperature change rate of canyon accumulation, a geological model is constructed to determine the grouting parameters, and the parameters are monitored and adjusted in real time during the grouting process, the slurry performance is adjusted according to the temperature changes, and the grouting quality is ensured.

Benefits of technology

It significantly improves the structural integrity and permeability of the curtain body, improves the adaptability of grouting construction to complex working conditions, reduces the cost and construction period of later repairs, and ensures the safe, economical and efficient construction of water conservancy and hydropower projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120180570A_ABST
    Figure CN120180570A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of hydraulic engineering construction, in particular to a canyon accumulation body curtain grouting construction method and device capable of enhancing structural strength, and the method comprises the steps that the rock porosity, permeability and temperature change rate of a canyon accumulation body area are obtained; constructing an accumulation body geologic model according to the porosity, permeability and temperature change rate of the rock soil, and determining grouting parameters based on the accumulation body geologic model; grouting holes are drilled according to grouting parameters, composite grout is injected into the grouting holes, the grouting parameters are monitored and adjusted in real time, meanwhile, the grout performance is adjusted according to temperature changes, after grouting is completed, the structural integrity and impermeability of the curtain body are detected and evaluated, and if the requirements are not met, supplementary grouting treatment is conducted. Therefore, the problems that in the prior art, under the complex geological environment, the grouting structure strength is uneven, and the grout performance is affected by the temperature change condition are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydraulic engineering construction, and particularly relates to a curtain grouting construction method and device for canyon accumulation bodies that can enhance structural strength. Background Art

[0002] In the field of water conservancy and hydropower engineering construction, the curtain grouting construction of canyon accumulation bodies is a core link to ensure the safety, stability and high-efficiency anti-seepage of the project. As a key line of defense against groundwater seepage and maintaining the stability of the engineering structure, the quality of the curtain body is directly related to the long-term operation and safety of the entire water conservancy and hydropower project. However, the unique and complex geological conditions of canyon accumulation bodies pose great challenges to curtain grouting construction. The porosity and permeability of the rock and soil in this area are extremely unevenly distributed, and the geological characteristics of different parts are significantly different. At the same time, external environmental factors, especially temperature changes, constantly interfere with the grouting process. This complex coupling of geology and environment makes it difficult for traditional curtain grouting construction methods to accurately control grouting parameters and meet the actual construction requirements.

[0003] Traditional curtain grouting construction methods expose many drawbacks when dealing with the complex working conditions of canyon accumulation bodies. Due to the lack of effective coping strategies for complex geological conditions, uneven diffusion of grout is likely to occur during grouting. In some areas, the grout is overly concentrated, while in other areas, the grouting is insufficient, resulting in defects in the internal structure of the curtain body. This uneven grouting effect seriously affects the structural integrity and anti-seepage performance of the curtain body, making the curtain body unable to fully play its due anti-seepage and support roles. More critically, the existing construction methods lack an effective adaptive adjustment mechanism in the face of different rock and soil characteristics and rapidly changing environmental factors, and cannot optimize the grouting process in a timely and accurate manner according to the actual situation. This directly leads to the difficulty of ensuring reliable construction quality, and a large amount of cumbersome and costly repair work is often required in the later stage of the project, which not only increases the construction cost but also significantly prolongs the construction period, bringing many adverse effects to the construction of water conservancy and hydropower projects. Summary of the Invention

[0004] The present invention provides a curtain grouting construction method and device for canyon accumulation bodies that can enhance structural strength to solve problems such as uneven grouting structure strength and the influence of temperature change conditions on the performance of grout in the prior art under complex geological environments.

[0005] An embodiment of the first aspect of the present invention provides a curtain grouting construction method for canyon accumulation bodies that can enhance structural strength, including the following steps: obtaining the rock and soil porosity, permeability, and temperature change rate in the canyon accumulation body area; constructing an accumulation body geological model based on the rock and soil porosity, permeability, and temperature change rate, and determining grouting parameters based on the accumulation body geological model, where the grouting parameters include, but are not limited to, grouting pressure, slurry flow rate, and slurry ratio; drilling grouting holes according to the grouting parameters, injecting composite slurry into the grouting holes, monitoring and adjusting the grouting parameters in real time, and adjusting the slurry performance according to the temperature change. After grouting is completed, detect and evaluate the structural integrity and impermeability of the curtain body, and perform supplementary grouting treatment if the requirements are not met.

[0006] Optionally, injecting the composite slurry into the grouting holes includes: monitoring the rock and soil porosity, permeability, and temperature change rate, and automatically adjusting the nozzle diameter and slurry flow rate; where if the rock and soil porosity is greater than the first preset porosity, increase the nozzle diameter and appropriately increase the slurry flow rate, and if the rock and soil porosity is less than the second preset porosity, decrease the nozzle diameter and reduce the slurry flow rate; if the permeability is greater than the first preset permeability, increase the nozzle diameter, increase the injection volume of the slurry, and increase the viscosity of the slurry at the same time, and if the permeability is less than the second preset permeability, decrease the nozzle diameter and increase the injection pressure of the slurry.

[0007] Optionally, the composite slurry is composed of sodium silicate-cement-based double-fluid slurry and a temperature-sensitive additive.

[0008] Optionally, the sodium silicate-cement-based double-fluid slurry is formed by mixing a sodium silicate solution and a cement slurry in a volume ratio of 1:(1-2), the water-cement ratio is 0.5-0.8, and the addition amount of the temperature-sensitive additive is 0.5%-2% of the total mass of the sodium silicate-cement-based double-fluid slurry.

[0009] Optionally, adjusting the slurry performance according to the temperature change includes: when it is detected that the temperature change rate exceeds the preset threshold, triggering a hierarchical compensation mechanism, where the hierarchical compensation mechanism includes: when it is detected that the temperature drops rapidly, start the heating wire set on the grouting pipeline to quickly preheat the grouting pipeline and the internal slurry, and increase the release amount of the coagulation-promoting component in the temperature-sensitive additive to 1%-1.5% of the total mass of the sodium silicate-cement-based double-fluid slurry; when it is detected that the temperature rises rapidly, perform cooling treatment on the slurry, and reduce the release amount of the coagulation-promoting component in the temperature-sensitive additive to 0.3%-0.5% of the total mass of the sodium silicate-cement-based double-fluid slurry.

[0010] Optionally, the structural integrity and impermeability of the curtain body are tested and evaluated, and if they do not meet the requirements, supplementary grouting is carried out, including: based on the fusion technology of three-dimensional laser scanning and ultrasonic tomography, a three-dimensional detection of the surface and internal structure of the curtain body is carried out to generate a three-dimensional visualization model of the curtain body, and the anti-permeability performance of the curtain body is numerically simulated in combination with the drilling water pressure test data to determine whether it meets the design requirements; wherein, if it is assessed that the curtain body has loose structural areas or the permeability coefficient exceeds the standard, the cause of the defect is analyzed through the digital twin model, and a targeted supplementary grouting plan is formulated; during supplementary grouting, the proportion of the supplementary grouting grouting slurry and the grouting pressure are automatically adjusted according to the porosity and permeability data of the defective area, and nano-scale expansion filling materials are added to the supplementary grouting grouting slurry to enhance the density of the curtain body; after the supplementary grouting is completed, a re-inspection is carried out until the structural integrity and impermeability of the curtain body meet the standards.

[0011] Optionally, a geological model of the accumulation body is constructed according to the porosity, permeability and temperature change rate of the rock and soil, including: based on the Kriging interpolation method, spatially interpolating the porosity and permeability of the rock and soil to generate a porosity distribution field and a permeability distribution field; based on a geographic information system platform, in combination with topographic and geomorphic data, constructing a three-dimensional geological structure model of the canyon accumulation body; through indoor temperature control experiments, obtaining the porosity and permeability change rules of the rock and soil under different temperature conditions, and establishing a quantitative relationship model between temperature changes and the porosity and permeability of the rock and soil; embedding the quantitative relationship model into the three-dimensional geological structure model to construct a geological model of the accumulation body coupled with temperature-rock and soil characteristics; verifying the geological model of the accumulation body according to field monitoring data, comparing the differences between the rock and soil porosity, permeability and temperature distribution predicted by the model and the actual monitoring values, and determining and optimizing the model parameters.

[0012] The second aspect of the present invention provides a canyon deposit curtain grouting construction device capable of enhancing structural strength, comprising: an acquisition module for acquiring the rock and soil porosity, permeability and temperature change rate of the canyon deposit area; a construction module for constructing a deposit geological model according to the rock and soil porosity, permeability and temperature change rate, and determining grouting parameters based on the deposit geological model, wherein the grouting parameters include but are not limited to grouting pressure, slurry flow rate and slurry ratio; a processing module for drilling grouting holes according to the grouting parameters, injecting composite slurry into the grouting holes, monitoring and adjusting the grouting parameters in real time, and adjusting the slurry performance according to temperature changes, and after the grouting is completed, detecting and evaluating the structural integrity and impermeability of the curtain body, and performing supplementary grouting treatment if the requirements are not met.

[0013] Therefore, the present invention has at least the following beneficial effects: In the embodiments of the present invention, by obtaining core parameters such as the porosity, permeability, and temperature change rate of the rock and soil in the accumulation body, a geological model that conforms to the actual situation is constructed, providing a reliable basis for scientifically determining parameters such as grouting pressure, slurry flow rate, and ratio, and ensuring from the source that the grouting plan adapts to complex geological conditions. During grouting construction, by monitoring the grouting parameters in real time and dynamically adjusting them, and flexibly adapting the slurry performance according to the temperature change, an adaptive adjustment mechanism for the grouting process is formed to effectively cope with variable interferences during construction and ensure the stable and efficient progress of the grouting operation. After grouting is completed, a comprehensive inspection and evaluation of the integrity and impermeability of the curtain body structure is carried out. If the requirements are not met, supplementary grouting is immediately carried out to form a closed-loop control of grouting quality. With accurate geological modeling, dynamic parameter regulation, and closed-loop quality control, the integrity, impermeability of the curtain body structure, and the adaptability of grouting construction to complex conditions are significantly improved, the later repair cost and construction period are greatly reduced, and the safe, economic, and efficient construction of water conservancy and hydropower projects is effectively guaranteed. Thus, the problems in the prior art such as uneven strength of the grouting structure in a complex geological environment and the influence of temperature change conditions on the slurry performance are solved.

[0014] Additional aspects and advantages of the present invention will be given in part in the following description, become apparent in part from the following description, or be understood through the practice of the present invention. Brief Description of the Drawings

[0015] The above and / or additional aspects and advantages of the present invention will become apparent and be readily understood from the following description of the embodiments in conjunction with the drawings, where: Figure 1 It is a flowchart of a curtain grouting construction method for a canyon accumulation body that can enhance the structural strength according to an embodiment of the present invention; Figure 2 It is a flowchart of the preparation before construction according to an embodiment of the present invention; Figure 3 It is a schematic diagram of the porosity distribution in a canyon accumulation body according to an embodiment of the present invention; Figure 4 It is a flowchart of the grouting construction process according to an embodiment of the present invention; Figure 5 It is a flowchart of the inspection and supplementary grouting after construction according to an embodiment of the present invention; Figure 6 It is a block diagram example of a curtain grouting construction device for a canyon accumulation body that can enhance the structural strength according to an embodiment of the present invention. Detailed Embodiments

[0016] Embodiments of the present invention will be described in detail below. Examples of the embodiments are shown in the accompanying drawings, where the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the accompanying drawings are exemplary and are intended to explain the present invention, and should not be construed as a limitation of the present invention.

[0017] The following describes a curtain grouting construction method and device for canyon accumulation bodies that can enhance structural strength according to an embodiment of the present invention with reference to the accompanying drawings. Aiming at the problem of the lack of an adaptive adjustment mechanism mentioned in the above background technology, the present invention provides a curtain grouting construction method for canyon accumulation bodies that can enhance structural strength. In this method, by obtaining core parameters such as the porosity, permeability, and temperature change rate of the accumulation body rock and soil, a geological model that fits the actual situation is constructed, providing a reliable basis for scientifically determining parameters such as grouting pressure, slurry flow rate, and ratio, and ensuring that the grouting plan adapts to complex geological conditions from the source; during grouting construction, by real-time monitoring and dynamically adjusting grouting parameters, and flexibly adapting the slurry performance according to temperature changes, an adaptive adjustment mechanism for the grouting process is formed to effectively cope with variable interferences during construction and ensure the stable and efficient progress of grouting operations; after grouting is completed, a comprehensive inspection and evaluation of the integrity and impermeability of the curtain body structure is carried out. If the requirements are not met, supplementary grouting is immediately carried out to form a closed-loop control of grouting quality. With accurate geological modeling, dynamic parameter regulation, and closed-loop quality control, the integrity, impermeability of the curtain body structure, and the adaptability of grouting construction to complex conditions are significantly improved, greatly reducing the later repair cost and construction period, and effectively ensuring the safe, economic, and efficient construction of water conservancy and hydropower projects. Thus, the problems of uneven grouting structure strength and the influence of temperature change conditions on slurry performance in the prior art under complex geological environments are solved.

[0018] The following describes a curtain grouting construction method and device for canyon accumulation bodies that can enhance structural strength according to an embodiment of the present invention with reference to the accompanying drawings.

[0019] Specifically, Figure 1 is a schematic flow chart of a curtain grouting construction method for canyon accumulation bodies that can enhance structural strength provided by an embodiment of the present invention.

[0020] As Figure 1 shown, the curtain grouting construction method for canyon accumulation bodies that can enhance structural strength includes the following steps: In step S101, obtain the porosity, permeability, and temperature change rate of the rock and soil in the canyon accumulation body area.

[0021] Among them, the porosity of the rock and soil refers to the ratio of the pore volume in the rock and soil to the total volume of the rock and soil, the permeability refers to the ability of the rock and soil to allow fluids to pass through, and the temperature change rate refers to the amount of temperature change per unit time.

[0022] It can be understood that in the embodiments of the present invention, by obtaining the porosity, permeability and temperature change rate of the rock and soil in the canyon accumulation area, the geological characteristics of the accumulation body and the dynamic information of the environment are accurately grasped, which is convenient for subsequent grouting construction to accurately adapt to complex geological conditions.

[0023] In step S102, a geological model of the accumulation body is constructed based on the porosity, permeability and temperature change rate of the rock and soil, and grouting parameters are determined based on the geological model of the accumulation body.

[0024] Among them, the grouting parameters include but are not limited to grouting pressure, slurry flow rate and slurry ratio.

[0025] It can be understood that in the embodiments of the present invention, a geological model of the accumulation body is constructed with the porosity, permeability and temperature change rate of the rock and soil as the core data, and the grouting parameters are determined accordingly. The geological model accurately reproduces the coupling of the complex geological characteristics and dynamic environment of the accumulation body, breaking the ambiguity of traditional exploration; the grouting parameters are scientifically deduced based on the model, accurately adapting to different geological zones, avoiding the blindness of empirical decision-making, and ensuring the grouting quality from the source. Through accurate hole position planning, slurry volume estimation and resource overall planning, the construction cost and cycle are significantly compressed, and the resource utilization rate is greatly improved.

[0026] In the embodiments of the present invention, constructing a geological model of the accumulation body according to the porosity, permeability and temperature change rate of the rock and soil includes: based on the Kriging interpolation method, performing spatial interpolation processing on the porosity and permeability of the rock and soil to generate a porosity distribution field and a permeability distribution field; based on the geographic information system platform, combining topographic and geomorphic data to construct a three-dimensional geological structure model of the canyon accumulation body; through indoor temperature control experiments, obtaining the variation laws of the porosity and permeability of the rock and soil under different temperature conditions, and establishing a quantitative relationship model between temperature change and the porosity and permeability of the rock and soil; embedding the quantitative relationship model into the three-dimensional geological structure model to construct a temperature-rock and soil property coupling geological model of the accumulation body; verifying the geological model of the accumulation body according to the on-site monitoring data, comparing the differences between the predicted porosity, permeability and temperature distribution of the rock and soil in the model and the actual monitoring values, and determining and optimizing the model parameters.

[0027] It can be understood that in the embodiments of the present invention, the discrete sampling data of the porosity and permeability of the rock and soil are converted into a continuous spatial distribution field by the Kriging interpolation method, and a three-dimensional geological structure model is constructed by combining the geographic information system and topographic and geomorphic data to form a three-dimensional digital portrait, restoring the geological structure and rock and soil properties of the accumulation body; a quantitative relationship model between temperature and rock and soil parameters is established through indoor temperature control experiments, and it is embedded in the three-dimensional model to construct a temperature-rock and soil property coupling geological model, realizing the deep integration of environmental and geological factors. Based on this coupling model, predictions are carried out and optimized through on-site monitoring, significantly improving the accuracy of geological cognition and accurately depicting the dynamic characteristics of the geology; based on this, the grouting parameters and processes are optimized to improve the grouting uniformity and the quality of the curtain body, and reduce the construction cost.

[0028] Specifically, taking a canyon accumulation body area with a length of 500 meters and a width of 300 meters as an example, the process of constructing a geological model based on Kriging interpolation method is demonstrated. First, 15 sampling points are set at intervals of 100 meters × 100 meters to collect data on the porosity, permeability, and temperature of rock and soil; then, the data is processed using the Kriging interpolation algorithm of GIS software to generate the distribution fields of porosity and permeability; next, a three-dimensional geological structure model is constructed on the GIS platform in combination with topographic and geomorphic data; then, a quantitative relationship model between temperature and rock and soil properties is established through indoor temperature control experiments; after that, the quantitative relationship model is embedded into the three-dimensional geological structure model to form a coupled model; finally, 5 new monitoring points are selected to compare the measured and predicted data, and the model parameters are optimized to ensure the accuracy and reliability of the model, providing support for the curtain grouting construction.

[0029] In step S103, grouting holes are drilled according to the grouting parameters, the composite slurry is injected into the grouting holes, the grouting parameters are monitored and adjusted in real time, and at the same time, the performance of the slurry is adjusted according to the temperature change. After the grouting is completed, the structural integrity and impermeability of the curtain body are detected and evaluated. If the requirements are not met, supplementary grouting treatment is carried out.

[0030] Among them, the composite slurry is composed of sodium silicate-cement-based double-fluid slurry and a temperature-sensitive admixture.

[0031] It can be understood that the embodiments of the present invention rely on the pre-coupled geological model to accurately determine the grouting parameters, drill grouting holes accordingly and inject the composite slurry composed of sodium silicate-cement-based double-fluid slurry and a temperature-sensitive admixture. The performance of this composite slurry can be dynamically adapted to different geological conditions, achieving precise matching with the properties of rock and soil; during the grouting process, a dynamic feedback adjustment mechanism is constructed to monitor and adjust the grouting parameters in real time to cope with situations such as pressure fluctuations and uneven diffusion, and at the same time, the performance of the slurry is flexibly regulated according to the temperature change with the help of the temperature-sensitive admixture to ensure the stability and continuity of grouting; after the grouting is completed, the structural integrity and impermeability of the curtain body are detected and evaluated, and the defects are promptly supplemented and grouted to form a complete quality control system.

[0032] It should be noted that the sodium silicate-cement-based double-fluid slurry is formed by mixing a sodium silicate solution and a cement slurry at a volume ratio of 1:(1-2), the water-cement ratio is 0.5-0.8, and the addition amount of the temperature-sensitive admixture is 0.5%-2% of the total mass of the sodium silicate-cement-based double-fluid slurry.

[0033] Specifically, in most of the conventional areas of the accumulation body, since the properties of the rock and soil are relatively uniform, in order to balance the fluidity and setting strength of the slurry, a sodium silicate solution and a cement slurry are selected to be mixed at a volume ratio of 1:1.5, and the water-cement ratio is set to 0.7. At the same time, considering that the construction environment temperature is relatively stable (average temperature is about 20°C), the addition amount of the temperature-sensitive admixture is set to 1% of the total mass of the sodium silicate-cement-based double-fluid slurry, so that the slurry can stably set at the normal construction speed and meet the grouting requirements of the conventional area.

[0034] When encountering a high-porosity and high-permeability area with a porosity of 35% and a permeability of 0.15 cm / s, to enhance the filling and anti-loss ability of the slurry, the volume ratio of sodium silicate solution to cement slurry is adjusted to 1:1.2. A lower proportion of sodium silicate enables the cement slurry to play a stronger cementing role when filling pores. At the same time, the water-cement ratio is reduced to 0.6 to increase the slurry concentration. The addition amount of the temperature-sensitive admixture is increased to 1.5%, which can accelerate the setting speed while ensuring the fluidity of the slurry, prevent the slurry from excessive loss in the high-permeability area, and ensure the grouting effect in this area.

[0035] On the afternoon of the second day of construction, the ambient temperature rapidly rises from 20°C to 32°C within 2 hours. To prevent the slurry from setting too quickly due to high temperature, in addition to cooling the slurry, the ratio of sodium silicate-cement-based double-fluid slurry is adjusted. The volume ratio of sodium silicate solution to cement slurry is maintained at 1:1.5, but the water-cement ratio is slightly increased to 0.75 to increase the water content in the slurry and delay setting. The release system of the temperature-sensitive admixture reduces the release amount of the coagulation-promoting component from 1.2% to 0.4%, reduces the coagulation-promoting effect, and further delays the slurry setting time to ensure the smooth progress of grouting operations in high-temperature environments.

[0036] When performing supplementary grouting on areas with loose structure and excessive permeability coefficient, to enhance the density of the curtain body, the volume ratio of sodium silicate solution to cement slurry is adjusted to 1:1.8. Increasing the proportion of sodium silicate helps the slurry to better penetrate and diffuse; the water-cement ratio is set to 0.65 to ensure the slurry has an appropriate consistency. At the same time, a nano-scale expansion filling material accounting for 1.5% of the total mass of the double-fluid slurry is added, and the addition amount of the temperature-sensitive admixture is maintained at 1.2% to ensure that the supplementary grouting slurry can fully fill the defect area and improve the structural integrity and impermeability of the curtain body.

[0037] In the embodiment of the present invention, injecting the composite slurry into the grouting hole includes: monitoring the porosity, permeability, and temperature change rate of the rock and soil, and automatically adjusting the nozzle diameter and slurry flow rate; wherein, when the porosity of the rock and soil is greater than the first preset porosity, the nozzle diameter is increased and the slurry flow rate is appropriately increased, when the porosity of the rock and soil is less than the second preset porosity, the nozzle diameter is decreased and the slurry flow rate is decreased; when the permeability is greater than the first preset permeability, the nozzle diameter is increased, the injection amount of the slurry is increased, and at the same time the viscosity of the slurry is increased, when the permeability is less than the second preset permeability, the nozzle diameter is decreased, and the injection pressure of the slurry is increased.

[0038] It can be understood that in the embodiments of the present invention, by real-time monitoring the porosity, permeability and temperature change rate of rock and soil, an intelligent adjustment system based on dynamic feedback of geological parameters is constructed. According to the porosity and permeability thresholds, the nozzle diameter, slurry flow rate (and viscosity, injection pressure) are automatically adjusted to accurately adapt to complex geological characteristics. It can not only flexibly expand the nozzle, accelerate the slurry diffusion and optimize the slurry state according to the characteristics of high porosity / high permeability to quickly fill the pores of rock and soil, but also reduce the nozzle and pressurize the grouting to ensure effective penetration for low porosity / low permeability areas, realizing the dynamic matching of grouting parameters and geological conditions.

[0039] Specifically, in a curtain grouting project of a certain canyon accumulation body in the southwest, the construction team obtained the porosity and permeability data of rock and soil through a real-time monitoring system. When the porosity is greater than 30%, the nozzle diameter is increased and the slurry flow rate is increased; when it is less than 20%, the nozzle diameter is reduced and the flow rate is decreased. For the permeability, when it is greater than 0.10 cm / s, the nozzle is expanded, the injection volume and viscosity are increased; when it is less than 0.06 cm / s, the nozzle is reduced and the injection pressure is increased. By dynamically adjusting the parameters through the intelligent adjustment system, the construction efficiency is increased by 20%, the material waste is reduced by 15%, and the anti-seepage performance of the curtain body is improved by 30%.

[0040] In the embodiments of the present invention, the slurry performance is adjusted according to the temperature change, including: when the detected temperature change rate exceeds the preset threshold, a hierarchical compensation mechanism is triggered, where the hierarchical compensation mechanism includes: when a rapid temperature drop is detected, the heating wire set on the grouting pipeline is started to quickly preheat the grouting pipeline and the internal slurry, and the release amount of the coagulation-promoting component in the temperature-sensitive admixture is increased to 1%-1.5% of the total mass of the sodium silicate-cement-based double-fluid slurry; when a rapid temperature rise is detected, the slurry is cooled, and the release amount of the coagulation-promoting component in the temperature-sensitive admixture is reduced to 0.3%-0.5% of the total mass of the sodium silicate-cement-based double-fluid slurry.

[0041] Among them, the preset threshold can be specifically calibrated according to the actual situation, such as 2 °C / h and the temperature is lower than 5 °C, etc.

[0042] It is understandable that the embodiment of the present invention constructs a closed-loop system for dynamic temperature compensation, and triggers a graded response mechanism by real-time monitoring of the temperature change rate: when the temperature drops rapidly, the grouting pipeline heating wire is automatically started to preheat the slurry, and the temperature-sensitive admixture coagulation-promoting component is increased to 1%-1.5% of the total mass of the sodium silicate-cement-based dual-liquid slurry, accelerating the coagulation of the slurry to adapt to the low temperature environment; when the temperature rises rapidly, the slurry is cooled and the coagulation-promoting component is reduced to 0.3%-0.5%, delaying the curing process. The system realizes the dynamic adaptation of the slurry coagulation performance and the construction temperature through a dual control path, which not only ensures the fluidity and stability of the slurry under extreme temperature differences through pipeline temperature control, but also relies on the admixture to adjust and accurately control the coagulation time, effectively avoiding the grouting defects caused by temperature mutations, significantly improving the density and anti-seepage performance of the curtain body, and reducing the rework cost and resource waste, providing an intelligent and precise technical solution for grouting construction in complex geological environments.

[0043] Specifically, in the curtain grouting construction of a canyon water conservancy project, the preset threshold of the temperature change rate was set at 5°C per hour. When the temperature was monitored to drop from 15°C to 8°C (change rate 7°C / h) within 1 hour, the mechanism was triggered, the heating wire preheated the slurry and increased the release of the accelerating component of the temperature-sensitive admixture from 1% to 1.3%, shortening the initial setting time; when the temperature rose from 28°C to 35°C (change rate 7°C / h) within 1 hour, the cooling device cooled the slurry, and the release of the accelerating component dropped from 1.2% to 0.4%, extending the initial setting time. Finally, the integrity and impermeability of the curtain structure in the grouting area after compensation met the standards, ensuring the construction quality.

[0044] In an embodiment of the present invention, the structural integrity and impermeability of the curtain body are detected and evaluated, and if they do not meet the requirements, supplementary grouting is carried out, including: based on the fusion technology of three-dimensional laser scanning and ultrasonic tomography, the surface and internal structure of the curtain body are three-dimensionally detected, and a three-dimensional visualization model of the curtain body is generated; in combination with the drilling water pressure test data, the impermeability performance of the curtain body is numerically simulated to determine whether it meets the design requirements; wherein, if it is evaluated that the curtain body has loose structural areas or the permeability coefficient exceeds the standard, the cause of the defect is analyzed through the digital twin model, and a supplementary grouting plan is formulated in a targeted manner; during supplementary grouting, the proportion of the supplementary grouting grouting slurry and the grouting pressure are automatically adjusted according to the porosity and permeability data of the defective area, and nano-scale expansion filling materials are added to the supplementary grouting grouting slurry to enhance the density of the curtain body; after the supplementary grouting is completed, a re-inspection is carried out until the structural integrity and impermeability of the curtain body meet the standards.

[0045] It is understandable that the embodiments of the present invention integrate 3D laser scanning and ultrasonic tomography technologies to construct a surface-internal three-dimensional detection network for the curtain body, generate a high-precision 3D visualization model, carry out numerical simulation of anti-seepage performance in combination with the data of the water pressure test in boreholes, and achieve precise quantitative evaluation of the location, scale and cause of defects; rely on the digital twin model to trace the defect formation mechanism, dynamically formulate the supplementary grouting plan, automatically adjust the slurry ratio and grouting pressure based on the porosity and permeability parameters of the defect area, introduce nano-level expansion filling materials to improve the dense filling efficiency of the supplementary grouting slurry, form an integrated intelligent control system, effectively improve the defect detection rate to the millimeter level accuracy, reduce the loss of supplementary grouting materials by more than 30%, optimize the permeability coefficient of the curtain body by more than 20% compared with the design standard, and significantly enhance the durability of the anti-seepage barrier.

[0046] The curtain grouting construction method for canyon accumulation bodies that can enhance the structural strength proposed according to the embodiments of the present invention obtains core parameters such as the porosity, permeability and temperature change rate of the accumulation body rock and soil, and constructs a geological model that fits the actual situation based on this, providing a reliable basis for scientifically determining parameters such as grouting pressure, slurry flow rate and ratio, and ensuring that the grouting plan adapts to complex geological conditions from the source; during grouting construction, by monitoring the grouting parameters in real time and dynamically adjusting them, and flexibly adapting the slurry performance according to the temperature change, an adaptive adjustment mechanism for the grouting process is formed, effectively coping with variable interference during construction, and ensuring the stable and efficient progress of grouting operations; after grouting is completed, a comprehensive inspection and evaluation of the structural integrity and anti-seepage performance of the curtain body is carried out. If the requirements are not met, supplementary grouting is carried out immediately to form a closed-loop control of grouting quality. With precise geological modeling, dynamic parameter regulation and closed-loop quality control, the structural integrity, anti-seepage performance of the curtain body and the adaptability of grouting construction to complex conditions are significantly improved, the later repair cost and construction period are greatly reduced, and the safety, economy and high efficiency of water conservancy and hydropower projects are effectively guaranteed. Thus, the problems in the prior art such as uneven grouting structure strength under complex geological environments and the influence of temperature change conditions on slurry performance are solved.

[0047] The curtain grouting construction method for canyon accumulation bodies that can enhance the structural strength will be elaborated through a specific embodiment below. In a large-scale water conservancy project in the southwestern region, it is necessary to carry out curtain grouting construction in a canyon accumulation body area with a length of 800 meters and a width of 400 meters. The work is carried out according to the curtain grouting construction method for canyon accumulation bodies that can enhance the structural strength proposed by the present invention: As Figure 2 shown, preparation before construction Data collection: As Figure 3 shown, the construction team arranged 50 sampling points in the canyon accumulation body area at a grid spacing of 80 meters × 80 meters. Using professional drilling equipment and sensors, the rock and soil porosity (range 18%-38%), permeability (0.03-0.18 cm / s) and temperature change data (5-35 °C) of each sampling point were obtained. Constructing a geological model: Based on the Kriging interpolation method, spatial interpolation is performed on the collected porosity and permeability data to generate detailed porosity distribution fields and permeability distribution fields. With the help of a geographic information system platform and combined with the high-precision topographic and geomorphic data of the region, a three-dimensional geological structure model is constructed. Subsequently, in the laboratory, a temperature-controlled environment of 5 - 35°C is simulated, and temperature-controlled tests are conducted on representative geotechnical samples in the region to establish a quantitative relationship model between temperature changes and the porosity and permeability of geotechnical materials, and it is embedded into the three-dimensional geological structure model to obtain a geological model of the accumulation body with temperature-geotechnical property coupling. Finally, the model is verified and optimized through on-site data from 10 newly added monitoring points to ensure the prediction accuracy of the model. Determining grouting parameters: Based on the constructed geological model, the grouting pressure range is determined to be 1.2 - 1.8 MPa, and the slurry flow rate is 18 - 28 L / min. At the same time, for different geological regions, the ratio of sodium silicate-cement-based double-fluid slurry is preset: in the conventional region, the volume ratio of sodium silicate solution to cement slurry is 1:1.6, and the water-cement ratio is 0.7; in the high-permeability region, the volume ratio is 1:1.3, and the water-cement ratio is 0.65; the addition amount of the temperature-sensitive admixture is 1.2% of the total mass of the double-fluid slurry at normal temperature. As Figure 4 shown, the grouting construction process Drilling and grouting: After drilling grouting holes with a diameter of 90 mm according to the design requirements, the composite slurry is injected. During the construction process, the real-time monitoring system continuously monitors the geotechnical parameters and temperature changes. When constructing in a certain high-permeability region (porosity 32%, permeability 0.15 cm / s), the system automatically expands the nozzle diameter from 22 mm to 28 mm, increases the slurry flow rate from 20 L / min to 26 L / min, and increases the slurry viscosity from 16 s to 23 s by adding a thickening agent, effectively preventing slurry loss and ensuring the filling effect. Temperature adaptability adjustment: On the evening of the third day of construction, the temperature sensor detected that the temperature dropped from 28°C to 15°C within 1.5 hours, with a change rate of 8.7°C / h, exceeding the preset threshold of 5°C / h. At this time, the hierarchical compensation mechanism is activated, and the heating wire on the grouting pipeline quickly heats up to maintain the slurry temperature at about 20°C; the release amount of the coagulation-promoting component of the temperature-sensitive admixture increases from 1.2% to 1.4%, shortening the initial setting time of the slurry from 2 hours to 1.6 hours, ensuring the normal progress of grouting construction in a low-temperature environment. As Figure 5 shown, post-construction inspection and supplementary grouting Quality inspection: 72 hours after grouting is completed, a comprehensive inspection of the curtain body is carried out using a fusion technology of three-dimensional laser scanning and ultrasonic tomography. It is found through scanning that there is a problem of loose structure in an area near the fracture zone with a volume of about 8 cubic meters. The permeability coefficient of this area is 0.045 cm / s as shown by the drilling water pressure test, exceeding the design requirement of 0.025 cm / s. Supplementary grouting treatment: Through the analysis of the digital twin model, it is determined that the defect is caused by the too high permeability of this area and the insufficient first grouting pressure. The construction team formulates a supplementary grouting plan: adjust the volume ratio of sodium silicate solution to cement slurry to 1:1.8, set the water-cement ratio to 0.62, add nano-scale expansion filling materials accounting for 1.6% of the total mass of the double-fluid slurry, and increase the grouting pressure to 2.0 MPa. After the supplementary grouting is completed, the re-detection shows that the permeability coefficient of this area drops to 0.018 cm / s, the problem of loose structure is completely solved, and the overall quality of the curtain body meets the design standards. In summary, by adopting the curtain grouting construction method for canyon accumulation bodies that can enhance the structural strength, the curtain grouting construction period of this water conservancy project is shortened by 20% compared with the traditional method, the material waste is reduced by 18%, and the anti-seepage performance and structural strength of the curtain body are significantly improved, effectively ensuring the safety and durability of the project.

[0048] Secondly, the curtain grouting construction device for canyon accumulation bodies that can enhance the structural strength according to the embodiments of the present invention is described with reference to the accompanying drawings.

[0049] Figure 6 It is a block diagram of the curtain grouting construction device for canyon accumulation bodies that can enhance the structural strength according to the embodiments of the present invention.

[0050] As Figure 6 shown, the curtain grouting construction device 10 for canyon accumulation bodies that can enhance the structural strength includes: an acquisition module 100, a construction module 200, and a processing module 300.

[0051] Among them, the acquisition module 100 is used to acquire the porosity, permeability, and temperature change rate of the rock and soil in the canyon accumulation body area; the construction module 200 is used to construct a geological model of the accumulation body according to the porosity, permeability, and temperature change rate of the rock and soil, and determine the grouting parameters based on the geological model of the accumulation body, where the grouting parameters include but are not limited to grouting pressure, slurry flow rate, and slurry ratio; the processing module 300 is used to drill grouting holes according to the grouting parameters, inject the composite slurry into the grouting holes, monitor and adjust the grouting parameters in real time, and adjust the slurry performance according to the temperature change. After the grouting is completed, the structural integrity and anti-seepage performance of the curtain body are detected and evaluated, and if they do not meet the requirements, supplementary grouting treatment is carried out.

[0052] It should be noted that the foregoing explanations of the embodiments of the curtain grouting construction method for canyon accumulation bodies that can enhance the structural strength also apply to the curtain grouting construction device for canyon accumulation bodies that can enhance the structural strength in this embodiment, and will not be repeated here.

[0053] The curtain grouting construction device for canyon accumulation body capable of enhancing structural strength proposed according to the embodiments of the present invention obtains core parameters such as the porosity, permeability, and temperature change rate of the accumulation body rock and soil, and constructs a geological model that fits the actual situation, providing a reliable basis for scientifically determining parameters such as grouting pressure, slurry flow rate, and ratio, and ensuring that the grouting plan adapts to complex geological conditions from the source; during grouting construction, by real-time monitoring the dynamic adjustment of grouting parameters and flexibly adapting the slurry performance according to temperature changes, an adaptive adjustment mechanism for the grouting process is formed to effectively cope with variable interference during construction and ensure the stable and efficient progress of grouting operations; after grouting is completed, a comprehensive inspection and evaluation of the integrity and impermeability of the curtain body structure is carried out. If the requirements are not met, supplementary grouting is immediately carried out to form a closed-loop control of grouting quality. With precise geological modeling, dynamic parameter regulation, and quality closed-loop control, the integrity, impermeability of the curtain body structure, and the adaptability of grouting construction to complex conditions are significantly improved, the later repair cost and construction period are greatly reduced, and the safe, economic, and efficient construction of water conservancy and hydropower projects is effectively guaranteed. Thus, the problems of uneven grouting structure strength and the influence of temperature change conditions on slurry performance in the prior art under complex geological environments are solved.

[0054] In the description of this specification, the description referring to terms such as "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described can be combined in a suitable manner in any one or N embodiments or examples. In addition, without contradiction, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples.

[0055] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the quantity of the indicated technical features. Thus, the features defined with "first" and "second" can explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "N" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0056] Any process or method description depicted in the flowchart or otherwise described herein can be understood to represent a module, segment, or portion of code including one or N executable instructions for implementing a customized logical function or process. The scope of the preferred embodiments of the present invention includes additional implementations, where functions may be performed in a substantially simultaneous manner or in a reverse order according to the functions involved, rather than in the order shown or discussed, which should be understood by those skilled in the art to which the embodiments of the present invention pertain.

[0057] It should be understood that various parts of the present invention can be implemented by hardware, software, firmware, or a combination thereof. In the above embodiments, the N steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, any one or a combination of the following techniques well known in the art can be used: discrete logic circuits having logic gate circuits for implementing logical functions on data signals, application specific integrated circuits having appropriate combinational logic gate circuits, programmable gate arrays (PGAs), field programmable gate arrays (FPGAs), and the like.

[0058] Those of ordinary skill in the art of the present technology can understand that all or part of the steps carried out in implementing the above-described embodiment methods can be completed by instructing relevant hardware through a program. The said program can be stored in a computer-readable storage medium, and when executed, includes one or a combination of the steps of the method embodiments.

Claims

1. A construction method for curtain grouting of canyon accumulation bodies that can enhance structural strength, characterized in that, The method includes the following steps: Obtain the rock and soil porosity, permeability, and temperature change rate in the canyon accumulation area; Construct an accumulation body geological model based on the rock and soil porosity, permeability, and temperature change rate, and determine grouting parameters based on the accumulation body geological model, where the grouting parameters include, but are not limited to, grouting pressure, slurry flow rate, and slurry ratio; Drill grouting holes according to the grouting parameters, inject composite slurry into the grouting holes, monitor and adjust the grouting parameters in real time, and adjust the slurry performance according to the temperature change. After grouting is completed, detect and evaluate the structural integrity and impermeability of the curtain body. If the requirements are not met, perform supplementary grouting treatment.

2. The construction method for curtain grouting of canyon accumulation bodies that can enhance structural strength according to claim 1, characterized in that, Injecting the composite slurry into the grouting holes includes: Monitoring the rock and soil porosity, permeability, and temperature change rate, and automatically adjusting the nozzle diameter and slurry flow rate; where When the rock and soil porosity is greater than the first preset porosity, increase the nozzle diameter and appropriately increase the slurry flow rate. When the rock and soil porosity is less than the second preset porosity, decrease the nozzle diameter and reduce the slurry flow rate. When the permeability is greater than the first preset permeability, increase the nozzle diameter, increase the injection volume of the slurry, and increase the viscosity of the slurry at the same time. When the permeability is less than the second preset permeability, decrease the nozzle diameter and increase the injection pressure of the slurry.

3. The construction method for curtain grouting of canyon accumulation bodies that can enhance structural strength according to claim 1, characterized in that, The composite slurry is composed of sodium silicate-cement-based double-fluid slurry and temperature-sensitive admixture.

4. The construction method for curtain grouting of canyon accumulation bodies that can enhance structural strength according to claim 3, characterized in that, The sodium silicate-cement-based double-fluid slurry is formed by mixing sodium silicate solution and cement slurry in a volume ratio of 1:(1-2), with a water-cement ratio of 0.5-0.8, and the addition amount of the temperature-sensitive admixture is 0.5%-2% of the total mass of the sodium silicate-cement-based double-fluid slurry.

5. The construction method for curtain grouting of canyon accumulation bodies that can enhance structural strength according to claim 1, characterized in that, Adjusting the slurry performance according to the temperature change includes: When it is detected that the temperature change rate exceeds the preset threshold, trigger a hierarchical compensation mechanism, where the hierarchical compensation mechanism includes: When it is detected that the temperature drops rapidly, start the heating wire set on the grouting pipeline to quickly preheat the grouting pipeline and the internal slurry, and increase the release amount of the coagulation-promoting component in the temperature-sensitive admixture to 1%-1.5% of the total mass of the sodium silicate-cement-based double-fluid slurry; When it is detected that the temperature rises rapidly, cool down the slurry, and reduce the release amount of the coagulation-promoting component in the temperature-sensitive admixture to 0.3%-0.5% of the total mass of the sodium silicate-cement-based double-fluid slurry.

6. The construction method for curtain grouting of canyon accumulation bodies that can enhance structural strength according to claim 1, characterized in that, Detecting and evaluating the structural integrity and impermeability of the curtain body. If the requirements are not met, perform supplementary grouting treatment, including: Based on the fusion technology of three-dimensional laser scanning and ultrasonic tomography, perform three-dimensional detection on the surface and internal structure of the curtain body to generate a three-dimensional visualization model of the curtain body, and combine the data of the pumping water test in the borehole to perform numerical simulation on the impermeability performance of the curtain body to judge whether it meets the design requirements; where If it is evaluated that there are loose structural areas or excessive permeability coefficients in the curtain body, analyze the causes of defects through a digital twin model, and formulate a targeted supplementary grouting plan; during supplementary grouting, automatically adjust the ratio and grouting pressure of the supplementary grouting slurry according to the porosity and permeability data of the defect area, and add nano-scale expansion filling materials to the supplementary grouting slurry to enhance the density of the curtain body; after supplementary grouting is completed, perform a re-inspection until the structural integrity and impermeability of the curtain body meet the standards.

7. The construction method for curtain grouting of canyon accumulation bodies that can enhance structural strength according to claim 1, characterized in that, Construct a geological model of the accumulation body based on the porosity, permeability, and temperature change rate of the rock and soil, including: Based on the Kriging interpolation method, perform spatial interpolation processing on the porosity and permeability of the rock and soil to generate a porosity distribution field and a permeability distribution field; based on the geographic information system platform, combine topographic and geomorphic data to construct a three-dimensional geological structure model of the canyon accumulation body; Through indoor temperature control experiments, obtain the variation laws of the porosity and permeability of the rock and soil under different temperature conditions, and establish a quantitative relationship model between temperature change and the porosity and permeability of the rock and soil; embed the quantitative relationship model into the three-dimensional geological structure model to construct a geological model of the accumulation body coupled with temperature-rock and soil characteristics; Verify the geological model of the accumulation body according to the on-site monitoring data, compare the differences between the predicted porosity, permeability, and temperature distribution of the rock and soil in the model and the actual monitoring values, and determine and optimize the model parameters.

8. A construction device for curtain grouting of canyon accumulation bodies that can enhance structural strength, characterized in that, Including: An acquisition module for acquiring the porosity, permeability, and temperature change rate of the rock and soil in the canyon accumulation body area; A construction module for constructing a geological model of the accumulation body according to the porosity, permeability, and temperature change rate of the rock and soil, and determining grouting parameters based on the geological model of the accumulation body, where the grouting parameters include but are not limited to grouting pressure, slurry flow rate, and slurry ratio; A processing module for drilling grouting holes according to the grouting parameters, injecting composite slurry into the grouting holes, monitoring and adjusting the grouting parameters in real time, and adjusting the slurry performance according to the temperature change. After grouting is completed, detect and evaluate the structural integrity and impermeability of the curtain body, and perform supplementary grouting treatment if the requirements are not met.

Citation Information

Patent Citations

  • Dam grouting construction analysis and control method based on 3D (three-dimensional) geological model and real-time monitoring

    CN103866769A

  • Diffusion frontal surface curtain grouting numerical simulation method based on cement slurry thixotropy and VOF calculation

    CN106446439A

  • Grouting area fine three-dimensional geologic model modeling method based on multi-source data fusion

    CN117475096A

  • Underground limited space basin type grouting waterproof curtain construction method

    CN119177677A

  • Intelligent monitoring method for displacement of rainfall flood resource retaining structure

    CN119991672A