Offshore equipment side mounting device for offshore oil platform

By using a combination of articulated steel and inclined fall chains on offshore oil platforms, the problem of the side-mounted platform being difficult to quickly disassemble and assemble is solved, an efficient and safe equipment side-mounting process is achieved, and construction risks and workload are reduced.

CN120793087APending Publication Date: 2025-10-17OFFSHORE OIL ENG QINGDAO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510963710.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-07-14
Publication Date
2025-10-17

AI Technical Summary

Technical Problem

During the side installation process of equipment on offshore oil platforms, the side-mounted platform is not easy to disassemble and assemble quickly, and there are welding and cutting operations that are difficult, high-risk, and labor-intensive, and the construction is not reliable enough.

Method used

The combined structure of articulated steel and inclined fall chains is adopted. Through the cooperation of crane and fall chains, an articulated connection between the side-mounted platform and the offshore oil platform is realized, replacing traditional welding and welded diagonal bracing. The inclined fall chains are used to adjust the platform installation level to ensure construction reliability.

Benefits of technology

It enables convenient installation and removal of the side-mounted platform, reduces the workload of difficult welding and cutting operations, improves construction safety and efficiency, and reduces the workload of post-weld paint repair and scaffolding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120793087A_ABST
    Figure CN120793087A_ABST
Patent Text Reader

Abstract

The invention relates to the field of side mounting devices, in particular to an offshore oil platform offshore equipment side mounting device which comprises an offshore oil platform and further comprises a side mounting part fixedly mounted on one side of the offshore oil platform. And the two connecting parts are symmetrically arranged, the connecting parts are fixedly mounted at the positions, close to the edge of one side, of the upper surface of the side mounting part, and the side mounting part is hinged to the offshore oil platform through the connecting parts. In the invention, the sling of the crane is mounted on the hoisting point, the welding between the side-mounted platform and the offshore oil platform is replaced by hinging, and the welding inclined strut below the side-mounted platform is replaced by the inclined pulling chain block, so that the side-mounted platform is convenient and efficient to mount and dismount, and welding and offshore cutting operation with high difficulty, high risk and large workload are not needed; and the workload of paint repair after welding and the workload of building and dismantling the scaffold are greatly reduced. The installation levelness of the side installation platform can be accurately adjusted by adjusting the inclined pulling chain block, and the side installation construction reliability of equipment is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the field of side loading devices, in particular to a marine oil platform offshore equipment side loading device. BACKGROUND

[0002] The marine oil platform is built on land in a manner similar to building with blocks. Generally, mechanical equipment is hoisted to a coordinate position for installation before the upper deck piece is installed. However, due to delayed delivery of mechanical equipment and a tight platform construction period, there are cases where the equipment installation time is later than the upper deck piece installation time. Due to the obstruction of the upper deck piece, the equipment cannot be directly hoisted into place. Therefore, the construction team usually builds a side loading platform on the ground next to the platform on the outside of the platform. The equipment is hoisted onto the side loading platform and pulled and slid to the coordinate position for installation using auxiliary tools such as a chain and a slide rail. The above process is defined as "side loading", and the side loading platform is a key device in the side loading process. The side loading platform is usually composed of a platform welded by H-shaped steel of a certain specification, and a round steel pipe as a leg standing on the ground. In addition to the equipment side loading during the land construction of the marine oil platform, there are also cases of offshore side loading of some equipment. Unlike the construction of the side loading platform during the land construction process, the construction of the offshore side loading platform often uses a diagonal brace welded to the oil platform as a leg, and the side loading platform is welded to the oil platform next to it. This process not only has high difficulty and risk, but also requires the construction of a large number of scaffolds for assistance. After the offshore side loading is completed, the side loading platform, the diagonal brace, and the damaged paint surface need to be cut and removed, and a large number of scaffolds also need to be removed, all of which have high operation risk and large workload.

[0003] During side loading, there is a problem that the side loading platform is not convenient to quickly disassemble and assemble. In view of this, a marine oil platform offshore equipment side loading device is provided. SUMMARY

[0004] The main purpose of the present application is to provide a marine oil platform offshore equipment side loading device to solve the problem of inconvenient and quick disassembly and assembly of the side loading platform during side loading in the related art.

[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a marine oil platform offshore equipment side loading device is provided, comprising a marine oil platform, further comprising: a side loading part, the side loading part is fixedly installed on one side of the marine oil platform; two connection parts are symmetrically arranged, the connection part is fixedly installed on the upper surface of the side loading part close to the side edge, and the side loading part is hingedly connected with the marine oil platform through the connection part.

[0006] Further, the offshore oil platform comprises a side-mounted layer structure beam, and a hinge point is fixedly installed on the upper surface of the side-mounted layer structure beam near one side edge.

[0007] Further, the side-mounted part comprises a side-mounted platform, a plurality of hoisting lifting points are fixedly installed on the upper surface of the side-mounted platform, and two side-mounted lifting points are symmetrically fixedly installed on the edge of the upper surface of the side-mounted platform.

[0008] Further, the connecting part comprises a hinge head profile steel, and the hinge head profile steel is fixedly installed on the upper surface of the side-mounted platform near one side edge.

[0009] Further, a hinge head lifting point is fixedly installed on the upper surface of the hinge head profile steel.

[0010] Further, two hinge plates are symmetrically fixedly installed on the side wall of the hinge head profile steel, and the hinge plates are hingedly installed on the hinge point.

[0011] Further, a reinforcing rib plate is fixedly installed on one side of the hinge head profile steel, and the other end of the reinforcing rib plate is fixedly installed in the side-mounted platform.

[0012] Further, the offshore oil platform further comprises an upper layer structure beam, an upper beam bottom outer lifting point is fixedly installed on the lower surface of the upper layer structure beam near one side edge, the upper beam bottom outer lifting point comprises a cable-lifting chain, and the other end of the cable-lifting chain is fixedly installed on the side-mounted lifting point.

[0013] Further, an upper beam bottom inner lifting point is fixedly installed on the lower surface of the upper layer structure beam in the middle, the upper beam bottom inner lifting point comprises a lifting chain, and the other end of the lifting chain is fixedly installed on the hinge head lifting point.

[0014] Further, the offshore oil platform further comprises a crane, and the crane comprises a hoisting rigging, and the other end of the hoisting rigging is fixedly installed on the hoisting lifting point.

[0015] Compared with the prior art, the present application has the following beneficial effects: In the present application, the sling of the crane is installed on the hoisting lifting point, the lifting chain is connected to the articulated head lifting point, the hook of the crane is moved to gradually approach the offshore oil platform, the lifting chain is tightened when the side-mounted platform is at a suitable distance from the offshore oil platform, the articulated plate is embedded with the articulated point under the cooperation of the crane, the articulated plate and the articulated point are connected and locked by the pin shaft, the cable-stayed chain is connected with the side-mounted lifting point, the cable-stayed chain is tightened to bear the load, and the connection between the sling and the hoisting lifting point is released when the side-mounted platform is in a stable state, the installation level of the side-mounted platform can be accurately adjusted by adjusting the cable-stayed chain, and the reliability of the equipment side-mounted construction is ensured. When the oil platform is loaded and transported, the side-mounted platform is adjusted to the cable-stayed state by tightening and pulling the cable-stayed chain, the length of the side-mounted platform is reduced, and the overall stability is improved. After the offshore oil platform is installed in the designated sea area, the equipment side-mounted slide rail laying and the equipment side-mounted work can be carried out, the sling and the hoisting lifting point are connected after the equipment is in place, the sling and the lifting chain are tensioned, the pin shaft is pulled out, and the connection between the articulated plate and the articulated point is released. Under the cooperation of the crane and the lifting chain, the side-mounted platform is slowly lifted and moved outward, so that the cable-stayed chain does not bear the load, and then the connection between the cable-stayed chain and the side-mounted lifting point is released. When the side-mounted platform is at a suitable position, the load of the lifting chain is gradually unloaded until the load generated by the gravity of the side-mounted platform is completely applied to the crane, and the connection between the lifting chain and the articulated head lifting point is released. Then, the side-mounted platform is lifted to the storage area by the crane, the tools and equipment in the work are arranged, and the offshore equipment side-mounted work is completed. The welding between the articulated plate and the offshore oil platform is replaced by the welding, and the cable-stayed chain is used instead of the welded inclined support under the side-mounted platform, so that the side-mounted platform installation and removal are convenient and efficient, and the welding, offshore cutting work, post-painting repair, and scaffold erection and removal work are greatly reduced. The installation level of the side-mounted platform can be accurately adjusted by adjusting the cable-stayed chain, and the reliability of the equipment side-mounted construction is ensured. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1 The side-mounted part structure schematic view in the preferred embodiment of the present application is shown in the figure. Figure 2 The side-mounted part installation structure schematic view in the preferred embodiment of the present application is shown in the figure. Figure 3 The connection part structure schematic view in the preferred embodiment of the present application is shown in the figure. Figure 4 The side-mounted platform installation structure side view in the preferred embodiment of the present application is shown in the figure. Figure 5 The side-mounted platform hoisting structure side view in the preferred embodiment of the present application is shown in the figure.

[0017] Reference signs: 1, offshore oil platform; 11, hinge point; 12, upper beam bottom outer lifting point; 13, upper beam bottom inner lifting point; 14, crane; 121, inclined cable; 131, lifting cable; 141, lifting sling; 2, side-mounted part; 21, side-mounted platform; 22, side-mounted lifting point; 23, lifting lifting point; 24, reinforcing rib plate; 3, connecting part; 31, hinge head profile steel; 32, hinge head lifting point; 33, hinge plate. DETAILED DESCRIPTION

[0018] In order to further illustrate the technical means and effects adopted by the present application to achieve the predetermined object of the application, the specific embodiments, structures, features and effects according to the present application are described in detail as follows in combination with the drawings and preferred embodiments.

[0019] The embodiment provides a marine oil platform offshore equipment side-mounted device, which comprises an offshore oil platform 1, further comprising: a side-mounted part 2, the side-mounted part 2 is fixedly installed on one side of the offshore oil platform 1; a connecting part 3, the connecting part 3 is symmetrically provided with two, the connecting part 3 is fixedly installed on the upper surface of the side-mounted part 2 close to one side edge, and the side-mounted part 2 is hingedly connected with the offshore oil platform 1 through the connecting part 3; As shown in Figure 2 The offshore oil platform 1 at least comprises a side-mounted layer structure beam, and a hinge point 11 is fixedly installed on the upper surface of the side-mounted layer structure beam close to one side edge; As shown in Figure 1 The side-mounted part 2 comprises a side-mounted platform 21, a plurality of lifting lifting points 23 are fixedly installed on the upper surface of the side-mounted platform 21, and two side-mounted lifting points 22 are symmetrically fixedly installed on the edge of the upper surface of the side-mounted platform 21; As shown in Figure 2 、 Figure 3 The connecting part 3 comprises a hinge head profile steel 31, and the hinge head profile steel 31 is fixedly installed on the upper surface of the side-mounted platform 21 close to one side edge; As shown in Figure 2 、 Figure 3 The hinge head profile steel 31 is fixedly installed with a hinge head lifting point 32 on the upper surface; As shown in Figure 2 The hinge head profile steel 31 is symmetrically fixedly installed with two hinge plates 33 on the side wall, the hinge plates 33 are hingedly installed on the hinge point 11, and the hinge plates 33 and the hinge point 11 are connected and locked by a pin shaft; As shown in Figure 1 、 Figure 2 The hinge head profile steel 31 is fixedly installed with a reinforcing rib plate 24 on one side, and the other end of the reinforcing rib plate 24 is fixedly installed in the side-mounted platform 21, so that the connecting strength of the hinge head profile steel 31 and the side-mounted platform 21 is increased through the reinforcing rib plate 24; As shown in Figure 4As shown, the offshore oil platform 1 further comprises a superstructure beam, and an upper beam bottom outer lifting point 12 is fixedly installed on the lower surface of the superstructure beam near one side edge. The upper beam bottom outer lifting point 12 comprises a diagonal pull-down chain 121, and the other end of the diagonal pull-down chain 121 is fixedly installed on the side-mounted lifting point 22. The diagonal pull-down chain 121 replaces the welded diagonal brace under the side-mounted platform 21, so that the side-mounted platform 21 is convenient and efficient to install and remove, without high-difficulty, high-risk and large workload welding and offshore cutting operations, and the workload of post-weld paint repair, scaffold erection and removal is greatly reduced. The installation levelness of the side-mounted platform 21 can be accurately adjusted by adjusting the diagonal pull-down chain 121, so as to ensure the reliability of the equipment side-mounted construction; As shown in the drawings, Figure 5 As shown, the lower surface of the superstructure beam is fixedly installed with an upper beam bottom inner lifting point 13 in the middle. The upper beam bottom inner lifting point 13 comprises a lifting pull-down chain 131, and the other end of the lifting pull-down chain 131 is fixedly installed on the hinged joint lifting point 32. When the side-mounted platform 21 is at a suitable distance from the offshore oil platform 1, the lifting pull-down chain 131 is tightened, and the hinged plate 33 and the hinged point 11 are embedded under the cooperation of the crane 14; As shown in the drawings, Figure 5 As shown, the offshore oil platform 1 further comprises a crane 14, and the crane 14 comprises a lifting rig 141. The other end of the lifting rig 141 is fixedly installed on the lifting lifting point 23. The hook of the crane 14 moves to gradually approach the offshore oil platform 1 by the side-mounted platform 21; In specific use, the sling 141 of the crane 14 is installed on the hoisting lifting point 23, the lifting chain 131 is connected to the articulated head lifting point 32, the hook of the crane 14 is moved to gradually approach the offshore oil platform 1 to the side-mounted platform 21, when the side-mounted platform 21 is at a suitable distance from the offshore oil platform 1, the lifting chain 131 is tightened, the articulated plate 33 is embedded with the articulated point 11 under the cooperation of the crane 14, the articulated plate 33 and the articulated point 11 are connected and locked by the pin shaft, the inclined chain 121 is connected with the side-mounted lifting point 22, the inclined chain 121 is tightened to bear the load, and the connection between the sling 141 and the hoisting lifting point 23 is released when the side-mounted platform 21 is in a stable state, the installation level of the side-mounted platform 21 can be accurately adjusted by adjusting the inclined chain 121, and the reliability of the equipment side-mounted construction is ensured. When the oil platform is loaded and transported, the side-mounted platform 21 is adjusted to the inclined state by tightening and pulling the inclined chain 121, the length of the side-mounted platform 21 is reduced, and the overall stability is improved. After the offshore oil platform 1 is installed in the designated sea area, the equipment side-mounted slide rail laying and the equipment side-mounted work can be carried out, the sling 141 and the hoisting lifting point 23 are connected after the equipment is in place, the sling 141 and the lifting chain 131 are tensioned, the pin shaft is pulled out, and the connection between the articulated plate 33 and the articulated point 11 is released. Under the cooperation of the crane 14 and the lifting chain 131, the side-mounted platform 21 is slowly lifted and moved outward, so that the inclined chain 121 does not bear the load, and then the connection between the inclined chain 121 and the side-mounted lifting point 22 is released. When the side-mounted platform 21 is at a suitable position, the load of the lifting chain 131 is gradually unloaded until the load generated by the gravity of the side-mounted platform 21 is completely applied to the crane 14, and the connection between the lifting chain 131 and the articulated head lifting point 32 is released. Then, the side-mounted platform 21 is hoisted to the storage area by the crane 14, the tools and equipment in the work are arranged, and the offshore equipment side-mounted work is completed. The welding between the side-mounted platform 21 and the offshore oil platform 1 is replaced by articulation, the inclined brace under the side-mounted platform 21 is replaced by the inclined chain 121, the installation and removal of the side-mounted platform 21 are convenient and efficient, the welding, offshore cutting work, post-painting repair, and scaffold erection and removal work are not required, the installation level of the side-mounted platform 21 can be accurately adjusted by adjusting the inclined chain 121, and the reliability of the equipment side-mounted construction is ensured.

[0020] The above is only a preferred embodiment of the present application, and does not limit the present application in any form. Although the present application has been disclosed as above, it is not intended to limit the present application. Any person skilled in the art can make some changes or modifications to the above disclosed technical content to obtain equivalent embodiments with equivalent changes, without departing from the technical solution of the present application. Any modification, equivalent change and modification of the above embodiments, which does not depart from the technical solution of the present application, is still within the scope of the present application.

Claims

1. A side-mounted device for offshore equipment on an offshore oil platform, comprising an offshore oil platform (1), characterized in that: Also includes: A side mounting portion (2), the side mounting portion (2) being fixedly mounted on one side of the offshore oil platform (1); The connecting portion (3) is symmetrically provided with two connecting portions (3), and the connecting portion (3) is fixedly mounted on the upper surface of the side-mounted portion (2) near one side edge. The side-mounted portion (2) is hingedly connected to the offshore oil platform (1) via the connecting portion (3).

2. The side-mounted device for offshore equipment on an offshore oil platform according to claim 1, characterized in that: The offshore oil platform (1) comprises at least a side-mounted structural beam, and a hinge point (11) is fixedly installed on the upper surface of the side-mounted structural beam near one side edge.

3. The side-mounted device for offshore equipment on an offshore oil platform according to claim 1, characterized in that: The side mounting portion (2) comprises a side mounting platform (21), a plurality of lifting points (23) are fixedly mounted on the upper surface of the side mounting platform (21), and two side mounting points (22) are symmetrically fixedly mounted on the edge of the upper surface of the side mounting platform (21).

4. The side-mounted device for offshore equipment on an offshore oil platform according to claim 1, characterized in that: The connecting portion (3) comprises an articulated steel section (31), and the articulated steel section (31) is fixedly mounted on the upper surface of the side-mounted platform (21) near one side edge.

5. The side-mounted device for offshore equipment on an offshore oil platform according to claim 4, characterized in that: A hinged joint hanging point (32) is fixedly mounted on the upper surface of the hinged joint steel (31).

6. The side-mounted device for offshore equipment on an offshore oil platform according to claim 4, characterized in that: Two hinge plates (33) are symmetrically fixedly installed on the side wall of the hinged joint steel (31), and the hinge plates (33) are hingedly installed on the hinge point (11).

7. The side-mounted device for offshore equipment on an offshore oil platform according to claim 4, characterized in that: A reinforcing rib plate (24) is fixedly mounted on one side of the hinged joint steel (31), and the other end of the reinforcing rib plate (24) is fixedly mounted in the side mounting platform (21).

8. The side-mounted device for offshore equipment on an offshore oil platform according to claim 1, characterized in that: The offshore oil platform (1) further comprises an upper structural beam, wherein an upper beam bottom external lifting point (12) is fixedly mounted on the lower surface of the upper structural beam near one side edge, the upper beam bottom external lifting point (12) comprising an oblique fall chain (121), the other end of the oblique fall chain (121) being fixedly mounted on a side-mounted lifting point (22).

9. The side-mounted device for offshore equipment on an offshore oil platform according to claim 8, characterized in that: An upper beam bottom inner hanging point (13) is fixedly installed in the middle of the lower surface of the upper structure beam. The upper beam bottom inner hanging point (13) includes a lifting fall chain (131). The other end of the lifting fall chain (131) is fixedly installed on the hinge joint hanging point (32).

10. The side-mounted device for offshore equipment on an offshore oil platform according to claim 1, characterized in that: The offshore oil platform (1) further comprises a crane (14), the crane (14) comprising a sling (141), the other end of the sling (141) being fixedly mounted on a lifting point (23).