Template and construction method for installation of artistic sign in saline-alkali soil
By using plastic partition boards and side panels combined with snap-fit structures and steel reinforcement frames in casting templates in saline-alkali areas, the problem of corrosion of artistic landmark foundations in saline-alkali areas has been solved, achieving highly efficient impermeable and long-life cement structures.
Patent Information
- Application Number
- CN202511312890.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-15
- Publication Date
- 2025-11-28
- Estimated Expiration
- 2045-09-15
AI Technical Summary
In saline-alkali areas, the base of artistic signs is easily corroded, and groundwater dissolves salts and seeps into the cement, resulting in low durability, frequent maintenance and replacement, and high construction costs.
Plastic partition boards and plastic side panels are used as templates, combined with snap-fit structures, sealing components and steel reinforcement skeletons to form a corrosion-resistant casting template. The sealing performance is enhanced by the arc-shaped sealing part and the extrusion plate, and the anti-seepage performance of the connection is further improved by the use of earth pressure.
It effectively prevents salt water from corroding cement structures, extends the service life of artistic sign foundations, reduces maintenance and replacement frequency, and lowers construction costs.
Smart Images

Figure CN120797725B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of construction formwork, in particular to a formwork for installation of artistic signs in saline-alkali land and a construction method. BACKGROUND
[0002] In a salt lake or saline-alkali land area, the soil contains a large amount of sodium chloride, which has a certain corrosive effect on building materials such as concrete and steel bars, resulting in damage to buildings. In particular, ordinary cement will shrink slightly when solidified, which is easy to cause cracks and make it easy for salt water to enter the cement, thereby damaging the cement and concrete. Magnesium oxychloride cement is expensive, and long-term contact with salt water also easily damages it. At present, saline-alkali land and salt lakes are being developed, and buildings such as artistic signs need to be set up in these areas.
[0003] The prior art is difficult to ensure that the artistic sign base is not corroded in high-salinity soil, and underground water easily penetrates into the cement after dissolving the salt, so that the durability of the base part of the artistic sign is very low, and often needs to be maintained and replaced, and when replaced, the entire foundation needs to be rebuilt, which is high in construction cost. SUMMARY
[0004] In view of the above problems, the present application aims to solve the problem of corrosion of salt on the artistic sign base described above. An object of the present application is to provide a formwork for installation of artistic signs in saline-alkali land and a construction method to solve the above problems.
[0005] The present application adopts the following scheme: a formwork for installation of artistic signs in saline-alkali land, comprising a plastic partition plate and a plastic side plate, the plastic partition plate is arranged on the bottom surface, the plastic side plate is connected to the side of the plastic partition plate, the plastic side plate surrounds the steel bars in the middle part, and the plastic partition plate and the plastic side plate jointly constitute a pouring formwork.
[0006] The lower edge of the plastic side plate is provided with a clamping portion, the four sides of the plastic partition plate are provided with a clamping groove portion matched with the clamping portion, the inner side of the clamping portion is provided with an arc-shaped sealing portion, the arc-shaped sealing portion is arranged obliquely upward, the clamping groove portion is provided with a matched arc-shaped clamping groove obliquely upward, the top of the arc-shaped clamping groove is provided with a limiting portion, after installation, the arc-shaped sealing portion is located in the arc-shaped clamping groove below the limiting portion, and the outer side surface of the arc-shaped sealing portion is attached to the inner side surface of the arc-shaped clamping groove, when the cement solidifies and shrinks, the arc-shaped sealing portion is extruded into the arc-shaped clamping groove, and an effective sealing space is formed after pouring.
[0007] The middle of the plastic partition plate is provided with a plurality of fixing holes, and the reinforcing steel bars pass through the fixing holes during installation; the plastic side plate is provided with a plurality of connecting lugs, and the reinforcing steel bars pass through the connecting lugs in the horizontal and vertical directions during installation; and the plastic partition plate, the plastic side plate and the reinforcing steel bars are connected into an integral whole after pouring.
[0008] In order to further increase the sealing of the connection by using the earth pressure and reduce the penetration of salt water, the outer side wall of the clamping part is an arc surface, which is fitted with the inner side surface of the arc clamping groove during installation, the outer side of the clamping part is provided with a pressing part, the pressing part protrudes from the outer side surface of the plastic side plate, and the outermost side of the clamping groove part is provided with a pressing plate, which is abutted with the pressing part during installation.
[0009] Further, in order to provide sufficient deformation space for the pressing plate and provide sufficient pressing force, one side surface of the pressing plate close to the outer side surface of the plastic side plate is parallel to the outer side surface, the outermost side surface of the pressing plate is obliquely arranged, the outer side surface of the pressing plate gradually approaches the plastic side plate from bottom to top, the outermost side of the pressing plate is provided with a plurality of reinforcing rib plates, and the reinforcing rib plates are arranged perpendicularly to the outer side surface of the pressing plate.
[0010] In order to make the reinforcing steel bars and the plastic partition plate be connected stably and avoid the plastic partition plate being cracked and damaged due to the shaking of the reinforcing steel bars, a reinforcing ring is arranged around the fixing hole, a rubber gasket is arranged in the reinforcing ring, the fixing hole is arranged in a conical shape, the rubber gasket is in interference fit with the fixing hole, the reinforcing steel bars pass through the rubber gasket during installation, and the inner diameter of the rubber gasket is matched with the diameter of the reinforcing steel bars.
[0011] In order to ensure that the plastic side plates are connected tightly, one side edge of the plastic side plate is provided with a plug-in groove arranged in the vertical direction, the other side of the plastic side plate is provided with a sealing rod, the sealing rod is plugged into the plug-in groove during installation, the outer side wall of the sealing rod is fitted with the inner side wall of the plug-in groove, the plastic side plate is provided with a side pressing plate outside the plug-in groove, the side pressing plate is abutted with the sealing rod, and the side pressing plate applies an acting force to the sealing rod to move into the plug-in groove.
[0012] Preferably, in order to make the reinforcing steel bars and the plastic side plate be connected stably, ensure that the plastic side plate will not be separated after the cement is solidified, and further strengthen the connection of the plastic side plate, the connecting lug comprises a vertical lug and a horizontal lug, the vertical lug is provided with an extension part, one end of the vertical lug away from the plastic side plate is provided with a waist-shaped connecting hole, and the reinforcing steel bars located at the outermost side of the plastic partition plate pass through the waist-shaped connecting hole during installation; the length of the horizontal lug is smaller than that of the vertical lug, the horizontal lug is perpendicular to the vertical lug, the horizontal lug is provided with a horizontal reinforcing steel bar, and the horizontal reinforcing steel bar is tied and fixed with the reinforcing steel bars in one row of the vertical lug.
[0013] In order to make the top not easy to be infiltrated by salt water, and further increase the connection sealing by earth pressure. Also including the isolation cover plate, the edge of the isolation cover plate is provided with a sealing clamping groove, a sealing ring is arranged in the sealing clamping groove, and the sealing clamping groove is clamped with the plastic side plate top, when the downward force of the isolation cover plate, the sealing clamping groove extrudes the sealing ring; the middle position of the isolation cover plate is provided with a reinforced connecting ring, a plurality of embedded screw rods are arranged on the reinforced connecting ring, and the embedded screw rods are connected with the supporting legs of the artistic sign during installation.
[0014] Further, in order to facilitate the replacement of the artistic sign, and realize low-cost simple replacement. Also including a sealing protective cover, the sealing protective cover is sleeved on the supporting leg of the artistic sign, and covers the top of the embedded screw rod.
[0015] The lower side edge of the sealing protective cover is provided with a locking part, the outer side of the reinforced connecting ring is provided with a connecting column, a sealing pad is sleeved on the connecting column, the locking part and the connecting column are connected through screws, and the sealing pad is extruded between the locking part and the isolation cover plate.
[0016] The sealing protective cover is provided with a pressure inclined surface around the sealing protective cover, the top of the sealing protective cover is provided with a sleeve hole matched with the supporting leg of the artistic sign, and the sleeve hole is provided with an encryption rubber ring, and the encryption rubber ring is matched with the outer side wall of the supporting leg of the artistic sign during installation.
[0017] Preferably, in order to ensure the sealing of the top corner, a connecting corner code is further included, the connecting corner code is fixed to the lower side top corner of the connection between the plastic partition plate and the plastic side plate, and the connecting corner code is coated with sealing waterproof glue between the plastic partition plate and the plastic side plate.
[0018] The application also provides a construction method for installing artistic signs in saline-alkali soil,
[0019] The method comprises the following steps: S01, digging a foundation pit in saline-alkali soil and treating drainage;
[0020] Step S02, drilling holes according to the hole distance of the fixing holes of the plastic partition plate, inserting steel bars into the holes, and installing the plastic partition plate; during installation of the plastic partition plate, rubber washers are sequentially sleeved on each steel bar, then the plastic partition plate is sleeved, and finally each rubber washer is inserted into the fixing hole of the plastic partition plate;
[0021] Step S03, installing the plastic side plate and reserving an opening on one side, inserting the horizontal and vertical steel bars into the connecting lugs of the plastic side plate, connecting all the steel bars into one body through steel wires, and finally installing the last plastic side plate at the opening;
[0022] Step S04, pouring is carried out, after the concrete solidifies, the feet of the artistic sign are installed, then the isolation cover plate and the sealing protective cover are installed, and finally the burying is carried out; before pouring, the plastic side plate part is pre-buried, and the pre-buried height is greater than half of the height of the plastic side plate.
[0023] Compared with the prior art, the template and the construction method for installing the artistic sign in the saline-alkali soil have the following technical effects:
[0024] 1. The template for installing the artistic sign in the saline-alkali soil comprises plastic partition plates and plastic side plates, the plastic partition plates are arranged on the bottom surface, the plastic side plates are connected to the side edges of the plastic partition plates, the plastic side plates surround the steel bars in the middle parts, and the plastic partition plates and the plastic side plates jointly form the pouring template. The corrosion-resistant plastic partition plates and plastic side plates are used as the template, the template is integrated with the cement after pouring, and the plastic partition plates and the plastic side plates can long-protect the cement from being corroded by the salt water.
[0025] 2. The lower side edges of the plastic side plates are provided with clamping parts, the four sides of the plastic partition plates are provided with clamping groove parts matched with the clamping parts, the inner sides of the clamping parts are provided with arc-shaped sealing parts, the arc-shaped sealing parts are arranged in an upward inclined manner, the clamping groove parts are provided with arc-shaped clamping grooves matched with the arc-shaped sealing parts in an upward inclined manner, the top parts of the arc-shaped clamping grooves are provided with limiting parts, the arc-shaped sealing parts are located in the arc-shaped clamping grooves below the limiting parts after installation, and the outer side surfaces of the arc-shaped sealing parts are attached to the inner side surfaces of the arc-shaped clamping grooves. When the cement is solidified and shrinks, the arc-shaped sealing parts are extruded into the arc-shaped clamping grooves, and an effective sealing space is formed after pouring. Based on the micro-deformation characteristics of the plastic partition plates and the plastic side plates, the clamping groove structure is used, the clamping force between the clamping part and the clamping groove part is further increased due to the micro-shrinking effect of the cement after solidification, the cement has high anti-permeability after solidification, and the time for which the cement foundation part is not corroded by the salt water is effectively prolonged.
[0026] 3. One side surface of the extrusion plate close to the outer side surface of the plastic side plate is parallel to the outer side surface of the plastic side plate, the outermost side surface of the extrusion plate is arranged in an inclined manner, the outer side surfaces of the extrusion plate gradually approach the plastic side plate from bottom to top, the outermost side of the extrusion plate is provided with a plurality of reinforcing rib plates, and the reinforcing rib plates are arranged perpendicularly to the outer side surface of the extrusion plate. Based on the earth pressure after deep burying, a side pressure is given to the extrusion plate, so that the clamping part is extruded and attached to the clamping groove part, the attachment force is increased, the sealing property is improved, and the salt water is reduced.
[0027] Other characteristic features and advantages of the present application will become clear from the following description of exemplary embodiments, which is to be read with reference to the accompanying drawings. BRIEF DESCRIPTION OF DRAWINGS
[0028] The accompanying drawings, which are incorporated into and form a part of the specification, illustrate embodiments of the present application and, together with the description, serve to explain the principles of the application. In the drawings:
[0029] Figure 1 is a schematic diagram of the overall structure of the template for installing artistic signs in saline-alkali soil provided in the specific embodiments of the present application;
[0030] Figure 2 is a schematic diagram of the template and the reinforcing bar distribution installation structure for installing artistic signs in saline-alkali soil provided in the specific embodiments of the present application;
[0031] Figure 3 is a schematic diagram of the edge structure of the plastic side plate in the top view provided in the specific embodiments of the present application;
[0032] Figure 4 is a schematic diagram of the installation and cooperation of the clamping part and the clamping groove part provided in the specific embodiments of the present application;
[0033] Figure 5 is a schematic diagram of the vertical ear structure provided in the specific embodiments of the present application;
[0034] In the drawings:
[0035] 1, plastic side plate; 2, plastic partition plate; 3, isolation cover plate; 4, sealing protection cover; 5, connecting corner code; 11, clamping part; 12, insertion slot; 13, sealing rod; 111, arc-shaped sealing part; 112, extrusion part; 21, clamping groove part; 22, vertical ear; 221, extension part; 222, waist-shaped connecting hole; 23, fixing hole; 24, reinforcing ring; 25, rubber gasket; 211, arc-shaped clamping groove; 212, limiting part; 213, extrusion plate; 2131, reinforcing rib plate; 31, sealing clamping groove part; 32, sealing ring; 33, reinforcing connecting ring; 34, pre-buried screw; 35, connecting column; 36, sealing gasket; 41, locking part; 42, pressure applying inclined surface; 43, sleeving hole; 44, encrypted rubber ring. DETAILED DESCRIPTION
[0036] In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of the present application. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other in any manner without conflict.
[0037] The template for installing artistic signs in saline-alkali land and the construction method will be described in detail below with reference to the drawings and embodiments.
[0038] Embodiment one
[0039] As shown in the drawings, Figures 1-5 The present embodiment provides a template for installing artistic signs in saline-alkali land, which comprises a plastic partition plate 2 and a plastic side plate 1. The plastic partition plate 2 is arranged on the bottom surface and is made of plastic material with good salt and alkali corrosion resistance. The plastic partition plate 2 is arranged on the bottom surface to isolate the saline-alkali land bottom salt water from directly contacting the subsequent poured cement structure, so as to avoid the erosion of salt water to the cement. The plastic side plate 1 is clamped on the side edge of the plastic partition plate 2. The clamping mode is convenient for quick assembly and disassembly of the template and meets the convenience requirement of on-site construction in saline-alkali land. The plastic side plate 1 surrounds the steel bars in the middle part thereof. The steel bars serve as the framework structure of the template and can enhance the overall anti-deformation ability of the template, preventing the template from swelling or breaking due to pressure when pouring cement. The plastic partition plate 2 and the plastic side plate 1 jointly constitute a pouring template. The two plates cooperate to form a closed pouring space, so as to ensure that the cement poured forms a foundation shape meeting the installation requirement of artistic signs.
[0040] The lower edge of the plastic side plate 1 is provided with a clamping part 11, and the plastic partition plate 2 is provided with a clamping groove part 21 matched with the clamping part 11 on four sides. The cooperation of the clamping part 11 and the clamping groove part 21 realizes the detachable connection of the plastic side plate 1 and the plastic partition plate 2, which is convenient for adjusting the size of the formwork or replacing the damaged parts on site. The inner side of the clamping part 11 is provided with an arc-shaped sealing part 111, which is arranged obliquely upward. The clamping groove part 21 is provided with a matched arc-shaped clamping groove 211 obliquely upward. The arc-shaped sealing part 111 can be smoothly slid into the arc-shaped clamping groove 211 along the inclined direction of the arc-shaped clamping groove 211, which reduces the installation difficulty. The top of the arc-shaped clamping groove 211 is provided with a limiting part 212. After installation, the arc-shaped sealing part 111 is located in the arc-shaped clamping groove 211 below the limiting part 212. The limiting part 212 can limit the arc-shaped sealing part 111 from separating upward from the arc-shaped clamping groove 211, which ensures the stability of the connection. The outer side surface of the arc-shaped sealing part 111 is attached to the inner side surface of the arc-shaped clamping groove 211. When initially installed, a preliminary sealing can be formed to prevent salt water from penetrating from the connection between the plastic side plate 1 and the partition plate. When the cement solidifies and shrinks, the cement will pull the plastic side plate 1 inward. At this time, the arc-shaped sealing part 111 will be further pressed into the arc-shaped clamping groove 211. The fitting surface will be more tightly squeezed. After pouring, an effective sealing space is formed, which can maintain good sealing effect even if the cement shrinks, avoiding the entry of salt water into the formwork to damage the cement structure.
[0041] The middle part of the plastic partition plate 2 is provided with a plurality of fixing holes 23. During installation, the steel bars pass through the fixing holes 23. The fixing holes 23 can position the position of the steel bars to prevent the steel bars from shifting due to the flow of cement during the pouring process, ensuring the shape accuracy of the steel bar framework. The plastic side plate 1 is provided with a plurality of connecting lugs. During installation, the steel bars pass through the connecting lugs horizontally and vertically. The horizontal and vertical steel bars pass through the connecting lugs alternately to form a mesh steel bar framework, which further enhances the overall strength and anti-deformation ability of the formwork. After pouring, the plastic partition plate 2, the plastic side plate 1 and the steel bars are connected as a whole. After the cement solidifies, the three are bonded into a stable structure. The plastic parts and the steel bars jointly bear the load, which improves the service life of the formwork and adapts to the complex environmental conditions of saline-alkali land.
[0042] In order to further increase the sealing of the connection by using the earth pressure, reduce the infiltration of salt water, the outer wall of the clamping part 11 is arc-shaped, which is fitted with the inner side of the arc-shaped clamping groove 211 during installation. The arc-shaped surface can increase the contact area of the clamping part 11 and the arc-shaped clamping groove 211, and improve the initial sealing effect. The outer side of the clamping part 11 is provided with an extrusion part 112, which protrudes from the outer side of the plastic side plate 1. The outermost side of the clamping groove part 21 is provided with an extrusion plate 213, which abuts against the extrusion part 112 during installation. The abutting structure of the extrusion part 112 and the extrusion plate 213 can convert the earth pressure into extrusion force on the clamping part 11. After the formwork is buried, the earth pressure acts on the outer side of the plastic side plate 1, and the extrusion part 112 extrudes the extrusion plate 213, so that the clamping part 11 is more tightly fitted with the arc-shaped clamping groove 211, further enhancing the sealing of the connection and effectively preventing salt water from infiltrating from the connection.
[0043] Further, in order to provide sufficient deformation space for the extrusion plate 213 and provide sufficient extrusion force, the side of the extrusion plate 213 close to the outer side of the plastic side plate 1 is parallel to it. The parallel structure can ensure that the extrusion plate 213 is uniformly stressed and avoid local stress from being too large to cause damage. The outermost side of the extrusion plate 213 is inclined, and the outer side of the extrusion plate 213 gradually approaches the plastic side plate 1 from bottom to top. The inclined outer side enables the earth pressure to be more effectively transmitted to the extrusion part 112, increasing the extrusion force of the extrusion part 112 on the arc-shaped clamping groove 211. The outermost side of the extrusion plate 213 is provided with a plurality of reinforcing rib plates 2131, which are perpendicular to the outer side of the extrusion plate 213. The reinforcing rib plates 2131 can improve the structural strength of the extrusion plate 213, prevent the extrusion plate 213 from deforming or breaking due to excessive earth pressure, and ensure the durability of the extrusion effect.
[0044] In order to make the steel bar and the plastic partition plate 2 connect stably, and avoid the steel bar from shaking and causing the plastic partition plate 2 to crack and damage, the fixing hole 23 is provided with a reinforcing ring 24 around it. The reinforcing ring 24 can increase the thickness and strength of the plastic partition plate 2 around the fixing hole 23, preventing the steel bar from causing wear or cracking to the edge of the fixing hole 23 when it shakes. The reinforcing ring 24 is provided with a rubber gasket 25, and the fixing hole 23 is provided in a conical shape. The conical structure can limit the rubber gasket 25, preventing it from falling out of the fixing hole 23. The rubber gasket 25 is in interference fit with the fixing hole 23, which makes the rubber gasket 25 tightly fitted with the inner wall of the fixing hole 23, enhancing the sealing effect of the fixing hole 23. During installation, the steel bar passes through the rubber gasket 25, and the inner diameter of the rubber gasket 25 is matched with the diameter of the steel bar. The elasticity of the rubber gasket 25 can buffer the impact force when the steel bar shakes, fill the gap between the steel bar and the fixing hole 23, prevent salt water from infiltrating from the gap, and avoid the steel bar from being corroded by salt water and reducing its strength.
[0045] In order to ensure the tight connection between the plastic side plates 1, one side edge of the plastic side plate 1 is provided with a plug-in slot 12, which is arranged in the vertical direction. The vertical plug-in slot 12 facilitates the up-down plug-in between the plastic side plates 1, improving the assembly efficiency. The other side of the plastic side plate 1 is provided with a sealing rod 13, which is clamped into the plug-in slot 12 during installation. The cooperation between the sealing rod 13 and the plug-in slot 12 realizes the connection between the plastic side plates 1, preventing the gap between the side plates. The outer side wall of the sealing rod 13 is in close contact with the inner side wall of the plug-in slot 12, and the close contact surface can form a seal to prevent salt water from penetrating from the connection between the side plates. The plastic side plate 1 is provided with a side pressing plate outside the plug-in slot 12, which abuts against the sealing rod 13. The side pressing plate applies an acting force to the sealing rod 13 to move into the plug-in slot 12, so that the sealing rod 13 is more closely attached to the inner wall of the plug-in slot 12, enhancing the sealing effect and preventing the sealing rod 13 from falling off the plug-in slot 12, ensuring the stability of the connection between the plastic side plates 1.
[0046] Preferably, in order to make the connection between the steel bars and the plastic side plates 1 stable, and to ensure that the plastic side plates 1 will not be separated after the cement is solidified, and to further strengthen the connection of the plastic side plates 1, the connecting lug includes a vertical lug 22 and a horizontal lug. The vertical lug 22 is arranged along the height direction of the plastic side plate 1 and can fix the longitudinal steel bars. The vertical lug 22 is provided with an extension part 221, which increases the contact length of the vertical lug 22 with the steel bars, improving the stability of the connection. The end of the vertical lug 22 away from the plastic side plate 1 is provided with a waist-shaped connecting hole 222. During installation, the steel bars located at the outermost side of the plastic partition plate 2 pass through the waist-shaped connecting hole 222 at the same time. The waist-shaped connecting hole 222 has a certain length allowance, which can adapt to the shrinkage deformation of the steel bars during the solidification of the cement, preventing the steel bars from tearing the plastic side plate 1 due to shrinkage. The length of the horizontal lug is less than that of the vertical lug 22. The horizontal lug is arranged along the horizontal direction of the plastic side plate 1 to avoid interference with the vertical lug 22. The horizontal lug is perpendicular to the vertical lug 22, forming a vertical structure with the vertical lug 22, and can fix the horizontal steel bars. The horizontal lug is provided with a horizontal steel bar, which is tied and fixed together with the steel bars in one row of the vertical lug 22. After the horizontal steel bar is tied with the longitudinal steel bar, a more stable mesh structure is formed, enhancing the overall strength of the steel bar framework, and making the connection between the plastic side plate 1 and the steel bars more closely, preventing the plastic side plate 1 from being separated from the steel bar framework after the cement is solidified.
[0047] In order to make the top not easy to be infiltrated by salt water, and further increase the connection sealing by earth pressure, the isolation cover plate 3 is further included, which covers the top of the formwork and can prevent salt water from directly infiltrating the cement structure from the top of the formwork; the edge of the isolation cover plate 3 is provided with a sealing clamping groove part 31, and a sealing ring 32 is arranged in the sealing clamping groove part 31, and the sealing ring 32 has elasticity and can enhance the sealing effect; the sealing clamping groove part 31 is clamped with the top of the plastic side plate 1, and the clamping mode facilitates the installation and disassembly of the isolation cover plate 3; when the isolation cover plate 3 is subjected to a force from top to bottom, such as the earth pressure acting on the isolation cover plate 3 when buried, the sealing clamping groove part 31 will extrude the sealing ring 32, the sealing ring 32 is deformed due to extrusion, fills the gap between the sealing clamping groove part 31 and the top of the plastic side plate 1, and enhances the sealing effect of the top; the reinforced connecting ring 33 is arranged at the middle position of the isolation cover plate 3, which can improve the structural strength of the isolation cover plate 3 and prevent the isolation cover plate 3 from being deformed due to excessive earth pressure; a plurality of embedded screw rods 34 are arranged on the reinforced connecting ring 33, and the embedded screw rods 34 are connected with the supporting legs of the artistic sign during installation, so that the artistic sign can be fixed on the formwork and the stability of the installation of the artistic sign is ensured.
[0048] Further, in order to facilitate the replacement of the artistic sign and achieve low-cost and simple replacement, the sealing protective cover 4 is further included, which is sleeved on the supporting leg of the artistic sign and can prevent salt water from directly contacting the supporting leg and avoid damage of the supporting leg due to corrosion; and covers the top of the embedded screw rod 34, which can prevent salt water from corroding the embedded screw rod 34 and prolong the service life of the embedded screw rod 34; when replacing the artistic sign, only the sealing protective cover 4 needs to be removed, and the connection between the embedded screw rod 34 and the supporting leg is loosened, so that the new artistic sign can be replaced, which is simple to operate and does not need to damage the formwork structure, thereby reducing the replacement cost.
[0049] The lower edge of the sealing protective cover 4 is provided with a locking part 41, the outer side of the reinforced connecting ring 33 is provided with a connecting column 35, the connecting column 35 provides a connection position for the locking part 41; the connecting column 35 is sleeved with a sealing gasket 36, and the sealing gasket 36 has elasticity; the locking part 41 and the connecting column 35 are connected by screws, the screw connection can realize the detachable fixing of the sealing protective cover 4 and is convenient for replacement; the sealing gasket 36 is extruded between the locking part 41 and the isolation cover plate 3, the sealing gasket 36 is deformed due to extrusion, fills the gap between the locking part 41 and the isolation cover plate 3, enhances the sealing effect of the connection part, and prevents salt water from infiltrating from the connection part; at the same time, the sealing gasket 36 can also buffer the pressure during screw connection, so as to prevent the locking part 41 or the isolation cover plate 3 from being damaged due to excessive pressure.
[0050] The sealing protective cover 4 is provided with a pressing slope 42 around, the pressing slope 42 can guide the earth pressure to be uniformly applied to the sealing protective cover 4, avoid that partial pressure is too large and leads to the deformation of sealing protective cover 4;The sealing protective cover 4 top is provided with the sleeve joint hole 43 matched with the foot of artistic sign, the size of sleeve joint hole 43 is matched with the foot size, can realize the accurate positioning of foot;The sleeve joint hole 43 is provided with the encryption rubber ring 44, the encryption rubber ring 44 is attached with the foot outer wall of artistic sign during installation, the encryption rubber ring 44 has good elasticity and sealing performance, can fill the gap between sleeve joint hole 43 and foot, prevent salt water from seeping from the gap, buffer the sway of foot, ensure the stability of artistic sign installation.
[0051] Preferably, in order to ensure the sealing of the top corner, a connecting corner code 5 is further included, which is fixed to the lower side of the top corner where the plastic partition plate 2 is connected with the plastic side plate 1. The top corner is a weak part where the plastic partition plate 2 is connected with the plastic side plate 1. The connecting corner code 5 can enhance the structural strength of the top corner to prevent cracking due to excessive stress. The connecting corner code 5 is coated with a sealing waterproof glue between the plastic partition plate 2 and the plastic side plate 1. The sealing waterproof glue can fill the gap between the connecting corner code 5 and the plastic parts, enhance the sealing effect of the top corner, prevent salt water from seeping from the top corner, and ensure the sealing performance of the entire formwork.
[0052] Embodiment Two
[0053] The application also provides a construction method for installing artistic signs in saline-alkali soil, comprising the following steps:
[0054] S01, a foundation pit is dug out in the saline-alkali soil, and drainage treatment is done. The saline-alkali soil contains a large amount of salt water. Digging the foundation pit can remove the surface saline-alkali soil to provide a clean construction space for the installation of the formwork. Good drainage treatment can prevent water accumulation in the foundation pit and avoid diluting the cement slurry or affecting the solidification effect of the cement.
[0055] Step S02, drill holes according to the hole distance of the fixing hole 23 of the plastic partition plate 2, insert the steel bars into the holes, and install the plastic partition plate 2. Drilling holes according to the hole distance of the fixing hole 23 can ensure that the position of the steel bars is accurately aligned with the fixing hole 23 of the plastic partition plate 2, facilitating the subsequent installation of the plastic partition plate 2. Inserting the steel bars into the holes can fix the lower end position of the steel bars to prevent displacement during the installation of the plastic partition plate 2. When installing the plastic partition plate 2, first, the rubber gasket 25 is sequentially sleeved on each steel bar, then the plastic partition plate 2 is sleeved, and finally each rubber gasket 25 is inserted into the fixing hole 23 of the plastic partition plate 2. The installation sequence of the rubber gasket 25 can ensure that the rubber gasket 25 can be correctly sleeved on the steel bar and inserted into the fixing hole 23, realizing the sealing and fixing effect of the rubber gasket 25 between the steel bar and the fixing hole 23, and avoiding incorrect installation sequence that causes the rubber gasket 25 to be unable to be correctly installed.
[0056] Step S03, install the plastic side plate 1 and reserve one side opening, insert the horizontal and vertical steel bars into the connecting tabs of the plastic side plate 1, connect all the steel bars into one body by steel wires, and finally install the last plastic side plate 1 at the opening; the reserved one side opening facilitates the insertion of the horizontal and vertical steel bars into the connecting tabs, avoiding the situation that the steel bars cannot be inserted after the plastic side plates 1 are completely installed; the insertion of the horizontal and vertical steel bars into the connecting tabs can fix the positions of the steel bars, forming a meshed steel bar framework; connecting all the steel bars into one body can enhance the overall strength of the steel bar framework, preventing the displacement of the steel bars due to uneven stress; and finally installing the side plate at the opening can complete the closure of the formwork, forming a complete pouring space.
[0057] Step S04, pouring, after the concrete is solidified, installing the supporting legs of the artistic sign, then installing the isolation cover plate 3 and the sealing protective cover 4, and finally burying; before pouring, the plastic side plate 1 is partially embedded, and the embedded height is greater than half of the height of the plastic side plate 1; embedding the plastic side plate 1 before pouring can enhance the connection sealing between the plastic side plate 1 and the plastic partition plate 2 by using earth pressure, and the embedded height greater than half can ensure the stability of the plastic side plate 1, preventing the displacement of the plastic side plate 1 due to the cement pressure during pouring; after the concrete is solidified, installing the supporting legs of the artistic sign can ensure the firm connection between the supporting legs and the cement structure; installing the isolation cover plate 3 and the sealing protective cover 4 can enhance the sealing effect of the top of the formwork, preventing the penetration of salt water; and finally burying can further enhance the sealing effect of the connections of the formwork by using earth pressure, while protecting the formwork and the artistic sign from the damage of the external environment.
[0058] It should be noted that the relational terms herein such as first and second and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any such actual relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variations thereof, are intended to cover a non-exclusive inclusion such that a process or method that comprises a list of elements does not include only those elements but can also include other elements not expressly listed or inherent to such process or method. In other words, the terms "comprises" and "comprising" should not be interpreted as signifying the existence of only the stated features or steps.
[0059] The above embodiments are only used to illustrate the technical solutions of the present application but not limit the present application, and the present application is described in detail only with reference to the preferred embodiments. It should be understood by those skilled in the art that the technical solutions of the present application can be modified or equivalently replaced without departing from the spirit and scope of the technical solutions of the present application, and all should be covered in the scope of the claims of the present application.
Claims
1. A template for installing artistic signs in saline-alkali land, characterized in that: It includes a plastic partition board and plastic side panels. The plastic partition board is set on the bottom surface, and the plastic side panels are snapped onto the side of the plastic partition board. The plastic side panels surround the steel bars in the middle. The plastic partition board and plastic side panels together constitute a casting template. The lower edge of the plastic side panel is provided with a snap-fit part, and the four sides of the plastic partition are provided with snap-fit grooves that cooperate with the snap-fit part. The inner side of the snap-fit part is provided with an arc-shaped sealing part, which is obliquely upward. The snap-fit part is provided with a matching arc-shaped slot at the oblique upper part. The top of the arc-shaped slot is provided with a limiting part. After installation, the arc-shaped sealing part is located in the arc-shaped slot below the limiting part, and the outer side of the arc-shaped sealing part is in contact with the inner side of the arc-shaped slot. When the cement cures and shrinks, the arc-shaped sealing part is squeezed into the arc-shaped slot. The plastic partition plate has several fixing holes in the middle. During installation, the reinforcing bars pass through the fixing holes. The plastic side plate has several connecting lugs. During installation, the reinforcing bars pass through the connecting lugs in both the horizontal and vertical directions. After casting, the plastic partition plate, the plastic side plate, and the reinforcing bars are connected as a whole.
2. The template for installing artistic signs in saline-alkali land as described in claim 1, characterized in that: The outer wall of the snap-fit part is an arc-shaped surface, which fits against the inner side of the arc-shaped slot during installation. A pressing part is provided on the outer side of the snap-fit part, which protrudes from the outer side of the plastic side plate. A pressing plate is provided on the outermost side of the slot part, and the pressing plate abuts against the pressing part during installation.
3. The template for installing artistic signs in saline-alkali land as described in claim 2, characterized in that: The outer side of the extrusion plate is parallel to the outer side of the plastic side plate. The outermost side of the extrusion plate is inclined. From bottom to top, the outer side of the extrusion plate gradually approaches the plastic side plate. The outermost side of the extrusion plate is provided with a number of reinforcing ribs, which are perpendicular to the outer side of the extrusion plate.
4. The template for installing artistic signs in saline-alkali land as described in claim 3, characterized in that: A reinforcing ring is provided around the fixing hole, and a rubber washer is provided in the reinforcing ring. The fixing hole is designed to be constricted. The rubber washer is interference-fitted with the fixing hole. During installation, the reinforcing bar passes through the rubber washer. The inner diameter of the rubber washer is adapted to the diameter of the reinforcing bar.
5. The template for installing artistic signs in saline-alkali land as described in claim 4, characterized in that: The plastic side panel has a insertion groove on one edge, which is vertically oriented. A sealing rod is provided on the other side of the plastic side panel. During installation, the sealing rod is inserted into the insertion groove, and the outer wall of the sealing rod is in contact with the inner wall of the insertion groove. A side pressure plate is provided on the outside of the insertion groove of the plastic side panel. The side pressure plate abuts against the sealing rod and applies a force to the sealing rod to move it into the insertion groove.
6. The template for installing artistic signs in saline-alkali land as described in claim 1, characterized in that: The connecting lugs include vertical lugs and horizontal lugs. The vertical lugs are provided with an extension. The end of the vertical lugs away from the plastic side plate is provided with a waist-shaped connecting hole. During installation, the steel bar located on the outermost side of the plastic partition plate passes through the waist-shaped connecting hole. The length of the horizontal lug is shorter than that of the vertical lug, the horizontal lug is perpendicular to the vertical lug, and a horizontal reinforcing bar is provided in the horizontal lug. The horizontal reinforcing bar is tied and fixed together with a row of reinforcing bars in the vertical lug.
7. The template for installing artistic signs in saline-alkali land as described in claim 1, characterized in that: It also includes an isolation cover plate, the edge of which is provided with a sealing groove, and a sealing ring is provided in the sealing groove. The sealing groove is engaged with the top of the plastic side plate. When the isolation cover plate exerts a force from top to bottom, the sealing groove squeezes the sealing ring. A reinforcing connecting ring is provided in the middle of the isolation cover plate, and several pre-embedded screws are provided on the reinforcing connecting ring. During installation, the pre-embedded screws are connected to the support legs of the artistic sign.
8. The template for installing artistic signs in saline-alkali land as described in claim 7, characterized in that: It also includes a sealing protective cover, which is fitted onto the support leg of the artistic sign and covers the top of the pre-embedded screw; The lower edge of the sealing protective cover is provided with a locking part, the outer side of the reinforcing connecting ring is provided with a connecting post, a sealing gasket is sleeved on the connecting post, the locking part and the connecting post are connected by screws, and the sealing gasket is pressed between the locking part and the isolation cover plate; The sealing cover has pressure-applying slopes around its perimeter, and the top of the sealing cover has a socket hole that mates with the support leg of the artistic logo. A reinforced rubber ring is installed inside the socket hole, and during installation, the reinforced rubber ring fits against the outer wall of the support leg of the artistic logo.
9. The template for installing artistic signs in saline-alkali land as described in claim 1, characterized in that: It also includes a connecting corner bracket, which is fixed at the lower top corner where the plastic partition plate and the plastic side plate are connected, and the connecting corner bracket and the plastic partition plate and the plastic side plate are coated with a sealing waterproof adhesive.
Citation Information
Patent Citations
Form for a concrete footing
CA2722627A1
A single-sided hole sealing sleeve for pipe insertion connection
CN102261471A