Natural resource engineering monitoring method and system based on cloud computing

By leveraging cloud computing technology to achieve unified access and spatiotemporal alignment of multi-source monitoring data, and combining quality labels and causal graph inference to generate risk evidence chains, the problem of unified access and closed-loop linkage of multi-source monitoring data is solved. This enables verifiable consistency of project status and risk tracing, and supports real-time linkage and continuous optimization of project scheduling.

CN120975740AActive Publication Date: 2025-11-18温州青谷网络科技有限公司

Patent Information

Application Number
CN202511469312.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-15
Publication Date
2025-11-18
Estimated Expiration
2045-10-15

AI Technical Summary

Technical Problem

Existing technologies struggle to achieve unified access, spatiotemporal alignment, and quality control of multi-source monitoring data, and to establish a closed-loop linkage between monitoring results and scheduling execution.

Method used

The cloud-based natural resource engineering monitoring method forms a standardized monitoring dataset by constructing a cloud access layer, time synchronization, spatial mapping, and quality label generation. It then generates a risk evidence chain through causal graph inference, outputs scheduling instructions, and forms a closed-loop management system.

Benefits of technology

It achieves standardized and unified management of multi-source monitoring data, ensures data accuracy, supports the linkage between risk identification and engineering scheduling, forms verifiable consistency snapshots and full-chain traceability, and supports differential assessment and dynamic adjustment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120975740A_ABST
    Figure CN120975740A_ABST
Patent Text Reader

Abstract

The invention discloses a natural resource engineering monitoring method and system based on cloud computing, and relates to the technical field of engineering monitoring. A cloud access layer is constructed, a standardized monitoring data set is formed, a monitoring quality abnormity label set is established, and an engineering state vector set is generated based on a space-time alignment monitoring data set; according to the method, standardization and unified management of multi-source monitoring data are achieved through cloud access, the data accuracy is guaranteed in combination with time synchronization, space mapping and a quality label mechanism, the method constructs an engineering state profile and generates consistent snapshots, and the method has the advantages of being simple in structure, convenient to operate and high in practicability. Historical comparison and tracing are supported, a risk event set and a risk evidence chain are generated through causal atlas inference, risk full-chain tracing is achieved, a scheduling instruction is further generated and combined with an execution receipt to form closed-loop management, differential evaluation and dynamic adjustment are supported, and therefore linkage and continuous optimization of monitoring, risk identification and engineering scheduling are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of engineering monitoring, in particular to a natural resource engineering monitoring method and system based on cloud computing. BACKGROUND

[0002] With the advancement of large-scale water conservancy projects, mine development and transportation infrastructure construction, the demand for safety monitoring of natural resource projects is increasing. Existing monitoring technologies mostly rely on a single type of sensor or local monitoring means, making it difficult to achieve fusion processing of cross-time and space, multi-source and heterogeneous data. At the same time, traditional monitoring systems mostly focus on data collection and alarm, lack unified spatio-temporal alignment mechanism and quality control means, resulting in problems of incomparability and low reliability of monitoring data. In addition, the linkage between monitoring results and project scheduling is insufficient, and real-time decision-making and execution closed loop based on monitoring data cannot be achieved.

[0003] At present, a natural resource ecological protection and restoration engineering monitoring method is disclosed in Chinese patent CN117011110A, which comprises the following steps: constructing a digital ecological space to form a data resource system for integrated protection and restoration of mountains, rivers, forests, farmland, lakes and grasslands; respectively constructing a thing-connected sensing module, a monitoring and early warning module, and a comprehensive evaluation module; constructing a project closed-loop management module to form an application system for integrated collaborative supervision of the whole life cycle of engineering projects. The natural resource ecological protection and restoration engineering monitoring method realizes real-time dynamic, visual and traceable comprehensive monitoring and supervision of ecological protection and restoration projects through digital means, and supports overall intelligent governance of ecological protection and restoration of mountains, rivers, forests, farmland, lakes and grasslands in terms of all factors, whole cycle and whole process.

[0004] The above-mentioned technology cannot realize unified access, spatio-temporal alignment and quality control of multi-source monitoring data, and form a closed-loop linkage between monitoring results and scheduling execution. SUMMARY

[0005] The technical problem solved by the present application is that the prior art cannot realize unified access, spatio-temporal alignment and quality control of multi-source monitoring data, and form a closed-loop linkage between monitoring results and scheduling execution.

[0006] To solve the above technical problems, the present application provides the following technical solutions: The natural resource engineering monitoring method based on cloud computing comprises the following steps: Step S1, constructing a cloud access layer to collect original monitoring data uploaded by edge collection nodes and generating source identification, device identification and time identification to form a standardized monitoring data set; Step S2 involves performing time synchronization, spatial mapping, and quality label generation on the standardized monitoring dataset to obtain a spatiotemporally aligned monitoring dataset and establishing a set of monitoring quality anomaly labels. Step S3: Generate a set of engineering status vectors based on the spatiotemporal aligned monitoring dataset, construct a unified monitoring profile, and store it in versioned storage to generate a verifiable consistency snapshot. Step S4: Run causal graph inference on the set of engineering state vectors, output a set of risk events and generate a risk evidence chain, record and store it in the audit log; Step S5: Generate a set of scheduling instructions based on the monitoring profile and risk evidence chain and send them to the edge execution nodes, receive execution receipts and establish corresponding relationships; Step S6: Generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset, update the threshold inheritance graph and causal graph versions, and write the change record to the audit log.

[0007] Preferably, step S1 includes the following sub-steps: Step S101: Collect slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data, and construction equipment operation logs, and upload the slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data, and construction equipment operation logs to the cloud to form an original monitoring data set; Step S102 involves generating source identifiers, device identifiers, and time identifiers for each piece of data in the original monitoring data set, and then appending them to the original monitoring data set to form a standardized monitoring dataset.

[0008] Preferably, step S2 includes the following sub-steps: Step S201: Perform time synchronization processing on the standardized monitoring dataset; Step S202: Perform spatial mapping processing on the standardized monitoring dataset; Step S203: Generate monitoring quality labels for the standardized monitoring dataset and establish a set of monitoring quality anomaly labels. Label slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data and construction equipment operation logs that have outliers, missing segments and signal noise anomalies with anomaly labels, and output the spatiotemporally aligned monitoring dataset.

[0009] Preferably, step S3 includes the following sub-steps: Step S301: Generate an engineering state vector set based on the spatiotemporal aligned monitoring dataset. The engineering state vector set includes displacement, seepage, pore water pressure, and environmental conditions, and is aggregated to form a multidimensional vector set. Step S302: Construct a unified monitoring profile based on the engineering state vector set, combine the engineering state vectors corresponding to each monitoring point in a unified spatial coordinate system to generate a visual profile, and maintain a one-to-one correspondence with the engineering state vector set. Step S303: Store the engineering status vector set and monitoring profile into versioned storage, and generate version number and verification information for each write to form a verifiable consistency snapshot.

[0010] Preferably, step S4 includes the following sub-steps: Step S401: Run causal graph inference on the engineering state vector set to generate a risk event set. The causal graph inference identifies links that may cause engineering anomalies by analyzing the causal relationship and time series changes between monitoring parameters and outputting a risk event set, which includes displacement mutation, seepage anomaly, pore water pressure increase and rainfall overload. Step S402: Generate a risk evidence chain based on the risk event set. The risk evidence chain includes the monitoring data source corresponding to the risk event, the relationship of monitoring parameters involved in the inference path, the threshold basis, and the triggering node. Step S403: Record the risk evidence chain and store it in the audit log.

[0011] Preferably, step S5 includes the following sub-steps: Step S501: Generate a set of scheduling instructions based on the monitoring profile and the risk evidence chain. The set of scheduling instructions includes the execution action, priority and constraints. During the generation of the set of scheduling instructions, the instructions are bound to the corresponding risk evidence chain. Step S502: The set of scheduling instructions is sent to the edge execution node and the task is executed. The edge execution node parses and executes the received instructions. The content of the execution includes equipment start-up and shutdown operations, operating parameter adjustment and emergency handling operations. Step S503: Receive the execution receipts returned by the edge execution nodes and establish a corresponding relationship. The execution receipts include the execution results, completion time, device status and abnormal information. The cloud stores the execution receipts and scheduling instruction sets in correspondence.

[0012] Preferably, step S6 includes the following sub-steps: Step S601: Generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset. The differential evaluation report includes the deviation between the scheduling instructions and the actual response, data trend changes, monitoring profile comparison results, and anomaly statistics. Step S602: Update the threshold inheritance graph and causal graph versions. During the update process, incorporate the new round of monitoring data and differential evaluation results into the calculation, correct the historical threshold, output the inheritance threshold, and adjust the node relationships and edge weights in the causal graph. Step S603: Write the threshold inheritance graph update and causal graph change records into the audit log, and attach a timestamp, version number, reason for modification and corresponding monitoring data source to the log.

[0013] Preferably, the risk evidence chain enables full-chain tracing of the formation process of a risk event, specifically including: Indicate the source of the original monitoring data corresponding to the triggering event, the inference node in the causal graph, the threshold conditions on which the judgment is based, and the monitoring unit involved.

[0014] Preferably, the set of scheduling instructions and execution receipts form a closed-loop management system. The closed-loop management includes a one-to-one correspondence between scheduling instructions and execution receipts, recording of execution result deviations, classification of abnormal feedback, and automatic adjustment of scheduling strategies. The closed-loop management supports differential evaluation and auditing.

[0015] The cloud-based natural resource engineering monitoring system includes a data unification module, a spatiotemporal alignment module, a monitoring construction module, a map inference module, an instruction execution module, and a closed-loop evaluation module. The data unification module is used to build a cloud access layer, collect raw monitoring data uploaded by edge acquisition nodes, and generate source identifiers, device identifiers, and time identifiers to form a standardized monitoring dataset. The spatiotemporal alignment module is used to perform time synchronization, spatial mapping, and quality label generation on the standardized monitoring dataset to obtain a spatiotemporal aligned monitoring dataset and to establish a set of monitoring quality anomaly labels. The monitoring construction module is used to generate a set of engineering status vectors based on the spatiotemporally aligned monitoring dataset, construct a unified monitoring profile, and store it in versioned storage to generate verifiable consistency snapshots. The graph inference module is used to run causal graph inference on the set of engineering state vectors, output a set of risk events and generate a risk evidence chain, and record and store it in the audit log. The instruction execution module is used to generate a set of scheduling instructions based on the monitoring profile and the risk evidence chain and send them to the edge execution nodes, receive execution receipts and establish corresponding relationships; The closed-loop evaluation module is used to generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset, update the threshold inheritance graph and causal graph versions, and write the change records to the audit log.

[0016] The beneficial effects of this invention are as follows: This invention achieves standardized and unified management of multi-source monitoring data through cloud access, and ensures data accuracy by combining time synchronization, spatial mapping and quality labeling mechanisms. The method constructs an engineering status profile and generates a consistent snapshot, supports historical comparison and traceability, and generates a set of risk events and a risk evidence chain through causal graph inference, realizing full-chain traceability of risks. Furthermore, it generates scheduling instructions and forms a closed-loop management system by combining execution receipts, supporting differential evaluation and dynamic adjustment, thereby realizing the linkage and continuous optimization of monitoring, risk identification and engineering scheduling. Attached Figure Description

[0017] Figure 1 A flowchart illustrating the steps of a cloud computing-based natural resource engineering monitoring method according to an embodiment of the present invention; Figure 2 This is a basic flowchart of a cloud-based natural resource engineering monitoring system provided as an embodiment of the present invention. Detailed Implementation

[0018] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0019] Example 1, referring to Figure 1 It provides a cloud-based method for monitoring natural resource engineering, including the following steps: Step S1: Construct a cloud access layer, collect raw monitoring data uploaded by edge acquisition nodes, and generate source identifier, device identifier, and time identifier to form a standardized monitoring dataset.

[0020] Step S2 involves performing time synchronization, spatial mapping, and quality label generation on the standardized monitoring dataset to obtain a spatiotemporally aligned monitoring dataset and establishing a set of monitoring quality anomaly labels.

[0021] Step S3: Generate a set of engineering status vectors based on the spatiotemporal aligned monitoring dataset, construct a unified monitoring profile, and store it in versioned storage to generate a verifiable consistency snapshot.

[0022] Step S4: Run causal graph inference on the set of engineering state vectors, output a set of risk events and generate a risk evidence chain, record and store it in the audit log.

[0023] Step S5: Generate a set of scheduling instructions based on the monitoring profile and risk evidence chain and send them to the edge execution nodes, receive execution receipts and establish corresponding relationships.

[0024] Step S6: Generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset, update the threshold inheritance graph and causal graph versions, and write the change record to the audit log.

[0025] This invention achieves standardized and unified management of multi-source monitoring data through cloud access, and ensures data accuracy by combining time synchronization, spatial mapping and quality labeling mechanisms. The method constructs an engineering status profile and generates a consistent snapshot, supports historical comparison and traceability, and generates a set of risk events and a risk evidence chain through causal graph inference, realizing full-chain traceability of risks. Furthermore, it generates scheduling instructions and forms a closed-loop management system with execution receipts, supports differential evaluation and dynamic adjustment, thereby realizing the linkage and continuous optimization of monitoring, risk identification and engineering scheduling.

[0026] Step S1 includes the following sub-steps: Step S101: Collect slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data, and construction equipment operation logs, and upload the slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data, and construction equipment operation logs to the cloud to form an original monitoring data set.

[0027] Step S101 collects various types of monitoring data, such as slope displacement, seepage pressure, pore water pressure, rainfall, GNSS base station and construction equipment operation logs, which can comprehensively cover the structural safety, environmental hydrology and construction disturbance of natural resource projects, forming a complete set of original monitoring data.

[0028] Step S102 involves generating source identifiers, device identifiers, and time identifiers for each piece of data in the original monitoring data set, and then appending them to the original monitoring data set to form a standardized monitoring dataset.

[0029] Step S102 generates source identifier, device identifier and time identifier for each piece of original monitoring data and attaches them to the data to form a standardized monitoring dataset. This enables consistent data management and traceability, avoiding analytical bias caused by unknown sources or format differences.

[0030] Step S1 enables unified access and standardized management of multi-source monitoring data, ensuring that monitoring data from different sources and in different formats can form a consistent and traceable data foundation in the cloud, providing a reliable data source for subsequent spatiotemporal alignment, state vector generation, and causal inference.

[0031] Step S2 includes the following sub-steps: Step S201: Perform time synchronization processing on the standardized monitoring dataset.

[0032] Step S201 uses time synchronization processing to unify the data uploaded by different sensors and acquisition nodes to the same time reference, eliminating errors caused by acquisition delay and clock drift, and ensuring the consistency of various monitoring data in the time dimension.

[0033] Step S202: Perform spatial mapping processing on the standardized monitoring dataset.

[0034] Step S202 uses spatial mapping to map the data from each monitoring point to a unified coordinate system, correcting differences in the collection locations and enabling data from different sources to be superimposed and compared in space, thus ensuring the spatial consistency of the analysis results.

[0035] Step S203: Generate monitoring quality labels for the standardized monitoring dataset and establish a set of monitoring quality anomaly labels. Label slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data and construction equipment operation logs that have outliers, missing segments and signal noise anomalies with anomaly labels, and output the spatiotemporally aligned monitoring dataset.

[0036] Step S203 generates monitoring quality labels and establishes a set of monitoring quality anomaly labels to identify abnormal values, missing segments, or noise data in slope displacement, seepage pressure, pore water pressure, rainfall, GNSS base station and construction equipment operation logs, forming traceable quality anomaly records, and outputs a cleaned and labeled spatiotemporally aligned monitoring dataset.

[0037] Step S2 unifies the multi-source monitoring data in both time and space dimensions, and combines a quality control mechanism to screen out abnormal samples, forming a spatiotemporally aligned monitoring dataset, thereby ensuring the accuracy and reliability of the subsequent generation of engineering state vectors and monitoring profiles.

[0038] Step S3 includes the following sub-steps: Step S301: Generate an engineering state vector set based on the spatiotemporal aligned monitoring dataset. The engineering state vector set includes displacement, seepage, pore water pressure, and environmental conditions, and is aggregated to form a multidimensional vector set.

[0039] Step S301 generates an engineering state vector set based on a spatiotemporally aligned monitoring dataset, which aggregates multi-dimensional monitoring parameters such as displacement, seepage, pore water pressure, and environmental conditions, enabling a systematic characterization of the operation status of natural resource engineering in each monitoring unit and forming a comprehensive numerical representation.

[0040] Step S302: Construct a unified monitoring profile based on the engineering state vector set. Combine the engineering state vectors corresponding to each monitoring point in a unified spatial coordinate system to generate a visual profile and maintain a one-to-one correspondence with the engineering state vector set.

[0041] Step S302 constructs a unified monitoring profile based on the set of engineering state vectors, combines the state vectors corresponding to each monitoring point in a unified spatial coordinate system, generates an intuitive visualization profile, realizes a one-to-one correspondence between monitoring data and spatial location, and facilitates an intuitive analysis of the overall safety status of the dam body, bedrock and construction area.

[0042] Step S303: Store the engineering status vector set and monitoring profile into versioned storage, and generate version number and verification information for each write to form a verifiable consistency snapshot.

[0043] Step S303 stores the engineering status vector set and monitoring profile into versioned storage, and generates a version number and verification information each time it is written, which can form a verifiable consistency snapshot, realize the historical traceability, version comparison and long-term consistency verification of monitoring data and profile.

[0044] Step S3 realizes the structured expression and spatial visualization of multi-source monitoring data, forming a multi-dimensional vector set that can reflect the overall engineering status and intuitively display the monitoring profile of key parts. It also establishes verifiable and consistent snapshots through versioned storage, providing a reliable basis for historical comparison and tracing.

[0045] Step S4 includes the following sub-steps: Step S401: Run causal graph inference on the engineering state vector set to generate a risk event set. Causal graph inference identifies links that may cause engineering anomalies by analyzing the causal relationship and temporal changes between monitoring parameters. The output risk event set includes displacement mutation, seepage anomaly, pore water pressure increase and rainfall overload.

[0046] Step S401, by running causal graph inference on the set of engineering state vectors, can analyze the causal relationships and temporal changes between monitoring parameters, identify causal links that may lead to engineering anomalies, and output a set of risk events. This set covers key risk types such as displacement mutation, seepage anomaly, pore water pressure increase and rainfall overload, and comprehensively reflects the potential safety hazards of the project.

[0047] Step S402: Generate a risk evidence chain based on the risk event set. The risk evidence chain includes the monitoring data source corresponding to the risk event, the relationship of monitoring parameters involved in the inference path, the threshold basis, and the triggering node.

[0048] Step S402 generates a risk evidence chain based on the risk event set, connecting the monitoring data sources, causal inference paths, threshold criteria, and triggering nodes corresponding to the risk events to form a complete evidence chain, ensuring that each risk conclusion has a clear formation process and interpretability, which facilitates subsequent responsibility determination and review.

[0049] Step S403: Record the risk evidence chain and store it in the audit log.

[0050] Step S403, by recording and storing the risk evidence chain in the audit log, can solidify the entire process of risk identification and inference, ensure the traceability of risk sources, and provide reliable data for regulatory inspections and historical audits.

[0051] Step S4 implements causal inference analysis based on the set of engineering state vectors, which can identify potential risk events and form a risk evidence chain, thereby providing interpretable and traceable risk evidence for engineering safety monitoring, and solidifying the risk analysis process through audit logs.

[0052] Step S5 includes the following sub-steps: Step S501: Generate a set of scheduling instructions based on the monitoring profile and the risk evidence chain. The set of scheduling instructions includes the execution action, priority and constraints. During the generation of the set of scheduling instructions, the instructions are bound to the corresponding risk evidence chain.

[0053] Step S501 generates a set of scheduling instructions based on the monitoring profile and the risk evidence chain, which can transform the abstract risk identification results into specific execution actions, set priorities and constraints, and bind the corresponding risk evidence chain to achieve transparency and traceability of scheduling decisions.

[0054] Step S502: The set of scheduling instructions is sent to the edge execution node and the task is executed. The edge execution node parses and executes the received instructions. The execution includes equipment start-up and shutdown operations, operating parameter adjustments and emergency response operations.

[0055] Step S502 sends the set of scheduling instructions to the edge execution node for parsing and execution, enabling on-site equipment start-up and shutdown, operating parameter adjustment and emergency response operations to be completed directly, so that the scheduling strategy generated in the cloud can be implemented in a timely manner, ensuring the real-time and effectiveness of risk handling.

[0056] Step S503: Receive the execution receipts returned by the edge execution nodes and establish a corresponding relationship. The execution receipts include the execution results, completion time, device status and abnormal information. The cloud stores the execution receipts and scheduling instruction sets accordingly.

[0057] Step S503, by receiving the execution receipts returned by the edge execution nodes and establishing a corresponding relationship, can store the execution results, completion time, device status, and abnormal information in a one-to-one correspondence with the original scheduling instructions, forming a closed-loop record of instructions and execution, providing a complete basis for subsequent differential evaluation, strategy optimization, and accountability.

[0058] Step S5 realizes a closed loop of scheduling execution based on monitoring profile and risk evidence chain, transforms risk identification results into operable scheduling instructions and implements them at edge nodes, and then stores them in conjunction with execution receipts, thereby opening up the entire process link.

[0059] Step S6 includes the following sub-steps: Step S601: Generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset. The differential evaluation report includes the deviation between the scheduling instructions and the actual response, data trend changes, monitoring profile comparison results, and anomaly statistics.

[0060] Step S601 generates a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset. This report can quantify the difference between scheduling instructions and actual responses, track data trend changes, compare the differences between the old and new monitoring profiles, and statistically analyze anomalies, thereby providing a comprehensive evaluation of scheduling effectiveness and risk management effectiveness.

[0061] Step S602: Update the threshold inheritance graph and causal graph versions. During the update process, incorporate the new round of monitoring data and differential evaluation results into the calculation, correct the historical threshold, output the inheritance threshold, and adjust the node relationships and edge weights in the causal graph.

[0062] Step S602 updates the threshold inheritance graph and causal graph versions, incorporates the new round of monitoring data and differential evaluation results into the calculation, corrects historical thresholds, outputs inheritance thresholds that are more consistent with the current working conditions, and adjusts the node relationships and edge weights of the causal graph, thereby maintaining the synchronization and accuracy of the model with the actual operating state of the project.

[0063] Step S603: Write the threshold inheritance graph update and causal graph change records into the audit log, and attach a timestamp, version number, reason for modification and corresponding monitoring data source to the log.

[0064] Step S603 writes the threshold inheritance graph update and causal graph change records into the audit log, and adds timestamps, version numbers, reasons for modification and monitoring data sources. This can retain complete evidence for each update, ensure that the modification process is traceable and transparent, and provide long-term reliable record basis for supervision and operation and maintenance.

[0065] Step S6 achieves closed-loop evaluation and model update of monitoring data and scheduling execution. Through differential evaluation reports, execution deviations and new risk characteristics are discovered, and thresholds and causal graphs are corrected accordingly. Finally, the update process is solidified in the form of logs to build a monitoring and control system that can be continuously iterated and optimized.

[0066] The risk evidence chain enables full-chain tracing of the formation process of a risk event, specifically including: Indicate the source of the original monitoring data corresponding to the triggering event, the inference node in the causal graph, the threshold conditions on which the judgment is based, and the monitoring unit involved.

[0067] The set of scheduling instructions and execution receipts form a closed-loop management system. The closed-loop management includes a one-to-one correspondence between scheduling instructions and execution receipts, recording of execution result deviations, classification of abnormal feedback, and automatic adjustment of scheduling strategies. The closed-loop management supports differential evaluation and auditing.

[0068] Example 2, refer to Figure 2 It provides a cloud-based natural resource engineering monitoring system, including a data unification module, a spatiotemporal alignment module, a monitoring construction module, a map inference module, an instruction execution module, and a closed-loop evaluation module.

[0069] The data unification module is used to build a cloud access layer, collect raw monitoring data uploaded by edge acquisition nodes, and generate source identifiers, device identifiers, and time identifiers to form a standardized monitoring dataset.

[0070] The spatiotemporal alignment module is used to perform time synchronization, spatial mapping, and quality label generation on the standardized monitoring dataset to obtain a spatiotemporally aligned monitoring dataset and to establish a set of monitoring quality anomaly labels.

[0071] The monitoring building module is used to generate a set of engineering status vectors based on the spatiotemporally aligned monitoring dataset, construct a unified monitoring profile, and store it in versioned storage to generate verifiable consistency snapshots.

[0072] The graph inference module is used to run causal graph inference on the set of engineering state vectors, output a set of risk events and generate a risk evidence chain, which is then recorded and stored in the audit log.

[0073] The instruction execution module is used to generate a set of scheduling instructions based on the monitoring profile and risk evidence chain and send them to the edge execution nodes, receive execution receipts and establish corresponding relationships.

[0074] The closed-loop evaluation module is used to generate differential evaluation reports based on execution receipts and new spatiotemporal alignment monitoring datasets, update the threshold inheritance graph and causal graph versions, and write change records to the audit log.

[0075] This invention achieves standardized processing and unified identification of multi-source monitoring data, such as slope displacement, seepage pressure, pore water pressure, rainfall, GNSS base station and construction equipment operation logs, through a cloud access layer. This improves data traceability and consistency. A unified spatiotemporal framework is established through time synchronization and spatial mapping, and an abnormal monitoring data is identified by a quality labeling mechanism, ensuring the accuracy and reliability of monitoring results. A unified monitoring profile is constructed and verifiable consistency snapshots are generated, giving the monitoring data versioning and long-term traceability, providing support for historical comparison and trend analysis. A set of risk events is generated based on causal graph inference, forming a risk evidence chain, realizing full-chain traceability of the risk event formation process, with interpretability and responsibility definition capabilities. A set of scheduling instructions is generated and issued to edge execution nodes, and a closed-loop management mechanism is established with execution receipts, supporting differential evaluation and strategy adjustment, realizing real-time linkage between monitoring and engineering scheduling. The differential evaluation report drives the dynamic updating of threshold inheritance graph and causal graph, forming an iteratively optimized monitoring and control system that adapts to changes in the engineering environment.

[0076] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product implemented on one or more computer-usable storage media containing computer-usable program code. The storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as Static Random Access Memory (SRAM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Erasable Programmable Read Only Memory (EPROM), Programmable Read-Only Memory (PROM), Read-Only Memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk. These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0077] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.

Claims

1. A cloud computing-based method for monitoring natural resource engineering, characterized in that, Includes the following steps: Step S1: Construct a cloud access layer, collect raw monitoring data uploaded by edge acquisition nodes, and generate source identifier, device identifier, and time identifier to form a standardized monitoring dataset; Step S2 involves performing time synchronization, spatial mapping, and quality label generation on the standardized monitoring dataset to obtain a spatiotemporally aligned monitoring dataset and establishing a set of monitoring quality anomaly labels. Step S3: Generate a set of engineering status vectors based on the spatiotemporal aligned monitoring dataset, construct a unified monitoring profile, and store it in versioned storage to generate a verifiable consistency snapshot. Step S4: Run causal graph inference on the set of engineering state vectors, output a set of risk events and generate a risk evidence chain, record and store it in the audit log; Step S5: Generate a set of scheduling instructions based on the monitoring profile and risk evidence chain and send them to the edge execution nodes, receive execution receipts and establish corresponding relationships; Step S6: Generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset, update the threshold inheritance graph and causal graph versions, and write the change record to the audit log.

2. The cloud computing-based natural resource engineering monitoring method as described in claim 1, characterized in that, Step S1 includes the following sub-steps: Step S101: Collect slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data, and construction equipment operation logs, and upload the slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data, and construction equipment operation logs to the cloud to form an original monitoring data set; Step S102 involves generating source identifiers, device identifiers, and time identifiers for each piece of data in the original monitoring data set, and then appending them to the original monitoring data set to form a standardized monitoring dataset.

3. The cloud computing-based natural resource engineering monitoring method as described in claim 2, characterized in that, Step S2 includes the following sub-steps: Step S201: Perform time synchronization processing on the standardized monitoring dataset; Step S202: Perform spatial mapping processing on the standardized monitoring dataset; Step S203: Generate monitoring quality labels for the standardized monitoring dataset and establish a set of monitoring quality anomaly labels. Label slope displacement monitoring data, seepage pressure monitoring data, pore water pressure monitoring data, rainfall monitoring data, GNSS base station monitoring data and construction equipment operation logs that have outliers, missing segments and signal noise anomalies with anomaly labels, and output the spatiotemporally aligned monitoring dataset.

4. The cloud computing-based natural resource engineering monitoring method as described in claim 3, characterized in that, Step S3 includes the following sub-steps: Step S301: Generate an engineering state vector set based on the spatiotemporal aligned monitoring dataset. The engineering state vector set includes displacement, seepage, pore water pressure, and environmental conditions, and is aggregated to form a multidimensional vector set. Step S302: Construct a unified monitoring profile based on the engineering state vector set, combine the engineering state vectors corresponding to each monitoring point in a unified spatial coordinate system to generate a visual profile, and maintain a one-to-one correspondence with the engineering state vector set. Step S303: Store the engineering status vector set and monitoring profile into versioned storage, and generate version number and verification information for each write to form a verifiable consistency snapshot.

5. The cloud computing-based natural resource engineering monitoring method as described in claim 4, characterized in that, Step S4 includes the following sub-steps: Step S401: Run causal graph inference on the engineering state vector set to generate a risk event set. The causal graph inference identifies links that may cause engineering anomalies by analyzing the causal relationship and time series changes between monitoring parameters and outputting a risk event set, which includes displacement mutation, seepage anomaly, pore water pressure increase and rainfall overload. Step S402: Generate a risk evidence chain based on the risk event set. The risk evidence chain includes the monitoring data source corresponding to the risk event, the relationship of monitoring parameters involved in the inference path, the threshold basis, and the triggering node. Step S403: Record the risk evidence chain and store it in the audit log.

6. The cloud computing-based natural resource engineering monitoring method as described in claim 5, characterized in that, Step S5 includes the following sub-steps: Step S501: Generate a set of scheduling instructions based on the monitoring profile and the risk evidence chain. The set of scheduling instructions includes the execution action, priority and constraints. During the generation of the set of scheduling instructions, the instructions are bound to the corresponding risk evidence chain. Step S502: The set of scheduling instructions is sent to the edge execution node and the task is executed. The edge execution node parses and executes the received instructions. The content of the execution includes equipment start-up and shutdown operations, operating parameter adjustment and emergency handling operations. Step S503: Receive the execution receipts returned by the edge execution nodes and establish a corresponding relationship. The execution receipts include the execution results, completion time, device status and abnormal information. The cloud stores the execution receipts and scheduling instruction sets in correspondence.

7. The cloud computing-based natural resource engineering monitoring method as described in claim 6, characterized in that, Step S6 includes the following sub-steps: Step S601: Generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset. The differential evaluation report includes the deviation between the scheduling instructions and the actual response, data trend changes, monitoring profile comparison results, and anomaly statistics. Step S602: Update the threshold inheritance graph and causal graph versions. During the update process, incorporate the new round of monitoring data and differential evaluation results into the calculation, correct the historical threshold, output the inheritance threshold, and adjust the node relationships and edge weights in the causal graph. Step S603: Write the threshold inheritance graph update and causal graph change records into the audit log, and attach a timestamp, version number, reason for modification and corresponding monitoring data source to the log.

8. The cloud computing-based natural resource engineering monitoring method as described in claim 7, characterized in that, The risk evidence chain enables full-chain tracing of the formation process of a risk event, specifically including: Indicate the source of the original monitoring data corresponding to the triggering event, the inference node in the causal graph, the threshold conditions on which the judgment is based, and the monitoring unit involved.

9. The cloud computing-based natural resource engineering monitoring method as described in claim 8, characterized in that, The set of scheduling instructions and execution receipts form a closed-loop management system. The closed-loop management includes a one-to-one correspondence between scheduling instructions and execution receipts, recording of execution result deviations, classification of abnormal feedback, and automatic adjustment of scheduling strategies. The closed-loop management supports differential evaluation and auditing.

10. A cloud computing-based natural resource engineering monitoring system, applied in any one of the cloud computing-based natural resource engineering monitoring methods as described in claims 1-9, characterized in that, It includes a data unification module, a spatiotemporal alignment module, a monitoring and construction module, a graph inference module, an instruction execution module, and a closed-loop evaluation module; The data unification module is used to build a cloud access layer, collect raw monitoring data uploaded by edge acquisition nodes, and generate source identifiers, device identifiers, and time identifiers to form a standardized monitoring dataset. The spatiotemporal alignment module is used to perform time synchronization, spatial mapping, and quality label generation on the standardized monitoring dataset to obtain a spatiotemporal aligned monitoring dataset and to establish a set of monitoring quality anomaly labels. The monitoring construction module is used to generate a set of engineering status vectors based on the spatiotemporally aligned monitoring dataset, construct a unified monitoring profile, and store it in versioned storage to generate verifiable consistency snapshots. The graph inference module is used to run causal graph inference on the set of engineering state vectors, output a set of risk events and generate a risk evidence chain, and record and store it in the audit log. The instruction execution module is used to generate a set of scheduling instructions based on the monitoring profile and the risk evidence chain and send them to the edge execution nodes, receive execution receipts and establish corresponding relationships; The closed-loop evaluation module is used to generate a differential evaluation report based on the execution receipt and the new spatiotemporal alignment monitoring dataset, update the threshold inheritance graph and causal graph versions, and write the change records to the audit log.

Citation Information

Patent Citations

  • Natural resource ecological protection and restoration engineering monitoring method

    CN117011110A

  • Merchant subject risk assessment method and system based on machine learning

    CN119578900A

  • Construction site safety early warning method and system based on multi-dimensional data mining

    CN119831342A

  • Intelligent anesthesia record sheet automatic generation system

    CN120260786A

  • Hydraulic engineering equipment data intelligent management system based on digital twinning

    CN120410501A

Cited By

  • Water conservancy facility operation state detection system

    CN121302293A

  • Engineering measurement data intelligent analysis method and system

    CN121302302A

  • Engineering quality detection method based on big data analysis

    CN121481365A

  • Live broadcast full-link data middle station regulation and control system

    CN121619424A

  • Three-dimensional settlement-crack monitoring method and system for static cutting connection area of subway exit

    CN121783088A