Staggered steel bar connector of concrete member and connecting method of staggered steel bar connector
By designing the misaligned steel bar connector for concrete components, and using a combined structure of the main connector, a mobile casing and connecting rod, the problems of high construction difficulties and poor connection quality caused by misalignment of steel bars are solved, and efficient and safe steel bar connections are achieved.
Patent Information
- Application Number
- CN202510663058.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-22
- Publication Date
- 2025-08-05
AI Technical Summary
The existing steel bar connection method has high requirements for the steel bar position. When the steel bars are dislocated, it is difficult to construct and the connection quality is difficult to guarantee, which can easily lead to insufficient bearing capacity of the components after splicing, which poses serious safety hazards.
A dislocation steel bar connector for concrete components is designed, and a combined structure of the main body connector, a mobile sleeve and a connecting rod is adopted. The dislocation steel bar is connected through welding and threaded connection. The main body connector is a combination of straight pipe or straight pipe bent pipes. The mobile sleeve moves on the main body connector to adapt to different dislocation situations.
It improves the integrity of re-split or prefabricated components of concrete components, solves the problem of steel bar misalignment, provides convenient and efficient connection measures, and reduces construction difficulty and safety hazards.
Smart Images

Figure CN120425860A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building facility construction, and particularly relates to a staggered steel bar connector for a concrete component and a connection method thereof. Background Art
[0002] With society placing a high priority on sustainable development and resource recycling, research on the re-joining of concrete components has significant practical significance. By joining discarded concrete components, we offer an innovative solution for the reuse of construction waste. This approach not only helps reduce the environmental impact of construction waste but also increases resource reuse and reduces project costs.
[0003] At the same time, we will develop prefabricated buildings, establish a prefabricated building technology system, continuously increase the proportion of prefabricated buildings in new buildings, and actively promote the development of the construction industry towards a green and environmentally friendly direction.
[0004] Whether in the process of re-splicing components or in the splicing of prefabricated components, the steel bar connection method is a key influencing factor. In the actual process, due to external forces or improper operation of embedded steel bars, the steel bars may be misplaced. The existing steel bar connection methods, such as sleeve connection and mechanical connection, are mainly used in positioning steel bars. They have high requirements on the position of steel bars. When the steel bars are misplaced, the construction is more difficult and the connection quality is difficult to guarantee, which can easily lead to insufficient bearing capacity of the spliced components and cause serious safety hazards. Summary of the Invention
[0005] Based on the problems existing in the above-mentioned background technology, the present invention proposes a staggered steel bar connector for concrete components and a connection method thereof, which solves the problem that the existing steel bar connection method has high requirements on the position of the steel bars. When the steel bars are greatly misaligned, the construction is more difficult and the connection quality is difficult to guarantee, which can easily lead to insufficient bearing capacity of the spliced components and cause serious safety hazards.
[0006] The embodiment of the present invention is achieved as follows:
[0007] The present invention provides a staggered steel bar connector for concrete components, which includes a main connecting piece, on which at least two movable sleeves are sleeved, and each of the movable sleeves is fixedly connected to the main connecting piece by welding; a connecting rod is fixedly provided on the side wall of each main connecting piece, and the end of each connecting rod is threadedly connected to a steel bar sleeve, and the other end of the steel bar sleeve is used for threaded connection to the steel bar to be connected.
[0008] Furthermore, there are two movable sleeves, which are respectively located at both ends of the main connecting piece, and two connecting rods on the two movable sleeves are respectively located at both sides of the main connecting piece.
[0009] Further, the main connector is a straight pipe, a bent pipe or a combined structure of a straight pipe and a bent pipe.
[0010] Further, when the main connector is a structure of a combined straight pipe and bent pipe, the main connector includes a straight pipe section and a bent pipe section which are integrally arranged;
[0011] The bent pipe section is an arc structure, and one end of the bent pipe section is fixedly connected to one end of the straight pipe section;
[0012] One of the mobile sleeves is provided on both the straight pipe section and the bent pipe section; the mobile sleeve on the bent pipe section is provided with a matching radian; the length direction of the connecting rod in the mobile sleeve on the straight pipe section is perpendicular to the length direction of the straight pipe section, and the connecting rod in the mobile sleeve on the bent pipe section is arranged in the circular direction of the bent pipe section.
[0013] In the misaligned steel bar connector for concrete members of the present invention, by designing the main connector into a structure combining a straight pipe and an arc pipe, the two mobile sleeves can move on the main connector, so as to connect the steel bars to be connected with parallel misalignment and spatial misalignment into a whole, which is beneficial to improving the integrity of the re - splicing of concrete members or the connection of prefabricated concrete members, solving the problem of spatial misalignment between the connecting steel bars, and providing a convenient, efficient and practical solution for various forms of misaligned steel bar connection.
[0014] Preferably but not limited to, the cross - section of the main connector is a rectangular hollow structure, so that the structural weight of the main connector is lightened and the shear resistance effect is relatively good.
[0015] The present invention also provides a connection method for a misaligned steel bar connector of a concrete member, which includes the following steps:
[0016] Step 1, install the steel bar sleeve: thread - connect the steel bar sleeve with the steel bars to be connected;
[0017] Step 2, install the connector: for parallel misaligned steel bars, sleeve two mobile square sleeves on both ends of the main connector;
[0018] For spatially misaligned steel bars, sleeve two mobile square sleeves on the straight pipe section and the bent pipe section of the main connector respectively;
[0019] Step 3, determine the position: according to the misalignment spacing and angle of the steel bars to be connected, move the two mobile sleeves. After the position is determined, rotate the steel bar sleeve to connect the connecting rod and the steel bars to be connected into a whole;
[0020] Step 4, weld and fix: weld and fix the two mobile sleeves on the main connector to ensure that when the connector is stressed, there is no displacement between the main connector and the mobile sleeves.
[0021] The beneficial effects of the present invention are as follows: A misaligned steel bar connector for concrete members and its connection method provided by the present invention. The main connector can be flexibly designed according to the actual misalignment of the misaligned steel bars in the concrete members. The main connector can be a straight pipe, a bent pipe or a combination structure of a straight pipe and a bent pipe. When the misaligned steel bars in the concrete members are parallel misalignments, the main connector is a straight pipe structure; when the misaligned steel bars in the concrete members are spatial misalignments, the main connector is a bent pipe or a combination of a straight pipe and a bent pipe. The two movable sleeves can move on the main connector to connect the steel bars to be connected with parallel misalignments and spatial misalignments into a whole, which is beneficial to improving the integrity of the re - splicing of concrete members or the connection of prefabricated concrete members, solving the problem of spatial misalignment between the connecting steel bars, and providing a convenient, efficient and practical solution for various forms of misaligned steel bar connections. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for use in the embodiments. Obviously, the following - described drawings are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings. As shown in the drawings, the above - mentioned and other objects, features and advantages of the present invention will become clearer. The same reference numerals in all the drawings indicate the same parts. The drawings are not deliberately drawn to scale in actual size, and the focus is on showing the gist of the present invention.
[0023] Figure 1 It is a schematic structural diagram of the misaligned steel bar connector when the main connector is a straight pipe structure.
[0024] Figure 2 It is a schematic structural diagram of the misaligned steel bar connector when the main connector is a combination structure of a straight pipe and a bent pipe.
[0025] Figure 3 It is a schematic diagram of the actual application scenario of the misaligned steel bar connector Figure 1 .
[0026] Figure 4 It is a schematic diagram of the actual application scenario of the misaligned steel bar connector Figure 2 .
[0027] Among them, 1. Main connector; 101. Straight pipe section; 102. Bent pipe section; 2. Movable sleeve; 3. Connecting rod; 4. Steel bar sleeve; 5. Steel bar to be connected. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0028] To make the objectives, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Apparently, the described embodiments are some but not all of the embodiments of the present invention. Components of the embodiments of the present invention usually described and illustrated in the drawings here can be arranged and designed in various different configurations.
[0029] Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed present invention, but merely represents selected embodiments of the present invention. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts fall within the scope of protection of the present invention.
[0030] It should be noted that like reference numerals and letters denote like items in the following drawings. Therefore, once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings.
[0031] In addition, the terms "first", "second", etc. are only used for descriptive distinction and cannot be construed as indicating or implying relative importance.
[0032] Please refer to Figure 1 and Figure 2 As shown, the present invention provides a misaligned steel bar connector for concrete members, which includes a main connector 1. At least two movable sleeves 2 are sleeved on the main connector 1, and each movable sleeve 2 is fixedly connected to the main connector 1 by welding. A connecting rod 3 is fixedly arranged on the side wall of each main connector 1, and a steel bar sleeve 4 is threadedly connected to the end of each connecting rod 3. The other end of the steel bar sleeve 4 is used for threaded connection with a to-be-connected steel bar 5.
[0033] Further, the number of the movable sleeves 2 is two. The two movable sleeves 2 are respectively located at both ends of the main connector 1, and the two connecting rods 3 on the two movable sleeves 2 are respectively located on both sides of the main connector 1.
[0034] Further, the main connector 1 is a straight pipe, a bent pipe or a combined structure of a straight pipe and a bent pipe.
[0035] Further, when the main connector 1 is a combined structure of a straight pipe and a bent pipe, the main connector 1 includes a straight pipe section 101 and a bent pipe section 102 which are integrally arranged;
[0036] The bent pipe section 102 is a quarter - arc structure, and one end of the bent pipe section 102 is fixedly connected to one end of the straight pipe section 101;
[0037] A said mobile sleeve 2 is provided on each of the straight pipe section 101 and the elbow pipe section 102; the mobile sleeve 2 located on the elbow pipe section 102 is provided with a matching radian; the length direction of the connecting rod 3 in the mobile sleeve 2 on the straight pipe section 101 is perpendicular to the length direction of the straight pipe section 101, and the connecting rod 3 in the mobile sleeve 2 on the elbow pipe section 102 is arranged in the circular direction of the elbow pipe section 102.
[0038] In the misaligned steel bar connector for concrete members of the present invention, by designing the main connector 1 into a structure combined with a straight pipe and an arc pipe, the two mobile sleeves 2 can move on the main connector 1, realizing connecting the to-be-connected steel bars 5 with parallel misalignment and spatial misalignment into a whole, which is beneficial to improving the integrity of the re-splicing of concrete members or the connection of precast concrete members, solving the problem of spatial misalignment between the connecting steel bars, and providing a convenient, efficient and practical solution for various forms of misaligned steel bar connections.
[0039] Preferably but not limited to, the cross-section of the main connector 1 is a rectangular hollow structure, making the structural weight of the main connector 1 lightweight and the shear resistance effect relatively good.
[0040] The present invention also provides a connection method for a misaligned steel bar connector of a concrete member, which includes the following steps:
[0041] Step 1, installing the steel bar sleeve 4: threadedly connecting the steel bar sleeve 4 with the to-be-connected steel bar 5;
[0042] Step 2, installing the connector: for the parallel misaligned steel bars, sleeving two mobile square sleeves on both ends of the main connector 1;
[0043] For the spatially misaligned steel bars, respectively sleeving two mobile square sleeves on the straight pipe section 101 and the elbow pipe section 102 of the main connector 1;
[0044] Step 3, determining the position: according to the misalignment spacing and angle of the to-be-connected steel bar 5, moving the two mobile sleeves 2, and after the position is determined, rotating the steel bar sleeve 4 to connect the connecting rod 3 and the to-be-connected steel bar 5 into a whole;
[0045] Step 4, welding and fixing: welding and fixing the two mobile sleeves 2 on the main connector 1 to ensure that no displacement occurs between the main connector 1 and the mobile sleeves 2 when the connector is stressed.
[0046] A misaligned steel bar connector for concrete members and its connection method provided by the present invention. The main connector 1 can be flexibly designed according to the actual misalignment of the misaligned steel bars of the concrete members. The main connector 1 can be a straight pipe, a bent pipe or a combination structure of a straight pipe and a bent pipe. When the misaligned steel bars of the concrete members are parallel misalignments, the main connector 1 is a straight pipe structure; when the misaligned steel bars of the concrete members are spatial misalignments, the main connector 1 is a bent pipe or a combination of a straight pipe and a bent pipe. Two movable sleeves 2 can move on the main connector 1 to connect the to-be-connected steel bars 5 with parallel misalignments and spatial misalignments into a whole, which is beneficial to improving the integrity of the re-splicing of concrete members or the connection of precast concrete members, solving the problem of spatial misalignment between the connecting steel bars, and providing a convenient, efficient and practical solution for various forms of misaligned steel bar connections.
[0047] As Figure 3 shown, this embodiment provides a connection method for the re-splicing of waste concrete beams. The figure includes 2 waste concrete beams and a misaligned steel bar connector as Figure 1 shown. Knock out the concrete of the damaged part of the waste concrete beam and leave the steel bar part. Since the steel bar reinforcements of different waste beams are different, when the steel bars show parallel misalignments, connect them to the misaligned steel bar connector as Figure 1 shown through the steel bar sleeve 4 on the steel bars of the waste beam. By adjusting the position of the movable sleeve 2, the control of the distance between the misaligned steel bars is achieved, and the connection of the vertical misalignment of the steel bars is realized through the connecting rod 3 and the steel bar sleeve 4. By using this method, while reducing the pressure of construction waste on the environment, the waste buildings can be fully utilized, the resource recycling rate can be improved, and the project cost can be reduced.
[0048] As Figure 4 shown, this embodiment provides another connection method for the re-splicing of waste concrete beams. The figure includes 2 waste concrete beams and a misaligned steel bar connector as Figure 2 shown. In the figure of the misaligned steel bar connector as Figure 2 shown, the main connector 1 is a combination structure of a straight pipe and a bent pipe. A movable sleeve 2 is provided on both the straight pipe section 101 and the bent pipe section 102. Through the design of the bent pipe section 102, it is allowed that the misaligned steel bars can have an angle of 0-90° on the horizontal plane. Through the connection of the steel bar sleeve 4, the whole connector is allowed to rotate 360° on the vertical plane to realize the connection of non-parallel misaligned steel bars at various angles.
[0049] The above are only the preferred embodiments of the present invention and are not used to limit the present invention. For those skilled in the art, the present invention can have various changes and modifications. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.
Claims
1. A dislocated steel bar connector for a concrete member, characterized in that: It includes a main connecting part, on which at least two movable sleeves are sleeved, and each of the movable sleeves is fixedly connected to the main connecting part by welding; a connecting rod is fixedly provided on the side wall of each main connecting part, and the end of each connecting rod is threadedly connected to a steel sleeve, and the other end of the steel sleeve is used for threaded connection to the steel bar to be connected.
2. The staggered steel bar connector for concrete components according to claim 1, characterized in that: There are two movable sleeves, which are respectively located at both ends of the main connecting piece, and two connecting rods on the two movable sleeves are respectively located at both sides of the main connecting piece.
3. The staggered steel bar connector for concrete components according to claim 2, characterized in that: The main connecting piece is a straight pipe, a curved pipe or a straight pipe and curved pipe combination structure.
4. The staggered steel bar connector for concrete components according to claim 3, characterized in that: When the main connecting piece is a structure of a straight pipe and a bent pipe combination, the main connecting piece includes an integrated straight pipe section and a bent pipe section; The curved pipe section is an arc structure, and one end of the curved pipe section is fixedly connected to one end of the straight pipe section; A movable sleeve is provided on each of the straight pipe section and the curved pipe section; the movable sleeve located on the curved pipe section is provided with an arc matching it; the length direction of the connecting rod in the movable sleeve on the straight pipe section is perpendicular to the length direction of the straight pipe section, and the connecting rod in the movable sleeve on the curved pipe section is arranged toward the circular direction of the curved pipe section.
5. The staggered steel bar connector for concrete components according to any one of claims 1 to 4, characterized in that: The cross section of the main connecting piece is a rectangular hollow structure.
6. A method for connecting staggered steel bar connectors of concrete components based on any one of claims 1 to 5, characterized in that: The following steps are involved: Step 1: Install the steel sleeve: Thread the steel sleeve into the steel bar to be connected; Step 2: Install the connector: For parallel staggered steel bars, insert two movable square sleeves into both ends of the main connector; For spatially dislocated steel bars, two movable square sleeves are respectively inserted into the straight pipe section and the curved pipe section of the main connecting piece; Step 3: Determine the position: Move the two movable sleeves according to the spacing and angle of the dislocation of the steel bars to be connected. After the position is determined, rotate the steel sleeve to connect the connecting rod and the steel bars to be connected as a whole; Step 4: Welding and fixing: Weld the two movable sleeves to the main connector to ensure that there is no displacement between the main connector and the movable sleeve when the connector is subjected to force.