A diaphragm wall trd construction method advances-retreats-wall forming construction process automatic determination method

By calculating the angle between the measured displacement vector and the design direction vector of the TRD equipment and processing the sliding window, the problem of automatically determining the status of TRD construction procedures was solved, achieving precise control of the construction process and reliable data recording.

CN122283180APending Publication Date: 2026-06-26TIANJIN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610511451.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-04-17
Publication Date
2026-06-26

AI Technical Summary

Technical Problem

In existing technologies, the determination of the status of construction procedures in TRD relies on manual recording, which is highly subjective and easily influenced by experience, leading to misjudgments and incomplete data, thus affecting construction quality and automation level.

Method used

By calculating the characteristic angle between the measured displacement vector of the TRD equipment and the design direction vector in real time, and combining the continuous change law of the construction direction state, the sliding statistical window is used to perform data cleaning and extreme value extraction, so as to realize the automatic determination of the forward, retreat and wall construction processes.

Benefits of technology

It improved the accuracy and efficiency of the construction process, realized automated monitoring and digital management of the construction status, and improved the accuracy of determining the switching points of the work process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122283180A_ABST
    Figure CN122283180A_ABST
Patent Text Reader

Abstract

This invention relates to an automatic determination method for the forward-retreat-wall-completion construction sequence of the TRD (Transverse Damping) method for cut-off walls. By calculating the characteristic angle between the measured displacement vector of the TRD equipment and the design direction vector in real time, and combining this with the continuous change pattern of the construction direction, the method makes a preliminary determination of the sequence switching points. Furthermore, a sliding statistical window is introduced to clean the data and extract extreme values ​​from the preliminary determination results, eliminating systematic lag in the continuous determination process and achieving automatic determination of the three key sequences: forward movement, retreat, and wall completion. This invention enables intelligent determination and automatic recording of the three construction stages, improving the accuracy and efficiency of construction process control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of building construction technology, and relates to the construction of anti-seepage walls, and in particular to an automatic determination method for the construction process of the TRD method for anti-seepage walls, specifically the process of moving forward, retreating, and forming the wall. Background Technology

[0002] The TRD (Trench-Cutting Re-mixing Deep Wall) method is a construction method for underground continuous walls based on a combination of chainsaw cutting and deep mixing technology. It produces walls with uniform quality and excellent seepage prevention performance, and is therefore widely used in deep foundation pit cutoff walls, complex strata retaining structures, and groundwater seepage prevention projects. According to the construction process, the TRD method typically consists of three core procedures: advancing, retreating, and wall completion. Each construction section is generally controlled to a length of 10–20 m, and adjacent sections must maintain sufficient overlap to ensure the overall continuity of the wall and its effectiveness in preventing seepage. During construction, real-time and accurate judgment of the transition points between procedures is crucial to ensuring the orderly connection of each stage of work and that the wall quality meets design requirements.

[0003] Currently, the determination of process status in existing TRD equipment mainly relies on on-site records and visual judgment by operators. This is highly subjective and easily influenced by differences in operating experience, leading to misjudgments. This results in problems such as missing construction records, incorrect process determination, or discontinuous connections, further affecting the integrity of construction process data and the reliability of subsequent quality analysis. Especially under complex working conditions such as long-term continuous operation, frequent equipment start-ups and shutdowns, and alternating operations of multiple construction sections, the difficulty of manually determining process switching points increases significantly, which has become a major bottleneck restricting the improvement of TRD construction automation level and the implementation of refined quality management.

[0004] To address the aforementioned issues, there is an urgent need to propose a method that can automatically determine and accurately perceive the status of TRD construction procedures, so as to achieve automated monitoring and digital management of the construction process. Summary of the Invention

[0005] The purpose of this invention is to address the shortcomings and deficiencies of existing technologies by providing an automatic determination method for the construction process of the TRD method for impermeable walls, which enables intelligent determination and automatic recording of the three construction stages of advancing, retreating, and forming the wall, thereby improving the accuracy and efficiency of construction process control.

[0006] The technical problem solved by this invention is achieved through the following technical solution: An automatic determination method for the forward-retreat-wall-construction construction sequence of the TRD (Transverse Damping) method for cut-off walls is disclosed. This method calculates the characteristic angle between the measured displacement vector of the TRD equipment and the design direction vector in real time, and combines this with the continuous change pattern of the construction direction state to initially determine the sequence switching points. Furthermore, a sliding statistical window is introduced to clean the preliminary judgment results and extract extreme values, eliminating systematic lag in the continuous judgment process and achieving automatic determination of the three key sequences: forward, retreat, and wall-construction. The steps of the method are as follows: S1. Construction of measured displacement vector and design direction vector of the cutting box: A GNSS dual-antenna positioning module is deployed on the top of the cutting box of the TRD equipment to obtain the spatial coordinates of the cutting box in real time, and the measured displacement vector is calculated accordingly; at the same time, the design direction vector is constructed based on the heading angle information of the dual antennas. S2. Travel direction status identification based on angle threshold: By calculating the characteristic angle between the measured displacement vector in S1 and the design direction vector, and combining it with the preset angle threshold, the current construction direction status of the TRD equipment is identified to determine whether the TRD equipment is in a forward moving state or a reverse retreating state. S3. Preliminary identification of construction procedure switching points based on changes in direction status: Based on the continuous change characteristics of the construction direction status in S2, the forward endpoint (i.e., the retreat starting point) and the retreat endpoint (i.e., the wall formation starting point) are preliminarily identified, and the corresponding station number and time information are recorded. S4. Accuracy correction of process switching station number and corresponding time: The process switching points obtained by the preliminary judgment in S3 are cleaned and extreme values ​​are extracted using a sliding statistical window to eliminate the systematic lag caused by continuous judgment and improve the accuracy of the determination of process switching station number and corresponding time.

[0007] Moreover, S1 specifically refers to: 1) The GNSS dual-antenna positioning module deployed on the top of the TRD equipment cutting box outputs the latitude and longitude observation values ​​of the cutting box in the WGS-84 coordinate system in real time. The latitude and longitude observations are converted using a projection and reference transformation function. Mapping to the engineering plane coordinate system : ; in: It is achieved through a combination of ellipsoidal projection, seven-parameter / four-parameter transformation, and necessary elevation fitting steps; Considering the relatively low construction speed of TRD and the sensitivity of positioning noise to short-term displacement directional disturbances, in order to suppress random errors, a fixed time window is used. The time is obtained by averaging the coordinates of the multi-epoch engineering project. Smoothed coordinates: ; in: , This represents the number of sampling points within the window. 2) During the displacement calculation interval Construct the measured displacement vector of the cut box body : ; 3) The design direction vector is constructed based on the real-time heading angle information of the GNSS dual antennas. Considering that the GNSS dual antennas and the TRD cutting box maintain a fixed connection during construction, and that the cutting box maintains a fixed parallel relationship with the design and construction axis, the design direction vector is constructed based on the real-time heading angle information of the dual antennas. Constructing design direction vectors : .

[0008] Moreover, S2 specifically refers to: To determine the real-time construction direction status, the measured displacement vector is calculated. With design direction vector Spatial geometric relationships, analyze and calculate the characteristic angle between vectors, and define the characteristic angle between them. for: ; in: To be a sufficiently small number to prevent the denominator from being zero; Set characteristic angle threshold Then the construction direction status The discrimination rule is: ; when The interval can be considered as an uncertain interval and will not be included in further calculations.

[0009] Furthermore, S3 specifically involves obtaining a construction direction state sequence over a continuous time series. Subsequently, the determination of the forward cutting, retraction cutting and wall mixing processes is transformed into the identification of stable reversal of directional state; To suppress misjudgments caused by single-point fluctuations, a time-series consistency constraint is introduced. When the equipment is in the forward cutting state, if continuous Within each calculation interval If all conditions for retraction are met, the process status is considered to have switched from forward cutting to retraction cutting, and the corresponding station number and time are recorded. ; when continuous If the forward discrimination condition is met again, then the critical moment is determined as the end point of the current segment's pullback cutting, which is also the starting point of the wall-forming mixing, and is denoted as . ; In addition, considering that in actual construction, apart from the first section, a certain length of safety zone usually needs to be reserved before the next section is cut after the mixing of each section of the wall is completed and the next section is moved forward, in addition to the first section of the operation. To reduce the risk of consolidation or jamming caused by equipment failure during grouting, the end pile number of the wall mixing process is represented as the difference between the end pile number of the preceding cutting process and the reserved safety length. ; in: This is the station number where the wall mixing process for this section ends. To allow for a safe length; Corresponding time Based on the correspondence between the station number and time during the wall construction stage, the completion point of the previous section of wall construction is determined synchronously. As the starting point for the next stage of work, cutting is carried out. This enables closed-loop calibration of the start and end times of continuous construction.

[0010] Moreover, S4 specifically refers to: In actual calculations, the determination of the switching points between the two processes of forward cutting-retreat cutting and retreat cutting-wall mixing, namely the station number and time point, is crucial. and All of these rely on continuous-time state discrimination conditions, that is, they need to be continuous. Secondary satisfaction or The system only allows for the determination of whether to proceed to the next process step, resulting in a systematic lag in the determination results, which requires delay correction. 1) Extract the station number sequence within the initial judgment interval The endpoint of the forward cutting in this segment is the starting point of the reverse cutting. and Extract the preliminary determined time interval for the preceding operations. All chainage records are first standardized and converted into a continuous numerical format, converting the segmented representation commonly used in engineering into a continuous numerical format. 2) Construct a sliding window and count the values ​​represented by the window. Set a sliding time window and define a time window of fixed duration. W The window length is set by comprehensively considering the typical travel speed of the TRD device and the data sampling frequency. Subsequently, within the initially determined forward operation time interval [ T a , T b Within the [section], the station number data sequence is processed window by window; For any given time window, it contains Q The original observations are denoted as . The average of these values ​​is calculated and denoted as . U This is used as the representative station number value for that time window; 3) Adjust the station number based on the direction parameters. right All continuous intervals W Repeat the above process within a minute time window to obtain a total of F Each window represents the station number value. , m =1,2,…, F ; Considering that the working direction may change during the construction of TRD equipment, a working direction attribute has been added during the modification process. D ,set up D =0 indicates that the forward cutting construction is in the direction of increasing station number. D =1 indicates that the forward cutting construction is in the direction of decreasing station number; In ideal forward motion, the station number monotonically increases / decreases, and its maximum / minimum value is most likely to be infinitely close to the actual direction-switching critical point. Therefore, from this representative value sequence... Find the extreme value max( ) or min( The corresponding station number is the corrected end point of the forward phase, which is also the starting point of the retreat. ; ; 4) Time correction based on the midpoint of the window. Let the window that yields this extreme value be the first... k Each window has a time range of [number]. Then the corrected time The median time of this window: ; Similarly, for the time interval of the pullback operation [ T b , T c The station number data within ] is processed in the same way to obtain G Each window represents the station number value. , n =1,2,…, G Take the minimum value min( ) or maximum value max( (This is) the corrected terminal station of the retreat. The median time of the corresponding time window is the corrected time. ; Therefore, the starting station number for the forward cutting was determined to be... The start time is The termination station number is The end time is The starting chainage for the pullback and cutting is... The start time is The termination station number is The end time is The starting pile number for wall mixing is... The start time is The termination station number is The end time is .

[0011] The advantages and beneficial effects of this invention are as follows: 1. Based on the characteristic constraint of the continuous travel direction of the equipment, this invention calculates the characteristic angle between the measured displacement vector of the TRD equipment and the design direction vector in real time, and combines the continuous change law of the construction direction state to realize the preliminary determination of the switching point of the forward-retreat-wall formation process.

[0012] 2. This invention introduces a delay correction mechanism based on statistical laws to correct the accuracy of the station number and time corresponding to the initial judgment process switching point, effectively suppressing the systematic lag caused by continuous state discrimination and improving the spatiotemporal accuracy of process judgment results.

[0013] 3. This invention can automatically identify and digitally record the status and key node information of the entire TRD construction process, providing a reliable data foundation for project quality control, accountability, and further analysis and evaluation. Attached Figure Description

[0014] Figure 1 This is a flowchart of the present invention; Figure 2 This is a schematic diagram of the measured displacement vector and the design direction vector of the present invention; Figure 3 This is a schematic diagram of the construction of a continuous section of the anti-seepage wall according to the present invention; Figure 4 The initial judgment point K for process switching and the actual process switching point of this invention. Schematic diagram. Detailed Implementation

[0015] The present invention will be further described in detail below through specific embodiments. The following embodiments are merely descriptive and not limiting, and should not be used to limit the scope of protection of the present invention.

[0016] like Figure 1As shown, an automatic determination method for the forward-retreat-wall formation construction process of the TRD method for seepage prevention walls is innovative in that: the method is used to automatically determine the three key processes of forward cutting, retreat cutting and wall mixing during the construction of TRD equipment, and to make accurate corrections to the station number and time corresponding to the process switching points.

[0017] The steps of the method are as follows: S1. Construction of measured displacement vector and design direction vector of the cutting box: A GNSS dual-antenna positioning module is deployed on the top of the cutting box of the TRD equipment to obtain the spatial coordinates of the cutting box in real time and calculate the measured displacement vector accordingly; at the same time, the design direction vector is constructed based on the heading angle information of the dual antennas.

[0018] Before construction begins, a GNSS dual-antenna positioning module is installed on the top of the TRD equipment cutting box. The dual antennas include a main antenna and a secondary antenna, both rigidly connected to the cutting box and moving synchronously with it. The GNSS dual-antenna positioning module outputs real-time position coordinates, timestamps, and heading angles of the main and secondary antennas. Assume the latitude and longitude observations of the GNSS dual-antenna positioning module in the WGS-84 coordinate system. To meet the requirements of engineering measurement and vector calculation, latitude and longitude coordinates are transformed using projection and benchmark transformation functions. Mapping to the engineering plane coordinate system : ; In the formula, This can be achieved through a combination of ellipsoidal projection, seven-parameter / four-parameter transformation, and necessary elevation fitting. Considering the relatively slow construction speed of TRD and the sensitivity of positioning noise to short-term displacement directional disturbances, a fixed time window is used to suppress random errors. The time is obtained by averaging the coordinates of the multi-epoch engineering project. Smoothed coordinates: ; In the formula, , The number of sampling points within the window is further calculated at the displacement calculation interval. Construct the measured displacement vector of the cut box body : ; The design direction vector is constructed based on the real-time heading angle information of the GNSS dual antennas. Considering that the GNSS dual antennas and the TRD cutting box maintain a fixed connection during construction, and that the cutting box maintains a fixed parallel relationship with the design and construction axis, the design direction vector is constructed based on the real-time heading angle information of the dual antennas. Constructing design direction vectors ,like Figure 2 As shown: .

[0019] S2. Travel direction status recognition based on included angle threshold: By calculating the characteristic included angle between the measured displacement vector and the design direction vector, and combining it with the preset included angle threshold, the current construction direction status of the equipment is identified to determine whether it is in a forward moving state or a reverse retreating state.

[0020] To determine the real-time construction direction status, the measured displacement vector is solved. With design direction vector Spatial geometric relationships, analyze and calculate the characteristic angle between vectors, and define the characteristic angle between them. for: ; In the formula, To be a sufficiently small number to prevent the denominator from being zero; From the angle relationship, we can know that when When the value is small, it indicates that the actual direction of the equipment's movement is basically consistent with the designed direction, and it can be determined that the equipment is in a positive forward movement state; when When the value approaches π, it indicates that the actual direction of the equipment's movement is approximately opposite to the designed direction, and it can be determined that the equipment is in a reverse retreat state. Set characteristic angle threshold Then the construction direction status The discrimination rule is: when The interval can be considered as an uncertain interval and will not be included in further calculations.

[0021] S3. Preliminary identification of construction procedure switching points based on changes in direction: Based on the continuous change characteristics of the construction direction, the forward endpoint (retreat starting point) and the retreat endpoint (wall completion starting point) are preliminarily identified, and the corresponding station number and time information are recorded.

[0022] Obtaining the construction direction state sequence in continuous time. Subsequently, the problem of determining the forward cutting, retraction cutting, and wall mixing processes was unified into the problem of identifying the stable reversal of the directional state.

[0023] To suppress misjudgments caused by single-point fluctuations, a time-series consistency constraint is introduced. (Commonly used in engineering) When the system is already in the forward cutting state, if continuous Within each calculation interval If all conditions for retraction are met, the process status is considered to have switched from forward cutting to retraction cutting, and the corresponding station number and time are recorded. ; Furthermore, when continuous If the forward discrimination condition is met again, then the critical moment is determined as the end point of the current segment's retraction and cutting (i.e., the starting point of the wall-forming mixing), and is denoted as... .

[0024] In addition, considering the actual construction process (except for the first section), a certain length of safety zone usually needs to be reserved before each section of the wall is mixed and before moving on to the next section for cutting. To reduce the risk of consolidation or jamming caused by equipment failure during grouting, such as Figure 3 As shown. Based on this, the end station of the wall mixing can be expressed as the difference between the end station of the preceding cutting and the reserved safety length: ; In the formula, This is the station number where the wall mixing process for this section ends. To allow for a safety margin. Corresponding time. This can be determined synchronously based on the correspondence between station numbers and time during the wall-forming stage. Furthermore, the end point of the previous section's wall-forming work... It can serve as the starting point for the next stage of the cutting process. This enables closed-loop calibration of the start and end times of continuous construction.

[0025] S4. Accuracy correction of process switching station number and corresponding time: The sliding statistical window is used to clean the data and extract extreme values ​​of the process switching points obtained in the initial judgment, so as to eliminate the systematic lag caused by continuous judgment and improve the accuracy of the judgment of process switching station number and corresponding time.

[0026] In actual calculations, the determination of the switching points between the two processes of forward cutting-retreat cutting and retreat cutting-wall mixing (corresponding to the station number and time point respectively) is crucial. and All of these depend on the continuous-time state discrimination condition (i.e., continuous time is required). Secondary satisfaction or Only then can the status of proceeding to the next process be determined, resulting in a systematic lag in its identification results, such as... Figure 4 As shown. To eliminate the impact of the lag in recognition results on the spatiotemporal accuracy of process switching decisions, delay correction is required. The specific method is as follows: 1) Extract the station number sequence within the initial judgment interval For the endpoint of this forward cutting (i.e., the starting point of the retraction cutting), and Extract the preliminary determined time interval for the preceding operations. All station numbers are recorded. To facilitate numerical calculations, the station number data is first standardized and converted into a continuous numerical format, converting the segmented representation commonly used in engineering into a continuous numerical format. 2) Construct a sliding window and count the values ​​represented by the window. Set a sliding time window and define a time window of fixed duration. W The setting of this window length needs to take into account the typical travel speed and data sampling frequency of the TRD device. Then, within the initially determined forward operation time interval... T a , T b Within this scope, the station number data sequence is processed window by window; For any given time window, it contains Q The original observations (denoted as ) ), and calculate their average, denoted as U This is used as the representative station number value for that time window; 3) Adjust the station number based on the direction parameters. right All continuous intervals W Repeat the above process within a minute time window to obtain a total of F Each window represents the station number value. ( m =1,2,…, F ); Considering that the working direction may change during the construction of TRD equipment, a working direction attribute has been added during the modification process. D ,set up D =0 indicates that the forward cutting construction is in the direction of increasing station number. D =1 indicates that the forward cutting construction is in the direction of decreasing station number; In ideal forward motion, the station number monotonically increases / decreases, and its maximum / minimum value is most likely to be infinitely close to the actual direction-switching critical point. Therefore, from this representative value sequence... Find the extreme value max( ) or min( The corresponding station number is the corrected station number of the end point (starting point) of the forward phase. ; ; 4) Time correction based on the midpoint of the window. Let the window that yields this extreme value be the first... k Each window has a time range of [number]. Then the corrected time The median time of this window: ; Similarly, for the time interval of the pullback operation [ T b , T c The station number data within ] is processed in the same way to obtain G Each window represents the station number value. ( n =1,2,…, G Take the minimum value min( ) or maximum value max( (This is) the corrected terminal station of the retreat. The median time of the corresponding time window is the corrected time. .

[0027] Therefore, the starting station number for the forward cutting can be determined as follows: The start time is The termination station number is The end time is The starting chainage for the pullback and cutting is... The start time is The termination station number is The end time is The starting pile number for wall mixing is... The start time is The termination station number is The end time is .

[0028] This invention has been applied in a TRD construction project of a dam seepage prevention wall. Table 1 shows the verification results of the calculation results and the actual on-site inspection of the process switching time and station number.

[0029] Table 1 Comparison of Calculated Output and On-site Records

[0030] As shown in Table 1, the calculation results of the four key control points by the method of the present invention are generally consistent with the actual situation on site. The absolute errors of the starting and ending station numbers of each process are -0.07m, -0.05m, +0.03m, and -0.06m, respectively, and the time errors are distributed between -6 and +4 s. The accuracy meets the engineering requirements, verifying the accuracy and reliability of the method of the present invention in the TRD project of the anti-seepage wall.

[0031] Although embodiments and drawings of the present invention have been disclosed for illustrative purposes, those skilled in the art will understand that various substitutions, variations and modifications are possible without departing from the spirit and scope of the present invention and the appended claims. Therefore, the scope of the present invention is not limited to the contents disclosed in the embodiments and drawings.

Claims

1. An automatic determination method for the construction sequence of the TRD (Transverse Damping) method for cut-off wall construction—advance-retreat-wall completion, characterized in that: The method calculates the characteristic angle between the measured displacement vector of the TRD equipment and the design direction vector in real time, and combines the continuous change law of the construction direction state to make a preliminary judgment on the process switching point; further, a sliding statistical window is introduced to clean the data and extract extreme values ​​of the preliminary judgment results, eliminate the systematic lag in the continuous judgment process, and realize the automatic judgment of the three key processes of forward movement, retreat and wall formation. The steps of the method are as follows: S1. Construction of measured displacement vector and design direction vector of the cutting box: A GNSS dual-antenna positioning module is deployed on the top of the cutting box of the TRD equipment to obtain the spatial coordinates of the cutting box in real time, and the measured displacement vector is calculated accordingly; at the same time, the design direction vector is constructed based on the heading angle information of the dual antennas. S2. Travel direction status identification based on angle threshold: By calculating the characteristic angle between the measured displacement vector in S1 and the design direction vector, and combining it with the preset angle threshold, the current construction direction status of the TRD equipment is identified to determine whether the TRD equipment is in a forward moving state or a reverse retreating state. S3. Preliminary identification of construction procedure switching points based on changes in direction status: Based on the continuous change characteristics of the construction direction status in S2, the forward endpoint (i.e., the retreat starting point) and the retreat endpoint (i.e., the wall formation starting point) are preliminarily identified, and the corresponding station number and time information are recorded. S4. Accuracy correction of process switching station number and corresponding time: The process switching points obtained by the preliminary judgment in S3 are cleaned and extreme values ​​are extracted using a sliding statistical window to eliminate the systematic lag caused by continuous judgment and improve the accuracy of the determination of process switching station number and corresponding time.

2. The automatic determination method for the forward-retreat-wall formation construction sequence of the TRD method for seepage prevention wall as described in claim 1, characterized in that: Specifically, S1 is: 1) The GNSS dual-antenna positioning module deployed on the top of the TRD equipment cutting box outputs the latitude and longitude observation values ​​of the cutting box in the WGS-84 coordinate system in real time. The latitude and longitude observations are converted using a projection and reference transformation function. Mapping to the engineering plane coordinate system : ; in: It is achieved through a combination of ellipsoidal projection, seven-parameter / four-parameter transformation, and necessary elevation fitting steps; Considering the relatively low construction speed of TRD and the sensitivity of positioning noise to short-term displacement directional disturbances, in order to suppress random errors, a fixed time window is used. The time is obtained by averaging the coordinates of the multi-epoch engineering project. Smoothed coordinates: ; in: , This represents the number of sampling points within the window. 2) During the displacement calculation interval Construct the measured displacement vector of the cut box body : ; 3) The design direction vector is constructed based on the real-time heading angle information of the GNSS dual antennas. Considering that the GNSS dual antennas and the TRD cutting box maintain a fixed connection during construction, and that the cutting box maintains a fixed parallel relationship with the design and construction axis, the design direction vector is constructed based on the real-time heading angle information of the dual antennas. Constructing design direction vectors : 。 3. The automatic determination method for the forward-retreat-wall formation construction sequence of the TRD method for seepage prevention wall as described in claim 2, characterized in that: Specifically, S2 is: To determine the real-time construction direction status, the measured displacement vector is calculated. With design direction vector Spatial geometric relationships, analyze and calculate the characteristic angle between vectors, and define the characteristic angle between them. for: ; in: To be a sufficiently small number to prevent the denominator from being zero; Set feature angle threshold Then the construction direction status The discrimination rule is: ; when The interval can be considered as an uncertain interval and will not be included in further calculations.

4. The automatic determination method for the forward-retreat-wall formation construction sequence of the TRD method for seepage prevention wall as described in claim 3, characterized in that: Specifically, S3 involves obtaining a construction direction state sequence over a continuous time frame. Subsequently, the determination of the forward cutting, retraction cutting and wall mixing processes is transformed into the identification of stable reversal of directional state; To suppress misjudgments caused by single-point fluctuations, a time-series consistency constraint is introduced. When the equipment is in the forward cutting state, if continuous Within each calculation interval If all conditions for retraction are met, the process status is considered to have switched from forward cutting to retraction cutting, and the corresponding station number and time are recorded. ; when continuous If the forward discrimination condition is met again, then the critical moment is determined as the end point of the current segment's pullback cutting, which is also the starting point of the wall-forming mixing, and is denoted as . ; In addition, considering that in actual construction, apart from the first section, a certain length of safety zone usually needs to be reserved before the next section is cut after the mixing of each section of the wall is completed and the next section is moved forward, in addition to the first section of the operation. To reduce the risk of consolidation or jamming caused by equipment failure during grouting, the end pile number of the wall mixing process is represented as the difference between the end pile number of the preceding cutting process and the reserved safety length. ; in: This is the station number where the wall mixing process for this section ends. To allow for a safe length; Corresponding time Based on the correspondence between the station number and time during the wall construction stage, the completion point of the previous section of wall construction is determined synchronously. As the starting point for the next stage of work, cutting is carried out. This enables closed-loop calibration of the start and end times of continuous construction.

5. The automatic determination method for the forward-retreat-wall formation construction sequence of the TRD method for seepage prevention wall as described in claim 4, characterized in that: Specifically, S4 is: In actual calculations, the determination of the switching points between the two processes of forward cutting-retreat cutting and retreat cutting-wall mixing, namely the station number and time point, is crucial. and All of these rely on continuous-time state discrimination conditions, that is, they need to be continuous. Secondary satisfaction or The system only allows for the determination of whether to proceed to the next process step, resulting in a systematic lag in the determination results, which requires delay correction. 1) Extract the station number sequence within the initial judgment interval The endpoint of the forward cutting in this segment is the starting point of the reverse cutting. and Extract the preliminary determined time interval for the preceding operations. All chainage records are first standardized and converted into a continuous numerical format, converting the segmented representation commonly used in engineering into a continuous numerical format. 2) Construct a sliding window and count the values ​​represented by the window. Set a sliding time window and define a time window of fixed duration. W The window length is set by comprehensively considering the typical travel speed of the TRD device and the data sampling frequency. Subsequently, within the initially determined forward operation time interval [ T a , T b Within the [section], the station number data sequence is processed window by window; For any given time window, it contains Q The original observations are denoted as . The average of these values ​​is calculated and denoted as . U This is used as the representative station number value for that time window; 3) Adjust the station number based on the direction parameters. right All continuous intervals W Repeat the above process within a minute time window to obtain a total of F Each window represents the station number value. , m =1,2,…, F ; Considering that the working direction may change during the construction of TRD equipment, a working direction attribute has been added during the modification process. D ,set up D =0 indicates that the forward cutting construction is in the direction of increasing station number. D =1 indicates that the forward cutting construction is in the direction of decreasing station number; In ideal forward motion, the station number monotonically increases / decreases, and its maximum / minimum value is most likely to be infinitely close to the actual direction-switching critical point. Therefore, from this representative value sequence... Find the extreme value max( ) or min( The corresponding station number is the corrected end point of the forward phase, which is also the starting point of the retreat. ; ; 4) Time correction based on the midpoint of the window. Let the window that yields this extreme value be the first... k Each window has a time range of [number]. Then the corrected time The median time of this window: ; Similarly, for the time interval of the pullback operation [ T b , T c The station number data within ] is processed in the same way to obtain G Each window represents the station number value. , n =1,2,…, G Take the minimum value min( ) or maximum value max( (This is) the corrected terminal station of the retreat. The median time of the corresponding time window is the corrected time. ; Therefore, the starting station number for the forward cutting was determined to be... The start time is The termination station number is The end time is The starting chainage for the pullback and cutting is... The start time is The termination station number is The end time is The starting pile number for wall mixing is... The start time is The termination station number is The end time is .