Intelligent distribution network fault positioning and early warning system based on multi-source sensing cooperation
By constructing a multi-source sensing and collaborative intelligent distribution network fault location and early warning system, the problems of distribution network fault decision delay and misjudgment have been solved. It realizes autonomous collaborative decision-making and rapid fault location at the edge side, thereby improving the operation and maintenance efficiency and power supply reliability of the distribution network.
CN121933875APending Publication Date: 2026-04-28SHANDONG HUAXIN ELECTRIC
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- SHANDONG HUAXIN ELECTRIC
- Filing Date
- 2026-02-02
- Publication Date
- 2026-04-28
Smart Images

Figure CN121933875A_ABST
Abstract
The invention discloses an intelligent distribution network fault positioning and early warning system based on multi-source sensing cooperation, and relates to the technical field of fault positioning and early warning. The system comprises an edge sensing node module, a self-organizing networking module, a data sharing module, a collaborative research and judgment module and a decision output module. The edge sensing node module collects a distribution network multi-source signal and triggers a distributed collaborative decision when the distribution network multi-source signal is abnormal; the self-organizing networking module completes node scanning and multi-dimensional core node screening, and builds and monitors a temporary collaborative consensus group; the data sharing module realizes intra-group feature data sharing; the collaborative research and judgment module forms a research and judgment result, and triggers secondary acquisition verification when the research and judgment result is not consensus; and the decision output module pushes early warning information, and generates and uploads a fault positioning result and a disposal scheme. According to the invention, edge-side autonomous collaborative decision is realized, main station dependence is broken through, fault response time delay is shortened, misjudgment and missed judgment rates are reduced, and distribution network power supply reliability is improved.
Need to check novelty before this filing date? Find Prior Art