Operation management system, method and equipment based on electrical design and storage medium
Through the operation and management system based on electrical design, the problems of insufficient traceability and controllability in electrical system management have been solved, the digital storage and three-dimensional visualization of electrical projects have been realized, the scientific nature of electrical project design and construction efficiency have been improved, and costs have been reduced.
Patent Information
- Application Number
- CN202510725912.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-03
- Publication Date
- 2025-09-12
AI Technical Summary
The existing electrical system management system has serious deficiencies in traceability and controllability, resulting in unclear cable identification, difficult troubleshooting, unclear equipment connection relationships, and difficult line modification, which increases construction costs and modification cycles.
Provide an operation and management system based on electrical design, including an information acquisition module, an intelligent management module and a visual display module. It plans cable routes through multi-source information, generates electrical project planning drawings and budgets, and performs three-dimensional visual display. It integrates mapping software and document software to establish a standardized data governance system.
It realizes the digital storage and 3D visualization operation of electrical projects, improves the scientific nature of electrical project design and construction efficiency, reduces manual intervention, saves manpower and time costs, quickly screens out the most cost-effective solution, and avoids waste of resources.
Smart Images

Figure CN120634131A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electrical system management, and in particular to an operation management system, method, device and storage medium based on electrical design. Background Art
[0002] In heavy industries such as large-scale mining, metallurgy, and steel, the continued expansion of enterprise scale and the rapid evolution of technology have led to frequent turnover of electrical operation and maintenance personnel, and issues in electrical system management have become increasingly prominent. Cable laying and bridge routing management are particularly prominent, significantly impacting production operations and safety benefits.
[0003] The current cable identification system suffers from numerous flaws: the end-of-line markings are simplistic and the material is easily damaged by environmental factors; and the middle section of the cable is completely unmarked. Numerous cables are densely interwoven in cable trenches or cable trays. The lack of central markings makes it difficult for maintenance personnel to quickly and accurately identify the cable's function, route, and operating status. This leads to significant difficulties in subsequent maintenance and operation, inefficient troubleshooting and operational execution, and prone to misjudgments and incorrect operations. Furthermore, the connection between switches and cables within distribution cabinets is unclear, making it difficult to intuitively determine which device a switch corresponds to and its operating status. When new equipment is added, it's difficult to identify available switches. Due to a lack of transparency, unused cables are often overlooked after equipment replacements, resulting in the duplication of new cables. Furthermore, the elevated location of cable trays within workshops makes it difficult to accurately assess the number of cables actually laid. This makes planning for line modifications challenging and inaccurate, leading to over-provisioning and inadequate design, increasing construction costs and renovation times. The existing electrical management system has serious deficiencies in traceability and controllability, which has become a key bottleneck restricting corporate production operations and equipment transformation. Summary of the Invention
[0004] In view of the above-mentioned deficiencies in the prior art, the present invention provides an operation management system, method, device and storage medium based on electrical design, which effectively solves the serious deficiencies in the traceability and controllability of the existing electrical management system.
[0005] In a first aspect, the present invention provides an operation management system based on electrical design, the system comprising:
[0006] An information acquisition module, configured to acquire multi-source information of an electrical project, wherein the multi-source information includes at least electrical equipment information, cable routing information, and user terminal information;
[0007] an intelligent management module, configured to plan a laying path for cable routing according to the multi-source information, and to generate an electrical project planning diagram and an electrical project budget based on the laying path and the multi-source information;
[0008] A visual display module is used to perform visual display based on the laying path and the electrical project planning diagram.
[0009] In an optional embodiment, the intelligent management module includes:
[0010] A power distribution line design unit, configured to generate a three-dimensional power distribution path based on the multi-source information, and perform spatial conflict detection based on the three-dimensional power distribution path to obtain a target power distribution line;
[0011] The cable route design unit is used to automatically route cables based on the integrated pipe gallery design plan, adjust cable trays, and manage cable laying to obtain the target cable route.
[0012] An electrical project planning unit is configured to generate the electrical project planning diagram and the electrical project budget based on the multi-source information, the target distribution line, and the target cable line.
[0013] In an optional embodiment, the power distribution line design unit includes:
[0014] A three-dimensional path design subunit, configured to determine element nodes of a distribution line and generate a plurality of the three-dimensional distribution paths according to the element nodes;
[0015] A spatial conflict detection subunit, configured to scan the spatial relationship of all elements of the plurality of three-dimensional power distribution paths to obtain conflict detection results;
[0016] A power distribution path decision subunit is configured to determine the target power distribution line according to the conflict detection result and the multi-source information.
[0017] In an optional embodiment, the cable line design unit includes:
[0018] The cable path planning subunit is used to automatically route cables according to the integrated pipe gallery design plan to obtain an initial cable path;
[0019] a cable tray adjustment subunit, configured to adjust the positions of the cable tray and the cable well according to the initial cable path to obtain a cable tray position;
[0020] The cable laying management subunit is used to adjust the cable laying position and bending radius according to the position of the cable tray to obtain the target cable line.
[0021] In an optional embodiment, the electrical project planning unit includes:
[0022] a load calculation subunit, configured to perform load calculation based on the multi-source information, the target distribution line, and the target cable line to obtain load information;
[0023] A project planning subunit, configured to allocate equipment according to the load information and generate the electrical project planning diagram;
[0024] The investment estimation subunit is used to perform investment estimation based on the multi-source information and the electrical project planning map to obtain the electrical project budget.
[0025] In an optional embodiment, the information acquisition module includes:
[0026] A mapping software integration unit is used to perform embedded integration with third-party mapping software through interface calls to obtain mapping files;
[0027] A heterogeneous file parsing unit, used for converting the format of the drawing file to obtain a system standard format file;
[0028] The document software collaboration unit is used to call the document software to edit the document and obtain the input information document.
[0029] In an optional embodiment, the visual display module includes:
[0030] A three-dimensional model display unit, configured to generate a three-dimensional model of the laying path and generate a two-dimensional cross-sectional view based on the three-dimensional model;
[0031] an equipment identification generating unit, configured to generate an electrical equipment identification according to the multi-source information, wherein the electrical equipment identification includes information corresponding to the electrical equipment;
[0032] The parameter document generating unit is used to obtain the engineering parameters in the three-dimensional model and fill the engineering parameters into the standard document template to obtain the parameter document of the electrical project.
[0033] In a second aspect, the present invention provides an operation management method based on electrical design, which is applied to the operation management system based on electrical design according to the first aspect of the present invention, and the method comprises:
[0034] Acquire multi-source information of an electrical project, the multi-source information including at least electrical equipment information, cable routing information, and user terminal information;
[0035] Planning a laying path for cable routing according to the multi-source information, and generating an electrical project planning diagram and an electrical project budget based on the laying path and the multi-source information;
[0036] Visual display is performed according to the laying path and the electrical project planning diagram.
[0037] In a third aspect, the present invention provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the operation and management method based on electrical design as described in the second aspect of the present invention.
[0038] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the operation management method based on electrical design as described in the second aspect of the present invention.
[0039] The electrical design-based operation management system, method, equipment and storage medium provided by the present invention store the electrical parameters of electrical projects in digital form, and provide an intuitive three-dimensional visual operating environment for relevant personnel by seamlessly integrating electrical engineering design elements into the circuit planning process, which facilitates the later maintenance and upgrading of electrical projects. At the same time, by integrating full-cycle data resources such as planning, design, and project execution, a standardized data governance system is established, multi-source heterogeneous data is structured and intelligently classified, and a central data warehouse covering the entire power supply and distribution business chain is constructed, thereby forming a traceable dynamic database, providing accurate data services for power design, construction, and operation management, and effectively improving the scientific nature and construction efficiency of electrical project design. Based on digital storage and three-dimensional display, manual intervention is effectively reduced, and manpower and time costs are greatly saved. In the links such as equipment selection and line path planning, the most cost-effective solution can be quickly screened to avoid waste of resources, so that the cost of the entire life cycle of the project can be effectively controlled. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying any creative work.
[0041] Figure 1 This is a first schematic diagram of the structure of an operation management system based on electrical design provided by an embodiment of the present invention;
[0042] Figure 2 This is a second schematic diagram of the structure of an operation management system based on electrical design provided by an embodiment of the present invention;
[0043] Figure 3 This is a third schematic diagram of the structure of an operation management system based on electrical design provided by an embodiment of the present invention;
[0044] Figure 4This is a fourth schematic diagram of the structure of an operation management system based on electrical design provided by an embodiment of the present invention;
[0045] Figure 5 This is a flow chart of an operation management method based on electrical design provided by an embodiment of the present invention;
[0046] Figure 6 It is a structural diagram of an electronic device provided by an embodiment of the present invention.
[0047] Description of main component symbols:
[0048] 100. Operation and management system based on electrical design; 110. Information acquisition module; 111. Drawing software integration unit; 112. Heterogeneous file parsing unit; 113. Document software collaboration unit; 120. Intelligent management module; 121. Distribution line design unit; 122. Cable line design unit; 123. Electrical project planning unit; 130. Visual display module; 131. Three-dimensional model display unit; 132. Equipment identification generation unit; 133. Parameter document generation unit; 600. Electronic device; 610. Processor; 620. Communication interface; 630. Memory; 640. Communication bus. DETAILED DESCRIPTION
[0049] To make the purpose, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be further clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. It should be noted that the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0050] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of the technical features being referred to. Thus, a feature identified as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.
[0051] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which this application belongs. The terms used in this specification are for the purpose of describing specific embodiments only and are not intended to limit the present invention. As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items.
[0052] The current cable identification system for electrical system management suffers from numerous flaws: The end-of-line markings are simplistic and easily damaged by environmental factors; and the middle sections of cables lack markings at all. Numerous cables are densely interwoven in cable trenches or cable trays. The lack of central markings makes it difficult for maintenance personnel to quickly and accurately identify the cable's function, routing, and operating status. This leads to significant difficulties in subsequent maintenance and operation, inefficient troubleshooting and operational execution, and prone to misjudgments and incorrect operations. Furthermore, the connection between switches and cables within distribution cabinets is unclear, making it difficult to intuitively identify the device to which the switch corresponds and its operating status. When new equipment is added, it's difficult to identify available switches. Due to a lack of transparency, unused cables are often overlooked after equipment replacements, leading to the duplication of new cables. Furthermore, the elevated location of cable trays within workshops makes it difficult to accurately assess the actual number of cables installed. This makes planning for line modifications challenging and inaccurate, leading to over-provisioning and inadequate design, increasing construction costs and renovation cycles. The existing electrical management system has serious deficiencies in traceability and controllability, which has become a key bottleneck restricting corporate production operations and equipment transformation.
[0053] Example 1
[0054] The embodiment of the present invention provides an operation management system based on electrical design, which effectively solves the serious deficiencies in the traceability and controllability of existing electrical management systems. Figure 1 This is a first schematic diagram of the structure of an operation management system based on electrical design provided by an embodiment of the present invention. Figure 1 As shown, the electrical design-based operation management system 100 includes an information acquisition module 110 , an intelligent management module 120 and a visual display module 130 .
[0055] The information acquisition module 110 is used to acquire multi-source information for electrical projects, including at least electrical equipment information, cable routing information, and user terminal information. The electrical equipment information includes, but is not limited to, the name and location of the distribution room, the number of distribution cabinets, the number of distribution cabinets, the number of distribution cabinet circuits, and the usage of the distribution cabinets. The cable routing information includes, but is not limited to, the cable number, cable model, cable start and end locations, cable tray number, cable installation height, installed cable type, and cable quantity. User terminal information includes, but is not limited to, the name, number, power, and location of the user terminal.
[0056] In the embodiment of the present invention, the electrical equipment information, cable routing information and user terminal information of the electrical project may be input into the information acquisition module 110 through drawings, tables and manual input. Figure 2 This is a second schematic diagram of the structure of the operation management system based on electrical design provided by an embodiment of the present invention. Figure 2 As shown, the information acquisition module 110 includes a mapping software integration unit 111 , a heterogeneous file parsing unit 112 and a document software collaboration unit 113 .
[0057] The drawing software integration unit 111 is used to achieve embedded integration with third-party drawing software via an interface call to obtain drawing files. In an embodiment of the present invention, the drawing software integration unit 111 can achieve embedded integration with third-party drawing software such as AUTOCAD and Bentley via an interface call, thereby supporting direct call of drawing software for engineering design from the system interface, establishing a unified drawing file management system, and realizing digital archiving, version control, online preview, and standardized output of design results.
[0058] The heterogeneous file parsing unit 112 is used to convert the format of the drawing file to obtain a system standard format file. In this embodiment of the present invention, the heterogeneous file parsing unit 112 has built-in AUTOCAD DWG format and Bentley DGN format parsing algorithms, thereby automatically completing the conversion of the drawing file to the system standard format file while preserving the original design metadata.
[0059] The document software collaboration unit 113 is used to call document software for document editing and obtain input information documents. In an embodiment of the present invention, the document software collaboration unit 113 achieves deep integration with Microsoft Office through COM component technology, supporting direct calling of document software such as Word and Excel for document editing within the system environment, thereby establishing a full lifecycle management system for text documents, providing online editing and annotation, template generation, and cross-platform synchronized storage capabilities.
[0060] The information acquisition module 110 collects information during the design and construction phases of electrical projects. It quickly and easily accesses equipment information during later maintenance and modification phases, providing optimal maintenance and modification solutions. It also supports the input of files in multiple formats, including but not limited to Word, Excel, DWG, and PDF. It can also scan and input information using a barcode scanner, automatically compiling the input information or manually editing and modifying it.
[0061] Intelligent management module 120 plans cable routing paths based on multi-source information and generates electrical project plans and budgets based on these routing paths and multi-source information. Intelligent management module 120 is the nerve center of the entire system, responsible for storing, calculating, compiling, and managing multi-source information. It provides optimal routing for cable trays, cables, and other equipment, enhancing the convenience and scientific nature of electrical project design. Figure 3 This is a third schematic diagram of the structure of an operation management system based on electrical design provided by an embodiment of the present invention. Figure 3As shown, the intelligent management module 120 includes a power distribution line design unit 121 , a cable line design unit 122 and an electrical project planning unit 123 .
[0062] The distribution line design unit 121 is used to generate a three-dimensional distribution path based on multi-source information, perform spatial conflict detection on the three-dimensional distribution path, and obtain the target distribution line. The distribution line design unit 121 includes a three-dimensional path design subunit, a spatial conflict detection subunit, and a distribution path decision subunit.
[0063] The 3D path design subunit is used to determine the element nodes of the distribution line and generate multiple 3D distribution paths based on the element nodes. The 3D path design subunit provides an intuitive 3D visualization operating environment, supports the three-dimensional display and analysis of design results, and realizes the full-process 3D design of the distribution line. In the 3D path design subunit, users can independently define the element nodes of the distribution line. The element nodes include but are not limited to the starting point, end point and turning point. The 3D path design subunit can automatically generate topological connections based on the set coordinates and display the path information in real time. At the same time, an interactive node editing tool is provided, which allows real-time dragging and correction of positioning coordinates, and the horizontal spacing indicators between the conductors and ground attachments are synchronously calculated and visualized through the spatial analysis engine. The 3D path design subunit also has the ability to collaboratively manage multiple schemes. It can create and store multiple alternative 3D distribution paths in the same coordinate system, and support the on-demand activation and hiding of views of specific 3D distribution paths.
[0064] The spatial conflict detection subunit is used to scan the spatial relationships of all elements of multiple three-dimensional power distribution paths to obtain conflict detection results. In an embodiment of the present invention, the spatial conflict detection subunit integrates an intelligent recognition component. When the user activates the detection command, it can automatically scan the spatial relationships of all elements, accurately mark the risk sections with horizontal clearance defects and the key nodes where line crossings and crossing special areas occur. The detection results are visualized through layered overlay display technology, and structured annotation information containing violation type, location coordinates and risk level is generated, thereby automatically detecting path segments that do not meet safety distance requirements and providing information on cross-over or crossing path segments.
[0065] The distribution path decision subunit is used to determine the target distribution line based on conflict detection results and multi-source information. In an embodiment of the present invention, the distribution path decision subunit has a built-in multi-dimensional evaluation system that can perform quantitative comparative analysis of various technical parameters of multiple three-dimensional distribution paths, including but not limited to span compliance, engineering workload, and environmental impact. Based on a preset algorithm model, the distribution path decision subunit automatically generates a decision recommendation report with a ranking of advantages and disadvantages, helping users quickly identify the optimal target distribution line. For example, a distribution line originates at a distribution cabinet in a distribution room and terminates at a power-consuming device. Several different cable routing paths are available between the origin and the endpoint. Each routing path is evaluated based on ten indicators: total length, cable trench length, bridge length, conduit length, height difference, number of turns, number of collisions with other equipment and pipelines, impact on other equipment along the path, engineering workload, and required cost. Each indicator is scored and weighted to determine a total score for each routing path. The routing path with the highest total score is the optimal target distribution line.
[0066] Intelligently match cable tray routes based on the path characteristics of the target distribution line, support three-dimensional spatial position adjustment, and automatically connect electrical equipment and control switches based on wire selection specifications, and automatically issue warnings when requirements are not met.
[0067] The cable route design unit 122 is used to automatically route cables based on the integrated pipe gallery design plan, adjust cable trays, and manage cable laying to obtain the target cable route. The cable route design unit 122 includes a cable path planning subunit, a cable tray adjustment subunit, and a cable laying management subunit.
[0068] The cable routing subunit is used to automatically route cables based on the integrated pipe gallery design to obtain an initial cable path. In this embodiment of the present invention, the cable routing subunit, combined with the integrated pipe gallery design for electrical projects, automatically avoids cable trays and other specialized pipelines, supports node selection and path comparison to automatically route cables and obtain an initial cable path.
[0069] For example, a comprehensive pipeline corridor is 2 meters wide and 2.5 meters high, in which water supply pipes, drainage pipes, thermal pipes, communication pipes, high-voltage cable trays, low-voltage cable trays and other pipes are arranged. Now a layer of power cable tray is to be laid, and the initial elevation of the starting and ending points is set to 1.8 meters. The cable path planning subunit automatically detects whether there are other pipeline collisions along the entire length of the 1.8-meter elevation pipeline corridor. If there are no other pipeline collisions, the cable is laid directly. If there are other pipeline collisions, the cable is raised 0.1 meters at the collision position to detect whether there are other pipeline collisions. And so on until there are no other pipeline collisions and then continue to lay the cables. If there are other pipeline collisions within the entire 2.5-meter range, a fault message is sent and manual intervention is performed by relevant staff.
[0070] Optionally, an intelligent path planning algorithm drives the construction of the pipeline corridor network, integrating the BIM model library to achieve a dual mode of automatic topology connection and manual intervention. Equipped with a real-time compliance verification engine, it dynamically verifies the pipeline corridor network's line parameters according to the IEC 61937 standard. Abnormal operating conditions trigger a three-level early warning response mechanism (visual warning + audio and video prompts + logging). The cable path planning subunit opens a pipeline corridor vector parameter adjustment interface, supporting manual optimization of longitudinal slope and transverse curvature.
[0071] The cable tray adjustment subunit is used to adjust the position of the cable tray and the cable well according to the initial cable path to obtain the position of the cable tray. When, in an embodiment of the present invention, the cable needs to cross the road, the cable well can be manually arranged and the position adjusted to automatically match the three-dimensional design scene, thereby realizing automatic or manual connection between the cable well and the cable tray, and supporting longitudinal and transverse curvature adjustment. The cable well is an important component connecting the cable trench and the cable tray. The cable tray adjustment subunit provides an interactive layout construction plan in a three-dimensional and two-dimensional dual-modal design environment, and realizes intelligent matching and precise placement of modules based on a preset engineering parameter database. At the same time, the cable tray adjustment subunit synchronously supports multi-dimensional coordinate correction functions, allowing users to make fine adjustments to the deployed cable wells through operations such as translation and rotation.
[0072] The cable laying management subunit is used to adjust the cable laying position and bending radius according to the cable tray position to obtain the target cable route. In an embodiment of the present invention, the cable laying management subunit combines the wire selection database and the topology logic verification engine to realize the automatic adjustment of the cable tray and the layout of the wires in three-dimensional space, and is equipped with a plane section collaborative design engine to synchronize the associated data of the three-dimensional model and the two-dimensional drawing in real time. According to the selected cable tray position, the node topology editing and path scheme comparison algorithm are used to realize the automatic laying of the cable line, and the places that do not meet the laying requirements are marked with colors. At the same time, manual adjustment of the cable laying position and bending radius is supported.
[0073] For example, if a cable needs to be laid from point A to point E, there are two possible routes: ABDE and ACDE. Point D is a mandatory point, while points B and C are optional. The cable laying management subunit first queries the number of cables laid on the cable trays in sections AB, BD, AC, and CD to determine whether there is space for an additional cable, prioritizing the path with the fewest cables. It then queries the number of cables at points B and C to determine whether there is space for an additional cable, prioritizing the point with the largest space. Finally, it comprehensively compares the two route options to select the optimal target cable route.
[0074] After obtaining the target cable line, visual positioning technology is used to determine the cable movement path by clicking on the interface. During the modeling stage, the minimum turning radius of cable trays, cables and steel pipes is defined in the cross-sectional parameter database according to the specifications. Automatic path generation is achieved by integrating the cross-sectional parameter database with the bending radius algorithm. During the drawing stage, if a cable needs to be laid from A to C, click on points A, B and C in sequence. The cable laying management subunit automatically detects the need for a turn and automatically generates a path according to the minimum radius based on the properties of the cable.
[0075] In terms of safety verification, the cable laying management subunit incorporates a multi-dimensional compliance verification system, intelligently analyzing conductor and bridge clearances in accordance with the GB 50217 standard. Design flaws are intuitively identified through a red, yellow, and blue warning system. Furthermore, the cable laying management subunit supports automatic bridge routing and engineering attribute annotation. Its spatial topology construction module enables automatic angle adaptation of components such as cable bridge accessories, while the cross-over verification function uses three-dimensional coordinate system conversion technology to accurately calculate conductor-to-ground distances and safety clearance requirements. This ultimately forms a complete digital workflow encompassing planning and design, construction simulation, and operations and maintenance management, significantly improving the efficiency and reliability of power supply and distribution design.
[0076] Optionally, path optimization can be performed based on constraints such as safe distances between the cable tray and other nearby equipment and crossovers. For example, a safe clearance distance is set between the cable tray and other electrical equipment. The cable laying management subunit then determines the distance between the entire cable tray and nearby electrical equipment. If the distance is greater than or equal to the safe clearance distance, no optimization is required. If the distance is less than the safe clearance distance, the cable tray laying path is automatically adjusted to ensure that the distance meets regulatory requirements. A prompt is given when a more optimal path is detected, and the designer decides whether to optimize.
[0077] The electrical project planning unit 123 is used to generate an electrical project planning diagram and an electrical project budget based on multi-source information, target distribution lines, and target cable lines. The electrical project planning unit 123 includes a load calculation subunit, a project planning subunit, and an investment estimation subunit.
[0078] The load calculation subunit is used to calculate loads based on multi-source information, target distribution lines, and target cable lines to obtain load information. In this embodiment of the present invention, the load calculation subunit summarizes and organizes electrical equipment information such as device name, power, installed quantity, operating quantity, demand coefficient, power factor, daily workday, and working hours to calculate load information such as installed capacity, operating capacity, active power, reactive power, and apparent power.
[0079] The project planning subunit is used to allocate equipment based on load information and generate an electrical project planning diagram. In an embodiment of the present invention, the project planning subunit automatically generates an electrical project planning diagram by allocating the appropriate number and capacity of transformers, displaying the load status of transformers and busbars in real time.
[0080] The investment estimation subunit is used to perform an investment estimate based on multi-source information and the electrical project plan to obtain an electrical project budget. In this embodiment of the present invention, the investment estimation subunit calculates equipment costs, transportation costs, installation costs, management fees, and other expenses based on the unit price and quantity of electrical equipment, thereby estimating the investment for the electrical portion of the entire electrical project and obtaining the electrical project budget.
[0081] The visualization display module 130 is used to perform visualization based on the laying path and the electrical project planning diagram. The visualization display module 130 can conveniently and quickly display the location and size of the distribution room of the entire electrical project, the number and function of the distribution cabinets, the laying path of cables and bridges, the location and electrical parameters of electrical equipment, etc., which can be displayed in the control center, display screen or handheld terminal. Figure 4 This is a fourth schematic diagram of the structure of an operation management system based on electrical design provided by an embodiment of the present invention. Figure 4 As shown, the visualization display module 130 includes a three-dimensional model display unit 131 , a device identification generation unit 132 and a parameter document generation unit 133 .
[0082] The three-dimensional model display unit 131 is used to generate a three-dimensional model of the laying path and generate a two-dimensional cross-sectional view based on the three-dimensional model. In an embodiment of the present invention, the three-dimensional model display unit 131 can realize multi-level visual interaction. Its core functions include a high-precision three-dimensional scene rendering engine, support for multi-scale model detail magnification, arbitrary perspective rotation observation and spatial coordinate positioning functions, support for fly-through browsing of cable paths, detail magnification and attribute query functions, and realize millimeter-level precision interactive review of three-dimensional models. At the same time, it realizes seamless linkage between the three-dimensional model and the two-dimensional cross-sectional design, supports the output of two-dimensional plan and cross-sectional drawings of cable trays at any point in the cable route. The three-dimensional model display unit 131 can automatically generate a cross-sectional view based on the selected location, intuitively presenting the laying layout of the cable tray and cables, and meeting the visualization requirements of engineering design.
[0083] The device identification generation unit 132 is used to generate an electrical device identification based on multi-source information. The electrical device identification includes information about the corresponding electrical device. In an embodiment of the present invention, the device identification generation unit 132 compiles the information of each electrical device and component, produces and generates an electronic tag, and forms a unique QR code. Optionally, the QR code can be printed on the electrical equipment and components using a spray gun to facilitate later inquiries. When the electrical project needs to be repaired or upgraded later, detailed information about the electrical equipment and components can be obtained by simply scanning the QR code on the electrical equipment and components with a scanning device, without having to check the original drawings, which greatly improves work efficiency.
[0084] The parameter document generation unit 133 is used to obtain engineering parameters from the 3D model and populate them into a standard document template to create a parameter document for the electrical project. In this embodiment of the present invention, the parameter document generation unit 133 stores standardized document templates such as Word and Excel. It automatically extracts engineering data, such as device parameters and topological relationships, from the 3D design model and intelligently populates them into the corresponding fields of the standard document template to create a parameter document for the electrical project. Template revisions can also be made within the Office software or platform interface, with modifications synchronized to the template database in real time, recording all changes to the standard document template and associated design project information.
[0085] The electrical design-based operation and management system provided by the embodiment of the present invention stores the electrical parameters of electrical projects in digital form. By seamlessly integrating electrical engineering design elements into the circuit planning process, it provides relevant personnel with an intuitive three-dimensional visual operating environment, facilitating the subsequent maintenance and upgrade of electrical projects. At the same time, by integrating full-cycle data resources such as planning, design, and project execution, a standardized data governance system is established, multi-source heterogeneous data is structured and intelligently classified, and a central data warehouse covering the entire power supply and distribution business chain is constructed, thereby forming a traceable dynamic database, providing accurate data services for power design, construction, and operation management, and effectively improving the scientific nature of electrical project design and construction efficiency.
[0086] Example 2
[0087] Based on the same technical concept as the above embodiment 1, an embodiment of the present invention provides an operation management method based on electrical design, which is applied to the operation management system 100 based on electrical design in the above embodiment 1. Figure 5 This is a flow chart of an operation management method based on electrical design provided by an embodiment of the present invention. Figure 5 As shown, the method includes the following steps:
[0088] S100: Acquire multi-source information of an electrical project, where the multi-source information includes at least electrical equipment information, cable routing information, and user terminal information.
[0089] S200 , planning a laying path for cable routing according to multi-source information, and generating an electrical project planning diagram and an electrical project budget based on the laying path and the multi-source information.
[0090] S300: Visual display is performed based on the laying path and electrical project planning diagram.
[0091] The electrical design-based operation and management method provided by the present invention effectively reduces manual intervention based on digital storage and three-dimensional display, significantly saving manpower and time costs. In aspects such as equipment selection and line path planning, it can quickly screen out the most cost-effective solution, avoid waste of resources, and effectively control the cost of the project throughout its life cycle.
[0092] It can be understood that the implementation method of the operation management system based on electrical design described in the above embodiment 1 is also applicable to this embodiment and can achieve the same technical effect, so it will not be repeated here.
[0093] Example 3
[0094] Based on the same concept, an embodiment of the present invention further provides an electronic device, Figure 6 is a schematic structural diagram of an electronic device provided by an embodiment of the present invention, such as Figure 6 As shown, the electronic device 600 may include: a processor 610, a communication interface 620, a memory 630, and a communication bus 640, wherein the processor 610, the communication interface 620, and the memory 630 communicate with each other via the communication bus 640. The processor 610 may call the logic instructions in the memory 630 to execute the steps of the operation management method based on electrical design as described in the above embodiments, for example, including:
[0095] S100, acquiring multi-source information of an electrical project, where the multi-source information includes at least electrical equipment information, cable routing information, and user terminal information;
[0096] S200, planning a laying path for cable routing according to the multi-source information, and generating an electrical project planning diagram and an electrical project budget based on the laying path and the multi-source information;
[0097] S300: Visual display is performed based on the laying path and electrical project planning diagram.
[0098] The processor 610 may be a central processing unit (CPU). The processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.
[0099] In addition, the logic instructions in the above-mentioned memory 630 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0100] The memory 630 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the processor, etc. In addition, the memory may include a high-speed random access memory, and may also include a non-transitory memory, such as at least one disk storage device, a flash memory device, or other non-transitory solid-state storage device. In some embodiments, the memory may optionally include a memory remotely located relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0101] Example 4
[0102] Based on the same concept, an embodiment of the present invention further provides a computer-readable storage medium storing a computer program. The computer program includes at least one code segment. The at least one code segment can be executed by a main control device to control the main control device to implement the steps of the electrical design-based operation management method described in the above embodiments, for example, including:
[0103] S100, acquiring multi-source information of an electrical project, where the multi-source information includes at least electrical equipment information, cable routing information, and user terminal information;
[0104] S200, planning a laying path for cable routing according to the multi-source information, and generating an electrical project planning diagram and an electrical project budget based on the laying path and the multi-source information;
[0105] S300: Visual display is performed based on the laying path and electrical project planning diagram.
[0106] Based on the same technical concept, an embodiment of the present invention further provides a computer program, which, when executed by a main control device, is used to implement the above method embodiment.
[0107] The computer program may be stored in whole or in part on a computer-readable storage medium packaged with the processor, or may be stored in whole or in part on a memory not packaged with the processor.
[0108] Based on the same technical concept, an embodiment of the present invention further provides a processor for implementing the above method embodiment. The above processor may be a chip.
[0109] In summary, the operation management system, method, equipment and storage medium based on electrical design provided by the present invention store the electrical parameters of electrical projects in digital form, and provide an intuitive three-dimensional visual operating environment for relevant personnel by seamlessly integrating electrical engineering design elements into the circuit planning process, which is convenient for the later maintenance and upgrading of electrical projects. At the same time, by integrating full-cycle data resources such as planning, design, and project execution, a standardized data governance system is established, multi-source heterogeneous data is structured and intelligently classified, and a central data warehouse covering the entire power supply and distribution business chain is constructed, thereby forming a traceable dynamic database, providing accurate data services for power design, construction and operation management, and effectively improving the scientific nature and construction efficiency of electrical project design. Based on digital storage and three-dimensional display, manual intervention is effectively reduced, manpower and time costs are greatly saved, and the most cost-effective solution can be quickly screened in links such as equipment selection and line path planning, avoiding waste of resources, and effectively controlling the cost of the entire life cycle of the project.
[0110] References herein to "embodiments" mean that a particular feature, structure, or characteristic described in connection with the embodiments may be included in at least one embodiment of the present application. The appearance of this phrase in various places in the specification does not necessarily refer to the same embodiment, nor does it constitute an independent or alternative embodiment that is mutually exclusive of other embodiments. It is understood, both explicitly and implicitly, by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0111] The above-described embodiments merely illustrate several implementations of the present invention, and while their descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the present invention. It should be noted that a person skilled in the art would be able to make numerous variations and improvements without departing from the spirit of the present invention, all of which fall within the scope of protection of the present invention. Therefore, the scope of protection of the present invention shall be determined by the appended claims.
[0112] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims
1. An operation management system based on electrical design, characterized in that: The system comprises: An information acquisition module, configured to acquire multi-source information of an electrical project, wherein the multi-source information includes at least electrical equipment information, cable routing information, and user terminal information; an intelligent management module, configured to plan a laying path for cable routing according to the multi-source information, and to generate an electrical project planning diagram and an electrical project budget based on the laying path and the multi-source information; A visual display module is used to perform visual display based on the laying path and the electrical project planning diagram.
2. The operation management system based on electrical design according to claim 1, characterized in that: The intelligent management module includes: A power distribution line design unit, configured to generate a three-dimensional power distribution path based on the multi-source information, and perform spatial conflict detection based on the three-dimensional power distribution path to obtain a target power distribution line; The cable route design unit is used to automatically route cables based on the integrated pipe gallery design plan, adjust cable trays, and manage cable laying to obtain the target cable route. An electrical project planning unit is configured to generate the electrical project planning diagram and the electrical project budget based on the multi-source information, the target distribution line, and the target cable line.
3. The operation management system based on electrical design according to claim 2, characterized in that: The distribution line design unit includes: A three-dimensional path design subunit, configured to determine element nodes of a distribution line and generate a plurality of the three-dimensional distribution paths according to the element nodes; A spatial conflict detection subunit, configured to scan the spatial relationship of all elements of the plurality of three-dimensional power distribution paths to obtain conflict detection results; A power distribution path decision subunit is configured to determine the target power distribution line according to the conflict detection result and the multi-source information.
4. The operation management system based on electrical design according to claim 2, characterized in that: The cable line design unit includes: The cable path planning subunit is used to automatically route cables according to the integrated pipe gallery design plan to obtain an initial cable path; a cable tray adjustment subunit, configured to adjust the positions of the cable tray and the cable well according to the initial cable path to obtain a cable tray position; The cable laying management subunit is used to adjust the cable laying position and bending radius according to the position of the cable tray to obtain the target cable line.
5. The operation management system based on electrical design according to claim 2, characterized in that: The electrical project planning unit includes: a load calculation subunit, configured to perform load calculation based on the multi-source information, the target distribution line, and the target cable line to obtain load information; A project planning subunit, configured to allocate equipment according to the load information and generate the electrical project planning diagram; The investment estimation subunit is used to perform investment estimation based on the multi-source information and the electrical project planning map to obtain the electrical project budget.
6. The operation management system based on electrical design according to claim 1, characterized in that: The information acquisition module includes: A mapping software integration unit is used to perform embedded integration with third-party mapping software through interface calls to obtain mapping files; A heterogeneous file parsing unit, used for converting the format of the drawing file to obtain a system standard format file; The document software collaboration unit is used to call the document software to edit the document and obtain the input information document.
7. The operation management system based on electrical design according to claim 6, characterized in that: The visual display module includes: A three-dimensional model display unit, configured to generate a three-dimensional model of the laying path and generate a two-dimensional cross-sectional view based on the three-dimensional model; an equipment identification generating unit, configured to generate an electrical equipment identification according to the multi-source information, wherein the electrical equipment identification includes information corresponding to the electrical equipment; The parameter document generating unit is used to obtain the engineering parameters in the three-dimensional model and fill the engineering parameters into the standard document template to obtain the parameter document of the electrical project.
8. An operation management method based on electrical design, applied to the operation management system based on electrical design according to any one of claims 1 to 7, characterized in that: The method comprises: Acquire multi-source information of an electrical project, the multi-source information including at least electrical equipment information, cable routing information, and user terminal information; Planning a laying path for cable routing according to the multi-source information, and generating an electrical project planning diagram and an electrical project budget based on the laying path and the multi-source information; Visual display is performed according to the laying path and the electrical project planning diagram.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: The processor executes the computer program to implement the electrical design-based operation management method according to claim 8.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the operation management method based on electrical design according to claim 8 is implemented.