Steel structure welding device for constructional engineering
By designing an automated steel structure welding device, the problems of low welding efficiency and smoke hazards of steel structures are solved, and an efficient and safe welding process is achieved.
Patent Information
- Application Number
- CN202510522911.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-24
- Publication Date
- 2025-07-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When welding steel structures, workers need to frequently switch positions and move the steel structure, resulting in inefficient welding and welding smoke is harmful to health.
A steel structure welding device for construction engineering is designed, including a processing table, a load table and a management system. It uses the rotation of movable columns and discs to automatically purify smoke and dust, flip the steel structure through the clamping frame to adapt to different welding surfaces, and combines the elastic parts to sense the load and automatically control the air duct switching to realize unmanned operation and efficient welding.
It realizes efficient automation of steel structure welding, reduces workers' operating frequency, improves welding efficiency, and effectively purifies welding smoke and dust to protect workers' health.
Smart Images

Figure CN120382300A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of steel structure welding, and specifically relates to a steel structure welding device for construction engineering. Background Art
[0002] When welding steel structures, it is mostly workers holding a face mask and a welding gun to weld two steel structures. During welding, due to the different surfaces of the steel structures, the operator needs to reciprocally switch positions, and even needs to move the steel structures. Moreover, when moving the steel structures, it is necessary to ensure that both are moved simultaneously, otherwise the previously welded positions are prone to bending or breaking. In addition, the welding fumes cause direct damage to the staff, affecting the health of the operators and resulting in a sharp drop in welding efficiency.
[0003] In view of this, a steel structure welding device for construction engineering is proposed. Summary of the Invention
[0004] The purpose of this part is to outline some aspects of the embodiments of the present invention and briefly introduce some preferred embodiments. Simplifications or omissions may be made in this part, as well as in the abstract and title of the present application, to avoid obscuring the purpose of this part, the abstract, and the title. However, such simplifications or omissions shall not be used to limit the scope of the present invention.
[0005] In view of the following technical problems existing in the prior art: When welding steel structures, it is mostly workers holding a face mask and a welding gun to weld two steel structures. During welding, due to the different surfaces of the steel structures, the operator needs to reciprocally switch positions, and even needs to move the steel structures. Moreover, when moving the steel structures, it is necessary to ensure that both are moved simultaneously, otherwise the previously welded positions are prone to bending or breaking. In addition, the welding fumes cause direct damage to the staff, affecting the health of the operators and resulting in a sharp drop in welding efficiency.
[0006] To solve the above technical problems, the present invention provides the following technical solution: A steel structure welding device for construction engineering, including a processing table, a bearing table, and a treatment system. The number of the processing tables installed is a pair, the bearing table is arranged at the middle position between the pair of processing tables, and the treatment system is installed on one side of the bearing table through a clamp; a clamping frame is hinged on the processing table.
[0007] The treatment system includes an air suction funnel, a housing, a first channel, and a second channel. A cross-shaped platform is arranged in the housing. The spaces between the multiple bifurcated edges of the cross-shaped platform are defined as purification spaces. The bifurcated edges of the cross-shaped platform extend to the outer periphery of the housing. A peeling grid frame one is arranged in the purification space. An outer baffle is arranged on the outer periphery of the peeling grid frame one. A guiding module is arranged at the export part of the housing.
[0008] A display shell is fixedly connected to the back surface of each of the outer blocks. A linkage space one is reserved in the display shell. A linkage space two is milled on the inner edge of the linkage space one. A folding cylinder two is arranged on the inner edge of the linkage space two. A linkage pad is arranged at the movable end of the folding cylinder two. The linkage pad moves telescopically in the linkage space one.
[0009] As a preferred technical solution of a steel structure welding device for construction engineering, a bearing arm is arranged on one side of the processing table close to the clamping frame. A clamping member is arranged on the inner edge of the clamping frame. A gear is hinged in the bearing arm. Tooth groove openings are milled on the outer circumferences of the gear and the clamping frame. The gear meshes with the clamping frame.
[0010] As a preferred technical solution of a steel structure welding device for construction engineering, a threaded transmission structure passes through the treatment system. A welding arm is arranged on the bearing table. A welding head is installed at the output part of the welding arm.
[0011] As a preferred technical solution of a steel structure welding device for construction engineering, a channel one is butted at the guiding part of the outer shell. The channel one extends to the side of the welding head and is butted with an air guiding hopper. A linkage space three is reserved on one side of the cross-shaped table facing the channel one. A movable column is hinged in the linkage space three. A disc one is fixedly connected to the part of the movable column outside the linkage space three. Transmission holes and communication holes are reserved on the surface of the disc one. The communication hole is located at the center of the disc one. The transmission hole is located at an eccentric position of the disc one.
[0012] As a preferred technical solution of a steel structure welding device for construction engineering, a pre-entry space is milled on the inner edge of the communication hole. A blocking module is arranged in the pre-entry space. A channel three is arranged in the movable column. The input part of the channel three is butted in the pre-entry space. The output part of the channel three is butted in the linkage space three. An arc-shaped piece is arranged on the inner edge of the linkage space three. The output part of the channel three is facing the outer arc edge of the arc-shaped piece. A drainage module is arranged on the side of the linkage space three deviating from the disc one.
[0013] As a preferred technical solution of a steel structure welding device for construction engineering, the guiding module includes a disc two, a disc three and a channel four. The disc two is arranged on the side of the cross-shaped table deviating from the channel one. A disc three is arranged in a parallel manner on the side of the disc two deviating from the peeling grid one. A channel two is butted on the side of the outer shell deviating from the channel one. A pre-export space is defined between the inner edge of the outer shell close to the channel two and the disc three. A channel four is jointly arranged on the disc two and the disc three. A check valve one is arranged in the channel four.
[0014] As an optimal technical solution for a steel structure welding device for construction projects, the barrier module includes a folding cylinder, an elastic member and a blocking disc. The folding cylinder is installed on the inner edge of the pre-entry space, and the blocking disc is configured at the movable end of the folding cylinder. The size of the blocking disc is larger than the size of the connecting hole. An elastic member is installed between the back of the blocking disc and the inner edge of the pre-entry space, and the elastic member is wrapped around the outer circumference of the folding cylinder.
[0015] As an optimal technical solution for a steel structure welding device for construction projects, the drainage module includes channel five, an outer box and channel six. The outer box is arranged on a side of the outer shell close to channel two, and the channel five is connected to the side of the outer box. The other end of the channel five is connected to the inner edge of the linkage space three via the outer shell, disc two and cross-shaped table. The channel six is connected to a side of the outer box deviating from channel five, and the other end of the channel six is connected to the pre-guiding space via the outer shell. A peeling grid two is installed in the outer box, and a blockage is installed on a side of the outer box deviating from the outer shell.
[0016] As an optimal technical solution for a steel structure welding device for construction projects, an elastic member 2 is installed between the back of the linkage pad and the inner edge of the linkage space 2, and the elastic member 2 is surrounded by the outer periphery of the folding tube 2. A prompt module is installed at the inner edge of the linkage space 1 near the linkage space 2, and a channel 7 is milled on the peeling grid 1 and the display shell. The channel 7 is communicated with the linkage space 1, and a backstop 2 is installed at the position of the channel 7 near the linkage space 1, and a blocking cap is installed outside the display shell.
[0017] As an optimal technical solution for a steel structure welding device for construction projects, the prompt module includes a switch and an indicator panel. The switch is installed at the inner edge of linkage space one close to linkage space two, and the indicator panel is installed at the peripheral position of the display shell. The outer guard and the outer shell are installed by a latch.
[0018] Beneficial effects of the present invention:
[0019] 1. This steel structure welding device for construction projects rotates the movable column and disc 1. When a large amount of particles are blocked on the stripping grid 1, and its own load is too large, it automatically switches to the stripping grid 1 that does not block particles through channel 3 and the arc-shaped plate, achieving continuous and efficient purification. The reverse thrust effect of the arc-shaped plate drives the rotation, without the need for an additional power source, energy saving and high reliability.
[0020] 2. This steel structure welding device for construction projects senses the load of the purification space through the deformation of the elastic part 1, automatically controls the air duct switching, and realizes unmanned operation;
[0021] 3. The steel structure welding device for building engineering cooperates with the linkage pad and the second elastic member to trigger the prompt module, which can display the position of the peeling grid frame one that needs maintenance in real time, improving the maintenance efficiency and facilitating the maintenance workers to quickly locate it;
[0022] 4. The smoke in the linkage space three of the steel structure welding device for building engineering will be guided into the outer box through the channel five. The peeling grid frame two is relied on to intercept the particulate matter in this part of the smoke. In the pre-export space introduced by the channel six, it is ensured that the electric welding fumes guided into the outer shell can be completely purified;
[0023] 5. The driving member on the bearing arm of the steel structure welding device for building engineering controls the gear to rotate. Under the meshing action, the clamping frame is linked to rotate, enabling the steel structure to be flipped, so as to realize the welding work on different surfaces and improve the welding efficiency.
[0024] Other features and advantages of the present invention will be described in the subsequent description, and some of them will be obvious from the description or understood by implementing the present invention. The objectives and other advantages of the present invention can be achieved and obtained through the structures specifically pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following will briefly introduce the drawings required for the description of the embodiments. Obviously, the following drawings are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts. Among them:
[0026] Figure 1 is the overall structural schematic diagram of the present invention.
[0027] Figure 2 is the sectional view of the bearing arm of the present invention.
[0028] Figure 3 is the structural schematic diagram of the treatment system of the present invention.
[0029] Figure 4 is the sectional view of the treatment system of the present invention.
[0030] Figure 5 is based on the present invention Figure 4 schematic diagram at X.
[0031] Figure 6 is based on the present invention Figure 4 schematic diagram at Y.
[0032] Figure 7 is the schematic diagram of the peeling grid frame one and the outer baffle structure of the present invention.
[0033] Figure 8 This is a schematic diagram of the cross-shaped platform structure of the present invention.
[0034] Figure 9 This is a schematic diagram of the first disc structure of the present invention.
[0035] Figure 10 This is a schematic diagram of the cross-section of the outer box of the present invention.
[0036] Reference numerals:
[0037] 100, processing table; 101, carrying arm; 102, clamping frame; 103, clamping member; 104, gear; 200, carrying platform; 201, welding arm; 202, welding head; 203, screw drive structure; 300, treatment system; 301, air suction funnel; 302, outer shell; 303, cross-shaped platform; 304, purification space; 305, peeling grid one; 306, outer baffle; 307, channel one; 308, linkage space; 309, movable column; 310, first disc; 311, transmission hole; 312, connecting hole; 313, pre-entry space; 314, channel three; 315, arc piece; 316, second disc; 317, third disc; 318, pre-export space; 319, channel four; 320, check valve one; 321, channel two; 322, folding cylinder one; 323, elastic member one; 324, blocking disc; 325, channel five; 326, outer box; 327, channel six; 328, peeling grid two; 329, sealing baffle; 330, display shell; 331, linkage space one; 332, linkage space two; 333, folding cylinder two; 334, elastic member two; 335, linkage pad; 336, channel seven; 337, check valve two; 338, retaining cap; 339, switch; 340, indicating disc; 341, pin. Detailed implementation manners
[0038] To make the above objects, features, and advantages of the present invention more obvious and understandable, the following will describe the detailed implementation manners of the present invention in conjunction with the accompanying drawings of the specification.
[0039] In the following description, many specific details are set forth to fully understand the present invention. However, the present invention can also be implemented in other ways different from the description herein. Those skilled in the art can make similar extensions without departing from the connotation of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed below.
[0040] Secondly, the so-called "one embodiment" or "embodiment" herein refers to a specific feature, structure, or characteristic that can be included in at least one implementation manner of the present invention. The "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor is it an embodiment that is separate from or mutually exclusive of other embodiments.
[0041] Furthermore, the present invention is described in detail with reference to schematic diagrams. For ease of illustration, when describing the embodiments of the present invention, cross-sectional views illustrating device structures may be partially enlarged and not to scale. Furthermore, the schematic diagrams are merely illustrative and should not limit the scope of protection of the present invention. Furthermore, in actual production, the three-dimensional dimensions of length, width, and depth should be included.
[0042] In one embodiment, a steel structure welding device for construction engineering includes a processing table 100, a supporting table 200, and a treatment system 300. The processing tables 100 are arranged in a pair, the supporting table 200 is arranged in the middle of the pair of processing tables 100, and the treatment system 300 is installed on one side of the supporting table 200 through a clamp.
[0043] Reference Figure 1 and 2 A clamping frame 102 is hinged on the processing table 100. A carrying arm 101 is installed on one side of the processing table 100 close to the clamping frame 102. A clamping member 103 is installed on the inner edge of the clamping frame 102, wherein the clamping member 103 clamps the steel structure. A gear 104 is hinged in the carrying arm 101. The outer periphery of the gear 104 and the clamping frame 102 are milled with tooth notches, and the gear 104 is meshed with the clamping frame 102.
[0044] The driving member on the carrying arm 101 controls the gear 104 to rotate, and the gear 104 is engaged to rotate the clamping frame 102, so that the steel structure can be flipped, thereby realizing welding work on different surfaces. Under the action of the clamping member 103, the steel structure can be clamped, and the guide rail under the processing table 100 can be used to weld two sections of steel structure;
[0045] Reference Figure 1 A threaded transmission structure 203 passes through the treatment system 300. Under the action of the threaded transmission structure 203, the treatment system 300 can be linked to change its position. A welding arm 201 is installed on the carrier 200. The output part of the welding arm 201 is installed with a welding head 202, wherein the welding head 202 performs welding work on the steel structure.
[0046] Reference Figure 1 、 3, 4, 7, 8, and 9, the treatment system 300 includes an air draft hopper 301, a housing 302, a first channel 307, and a second channel 321. A cross-shaped platform 303 is arranged in the housing 302. The spaces between the multiple bifurcated edges of the cross-shaped platform 303 define a purification space 304. The bifurcated edges of the cross-shaped platform 303 extend to the outer periphery of the housing 302. A first stripping grid 305 is installed in the purification space 304. An outer baffle 306 is arranged on the outer periphery of the first stripping grid 305. A guiding module is arranged at the outlet part of the housing 302. The inlet part of the housing 302 is docked with the first channel 307. The first channel 307 extends to the edge position of the welding head 202 and is docked with the air draft hopper 301. A fan is installed in the air draft hopper 301 to introduce the electric welding fumes generated during welding at the welding head 202 position into the first channel 307 and then into the housing 302. A third linkage space 308 is reserved on one side of the cross-shaped platform 303 facing the first channel 307. A movable column 309 is hinged in the third linkage space 308. A first disk 310 is fixedly connected to the part of the movable column 309 outside the third linkage space 308. A transmission hole 311 and a communication hole 312 are reserved on the surface of the first disk 310. The communication hole 312 is located at the axis position of the first disk 310, and the transmission hole 311 is located at an eccentric position of the first disk 310. A pre-entry space 313 is milled on the inner edge of the communication hole 312. A blocking module is installed in the pre-entry space 313. A third channel 314 is arranged in the movable column 309. The input part of the third channel 314 is docked in the pre-entry space 313, and the output part of the third channel 314 is docked in the third linkage space 308. An arc-shaped piece 315 is arranged on the inner edge of the third linkage space 308. The output part of the third channel 314 faces the outer arc edge of the arc-shaped piece 315. A drainage module is arranged on the side of the third linkage space 308 deviating from the first disk 310.
[0047] During the welding process, the welding fumes generated are introduced into the housing 302 through passage 1 307. At this time, the welding fumes entering the housing 302 will be guided to the purification space 304 under the action of the transmission hole 311. The stripping grid 1 305 on the purification space 304 purifies this part of the welding fumes. The particulate matter in the welding fumes will be blocked in the stripping grid 1 305. The smoke after the particulate matter is removed can be exported under the action of the guiding module. After a large amount of particulate matter is blocked in the stripping grid 1 305, at this time, passage 1 307 is still continuously introducing welding fumes, and the load on the stripping grid 1 305 increases. At this time, the blocking module will not block the passage between the communication hole 312 and the pre-entry space 313. At this time, the wind will be introduced into the pre-entry space 313 at the position of the communication hole 312, and the wind in the pre-entry space 313 will be introduced into the linkage space 3 308 through passage 3 314. This part of the wind directly acts on the arc-shaped piece 315, and then the drainage module guides these winds out of the linkage space 3 308. When the wind directly acts on the arc-shaped piece 315, under the action of the reverse push, the movable column 309 rotates at this time, and the disc 1 310 moves together with the movable column 309 at this moment. At this time, the position of the transmission hole 311 changes. When the transmission hole 311 corresponds to the purification space 304 that has not blocked the particulate matter, the welding fumes introduced by passage 1 307 will enter the newly corresponding stripping grid 1 305 through the transmission hole 311. The load on the blocking module is reduced. At this time, the passage between the communication hole 312 and the pre-entry space 313 is blocked under the reset action of the blocking module. At this time, there is no wind acting on the arc-shaped piece 315, and the positions of the movable column 309 and the disc 1 310 are locked. At this time, the normal purification work of the welding fumes is carried out;
[0048] After a sufficient amount of particulate matter is blocked by the stripping grid 1 305, at this time, the transmission hole 311 will be adjusted to the position of the stripping grid 1 305 that has not blocked the particulate matter under the action of the blocking module, the movable column 309, passage 3 314 and the arc-shaped piece 315. At this time, the whole machine does not need to interrupt operation to carry out the maintenance work of the stripping grid 1 305. When the stripping grid 1 305 that has blocked a sufficient amount of particulate matter is no longer facing the transmission hole 311, at this time, the stripping grid 1 305 can be maintained, and during the maintenance work of the stripping grid 1 305, the purification process of the welding fumes is still in progress.
[0049] Refer to Figure 4, the guiding module includes the second disc 316, the third disc 317 and the fourth channel 319. The second disc 316 is disposed on the side of the cross-shaped platform 303 deviating from the first channel 307. The third disc 317 is disposed parallel to the side of the second disc 316 deviating from the first stripping grid 305. The second channel 321 is docked to the side of the housing 302 deviating from the first channel 307. The space defined between the inner edge of the housing 302 near the second channel 321 and the third disc 317 is the pre-export space 318. The fourth channel 319 is jointly installed on the second disc 316 and the third disc 317, and the first check valve 320 is installed in the fourth channel 319.
[0050] After the particulate matter in the welding fume is intercepted by the first stripping grid 305, at this time, the purified smoke reaches the position of the fourth channel 319 and is exported to the second channel 321 through the pre-export space 318.
[0051] Refer to Figure 5 , the blocking module includes the first folding cylinder 322, the first elastic member 323 and the blocking disc 324. The first folding cylinder 322 is installed on the inner edge of the pre-entry space 313. The blocking disc 324 is disposed at the movable end of the first folding cylinder 322. The size of the blocking disc 324 is larger than the size of the communication hole 312. The first elastic member 323 is installed between the back of the blocking disc 324 and the inner edge of the pre-entry space 313, and the first elastic member 323 surrounds the outer circumference of the first folding cylinder 322.
[0052] After a large amount of particulate matter is blocked in the first stripping grid 305, the load on the first stripping grid 305 increases. At this time, the load on the blocking disc 324 exceeds the first elastic member 323. At this time, the blocking disc 324 moves towards the position of the movable column 309. At this moment, the channel between the communication hole 312 and the pre-entry space 313 is opened. At this time, the wind force will be introduced into the pre-entry space 313 through the position of the communication hole 312. When the transmission hole 311 corresponds to the purification space 304 where the particulate matter is not blocked, the load is reduced. At this time, the first elastic member 323 can drive the blocking disc 324 to reset. At this moment, the channel between the communication hole 312 and the pre-entry space 313 is blocked, and the smoke will not reach the pre-entry space 313.
[0053] Refer to Figure 3 , 5 And 10, the drainage module includes the fifth channel 325, the outer box 326 and the sixth channel 327. The outer box 326 is disposed on the side of the housing 302 near the second channel 321. The fifth channel 325 is docked to the side of the outer box 326. The other end of the fifth channel 325 is docked to the inner edge of the third linkage space 308 through the housing 302, the second disc 316 and the cross-shaped platform 303. The sixth channel 327 is docked to the side of the outer box 326 deviating from the fifth channel 325. The other end of the sixth channel 327 is docked into the pre-export space 318 through the housing 302. The second stripping grid 328 is installed in the outer box 326, and the baffle 329 is installed on the side of the outer box 326 deviating from the housing 302.
[0054] The smoke in the linkage space three 308 will be guided by the passage five 325 into the outer box 326. Relying on the stripping grid two 328, particulate matter interception work is carried out on this part of the smoke. In the introduction and pre-export space 318 introduced by the passage six 327, it is ensured that the electric welding fumes guided into the outer shell 302 can be completely purified.
[0055] Refer to Figure 3 、 6 And 7, a display shell 330 is fixedly connected to the back surface of multiple outer blocks 306. A linkage space one 331 is reserved in the display shell 330. A linkage space two 332 is milled along the inner edge of the linkage space one 331. A folding cylinder two 333 is arranged along the inner edge of the linkage space two 332. A linkage pad 335 is arranged at the movable end of the folding cylinder two 333. The linkage pad 335 moves telescopically in the linkage space one 331. An elastic part two 334 is arranged between the back of the linkage pad 335 and the inner edge of the linkage space two 332. The elastic part two 334 surrounds the outer periphery of the folding cylinder two 333. Among them, the elastic part two 334 is more prone to deformation than the elastic part one 323. A prompt module is arranged at the position of the inner edge of the linkage space one 331 close to the linkage space two 332. A passage seven 336 is jointly milled on the stripping grid one 305 and the display shell 330. The passage seven 336 communicates with the linkage space one 331. A check valve two 337 is arranged at the part of the passage seven 336 close to the linkage space one 331. A retaining cap 338 is arranged outside the display shell 330. An air duct is milled between the linkage space one 331 and the peripheral surface of the display shell 330, and is blocked by the retaining cap 338.
[0056] After a large amount of particulate matter is blocked in the stripping grid one 305, at this moment, the impact force of the smoke becomes larger, and the wind force entering the linkage space one 331 becomes larger. At this time, it will act on the linkage pad 335 to move towards the position of the folding cylinder two 333. When the linkage pad 335 moves to the specified position, the prompt module gives a different normal style prompt on the outer surface of the display shell 330. No matter which position of the stripping grid one 305 corresponds to the transmission hole 311, the prompt module at the corresponding position of the stripping grid one 305 that blocks a large amount of particulate matter will always have a display in a different normal state. The operator can quickly and accurately perform maintenance operations on the stripping grid one 305 that blocks a large amount of particulate matter. In this process, by operating the retaining cap 338 to open, under the action of the elastic part two 334, the linkage pad 335 can be reset.
[0057] Refer to Figure 6 And 7 ,The prompt module includes a switch 339 and an indicator panel 340. The switch 339 is arranged at the position of the inner edge of the linkage space one 331 close to the linkage space two 332, and the indicator panel 340 is arranged at the peripheral position of the display shell 330.
[0058] When the linkage pad 335 moves towards the position of the folding cylinder two 333 after being loaded, the linkage pad 335 squeezes the switch 339, and the indicating disk 340 can show an unusual state at this moment, which is convenient for maintenance workers to quickly and accurately locate.
[0059] Refer to Figure 3 , the outer block 306 and the housing 302 are installed through the pin 341.
[0060] It should be understood that in the development process of any actual implementation manner, in any engineering or design project, a large number of specific implementation decisions can be made. Such development efforts may be complex and time-consuming, but for those of ordinary skill in the art who benefit from this disclosure, without undue experimentation, the development efforts will be a routine task of design, manufacture, and production.
[0061] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be modified or equivalently replaced without departing from the spirit and scope of the technical solutions of the present invention, and they should all be covered by the scope of the claims of the present invention.
Claims
1. A steel structure welding device for construction engineering, characterized in that: It includes a processing table, a bearing table and a treatment system. There is a pair of the processing tables installed, the bearing table is configured at the middle position between the pair of processing tables, and the treatment system is installed on one side of the bearing table through a clamp; A clamping frame is hinged on the processing table; The treatment system includes an air suction funnel, a housing, a channel one and a channel two. A cross-shaped platform is configured in the housing. The spaces between the multiple bifurcated edges of the cross-shaped platform are defined as purification spaces. The bifurcated edges of the cross-shaped platform extend to the outer periphery of the housing. A peeling wire mesh frame one is installed in the purification space. An outer baffle is configured on the outer periphery of the peeling wire mesh frame one. A guiding module is configured at the outlet part of the housing; On the opposite sides of multiple said outer baffles, a display shell is fixedly connected. A linkage space one is reserved in the display shell. A linkage space two is milled on the inner edge of the linkage space one. A folding cylinder two is configured on the inner edge of the linkage space two. A linkage pad is installed at the movable end of the folding cylinder two. The linkage pad moves telescopically in the linkage space one.
2. The steel structure welding device for construction engineering according to claim 1, characterized in that: On one side of the processing table close to the clamping frame, a bearing arm is installed. Clamping parts are installed on the inner edge of the clamping frame. A gear is hinged in the bearing arm. Tooth groove openings are milled on the outer peripheries of the gear and the clamping frame. The gear meshes with the clamping frame.
3. The steel structure welding device for construction engineering according to claim 1, wherein: A threaded transmission structure passes through the treatment system. A welding arm is installed on the bearing table. A welding head is installed at the output part of the welding arm.
4. The steel structure welding device for construction engineering according to claim 1, characterized in that: The inlet part of the housing is docked with the channel one. The channel one extends to the side of the welding head and is docked with the air suction funnel. A linkage space three is reserved on one side of the cross-shaped platform facing the channel one. A movable column is hinged in the linkage space three. A disc one is fixedly connected to the part of the movable column outside the linkage space three. Transmission holes and communication holes are reserved on the surface of the disc one. The communication hole is located at the center position of the disc one. The transmission hole is located at an eccentric position of the disc one.
5. The steel structure welding device for construction engineering according to claim 4, characterized in that: A pre-entry space is milled on the inner edge of the communication hole. A blocking module is installed in the pre-entry space. A channel three is configured in the movable column. The input part of the channel three is docked in the pre-entry space. The output part of the channel three is docked in the linkage space three. An arc-shaped piece is configured on the inner edge of the linkage space three. The output part of the channel three faces the outer arc edge of the arc-shaped piece. A drainage module is arranged on the side of the linkage space three deviating from the disc one.
6. The steel structure welding device for construction engineering according to claim 1, characterized in that: The guiding module includes a disc two, a disc three and a channel four. The disc two is configured on the side of the cross-shaped platform deviating from the channel one. The disc three is configured in parallel on the side of the disc two deviating from the peeling wire mesh frame one. The channel two is docked on the side of the housing deviating from the channel one. The pre-outlet space is defined between the inner edge of the housing close to the channel two and the disc three. The channel four is jointly installed on the disc two and the disc three. A check valve one is installed in the channel four.
7. The steel structure welding device for construction engineering according to claim 5, characterized in that: The blocking module includes a folding cylinder one, an elastic part one and a blocking disc. The folding cylinder one is installed on the inner edge of the pre-entry space. The blocking disc is configured at the movable end of the folding cylinder one. The size of the blocking disc is larger than the size of the communication hole. An elastic part one is installed between the back of the blocking disc and the inner edge of the pre-entry space. The elastic part one winds around the outer periphery of the folding cylinder one.
8. The steel structure welding device for construction engineering according to claim 5, characterized in that: The drainage module includes channel five, an outer box, and channel six. The outer box is disposed on one side of the outer shell close to channel two. Channel five is docked to the side of the outer box. The other end of channel five is docked to the inner edge of linkage space three via the outer shell, disk two, and cross-shaped platform. Channel six is docked to one side of the outer box deviating from channel five. The other end of channel six is docked into the pre-export space via the outer shell. A peeling grid two is installed in the outer box, and a baffle is installed on the side of the outer box deviating from the outer shell.
9. The steel structure welding device for construction engineering according to claim 1, characterized in that: An elastic member two is installed between the back of the linkage pad and the inner edge of linkage space two. The elastic member two surrounds the outer circumference of folding cylinder two. A prompt module is installed at the position of the inner edge of linkage space one close to linkage space two. A channel seven is jointly milled on the peeling grid one and the display shell. Channel seven communicates with linkage space one. A check valve two is installed at the part of channel seven close to linkage space one. A retaining cap is installed outside the display shell.
10. The steel structure welding device for construction engineering according to claim 9, characterized in that: The prompt module includes a switch and an indicator disk. The switch is installed at the position of the inner edge of linkage space one close to linkage space two. The indicator disk is installed at the peripheral position of the display shell. The outer baffle is installed on the outer shell through a pin.
Citation Information
Cited By
Front protection device for titanium alloy laser welding seam and protection method thereof
CN120839326A
A titanium alloy laser welding seam front protection device and a protection method thereof
CN120839326B