A power high-low voltage cabinet production and manufacturing process monitoring management system

By analyzing real-time manufacturing data of high and low voltage switchgear production lines using an improved process correlation algorithm, the system identifies quality correlations and efficiency constraints, generates dynamic monitoring strategies, and solves the problem of insufficient targeting of monitoring strategies in existing technologies, thereby achieving dynamic adaptation and optimization of the production process.

CN122334898APending Publication Date: 2026-07-03SHANGHAI TIANZHOU ELECTRIC GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN Β· China
Patent Type
Applications(China)
Current Assignee / Owner
SHANGHAI TIANZHOU ELECTRIC GRP CO LTD
Filing Date
2026-06-04
Publication Date
2026-07-03

Smart Images

  • Figure CN122334898A_ABST
    Figure CN122334898A_ABST
Patent Text Reader

Abstract

This invention discloses a monitoring and management system for the manufacturing process of high and low voltage switchgear, relating to the field of power equipment manufacturing monitoring technology. It includes modules for data acquisition, correlation analysis, strategy generation, real-time control, and optimization reporting. The data acquisition module collects real-time manufacturing data from multiple process stations; the correlation analysis module uses an improved process correlation algorithm to uncover inherent connections in the data and identify quality correlations and efficiency constraints between processes; the strategy generation module generates a dynamic monitoring strategy based on this, including instructions for adjusting the quality monitoring frequency of key processes and the priority of material supply; the real-time control module uses this strategy to regulate production and collect response data; and the optimization reporting module iteratively optimizes the strategy and generates reports. This system can clearly identify inter-process correlations and constraints, achieving dynamic adaptation between monitoring and control, forming a closed-loop management system, making production connections smoother, and ensuring the stability and continuity of the production process.
Need to check novelty before this filing date? Find Prior Art