A seamless construction method of super-long structure combined with sequence, skip, interval and reinforcement
By dividing the ultra-long structure into construction zones and using the intervals between concrete pouring and the haunch structure to replace the post-pouring strip, the problem of no operating space at the prestressing tensioning end was solved, achieving seamless construction and improving the crack resistance and construction efficiency of the structure.
Patent Information
- Application Number
- CN202610593436.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-04-30
- Publication Date
- 2026-06-16
AI Technical Summary
In the construction of ultra-long, large-span prestressed concrete structures, the elimination of post-pouring strips results in no operating space at the prestressing tensioning end, causing interference between the tensioning equipment and the longitudinal main reinforcement bars inside the main beam. Furthermore, sealing off the area makes it difficult to ensure the density of the concrete, creating weak areas and potential leakage hazards in the structure.
The construction method adopts a combination of sequential, skip-construction, intermittent, and reinforced construction. The tensile cracking risk threshold is set through equivalent continuous constraint calculation, the construction zone is divided, the intermittent time of concrete pouring is used to replace the post-pouring strip, and haunches and tension grooves are added to achieve spatial offset and high-density sealing of prestressed tendons.
Without cutting the reinforcing steel bars of the main beam, the problem of insufficient prestressing tension space was solved, which improved the crack resistance and construction efficiency of the structure and reduced the cost of turnover materials.