Underground pipe gallery rapid construction trolley, formwork and construction method
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CCCC SECOND HARBOR ENGINEERING CO LTD
- Filing Date
- 2024-12-06
- Publication Date
- 2026-06-09
AI Technical Summary
In existing underground utility tunnel construction, the embedded structures are easily blocked by concrete grout, resulting in complex and inefficient construction. In particular, cleaning is difficult during the installation of cable supports, which requires a lot of manpower.
The system employs a non-removable formwork and an inner formwork trolley. The inner formwork support of the inner formwork trolley is connected to the non-removable formwork via an adjustable connecting rod. Pre-embedded steel plates are fixed with nuts, which are used to connect cable supports and truss reinforcement at different stages. Combined with the outer formwork sliding formwork trolley, it enables rapid formwork erection and dismantling.
It improved construction efficiency, reduced the time for erecting and dismantling formwork, simplified the installation process of cable supports, saved labor, and improved overall construction efficiency.
Smart Images

Figure CN122169526A_ABST