Construction method for adding ore transfer rubber belt way during capital construction period
By employing a construction method that combines fully enclosed protection of existing facilities, mechanical rock breaking and drilling, and multiple cyclic blasting with anchor mesh support, the dynamic disturbance and structural problems encountered when adding ore transfer conveyor belts during the infrastructure construction phase were resolved, thereby improving construction safety and quality.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- JCC YINSHAN MINING CO LTD
- Filing Date
- 2026-04-23
- Publication Date
- 2026-06-05
AI Technical Summary
In existing technologies, when adding ore transfer conveyor belts during the infrastructure construction phase, blasting causes significant dynamic disturbance to adjacent existing facilities and surrounding rock, and the conveyor belts are prone to cracking and roof instability.
The existing facilities are fully enclosed by a composite protection structure. Excavation is carried out using mechanical rock breaking and drilling and multiple cycles of blasting. Combined with anchor mesh support and a step-by-step construction sequence, permanent lining is carried out after monitoring the displacement of the surrounding rock.
This effectively reduced the impact of blasting on existing facilities, decreased the risk of conveyor belt cracking and roof instability, and improved construction safety and quality.