A hierarchical multi-agent construction progress simulation method and system
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- 中亿丰数字科技集团股份有限公司
- Filing Date
- 2026-06-24
- Publication Date
- 2026-07-24
AI Technical Summary
In existing construction progress simulation methods, there is insufficient linkage between construction model data and scheduling decision data, unclear division of functions among multiple agents, resulting in low efficiency of collaborative decision-making, difficulty in continuously transmitting construction deviation and conflict states in the task chain, and the progress simulation process focuses on the playback of the initial plan and lacks a closed-loop iteration mechanism.
A hierarchical multi-agent construction progress simulation method is adopted. By importing construction project data into the construction information model, the construction process tasks are analyzed based on the hierarchical multi-agent structure, standardized construction task units and constraint feature information are generated, collaborative decision-making is carried out, construction status features are output, and the construction progress plan is iteratively adjusted.
It enables the invocation and write-back of construction objects, task sequences, resource constraints, and site constraints in the same data link, unifies the task running status, resource allocation status, and environment executable status, reduces scheduling conflicts caused by the homogenization of multi-agent functions and the disconnection of local decisions, and improves the consistency between the progress simulation model and the scheduling data and the accuracy of dynamic iteration.