A district and county-oriented distributed power supply carrying capacity rapid evaluation model construction method and device

By constructing an initial model structure based on dual definitions of administrative jurisdiction and electrical affiliation, the main grid and distribution network models are automatically generated, and time-series power flow calculations are performed for verification. This solves the problems of unclear assessment boundaries and inaccurate constraint transmission in the assessment of distributed power carrying capacity at the district and county levels, and achieves rapid and accurate assessment results.

CN122389307APending Publication Date: 2026-07-14ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD
Filing Date
2026-04-13
Publication Date
2026-07-14

Smart Images

  • Figure CN122389307A_ABST
    Figure CN122389307A_ABST
Patent Text Reader

Abstract

The application is suitable for the technical field of distributed power supply, and provides a district and county-oriented distributed power supply carrying capacity rapid evaluation model construction method and device, which comprises the following steps: constructing a model initial structure comprising a target area substructure and an equivalent area substructure, obtaining multi-source data of the target area substructure and the equivalent area substructure according to the definition result of the model initial structure, loading the multi-source data into the model initial structure, and generating a full-voltage level evaluation intermediate model comprising a main network model and a distribution network model; performing time sequence power flow calculation verification on the full-voltage level evaluation intermediate model, judging whether the power flow section of the full-voltage level evaluation intermediate model converges in all time periods, and determining the full-voltage level evaluation intermediate model after correction and full-time period convergence as a full-voltage level evaluation target structure as a district and county-oriented distributed power supply carrying capacity rapid evaluation model. The application effectively improves the modeling efficiency and the model reliability.
Need to check novelty before this filing date? Find Prior Art