An assembled electronic signal shielding room against bullet penetration and construction method

By combining a multi-layered composite structure with a hydraulic locking mechanism, the shortcomings of existing shielded rooms in terms of impact resistance, electromagnetic shielding continuity, and assembly precision are solved, achieving highly efficient protection against shrapnel penetration and electromagnetic shielding effects, making it suitable for electronic signal shielded rooms in high-risk environments.

CN121803087BActive Publication Date: 2026-05-29CSIC INTERNATIONAL ENGINEERING CO LTD +3

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CSIC INTERNATIONAL ENGINEERING CO LTD
Filing Date
2026-03-11
Publication Date
2026-05-29

AI Technical Summary

Technical Problem

Existing electronic signal shielding rooms are inadequate in terms of impact resistance, electromagnetic shielding continuity, door and window joint protection, and on-site assembly precision control, making it difficult to meet the protection requirements of high-risk environments.

Method used

The wall panel module adopts a multi-layer composite structure, including a ceramic composite impact layer, a ribbed steel plate load-bearing layer, a honeycomb buffer layer, and an electromagnetic shielding layer. Combined with a hydraulic locking mechanism and conductive sealant, it forms a closed shielding layer, which enhances the resistance to bullet penetration and electromagnetic shielding performance. The hydraulic locking mechanism enables rapid assembly.

Benefits of technology

It enhances the shielding room's resistance to bullet penetration and electromagnetic shielding integrity, simplifies on-site construction processes, improves structural reliability and assembly efficiency, and meets the needs of high-risk environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121803087B_ABST
    Figure CN121803087B_ABST
Patent Text Reader

Abstract

The present application relates to a kind of anti-fragment penetration assembled electronic signal shielding room, construction method, the shielding room includes: multiple wallboard modules, each is sequentially fixedly connected with ceramic composite impact layer, ribbed steel plate bearing layer, honeycomb buffer layer and first electromagnetic shielding layer from outside to inside, multiple wallboard modules head-to-tail butt joint;Top plate module is at least provided with second electromagnetic shielding layer, and top plate module is adaptively butted with the top of multiple wallboard modules;Bottom plate module is at least provided with third electromagnetic shielding layer, and bottom plate module is adaptively butted with the bottom of multiple wallboard modules;Hydraulic locking mechanism is arranged at the butt joint of adjacent wallboard module, wallboard module and top plate module and wallboard module and bottom plate module;Multiple wallboard modules and top plate module and bottom plate module cooperatively form closed shielding room.The present application realizes the coordination of anti-fragment penetration protection, electromagnetic shielding integrity and quick assembly construction, improves the structural reliability and shielding stability in high-risk environment.
Need to check novelty before this filing date? Find Prior Art