A method for preventing power supply loop tripping in a substation

By setting load and current thresholds, calculating the three-phase imbalance of the terminal box and loop, and adjusting the load, the problems of false alarms and missed tripping in the power supply loop in the prior art are solved, and the reliability of the power supply system is improved.

CN121507724BActive Publication Date: 2026-11-17STATE GRID JIANGSU ELECTRIC POWER CO LTD NANJING POWER SUPPLY COMPANY
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202511470099.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-10-15
Publication Date
2026-11-17
Estimated Expiration
2045-10-15

AI Technical Summary

Technical Problem

The existing anti-tripping mechanism of the substation power supply loop relies on current value judgment, which leads to false alarms and missed alarms, making it difficult to effectively prevent tripping accidents.

Method used

By setting load and current thresholds, the three-phase imbalance of the terminal box and loop is calculated, and load adjustment is performed to prevent tripping, including integral calculation and load transfer mechanism.

Benefits of technology

It enables precise load adjustment of the power supply loop, avoids tripping accidents, and improves power supply reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121507724B_ABST
    Figure CN121507724B_ABST
Patent Text Reader

Abstract

This invention relates to a method for preventing power supply loop tripping in substations, belonging to the technical field of short-circuit testing by measuring electrical variables during testing. The method first divides time intervals and sets thresholds. At each time interval, it first compares the load and maximum current of an individual terminal box with the threshold to determine whether load transfer is needed for that terminal box, identifying particularly problematic terminal boxes. Then, it compares the overall load and maximum current of the power supply loop with the threshold to determine whether load transfer to these problematic terminal boxes is needed. This method monitors the power supply loop in real time and adjusts the local load according to a specific judgment formula, effectively preventing substation power supply loop tripping.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for preventing tripping in a substation power supply loop, belonging to the technical field of short circuit testing by measuring electrical variables during testing (G01R31 / 52). Background Technology

[0002] In substation power supply systems, such as Figure 1 As shown, typically, two independent power supplies are drawn from the two busbars in the AC room of a substation. These two power supplies are connected to different feeder panels in the AC room, and then connected in series through terminal boxes to form a closed-loop power supply circuit with the two feeder panels as the starting and ending points. However, with the increasingly complex operating environment of substations, power supply loops often trip. Once a terminal box in the loop trips, all the terminal boxes connected in series after it will lose their load, posing a serious threat to the reliability of power supply.

[0003] Currently, traditional power supply loop anti-tripping mechanisms mostly rely on whether the loop current value exceeds the standard as the judgment criterion, but ignore the overall load of the loop. This deficiency often leads to false alarms and missed tripping warnings in the power supply system, ultimately making it difficult to avoid tripping accidents. Summary of the Invention

[0004] The technical problem to be solved by this invention is: how to prevent power supply loop tripping in substations.

[0005] The technical solution proposed by this invention to solve the above-mentioned technical problems is: a method for preventing tripping in a substation power supply loop, comprising the following steps:

[0006] Step 1: Set the interval time m for checking the power supply loop. Record the time of the first check of the power supply loop as the first moment, and the time of the second check of the power supply loop after one interval as the second moment, and so on up to the nth moment.

[0007] Set the first load threshold of the terminal box and the first current threshold ;

[0008] Set the second load threshold for the power supply loop. Second current threshold ;

[0009] Step 2: When the power supply loop reaches time n, based on the incoming three-phase currents of the N terminal boxes collected from time n-1 to time n. , , and outgoing three-phase current , , The N first integral three-phase differential currents of the N terminal boxes are obtained by integrating according to the following formula (1). , and

[0010] (1);

[0011] In equation (1), t is a time variable; and These are the incoming A-phase, B-phase, and C-phase currents of the i-th terminal box at time t, from time n-1 to time n. and These are the outgoing phases A, B, and C of the i-th terminal box at time t, from time n-1 to time n. It is an integral infinitesimal element;

[0012] Let the maximum value of each of the N first integral three-phase differential currents be denoted as . Get N ;

[0013] Step 3: Calculate the N first load values ​​of the N terminal boxes according to the following formula (2).

[0014] (2);

[0015] In all Of the terminal boxes, at least one terminal box may be selected as a special terminal box;

[0016] Each and The load connected in the terminal box with the maximum current phase should be reconnected to the phase with the minimum current.

[0017] Step 4: Based on the incoming three-phase current of the power supply loop terminal box collected from time n-1 to time n. , and The second integral three-phase current is obtained by integrating the equation (3) as follows. , and

[0018] (3);

[0019] Let the maximum value of the second integral three-phase current be denoted as... ;

[0020] Step 5: Calculate the second load value of the power supply loop according to formula (4).

[0021] (4);

[0022] like and In each special terminal box, the load connected to the phase with the maximum current is reconnected to the phase with the minimum current.

[0023] like or It was determined that the power supply loop would not trip.

[0024] Furthermore, the first load threshold Set to 0.8, the first current threshold. Set it to 0.5, the second load threshold. Set to 0.4, the second current threshold. Take 16.

[0025] The beneficial effects of this invention are as follows: First, it reflects the three-phase imbalance of each terminal box based on the individual terminal box load calculation formula, and implements local load adjustment in conjunction with the maximum phase current value of each terminal box. Then, it reflects the overall three-phase imbalance of the power supply loop through the overall loop load calculation formula, and performs precise load transfer in conjunction with the maximum phase current value of the overall loop. Through this dual judgment and transfer mechanism, it is possible to prevent power supply loop tripping in a timely and effective manner. Attached Figure Description

[0026] The following description, in conjunction with the accompanying drawings, further illustrates a method for preventing tripping in a substation power supply loop according to the present invention.

[0027] Figure 1 This is a schematic diagram of the power supply loop in a substation. Detailed Implementation

[0028] Example

[0029] This embodiment of a substation power supply loop tripping prevention method includes the following steps:

[0030] Step 1: Set the interval time for checking the power supply loop to m=1s. Record the time of the first check of the power supply loop as the first moment, and the time of the second check of the power supply loop after one interval as the second moment, and so on up to the nth moment.

[0031] Set the first load threshold of the terminal box =0.8 and the first current threshold =0.5A.

[0032] Set the second load threshold for the power supply loop. =0.4 and the second current threshold =16A.

[0033] Step 2: When the power supply loop reaches the 4th moment, the incoming three-phase currents of the 10 terminal boxes collected between the 3rd and 4th moments are used as the basis. , , and outgoing three-phase current , , The 10 first integral three-phase differential currents of the 10 terminal boxes are obtained by integrating according to the following formula (1). , and

[0034] (1);

[0035] In equation (1), t is a time variable; and These are the incoming A-phase, B-phase, and C-phase currents of the i-th terminal box at time t, from time 3 to time 4. and These are the outgoing phases A, B, and C of the i-th terminal box during the period from time 3 to time 4, respectively, at time t. It is an integral infinitesimal element.

[0036] The maximum value among the 10 first integral three-phase differential currents is denoted as: , obtained They are 0.6A, 0.7 A, 0.8 A, 0.9 A, 1.0 A, 0.5 A, 0.4 A, 0.3 A, 0.6 A, 0.7 A respectively.

[0037] Step 3: Calculate the 10 first load values ​​for the 10 terminal boxes according to formula (2).

[0038] (2);

[0039] In all Of the terminal boxes, at least one terminal box is randomly selected as a special terminal box.

[0040] Each and The load connected in the terminal box with the maximum current phase should be reconnected to the phase with the minimum current phase.

[0041] The first load threshold can reflect the three-phase imbalance of the terminal box. The closer the first load threshold is to 1, the more unbalanced the load inside the terminal box is. It is calculated according to formula (2). The values ​​are 0.4, 0.5, 0.6, 0.85, 0.9, 0.3, 0.2, 0.1, 0.55, and 0.65, respectively. Therefore, the loads connected to the phase with the maximum current in the fourth and fifth terminal boxes need to be reconnected to the phase with the minimum current.

[0042] In this embodiment, the first load value is selected. and The corresponding third and fourth terminal boxes are designated as two special terminal boxes.

[0043] Step 4: Based on the incoming three-phase current of the power supply loop terminal box collected between time 3 and time 4. , and The second integral three-phase current is obtained by integrating the equation (3) as follows. =3A、 =3A and =15A

[0044] (3);

[0045] The maximum value of the second integral three-phase current is denoted as... =15A.

[0046] Step 5: Calculate the second load value of the power supply loop according to formula (4). =0.571

[0047] (4);

[0048] like and In each special terminal box, the load connected to the phase with the maximum current is reconnected to the phase with the minimum current.

[0049] like or It was determined that the power supply loop would not trip.

[0050] The second load threshold can reflect the overall three-phase imbalance of the loop. The closer the second load threshold is to 1, the more unbalanced the overall load of the loop is.

[0051] In this embodiment, due to the second load value =0.571> and Therefore, the loads connected to the maximum current phase in each of the two special terminal boxes were reconnected to the minimum current phase; after the reconnection was completed, the second integral three-phase current... Change to 6A Become 3A and It becomes 12A, and

[0052] ,

[0053] It can be seen that after the load transfer, the maximum phase current of the power supply loop drops to 12A, and the three phases of the loop as a whole tend to be balanced, effectively preventing loop tripping and ensuring the continuity of loop power supply.

[0054] The above description is only a preferred embodiment of the present invention, but the present invention is not limited thereto. All equivalent substitutions or modifications made to the concepts and technical solutions of the present invention should be covered within the protection scope of the present invention.

Claims

1. A substation power supply loop trip prevention method, characterized by Includes the following steps: Step 1: Set the interval time m for checking the power supply loop. Record the time of the first check of the power supply loop as the first moment, and the time of the second check of the power supply loop after one interval as the second moment, and so on up to the nth moment. Set the first load threshold of the terminal box and the first current threshold ; Set the second load threshold for the power supply loop. Second current threshold ; Step 2: When the power supply loop reaches time n, based on the incoming three-phase currents of the N terminal boxes collected from time n-1 to time n. , , and outgoing three-phase current , , The N first integral three-phase differential currents of the N terminal boxes are obtained by integrating according to the following formula (1). , and : (1); In equation (1), t is a time variable; and These are the incoming A-phase, B-phase, and C-phase currents of the i-th terminal box at time t, from time n-1 to time n. and These are the outgoing phases A, B, and C of the i-th terminal box at time t, from time n-1 to time n. It is an integral infinitesimal element; Let the maximum value of each of the N first integral three-phase differential currents be denoted as . Get N ; Step 3: Calculate the N first load values ​​of the N terminal boxes according to the following formula (2). : (2); In all Of the terminal boxes, at least one terminal box may be selected as a special terminal box; Each and The load connected in the terminal box with the maximum current phase should be reconnected to the phase with the minimum current. Step 4: Based on the incoming three-phase current of the power supply loop terminal box collected from time n-1 to time n. , and The second integral three-phase current is obtained by integrating the equation (3) as follows. , and : (3); Let the maximum value of the second integral three-phase current be denoted as... ; Step 5: Calculate the second load value of the power supply loop according to formula (4). : (4); like and In each special terminal box, the load connected to the phase with the maximum current is reconnected to the phase with the minimum current. like or It was determined that the power supply loop would not trip.

2. The substation power supply loop tripping prevention method according to claim 1, characterized in that: First load threshold Set to 0.8, the first current threshold. Take 0.5A, the second load threshold. Set to 0.4, the second current threshold. Take 16 A.

Citation Information

Patent Citations

  • Power distribution network feeder line power supply transfer method and device, computer equipment and storage medium

    CN113541128A

  • Incompletely fixed in-station power cable residual current monitoring method

    CN116381551A