Automatic tabletting and sample preparation mechanism for logging rock debris
By designing an automatic pelleting and sample preparation mechanism for logging cuttings, the automatic pelleting and sample preparation of cuttings powder has been realized, solving the problems of low efficiency and unstable quality in the existing technology, and improving the automation level and sample consistency of logging detection.
Patent Information
- Application Number
- CN202511030652.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-25
- Publication Date
- 2025-11-04
AI Technical Summary
Current logging testing methods for cuttings pelleting are inefficient and susceptible to human error, making it difficult to guarantee pelleting quality.
Design an automatic pelleting sample preparation mechanism for logging cuttings, including a ring-separating assembly, a cuttings sampling assembly, a ring loading and unloading assembly, a ring locking assembly, and a pressing assembly. This mechanism enables automatic pelleting of cuttings powder. The automatic output, transfer, and locking of the ring are achieved through driving devices such as cylinders and grippers. Combined with quantitative sampling and cleaning devices, it ensures the consistency and cleanliness of the sample quantity.
It improves the automation and efficiency of rock chip pressing and sample preparation, ensures the quality and consistency of each pressing and sample preparation, reduces manual intervention, and realizes the positioning and cleaning of the pressing ring.
Smart Images

Figure CN120890759A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the field of mud logging detection, in particular to a mud logging rock debris automatic tabletting and sample preparation mechanism. BACKGROUND
[0002] Mud logging detection is mainly used for oil and gas resource evaluation, that is, various measuring instruments are used to obtain real-time data reflecting underground geological structure, oil and gas conditions, drilling and other aspects during oil and gas drilling operation. The rock debris returned to the ground during drilling is an intuitive material for timely understanding of the formation lithology and oil and gas layer. The rock debris needs to be ground from granular to powder, and in many cases, the rock debris powder needs to be pressed in a pressing ring for subsequent related detection. In the prior art, each process of rock debris tabletting and sample preparation, such as pouring rock debris powder, loading and unloading the pressing ring, cleaning the pressing surface, etc., is mainly completed by manual operation, which not only has low operation efficiency, but also is easily affected by human factors, and cannot completely guarantee the pressing quality of the rock debris powder. SUMMARY
[0003] The present application relates to the field of mud logging detection, in particular to a mud logging rock debris automatic tabletting and sample preparation mechanism.
[0004] The purpose of the present application is achieved by the following technical solutions:
[0005] A mud logging rock debris automatic tabletting and sample preparation mechanism, comprising a pressing ring split ring assembly, a rock debris sampling assembly, a pressing ring feeding and discharging assembly, a pressing ring locking assembly and a pressing assembly, wherein the pressing ring split ring assembly comprises a pressing ring split ring seat and a split ring plug plate, a plurality of pressing rings are stacked on the pressing ring split ring seat, and a socket is provided on the lower side; the lowermost pressing ring in the pressing ring split ring seat is inserted into the socket by the split ring plug plate to push and output; the pressing ring feeding and discharging assembly is provided with movable pressing ring clamping jaws, and the output pressing ring in the pressing ring split ring seat is moved to the pressing station seat on the lower side of the pressing assembly by the pressing ring clamping jaws; the pressing station seat is provided with the pressing ring locking assembly on both sides, and the pressing ring locking assembly is provided with movable locking clamping blocks; the pressing ring on the pressing station seat is clamped and locked by the locking clamping blocks on both sides; the rock debris sampling assembly comprises a sampling bucket and a discharge plate, wherein the lower end of the sampling bucket is provided with a sampling bucket base, the discharge plate is movably arranged on the lower side of the sampling bucket base, and the discharge plate is provided with a quantitative discharge hole; during sampling, the quantitative discharge hole on the discharge plate moves to the lower side of the sampling bucket base and receives the rock debris sample falling into the sampling bucket; during discharging, the quantitative discharge hole on the discharge plate moves above the pressing ring of the pressing station seat.
[0006] The rock debris sampling assembly comprises a pushing cylinder, a moving adjusting cylinder, an adjusting plate, a vibrating cylinder and a sampling base, wherein the moving adjusting cylinder is arranged on the sampling base, the adjusting plate is driven to move by the moving adjusting cylinder, the sampling bucket base at the lower end of the sampling bucket is fixed on the adjusting plate, the discharging plate is slidingly inserted between the adjusting plate and the sampling bucket base, the pushing cylinder is fixed on the adjusting plate, and the discharging plate is driven to move by the pushing cylinder, the sampling bucket is provided with the vibrating cylinder on one side, and the adjusting plate is provided with a dust suction element on one side.
[0007] The adjusting plate is provided with a pushing cylinder seat and a discharging slide rail, wherein the cylinder body of the pushing cylinder is fixed on the pushing cylinder seat, the power shaft end of the pushing cylinder is provided with a discharging connecting seat, the lower side of the discharging connecting seat is provided with a discharging slide block matched with the discharging slide rail, and the discharging connecting seat is fixedly connected with the discharging plate; the lower side of one end of the sampling bucket base is provided with a base mounting block fixedly connected with the adjusting plate, and the lower side of the other end is provided with a guide slide block, the upper side of the discharging plate is provided with a guide slide groove matched with the guide slide block, and the lower side of the discharging plate is slidingly connected with the adjusting plate.
[0008] The rock debris sampling assembly is provided with a hopper dust removal assembly above, the hopper dust removal assembly comprises a guide rail connecting plate, a cylinder connecting plate, a brush lifting cylinder, a brush lifting frame, a brush driving device and a hopper brush, wherein the cylinder connecting plate is arranged on the guide rail connecting plate, the brush lifting cylinder is arranged on the cylinder connecting plate, the guide rail connecting plate is provided with lifting guide rails, the brush lifting frame comprises a lifting connecting plate and a brush mounting plate, the lifting connecting plate is provided with a lifting slide block matched with the lifting guide rails, the power shaft end of the brush lifting cylinder is fixedly connected with the brush mounting plate, the brush mounting plate is provided with the brush driving device on the upper side and the hopper brush on the lower side, and the hopper brush is driven to rotate by the brush driving device.
[0009] The split ring assembly comprises a split ring cylinder and a split ring driving slide plate, the split ring driving slide plate is driven to move by the split ring cylinder and is fixedly connected with the split ring inserting plate, the split ring seat is provided with a plurality of split ring blocking shafts, and a split ring material bin is formed between each split ring blocking shaft, each split ring is stacked in the split ring material bin along the height direction, and the split ring seat is provided with a split ring work station plate away from the split ring inserting plate, and the split ring work station plate is provided with a feeding work station and a discharging work station.
[0010] The press-fitting work station and the press-fitting assembly are cleaned by a press-fitting dust removal assembly after the press-fitting is completed, the press-fitting dust removal assembly comprises a dust removal adjusting cylinder and a dust removal adjusting frame, wherein the dust removal adjusting frame comprises a moving connecting frame, a moving cylinder, a first dust removal plate and a second dust removal plate, the moving connecting frame is driven to move by the dust removal adjusting cylinder, the moving cylinder is arranged on the moving connecting frame, the first dust removal plate and the second dust removal plate are arranged in a top-down manner and connected by a dust removal connecting plate at rear ends, the first dust removal plate is driven to move by the moving cylinder, first and second dust removal devices are arranged on both sides of the first dust removal plate, a first dust removal brush is arranged on the top side of the first dust removal plate, a second dust removal brush is arranged on the bottom side of the second dust removal plate, and first and second transmission assemblies are arranged between the first and second dust removal plates, wherein the first dust removal brush is driven to rotate by the first dust removal device, the first dust removal device transmits torque by the first transmission assembly, the second dust removal brush is driven to rotate by the second dust removal device, and the second dust removal device transmits torque by the second transmission assembly.
[0011] The press ring feeding and discharging assembly comprises a horizontal moving module, a jaw lifting cylinder and a press ring jaw cylinder, wherein the jaw lifting cylinder is driven to move horizontally by the horizontal moving module, the press ring jaw cylinder is driven to lift and lower by the jaw lifting cylinder, and two press ring jaws are driven to open and close by the press ring jaw cylinder.
[0012] The press ring locking assembly comprises a locking support, and the locking support is provided with a locking cylinder, first and second connecting rods, a locking sliding seat and a hinged seat at an upper end, wherein the power shaft of the locking cylinder is hinged to one end of the first connecting rod and one end of the second connecting rod at a point, the other end of the first connecting rod is hinged to the hinged seat, the other end of the second connecting rod is hinged to the locking sliding seat, and the locking sliding seat is provided with a locking clamping block.
[0013] The press-fitting assembly comprises a press-fitting hydraulic cylinder, and the press-fitting hydraulic cylinder is provided with a press-fitting floating plate at a lower end, the press-fitting floating plate is provided with a press-fitting shaft at a bottom side, the edges of the press-fitting floating plate are provided with a plurality of guide sleeves respectively sleeved on corresponding guide shafts, and the bottom sides of the guide sleeves are provided with guide sleeve flanges, the lower ends of the guide shafts are provided with press-fitting mounting blocks, springs are sleeved on the guide shafts, and the springs are arranged between the guide sleeve flanges and the press-fitting mounting blocks.
[0014] The ring assembly, the rock sample assembly, the ring loading and unloading assembly, the ring locking assembly and the pressing assembly are arranged on a total assembly frame body, the total assembly frame body comprises a first mounting plate, a second mounting plate and a third mounting plate arranged from high to low, wherein the ring assembly, the rock sample assembly and the pressing station seat are arranged on the second mounting plate, the pressing assembly is fixedly arranged on the first mounting plate at the upper end and above the pressing station seat at the lower end, the ring loading and unloading assembly and the ring locking assembly are arranged on the third mounting plate, the ring clamping jaw and the locking clamping block are arranged on the upper side of the second mounting plate, in addition, the first mounting plate is provided with a funnel dust removal assembly on the lower side, the first mounting plate is provided with a dust suction control assembly on the upper side, and the second mounting plate is provided with a pressing dust removal assembly on the upper side.
[0015] The advantages and positive effects of the present application are:
[0016] 1、The ring assembly is used for automatically outputting the ring, the ring loading and unloading assembly is used for transferring the ring between different stations, the rock sample assembly is used for quantitatively taking the rock powder and inputting into the ring on the pressing station seat, and finally the pressing assembly is used for completing the tabletting of the sample in the ring, so that the whole process is automatically completed, the manual intervention is greatly reduced (only the ring is supplemented), the operation efficiency is improved, and the quality of the tabletting is ensured.
[0017] 2、The rock sample assembly can quantitatively take the rock sample, so that the consistency of the sample quantity in each tabletting is ensured, in addition, after the quantitative sampling is completed, the funnel dust removal assembly and the dust suction element are used for cleaning in time, so that the sampling bucket is clean and does not affect the next batch of samples, and after the pressing assembly completes the pressing, the upper and lower pressing contact surfaces of the pressing station can be cleaned in time by the pressing dust removal assembly, so that the pressing station is clean, and the above measures can ensure the quality of the tabletting.
[0018] 3、The ring locking assembly is separately designed for assisting the positioning of the ring, so that the ring is not taken up by the pressing assembly after the pressing. DETAILED DESCRIPTION
[0019] Figure 1 It is a schematic view of the overall structure of the present application,
[0020] Figure 2 It is a K view in Figure 1
[0021] Figure 3 It is an A-A view in Figure 2
[0022] Figure 4 It is a B-B view in Figure 1 Structure diagram of dust removal assembly of middle funnel,
[0023] Figure 5 For Figure 1 Structure diagram of middle pressure ring sub-assembly,
[0024] Figure 6 For Figure 1 Structure diagram of middle rock debris sampling assembly,
[0025] Figure 7 For Figure 6 X-direction view in,
[0026] Figure 8 For Figure 6 Y-direction view in,
[0027] Figure 9 For Figure 2 Structure diagram of dust removal assembly of middle pressure,
[0028] Figure 10 For Figure 9 Front view of dust removal assembly of middle pressure,
[0029] Figure 11 For Figure 10 Left view of dust removal assembly of middle pressure,
[0030] Figure 12 For Figure 1 Structure diagram of dust suction control assembly,
[0031] Figure 13 For Figure 12 Bottom view of dust suction control assembly,
[0032] Figure 14 For Figure 13 B-B view in,
[0033] Figure 15 For Figure 3 Structure diagram of middle pressure ring feeding and discharging assembly,
[0034] Figure 16 For Figure 3 Structure diagram of middle pressure ring locking assembly,
[0035] Figure 17 For Figure 16 Top view of middle pressure ring locking assembly,
[0036] Figure 18 For Figure 2 Structure diagram of middle pressure assembly.
[0037] Wherein, 1 is a funnel dust removal assembly, 101 is a guide rail connecting plate, 102 is a cylinder connecting plate, 103 is a lifting slider, 104 is a lifting connecting plate, 105 is a brush mounting plate, 106 is a funnel brush, 107 is a brush lifting cylinder, 108 is a brush driving device, 109 is a brush cylinder joint, 110 is a lifting plate connecting seat;
[0038] 2 is a pressure ring split ring assembly, 201 is a split ring cylinder, 202 is a split ring guide rail, 203 is a split ring cylinder joint, 204 is a blanking station, 205 is a feeding station, 206 is a material shortage sensor, 207 is a pressure ring split ring seat, 208 is a split ring plugboard, 209 is a split ring drive sliding plate, 210 is a split ring drive connecting plate, 211 is a pressure ring hopper, 212 is a pressure ring blocking shaft, 213 is a split ring station plate;
[0039] 3 is a rock sample taking assembly, 301 is a pushing cylinder, 302 is a limiting seat, 303 is a discharging connecting seat, 304 is a sampling bucket, 3041 is a sampling bucket base, 3042 is a base mounting block, 305 is a discharging plate, 3051 is a quantitative discharging hole, 3052 is a guide chute, 306 is a moving adjustment cylinder, 307 is an adjustment plate, 308 is a sampling base, 3081 is a limiting support block, 309 is a pushing cylinder seat, 310 is a dust suction element, 311 is a vibrating cylinder, 312 is a discharging slide rail;
[0040] 4 is a press fitting dust removal assembly, 401 is a connecting frame, 402 is a sweeping adjustment cylinder, 403 is a sweeping adjustment frame, 4031 is a moving connecting frame, 4032 is a first sweeping plate, 4033 is a second sweeping plate, 4034 is a moving cylinder, 404 is a second sweeping device, 405 is a first sweeping device, 406 is a first sweeping brush, 407 is a second sweeping brush, 408 is a first transmission belt, 409 is a second transmission belt, 410 is a first drive pulley, 411 is a second drive pulley;
[0041] 5 is a dust suction control assembly, 501 is a baffle cylinder, 502 is a baffle cylinder seat, 503 is a baffle sleeve, 504 is a dust suction connecting seat, 505 is a dust suction device joint, 506 is a connecting shaft, 507 is an on-off baffle, 508 is a dust suction pipe joint;
[0042] 6 is a pressure ring feeding and discharging assembly, 601 is a horizontal moving module, 6011 is a horizontal moving seat, 602 is a drag chain, 603 is a jaw lifting cylinder, 6031 is a jaw lifting seat, 604 is a pressure ring jaw cylinder, 605 is a pressure ring jaw, 6051 is a jaw connecting seat, 606 is a mounting base;
[0043] 7 is the pressure ring locking assembly, 701 is the locking cylinder tailstock, 702 is the locking cylinder, 703 is the first connecting rod, 704 is the second connecting rod, 705 is the locking clamping block, 706 is the locking cylinder connector, 707 is the locking slide, 7071 is the lower connecting plate of the slide, 708 is the locking slider, 709 is the locking bracket, and 710 is the hinge seat.
[0044] 8 is the press-fit assembly, 801 is the press-fit hydraulic cylinder, 8011 is the press-fit shaft, 802 is the press-fit floating plate, 803 is the guide sleeve, 8031 is the guide sleeve flange, 804 is the spring, 805 is the press-fit mounting block, 806 is the guide shaft, and 807 is the press-fit mounting plate.
[0045] 9 is the assembly frame, 901 is the first mounting plate, 902 is the second mounting plate, 903 is the third mounting plate, and 10 is the pressure ring. Detailed Implementation
[0046] The invention will now be described in further detail with reference to the accompanying drawings.
[0047] like Figures 1-18 As shown, the present invention includes a pressure ring separating assembly 2, a rock cuttings sampling assembly 3, a pressure ring loading and unloading assembly 6, a pressure ring locking assembly 7, and a pressing assembly 8, wherein, as... Figure 5 As shown, the pressure ring splitting assembly 2 includes a pressure ring splitting seat 207 and a splitting insert plate 208. Multiple pressure rings 10 are stacked along the height direction on the pressure ring splitting seat 207. An insertion port is provided on the lower side of the pressure ring splitting seat 207, and the lowest pressure ring 10 within the pressure ring splitting seat 207 is inserted into the insertion port through the splitting insert plate 208 for output. Figure 15 As shown, the pressing ring loading and unloading assembly 6 is equipped with a movable pressing ring gripper 605, and the pressing ring 10 output from the pressing ring separating seat 207 is clamped and moved by the pressing ring gripper 605 to the pressing station seat located on the lower side of the pressing assembly 8; the pressing station seat is equipped with pressing ring locking assemblies 7 on both sides, and as shown... Figure 16 The pressure ring locking assembly 7 is provided with a movable locking clamping block 705, and the pressure ring 10 on the pressing station seat is clamped and locked by the locking clamping blocks 705 in the pressure ring locking assemblies 7 on both sides; as Figures 6-8As shown, the rock sample assembly 3 comprises a sampling bucket 304 and a discharge plate 305, wherein the sampling bucket 304 is provided with a sampling bucket base 3041 at the lower end, the discharge plate 305 is movably arranged at the lower side of the sampling bucket base 3041, and the discharge plate 305 is provided with a quantitative discharge hole 3051, the quantitative discharge hole 3051 on the discharge plate 305 is moved to the lower side of the sampling bucket base 3041 to receive the falling rock sample in the sampling bucket 304 during sampling, and the quantitative discharge hole 3051 on the discharge plate 305 is moved above the pressing ring 10 of the pressing station base during discharging, and the rock sample in the quantitative discharge hole 3051 falls into the pressing ring 10, and then the pressing assembly 8 is started to complete the pressing of the sample in the pressing ring 10.
[0048] As shown, Figures 1-3 In this embodiment, the pressing ring split ring assembly 2, the rock sample assembly 3, the pressing ring feeding and discharging assembly 6, the pressing ring locking assembly 7 and the pressing assembly 8 are all arranged on a general assembly frame 9, the general assembly frame 9 comprises a first mounting plate 901, a second mounting plate 902 and a third mounting plate 903 arranged in sequence from high to low, wherein the pressing ring split ring assembly 2, the rock sample assembly 3 and the pressing station base are all arranged on the second mounting plate 902, the upper end of the pressing assembly 8 is fixedly arranged on the first mounting plate 901, and the main body of the pressing ring feeding and discharging assembly 6 and the main body of the pressing ring locking assembly 7 are both arranged on the third mounting plate 903, but the pressing ring clamping jaw 605 and the locking clamping block 705 are both located on the upper side of the second mounting plate 902 to realize the clamping movement and clamping locking of the pressing ring 10.
[0049] As shown, Figures 6-8 In this embodiment, the rock sample assembly 3 comprises a pushing cylinder 301, a moving and adjusting cylinder 306, an adjusting plate 307, a vibrating cylinder 311 and a sampling base 308, wherein the sampling base 308 is arranged on the second mounting plate 902, the moving and adjusting cylinder 306 is arranged on the sampling base 308, and the adjusting plate 307 is driven to move by the moving and adjusting cylinder 306, in this embodiment, the moving and adjusting cylinder 306 can be a rodless cylinder, and the adjusting plate 307 is fixedly connected with the moving slider of the rodless cylinder, the sampling bucket base 3041 at the lower end of the sampling bucket 304 is fixedly arranged on the adjusting plate 307, and the discharge plate 305 is slidingly inserted between the adjusting plate 307 and the sampling bucket base 3041, the pushing cylinder 301 is fixedly arranged on the adjusting plate 307, and the discharge plate 305 is driven to move by the pushing cylinder 301, and the sampling bucket 304 is provided with the vibrating cylinder 311 at one side.
[0050] In operation, as shown, Figure 1As shown, the mobile adjusting cylinder 306 drives the adjusting plate 307 to move to adjust the position of the sampling hopper 304, such as moving the sampling hopper 304 outside the first mounting plate 901 to enable the mechanical arm of the previous process to pour the rock sample into the sampling hopper 304, and after the sampling hopper 304 is filled, the mobile adjusting cylinder 306 drives the adjusting plate 307 to move forward to a set position to perform the quantitative sampling. Figure 6 As shown, the discharge plate 305 is driven to retreat by the pushing cylinder 301 to move the quantitative discharge hole 3051 to the lower side of the sampling hopper base 3041, then the vibration cylinder 311 on one side of the sampling hopper 304 is started to vibrate the sampling hopper 304 and make the sample fall into the quantitative discharge hole 3051, then the discharge plate 305 is driven to move forward by the pushing cylinder 301 to move the quantitative discharge hole 3051 above the compression ring 10 and misaligned with the adjusting plate 307 to expose, so that the sample in the quantitative discharge hole 3051 can fall into the compression ring 10.
[0051] As shown, Figures 6-8 As shown in the embodiment, the adjusting plate 307 is provided with a pushing cylinder seat 309 and a discharge sliding rail 312, the cylinder body of the pushing cylinder 301 is fixed on the pushing cylinder seat 309, the power shaft end of the pushing cylinder 301 is provided with a discharge connecting seat 303, the lower side of the discharge connecting seat 303 is provided with a discharge sliding block matched with the discharge sliding rail 312, and the lower side of the discharge connecting seat 303 is provided with a discharge connecting block fixed with the front end of the discharge plate 305. The extension and retraction of the power shaft of the pushing cylinder 301 drives the discharge plate 305 to move.
[0052] As shown, Figures 6-8 As shown in the embodiment, the lower side of one end of the sampling hopper base 3041 is provided with a base mounting block 3042 fixed with the adjusting plate 307, and the lower side of the other end is provided with a guide sliding block, the upper side of the discharge plate 305 is provided with a guide sliding groove 3052, and the guide sliding block is matched with the guide sliding groove 3052 to realize the sliding connection of the sampling hopper base 3041 and the discharge plate 305, and the lower side of the discharge plate 305 can also realize the sliding connection with the adjusting plate 307 through the sliding block and sliding groove structure, and one side of the sampling base 308 is provided with a limiting seat 302 for limiting the extension displacement of the discharge plate 305.
[0053] As shown, Figures 6-8As shown, in the embodiment, the adjusting plate 307 is provided with a dust suction element 310 on one side, when the sample in the quantitative discharge hole 3051 falls into the pressure ring 10, the discharge plate 305 retreats to the original position, at this time, the dust suction element 310 can start to suck the excess sample in the quantitative discharge hole 3051 into the dust collector, in addition, the discharge plate 305 can also be matched to move, so that the residual sample on the discharge plate 305 can also be sucked into the dust collector through the dust suction element 310. Figure 6 As shown, in the embodiment, the dust suction element 310 is a rectangle as a whole, the dust suction port is provided on the side of the dust suction element 310 facing the discharge plate 305, the dust suction gap is provided between the two guide sliding blocks matched with the guide sliding groove 3052 of the sampling hopper base 3041, and the dust suction port is aligned with the dust suction gap, when the quantitative discharge hole 3051 retreats below the sampling hopper base 3041, the residual sample in the quantitative discharge hole 3051 enters the dust suction element 310 through the dust suction gap, one side of the dust suction element 310 is provided with a connecting pipeline connected with the dust suction control assembly 5, and the dust suction control assembly 5 is connected with the dust collector.
[0054] As shown, Figure 1 As shown, the funnel dust removal assembly 1 is provided above the rock debris sampling assembly 3, and as shown, Figure 4 As shown, in the embodiment, the funnel dust removal assembly 1 comprises a guide rail connecting plate 101, a cylinder connecting plate 102, a brush lifting cylinder 107, a brush lifting frame, a brush driving device 108 and a funnel brush 106, wherein the upper end of the guide rail connecting plate 101 is fixedly connected with the first mounting plate 901, the cylinder connecting plate 102 is arranged on the guide rail connecting plate 101, the brush lifting cylinder 107 is arranged on the cylinder connecting plate 102, the guide rail connecting plate 101 is provided with lifting guide rails, the brush lifting frame comprises a lifting connecting plate 104 and a brush mounting plate 105, wherein the lifting connecting plate 104 is provided with lifting sliding blocks matched with the lifting guide rails, and the power shaft end of the brush lifting cylinder 107 is fixedly connected with the brush mounting plate 105, in the embodiment, the power shaft end of the brush lifting cylinder 107 is provided with a brush cylinder joint 109, the brush mounting plate 105 is provided with a lifting plate connecting seat 110, and the brush cylinder joint 109 is fixedly connected with the lifting plate connecting seat 110. Figure 4 As shown, the brush driving device 108 is provided on the upper side of the brush mounting plate 105, the funnel brush 106 is provided on the lower side of the brush mounting plate 105, and the funnel brush 106 is driven to rotate through the brush driving device 108. The brush driving device 108 can adopt the structure of a motor + right-angle speed reducer, wherein the rotating shaft of the funnel brush 106 is fixedly connected with the power shaft of the right-angle speed reducer.
[0055] When the present application works, as shown, Figure 1As shown, the sampling bucket 304 in the rock debris sampling assembly 3 is moved to below the hopper brush 106 of the hopper dust removal assembly 1 by the adjusting plate 307, then the hopper brush 106 is driven to descend into the sampling bucket 304 by the brush lifting cylinder 107, and the hopper brush 106 is driven to rotate by the brush driving device 108 to clean the residual sample in the sampling bucket 304, and the cleaned residual sample can be sucked away by the dust suction element 310, so that the inside of the sampling bucket 304 is cleaned, and the next batch of sample input and pressing is not affected. In addition, compared with the manual rock debris powder pouring and manual cleaning in the prior art, the present application realizes automatic sampling and cleaning of the rock debris powder, and greatly improves the operation efficiency and automation degree.
[0056] As Figure 5 As shown, in the embodiment, the compression ring split ring assembly 2 comprises a split ring cylinder 201 and a split ring driving slide plate 209, the split ring driving slide plate 209 is driven to move by the split ring cylinder 201 and is fixedly connected with the split ring insertion plate 208, the split ring insertion plate 208 is inserted into the socket on the lower side of the compression ring split ring seat 207 by the split ring driving slide plate 209, the compression ring split ring seat 207 is provided with a plurality of compression ring blocking shafts 212, and the compression ring material warehouse 211 accommodating the compression ring 10 is formed between each compression ring blocking shaft 212, each compression ring 10 is stacked in the compression ring material warehouse 211 along the height direction, and the upper side of the compression ring split ring seat 207 is provided with a lack of material sensor 206, which sends a signal prompt when the height of the compression ring 10 in the compression ring material warehouse 211 is lower than the lack of material sensor 206. The lack of material sensor 206 is a commercially available product. The compression ring split ring assembly 2 of the present application can realize automatic compression ring 10 operation, and can fill a plurality of compression rings 10 at a time, greatly reducing human intervention factors. The present application only needs to complete the compression ring 10 replenishment in time when the lack of material sensor 206 sends a prompt signal.
[0057] As Figure 5 As shown, in the embodiment, the compression ring split ring assembly 2 comprises a split ring guide rail 202, and the lower side of the split ring driving slide plate 209 is provided with a split ring sliding block matched with the split ring guide rail 202, the power shaft end of the split ring cylinder 201 is provided with a split ring cylinder joint 203, one side of the split ring driving slide plate 209 is provided with a split ring driving connecting plate 210, and the split ring cylinder joint 203 is fixedly connected with the split ring driving connecting plate 210, as shown, in the embodiment, the split ring cylinder 201 and the split ring guide rail 202 are directly arranged on the second mounting plate 902. Figure 1
[0058] As Figure 5 As shown, in the embodiment, the split ring seat 207 of the compression ring is provided with a split ring work station plate 213 away from the split ring insertion plate 208, and the split ring work station plate 213 is provided with an upper feeding station 205 and a lower feeding station 204, wherein the compression ring 10 at the lower end of the split ring seat 207 is pushed out to the upper feeding station 205 through the split ring insertion plate 208, and then the compression ring 10 in the upper feeding station 205 is transferred by the compression ring clamping jaw 605 in the compression ring upper and lower feeding assembly 6, and the compression ring 10 after pressing is transferred by the compression ring clamping jaw 605 to the lower feeding station 204 to wait for the next process mechanical hand clamping output.
[0059] As shown, Figure 1 As shown, the upper side of the second mounting plate 902 is provided with a press fitting dust removal assembly 4, and as shown, Figures 9-11 As shown, in the embodiment, the press fitting dust removal assembly 4 includes a connecting frame 401, a dust removal adjusting cylinder 402, a dust removal adjusting frame 403, a first dust removal device 405, a second dust removal device 404, a first dust removal brush 406 and a second dust removal brush 407, wherein the upper end of the connecting frame 401 is fixedly connected with the first mounting plate 901, and the lower end is provided with the dust removal adjusting cylinder 402; the dust removal adjusting frame 403 includes a moving connecting frame 4031, a moving cylinder 4034, a first dust removal plate 4032 and a second dust removal plate 4033, wherein the moving connecting frame 4031 is driven to move by the dust removal adjusting cylinder 402, in the embodiment, the dust removal adjusting cylinder 402 is a rodless cylinder, the moving connecting frame 4031 is fixedly connected with the moving slider of the rodless cylinder, the moving cylinder 4034 is arranged on the moving connecting frame 4031, the first dust removal plate 4032 and the second dust removal plate 4033 are arranged in a vertical manner and connected through a vertical dust removal connecting plate at the rear end, the first dust removal plate 4032 is driven to move by the moving cylinder 4034, and simultaneously drives the second dust removal plate 4033 to move synchronously, the first dust removal device 405 and the second dust removal device 404 are arranged on the two sides of the first dust removal plate 4032, the first dust removal brush 406 is arranged on the upper side of the first dust removal plate 4032, the second dust removal brush 407 is arranged on the lower side of the second dust removal plate 4033, and the first dust removal plate 4032 and the second dust removal plate 4033 are provided with a first transmission assembly and a second transmission assembly, wherein the first dust removal brush 406 is driven to rotate by the first dust removal device 405, and the first dust removal device 405 transmits torque through the first transmission assembly, the second dust removal brush 407 is driven to rotate by the second dust removal device 404, and the second dust removal device 404 transmits torque through the second transmission assembly. The outer sides of the first dust removal brush 406 and the second dust removal brush 407 can be provided with a protective cover as needed to prevent sample overflow.
[0060] In operation, the first dust-sweeping device 405, the second dust-sweeping device 404, the first dust-sweeping brush 406, and the second dust-sweeping brush 407 are first moved by the dust-sweeping adjusting cylinder 402 to achieve position adjustment. After moving into position, the moving cylinder 4034 on the dust-sweeping adjusting frame 403 is activated to drive the first dust-sweeping plate 4032 and the second dust-sweeping plate 4033 to move forward synchronously and enter between the pressing assembly 8 and the pressing station seat. Then, the first dust-sweeping device 405 and the second dust-sweeping device 404 are activated to drive the first dust-sweeping brush 406 and the second dust-sweeping brush 407 to rotate, respectively. The first dust-sweeping brush 406 is used to clean the pressing contact surface of the upper pressing assembly 8 (i.e., the pressing contact surface). Figure 18 As shown in the diagram (lower end of the pressing shaft 8011), the second dust-sweeping brush 407 is used to clean the pressing contact surface of the lower pressing station seat. The movable connecting frame 4031 of the dust-sweeping adjustment frame 403 is equipped with a suction head connected to a vacuum cleaner to remove residual samples after cleaning. In this embodiment, the suction head is first connected to the suction control component 5 via a pipe, and the suction control component 5 is then connected to the vacuum cleaner via a pipe. Compared to manual wiping in the prior art, this invention utilizes the first dust-sweeping brush 406 and the second dust-sweeping brush 407 to achieve automatic cleaning of the pressing contact surfaces of the pressing component 8 and the pressing station seat, improving both work efficiency and automation.
[0061] like Figure 11 As shown in this embodiment, both the first transmission assembly and the second transmission assembly are transmission belt structures. The first dust-sweeping device 405 has a first drive pulley 410 at its power shaft end, and a first driven pulley is provided on the rotating shaft of the first dust-sweeping brush 406. The first drive pulley 410 and the first driven pulley are connected by a first transmission belt 408. The second dust-sweeping device 404 has a second drive pulley 411 at its power shaft end, and a second driven pulley is provided on the rotating shaft of the second dust-sweeping brush 407. The second drive pulley 411 and the second driven pulley are connected by a second transmission belt 409. Furthermore, both the first dust-sweeping device 405 and the second dust-sweeping device 404 are driven by a motor and a right-angle reducer.
[0062] like Figure 1 As shown, the upper side of the first mounting plate 901 is provided with a dust collection control component 5, such as... Figures 12-14As shown, in the embodiment, the dust suction control assembly 5 comprises baffle air cylinders 501, baffle sleeves 503 and dust suction connecting seats 504, wherein each baffle sleeve 503 is in communication with the interior of the dust suction connecting seat 504, and each baffle sleeve 503 is provided with a dust suction pipe joint 508, which can be connected to the positions inside the general assembly frame 9 that need to be dusted, including the dust suction element 310 in the rock sample taking assembly 3, the dust suction head in the press assembly and dust removal assembly 4, etc., the dust suction device joint 505 is provided on the dust suction connecting seat 504, which is connected to the dust collector and other devices through the pipeline, the on-off baffle 507 is provided on the baffle sleeve 503 and driven to rise and fall by the corresponding baffle air cylinder 501, and the air duct inside the baffle sleeve 503 is controlled to be opened or closed by the on-off baffle 507, wherein when the on-off baffle 507 is lowered, the dust suction pipe joint 508 corresponding to the on-off baffle 507 is in a closed state.
[0063] As shown, Figure 14 In the embodiment, the baffle sleeve 503 is provided with a baffle cylinder seat 502, and the baffle air cylinder 501 is arranged on the corresponding baffle cylinder seat 502, and the power shaft end of the baffle air cylinder 501 is connected to the corresponding on-off baffle 507 through the connecting shaft 506.
[0064] As shown, Figure 15 In the embodiment, the pressure ring feeding and discharging assembly 6 comprises a horizontal movement module 601, a jaw lifting air cylinder 603 and a pressure ring jaw air cylinder 604, wherein the jaw lifting air cylinder 603 is driven to move horizontally by the horizontal movement module 601, the pressure ring jaw air cylinder 604 is driven to rise and fall by the jaw lifting air cylinder 603, and the two pressure ring jaws 605 are driven to open and close by the pressure ring jaw air cylinder 604 to realize clamping or releasing of the pressure ring 10.
[0065] As shown, Figure 15As shown, in this embodiment, the transverse module 601 can adopt a suitable structural form as needed, such as a rodless cylinder or a motor lead screw and nut structure. The transverse module 601 is provided with a transverse moving seat 6011, and the lower end of the gripper lifting cylinder 603 is fixed on the transverse moving seat 6011. The power shaft end of the gripper lifting cylinder 603 is provided with a gripper lifting seat 6031, and the pressure ring gripper cylinder 604 is provided on the gripper lifting seat 6031. Both moving ends of the pressure ring gripper cylinder 604 are provided with gripper connecting seats 6051, and the gripper connecting seats 6051 are fixedly connected to the corresponding pressure ring grippers 605. The transverse module 601 is provided with a drag chain 602 on one side for carrying various cables, which is a well-known technology in the art. In addition, the transverse module 601 is mounted on a mounting base 606, which is mounted on the third mounting plate 903. At the same time, the pressure ring clamp 605 moves on the upper side of the second mounting plate 902 to cooperate in realizing the clamping and transfer of the pressure ring 10. The second mounting plate 902 is provided with a slot for movement.
[0066] like Figures 16-17 As shown, in this embodiment, the pressure ring locking assembly 7 includes a locking bracket 709, and the upper end of the locking bracket 709 is provided with a locking cylinder 702, a first connecting rod 703, a second connecting rod 704, a locking slide 707, and a hinge seat 710. The front end of the power shaft of the locking cylinder 702 is hinged at a point to one end of the first connecting rod 703 and one end of the second connecting rod 704. The other end of the first connecting rod 703 is hinged to the hinge seat 710, and the other end of the second connecting rod 704 is hinged to the locking slide 707. The locking slide 707 is provided with a locking clamping block 705. Figure 17 As shown, during operation, the power shaft of the locking cylinder 702 retracts, pulling the first connecting rod 703 and the second connecting rod 704 towards the side of the locking cylinder 702. This causes the locking slide 707, along with the locking clamping block 705, to retract and release the pressure ring 10. Conversely, the power shaft of the locking cylinder 702 extends, driving the first connecting rod 703 and the second connecting rod 704 to rotate away from the locking cylinder 702. This causes the locking slide 707, along with the locking clamping block 705, to move forward and clamp the pressure ring 10. When the first connecting rod 703 and the second connecting rod 704 are aligned, a dead point position is formed to ensure clamping. In the prior art, the pressure ring 10 is often lifted by the pressing assembly 8 after pressing, generally requiring manual intervention to hammer it. This invention avoids this situation by clamping and fixing the pressure ring 10 using the aforementioned pressure ring locking assembly 7.
[0067] like Figures 16-17As shown, in the embodiment, the upper end of the locking support 709 is provided with a locking cylinder tail seat 701, and the rear end of the cylinder body of the locking cylinder 702 is rotatably installed on the locking cylinder tail seat 701. In addition, the upper end of the locking support 709 is provided with a locking sliding rail, the lower end of the locking sliding seat 707 is provided with a sliding seat lower connecting plate 7071, and the lower side of the sliding seat lower connecting plate 7071 is provided with a locking sliding block 708 matched with the locking sliding rail.
[0068] As shown, Figure 18 As shown, in the embodiment, the pressing assembly 8 comprises a pressing hydraulic cylinder 801, the upper end of the pressing hydraulic cylinder 801 is fixedly connected with the first mounting plate 901, the lower end is provided with a pressing floating plate 802, the lower side of the pressing floating plate 802 is provided with a pressing shaft 8011, the edge of the pressing floating plate 802 is provided with a plurality of guide sleeves 803 respectively sleeved on corresponding guide shafts 806, the lower side of the guide sleeve 803 is provided with a guide sleeve flange 8031 connected with the pressing floating plate 802, the lower end of the guide shaft 806 is provided with a pressing mounting block 805 fixedly arranged on the second mounting plate 902, the guide shaft 806 is sleeved with a spring 804, and the spring 804 is arranged between the guide sleeve flange 8031 and the pressing mounting block 805. The spring 804 can play a floating buffering role to avoid damage to the pressing ring 10. In addition, displacement sensors or other elements can be arranged on the pressing floating plate 802 as needed to judge whether it is completely retracted in real time. Only when the pressing floating plate 802 is completely retracted, the next action of the application can be performed.
[0069] The working principle of the application is as follows:
[0070] The working principle of the application is as follows:
[0071] Step one: the split ring plug-in plate 208 in the split ring subassembly 2 is inserted into the socket at the lower end of the split ring split ring seat 207 to output a pressing ring 10.
[0072] Step two: the pressing ring clamp jaw 605 in the pressing ring feeding and discharging assembly 6 clamps the pressing ring 10 and sends it to the pressing station seat on the lower side of the pressing assembly 8.
[0073] Step three: the locking cylinder 702 in the pressing ring locking assembly 7 on both sides of the pressing station seat is started, and moves the locking sliding seat 707 through the first connecting rod 703 and the second connecting rod 704, so that the locking clamping block 705 on the locking sliding seat 707 completes the clamping positioning of the pressing ring 10 on the pressing station seat.
[0074] Step four: the moving adjustment cylinder 306 in the drill cuttings sampling assembly 3 drives the adjustment plate 307 to move and the sampling bucket 304 with the drill cuttings sample moves to the set position, then the discharge plate 305 is driven to retreat by the pushing cylinder 301 so that the quantitative discharge hole 3051 moves to the lower side of the sampling bucket base 3041, then the vibration cylinder 311 on one side of the sampling bucket 304 is started to vibrate the sampling bucket 304 and make the sample fall into the quantitative discharge hole 3051, then the discharge plate 305 is driven to move forward by the pushing cylinder 301 so that the quantitative discharge hole 3051 moves above the compression ring 10 and is exposed from the adjustment plate 307, so that the sample in the quantitative discharge hole 3051 can fall into the compression ring 10, thereby realizing quantitative sampling.
[0075] In addition, in order to improve the work efficiency, the above steps one to three can be synchronized, that is, the compression ring 10 is output while the quantitative sampling of the drill cuttings sample is completed, when the compression ring 10 is confirmed to move to the compression station base and is clamped and fixed, the discharge plate 305 is timely matched to move forward so that the sample in the quantitative discharge hole 3051 falls into the compression ring 10.
[0076] In this step, after the quantitative sampling is completed, the discharge plate 305 retreats to the original position, at this time the dust suction element 310 can start to suck the excess sample in the quantitative discharge hole 3051 into the dust collector, the sampling bucket 304 is moved to the lower side of the funnel brush 106 of the funnel dust removal assembly 1 by the adjustment plate 307, then the funnel brush 106 is driven to descend into the sampling bucket 304 by the brush lifting cylinder 107, and the funnel brush 106 is driven to rotate to realize the cleaning of the residual sample in the sampling bucket 304 by the brush driving device 108, and the fallen residual sample can also be sucked away by the dust suction element 310, thereby ensuring that the inside of the sampling bucket 304 is cleaned and will not affect the input and compression of the next batch of sample.
[0077] Step five: the compression hydraulic cylinder 801 in the compression assembly 8 is started to drive the compression floating plate 802 to move downward with the compression shaft 8011 to complete the tabletting and sampling of the sample in the compression ring 10.
[0078] Step six: after the tabletting and sampling are completed, the compression ring locking assembly 7 on both sides of the compression station base releases the clamping of the compression ring 10, then the compression ring 10 that is completed is clamped by the compression ring clamping jaw 605 in the compression ring feeding and discharging assembly 6 and is sent to the discharging station 204 on the discharging station plate 213 of the compression ring separating assembly 2.
[0079] Step seven: the pressing assembly 4 realizes the cleaning of the pressing contact surface on the upper and lower sides of the pressing station, wherein the first and second dust sweeping devices 405 and 404, the first and second dust sweeping brushes 406 and 407 of the pressing assembly 4 are integrally moved to realize position adjustment through the dust sweeping adjusting frame 403, after being moved to the position, the moving cylinder 4034 on the dust sweeping adjusting frame 403 is started to drive the first and second dust sweeping plates 4032 and 4033 to move forward synchronously and enter between the pressing assembly 8 and the pressing station seat, then the first and second dust sweeping devices 405 and 404 are started to drive the first and second dust sweeping brushes 406 and 407 to rotate, wherein the first dust sweeping brush 406 is used for cleaning the pressing contact surface of the upper pressing assembly 8 (i.e. the lower end of the pressing shaft 8011 shown in FIG. 8B), and the second dust sweeping brush 407 is used for cleaning the pressing contact surface of the lower pressing station seat, and a dust suction head is matched on the moving connecting frame 4031 of the dust sweeping adjusting frame 403 to suck away the residual sample cleaned. Figure 18
[0080] In addition, when the corresponding dust cleaning operation is performed, the on-off baffle 507 in the dust control assembly 5 can be matched with the lifting to realize the dust suction on-off control.
Claims
1. An automatic cuttings pelleting and sample preparation mechanism for logging, characterized in that: The assembly includes a ring-splitting component (2), a rock cuttings sampling component (3), a ring-loading and unloading component (6), a ring-locking component (7), and a pressing component (8). The ring-splitting component (2) includes a ring-splitting seat (207) and a ring-splitting insert plate (208). Multiple rings (10) are stacked on the ring-splitting seat (207), and an insertion port is provided on the lower side. The lowest ring (10) in the ring-splitting seat (207) is pushed out by inserting it into the insertion port through the ring-splitting insert plate (208). The ring-loading and unloading component (6) is provided with a movable ring clamp (605), and the ring (10) output from the ring-splitting seat (207) is clamped and moved to the pressing station seat located on the lower side of the pressing component (8) by the ring clamp (605). The pressing station seat is provided with ring-locking components (7) on both sides, and the pressing... The ring locking assembly (7) is provided with movable locking clamping blocks (705), and the pressure ring (10) on the pressing station seat is clamped and locked by the locking clamping blocks (705) on both sides; the rock cuttings sampling assembly (3) includes a sampling hopper (304) and a discharge plate (305), wherein the lower end of the sampling hopper (304) is provided with a sampling hopper base (3041), and the discharge plate (305) is movably disposed on the sampling hopper base (3041). 41) On the lower side, and the discharge plate (305) is provided with a quantitative discharge hole (3051). When sampling, the quantitative discharge hole (3051) on the discharge plate (305) moves to the lower side of the sampling bucket base (3041) and receives the rock cutting sample falling from the sampling bucket (304). When discharging, the quantitative discharge hole (3051) on the discharge plate (305) moves to the upper side of the pressing ring (10) of the pressing station seat.
2. The automatic cuttings pelleting and sample preparation mechanism for logging according to claim 1, characterized in that: The rock cuttings sampling assembly (3) includes a pushing cylinder (301), a moving adjustment cylinder (306), an adjustment plate (307), a vibration cylinder (311), and a sampling base (308). The moving adjustment cylinder (306) is located on the sampling base (308), and the adjustment plate (307) is driven to move by the moving adjustment cylinder (306). The sampling bucket base (3041) at the lower end of the sampling bucket (304) is fixed on the adjustment plate (307), and the discharge plate (305) is slidably inserted between the adjustment plate (307) and the sampling bucket base (3041). The pushing cylinder (301) is fixed on the adjustment plate (307), and the discharge plate (305) is driven to move by the pushing cylinder (301). A vibration cylinder (311) is provided on one side of the sampling bucket (304), and a dust collection element (310) is provided on one side of the adjustment plate (307).
3. The automatic cuttings pelleting and sample preparation mechanism for logging according to claim 2, characterized in that: The adjusting plate (307) is provided with a pusher cylinder seat (309) and a discharge slide rail (312). The cylinder body of the pusher cylinder (301) is fixedly mounted on the pusher cylinder seat (309). The power shaft end of the pusher cylinder (301) is provided with a discharge connecting seat (303). The lower side of the discharge connecting seat (303) is provided with a discharge slider that cooperates with the discharge slide rail (312). The discharge connecting seat (303) is fixedly connected to the discharge plate (305). One end of the sampling hopper base (3041) is provided with a base mounting block (3042) that is fixedly connected to the adjusting plate (307). The other end is provided with a guide slider. The upper side of the discharge plate (305) is provided with a guide groove (3052). The guide slider cooperates with the guide groove (3052). The lower side of the discharge plate (305) is slidably connected to the adjusting plate (307).
4. The automatic cuttings pelleting and sample preparation mechanism according to claim 1, characterized in that: The cuttings sampling assembly (3) is equipped with a funnel dust removal assembly (1) above it. The funnel dust removal assembly (1) includes a guide rail connecting plate (101), a cylinder connecting plate (102), a brush lifting cylinder (107), a brush lifting frame, a brush driving device (108), and a funnel brush (106). The cylinder connecting plate (102) is located on the guide rail connecting plate (101), and the brush lifting cylinder (107) is located on the cylinder connecting plate (102). The guide rail connecting plate (101) is equipped with a lifting guide. The brush lifting frame includes a lifting connecting plate (104) and a brush mounting plate (105). The lifting connecting plate (104) is provided with a lifting slider that cooperates with the lifting guide rail. The power shaft end of the brush lifting cylinder (107) is fixedly connected to the brush mounting plate (105). The brush mounting plate (105) is provided with a brush driving device (108) on the upper side and a funnel brush (106) on the lower side. The funnel brush (106) is driven to rotate by the brush driving device (108).
5. The automatic cuttings pelleting and sample preparation mechanism according to claim 1, characterized in that: The ring-splitting assembly (2) includes a ring-splitting cylinder (201) and a ring-splitting drive slide plate (209). The ring-splitting drive slide plate (209) is driven to move by the ring-splitting cylinder (201) and is fixedly connected to the ring-splitting insert plate (208). The ring-splitting seat (207) is provided with a plurality of ring-splitting retaining shafts (212), and a ring-splitting hopper (211) is formed between each ring-splitting retaining shaft (212). Each ring (10) is stacked in the ring-splitting hopper (211) along the height direction. The ring-splitting seat (207) is provided with a ring-splitting station plate (213) on the side away from the ring-splitting insert plate (208), and the ring-splitting station plate (213) is provided with a loading station (205) and a unloading station (204).
6. The automatic cuttings pelleting and sample preparation mechanism according to claim 1, characterized in that: After the pressing station seat and pressing assembly (8) complete the pressing, they are cleaned by the pressing dust removal assembly (4). The pressing dust removal assembly (4) includes a dust removal regulating cylinder (402) and a dust removal regulating frame (403). The dust removal regulating frame (403) includes a movable connecting frame (4031), a movable cylinder (4034), a first dust removal plate (4032), and a second dust removal plate (4033). The movable connecting frame (4031) is driven to move by the dust removal regulating cylinder (402). The movable cylinder (4034) is mounted on the movable connecting frame (4031). The first dust removal plate (4032) and the second dust removal plate (4033) are arranged vertically and connected at their rear ends by a dust removal connecting plate. The first dust removal plate (4032) is driven to move by the movable cylinder (4034). A first dust-sweeping device (405) and a second dust-sweeping device (404) are respectively provided on both sides of the first dust-sweeping plate (4032). A first dust-sweeping brush (406) is provided on the upper side of the first dust-sweeping plate (4032), and a second dust-sweeping brush (407) is provided on the lower side of the second dust-sweeping plate (4033). A first transmission assembly and a second transmission assembly are provided between the first dust-sweeping plate (4032) and the second dust-sweeping plate (4033). The first dust-sweeping brush (406) is driven to rotate by the first dust-sweeping device (405), and the first dust-sweeping device (405) transmits torque through the first transmission assembly. The second dust-sweeping brush (407) is driven to rotate by the second dust-sweeping device (404), and the second dust-sweeping device (404) transmits torque through the second transmission assembly.
7. The automatic cuttings pelleting and sample preparation mechanism for logging according to claim 1, characterized in that: The pressing ring loading and unloading assembly (6) includes a transverse module (601), a gripper lifting cylinder (603), and a pressing ring gripper cylinder (604). The gripper lifting cylinder (603) is driven to move horizontally by the transverse module (601), the pressing ring gripper cylinder (604) is driven to lift by the gripper lifting cylinder (603), and the two pressing ring grippers (605) are driven to open and close by the pressing ring gripper cylinder (604).
8. The automatic cuttings pelleting and sample preparation mechanism according to claim 1, characterized in that: The pressure ring locking assembly (7) includes a locking bracket (709), and the upper end of the locking bracket (709) is provided with a locking cylinder (702), a first connecting rod (703), a second connecting rod (704), a locking slide (707), and a hinge seat (710). The front end of the power shaft of the locking cylinder (702) is hinged to one end of the first connecting rod (703) and one end of the second connecting rod (704) at a point. The other end of the first connecting rod (703) is hinged to the hinge seat (710), and the other end of the second connecting rod (704) is hinged to the locking slide (707). The locking slide (707) is provided with a locking clamping block (705).
9. The automatic cuttings pelleting and sample preparation mechanism according to claim 1, characterized in that: The pressing assembly (8) includes a pressing hydraulic cylinder (801), and a pressing floating plate (802) is provided at the lower end of the pressing hydraulic cylinder (801). A pressing shaft (8011) is provided on the lower side of the pressing floating plate (802). Multiple guide sleeves (803) are provided on the edge of the pressing floating plate (802) and are respectively fitted onto the corresponding guide shafts (806). A guide sleeve flange (8031) is provided on the lower side of the guide sleeve (803). A pressing mounting block (805) is provided at the lower end of the guide shaft (806). A spring (804) is fitted on the guide shaft (806), and the spring (804) is located between the guide sleeve flange (8031) and the pressing mounting block (805).
10. The automatic cuttings pelleting and sample preparation mechanism for logging according to claim 1, characterized in that: The ring-splitting assembly (2), the cuttings sampling assembly (3), the ring-loading assembly (6), the ring-locking assembly (7), and the pressing assembly (8) are all mounted on a single assembly frame (9). The assembly frame (9) includes a first mounting plate (901), a second mounting plate (902), and a third mounting plate (903) arranged sequentially from high to low. The ring-splitting assembly (2), the cuttings sampling assembly (3), and the pressing station are all mounted on the second mounting plate (902). The upper end of the pressing assembly (8) is fixed to the first mounting plate. The mounting plate (901) is located above the pressing station seat. The pressing ring loading and unloading assembly (6) and the pressing ring locking assembly (7) are both located on the third mounting plate (903). The pressing ring clamp (605) and the locking clamping block (705) are both located on the upper side of the second mounting plate (902). In addition, the lower side of the first mounting plate (901) is provided with a funnel dust removal assembly (1), the upper side of the first mounting plate (901) is provided with a dust suction control assembly (5), and the upper side of the second mounting plate (902) is provided with a pressing dust removal assembly (4).
Citation Information
Patent Citations
Cramping apparatus for screwing helical burr
CN101372091A
Rotatable tabletting device
CN114354311A
Automatic electrolyte sample preparation system and method
CN114839015A
Automatic sample preparation device for rock element analysis
CN118209385A
Powder product hot press molding equipment
CN118288603A