Deep trench artificial digging anti-slide pile based on topography and intelligent monitoring construction method

By employing an intelligent monitoring and construction method for manually excavated anti-slide piles in deep gully terrain, and utilizing a wedge-shaped block and spring-loaded snap-fit ​​assembly and threaded rod design, a multi-directional reinforcement structure is formed. This solves the problem of insufficient fixation of existing anti-slide piles in deep gully terrain areas, achieves a stable connection between the pile body and the borehole wall, and improves the stability and safety of construction.

CN121024095BActive Publication Date: 2026-06-26SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
Filing Date
2025-09-29
Publication Date
2026-06-26

Smart Images

  • Figure CN121024095B_ABST
    Figure CN121024095B_ABST
Patent Text Reader

Abstract

The application discloses a deep trench topography-based artificial hole-digging anti-slide pile and an intelligent monitoring construction method, and particularly relates to the technical field of bridge engineering. The device comprises a mounting base, a connecting frame is connected to the mounting base in a clamping manner, a clamping assembly is connected to the connecting frame and the mounting base, a reinforcing assembly is arranged on the mounting base and the connecting frame, a fixing groove is arranged on the mounting base and the connecting frame, connecting grooves are arranged on the two sides of the fixing groove, a clamping groove is arranged on the connecting frame, the clamping assembly, the cooperation of the first wedge and the clamping groove and the elastic action of the first spring can ensure the convenience during installation, the reinforcing assembly can drive the moving block to move when the threaded rod rotates, the conical structure of the moving block is used to extrude the second wedge, the reinforcing nails are driven into the hole wall, the side nails are linked with the moving block through the connecting rods, the angle of the side nails is adjusted under the action of the moving block and the side nails are driven into the hole wall, multi-directional reinforcement is formed, and the combination strength of the anti-slide pile and the hole wall is effectively improved.
Need to check novelty before this filing date? Find Prior Art