Method and device for determining internal discharge of open-pit mine, storage medium and computer
By calculating the horizontal distance between the spoil heap and the working slope within the final boundary of open-pit mining, as well as the production stripping ratio, the problem of accuracy in determining the soil receiving conditions within the final boundary of open-pit mining was solved. This enabled a scientific and efficient determination of soil receiving conditions within the spoil heap, thus avoiding environmental damage.
Patent Information
- Application Number
- CN202610172995.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-02-06
- Publication Date
- 2026-04-24
- Estimated Expiration
- 2046-02-06
AI Technical Summary
Existing technologies lack scientific and effective methods to determine whether the final boundary of open-pit mining meets the conditions for internal discharge and soil acceptance, resulting in insufficient accuracy of the determination results. This makes it impossible to accurately match the complex working conditions of actual mining scenarios, leading to unreasonable spatial layout of the final boundary of open-pit mining, and solid waste cannot be discharged internally but must be discharged externally, damaging the mine and the surrounding environment.
By obtaining the design parameters of the inner spoil heap at the final boundary of open-pit mining, the horizontal distance between the inner spoil heap slope and the working slope is calculated and compared with the preset safe distance value. Instructions are output to adjust the design parameters or to make plans. The conditions for receiving soil for inner spoil heap are determined by combining the production stripping ratio and the capacity of the compensation space.
It significantly improves the accuracy and efficiency of determining the soil conditions for internal drainage, ensuring that the determination results are consistent with the actual engineering situation, avoiding environmental damage, and realizing the scientific and efficient determination of soil conditions for internal drainage.
Smart Images

Figure CN121659806B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mining technology, and in particular to a method, apparatus, storage medium, and computer for determining the soil impact during internal drainage in open-pit mines. Background Technology
[0002] For large open-pit mines, the disposal of stripping waste rock is one of the core challenges in the mining process. Utilizing mined or unmined areas of the mining site for internal waste dumping can reduce the construction and operation costs of external waste dumps and avoid the damage to the surrounding ecological environment caused by the discharge of solid waste. This is a key path to improve the environmental protection level of mines.
[0003] The feasibility of internal soil dumping is highly dependent on the spatial adaptability of the final boundary of the designed open-pit mining. If there is a lack of scientific assessment of the soil dumping conditions within this boundary, the mining area formed based on this boundary may not have the conditions for internal soil dumping.
[0004] Currently, in the design phase of the final open-pit mining area, there is a lack of scientific and effective systematic methods for determining whether the spatial parameters meet the conditions for internal drainage. This results in inefficient and time-sensitive methods that are difficult to adapt to the timeliness requirements of engineering design. Furthermore, the accuracy of the determination results is insufficient and cannot accurately match the complex working conditions of actual mining scenarios. Consequently, the determination conclusions of the design parameters may not meet the application requirements of actual engineering, which may lead to an unreasonable spatial layout of the final open-pit mining area. Solid waste generated during mining may not be able to be internally discharged but must be discharged externally, ultimately causing serious damage to the mine and its surrounding environment. Summary of the Invention
[0005] In view of this, this application provides a method, apparatus, storage medium and computer for determining internal soil discharge conditions in open-pit mines, with the main purpose of solving the technical problem of low accuracy in determining whether the final boundary of open-pit mining has internal soil discharge conditions.
[0006] According to a first aspect of the present invention, a method for determining the soil impact of internal discharge in an open-pit mine is provided, the method comprising:
[0007] Obtain the design parameters of the inner spoil heap at the final boundary of open-pit mining. The design parameters of the inner spoil heap include the length of the bottom of the mining area, the final slope height, the inner spoil heap slope angle, the inner spoil heap side slope angle, the working slope angle, and the final slope angle of the working side.
[0008] Based on the design parameters of the internal spoil heap, calculate the horizontal distance between the slope of the internal spoil heap and the working slope at the final boundary of the open-pit mining.
[0009] Obtain a preset safe distance value, and determine whether the horizontal distance value is greater than or equal to the safe distance value;
[0010] If the horizontal distance value is greater than or equal to the safe distance value, a first instruction is output. The first instruction is used to instruct the final boundary planning of open-pit mining based on the current internal spoil heap design parameters.
[0011] If the horizontal distance value is less than the safe distance value, a second instruction is output. The second instruction is used to instruct the adjustment of the design parameters of the internal spoil heap and to re-plan the final boundary of the open-pit mining.
[0012] In an optional embodiment, calculating the horizontal distance between the slope of the inner spoil heap and the working slope at the final boundary of the open-pit mining, based on the design parameters of the inner spoil heap, includes: calculating the horizontal distance based on the following formula:
[0013]
[0014] in, This is the horizontal distance value. H is the length of the bottom of the stope, and H is the final slope height. For the slope angle of the internal spoil heap, The inner spoil heap is located at the side slope angle. Help the slope for work, The final slope angle for the working side.
[0015] In an optional embodiment, the method further includes: during the mining process of the mining area corresponding to the final boundary of the open-pit mining, determining whether the compensation space generated by the mining operation in the mining area can accommodate the stripped rock and soil generated by the mining operation; when the compensation space can accommodate the stripped rock and soil generated by the mining operation, determining that the mining area corresponding to the final boundary of the open-pit mining has the condition for complete internal drainage of the stripped rock and soil.
[0016] In an optional embodiment, determining whether the compensation space generated by the mining operation in the mining area can accommodate the stripped rock and soil generated by the mining operation includes: during the mining process of the mining area corresponding to the final boundary of the open-pit mining, determining the production stripping ratio of the mining area, comparing the production stripping ratio with a preset production stripping ratio threshold, and determining whether the production stripping ratio is less than or equal to the production stripping ratio threshold; if the production stripping ratio is less than or equal to the production stripping ratio threshold, then determining that the compensation space can accommodate the stripped rock and soil generated by the mining operation.
[0017] In an optional embodiment, the method for determining the production stripping ratio threshold includes: determining the control production stripping ratio to be achieved in the mining area when the volume of the compensation space generated by the mining operation in the mining area is equal to the loose volume of the stripped rock and soil generated by the mining operation, and determining the control production stripping ratio as the production stripping ratio threshold.
[0018] In an optional embodiment, the control production stripping ratio is calculated using the following formula:
[0019] =
[0020]
[0021] in, To compare the production stripping ratio, The looseness coefficient of the stripped soil and rock. The settlement coefficient of the stripped soil and rock is denoted as .
[0022] In an optional embodiment, obtaining the design parameters of the internal spoil heap of the final boundary of the open-pit mining includes: obtaining the design document of the final boundary of the open-pit mining corresponding to the final boundary of the open-pit mining, and converting the design document of the final boundary of the open-pit mining into a structured text file; inputting the structured text file into a pre-trained design parameter recognition model to identify the design parameters of the internal spoil heap in the structured text file.
[0023] According to a second aspect of the present invention, an internal soil discharge determination device for open-pit mines is provided, the device comprising:
[0024] The parameter acquisition module is used to acquire the design parameters of the inner spoil heap at the final boundary of the open-pit mining. The inner spoil heap design parameters include the length of the bottom of the mining area, the final slope height, the inner spoil heap slope angle, the inner spoil heap side slope angle, the working slope angle, and the final slope angle of the working side.
[0025] The data calculation module is used to calculate the horizontal distance between the slope of the inner spoil heap and the working slope at the final boundary of the open-pit mining, based on the design parameters of the inner spoil heap.
[0026] The parameter determination module is used to obtain a preset distance safety value and determine whether the horizontal distance value is greater than or equal to the distance safety value.
[0027] The result output module is used to output a first instruction if the horizontal distance value is greater than or equal to the distance safety value, the first instruction being used to instruct the internal spoil disposal site to be planned according to the current internal spoil disposal site design parameters; and to output a second instruction if the horizontal distance value is less than the distance safety value, the second instruction being used to instruct the internal spoil disposal site design parameters to be adjusted and the internal spoil disposal site to be planned again.
[0028] According to a third aspect of the present invention, a storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the above-described method for determining soil discharge in open-pit mines.
[0029] According to a fourth aspect of the present invention, a computer is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the above-described method for determining the internal discharge soil in an open-pit mine.
[0030] This invention provides a method, apparatus, storage medium, and computer for determining the soil impact conditions of internal dumping in open-pit mines. By acquiring the internal dumping site design parameters from the final boundary design document of the open-pit mining, calculating the horizontal distance between the internal dumping site slope and the working slope, and determining the soil impact conditions of internal dumping, a scientific and efficient path for determining these conditions is established. This solution significantly improves the efficiency and accuracy of determining internal dumping conditions, accurately matching the complex working conditions of actual mining scenarios, ensuring that the determination results conform to engineering realities, and preventing damage to the mine and its surrounding environment.
[0031] The above description is only an overview of the technical solution of this application. In order to better understand the technical means of this application and to implement it in accordance with the contents of the specification, and to make the above and other objects, features and advantages of this application more obvious and understandable, the following are specific embodiments of this application. Attached Figure Description
[0032] The accompanying drawings, which are included to provide a further understanding of the invention and form part of this application, illustrate exemplary embodiments of the invention and, together with their description, serve to explain the invention and do not constitute an undue limitation thereof. In the drawings:
[0033] Figure 1 A flowchart illustrating a method for determining soil discharge in an open-pit mine according to an embodiment of the present invention is shown.
[0034] Figure 2 This diagram illustrates a schematic representation of a final boundary design document for open-pit mining according to an embodiment of the present invention.
[0035] Figure 3 This diagram illustrates one of the mining areas provided in an embodiment of the present invention.
[0036] Figure 4 This is a second schematic diagram of a mining area provided by an embodiment of the present invention;
[0037] Figure 5 This is shown as a third schematic diagram of a mining area provided by an embodiment of the present invention;
[0038] Figure 6 This is shown as a fourth schematic diagram of a mining area provided by an embodiment of the present invention;
[0039] Figure 7 The fifth schematic diagram of a mining area provided by an embodiment of the present invention is shown;
[0040] Figure 8 The diagram shows a structural schematic of an internal soil discharge determination device for an open-pit mine provided by an embodiment of the present invention.
[0041] in, Figures 1 to 8 The correspondence between the reference numerals and component names in the attached drawings is as follows:
[0042] 21. Internal spoil heap slope; 22. Internal spoil heap side slope; 23. Working slope; 24. Final working slope; 31. Area to be mined; H. Final slope height. The slope angle of the inner spoil heap, The inner spoil heap is located next to the slope corner of the side wall. Work on the slope, Final slope angle of the working side Length of the bottom of the stope Horizontal distance value, 81 Parameter acquisition module, 82 Data calculation module, 83 Parameter determination module, 84 Result output module, A, B, E, F are in the attached Figure 3 Points F1 and D1 delineate the final boundary of the open-pit mining area. Figure 3 The designated work slope points are A01, B01, E01, and F01, which are located on the attached slope. Figure 4 Points F11 and D01 delineate the final boundary of the open-pit mining area. Figure 4 The work assistance points are designated in the middle, with C01 being the attached point. Figure 4 Points A02, B02, E02, and F02 are designated as the slopes of the internal spoil heap. Figure 5 Points A22 and C02 are located on the adjacent mining area that define the final boundary of the open-pit mining zone. Figure 5 Points F22 and D02 are designated on the slope of the inner spoil heap. Figure 5 The designated work slope points are A03, B03, E03, and F03, which are located on the attached slope. Figure 6 Points A33 and C03 are located within the mining area that define the final boundary of open-pit mining. Figure 6 Points D03 and F33 are used to delineate the slope of the internal spoil heap. Figure 6 The designated work slope points are A04, B04, E04, and F04, which are located on the adjacent slope. Figure 7 Points A44 and C04 delineate the final boundary of the open-pit mining area. Figure 7 The points on the slope of the internal spoil heap are demarcated. Detailed Implementation
[0043] The present invention will be described in detail below with reference to the accompanying drawings and embodiments. It should be noted that, unless otherwise specified, the embodiments and features described in the present application can be combined with each other.
[0044] Currently, the feasibility of internal waste disposal is highly dependent on the spatial adaptability of the designed final boundary of open-pit mining. Without a scientific assessment of the waste disposal conditions within this boundary, the resulting mining area may lack the necessary conditions for internal waste disposal. At present, during the design phase of the final boundary of open-pit mining, there is a lack of a scientific and effective systematic method for determining whether its spatial parameters meet the conditions for internal waste disposal. This results in inefficiency, difficulty in meeting the timeliness requirements of engineering design, and insufficient accuracy in the judgment results, failing to precisely match the complex working conditions of actual mining scenarios. Consequently, the conclusions regarding design parameters may not meet the application requirements of actual engineering, potentially leading to an unreasonable spatial layout of the final boundary of open-pit mining. This could result in solid waste generated during mining being unable to be disposed of internally and instead requiring external disposal, ultimately causing serious damage to the mine and its surrounding environment.
[0045] To address the above problems, in one embodiment, such as Figure 1 As shown, a method for determining the soil impact during internal discharge in open-pit mines is provided. Taking the application of this method to a computer as an example, the method includes the following steps:
[0046] 101. Obtain the design parameters of the inner spoil heap at the final boundary of the open-pit mining, including the bottom length of the mining area, the final slope height, the inner spoil heap slope angle, the inner spoil heap side slope angle, the working slope angle, and the final slope angle of the working side.
[0047] Here, you can obtain the design documents for the final boundary of open-pit mining. The final boundary of open-pit mining is the final spatial outline formed when a mining area in an open-pit mine is completed. It is the outline of the mining area determined based on resource endowment, mining technology, economic and technical factors, and safety and environmental protection requirements. It includes key spatial parameters such as the final slope, mining bottom boundary, and boundary line, defining the maximum extent of mining. Furthermore, the design documents for the final boundary of open-pit mining are technical documents that contain this outline and related design content. Core components include internal spoil heap design parameters, slope angles, working slope parameters, mining area boundary coordinates, bottom boundary elevation, and safety protection requirements. These documents serve as the core technical basis for guiding mine construction and spoil heap planning.
[0048] As an example, such as Figure 2 As shown, the design documents for the final boundary of open-pit mining indicate the length of the bottom of the stope. Final slope height H, slope angle of the inner spoil heap The side slope angle of the inner spoil heap , work slope angle and the final slope angle of the working side As a design parameter for internal spoil heaps. Working slope angle. Angle of slope with inner spoil heap These parameters remain unchanged during the actual mining process. The above parameters are determined by the relevant designers when designing the final boundary of the open-pit mine; among them, the length of the bottom of the stope... The final slope height H is the horizontal projection length of the final mining bottom boundary of the open-pit mine; the final slope height H is the maximum vertical height of the final slope after the open-pit mining is completed; and the slope angle of the inner spoil heap is... It is the angle between the slope of the inner spoil heap and the horizontal plane, and the angle of the slope of the inner spoil heap's side slope. It is the angle between the side slope 22 of the inner spoil heap and the horizontal plane, the working slope angle. It is the angle between the slope surface of the working slope 23 and the horizontal plane during the mining process, and the final slope angle of the working slope. It is the angle between the final slope surface on one side of the working slope 23 and the horizontal plane.
[0049] Here, the length of the bottom of the mining area The larger the slope and the smaller the final slope height H, the higher the feasibility of implementing internal spoil disposal in open-pit mines. This principle also provides important theoretical support for the delineation of internal spoil disposal areas, the calculation of internal spoil disposal site volume, and the selection of the first spoil disposal area. Specifically, the design parameters of the aforementioned internal spoil disposal site in the design documents of the final boundary of open-pit mining can be identified and collected to obtain the judgment parameters for determining internal spoil disposal.
[0050] 102. Based on the design parameters of the internal spoil heap, calculate the horizontal distance between the slope of the internal spoil heap and the working slope at the final boundary of the open-pit mining.
[0051] Among them, since the access road within the mining area needs to be set between the inner spoil heap slope 21 and the working slope 23, the horizontal distance between the two is... It should be wider than the width of the road to allow sufficient space for a road to meet engineering standards.
[0052] Specifically, the horizontal distance value can be calculated based on the following formula 1:
[0053] (1)
[0054] in, This is the horizontal distance value. H is the length of the bottom of the stope, and H is the final slope height. For the slope angle of the internal spoil heap, The inner spoil heap is located at the side slope angle. Help the slope for work, The final slope angle for the working side.
[0055] 103. Obtain a preset safe distance value, and determine whether the horizontal distance value is greater than or equal to the safe distance value.
[0056] Among them, the safe distance value is a key reference standard to ensure the safety of internal soil disposal operations, smooth road traffic, and compliance of construction and maintenance. Its core requirement is that the horizontal distance between the internal soil disposal site slope 21 and the working slope 23 must be greater than a specific horizontal distance threshold. Therefore, whether the actual horizontal distance between the internal soil disposal site slope 21 and the working slope 23 exceeds this safe distance value can be used as the core basis for determining whether the final boundary of the open-pit mining has the static feasibility of internal soil disposal.
[0057] Specifically, relevant personnel can combine the safety regulations and engineering design specifications of the open-pit mine area, refer to actual engineering cases of similar mines, and take into account actual engineering conditions such as the internal spoil heap stacking process, road traffic standards, and slope stability requirements, and determine the specific value of the safe distance through engineering calculations and numerical simulations.
[0058] 104. If the horizontal distance value is greater than or equal to the distance safety value, then output a first instruction, which is used to instruct the final boundary planning of open-pit mining based on the current internal spoil heap design parameters.
[0059] Specifically, in terms of horizontal distance value When the distance is greater than or equal to the safety value, it can be determined that the design parameters of the inner spoil heap at the final boundary of the open-pit mining meet the safety and engineering requirements for inner spoil heap. This indicates that the distance can not only fully accommodate the excavated soil and rock to be stockpiled at the inner spoil heap, meeting the requirements for inner spoil heap capacity and slope stability, but also reserve compliant and safe space for road traffic, construction, and maintenance, thus possessing reliable inner spoil heap conditions. Therefore, the first instruction is output to the computer terminals used by relevant personnel, instructing them to carry out mineral mining work according to the currently established design parameters of the inner spoil heap at the final boundary of the open-pit mining.
[0060] 105. If the horizontal distance value is less than the safe distance value, a second instruction is output. The second instruction is used to instruct the adjustment of the design parameters of the internal spoil heap and to re-plan the final boundary of the open-pit mining.
[0061] Specifically, in terms of horizontal distance value When the distance is less than the safe distance value, it indicates that the horizontal distance value is... It is impossible to simultaneously meet the requirements of safety in internal spoil disposal operations, smooth road access, and compliance with construction and maintenance regulations. Therefore, a second instruction is issued, instructing relevant personnel to optimize and adjust the existing internal spoil disposal site design parameters, such as the slope angle and stockpiling area. After the parameter adjustments are completed, the internal spoil disposal site planning work will be restarted to ensure that the adjusted plan meets the actual engineering safety and application requirements of internal spoil disposal.
[0062] Furthermore, when initiating actual mining based on the design parameters of the inner spoil heap within the final boundary of the open-pit mine, the initial mining area can be determined in the region near the inner spoil heap's side slope 22 within the final boundary of the open-pit mine. Simultaneously, the surface on the opposite side of the open-pit mine boundary can be designated as a temporary spoil heap area, where the waste rock generated during mining can be temporarily stockpiled. Furthermore, once the mining area near the inner spoil heap's side slope 22 within the final boundary of the open-pit mine has formed a compensation space with a certain spatial capacity through mining operations, the waste rock generated during the mining process can be... The newly generated waste rock and the existing waste rock in the temporary dumping area are piled up from bottom to top into the compensation space along a predetermined path, forming the inner dumping slope 21. Furthermore, as the mining operation continues, the compensation space will gradually move closer to the final slope 24 on the working side, and the inner dumping slope 21 will also move closer to the final slope. Finally, when the compensation space connects with the final slope 24 on the working side, and the distance between the inner dumping slope 21 and the final slope 24 on the working side reaches the safe distance value, the mining work at the final boundary of the open-pit mining is completed.
[0063] The open-pit mine internal dumping soil acceptance determination method provided in this embodiment obtains the internal dumping site design parameters from the final boundary design document of the open-pit mining, calculates the horizontal distance between the internal dumping site slope 21 and the working slope 23, and determines the internal dumping soil acceptance conditions accordingly. A static feasibility assessment is then performed to determine whether the final boundary of the open-pit mining meets the internal dumping soil acceptance conditions. This scheme significantly improves the efficiency and accuracy of internal dumping soil acceptance condition determination, accurately matches the complex working conditions of actual mining scenarios, ensures that the determination results are consistent with engineering realities, and avoids damage to the mine and its surrounding environment.
[0064] In an optional embodiment, the method for determining the design parameters of the internal spoil heap at the final boundary of the open-pit mining includes:
[0065] First, obtain the open-pit mining final stage design document corresponding to the final stage of the open-pit mining, and convert the open-pit mining final stage design document into a structured text file.
[0066] Among them, the final design documents for open-pit mining, which are formed during the design phase of open-pit mining, can be in various forms such as PDF design specifications and text-based design schemes. They contain key information such as the spatial layout of the final open-pit mining area and related designs for the internal spoil heap.
[0067] Specifically, optical character recognition (OCR) can be used to identify text information in the final design documents of open-pit mining, so as to convert the final design documents of open-pit mining into structured text files that can be read and written.
[0068] Then, the structured text file is input into a pre-trained design parameter recognition model to identify the internal spoil disposal site design parameters in the structured text file.
[0069] Here, the design parameter recognition model can be trained based on deep learning algorithms such as BERT and CNN. The training data covers a large number of structured text samples related to the design of open-pit mine spoil heaps, enabling the model to learn and master the characteristic patterns and expressions of spoil heap design parameters. In actual work, the design parameter recognition model accurately identifies and extracts various spoil heap design parameters by parsing the input structured text file sentence by sentence, matching keywords, extracting features, and understanding semantics. This provides accurate and standardized parameter basis for subsequent horizontal distance calculation and determination of spoil heap conditions.
[0070] The embodiments provided in this application can use OCR technology to convert various forms of open-pit mining final boundary design documents into readable and writable structured text to achieve efficient information extraction. Furthermore, relying on the design parameter recognition model and the parameter feature patterns learned from a large number of samples, the identification and extraction of internal spoil disposal design parameters can be accurately completed, greatly improving the efficiency, automation level and accuracy of parameter extraction, and significantly improving the efficiency of internal spoil disposal soil acceptance determination.
[0071] In an optional embodiment, the method further includes:
[0072] First, during the mining process in the mining area corresponding to the final boundary of the open-pit mining, it is determined whether the compensation space generated by the mining operation in the mining area can accommodate the stripped rock and soil generated by the mining operation.
[0073] Specifically, during the mining process in the mining area corresponding to the final boundary of open-pit mining, the production stripping ratio of the ore produced in the mining area can be determined in real time. This production stripping ratio is then compared with a preset production stripping ratio threshold to determine whether it is less than or equal to the threshold. The production stripping ratio refers to the ratio of the volume of stripped rock and soil to the volume of mined ore during a certain period in the actual production process of an open-pit mine. It is a key parameter for measuring the stripping cost and ore production efficiency in open-pit mining. Furthermore, if the production stripping ratio is less than or equal to the threshold, it is determined that the compensation space can accommodate the stripped rock and soil generated during mining operations. Here, because the production stripping ratio reflects the volume of rock and soil required to produce one unit of ore, when the production stripping ratio is less than or equal to the threshold, it indicates that the actual volume of stripped rock and soil, even after considering loosening and settlement, is still less than the effective volume of the compensation space. Therefore, it can be determined that the compensation space can accommodate all the stripped rock and soil.
[0074] Furthermore, when the compensation space can accommodate the stripped rock and soil generated during the mining operation, it is determined that the mining area corresponding to the final boundary of the open-pit mining has the condition for complete internal discharge of the stripped rock and soil.
[0075] Conversely, when the compensation space cannot accommodate the stripped rock and soil generated by the mining operation, a temporary external spoil disposal site can be set up near the mining area. All stripped waste rock is discharged to this external spoil disposal site. After the mining area 31 is completed, or after sufficient space is formed inside the mining area, the waste rock initially stored in the external temporary spoil disposal site is transferred to the inside of the mining area for backfilling and internal disposal.
[0076] Furthermore, the method for determining the production stripping ratio threshold includes...
[0077] First, determine the control production stripping ratio to be achieved in the mining area when the volume of the compensation space generated by the mining operation is equal to the loose volume of the stripped soil and rock generated by the mining operation, and then determine the control production stripping ratio as the production stripping ratio threshold.
[0078] Here, the volume of the compensation space can be calculated using Formula 2:
[0079] (2)
[0080] in, The volume of the compensation space formed by mining. To compare the production stripping ratio, This refers to the volume of ore extracted during the mining process.
[0081] Furthermore, the loose volume of the stripped soil and rock can be calculated based on Formulas 3 and 4:
[0082] (3)
[0083] (4)
[0084] in, This is the actual number of cubic meters of rock stripped from the rock. To compare the production stripping ratio, This refers to the volume of ore extracted during the mining process. For a predetermined loosening coefficient of the stripped soil and rock, The pre-determined settlement coefficient of the stripped soil and rock. This refers to the loose volume formed after the stripped soil and rock are deposited in the spoil heap.
[0085] Furthermore, when the volume of the compensation space is equal to the loose volume of the stripped rock and soil generated during the mining operation, the volume V of the compensation space is equal to the loose volume. Formula 5 can be derived from Formulas 2 and 4:
[0086] = (5)
[0087] in, To compare the production stripping ratio, The looseness coefficient of the stripped soil and rock. The settlement coefficient of the stripped soil and rock is denoted as .
[0088] Furthermore, by adjusting formula 5, we can obtain formula 6:
[0089] (6)
[0090] in, To compare the production stripping ratio, The looseness coefficient of the stripped soil and rock. The settlement coefficient of the stripped soil and rock is denoted as .
[0091] Furthermore, the known loosening coefficient and settlement coefficient of the stripped soil can be substituted into Formula 6 to obtain the control production stripping ratio, and this control production stripping ratio can be determined as the production stripping ratio threshold.
[0092] The embodiments provided in this application, by calculating the stripping ratio in real time and comparing it with a threshold, can dynamically determine whether the compensation space can accommodate the stripped rock and soil extracted in real time, thus achieving a dynamic quantitative assessment of the feasibility of internal drainage. By introducing the loosening coefficient and settlement coefficient to establish a threshold calculation model, the threshold determination becomes more scientific and accurate, providing a basis for mines to adjust stripping and dumping schemes in real time, effectively improving internal drainage efficiency, reducing external drainage pressure, and enhancing the economic and environmental benefits of mining.
[0093] The open-pit mine internal discharge soil determination method provided in this embodiment can construct a dual criterion system of "static feasibility and dynamic feasibility" by quantitatively analyzing the relationship between mining space parameters and operational dynamics, scientifically determine the feasibility of internal discharge space conversion, and maximize the effective mining of resources while efficiently disposing of stripped waste rock, providing comprehensive guidance for the scientific production of mines.
[0094] Furthermore, in combination Figures 3 to 7 This section describes the mining process in the mining area corresponding to the final boundary of open-pit mining. Firstly, as... Figure 3 As shown, ore mining operations are carried out within the mining area defined by points A, B, E, and F, which is the final boundary of the open-pit mining area. Points F1 and D1 are used for... Figure 3 A working slope 23 is designated to form a compensation space within the areas defined by points A, B, D1, and F1. At this point, the stripped rock and soil formed by mining this compensation space can be placed in a temporary external spoil heap. All stripped waste rock is discharged into this external spoil heap. Once sufficient space is created inside the mining area, the waste rock initially stockpiled in the external temporary spoil heap is transferred to the mining area for backfilling and internal discharge. Here, since the stripped rock and soil mainly consists of the soil, weathered layer, rock strata, and waste rock covering the ore body, its total volume is usually much smaller than the volume of the compensation space formed by mining. Therefore, all the stripped rock and soil can be discharged internally into the compensation space inside the mining area. Furthermore, a road can be constructed within the mining area between points B and D1.
[0095] Then, as Figure 4 As shown, points A01, B01, E01, and F01 are... Figure 4The mining area, defined as the final boundary of the open-pit mining, is as follows: As mining work progresses in the area to be mined (31), the working slope 23 moves towards the final working slope 24, creating a compensation space. At this point, the waste rock initially stockpiled in the external temporary spoil heap, along with the waste rock generated during the current mining work, is transferred to the mining area for backfilling and internal dumping, forming the internal spoil heaps defined by points A01, B01, and C01. Meanwhile, the area to be mined (31) continues to shrink, and the working slope 23 defined by points F11 and D01 moves towards the final working slope 24, forming the area to be mined (31) within the range of points D01, F11, F01, and E01. At this time, the road within the mining area can be moved between points C01 and D01.
[0096] Furthermore, in Figure 5 In the diagram, points A02, B02, E02, and F02 delineate the final mining area of the open-pit mine; points A22 and C02 delineate the inner spoil heap slope 21; and points F22 and D02 delineate the working slope 23. Furthermore, in... Figure 6 In the middle, points A03, B03, E03, and F03 delineate the mining area of the final boundary of open-pit mining, points A33 and C03 delineate the inner spoil heap slope 21, and points D03 and F33 delineate the working slope 23.
[0097] like Figure 5 and Figure 6 As shown, with the continuous mining of the area 31 to be mined, the working slope 23 moves towards the final working slope 24, and the area 31 to be mined continues to shrink; simultaneously, with the internal spoil heap, the internal spoil heap slope 21 continues to move closer towards the final working slope 24. At the same time, roads within the mining area can be accessed from... Figure 5 Move between points C02 and D02 in the middle. Figure 6 Between points C03 and D03.
[0098] Finally, as Figure 7 As shown, points A04, B04, E04, and F04 delineate the mining area at the final boundary of the open-pit mining, while points A44 and C04 delineate the inner spoil heap slope 21. After the mining area 31 is completed, the inner spoil heap slope 21 is advanced to the line of points A44 and C04, forming an inner spoil heap within the space delineated by points A04, B04, A44, and C04, thus completing the mining work at the final boundary of the open-pit mining.
[0099] Furthermore, as Figure 1 The specific implementation of the method shown in this embodiment provides a device for determining the soil discharge conditions in an open-pit mine, such as... Figure 8As shown, the device includes: a parameter acquisition module 81, a data calculation module 82, a parameter determination module 83, and a result output module 84.
[0100] The parameter acquisition module 81 can be used to acquire the design parameters of the inner spoil heap at the final boundary of the open-pit mining. The inner spoil heap design parameters include the bottom length of the mining area, the final slope height, the inner spoil heap slope angle, the inner spoil heap side slope angle, the working slope angle, and the final slope angle of the working side.
[0101] Data calculation module 82 can be used to calculate the horizontal distance between the slope of the inner spoil heap and the working slope at the final boundary of the open-pit mining, based on the design parameters of the inner spoil heap.
[0102] The parameter determination module 83 can be used to obtain a preset distance safety value and determine whether the horizontal distance value is greater than or equal to the distance safety value;
[0103] The result output module 84 can be used to output a first instruction if the horizontal distance value is greater than or equal to the distance safety value, the first instruction being used to instruct the final boundary planning of open-pit mining based on the current internal spoil heap design parameters; if the horizontal distance value is less than the distance safety value, a second instruction is output, the second instruction being used to instruct the adjustment of the internal spoil heap design parameters and to re-plan the final boundary of open-pit mining.
[0104] In a specific application scenario, the parameter acquisition module 81 can be used to acquire the open-pit mining final boundary design file corresponding to the final boundary of the open-pit mining, and convert the open-pit mining final boundary design file into a structured text file; input the structured text file into a pre-trained design parameter recognition model to identify the internal spoil disposal site design parameters in the structured text file.
[0105] In specific application scenarios, the data calculation module 82 can be used to calculate the horizontal distance value based on the following formula:
[0106]
[0107] in, This is the horizontal distance value. H is the length of the bottom of the stope, and H is the final slope height. For the slope angle of the internal spoil heap, The inner spoil heap is located at the side slope angle. Help the slope for work, The final slope angle for the working side.
[0108] In a specific application scenario, the result output module 84 can be used to determine whether the compensation space generated by the mining operation in the mining area corresponding to the final boundary of the open-pit mining can accommodate the stripped rock and soil generated by the mining operation during the mining process; when the compensation space can accommodate the stripped rock and soil generated by the mining operation, it is determined that the mining area corresponding to the final boundary of the open-pit mining has the condition for complete internal discharge of the stripped rock and soil.
[0109] In a specific application scenario, the result output module 84 can be used to determine the production stripping ratio of the mining area during the mining process of the mining area corresponding to the final boundary of the open-pit mining, and compare the production stripping ratio with a preset production stripping ratio threshold to determine whether the production stripping ratio is less than or equal to the production stripping ratio threshold; if the production stripping ratio is less than or equal to the production stripping ratio threshold, it is determined that the compensation space can accommodate the stripped rock and soil generated by the mining operation.
[0110] In specific application scenarios, the result output module 84 can be used to determine the reference production stripping ratio to be achieved in the mining area when the volume of the compensation space generated by the mining operation in the mining area is equal to the loose volume of the stripped rock and soil generated by the mining operation, and to determine the reference production stripping ratio as the production stripping ratio threshold.
[0111] It should be noted that other corresponding descriptions of the functional units involved in the soil discharge determination device for open-pit mines provided in this embodiment can be found in [reference needed]. Figure 1 The corresponding description in [the document] will not be repeated here.
[0112] Based on the above, Figure 1 Accordingly, this embodiment also provides a storage medium storing a computer program that, when executed by a processor, implements the above-described method. Figure 1 The method for determining the soil discharge in an open-pit mine is shown.
[0113] Based on this understanding, the technical solution of this application can be embodied in the form of a software product. The software product to be identified can be stored in a non-volatile storage medium (such as a CD-ROM, USB flash drive, mobile hard drive, etc.) and includes several instructions to cause a computer device (such as a personal computer, server, or network device, etc.) to execute the methods described in the various implementation scenarios of this application.
[0114] Based on the above, Figure 1 The method shown, and Figure 8The embodiment of the open-pit mine internal discharge soil acceptance determination device shown herein, in order to achieve the above objectives, also provides a computer for executing the open-pit mine internal discharge soil acceptance determination method. Specifically, this computer device can be a personal computer, server, smartphone, tablet computer, smartwatch, or other network device, etc. The computer device includes a storage medium and a processor; the storage medium is used to store computer programs and an operating system; the processor is used to execute the computer program to implement the above-described... Figure 1 The method shown.
[0115] Optionally, the computer device may also include internal memory, a communication interface, a network interface, a camera, radio frequency (RF) circuitry, sensors, audio circuitry, a Wi-Fi module, a display screen, and input devices such as a keyboard. The communication interface may also include a USB interface, a card reader interface, etc. The network interface may optionally include a standard wired interface or a wireless interface (such as a Wi-Fi interface).
[0116] Those skilled in the art will understand that the computer device structure for recognizing operational actions provided in this embodiment does not constitute a limitation on the computer device, and may include more or fewer components, or combine certain components, or have different component arrangements.
[0117] The storage medium may also include an operating system and a network communication module. The operating system is a program that manages the aforementioned computer hardware and the software resources to be identified, supporting the operation of information processing programs and other software and / or programs to be identified. The network communication module is used to enable communication between the various components within the storage medium, as well as communication with other hardware and software in the information processing computer device.
[0118] Through the above description of the embodiments, those skilled in the art can clearly understand that this application can be implemented by means of software plus necessary general-purpose hardware platform, or it can be implemented by hardware. By applying the technical solution of this application, firstly, the design parameters of the inner spoil heap of the final boundary of the open-pit mining are obtained. The design parameters of the inner spoil heap include the length of the bottom of the mining area, the final slope height, the inner spoil heap slope angle, the inner spoil heap side slope angle, the working slope angle, and the final slope angle of the working side. Then, based on the inner spoil heap design parameters, the horizontal distance between the inner spoil heap slope and the working slope of the final boundary of the open-pit mining is calculated. Next, a preset safety distance value is obtained, and it is determined whether the horizontal distance value is greater than or equal to the safety distance value. If the horizontal distance value is greater than or equal to the safety distance value, a first instruction is output, which is used to instruct the final boundary planning of the open-pit mining according to the current inner spoil heap design parameters. If the horizontal distance value is less than the safety distance value, a second instruction is output, which is used to instruct the adjustment of the inner spoil heap design parameters and the re-planning of the final boundary of the open-pit mining. Compared with existing technologies, this method can improve the accuracy of determining whether the final boundary of open-pit mining has the conditions for internal soil discharge, thereby improving the environmental protection level of open-pit mines.
[0119] Those skilled in the art will understand that the accompanying drawings are merely schematic diagrams of a preferred embodiment, and the modules or processes shown in the drawings are not necessarily essential for implementing this application. Those skilled in the art will understand that the modules in the apparatus of the embodiment can be distributed within the apparatus of the embodiment as described, or can be modified to be located in one or more apparatuses different from this embodiment. The modules of the above-described embodiment can be combined into one module, or further divided into multiple sub-modules.
[0120] The serial numbers in this application are for descriptive purposes only and do not represent the superiority or inferiority of any particular implementation scenario. The above disclosures are merely a few specific implementation scenarios of this application; however, this application is not limited thereto, and any variations conceived by those skilled in the art should fall within the protection scope of this application.
Claims
1. A method for determining the soil impact during internal discharge in an open-pit mine, characterized in that, The method for determining the soil impact during internal discharge in the open-pit mine includes: To obtain the design parameters of the inner spoil heap at the final boundary of open-pit mining, the inner spoil heap design parameters include the length of the bottom of the mining area, the final slope height, the inner spoil heap slope angle, the inner spoil heap side slope angle, the working slope angle, and the final slope angle of the working side. Based on the design parameters of the internal spoil heap, calculate the horizontal distance between the slope of the internal spoil heap and the working slope at the final boundary of the open-pit mining. Obtain a preset safe distance value, and determine whether the horizontal distance value is greater than or equal to the safe distance value; If the horizontal distance value is greater than or equal to the distance safety value, then a first instruction is output, which is used to instruct the final boundary planning of open-pit mining based on the current internal spoil heap design parameters. If the horizontal distance value is less than the safe distance value, a second instruction is output. The second instruction is used to instruct the adjustment of the design parameters of the internal spoil heap and to re-plan the final boundary of the open-pit mining.
2. The method for determining the soil impact during internal discharge in open-pit mines according to claim 1, characterized in that, The calculation of the horizontal distance between the slope of the inner spoil heap and the working slope at the final boundary of the open-pit mining, based on the design parameters of the inner spoil heap, includes: The horizontal distance value is calculated based on the following formula: in, This is the horizontal distance value. H is the length of the bottom of the stope, and H is the final slope height. For the slope angle of the internal spoil heap, The inner spoil heap is located at the side slope angle. Help the slope for work, The final slope angle for the working side.
3. The method for determining the soil impact during internal discharge in open-pit mines according to claim 1, characterized in that, The method further includes: During the mining process in the mining area corresponding to the final boundary of the open-pit mining, it is determined whether the compensation space generated by the mining operation in the mining area can accommodate the stripped rock and soil generated by the mining operation; When the compensation space can accommodate the stripped rock and soil generated during mining operations, it is determined that the mining area corresponding to the final boundary of the open-pit mining has the condition for complete internal discharge of the stripped rock and soil.
4. The method for determining the soil impact during internal discharge in open-pit mines according to claim 3, characterized in that, Determining whether the compensation space generated by the mining operation in the mining area can accommodate the stripped rock and soil generated by the mining operation includes: During the mining process in the mining area corresponding to the final boundary of the open-pit mining, the production stripping ratio of the mining area is determined, and the production stripping ratio is compared with a preset production stripping ratio threshold to determine whether the production stripping ratio is less than or equal to the production stripping ratio threshold. If the production stripping ratio is less than or equal to the production stripping ratio threshold, then the compensation space is determined to be able to accommodate the stripped rock and soil generated during the mining operation.
5. The method for determining the soil impact during internal discharge in open-pit mines according to claim 4, characterized in that, The method for determining the production stripping ratio threshold includes: When the volume of the compensation space generated by the mining operation in the mining area is equal to the loose volume of the stripped soil and rock generated by the mining operation, the control production stripping ratio to be achieved in the mining area is determined, and the control production stripping ratio is determined as the production stripping ratio threshold.
6. The method for determining the soil impact during internal discharge in open-pit mines according to claim 5, characterized in that, The control production stripping ratio is calculated using the following formula: = in, To compare the production stripping ratio, The looseness coefficient of the stripped soil and rock. The settlement coefficient of the stripped soil and rock is denoted as .
7. The method for determining the soil impact during internal discharge in open-pit mines according to claim 1, characterized in that, The design parameters for the internal spoil heap at the final boundary of the open-pit mining include: Obtain the open-pit mining final boundary design document corresponding to the final boundary of the open-pit mining, and convert the open-pit mining final boundary design document into a structured text file; The structured text file is input into a pre-trained design parameter recognition model to identify the internal spoil disposal site design parameters in the structured text file.
8. A device for determining the soil discharge conditions in an open-pit mine, characterized in that, The device includes: The parameter acquisition module is used to acquire the design parameters of the inner spoil heap at the final boundary of the open-pit mining. The inner spoil heap design parameters include the length of the bottom of the mining area, the final slope height, the inner spoil heap slope angle, the inner spoil heap side slope angle, the working slope angle, and the final slope angle of the working side. The data calculation module is used to calculate the horizontal distance between the slope of the inner spoil heap and the working slope at the final boundary of the open-pit mining, based on the design parameters of the inner spoil heap. The parameter determination module is used to obtain a preset distance safety value and determine whether the horizontal distance value is greater than or equal to the distance safety value. The result output module is used to output a first instruction if the horizontal distance value is greater than or equal to the safe distance value, the first instruction being used to instruct the final boundary planning of open-pit mining based on the current internal spoil heap design parameters; and to output a second instruction if the horizontal distance value is less than the safe distance value, the second instruction being used to instruct the adjustment of the internal spoil heap design parameters and to re-plan the final boundary planning of open-pit mining.
9. A storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 7.
10. A computer, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Novel method for governing large-scale debris flow of soil dump
CN103388327A
Method for determining surface mine exploiting limit
CN105275471A