New energy power station management method and system based on Beidou positioning and electronic fence

Through the combination of Beidou positioning and electronic fence, the operating needs of new energy power stations are automatically judged and permissions are set, which solves the problem of inefficient manual approval in the existing technology, and achieves efficient authority management and operation response.

CN120450276AInactive Publication Date: 2025-08-08TIANJIN SHANGYONG MECHANICAL & ELECTRICAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510447762.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-10
Publication Date
2025-08-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing electronic fences require manual approval when adjusting task requirements in new energy power plants, which is inefficient.

Method used

Through the combination of Beidou positioning and electronic fence, the operation information of the power station equipment is obtained, temporary operation needs are automatically judged, and the operation work orders are generated, and permissions are automatically set based on the evaluation data of the operators to realize automated permission management.

Benefits of technology

Improve the efficiency of permission setting to ensure the safety of workers and the timely response of work needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120450276A_ABST
    Figure CN120450276A_ABST
Patent Text Reader

Abstract

The invention provides a new energy power station management method and system based on Beidou positioning and an electronic fence, and the method comprises the steps: determining whether a temporary operation demand exists or not according to the operation information of power station equipment in a to-be-monitored electronic fence of a new energy power station; if the temporary operation demand exists, generating an operation work order; in response to an order receiving request of the temporary operator who receives the order, obtaining evaluation data of the temporary operator who receives the order; according to the evaluation data and the operation information of the operation work order, determining the operation capability of the temporary operation personnel receiving the order; and if the operation capability is greater than the preset capability threshold value, setting a temporary access permission for the temporary operator who receives the order, thereby realizing automatic judgment of whether the temporary operator meets the authorization condition or not and automatic permission setting, and improving efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of placement technology, and in particular to a management method and system for a new energy power station based on Beidou positioning and electronic fences. Background Art

[0002] New energy sites such as wind farms and photovoltaic power stations are located in vast areas and have scattered equipment, making the safety management of new energy sites even more important.

[0003] In related technologies, in order to prevent people from entering the key areas of the substation at will, electronic fences are usually used to monitor whether people enter the electronic fences.

[0004] However, existing electronic fences require manual approval when task requirements need to be adjusted, which is inefficient. Summary of the Invention

[0005] The present invention provides a management method and system for a new energy power station based on Beidou positioning and electronic fences, which is used to solve the defect that the existing electronic fences need manual approval when task requirements need to be adjusted, resulting in low efficiency.

[0006] In one aspect, the present invention provides a management method for a new energy power station based on Beidou positioning and electronic fences, comprising: Obtaining the operating information of the power station equipment in the electronic fence to be monitored in the new energy power station; Determining whether there is a temporary operation demand based on the operation information; If there is a temporary operation requirement, generate an operation work order; wherein the operation work order includes operation information for the power station equipment; In response to an order acceptance request from a temporary worker who has accepted the order, obtaining evaluation data of the temporary worker who has accepted the order; wherein the evaluation data includes at least one of skill assessment data, historical work data, and work evaluation data; Determining the operational capability of the temporary operator who receives the order based on the evaluation data and the operational information; If the operating capacity is greater than a preset capacity threshold, temporary access permissions are set for the temporary operator who accepts the order.

[0007] According to a management method for a new energy power station based on Beidou positioning and electronic fencing provided by the present invention, the operating capability of the temporary operator who receives the order is determined based on the evaluation data and the operating information, including: Determining, based on the skill assessment data, a first score value for the temporary worker who receives the order to perform the operation based on the operation information; Determining, based on the historical operation data, a second score value for the temporary operator who receives the order to perform the operation based on the operation information; determining a third score value of the temporary worker who receives the order based on the operation evaluation data; The first score value, the second score value, and the third score value are comprehensively evaluated to obtain a comprehensive score of the temporary worker who accepts the order, which is used as the work ability of the temporary worker who accepts the order.

[0008] A management method for a new energy power station based on Beidou positioning and electronic fence provided by the present invention also includes: If the temporary worker who receives the order is a social worker, determining the matching degree between the social worker's operation data and the preset operation data; Determining the actual reward amount for the social worker based on the matching degree and the set benchmark reward amount; The actual reward amount is sent to the corresponding account of the social worker.

[0009] A management method for a new energy power station based on Beidou positioning and electronic fence provided by the present invention also includes: If the operation capacity is less than or equal to the preset capacity threshold, the temporary operator who receives the order is prohibited from entering, and after generating a prompt message, the operation work order is continued to be sent.

[0010] A management method for a new energy power station based on Beidou positioning and electronic fence provided by the present invention also includes: Counting the number of times the temporary workers who accepted the order were denied entry within a preset time period; If the number is greater than the preset number, a penalty strategy is generated.

[0011] A management method for a new energy power station based on Beidou positioning and electronic fence provided by the present invention also includes: Based on a preset extension value, the range of the electronic fence to be monitored is expanded to obtain an extended electronic fence; A sub-electronic fence for the temporary worker who receives the order is set within the electronic extended fence.

[0012] A management method for a new energy power station based on Beidou positioning and electronic fence provided by the present invention also includes: If an associated permission request is detected from the temporary worker who accepted the order, information about the associated object is obtained; The temporary access permission is associated with the associated object, and the activity area and activity time of the associated object are set.

[0013] A management method for a new energy power station based on Beidou positioning and electronic fence provided by the present invention also includes: If it is detected that the risk value of the electronic fence to be monitored is greater than a preset risk threshold, determining a contraction value corresponding to the risk value according to a preset relationship between the risk value and the contraction value; According to the shrinkage value, the range of the electronic fence to be monitored is shrunk to obtain a shrunk electronic fence.

[0014] A management method for a new energy power station based on Beidou positioning and electronic fence provided by the present invention also includes: If an unauthorized object is detected entering the risk warning area corresponding to the electronic fence to be monitored, a risk level is determined; Output warning information corresponding to the risk level and record warning records of the unauthorized object.

[0015] On the other hand, the present invention also provides a management system for a new energy power station based on Beidou positioning and electronic fence, which includes: A monitoring module is configured to obtain operating information of power station equipment within a monitored electronic fence of a new energy power station; determine whether a temporary operation requirement exists based on the operating information; and if so, generate an operation work order; wherein the operation work order includes operation information for the power station equipment; a response module, configured to obtain, in response to an order acceptance request from a temporary worker who has accepted an order, evaluation data of the temporary worker who has accepted the order; wherein the evaluation data includes at least one of skill assessment data, historical work data, and work evaluation data; a determination module, configured to determine the operating capability of the temporary operator who receives the order based on the evaluation data and the operating information; A setting module is used to set temporary access permissions for the temporary workers who accept the order if the operating capacity is greater than a preset capacity threshold.

[0016] On the other hand, the present invention also provides an electronic device, which includes a memory, a processor, and a computer program stored in the memory and runnable on the processor. When the processor executes the program, it implements a management method for a new energy power station based on Beidou positioning and electronic fence as described in any one of the above.

[0017] On the other hand, the present invention also provides a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, it implements the management method of the new energy power station based on Beidou positioning and electronic fence as described in any of the above.

[0018] On the other hand, the present invention also provides a computer program product, including a computer program, which, when executed by a processor, implements any of the above-mentioned methods for managing new energy power stations based on Beidou positioning and electronic fences.

[0019] The present invention provides a management method and system for a new energy power station based on Beidou positioning and electronic fences. The method and system obtain the operating information of the power station equipment in the electronic fence to be monitored of the new energy power station. When it is determined that there is a temporary operation demand based on the operating information, a work order containing the operation information of the power station equipment is generated. Then, in response to the order acceptance request of the temporary operator who accepts the order, the evaluation data of the temporary operator who accepts the order is obtained to determine the operation capability of the temporary operator who accepts the order. When the operation capability of the temporary operator who accepts the order is greater than a preset capability threshold, temporary access permissions are automatically set for the temporary operator who accepts the order, thereby automatically judging whether the temporary operator meets the authorization conditions and automatically setting permissions, thereby improving efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the present invention or the prior art, a brief introduction is given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0021] Figure 1 This is one of the flow charts of a management method for a new energy power station based on Beidou positioning and electronic fences provided by an embodiment of the present invention; Figure 2 This is the second flow chart of the management method of a new energy power station based on Beidou positioning and electronic fence provided by an embodiment of the present invention; Figure 3 This is a structural diagram of a management system for a new energy power station based on Beidou positioning and electronic fences provided by an embodiment of the present invention; Figure 4 It is a structural diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0022] To make the objectives, technical solutions, and advantages of the present invention more clear, the technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the embodiments described are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts shall fall within the scope of protection of the present invention.

[0023] Figure 1 This is one of the flow charts of the management method of the new energy power station based on Beidou positioning and electronic fence provided by the embodiment of the present invention. Figure 1As shown, the execution subject of the management method of the new energy power station based on Beidou positioning and electronic fence provided in the embodiment of the present invention can be a processor in an electronic device, and the method mainly includes the following steps: 101. Obtaining the operating information of the power station equipment in the electronic fence to be monitored of the new energy power station; In a specific implementation, the Geographic Information System (GIS) database of the new energy power station can be obtained based on the layout of the new energy power station. Based on the GIS database, multiple geo-fences can be drawn for the new energy power station. Each geo-fence can serve as a monitored geo-fence, containing corresponding power station equipment. Various data acquisition devices can be used to collect operational information about the power station equipment within the monitored geo-fences. For example, the power station can be divided into zones to dynamically allocate inspection tasks. A track-based robot equipped with visible light cameras, infrared thermal imagers, and voiceprint sensors can be deployed to inspect indoor equipment (such as switchgear and relay protection screens) in the substation along a pre-set track. A drone equipped with lidar, high-definition zoom cameras, and partial discharge sensors can autonomously plan routes to inspect photovoltaic arrays, collector lines, and tubular busbars. Fixed sensors can be installed on key equipment in the power station for 24 / 7 monitoring. Key equipment can be labeled based on actual needs; for example, tubular busbars and bushings can be designated as key equipment.

[0024] 102. Determine whether there is a temporary operation demand based on the operation information; In a specific implementation, feature extraction can be performed on the collected operational information to obtain a feature vector for each type of operational information. Based on the DS evidence theory, these feature vectors are then fused to determine whether the monitored electronic fence has a temporary operational requirement, such as requiring maintenance for power station equipment. This process can be referenced in related art for implementing multi-data fusion based on the DS evidence theory and will not be further elaborated here.

[0025] 103. If there is a temporary job requirement, generate a job work order; In one specific implementation, when a power plant equipment anomaly is determined, a temporary operation requirement can be determined, and the anomaly location and type can be obtained. Furthermore, historical data on the anomaly equipment can be linked to an operation plan library to generate an operation work order containing the power plant equipment's operation information. For example, the power plant equipment's operation information can include the anomaly location, operation type (also known as the anomaly type), operation plan (also known as the solution to the anomaly), and operation level (also known as the anomaly level, which can be set based on the severity of the anomaly).

[0026] 104. In response to an order acceptance request from a temporary worker who accepts an order, obtaining evaluation data of the temporary worker who accepts the order; In a specific implementation, a work order can be published through the platform. This allows relevant temporary workers to learn about the work order and accept it. Upon receiving a request from a temporary worker, the system can respond and obtain assessment data for the temporary worker. This assessment data includes at least one of skill assessment data, historical work data, and work evaluation data. Temporary workers in this context are individuals who do not have permission to enter the electronic fence to be monitored.

[0027] In a specific implementation, temporary worker skill assessment data includes their responses and operational performance during regular skill assessments. This data can be used to determine whether the temporary worker has met the assessment standards, preventing errors and improving the safety of both the temporary worker and the PV plant.

[0028] It should be noted that a temporary worker may only be good at solving some anomalies. Therefore, the assessment standards here can include comprehensive standards, that is, the comprehensive score when answering questions is greater than the first preset score threshold, and the comprehensive score when operating is greater than the first preset score threshold. It can also include single item standards. For example, when answering questions, the theoretical score for a certain type of anomaly is greater than the first preset score threshold, and when operating, the operational score for a certain type of anomaly is greater than the first preset score threshold. In this way, when temporary workers are needed to perform operations in the later stage, more temporary workers can be matched. However, in order to ensure the overall operating level of temporary workers, when a single item is met, the score values of other items also need to be greater than the second preset score threshold, where the second preset score threshold is less than the first preset score threshold.

[0029] In a specific implementation, the temporary worker's historical work data can reflect which types of work they have performed frequently and with high proficiency over the past period. The temporary worker's work evaluation data can also reflect their work level, work quality, and personal credit.

[0030] 105. Determine the operational capability of the temporary operator who receives the order based on the evaluation data and the operational information; In a specific implementation process, the first score value of the temporary worker who accepts the order for performing the operation based on the operation information can be determined based on the skill assessment data; the second score value of the temporary worker who accepts the order for performing the operation based on the operation information can be determined based on the historical operation data; the third score value of the temporary worker who accepts the order can be determined based on the operation evaluation data; the first score value, the second score value, and the third score value are comprehensively evaluated to obtain the comprehensive score of the temporary worker who accepts the order as the operation ability of the temporary worker who accepts the order.

[0031] In other words, the temporary worker's skill assessment data can be matched with the job type, job plan, etc. in the job information to determine whether the temporary worker has passed the assessment for the job type and job plan. This ensures that the temporary worker can complete the power plant equipment operation using the recommended job plan to address the abnormality of the job type. A corresponding first score is then obtained based on the temporary worker's skill assessment data. The larger the score value of the assessment data, the larger the first score obtained. Conversely, the smaller the score value of the assessment data, the smaller the first score obtained.

[0032] The historical operation data of temporary operators can be matched with the operation type, operation plan, etc. in the operation information to determine whether the temporary operators have performed operations on abnormalities of this operation type in the past, and whether the operation plan adopted by the temporary operators for this operation type is similar to or the same as the recommended operation plan, etc., so as to ensure that the temporary operators can complete the operation on the abnormalities of the power plant equipment using the recommended operation plan for this operation type, and obtain the corresponding second score value based on the historical operation data of the temporary operators.

[0033] The personal credit of the temporary operator can be determined based on the temporary operator's work evaluation data. The temporary operator's work quality, work level, personal credit, etc. when performing the work for the type of work can be used to obtain a third score value for the temporary operator's work on the power plant equipment.

[0034] After obtaining the three scores, a comprehensive evaluation can be performed to obtain a comprehensive score for each temporary worker, which serves as the worker's operational capability. A weighted fusion method or a fusion of the three scores based on DS evidence theory can be used to obtain the final comprehensive score for each temporary worker.

[0035] 106. If the operating capacity is greater than a preset capacity threshold, set temporary access permissions for the temporary operator who accepts the order.

[0036] In a specific implementation process, if the working capacity of the temporary worker who accepts the order is greater than the preset capacity threshold, temporary access permissions can be set for the temporary worker who accepts the order. In this way, the temporary worker who accepts the order does not need to apply for permissions again, and can directly enter the monitored electronic fence to perform operations during his later work.

[0037] In a specific implementation, a temporary worker who accepts an order may bring other people with them or drive a vehicle to perform the work. Therefore, the temporary worker who accepts the order needs to upload an association permission request, which includes information about the associated object. Once the association permission request is detected, the associated object's information can be extracted, the temporary access permission can be associated with the associated object, and the associated object's activity area and activity time can be set. For example, a vehicle's co-location path can be set.

[0038] In a specific implementation process, Beidou high-precision positioning, GPS positioning, AI face recognition and other technologies can be used to track temporary workers who receive orders and related objects in real time, authorize them, etc., so that temporary workers who receive orders and related objects can perform their operations smoothly.

[0039] The management method of the new energy power station based on Beidou positioning and electronic fence in this embodiment obtains the operating information of the power station equipment in the electronic fence to be monitored of the new energy power station, and when it is determined that there is a temporary operation demand based on the operating information, generates a work order containing the operation information of the power station equipment, and responds to the order request of the temporary operator who accepts the order, obtains the evaluation data of the temporary operator who accepts the order to determine the operation capability of the temporary operator who accepts the order, and automatically sets temporary access permissions for the temporary operator who accepts the order when the operation capability of the temporary operator who accepts the order is greater than the preset capability threshold, thereby realizing automatic judgment of whether the temporary operator meets the authorization conditions and automatic permission setting, thereby improving efficiency.

[0040] In a specific implementation, temporary workers who accept orders can include both operators at new energy power plants and qualified individuals from the general public, referred to as social workers. After a work order is generated, it is first sent to operators at new energy power plants. If operators at new energy power plants are unable to complete the work in a timely manner, the work order is then sent to social workers.

[0041] In a specific implementation process, if the temporary worker who accepts the order is a social worker, he or she needs to be paid. Therefore, the matching degree between the social worker's operation data and the preset operation data can be further determined; based on the matching degree and the set benchmark reward amount, the actual reward amount of the social worker is determined; and the actual reward amount is sent to the corresponding account of the social worker.

[0042] In one specific implementation, the maximum acceptable operating cost of the power plant equipment can be determined based on the obtained operating information; and the benchmark reward amount can be set based on the operating capability of each social worker and the maximum acceptable value. Specifically, the acceptable range of economic losses due to abnormalities in the operating object can be determined based on the operating type and level of the power plant equipment, combined with local labor costs, using a relevant cost estimation function. Based on this range, the maximum cost that can be incurred by a social worker performing the operation is determined as the maximum acceptable operating cost of the inspection object. Then, a benchmark reward amount is set for each social worker based on their operating capability and maximum acceptable value. The stronger the operating capability of a social worker, the greater the benchmark reward amount within the maximum acceptable value. Conversely, the weaker the operating capability of a social worker, the smaller the benchmark reward amount within the maximum acceptable value.

[0043] Figure 2 This is the second flow chart of the management method of a new energy power station based on Beidou positioning and electronic fence provided in an embodiment of the present invention.

[0044] 201. Obtaining operation information of power station equipment in the electronic fence to be monitored of the new energy power station; 202. Determine whether there is a temporary operation demand based on the operation information; 203. If there is a temporary operation requirement, generate an operation work order; wherein the operation work order includes operation information for the power station equipment; 204. In response to the order acceptance request of the temporary worker who has accepted the order, obtain evaluation data of the temporary worker who has accepted the order; wherein the evaluation data includes at least one of skill assessment data, historical work data, and work evaluation data; 205. Determine the operating capability of the temporary operator who receives the order based on the evaluation data and the operating information; 206. Check whether the operating capacity of the temporary operator who accepts the order is greater than the preset capacity threshold. If so, execute step 207; if not, execute step 208; 207. Setting temporary access permissions for the temporary workers who take the order; The above steps 201 to 207 can refer to the aforementioned related content and will not be repeated here.

[0045] 208. Setting a prohibited access permission for the temporary worker who receives the order, generating a prompt message, and then continuing to send the work order; In a specific implementation process, if the operating capacity is less than or equal to the preset capacity threshold, it means that the temporary worker who accepts the order does not meet the temporary operating requirements. The temporary worker who accepts the order can be set with a no-entry permission to prevent him from entering the electronic fence to be monitored. After generating a prompt message, the work order will continue to be sent until a person with qualified operating capacity is found.

[0046] 209. Count the number of times the temporary workers who accepted the order were denied entry within a preset time period; 210. If the number of times is greater than a preset number, generate a penalty strategy.

[0047] In a specific implementation, the number of times the temporary worker who accepts orders is denied entry within a preset time period can be counted. If the counted number exceeds the preset number, a penalty strategy is generated, such as canceling the temporary worker's order acceptance qualification. In this way, invalid orders can be prevented.

[0048] It should be noted that temporary workers can also actively send a request for work capability detection before accepting an order. This can prevent temporary workers from accepting invalid orders and increase the number of times they are banned from entering.

[0049] In a specific implementation, when there is a need for work within the monitored electronic fence, in order to improve the safety of the area corresponding to the monitored electronic fence, the range of the monitored electronic fence can be expanded based on a preset expansion value to obtain an extended electronic fence. In other words, the safety range can be appropriately expanded to provide more comprehensive monitoring. In addition, although temporary access permissions are set for temporary workers who receive orders, since the area of the monitored electronic fence is relatively large, the expanded area is even larger. To prevent temporary workers who receive orders from freely walking around in the extended electronic fence, a sub-electronic fence for the temporary workers who receive orders can be set within the electronic extended fence. In this way, only temporary workers who receive orders are allowed to work within the sub-electronic fence. In a specific implementation, risk prediction and risk detection can also be performed on the area corresponding to the monitored electronic fence to obtain a risk value for the monitored electronic fence. When the risk value of the monitored electronic fence is detected to be greater than a preset risk threshold, a contraction value corresponding to the risk value is determined based on the relationship between the preset risk value and the contraction value. Based on the contraction value, the range of the monitored electronic fence is contracted to obtain a contracted electronic fence, thereby dynamically adjusting the range of the electronic fence. Reduction values can be set based on different risk levels. For example, higher risk values correspond to higher reduction values, and vice versa. This allows for closer detection of external threats (such as intruders or natural disasters) by reducing the risk of a fence, concentrating monitoring resources on core areas (such as computer rooms and areas housing valuable equipment) and minimizing interference at the periphery. Furthermore, this narrowing of the range reduces sensor misjudgments of minor disturbances (such as passing animals) at the periphery, resulting in more accurate alerts. For example, in extreme weather conditions, when the risk level of the monitored fence is high, the fence can be retracted to prohibit unnecessary entry.

[0050] In a specific implementation, a certain distance inside or outside the monitored electronic fence is designated as a risk warning zone. Using technologies such as high-precision positioning, GPS positioning, and AI facial recognition, the system can identify the permissions of people or vehicles entering the risk warning zone corresponding to the monitored electronic fence. If unauthorized objects are present, the system can further determine the risk level, output an alarm message corresponding to the risk level, and record a warning of the unauthorized object. For example, risk levels can be categorized as level one (prompt), level two (warning), and level three (emergency): In a level one (prompt), if an unauthorized object approaches the boundary of the electronic fence (distance ≤ 5 meters), an audible and visual alert will be issued. In a level two (warning), if the out-of-bounds behavior persists for 10 seconds, a work order will be sent to the security officer. In a level three (emergency), if an unauthorized person enters the high-risk area illegally, the access control system will be locked and an emergency broadcast will be activated.

[0051] Based on the same general inventive concept, the present invention also protects a management system for a new energy power station based on Beidou positioning and electronic fences. The management system for a new energy power station based on Beidou positioning and electronic fences provided by the present invention is described below. The management system for a new energy power station based on Beidou positioning and electronic fences described below and the management method for a new energy power station based on Beidou positioning and electronic fences described above can be referred to each other.

[0052] Figure 3 This is a structural diagram of a management system for a new energy power station based on Beidou positioning and electronic fences provided by an embodiment of the present invention. Figure 3 As shown, the management system of the new energy power station based on Beidou positioning and electronic fence in this embodiment includes a monitoring module 31 , a response module 32 , a determination module 33 and a setting module 34 .

[0053] The monitoring module 31 is configured to obtain operating information of power station equipment within the electronic fence to be monitored in the new energy power station; determine whether there is a temporary operation requirement based on the operating information; and if so, generate an operation work order; wherein the operation work order includes operation information for the power station equipment; a response module 32 for obtaining, in response to an order acceptance request from a temporary worker who has accepted an order, evaluation data of the temporary worker who has accepted the order; wherein the evaluation data includes at least one of skill assessment data, historical work data, and work evaluation data; A determination module 33 is configured to determine the operating capability of the temporary operator who receives the order based on the evaluation data and the operating information; The setting module 34 is used to set temporary access permissions for the temporary operator who accepts the order if the operating capacity is greater than a preset capacity threshold.

[0054] Figure 4 4 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present invention. The management system for a new energy power station based on Beidou positioning and electronic fences may include: a processor 410, a communications interface 420, a memory 430, and a communication bus 440. The processor 410, the communications interface 420, and the memory 430 communicate with each other via the communication bus 440. The processor 410 may call the logic instructions in the memory 430 to execute the management method for a new energy power station based on Beidou positioning and electronic fences.

[0055] Furthermore, the logic instructions in the aforementioned memory 430 can be implemented as software functional units and, when sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the portion that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product, stored in a storage medium, includes instructions for enabling a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as a USB flash drive, a mobile hard drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.

[0056] On the other hand, the present invention also provides a computer program product, which includes a computer program, which can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the management method of the new energy power station based on Beidou positioning and electronic fence provided by the above methods.

[0057] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the management method of a new energy power station based on Beidou positioning and electronic fence provided by the above methods.

[0058] It should be noted that the relevant user personal information that may be involved in the various embodiments of this application is strictly in accordance with the requirements of laws and regulations, follows the principles of legality, legitimacy and necessity, and is based on the reasonable purposes of business scenarios to process personal information that users actively provide during the use of products / services or generated due to the use of products / services, as well as personal information obtained with the user's authorization.

[0059] The user personal information processed by this application will vary depending on the specific product / service scenario and must be based on the specific scenario in which the user uses the product / service. This may involve the user's account information, device information, driving information, vehicle information, or other related information. This application will treat the user's personal information and its processing with a high degree of diligence.

[0060] This application attaches great importance to the security of user personal information and has taken reasonable and feasible security protection measures that comply with industry standards to protect user information and prevent personal information from being accessed, disclosed, used, modified, damaged or lost without authorization.

[0061] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate, and the components shown as units may or may not be physical units, i.e., they may be located in one location or distributed across multiple network units. Some or all of the modules may be selected based on actual needs to achieve the objectives of the present embodiment. Persons of ordinary skill in the art will be able to understand and implement the present invention without inventive effort.

[0062] Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment can be implemented using software plus a necessary general-purpose hardware platform, or of course, hardware. Based on this understanding, the essence of the above technical solution, or the portion that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, or an optical disk, and includes a number of instructions for causing a computer device (such as a personal computer, server, or network device) to execute the methods described in each embodiment or certain portions of the embodiments.

[0063] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention.

Claims

1. A management method for a new energy power station based on Beidou positioning and electronic fence, characterized in that: include: Obtaining the operating information of the power station equipment in the electronic fence to be monitored in the new energy power station; Determining whether there is a temporary operation demand based on the operation information; If there is a temporary operation requirement, generate an operation work order; wherein the operation work order includes operation information for the power station equipment; In response to an order acceptance request from a temporary worker who has accepted the order, obtaining evaluation data of the temporary worker who has accepted the order; wherein the evaluation data includes at least one of skill assessment data, historical work data, and work evaluation data; Determining the operational capability of the temporary operator who receives the order based on the evaluation data and the operational information; If the operating capacity is greater than a preset capacity threshold, temporary access permissions are set for the temporary operator who accepts the order.

2. The management method of a new energy power station based on Beidou positioning and electronic fence according to claim 1 is characterized in that: Determining the operational capability of the temporary operator who receives the order based on the evaluation data and the operational information includes: Determining, based on the skill assessment data, a first score value for the temporary worker who receives the order to perform the operation based on the operation information; Determining, based on the historical operation data, a second score value for the temporary operator who receives the order to perform the operation based on the operation information; determining a third score value of the temporary worker who receives the order based on the operation evaluation data; The first score value, the second score value, and the third score value are comprehensively evaluated to obtain a comprehensive score of the temporary worker who accepts the order, which is used as the work ability of the temporary worker who accepts the order.

3. The management method of a new energy power station based on Beidou positioning and electronic fence according to claim 2 is characterized in that: Also includes: If the temporary worker who receives the order is a social worker, determining the matching degree between the social worker's operation data and the preset operation data; Determining the actual reward amount for the social worker based on the matching degree and the set benchmark reward amount; The actual reward amount is sent to the corresponding account of the social worker.

4. The management method of a new energy power station based on Beidou positioning and electronic fence according to claim 1 is characterized in that: Also includes: If the operation capacity is less than or equal to the preset capacity threshold, the temporary operator who receives the order is prohibited from entering, and after generating a prompt message, the operation work order is continued to be sent.

5. The management method of a new energy power station based on Beidou positioning and electronic fence according to claim 1, characterized in that: Also includes: Counting the number of times the temporary workers who accepted the order were denied entry within a preset time period; If the number is greater than the preset number, a penalty strategy is generated.

6. The management method of a new energy power station based on Beidou positioning and electronic fence according to claim 1, characterized in that: Also includes: Based on a preset extension value, the range of the electronic fence to be monitored is expanded to obtain an extended electronic fence; A sub-electronic fence for the temporary worker who receives the order is set within the electronic extended fence.

7. The management method of a new energy power station based on Beidou positioning and electronic fence according to claim 1, characterized in that: Also includes: If an associated permission request is detected from the temporary worker who accepted the order, information about the associated object is obtained; The temporary access permission is associated with the associated object, and the activity area and activity time of the associated object are set.

8. The management method of a new energy power station based on Beidou positioning and electronic fence according to any one of claims 1 to 7, characterized in that: Also includes: If it is detected that the risk value of the electronic fence to be monitored is greater than a preset risk threshold, determining a contraction value corresponding to the risk value according to a preset relationship between the risk value and the contraction value; According to the shrinkage value, the range of the electronic fence to be monitored is shrunk to obtain a shrunk electronic fence.

9. The management method of a new energy power station based on Beidou positioning and electronic fence according to any one of claims 1 to 7, characterized in that: Also includes: If an unauthorized object is detected entering the risk warning area corresponding to the electronic fence to be monitored, a risk level is determined; Output warning information corresponding to the risk level and record warning records of the unauthorized object.

10. A management system for a new energy power station based on Beidou positioning and electronic fence, characterized in that: include: A monitoring module is used to obtain the operating information of the power station equipment in the electronic fence to be monitored in the new energy power station; Determine whether there is a temporary operation requirement based on the operation information, and if so, generate an operation work order; wherein the operation work order includes operation information for the power station equipment; a response module, configured to obtain, in response to an order acceptance request from a temporary worker who has accepted an order, evaluation data of the temporary worker who has accepted the order; wherein the evaluation data includes at least one of skill assessment data, historical work data, and work evaluation data; a determination module, configured to determine the operating capability of the temporary operator who receives the order based on the evaluation data and the operating information; A setting module is used to set temporary access permissions for the temporary workers who accept the order if the operating capacity is greater than a preset capacity threshold.