Support device for mass concrete construction in winter and construction method thereof

Through the multi-layer steel pipe support integrating foundation steel bars, insulation sheds and circulating water pipe support, the complex problem of traditional steel stirrup layout is solved, and construction simplification and quality improvement are achieved.

CN120291614APending Publication Date: 2025-07-11CHINA MCC22 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510566481.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-30
Publication Date
2025-07-11

AI Technical Summary

Technical Problem

In traditional winter large-volume concrete construction, the layout of steel stirrups is complex, the material and labor costs are high, and the three systems are easy to interfere, affecting the construction progress and quality.

Method used

A multi-layer steel pipe support structure is adopted, integrating foundation steel bars, insulation shed support and circulating water pipe support to form a stable support system, simplifying the construction process and reducing material and labor costs.

Benefits of technology

Significantly reduce construction complexity and cost, improve the accuracy of steel bar positioning, and improve the quality and durability of concrete structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120291614A_ABST
    Figure CN120291614A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to a bracket device for mass concrete construction in winter and a construction method thereof, and the bracket device comprises a bracket whole body, a heat preservation shed, a circulating water pump and a circulating water tank; the whole support comprises multiple layers of steel pipe supports arranged from top to bottom, the multiple layers of steel pipe supports are communicated to form a circulating waterway, one end of the circulating waterway serves as a water inlet end and is connected with a circulating water tank through a circulating water pump, and the other end of the circulating waterway serves as a water return end and is connected with the circulating water tank. Foundation steel bars are arranged above the steel pipes on the top layer, and a heat preservation shed is arranged outside the steel pipe support. The steel pipe supports are used for replacing steel bar stirrups to support the foundation steel bars and the heat preservation shed frame body and also serve as circulating water ways, all supporting systems on a construction site are effectively simplified, and the construction complexity and the workload are greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and more specifically, to a support device for mass concrete in winter construction and its construction method. Background Art

[0002] When carrying out engineering construction in the northern regions of our country, due to tight construction periods, winter construction is often inevitable. When pouring mass concrete in winter, it is necessary to control the temperature drop inside the concrete through methods such as cooling water circulation, and at the same time, it is necessary to carry out comprehensive thermal insulation protection treatment on the concrete pouring site to ensure that the concrete completes strength growth under suitable temperature and humidity conditions.

[0003] In the traditional process of mass concrete construction in winter, it is necessary to separately arrange steel stirrups in three systems. The steel stirrups are respectively used for the support of the foundation steel bars, the erection of the thermal insulation shed support, and the support of the cooling water circulation water pipes. The steel stirrups in the three systems should avoid arc interference; and when the steel stirrups are used for erecting the thermal insulation shed support and the circulation water pipe support, due to the limited bearing capacity of the steel stirrups, it is necessary to set support rods at intervals in the main steel bar mesh of the building structure to support the steel stirrups and prevent the steel stirrups from collapsing due to insufficient bearing capacity when supporting the circulation water pipes and the thermal insulation shed frame.

[0004] The above method requires a large amount of manual laying of steel stirrups and steel support materials, resulting in relatively high material costs, labor costs, and time costs. Moreover, in order to avoid interference between the three systems during construction, it is necessary for construction workers to accurately arrange and fix the construction site, increasing the workload and complexity of the construction and affecting the normal progress of the construction. Summary of the Invention

[0005] Aiming at the deficiencies of the prior art, the purpose of the present invention is to provide a support device for mass concrete in winter construction and its construction method. The present invention utilizes a multi-layer steel pipe support structure that integrates the laying of foundation steel bars, the erection of the thermal insulation shed support, and the support of the circulation water pipes, achieving the effects of simplifying the construction content, reducing the construction difficulty, and saving labor, materials, and time costs.

[0006] The technical solution adopted by the present invention to solve its technical problems is: A support device for mass concrete in winter construction includes an overall support, and also includes a thermal insulation shed, a circulation water pump, and a circulation water tank; the overall support includes multiple layers of steel pipe supports arranged from top to bottom, and a circulation water path is formed by connecting between the multiple layers of steel pipe supports. One end of the circulation water path is used as the water inlet end and is connected to the circulation water tank through the circulation water pump, and the other end of the circulation water path is used as the water return end and is connected to the circulation water tank; foundation steel bars are arranged above the top layer of steel pipes, and a thermal insulation shed is arranged outside the steel pipe support.

[0007] Compared with the prior art, the beneficial effects of the present invention are as follows: In the present invention, a steel pipe support is erected to replace the steel bar stirrup to support the foundation steel bars, the heat preservation shed body, and also serve as a circulating water path, effectively simplifying the layout and fixing processes of each support system, heat preservation system, and cooling system at the construction site, greatly reducing the construction complexity and workload, significantly reducing the material input such as steel bar stirrups and support rods, reducing the labor installation cost and laying time, and effectively ensuring the construction progress.

[0008] Compared with the traditional steel bar stirrup, the steel pipe support has better stability, can provide reliable support for the foundation steel bars, effectively avoid the displacement of steel bars during the concrete pouring process, ensure the accurate positioning of steel bars from the source, and then significantly improve the construction quality and durability of the concrete structure, and improve the quality of the concrete structure.

[0009] As a preference, a further technical solution of the present invention is as follows: Preferably, each layer of the steel pipe support includes a side frame and an internal support frame, and the side frame is connected to the internal support frame; the side frames are connected to form a whole through the columns arranged at intervals; the internal support frames are also connected to form a whole through the columns arranged at intervals.

[0010] Preferably, each layer of the internal support frame respectively includes an inclined support steel pipe, a diagonal support steel pipe, and a middle support steel pipe. An inclined support steel pipe is arranged between the midpoints of any two adjacent sides of the side frame, a middle support steel pipe is arranged between the midpoints of any two opposite sides of the side frame, and the middle support steel pipe is connected to the inclined support steel pipes on both sides through a connecting pipe; a diagonal support steel pipe is arranged between any two opposite vertices of the side frame, and the diagonal support steel pipe is respectively connected to the side frame through a connecting pipe.

[0011] Preferably, the middle support steel pipes and the inclined support steel pipes of all layers are connected through connecting pipes, and the diagonal support steel pipes of all layers are connected to the ends of the side frames through connecting pipes.

[0012] Preferably, a heat preservation shed body is erected above the upper end of the column on the foundation steel bars.

[0013] Preferably, a heat preservation shed is installed above the heat preservation shed body.

[0014] The present invention also discloses a construction method of a support device for mass concrete in winter construction, which is applied to the support device for mass concrete in winter construction described in any one of claims 1 to 6. The specific steps are as follows: S1. Determine the height of the uppermost layer of the steel pipe support according to the height of the foundation steel bars in the building structure; S2. Erect the steel pipe support from bottom to top, and connect and fix all the steel pipe supports through columns. S3. Use a connecting pipe to connect all steel pipe supports to form a circulating water path. Reserve a water inlet on the bottommost steel pipe support and a water return port on the topmost steel pipe support. S4. Erect basic steel bars above the topmost steel pipe support. S5. Use the upper end of the column to erect a heat preservation shed framework above the basic steel bars. S6. Install a gangplank on the heat preservation shed framework. S7. Install a heat preservation shed on the gangplank. S8. Install a circulating water tank on one side of the heat preservation shed. Connect the water outlet of the circulating water tank to the reserved water inlet on the steel pipe support through a circulating water pump; connect the water outlet of the circulating water tank to the reserved water return port on the steel pipe support. S9. Fill the circulating water tank with water. Under the operation of the circulating water pump, the water flows along the circulating water path to cool the concrete.

[0015] The present invention adopting the above technical solution, compared with the prior art, its prominent feature is: The present invention uses a multi-layer steel pipe support structure that integrates the laying of basic steel bars, the erection of a heat preservation shed support, and the support of circulating water pipes, simplifies the construction content, reduces the construction difficulty, and saves labor, materials, and time costs. Description of the Drawings

[0016] Figure 1 It is a schematic structural diagram of the present invention. In this figure, in order to see the internal structure of the heat preservation shed clearly, only a part of the heat preservation shed is shown; Figure 2 It is a schematic structural diagram of the steel pipe support of the present invention; Figure 3 It is a schematic structural diagram of the basic steel bars laid on the steel pipe support and the heat preservation shed framework in the present invention; Figure 4 It is a schematic structural diagram of the batten erected on the heat preservation shed framework in the present invention; Figure 5 It is Figure 4 a partial enlarged view of; Description of the reference numerals: 1. Overall support; 11. Side frame; 12. Diagonal support steel pipe; 13. Cross diagonal support steel pipe; 14. Middle support steel pipe; 2. Heat preservation shed; 3. Connecting pipe; 4. Circulating water tank; 5. Column; 6. Basic steel bars; 7. Heat preservation shed framework; 8. Gangplank. Detailed Embodiment

[0017] The following combines specific embodiments to further elaborate the present invention. The purpose is only to better understand the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

[0018] A support device for mass concrete construction in winter is composed of an overall support 1, a heat preservation shed 2, a circulating water pump, and a circulating water tank 4.

[0019] The overall support 1 is composed of multiple layers of steel pipe supports arranged from top to bottom. In this embodiment, there are three layers of steel pipe supports, namely the upper, middle, and lower layers. Each layer of steel pipe support is respectively composed of a side frame 11 and an internal support frame. The internal support frame is placed inside the side frame 11. The internal support frame is composed of diagonal support steel pipes 12, cross diagonal support steel pipes 13, and middle support steel pipes 14. Specifically, a diagonal support steel pipe 12 is arranged between the midpoints of any two adjacent sides of the side frame 11. The four diagonal support steel pipes 12 inside the side frame 11 form a parallelogram structure (or rhombus); a middle support steel pipe 14 is arranged between the midpoints of any two opposite sides of the side frame 11. The two middle support steel pipes 14 are vertically placed inside the side frame 11, and the ends of each middle support steel pipe 14 are respectively arranged in a crisscross pattern and connected with the two diagonal support steel pipes 12 at their respective ends. And the three connected nodes at the same position (that is, the end of each middle support steel pipe 14 and the two diagonal support steel pipes 12 at their respective ends form a node) are connected through a connecting pipe 3. A cross diagonal support steel pipe 13 is arranged between any two opposite vertices of the side frame 11. The two cross diagonal support steel pipes 13 are arranged in a crisscross pattern, and the two ends of each cross diagonal support steel pipe 13 respectively form a node with the end of the side frame 11 at their respective ends. The three nodes at the same position are connected through a connecting pipe 3.

[0020] The three - layer side frames 11, the three - layer diagonal support steel pipes 12, the three - layer middle support steel pipes 14, and the three - layer cross diagonal support steel pipes 13 are all connected through the columns 5 arranged at intervals.

[0021] After the above - mentioned structure is connected, a circulating water path is formed inside the steel pipe support. An inlet of the circulating water path is reserved on the lower - layer steel pipe support. The circulating water path is connected to one end of the circulating water pump through the inlet, and the other end of the circulating water pump is connected to the circulating water tank 4; a return port of the circulating water path is reserved on the upper - layer steel pipe support. The circulating water path is connected to the circulating water tank 4 through the return port.

[0022] The top of the upper - layer steel pipe support is paved with basic steel bars 6. The top of the column 5 is used to build the frame of the heat preservation shed 2 above the basic steel bars 6, and then the top of the heat preservation shed 2 is connected to the frame of the heat preservation shed 2. The side part of the heat preservation shed 2 surrounds the side part of the overall support 1 to insulate its interior.

[0023] Based on the above structure, the construction method of the support device for mass concrete construction in winter is as follows: S1. Determine the height of the top - most layer of steel pipe support according to the height of the basic steel bars 6 in the building structure.

[0024] S2. Erect the steel pipe support from bottom to top, and connect and fix the three-layer steel pipe support through the column 5.

[0025] S3. Connect the three-layer steel pipe supports with the connecting pipe 3 to form a circulating water path by connecting all the steel pipe supports. Reserve a water inlet on the bottommost steel pipe support and a water return port on the topmost steel pipe support.

[0026] S4. Erect the basic steel bars 6 above the topmost steel pipe support.

[0027] S5. Use the upper end of the column 5 to erect the frame of the heat preservation shed 2 above the basic steel bars 6.

[0028] S6. Install the gangplank 8 on the frame of the heat preservation shed 2.

[0029] S7. Install the heat preservation shed 2 on the gangplank 8.

[0030] S8. Install the circulating water tank 4 on one side of the heat preservation shed 2. Connect the water outlet of the circulating water tank 4 to the reserved water inlet on the steel pipe support through a circulating water pump; connect the water outlet of the circulating water tank 4 to the reserved water return port on the steel pipe support.

[0031] In the present invention, by erecting the steel pipe support to replace the steel bar stirrup to support the basic steel bars, the frame of the heat preservation shed and also serve as a circulating water path, the layout and fixing processes of each support system, heat preservation system and cooling system at the construction site are effectively simplified, the construction complexity and workload are greatly reduced, the material inputs such as steel bar stirrups and support rods are significantly reduced, the manual installation cost and laying time are reduced, and the construction progress is effectively guaranteed.

[0032] Compared with the traditional steel bar stirrup, the steel pipe support has better stability, can provide reliable support for the basic steel bars, effectively avoid the displacement of the steel bars during the concrete pouring process, ensure the accurate positioning of the steel bars from the source, and then significantly improve the construction quality and durability of the concrete structure, and improve the quality of the concrete structure.

[0033] The above are only the preferred embodiments of the present invention that can be implemented, and do not limit the scope of the rights of the present invention accordingly. All equivalent changes made by using the content of the specification and drawings of the present invention are included in the scope of the rights of the present invention.

Claims

1. A support device for mass concrete construction in winter, comprising an overall support, characterized in that: It also includes a heat preservation shed, a circulating water pump and a circulating water tank; the support as a whole includes multiple layers of steel pipe supports arranged from top to bottom, and the multiple layers of steel pipe supports are connected to form a circulating water path. One end of the circulating water path serves as the water inlet end, which is connected to the circulating water tank through the circulating water pump, and the other end of the circulating water path serves as the water return end and is connected to the circulating water tank; there is basic steel reinforcement above the steel pipes on the top layer, and a heat preservation shed is arranged outside the steel pipe supports.

2. The support device for mass concrete construction in winter according to claim 1, characterized in that: Each layer of steel pipe support includes a side frame and an internal support frame, and the side frame is connected to the internal support frame; the side frames are connected to form a whole through columns arranged at intervals; the internal support frames are also connected to form a whole through columns arranged at intervals.

3. The support device for mass concrete construction in winter according to claim 2, characterized in that: Each layer of internal support frame respectively includes inclined support steel pipes, diagonal support steel pipes and middle support steel pipes. Inclined support steel pipes are arranged between the midpoints of any two adjacent sides in the side frame, middle support steel pipes are arranged between the midpoints of any two opposite sides of the side frame, and both ends of the middle support steel pipes are respectively connected to the two inclined support steel pipes at their respective ends; diagonal support steel pipes are arranged between any two opposite vertices of the side frame, and both ends of the diagonal support steel pipes are respectively connected to the ends of the side frame at their respective ends.

4. The support device for mass concrete construction in winter according to claim 3, characterized in that: The middle support steel pipes and the inclined support steel pipes of all layers are connected through connecting pipes, and the diagonal support steel pipes of all layers are connected to the ends of the side frame through connecting pipes.

5. The support device for mass concrete in winter construction according to claim 2, characterized in that: The upper ends of the columns are used to build a heat preservation shed framework above the basic steel reinforcement.

6. The support device for mass concrete construction in winter according to claim 5, characterized in that: A heat preservation shed is installed above the heat preservation shed framework.

7. A construction method of a large-volume concrete support device for winter construction, characterized in that: It is applied to the support device for mass concrete in winter construction described in any one of claims 1 to 6, and the specific steps are as follows: S1. Determine the height of the topmost layer of steel pipe supports according to the height of the basic steel reinforcement in the building structure. S2. Build the steel pipe supports from bottom to top and connect and fix all the steel pipe supports through columns. S3. Connect all the steel pipe supports through connecting pipes to form a circulating water path, and reserve a water inlet on the bottommost layer of steel pipe supports and a water return port on the topmost layer of steel pipe supports. S4. Build basic steel reinforcement above the topmost layer of steel pipe supports. S5. Use the upper ends of the columns to build a heat preservation shed framework above the basic steel reinforcement. S6. Install a gangplank on the heat preservation shed framework. S7. Install a heat preservation shed on the gangplank. S8. Install a circulating water tank on one side of the heat preservation shed. The water outlet of the circulating water tank is connected to the reserved water inlet on the steel pipe support through the circulating water pump; the water outlet of the circulating water tank is connected to the reserved water return port on the steel pipe support. S9. Fill the circulating water tank with water, and under the operation of the circulating water pump, the water flows along the circulating water path to cool the concrete.