A method and system for controlling the feeder power transfer of an outdoor high-voltage vacuum circuit breaker.

By generating load status tables and power transfer margin tables, and combining historical action ratings of protection devices with cross-positioning of switch action sequences, the selection of power transfer paths is optimized, solving the path evaluation bias and reliability problems in existing technologies, and achieving highly reliable and accurate power transfer control.

CN122512396BActive Publication Date: 2026-11-17上海联众电力科技有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202610731708.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-05-26
Publication Date
2026-11-17
Estimated Expiration
2046-05-26

AI Technical Summary

Technical Problem

Existing power transfer control schemes fail to effectively combine the peak load characteristics and peak shifting margin of feeders, resulting in biases in path assessment. Furthermore, they lack systematic quantification of the historical operating status of protection devices and cross-verification of multiple paths, affecting the reliability of power transfer control in large-scale power grids.

Method used

By collecting load data and topology data, a load status table is generated. Combined with power supply type grouping and peak-shifting light load labeling, a power transfer margin table is generated. Path selection is performed using the deterioration rating of protection action history and capacity over-limit, and switch action timing cross-location and conflict correction are implemented to optimize power transfer operation decisions.

Benefits of technology

It improves the reliability and accuracy of the transfer path, solves the problem of inaccurate path capacity assessment in traditional solutions, and achieves accurate collaborative assessment of path health status and capacity safety, as well as fault location.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122512396B_ABST
    Figure CN122512396B_ABST
Patent Text Reader

Abstract

This invention discloses a method and system for controlling feeder power transfer in outdoor high-voltage vacuum circuit breakers. The method involves collecting load and topology data from each feeder, generating a power transfer margin table by prioritizing lightly loaded feeders during peak shifts, and generating a capacity margin benchmark by analyzing critical current-carrying feeder parameters and calibrating the upper capacity boundary. It then statistically analyzes the cross-feeder power transfer frequency across candidate fault sections, and uses the capacity margin benchmark to perform protection frequency path elimination verification to generate a set of available power transfer paths. The method further determines the primary power transfer path through priority screening of verified paths. It collects fault location characteristics of the primary power transfer path, and generates power transfer operation decisions through fault location based on switch action sequence and centralized verification of conflict periods. Finally, it generates an operation priority sequence by weighting and sorting the cross-feeder power transfer frequency, and outputs circuit breaker control commands through pre-arrangement of margin fast-loss paths, thus improving the overall reliability of power transfer path selection and command execution after a feeder fault.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power distribution network automation technology, and in particular to a control method and system for feeder transfer of power supply for outdoor high-voltage vacuum circuit breakers. Background Technology

[0002] The safe and stable operation of large-scale power grids depends on rapid isolation and power transfer restoration after feeder faults. The quality of the selected power transfer path directly determines the duration of power outages and the reliability of power restoration in non-faulty areas. Existing power transfer control schemes typically use static capacity parameters as criteria during the path evaluation phase, failing to incorporate the peak load characteristics of feeders with different power consumption types and the peak-shaving margin of adjacent feeders into the evaluation. This results in a discrepancy between the estimated capacity margin of the selected path during the actual power transfer period and the actual operating condition, leading to a higher risk of overload during peak-hour power transfer operations in large-scale power grids.

[0003] The historical operating status and path degradation trends of protection devices lack systematic quantification in existing schemes. Degradation signals indicating shrinking operating intervals over time are not extracted. Furthermore, the problem of misjudging fault direction due to near-simultaneous switching operations in multi-path scenarios lacks a cross-verification mechanism. In large-scale power grids, the number of feeders is large and the paths are complex. A collaborative prioritization mechanism for path health status and remaining capacity safety margin has not yet been established. The execution priority of power transfer commands lacks a comprehensive basis that considers both path health and capacity status, thus restricting the overall reliability of feeder power transfer control in complex power grid scenarios. Summary of the Invention

[0004] This invention discloses a power transfer control method and system for outdoor high-voltage vacuum circuit breakers. The aim is to incorporate the peak load characteristics and peak shifting margin of each feeder into the pre-screening of power transfer paths, generate a set of available power transfer paths by combining the degradation rating of protection operation history and the joint elimination mechanism of capacity exceeding the limit, determine the fault location section through multi-path cross-location and conflict correction of switch operation timing, and jointly drive the sorting of operation priority sequence and the pre-arrangement of margin fast-out paths by combining the path health status and historical power transfer frequency, and finally output the circuit breaker control command, providing systematic control support for the rapid recovery of feeder faults in large-scale power grids.

[0005] The first aspect of this invention proposes a power transfer control method for an outdoor high-voltage vacuum circuit breaker feeder, comprising the following steps: Collect load data and topology data of each feeder, perform load topology analysis on the load data and topology data to generate a load status table, and generate a transfer margin table by prioritizing the light load feeder according to the feeder power supply type. Based on the supply margin table, a set of candidate fault sections is determined, and a capacity margin benchmark is generated by calibrating the upper limit boundary of the set of candidate fault sections based on the supply margin table. The candidate fault section set is statistically analyzed for the number of cross-feeder similar sections to generate cross-feeder transfer frequency. Based on the capacity margin benchmark and the cross-feeder transfer frequency, the candidate fault section set is verified by protection frequency path elimination to generate a set of available transfer paths. The set of available transfer paths is then subjected to verified transfer path priority screening to determine the primary transfer path. Collect fault location features of the primary transfer path, perform switch action timing fault location based on the fault location features to determine the fault location segment, identify location conflict items in the fault location segment, perform centralized verification of conflict time periods to generate transfer operation decision; Based on the transfer operation decision and the transfer frequency across feeders, a weighted sorting of transfer frequencies is performed to generate an operation priority sequence. The operation priority sequence and the transfer operation decision are then pre-arranged with margin fast consumption paths to output circuit breaker control commands.

[0006] A second aspect of this invention provides an outdoor high-voltage vacuum circuit breaker feeder transfer control system, comprising: The feature extraction module is used to collect load data and topology data of each feeder, perform load topology analysis on the load data and topology data to generate a load status table, and implement peak shifting and light load feeder priority labeling according to feeder power supply type to generate a transfer margin table. The baseline construction module is used to determine the candidate fault segment set based on the transfer margin table, and to perform capacity upper limit boundary calibration on the candidate fault segment set based on the transfer margin table to generate a capacity margin baseline. The path filtering module is used to count the number of times the same section of the cross-feeder is transferred to generate the cross-feeder transfer frequency for the candidate fault section set, and to perform protection frequency path elimination verification on the candidate fault section set based on the capacity margin benchmark and the cross-feeder transfer frequency to generate an available transfer path set, and to perform verified transfer path priority screening on the available transfer path set to determine the primary transfer path. The fault location module is used to collect fault location features of the main transfer path, perform switch action timing fault location based on the fault location features to determine the fault location segment, identify location conflict items in the fault location segment, perform centralized verification of conflict time periods, and generate transfer operation decisions. The instruction output module is used to generate an operation priority sequence by weighting the transfer frequency based on the transfer operation decision and the cross-feeder transfer frequency, and to output circuit breaker control instructions by performing margin fast consumption path pre-arrangement on the operation priority sequence and the transfer operation decision.

[0007] The beneficial effects of this invention are reflected in the following points: First, by linking the peak-period staggering labeling under power supply type grouping with the analysis of the parameter change rate before and after the peak of critical current-carrying feeders into an evaluation chain, the two jointly drive the generation of capacity margin benchmarks. The judgment of path capacity availability changes from static comparison of rated values ​​to dynamic evaluation based on the actual peak operating state. The accurate extraction of staggering margins provides a quantitative basis for the safe selection of transfer paths during high-load periods. The dynamic calibration of capacity exceeding the limit makes the quality of the candidate fault section set better than the result of screening based solely on rated parameters, solving the problem of inaccurate capacity assessment of transfer paths during peak periods in traditional schemes. Second, the degradation rating of protection frequency-operating paths uses the linear regression slope of the action interval shrinkage trend as the core feature, which is different from the traditional action number threshold judgment. The shrinkage trend captures the continuous deterioration signal of the protection device in the time dimension. The degradation rating result and the cross-feeder transfer frequency jointly drive path screening. Then, the over-limit paths are reviewed by the capacity margin benchmark. The superposition of the three-layer screening mechanism effectively improves the reliability of the available transfer path set. The verified path priority screening further incorporates the historical operation reliability into the main path determination logic, realizing the collaborative evaluation of path health status and capacity safety. Finally, the multi-path cross-location of switch action sequences improves the accuracy of fault location in complex action sequence scenarios by correcting the initial action direction of nearly simultaneous actions through protection setting boundary comparison and attribution of conflict period source types. The priority score calculated jointly with the corrected location results and capacity margin incorporates both location accuracy and capacity safety into the transfer operation decision. The pre-arrangement of margin-critical paths prioritizes the circuit breaker operation for the path with the most pressing capacity risk, resolving the lack of coordinated prioritization between path health status and capacity status during the transfer execution phase. Attached Figure Description

[0008] Figure 1 This is a flowchart illustrating a power supply control method for an outdoor high-voltage vacuum circuit breaker feeder.

[0009] Figure 2 This is a schematic diagram of the generation of the peak-shifting and light-load feeder transfer margin table in the feeder transfer control method of the present invention.

[0010] Figure 3 This is a schematic diagram of the switching action timing fault location in the feeder transfer control method of the present invention.

[0011] Figure 4 This is a structural block diagram of an outdoor high-voltage vacuum circuit breaker feeder transfer control system according to the present invention.

[0012] Wherein: 1-Time axis; 2-Load rate axis; 3-Industrial feeder load curve; 4-Residential feeder load curve; 5-Mixed feeder load curve; 6-Group peak load rate average line; 7-Industrial peak period; 8-Residential peak period; 9-Light load feeder marked section; 10-Adjacent heavy load feeder marked section; 11-Effective peak shifting window; 12-Feeder topology line; 13-Section switch; 14-Tie switch; 15-Action sequence axis; 16-First action switch; 17-Nearly simultaneous action group; 18-Silent boundary; 19-Fault location section; 20-Switch action timestamp. Detailed Implementation

[0013] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.

[0014] It should be understood that, when used in this application specification and the appended claims, the term "comprising" indicates the presence of the described features, integrals, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or a collection thereof.

[0015] References to "one embodiment" or "some embodiments" as described in this specification mean that one or more embodiments of this application include a specific feature, structure, or characteristic described in connection with that embodiment. Therefore, the phrases "in one embodiment," "in some embodiments," "in other embodiments," "in still other embodiments," etc., appearing in different parts of this specification do not necessarily refer to the same embodiment, but rather mean "one or more, but not all, embodiments," unless otherwise specifically emphasized. The terms "comprising," "including," "having," and variations thereof mean "including but not limited to," unless otherwise specifically emphasized.

[0016] The technical solutions of the embodiments of this application will be described below.

[0017] like Figure 1 As shown, this embodiment of the invention provides a feeder transfer control method for an outdoor high-voltage vacuum circuit breaker, including the following steps S110-S150: Step S110: Collect load data and topology data of each feeder, perform load topology analysis on the load data and topology data to generate a load status table, and implement peak shifting and light load feeder priority labeling according to feeder power supply type to generate a transfer margin table.

[0018] Specifically, load and topology data for each feeder are collected. Load data is reported by current and voltage transformers deployed on the outgoing side of each feeder at fixed acquisition cycles, covering four types of operating parameters: active power, reactive power, current amplitude, and power factor. Each parameter carries a feeder identifier and timestamp and is uniformly calibrated using the dispatch master station clock. The feeder identifier is taken from the equipment ledger of the distribution automation system and remains unchanged throughout the acquisition link. When the acquisition time deviation between adjacent feeders exceeds half an acquisition cycle, a time sequence offset label is added, recording the deviation magnitude and the reference feeder identifier, serving as the basis for data alignment correction between adjacent feeders. Missing frames in the load data due to communication interruptions are replaced by linear interpolation of adjacent valid frames. Interpolation is only enabled when there are no more than three consecutive missing frames. When this limit is exceeded, the load data for the corresponding time period is marked with a low-confidence flag, which is recorded at the acquisition cycle granularity and triggers time-by-time weight reduction during the mean calculation phase. Topology data is collected in real time from the distribution automation system, including the status of sectionalizing switches and tie switches of each feeder, as well as the topological connection relationship between feeders. The switch status is recorded in two states, open and closed, and accumulated in chronological order to form a historical closed sequence. Sectional switch change events are recorded by change time and change direction. The load data before and after the change time belong to different topological structures before and after the change, and cross-topology data is not mixed and stored under the same topology identifier.

[0019] Load topology analysis is performed on load data and topology data to generate a load status table. The load topology analysis associates the calibrated load data and topology data according to feeder identifiers and timestamps. Based on the switch change times in the topology data, the topology assignment of load data at each time point is determined. Combined with time series offset annotations, the load data of adjacent feeders is aligned. The association results, along with the topology assignments, are written into the load status table. The load status table uses feeder identifiers as indexes. Each entry records the time-by-time sequence of four types of operating parameters for that feeder: active power, reactive power, current amplitude, and power factor. It also includes the corresponding topology identifier, sectionalizing switch and tie switch status, historical closing sequence of tie switches, low-confidence markers, and time-series offset annotations for that time period. The time-by-time active and reactive power sequences participate in load factor statistics as apparent power during peak periods. The current amplitude sequence is directly used in determining critical current carrying times. The topology identifier is used for topology connection determination when generating candidate fault segment sets. The sectionalizing switch and tie switch status, along with the historical closing sequence of tie switches, are used to determine closing relationships in adjacent feeder pair identification. Low-confidence markers and time-series offset annotations are passed along with the data at each time point and trigger weight reduction or time alignment during the mean calculation phase. Load status table entries are organized using key-value pairs. When a feeder is added or removed, corresponding entries are added or deleted using the feeder identifier. When switch status changes or load data is updated, only the corresponding fields are written without rebuilding the entire table.

[0020] In some embodiments, the step of prioritizing the labeling of lightly loaded feeders for peak shifting according to feeder power supply type in the load status table to generate a transfer margin table includes: dividing the load status table into power supply type groups according to feeder power supply type; calculating the peak load rate of the power supply type groups to generate a peak load rate sequence; identifying feeders with values ​​lower than the group average based on the peak load rate sequence to form a lightly loaded feeder set; and prioritizing the labeling of adjacent heavy-load peak shifting times in the lightly loaded feeder set to generate a transfer margin table.

[0021] The load status table is grouped by feeder power supply type. For example... Figure 2As shown, time axis 1 is the horizontal axis and load factor axis 2 is the vertical axis. The three power supply types are grouped according to the load curves of industrial feeders (solid line 3), residential feeders (dashed line 4), and mixed feeders (dotted line 5). The peak values ​​of the three curves are distributed in different positions on time axis 1: industrial feeders are concentrated during the day, residential feeders are concentrated at night, and mixed feeders are in between. The power supply type classification is based on the proportion of user categories connected to the feeder. After reading the feeder identifier from the load status table, it is associated with the user file. The proportion field is represented by the percentage of industrial, commercial, and residential feeders, and the sum of the three percentages is normalized to 1. Feeders with an industrial user share exceeding 60% in the load status table are grouped into the industrial group, those with a residential user share exceeding 60% are grouped into the residential group, and those with both below 60% are grouped into the mixed group. Feeders with a commercial user share exceeding 60% are grouped into the industrial group due to their similar daytime load patterns to the industrial group. Feeders with both commercial and residential user shares exactly 60% are grouped into the mixed group to avoid ambiguity in power supply type grouping. Feeders with low-reliability markers in the load status table are grouped normally and included in the mean calculation with a weighting factor to prevent feeders with poor communication quality from lowering the statistical benchmark for power supply type grouping. For newly commissioned feeders with less than 30 days of historical data collection, the design load type is used instead of the measured proportion for power supply type grouping. Feeders with missing user profile fields are grouped into the mixed group with a temporary group label, and the system automatically triggers regrouping after 30 days. The power supply type grouping results are organized into a mapping table with feeder identifier as the key and group type as the value, and are stored synchronously with the load status table entries for direct retrieval during subsequent peak load rate statistics.

[0022] Peak load rate sequences are generated by statistically analyzing peak load rates for different power supply types. Industrial peak load period 7 is marked with a light gray shaded area on time axis 1, covering the peak load period of the industrial group. Residential peak load period 8 is marked with a dark gray shaded area on time axis 1, covering the peak load period of the residential group. The difference in shade depth distinguishes the two groups. The peak value of the mixed-type feeder load curve 5 spans the interval between the two groups, and is not marked with a separate shaded area on time axis 1; its peak value information is implied in the curve shape. For each power supply type group, the data collected over the first thirty natural days is used. The average load rate of all feeders within the group is averaged over time to form a daily average load rate curve. Continuous periods exceeding 1.2 times the daily average are identified as the peak periods for the corresponding group. The average load rate of each feeder within its peak period is the peak period load rate of that feeder, calculated as L_r = S_act / S_rated, where S_act is the measured apparent power synthesized from active and reactive power, S_rated is the rated capacity from the equipment ledger, and L_r is the dimensionless ratio. Low-confidence marker times are weighted by a factor of 0.7 and include a weighting source label. Planned maintenance periods are excluded from the average calculation after being identified from maintenance plan records. Feeders with time-series offset labels are included in the average calculation after aligning with the times of adjacent feeders. The peak load rate sequence is composed of the peak load rates of all feeders in each power supply type group arranged according to feeder identification. When the variance of the peak load rate sequence distribution is small, the light load judgment threshold is adjusted upward by the product of the average peak load rate of the group and a light load judgment correction coefficient greater than 1. When the variance is normal, the coefficient is 1, so as to identify enough light load feeders from the peak load rate sequence.

[0023] Based on the peak load rate sequence, feeders with values ​​below the group average are identified to form a set of lightly loaded feeders. The average peak load rate line 6 is drawn as a short horizontal line within the time range of the industrial peak period 7. Its position on the load rate axis 2 corresponds to the average value of the industrial group in the peak load rate sequence. This average value is multiplied by the light load judgment correction coefficient and used as the light load judgment threshold. The corresponding line segment of the residential feeder load curve 4 within the industrial peak period 7 is the light load feeder marking segment 9. The position of this segment is consistently lower than the average peak load rate line 6. According to the peak load rate sequence, the corresponding feeder meets the light load judgment condition and is included in the light load feeder set. The corresponding line segment of the industrial feeder load curve 3 within the industrial peak period 7 is the adjacent heavy load feeder marking segment 10. The peak load rate of this segment on the load rate axis 2 is higher than 0.8, and the corresponding feeder is included in the heavy load feeder set. The greater the position difference between the adjacent heavy load feeder marking segment 10 and the light load feeder marking segment 9 on the load rate axis 2, the more significant the difference in their load levels within the industrial peak period 7, and the more abundant the capacity conditions for peak shifting and power transfer. The distance between the peak load rate of the light-load feeder segment 9 and the light-load judgment threshold on the load rate axis 2 quantifies the light-load margin. The light-load margin is a non-negative value, representing the feeder's ability to carry newly transferred loads during the industrial peak period 7. The light-load margin is transferred to the subsequent peak shifting labeling stage along with the light-load feeder set. Light-load feeder segments 9 with sufficient margin are prioritized in the transfer margin table, while light-load feeder segments 9 with insufficient margin are not prioritized to avoid actual overload after the transfer operation. The reliability of the feeder margin estimation with temporary group labels or reduced-weight source labels is lower than that of formal group feeders. The corresponding labels are transferred along with the light-load feeder set and are simultaneously retained in the transfer margin table entries.

[0024] For lightly loaded feeder sets, adjacent heavy-load staggered peak times are prioritized for labeling to generate a transfer margin table. Each lightly loaded feeder in the lightly loaded feeder set is selected as its adjacent heavy-load feeder based on the historical closed-position relationship of the tie switch (adjacent heavy-load feeders are derived from the heavy-load feeder set). The retrospective window is the previous 90 days; historical closed-position records outside the window are not included in the adjacent relationship determination to avoid incorrectly labeling feeder pairs with disconnected ties as adjacent. Feeder pairs with a cumulative closed-position time of the tie switch below a set lower limit within the retrospective window are marked as weakly adjacent. Feeder pairs with weakly adjacent labels are given lower priority than normally adjacent feeder pairs in the transfer margin table. For example... Figure 2As shown, the continuous time period in which the light-load feeder segment 9 and the adjacent heavy-load feeder segment 10 simultaneously meet their respective light-load and heavy-load conditions on time axis 1 is identified as the effective peak-shifting window 11. The effective peak-shifting window 11 is marked below time axis 1 in the form of brackets with double-ended arrows. The vertical lines at both ends of the brackets are aligned with the start and end times of the effective peak-shifting window 11, and the double-ended arrows point to the time period boundary of the window. The length of time covered by the brackets is the effective time window width for this transfer operation. Only peak-shifting time periods with a duration exceeding two acquisition cycles are marked as effective peak-shifting windows 11. Single-point instantaneous fluctuations are not marked. The larger the width of the effective peak-shifting window 11, the more time redundancy is available for this transfer operation. When multiple adjacent heavy-load feeders exist for the same light-load feeder in a light-load feeder set, each combination independently forms a transfer margin table entry. Each entry includes the time range of the effective peak-shifting window 11, the light-load feeder identifier corresponding to the light-load feeder set, its light-load margin, and the identifier of the adjacent heavy-load feeder. These three elements together describe the transfer timing, transfer capacity, and transfer direction of the entry. The adjacent heavy-load feeder corresponds to the potential transfer demand side of the entry, while the light-load feeder corresponds to the transfer capacity receiving side. At the same time, multiple entries are first grouped by adjacency type (normal adjacency first, weak adjacency second). Within the same group, they are arranged from high to low light-load margin. If the light-load margins are the same, they are arranged from large to small width of the effective peak-shifting window 11. The arrangement fields are output along with the entries.

[0025] Step S120: Determine the candidate fault segment set based on the supply margin table, and generate a capacity margin benchmark by calibrating the upper limit boundary of the candidate fault segment set based on the supply margin table.

[0026] Specifically, the candidate fault segment set is determined based on the power transfer margin table. In the power transfer margin table, the adjacent heavy-load feeder identifiers correspond to the side where potential power transfer demand occurs, and the light-load feeder identifiers correspond to the receiving side with power transfer capability. All segments on the path connected by tie switches between the two feeders possess the topological conditions to become fault power transfer paths. The set of these segments constitutes the initial candidate range of the candidate fault segment set. The number of segments is determined by the sectionalizing of the feeders on both sides of the tie switch in the topology data: densely sectionalized feeder segments have a larger number of segments, and the size of the candidate fault segment set is correspondingly larger; sparsely sectionalized feeder segments have a larger span, and the power loss range during a single segment fault is correspondingly wider. The time range covered by the effective peak-shifting window in the power transfer margin table is cross-referenced with historical fault records. Segments that have experienced faults in the historical fault records are marked with historical faults in the candidate fault segment set, and segments with high frequency of historical fault markings are given priority in subsequent capacity boundary calibration. When the transfer margin table entries carry a weighted source label, an additional margin uncertainty label is added to the candidate fault section on the corresponding tie path. This labeled section participates in the calculation with a conservative capacity upper limit during the capacity upper limit boundary calibration stage. The conservative capacity upper limit is taken as 80% of the rated capacity of the corresponding lightly loaded feeder, so that the overestimation of margin caused by the weighted source will not lead to actual overload after transfer. The candidate fault section set consists of all sections that meet the topology connection conditions. Each section carries the feeder identifier, tie path identifier (i.e., tie switch number sequence), and historical fault label. The spatial location is described by the section switch number and the line length between the switches.

[0027] In some embodiments, the step of calibrating the upper limit boundary of the candidate fault section set based on the power transfer margin table to generate a capacity margin benchmark includes: analyzing the operating parameters of each feeder based on the power transfer margin table to construct a critical current-carrying feeder set; analyzing the parameter change rate before and after the peak value of each feeder in the critical current-carrying feeder set to obtain a critical operating parameter set; performing capacity upper limit boundary matching on the candidate fault section set based on the critical operating parameter set to obtain a boundary matching result; and calculating the capacity overrun of each section based on the boundary matching result to generate a capacity margin benchmark.

[0028] A critical current-carrying feeder set is constructed by analyzing the operating parameters of each feeder in the power transfer margin table. The current amplitude, active power, and power factor of the adjacent heavily loaded feeders corresponding to each entry in the power transfer margin table are read from the load data moment by moment during the effective peak-shaving window, forming the operating parameter time series for that feeder. The moment when the current amplitude exceeds 85% of the feeder's rated current-carrying capacity in the operating parameter time series is marked as the critical current-carrying moment. The proportion of critical current-carrying moments corresponds to the duration of the feeder's operation in a high-load state within the peak-shaving window. Feeders whose critical current-carrying moment proportion exceeds a set percentage are determined to be critical current-carrying feeders. This determination percentage is written into the configuration parameters during the initialization phase according to the power grid operation procedures, typically taking 40% of the total effective peak-shaving window time. For heavily loaded feeders corresponding to entries in the power transfer margin table with margin uncertainty markings, the determination percentage is tightened to 30% to reduce the risk of capacity over-limit in subsequent power transfer operations under margin uncertainty conditions. In the load data, the time period carrying the low-confidence marker is included with a weight of 0.5 in the statistics of the proportion of critical current-carrying time. This ensures that abnormally high current readings during periods of poor communication quality are not falsely inflated, and that feeders that have not reached the critical state are not misjudged as critical current-carrying feeders. The critical current-carrying feeder set consists of all feeders that have passed the critical current-carrying determination. Each feeder carries the proportion of critical current-carrying time, the average current amplitude within the critical current-carrying time, and the corresponding effective peak-shaving window time range. The product of the proportion of critical current-carrying time and the average current amplitude is used as the comprehensive critical strength index E_cs. The proportion of critical current-carrying time is a dimensionless ratio, while the average current amplitude is in the current dimension. The value of E_cs is on the same order of magnitude as the average current. Each feeder in the critical current-carrying feeder set is subsequently processed in descending order of comprehensive critical strength index. Critical current-carrying feeders with historical fault markers in their connected candidate fault sections have their priority further increased when the indices are the same.

[0029] Critical operating parameter sets are obtained by analyzing the rate of change of parameters before and after the peak value of each feeder in the critical current-carrying feeder set. Each feeder in the critical current-carrying feeder set is processed sequentially from high to low according to E_cs. The maximum value of the current amplitude sequence during the peak period of the feeder is taken as the dividing point. The average current amplitude of the three consecutive acquisition cycles before the dividing point is taken as the pre-peak parameter, and the average current amplitude of the three consecutive acquisition cycles after the dividing point is taken as the post-peak parameter. The rate of change of current before and after the peak value is R_I = (I_after - I_before) / I_before, where I_before is the pre-peak parameter and I_after is the post-peak parameter. A positive R_I indicates that the current amplitude continues to rise after the peak value, and the peak value is not the true peak value but a local high point. The critical current-carrying state of the corresponding feeder may be further aggravated after the peak value. A negative R_I indicates that the current amplitude begins to decline after the peak value, and the peak value is the true highest load value. The current change rate and line voltage drop change rate of each feeder in the critical current-carrying feeder cluster are calculated separately and recorded side by side. The line voltage drop change rate R_U=(U_after-U_before) / U_before, where U_before is the voltage drop at the beginning and end before the peak value, and U_after is the voltage drop at the beginning and end after the peak value. They have the same dimensions. R_I and R_U are both dimensionless ratios. The joint distribution of the current change rate and the line voltage drop change rate reflects the evolution characteristics of the operating status of each critical current-carrying feeder before and after the peak value. If the two are in the same direction, it indicates that the capacity and voltage quality deteriorate synchronously. If the two are in opposite directions, it indicates that the power factor of the load structure may have changed. The critical operating parameter group consists of the rate of change of current before and after the peak value, the rate of change of line voltage drop, and the current amplitude at the peak moment for each feeder in the critical current-carrying feeder set. Feeders whose peak current amplitude exceeds 90% of the rated current carrying capacity in the critical operating parameter group are marked with an additional limit current carrying capacity label, which is sorted together with E_cs to determine the boundary matching priority. Feeders with an absolute value of R_I exceeding 0.15 are marked with a high rate of change label, and the corresponding sections are treated with a dynamic correction coefficient in the subsequent limit calculation.

[0030] For example, the step of performing capacity upper limit boundary matching on the candidate fault section set based on the critical operating parameter set to obtain boundary matching results includes: reading the peak current of each critical current-carrying feeder and the line voltage drop based on the critical operating parameter set to obtain critical parameter pairs; performing segment-by-segment rated difference calculation on the critical parameter pairs and the candidate fault section set to obtain a parameter difference sequence; identifying critical sections where the difference in the parameter difference sequence turns from negative to positive to form a capacity boundary candidate set; and performing bidirectional margin verification across feeders based on the capacity boundary candidate set to obtain boundary matching results.

[0031] Critical parameter pairs are obtained by reading the peak current and line voltage drop of each critical current-carrying feeder based on the critical operating parameter group. The peak time of each critical current-carrying feeder in the critical operating parameter group has been determined in the parameter change rate analysis stage. The current amplitude and line voltage drop corresponding to the peak time are directly read from the load data. The current amplitude is taken as the measured value within the peak time acquisition period, and the line voltage drop is taken as the measured value of the difference between the feeder's head voltage and tail voltage at the peak time. When reading the line voltage drop of each critical current-carrying feeder in the critical operating parameter group, if the tail voltage monitoring point cannot provide a measured value due to equipment failure, the tail voltage is estimated by multiplying the head voltage by the line impedance normalization factor, and then the voltage drop is calculated. The normalization factor used for estimation is read from the equipment ledger. If the ledger is missing, the historical average value of the same type of feeder is used as a substitute. The source of the estimation is marked on the corresponding critical parameter pair. The marked critical parameter pair is used in the calculation with a conservative voltage drop value increased by 5% when calculating the difference in each section. Critical parameter pairs are formed by pairing the peak current amplitude of each critical current-carrying feeder with the corresponding line voltage drop. After pairing, the critical parameter pairs corresponding to feeders carrying the limit current-carrying label are individually labeled. The limit current-carrying critical parameter pairs trigger stricter over-limit judgment conditions in subsequent segment-by-segment differential calculations. The over-limit judgment threshold is tightened from 100% of the rated capacity to 90% to reflect the higher sensitivity of limit current-carrying feeders to capacity over-limits. The ratio of the peak current amplitude to the line voltage drop in the critical parameter pair reflects the equivalent line impedance of the feeder under the current operating state. A higher ratio indicates greater line loss and a higher voltage quality risk for the corresponding feeder after power transfer. The ratio field is recorded along with the critical parameter pairs for use in judging voltage quality risk during the cross-feeder bidirectional margin verification stage.

[0032] The critical parameter pairs are compared with the candidate fault section set, and the rated difference is calculated segment by segment to obtain the parameter difference sequence. The rated difference calculation is performed on each section in the candidate fault section set that has an effective matching relationship with each critical current-carrying feeder. For sections with uncertain margin markings, their conservative upper limit capacity is used instead of the section's rated current capacity for calculation. The effective matching relationship only exists between sections with a direct connection on the tie path and the critical current-carrying feeders. In each effective matching pair, the peak current amplitude of the critical parameter pair is subtracted from the section's rated current capacity to obtain the current difference of the matching pair, and the line voltage drop of the critical parameter pair is subtracted from the section's rated voltage drop to obtain the voltage drop difference of the matching pair. A positive current difference indicates that the measured value after transfer exceeds the section's rated capacity, i.e., there is an over-limit, and a negative current difference indicates that there is still a capacity margin. The two differences are recorded side by side to form the difference record of the matching pair. The difference record is organized with a dual index of section identifier and critical current-carrying feeder identifier. When a candidate fault segment has an effective matching relationship with multiple critical current-carrying feeders within the same segment set, each matching pair independently forms a difference record. Among multiple difference records for the same segment, the record with the smallest current difference corresponds to the most pressing capacity constraint for that segment. This record is marked with a main constraint in the parameter difference sequence. The main constraint-marked record is used as the basis for judgment in the subsequent critical segment identification stage. Non-main constraint records are simultaneously retained for reference in the bidirectional margin verification stage across feeders. If either the current difference or the voltage drop difference in the parameter difference sequence is positive, it indicates a single-dimensional risk of exceeding the limit. If both are positive, a two-dimensional limit exceeding label is added, and the parameter difference is directly included in the capacity boundary candidate set generation stage without being subject to continuity condition constraints. For critical parameter pairs carrying estimation source labels, the voltage drop difference of the corresponding matching pair is marked with an estimation source in the parameter difference sequence. This does not participate in the continuity judgment of the difference turning from negative to positive, but is only used as an auxiliary reference.

[0033] The critical segment where the difference in the parameter difference sequence changes from negative to positive is identified to form a candidate set of capacity boundaries. The identification of the difference turning from negative to positive involves scanning the main constraint record of each segment in the parameter difference sequence segment by segment along the direction of increasing load on the critical current-carrying feeder. When the current difference between two adjacent segments changes from negative to positive, the intermediate boundary position is determined as the difference sign reversal point. The difference sign reversal point is the critical segment where the difference turns from negative to positive in the claims, corresponding to the position where the supplied load changes from being able to bear the load to exceeding the rated capacity. Physically, the segment corresponding to the sign reversal point is the critical position where the supplied load changes from being able to bear the load to exceeding the rated capacity. When the corresponding feeder segment experiences a fault in that segment and performs power transfer, it happens to be near the capacity boundary. The identification of sign reversal points requires that, centered on the candidate reversal point, the current difference between the preceding and following adjacent segment pairs both exhibit a monotonically increasing trend along the load increase direction. Abrupt changes in the difference between a single pair of adjacent segments do not trigger a reversal determination. The two sets of monotonically increasing conditions are used to filter out local difference fluctuations in the parameter difference sequence caused by line branches. Matching pairs carrying two-dimensional over-limit labels are directly included in the capacity boundary candidate set, unconstrained by the continuous condition of sign reversal. The capacity boundary position of the corresponding segment of the two-dimensional over-limit matching pair is determined to be over-limit rather than critical, and an over-limit label is added to the capacity boundary candidate set to distinguish it from critical reversal segments. The capacity boundary candidate set consists of all symbol-flipped critical sections and two-dimensional over-limit sections. Each entry records the corresponding critical current-carrying feeder identifier, the current difference symbol flipping amplitude, and the two-dimensional over-limit label status. The current difference symbol flipping amplitude corresponds to the steepness of the capacity boundary of the critical section. Sections with large flipping amplitudes will have a faster over-limit amplitude after exceeding the rated capacity during power transfer operations. Critical sections with flipping amplitudes exceeding 10% of the rated capacity are marked with a sharp over-limit label. Sections marked with sharp over-limit labels have a higher over-limit risk level in the boundary matching results than ordinary flipping sections.

[0034] Based on the capacity boundary candidate set, bidirectional margin verification across feeders is performed to obtain boundary matching results. The bidirectional margin verification simultaneously examines the margins of both the feeder-supplying side and the feeder-receiving side for each critical section in the capacity boundary candidate set: the feeder-supplying side margin is quantified by the difference between the peak current amplitude of the corresponding critical current-carrying feeder and the rated current-carrying capacity of that feeder; a positive difference indicates that the feeder-supplying feeder itself still has capacity margin, while a negative difference indicates that the feeder-supplying feeder itself is already in an over-limit state; the feeder-receiving side margin is quantified by the difference between the current operating load and the rated current-carrying capacity of the feeder in the candidate fault section. When the margins on both sides are in the same direction, it indicates that both sides have margin or both sides are over-limit; when the directions are opposite, it suggests that the capacity problem on the over-limit side should be addressed first before restarting the feeder-supplying. Sections with a high equivalent impedance ratio or a positive R_U of the corresponding critical current-carrying feeder are simultaneously marked with additional voltage quality risk. After the bidirectional margin of each critical section in the candidate capacity boundary is determined, the initial boundary difference is corrected using the correction formula ΔC_final=ΔC_init·(1+R_I·k_corr), where ΔC_init is the initial boundary difference, i.e., the current difference. A positive ΔC_init indicates exceeding the limit, and a negative ΔC_init indicates having a margin. R_I is the rate of change of current before and after the peak value of the corresponding critical current-carrying feeder, and k_corr is a dimensionless correction coefficient calibrated based on historical review data during the initialization stage. ΔC_final and ΔC_init have the same dimensions. When R_I is positive, the correction result increases ΔC_final relative to ΔC_init in the direction of exceeding the limit to reflect the capacity risk of the load still rising. When R_I is negative, the correction result narrows ΔC_final in the direction of the margin. The corrected results are combined with the current difference values ​​of each section in the candidate capacity boundary set to form the boundary matching result record. The boundary matching result is based on the section identifier, the corrected over-limit amount, and the bidirectional margin direction label. The over-limit amount of the section with the sharp over-limit label is increased by an additional 5%. The boundary matching result records of all sections are arranged in the order of the candidate fault section set to form the complete boundary matching result.

[0035] Based on the boundary matching results, the capacity overrun amount for each section is calculated to generate a capacity margin benchmark. The corrected overrun amount for each section in the boundary matching results forms the final overrun amount based on k_corr. k_corr is calibrated during the initialization phase based on historical capacity overrun review data. The correction coefficient for sections with high change rates is replaced with a dynamic correction coefficient k_dyn. k_dyn increases synchronously with the absolute value of R_I for that section, ensuring that sections with large capacity boundary drift with load receive more sufficient overrun correction. The final overrun amount for each section corresponds to the actual risk of capacity overrun after the section is transferred. A negative final overrun amount indicates that the section has a positive capacity margin, and its absolute value corresponds to the sufficiency of the transfer safety margin. Sections with a positive final exceedance value are marked with an exceedance risk label. These marked sections are used as priority elimination candidates in the subsequent protection frequent path elimination verification stage. Exceedance values ​​of sections carrying estimated source labels are simultaneously retained in the capacity margin benchmark. The exceedance values ​​of the estimated-labeled sections participate in the judgment in subsequent verification with a conservative exceedance value increased by 10%. When multiple boundary matching result records correspond to multiple path labels for the same section in the capacity margin benchmark, the final exceedance value is taken as the maximum value among all associated records. This maximum value rule takes precedence over the main constraint label. The capacity margin benchmark entry simultaneously records the exceedance values ​​of each associated path. Each section entry in the capacity margin benchmark also adds and saves the final exceedance values ​​accumulated during each execution of this process for that section. These are arranged in chronological order of fault events to form a historical exceedance value sequence, which is used for reference in subsequent margin fast-out path determination.

[0036] Step S130: Statistical analysis of the number of cross-feeder transfers for the same type of section in the candidate fault section set to generate cross-feeder transfer frequency; Based on the capacity margin benchmark and the cross-feeder transfer frequency, protection frequency path elimination verification is performed on the candidate fault section set to generate a set of available transfer paths; Verified transfer paths are preferentially screened on the set of available transfer paths to determine the primary transfer path.

[0037] Specifically, the cross-feeder transfer frequency is generated by statistically analyzing the number of transfers between similar sections across feeders in the candidate fault section set. Similar sections in the candidate fault section set are defined as sections with the same power supply type, similar rated capacity of their feeders, and similar interconnection path topology: the power supply type grouping of a section is obtained from the load status table using feeder identifiers; the same power supply type is determined by consistent grouping; similar rated capacity is determined by a difference in rated current carrying capacity not exceeding 20% ​​of the rated value; and similar topology is determined by a difference in the number of sectionalizing switches in the interconnection path not exceeding two. All three conditions must be met simultaneously to classify a section as similar. The number of transfers for each section in the candidate fault section set in the historical transfer records is read from the operation log of the distribution automation system. The operation log records the trigger time, operation section identifier, and transfer path identifier for each transfer. The number of transfers for the same section in the candidate fault section set under different transfer paths is statistically analyzed and summed to form the total historical transfer count. The cross-feeder transfer frequency is quantified by the difference between the total historical transfer count of each section and the average total historical transfer count of similar sections: a positive difference indicates that the historical transfer count of that section is higher than the average of similar sections, suggesting that the fault occurrence rate or transfer trigger frequency of that section is higher than the similar reference; a negative difference indicates that the historical transfer frequency of that section is lower than the similar average, possibly due to higher reliability of the section itself or a more stable load structure in the area. Candidate fault sections with fewer than thirty historical operation log entries are marked as insufficient samples when calculating the cross-feeder transfer frequency. The cross-feeder transfer frequency of these marked sections is replaced by the average total historical transfer count of similar sections instead of the measured difference, ensuring that insufficient sample sections in subsequent protection frequency path elimination verification are not misjudged as low-frequency, low-risk sections due to blank historical records.

[0038] In some embodiments, the step of generating a set of available transfer paths by performing protection frequency path elimination verification on the candidate fault segment set based on the capacity margin benchmark and the cross-feeder transfer frequency includes: retrieving the historical protection actions of each transfer path in the candidate fault segment set to obtain an action record set; rating the severity of the action record set according to the action interval shrinkage trend to form a path severity table; classifying the deterioration of each path in the candidate fault segment set based on the path severity table and the cross-feeder transfer frequency to form a deteriorated path set; and eliminating over-limit deteriorated paths according to the deteriorated path set and the capacity margin benchmark to generate a set of available transfer paths.

[0039] The action record set is obtained by retrieving the protection action history of each transfer path for the candidate fault section set. A transfer path is represented by a complete operating path consisting of the corresponding combination of connecting switches on each section and its connecting path within the candidate fault section set. Multiple transfer paths exist for the same section when it passes through different connecting paths, and each path is uniquely identified by a path identifier. The protection action history is retrieved from the relay protection action log of the distribution automation system. The retrieval scope covers the action records of protection devices on each transfer path of the candidate fault section set. Protection device types include overcurrent protection, distance protection, and reclosing devices. Each protection device's action record carries the action time, action type, and reset time. The time window for retrieving action records is 180 days prior to the current time. Historical action records exceeding the time window are not included in the action record set, ensuring that the historical action records of previously rectified equipment do not interfere with the current path severity rating. Multiple action records of the same protective device in the same fault event are merged into a single composite action record. The merging is based on consecutive actions of the same device within five minutes, which are considered to be the same fault event. The earliest action time and the latest reset time are taken for the composite action record. The action count field records the original number of actions before merging. The protection action records for each transfer path in the action record set are arranged chronologically, with the total number of records corresponding to the activity level of the protective devices on that path within the past 180 days. Paths with more than twice the average number of action records for all paths are marked with high-frequency actions. Paths marked with high-frequency actions have a higher base severity level than ordinary paths in the path severity rating stage, and their frequent action history indicates a potential for persistent faults.

[0040] The severity of the action record set is rated according to the trend of action interval contraction, forming a path severity table. The protection action records of each transfer path in the action record set are used as time-series input. The time difference between two adjacent action records is taken as the action interval for that adjacent pair. The action interval sequence is composed of the interval values ​​of all adjacent action pairs for each path arranged in chronological order. The determination of the action interval contraction trend is performed by linear regression on the action interval sequence: a negative regression slope k_t indicates that the action interval is shortening as the action sequence number advances, and the frequency of protection device operation is increasing. The absolute value of k_t corresponds to the rate of contraction, suggesting that the equipment corresponding to that path is deteriorating or external interference is intensifying; a positive or near-zero k_t indicates that there is no obvious trend of action interval contraction, and the frequency of protection device operation is relatively stable. To eliminate the difference in action interval benchmarks between different paths, a dimensionless contraction rate r_s = |k_t|·N / T_mean is defined, where k_t is the regression slope in the dimension of time, N is the length of the action interval sequence, T_mean is the mean of the action interval, and r_s is a dimensionless quantity. The severity level is set based on the joint distribution of the set shrinkage rate r_s of the action records and the total number of actions, and is written into the path severity table: r_s exceeding 0.1 and the total number of actions exceeding the group mean is rated as high severity; r_s exceeding 0.1 but the number of actions not exceeding the mean is rated as medium severity; and r_s below 0.1 is rated as low severity. Paths with high-frequency actions are forcibly upgraded by one level, and high severity paths are maintained after upgrading, with a continuous degradation label added to the path severity table. The path severity table consists of the core content of each entry, which is composed of the severity level of all transferred paths in the candidate fault segment set and the regression slope of the action interval. The regression slope is passed on to the degradation classification of the entry and referenced when subdividing paths of the same level. Each transferred path forms an independent entry.

[0041] Based on the path severity table and the cross-feeder transfer frequency, a degradation classification is applied to each path in the candidate fault section set to form a degraded path set. The degradation classification uses the severity level of each path in the path severity table as the first dimension and the frequency difference of the corresponding section in the cross-feeder transfer frequency as the second dimension. The joint judgment result of the two dimensions determines the degradation level of each path. Paths with high severity in the path severity table and a positive cross-feeder transfer frequency difference are classified as Level 1 degraded paths. This indicates that the path shows a trend of accelerated protection action in the path severity table, and the cross-feeder transfer frequency is higher than the average of similar paths. The combination of these two degradation characteristics indicates that the path has been subjected to multiple fault impacts and the protection status is continuously deteriorating. Paths with a continuous degradation marker in the Level 1 degraded paths are further assigned the highest degradation priority in the degraded path set and are prioritized for verification and removal during subsequent removal of excessively degraded paths. Paths with high severity in the candidate fault segment cluster but negative frequency difference across feeders, or medium severity with positive frequency difference, are classified as Level 2 deteriorated paths. These paths are significant in one dimension but do not exceed the threshold in another dimension, resulting in an overall deterioration lower than Level 1. Paths with medium severity and negative frequency difference, or low severity and positive frequency difference, in the candidate fault segment cluster are classified as Level 3 deteriorated paths. Paths with low severity and negative frequency difference in the candidate fault segment cluster are also classified as Level 3. Level 3 deteriorated paths have a relatively good historical performance and have the lowest priority in the deteriorated path set. In the deterioration classification, paths with a frequency difference of zero are included in the negative difference category, and within the same level, those with the larger absolute value of the regression slope are ranked higher. The deteriorated path set consists of Level 1 and Level 2 deteriorated paths. Paths corresponding to segments with insufficient samples are conservatively included as Level 2. Level 3 deteriorated paths are directly passed to the available feeder path set generation stage. Each entry records the path identifier, deterioration level, and severity level.

[0042] Based on the deterioration path set and capacity margin benchmark, out-of-limit deterioration paths are eliminated to generate a usable transfer path set. The determination of out-of-limit deterioration paths involves taking the union of two independent conditions: First, if a primary deterioration path in the deterioration path set exhibits both an accelerated protection action trend and a transfer frequency higher than the average for similar paths, with significant superposition of deterioration characteristics, it is directly determined as an out-of-limit deterioration path without further verification by the capacity margin benchmark. Second, if a secondary path in the deterioration path set shows significant deterioration in only one dimension, it needs to be determined in conjunction with the capacity margin benchmark. Paths with a positive final exceedance amount in the corresponding capacity margin benchmark and an additional exceedance risk label are determined as out-of-limit deterioration paths; those with a negative final exceedance amount in the capacity margin benchmark are retained as usable paths. Paths in the deterioration path set corresponding to segments with estimated source labels are considered with a conservative exceedance amount increased by 10% from the capacity margin benchmark. If the conservative exceedance amount is still negative, it is retained; if it is positive, it is determined as out-of-limit and eliminated. All paths exceeding the limits and deteriorating beyond the limit are removed from the candidate fault segment set. The remaining paths constitute the available transfer path set. Each entry inherits the segment identifier and connection path identifier from the candidate fault segment set and adds a degradation level field to record the three-level degradation classification result of each path. Level three deteriorated paths are retained in the available transfer path set with a low degradation label for subsequent priority screening of verified paths to distinguish available paths with different health levels. When the available transfer path set is empty after removal, the level two deteriorated paths with the smallest excess limit are retained as emergency available paths and marked with an emergency label to avoid transfer interruption due to no available paths.

[0043] In some embodiments, the step of performing a priority screening of verified transfer paths to determine the primary transfer path for the available transfer path set includes: generating a transfer frequency table by counting the historical transfer counts of each path in the available transfer path set; identifying unverified paths with zero historical transfer counts based on the transfer frequency table to obtain an unverified path set; performing availability verification of tie switches and protection settings on the unverified path set to form a mismatch candidate set; and eliminating unverified mismatch paths based on the mismatch candidate set to determine the primary transfer path.

[0044] A transfer frequency table is generated by statistically analyzing the historical transfer counts for each path in the available transfer path set. This step uses the transfer path as the statistical unit, distinct from the historical transfer counts in the cross-feeder transfer frequency analysis stage, which uses candidate fault sections as the unit. The two have different statistical granularities and are not interchangeable. The historical transfer counts for each path in the available transfer path set are statistically analyzed from the operation logs of the distribution automation system. The statistical range is consistent with the 180-day time window used when retrieving protection action history, ensuring alignment between the historical data coverage of the transfer frequency table and the action record set. When the time base is consistent, the reliability of the joint analysis results is higher than when the time windows are inconsistent. The historical transfer count is grouped using the path identifier. Each time a path is recorded as an actually executed transfer path in the historical record, it is counted once. Records that are only considered as alternative paths but not actually executed are not included in the transfer count. Historical records with missing path identifiers in the operation log are reverse-matched using a combination of section identifier and tie switch identifier. Successful matches are counted as transfer counts for the corresponding path. Records with unsuccessful matches are marked as having an "unknown source." Records with unknown sources are not included in the transfer frequency table statistics but are retained in the operation log for future reference. The transfer frequency table consists of the historical transfer counts of all paths in the available transfer path set, arranged by path identifier. The skewness of the historical transfer count distribution reflects the overall verification level of the available transfer path set: a highly right-skewed distribution indicates that a few paths have undertaken a large number of historical transfer operations while most paths have a low historical transfer count. With a highly right-skewed distribution, the zero-value judgment condition for the number of transfers in the unverified path identification stage can be appropriately relaxed to 10% below the global average to broaden the identification range of unverified paths.

[0045] The unverified path set is obtained by identifying unverified paths with zero historical transfer counts based on the transfer frequency table. Paths with zero historical transfer counts in the transfer frequency table are determined to be unverified paths, while paths with more than zero historical transfer counts are determined to be verified paths and directly enter the primary transfer path arrangement, without being included in the unverified path set. The coordination characteristics of the tie switch closing action and protection device response of unverified paths have not been tested in actual fault scenarios, and there is a potential risk of tie switch failure or protection malfunction during actual transfer. When the distribution height is skewed to the right, the relaxed identification conditions are applied. Paths with historical transfer counts less than 10% of the global average are also included in the unverified path set and marked with low verification degree. Paths marked with low verification degree have lower priority than paths with zero transfer counts in the primary transfer path arrangement. When all paths in the transfer frequency table have zero historical transfer counts, the unverified path set covers all paths in the available transfer path set, and subsequent verification is performed on all paths. Paths with low degradation markings in the unverified path set are prioritized for verification of tie switch and protection setting availability. Low-degradation and unverified path combinations indicate that the path has neither historical fault degradation records nor actual operational verification, representing the path with the highest uncertainty in the available transfer path set. Prioritizing their verification allows for focusing verification efforts on the most critical paths when resources are limited. The available transfer path set degradation level field attached to each path in the unverified path set is transmitted along with the path identifier. This allows the mismatch candidate set generation stage to distinguish unverified paths with different levels of uncertainty. Paths with low degradation levels and low historical transfer frequency are given relatively lower priority for removal from the mismatch candidate set.

[0046] For the unverified path set, the availability of tie switches and protection settings is verified to form a mismatch candidate set. The current remote signaling status, operating mechanism energy storage status, and recent maintenance records of the tie switches corresponding to each path in the unverified path set are checked. Tie switches with abnormal remote signaling status, incomplete energy storage, or a record of failure to operate within the past ninety days are judged to have questionable availability. The paths corresponding to tie switches with questionable availability are added to the mismatch candidate set and a switch mismatch mark is added. The protection setting availability verification compares the current protection settings of the protection devices on each path in the unverified path set with the expected protection settings under the power transfer scenario. The expected protection settings are jointly determined by the path topology after power transfer and the estimated power transfer load. When the difference between the current setting and the expected setting exceeds the allowable deviation range, it is judged as a setting mismatch. The allowable deviation range is written into the configuration parameters according to the relay protection setting procedure during the initialization phase. Setting mismatch is further divided into two categories: setting too high and setting too low. Protection devices with setting too low have the risk of maloperation under high load after power transfer, while protection devices with setting too high have the risk of failure to operate. The path corresponding to the protection device with setting mismatch is entered into the mismatch candidate set and marked with a setting mismatch label (categorized by setting too high / too low). When the same path has both switch mismatch and setting mismatch labels, a double mismatch label is added. Paths with double mismatch are removed from the mismatch candidate set with higher priority than those with single mismatch. Paths in the unverified path set that have neither switch mismatch nor value mismatch after verification will not be included in the mismatch candidate set. Such paths will participate in the screening as verified unverified paths in the subsequent primary selection and transfer path determination stage. The priority of verified unverified paths is lower than that of historically verified paths but higher than that of paths in the mismatch candidate set.

[0047] The primary transfer path is determined by eliminating unverified mismatched paths from the mismatch candidate set. Paths with double mismatch labels in the mismatch candidate set are directly eliminated from the set of available transfer paths. Paths with single mismatch labels in the mismatch candidate set are determined jointly based on the mismatch type and the corresponding capacity margin benchmark: if the final exceedance of a switch mismatch path in the mismatch candidate set is negative, it is temporarily retained and marked as requiring rectification; if the final exceedance of a fixed-value mismatch path in the mismatch candidate set is negative, it is also temporarily retained and marked as requiring rectification; single mismatch paths with a final exceedance of positive are directly eliminated. After eliminating all exceeding-limit mismatch paths, the remaining paths are ranked by priority to determine the primary transfer path. The priority chain is as follows: first priority is historically verified paths, i.e., paths with a historical transfer count greater than zero and no mismatch labels; second priority is paths marked as requiring rectification; third priority is verified but not verified paths, i.e., paths with zero transfer counts but no verified mismatches; fourth priority is emergency available paths. Within the same priority level, paths are primarily ranked based on the number of historical transfers, with those having higher transfer counts ranking higher. When transfer counts are the same, paths with a more negative final capacity margin benchmark take precedence. Paths marked with low verification levels are ranked last within their priority level, balancing verification level and capacity safety margin. Paths marked with "Needs Rectification" are automatically removed from the rectification list after maintenance and rectification are completed and the remote signaling status of the interconnection switch or protection settings are updated, and then re-ranked as historical verified paths or verified but unverified paths. The primary transfer paths are selected from the top few paths in the ranking. Each entry inherits the path identifier, section identifier, interconnection path identifier, degradation level, and capacity margin benchmark association records. The number of paths selected is based on the number of effective peak-shifting windows for the corresponding section in the transfer margin table. When the number of windows is large, the number of primary paths increases accordingly to cover transfer needs at different times.

[0048] Step S140: Collect fault location features of the main transfer path, determine the fault location section by performing switch action timing fault location based on the fault location features, identify the location conflict items of the fault location section and perform centralized verification of the conflict period to generate transfer operation decision.

[0049] Specifically, fault location characteristics are collected for the primary power transfer path. The original source of fault location characteristics is the operating status data of each protection device and switchgear on the primary power transfer path before and after the fault event trigger time. The collection scope covers the action timestamps of all section switches and tie switches on the primary power transfer path, the action type and reset time of the protection devices, and the current surge at each monitoring point during the fault. The switch action timestamps are recorded with millisecond-level precision by the event sequence recording device of the distribution automation system. The clock of the event sequence recording device is synchronized with the GPS clock of the dispatch master station. When the synchronization deviation exceeds two milliseconds, a clock deviation label is added to the timestamp of the corresponding device. The clock deviation label is used as a basis for timing comparison and correction during the fault location stage of the switch action sequence. The current surge during the fault is calculated from the difference in current amplitude at each monitoring point for one acquisition cycle before and after the fault trigger time. The moment when the current surge exceeds a set threshold is used as an estimation basis for the action timestamp when the protection device communication is interrupted. This characteristic value, together with the corresponding monitoring point identifier and the fault trigger time, constitutes a quantitative record of the fault location characteristics. When communication interruption of protection devices in the primary power transfer path prevents the upload of action records, the action timestamp of the corresponding protection device is replaced by an estimation of the trigger time of the current surge at adjacent monitoring points. An estimation timestamp is appended with a timestamp estimation label. This label triggers conservative timing processing during the timing comparison phase to prevent errors in the estimated timestamp from causing misjudgments of the fault direction. If the number of switches carrying estimation source labels on the primary power transfer path exceeds a set threshold, or if there are two or more switches carrying clock deviation labels on the path, an insufficient location reliability label is appended to the fault location characteristics of the corresponding primary power transfer path. This label indicates that the completeness of the action timing data or the reliability of the time reference for that path is insufficient.

[0050] In some embodiments, determining the fault location segment based on the fault location features by performing switch action timing fault location includes: parsing the fault location features to obtain an action timing set by analyzing the timestamps of each switch action during the fault period; comparing the action timing set by grouping it into segmented switches and tie switches in sequence to obtain a timing comparison table; identifying the type of the first-operated switch and determining the initial fault direction based on the timing comparison table; and determining the fault location segment by performing silent boundary reverse delineation on the timing comparison table based on the initial fault direction.

[0051] The fault location features are analyzed to extract the timestamps of each switch action during the fault period, forming an action time sequence set. The topological scene and timestamp distribution of the action time sequence set are as follows: Figure 3As shown, the upper part is the topology of the main feeder route. Feeder topology line 12 is a horizontal trunk line connecting the left bus and the right bus. From left to right, feeder topology line 12 has sectionalizing switches 13 (S1, S2, S3, S4) and tie switches 14 (S5). Section switches 13 are represented by square symbols. If there are diagonal lines inside the square, it means that the section switch 13 generated a switching action timestamp 20 during the fault. If the square is blank, it means that the section switch 13 did not operate. Tie switches 14 are represented by circular symbols with crosses. Figure 3 The lower action timing axis 15 uses a horizontal axis with arrows to represent the time progress; the switching action timestamps 20 of each segment switch 13 and the connecting switch 14 are represented by solid dots and vertical scale lines on the action timing axis 15. The position of each switch on the feeder topology line 12 and its switching action timestamp 20 on the action timing axis 15 are connected by a thin dashed line; switches that do not generate a switching action timestamp 20 on the action timing axis 15 indicate that they remain silent during the fault. In the fault location features, the switching action timestamps 20 of each segment switch 13 and the connecting switch 14 are recorded by an event sequence recording device with millisecond-level precision. The device clock is synchronized with the GPS clock of the dispatch master station; the timestamps carrying clock deviation markings in the fault location features undergo clock correction before participating in the arrangement. After correction, if the difference between the timestamp and the adjacent device timestamp is less than two milliseconds, the clock synchronization is qualified and written into the action timing set. When the same switch appears multiple timestamps 20 in the same fault event in the action timing set, it participates in the arrangement at the first time. The re-action record is retained but does not participate in the identification of the first-action switch 16.

[0052] A timing comparison table is obtained by comparing the action timing sets grouped by sectionalizing switches and tie switches in chronological order. The grouping of sectionalizing switches and tie switches is determined based on the function type field of each switch in the topology data. This function type field is written during the initialization of the distribution automation system and updated in real time with equipment changes. Within each sectionalizing switch group and tie switch group, the actions are sorted by their action times. Cross-group timing comparisons are performed between the two groups to determine whether the first action switch belongs to the sectionalizing switch group or the tie switch group, and the time difference between the earliest action switches in the two groups. The time difference is obtained by subtracting the earliest action time of the tie switch group from the earliest action time of the sectionalizing switch group in the action timing set: a positive difference indicates that the tie switch acted before the sectionalizing switch, suggesting a possible fault on the tie-side feeder; a negative difference indicates that the sectionalizing switch acted before the tie switch, suggesting a fault within the sectionalizing switch's jurisdiction. The timing comparison table consists of the cross-group time difference values ​​of each fault event in the action timing set, the earliest action switch identifier of each group, and the near-simultaneous action annotation. Fault events corresponding to the primary transfer path carrying an insufficient positioning reliability annotation are synchronously transmitted in the timing comparison table. Fault events with insufficient positioning reliability in the timing comparison table entries trigger a conservative judgment with expanded scope during the first-action switch identification stage. The cross-group time difference values ​​in the timing comparison table, which involve action timestamp estimation annotations, have their judgment threshold expanded based on the original near-simultaneous action judgment standard. When the time difference value corresponding to the annotation falls within the expanded threshold range, it is treated as a near-simultaneous action, ensuring that estimation timestamp deviations do not lead to misjudgments of the cross-group sequence.

[0053] For example, the step of identifying the first-action switch type and determining the preliminary fault direction based on the timing comparison table includes: filtering the earliest action switch records of each fault event to form a first-action switch set according to the timing comparison table; identifying millisecond-level time difference switch pairs to obtain a near-simultaneous action group based on the first-action switch set; performing protection setting boundary comparison and verification on the near-simultaneous action group to form a setting verification result; and performing fault direction correction on the first-action switch set based on the setting verification result to determine the preliminary fault direction.

[0054] The earliest activated switch record for each fault event is selected from the time sequence comparison table to form the first activated switch set. The action time sequence entries for each fault event in the time sequence comparison table are arranged in ascending order by the switch action timestamp 20. The entry with the smallest time in the sorted results corresponds to the first activated switch 16 record for that fault event. The first activated switch 16 records are extracted from the time sequence comparison table for each fault event and then summarized to form the first activated switch set. Each entry in the first activated switch set carries a fault event identifier, a first activated switch 16 identifier, the first activated time, and the function type of the first activated switch 16. The function type distinguishes between two categories: sectionalizing switch 13 and tie switch 14, which serves as the basis for determining the subsequent fault direction. When the first activated switch 16 is sectionalizing switch 13, it indicates that the fault originates within the sectionalizing section; when the first activated switch 16 is tie switch 14, it indicates that the fault originates from the tie-side feeder. The switch action timestamp 20 with clock deviation annotation has been corrected before participating in the earliest time selection. The corrected time is used for sorting, while the time before correction is retained as the original value field. Both are stored side by side in the first-action switch set entry. The original value field is used for comparison of the difference between the first-action switch identification results before and after clock correction during the fault direction correction stage. When there are multiple switch action timestamps 20 with the same time for the same fault event in the first-action switch set, all switch records at the same time are included in the first-action switch set and marked as concurrent first-action. The first-action switch set entry marked as concurrent first-action does not participate in the direct determination of a single first-action switch 16 type, but is transferred to the near-simultaneous action group 17 identification process, so that the first-action switch 16 type determination process in the concurrent first-action scenario is consistent with the near-simultaneous action scenario.

[0055] Based on the first-action switch set, millisecond-level time difference switch pairs are identified to obtain near-simultaneous action groups. The millisecond-level time difference is identified based on the difference between the first and second action times of each fault event in the first-action switch set. When the difference is less than five milliseconds, the order of the two actions exceeds the reliable resolution range of the event sequence recording device, and the corresponding switch pair is determined to be a near-simultaneous action pair. The identification of near-simultaneous action pairs involves scanning the action time sequence of each fault event in the first-action switch set pair by pair. When the difference between the switching action timestamps 20 of the first-action switch 16 and the second-action switch is less than five milliseconds, a near-simultaneous action pair is formed. When multiple near-simultaneous action pairs exist within the same fault event, each pair is identified independently. All near-simultaneous action pairs are summarized according to the fault event identifier to form near-simultaneous action group 17; such as... Figure 3As shown, the near-simultaneous action group 17 is marked in brackets above the action sequence axis 15. The vertical lines at both ends of the brackets are aligned with the earliest and latest switch action timestamps 20 within the action group, respectively, visually indicating that the order of switches within this interval cannot be reliably determined solely by the time sequence. Each entry in the near-simultaneous action group 17 records two switch identifiers, the time difference of the switch action timestamps 20, and the combination of their functional types. The functional type combinations distinguish between three cases: segmented switch pairs 13, interconnecting switch pairs 14, and cross-type switch pairs. Cross-type switch pairs represent the case with the highest uncertainty in the determination of the first-action switch type 16, and cross-type near-simultaneous action pairs are processed first during the setting value verification result generation stage. All concurrent switches corresponding to the first-action switch set entries carrying concurrent first-action annotations are automatically included in the near-simultaneous action group 17. The time difference of the switch action timestamps 20 for concurrent first-actions is recorded as zero. Concurrent pairs with zero difference trigger stricter setting value comparison conditions in subsequent setting value verification to improve the reliability of fault direction determination in concurrent scenarios.

[0056] The protection setting boundary comparison verification is performed on the near-simultaneous action group to form the setting verification result. The protection setting boundary comparison verification is performed on each near-simultaneous action pair in the near-simultaneous action group 17 one by one, with priority given to cross-type switch pairs. For zero-difference concurrent pairs, the measured current amplitude must exceed the setting value by 1.2 times. The verification object is the relationship between the overcurrent setting value of each switch and the measured current amplitude during the fault. The verification scope covers the protection devices of the sectionalizing switch 13 and the tie switch 14 involved in the near-simultaneous action group 17. The overcurrent protection setting value of each switch is read from the relay protection setting value sheet. The setting value sheet data is maintained in the distribution automation system in a version management manner. During verification, the setting value version that is valid at the time of the fault is used instead of the latest version, so that the verification basis is consistent with the time of the fault and is not affected by the setting value modification after the fault. During a fault, the measured current amplitude is taken as the maximum current amplitude within half a collection cycle before and after the action of the first-acting switch 16. When the measured current amplitude exceeds the overcurrent protection setting value of the corresponding switch, the protection action of that switch is determined to be triggered. When both switches are triggered, the switch with the larger absolute value of the difference between the measured current amplitude and the setting value is taken as the main triggering switch. The type of the main triggering switch is the protection triggering function type of the near-simultaneous action pair. The setting verification result consists of the main triggering switch identifier, function type, and the measured current amplitude exceeding the setting value (current dimension A) of each near-simultaneous action pair in the near-simultaneous action group 17, which together constitute the core content of each item. The exceeding value is normalized to the setting value and has a confidence level of 0~1, which determines the confidence level of the corresponding function type in the fault direction determination. When the measured current amplitude of both switches is lower than their respective set values, it is determined that the set value verification cannot be confirmed. The corresponding near-simultaneous action pair adds a set value verification failure mark to the set value verification result. The near-simultaneous action pair with the set value verification failure mark is handled in a conservative way by expanding the range of fault location section 19 during the fault direction correction stage.

[0057] Based on the setting verification results, the fault direction is corrected to determine the preliminary fault direction for the first-action switch set. The main trigger switch function type of each near-simultaneous action pair in the setting verification results replaces the first-action switch 16 function type corresponding to the fault event in the first-action switch set. Before replacement, the difference in first-action switch identification before and after clock correction is compared using the original value field. After replacement, the reliability of the first-action switch 16 function type is improved from the original time difference judgment to the judgment based on the physical basis of the protection action. Near-simultaneous action pairs marked as failing the setting verification are not replaced, and the first-action switch 16 function type corresponding to the fault event is marked as direction uncertain in the first-action switch set. For fault events marked as direction uncertain, a bidirectional assumption is adopted when determining the preliminary fault direction, i.e., two candidate fault directions are simultaneously generated pointing to the sectionalizing switch 13 side and the tie switch 14 side. Both candidate directions enter the reverse delineation stage of the silent boundary 18, corresponding to the generation of two candidate fault location segments 19. The intersection of the two candidate fault location segments 19 is used as the most conservative confirmed fault location segment 19 in subsequent transfer operation decisions. If the intersection is empty, the union is taken and a direction confirmation mark is added. The initial fault direction is determined by the function type of the first-action switch 16 in the corrected first-action switch set and its topological position on the feeder topology line 12. The function type field of each entry in the corrected first-action switch set is updated to the corrected type, and the previous type is retained as a historical field. The initial fault direction is recorded in the form of a direction vector and transmitted to the reverse delineation stage of the silent boundary 18. The confidence field of the direction vector is assigned by the normalized value of the over-set value in the setting verification result. The higher the confidence, the more sufficient the physical evidence of the protection action based on the setting verification result is for the initial fault direction, and the greater its weight in the priority scoring of the subsequent transfer operation decision.

[0058] Based on the initial fault direction, the timing comparison table is used to silently delineate the boundary in reverse to determine the fault location segment. For example... Figure 3 As shown, the silent boundary 18 is defined as the location of the segment switch 13 on the feeder topology line 12 that did not generate a switching action timestamp 20 during the fault. Its physical meaning is the termination point of the fault current propagation path. The fact that the fault current failed to reach the location of the silent boundary 18 means that the fault point is located in the section between the last segment switch 13 that generated a switching action timestamp 20 and the silent boundary 18. Figure 3In the action timing axis 15, there is no corresponding switch action timestamp 20 for switch S3. The position of S3 is marked with a short, thick dashed line and a solid triangle at the top as the silent boundary 18, to visually distinguish it from the segment switch 13 that generates the switch action timestamp 20. Starting from the direction of the initial fault, the action timing set corresponding to the timing comparison table is scanned switch by switch along the feeder topology line 12. The position of the first segment switch 13 without a switch action timestamp 20 in the timing comparison table is confirmed as the silent boundary 18. Although S4 and the tie switch 14 (S5) after S3 are also silent, the silent boundary 18 is taken from the first silent segment switch 13 closest to the starting point of the direction of the initial fault, i.e., S3, according to the timing comparison table. This completes the reverse delineation of the direction of the initial fault. The feeder topology line 12 segment between the silent boundary 18 and the first-operated switch 16 is the candidate fault location segment. Figure 3 The feeder topology line 12 segment between S2 and S3 is marked with a bold line as fault location segment 19. Fault location segment 19 indicates that this segment is the confirmed fault range between the farthest sectionalizing switch 13 and the silent boundary 18 that the fault current can reach. For the primary transfer path with insufficient location confidence, the silent boundary 18 is extended by one segment towards the first-action switch 16 to expand the coverage of fault location segment 19. For the same fault event, the fault location segment 19 is inconsistent on different primary transfer paths, and additional location divergence markings are added to the segments.

[0059] In some embodiments, the step of identifying and verifying conflicting items in the fault location segment and generating a transfer operation decision by centralized verification of conflict periods includes: determining the occurrence time of each conflicting item in the fault location segment to form a conflict time sequence; performing time period distribution statistics on the conflict time sequence to identify concentrated conflict periods and generate concentrated time period groups; attributing the conflict source type of the concentrated time period groups to determine the cause of the time period anomaly; and performing location conflict correction on the fault location segment based on the cause of the time period anomaly to generate a transfer operation decision.

[0060] In the fault location section, the occurrence times of each location conflict item are determined to form a conflict time sequence. The identification of location conflict items focuses on sections within the fault location section that carry location divergence markers. Sections where the location results for the same fault event are inconsistent on different primary transfer paths constitute a location conflict item. The occurrence time of the conflict item is taken as the first action time of the corresponding fault event. When the same section in the fault location section shows location divergence markers in multiple historical fault events, the first action time of each fault event is recorded one by one to form a conflict time sequence fragment for that section. All conflict time sequence fragments are merged and arranged chronologically to form a complete conflict time sequence for the fault location section. Each entry in the conflict time sequence carries, in addition to the occurrence time, the corresponding fault event identifier, the conflict section identifier, and the number of primary transfer paths involved in the location. When there are many participating paths but the location results still show divergence, it indicates that the action sequence of this fault event has high uncertainty. A multi-path divergence marker is added to the conflict time sequence for the corresponding conflict item. Conflict items with multi-path divergence markers have a higher weight than single-path divergence conflict items when identifying conflict-prone periods in subsequent periods. The conflict time sequence spans a 180-day historical window and covers the current fault event. The historical conflict time sequence reflects the pattern of location discrepancies in the fault location segment in recent history. The temporal relationship between historical patterns and current conflicts forms the basis for identifying subsequent conflict concentration periods. The number of reactivation records carried by each conflict item in the action sequence's corresponding fault event is recorded together. Conflict items with a large number of reactivation records indicate that the corresponding fault event involves frequent repeated actions of the protection device, serving as an auxiliary basis for intermittent fault identification during the conflict source type attribution stage.

[0061] Statistical analysis of conflict time series is performed to identify concentrated conflict periods and generate concentrated period groups. The 180-day historical window is divided into several time units, each two hours long. Each two-hour time unit forms twelve time grids within a day. The number of conflict time series entries within each time grid is counted as the conflict frequency for that time grid. The normalized conflict frequency is obtained by dividing the conflict frequency (from the conflict time series) of each time grid by the number of days within that time grid in the 180-day period, eliminating the incomparability of frequencies caused by differences in the number of days covered by different time grids. Concentrated conflict periods are identified based on a normalized conflict frequency exceeding 1.5 times the global average. Time grids exceeding this threshold are identified as concentrated conflict period grids. Adjacent concentrated conflict period grids that are consecutive on the time axis are merged into a single concentrated period. The conflict intensity of a concentrated period is quantified by the average normalized conflict frequency within the covered time grids. The concentrated time period group consists of all conflict concentrated time periods. The start and end times, conflict intensity, and number of covered time period grids of each concentrated time period in the concentrated time period group jointly describe the temporal characteristics. A large number of covered time period grids in a concentrated time period group indicates that the concentrated time period is relatively broad in time, suggesting that there are persistent positioning interference factors in the system operation status during this period. Conflict times with multi-path divergence labels are included with a weight of 1.5 times when calculating the normalized conflict frequency, making the contribution of multi-path divergence events to the identification of concentrated time periods higher than that of single-path divergence events. This allows high-uncertainty fault events with simultaneous multi-path divergence to be fully reflected in the identification of concentrated time periods.

[0062] The causes of anomalies in concentrated time periods were determined by attributing conflict sources to different types. The attribution of conflict sources involved a two-dimensional analysis of each concentrated time period within the concentrated time period group. The first dimension examined the distribution of protection device action types within the corresponding time period, combined with the number of reclosing records for conflict items: a high proportion of reclosing actions and a large number of reclosing records indicated intermittent faults in that time period. Intermittent faults caused repeated actions of protection devices, leading to timing disorder and being a major source of conflict identification. A high proportion of overcurrent protection actions indicated a persistent overload in that time period. Persistent overloads caused multiple protection devices to operate nearly simultaneously, resulting in the failure of the first-action switch identification. The second dimension examined the frequency of topology change events within the corresponding time period. A frequency of change events exceeding twice the average of non-concentrated time periods indicated frequent switch state switching in that time period. Rapid changes in the topology structure led to inconsistencies in the positioning basis of each primary transfer path, another major source of positioning discrepancies. The attribution results from two dimensions within a concentrated time period group are jointly used to determine the cause of time period anomalies. In the concentrated time period group, reclosing-dominated causes are determined to be driven by intermittent faults, overcurrent protection-dominated causes are determined to be driven by continuous overload, and displacement frequency-dominated causes are determined to be driven by topology fluctuations. When all three causes exist simultaneously, the proportion of reclosing actions, the proportion of overcurrent protection actions, and the frequency of displacement events are each divided by their corresponding baseline values ​​in non-concentrated time periods to obtain normalization strength. The maximum value of the three normalization strengths is taken to determine the dominant cause, and the dominant cause type is recorded in the time period anomaly cause field. The time period anomaly cause field, along with the concentrated time period group entries, is passed to the location conflict correction stage. Different anomaly cause types correspond to different correction strategies, ensuring that the correction operation does not uniformly apply the same correction rule to specific anomaly causes.

[0063] Based on the cause of the time-period anomaly, the fault location section is corrected for location conflicts to generate a transfer operation decision. When the cause of the time-period anomaly is an intermittent fault-driven type, the section with the highest frequency of location divergence results in the fault location section within that concentrated time period is taken as the corrected location section; when the cause of the time-period anomaly is a continuous overload-driven type, the fault location section is extended by one section upstream and downstream of the first-action switch; when the cause of the time-period anomaly is a topology fluctuation-driven type, the intersection of the location results of each primary transfer path with the fault location section is taken. If the intersection is empty, the location result of the path with the lowest location conflict intensity is used as the correction basis. After correction, the location confidence of the fault location segment with the direction to be confirmed is multiplied by a reduction factor less than 1. The final location result of each fault location segment is jointly calculated with the final over-limit amount of the corresponding primary transfer path capacity margin benchmark to calculate the transfer operation priority score P_op=w_loc·C_conf+w_cap·(1-ΔC_norm), where C_conf is the location confidence of the corrected location segment, assigned by the direction vector confidence of the initial fault direction, and the continuous overload drive and topology fluctuation drive type correction. The segment is multiplied by a reduction factor less than 1, with C_conf ranging from 0 to 1; ΔC_norm is the normalized value obtained by linearly mapping the final over-limit amount of the corresponding segment in the capacity margin benchmark to the maximum and minimum values ​​of all segments in the current fault event batch, ranging from 0 to 1, so that P_op falls within the 0 to 1 interval; w_loc and w_cap are the weighting coefficients of location confidence and capacity margin, which are written into the configuration parameters according to the scheduling strategy during the initialization phase, w_loc + w_cap = 1, both being dimensionless quantities. The transfer operation decision is composed of the final location result of all corrected fault location segments, the corresponding primary transfer path identifier, and the transfer operation priority score P_op. In the transfer operation decision, P_op is arranged from high to low to form an execution priority order, which is used for subsequent transfer frequency weighted sorting and margin fast consumption path pre-orchestration.

[0064] Step S150: Based on the transfer operation decision and the transfer frequency across feeders, a weighted sorting of transfer frequencies is performed to generate an operation priority sequence. The operation priority sequence and the transfer operation decision are pre-arranged with margin fast consumption path and the circuit breaker control command is output.

[0065] Specifically, an operation priority sequence is generated by weighting the transfer frequency based on the transfer operation decision and the transfer frequency across feeders. In the transfer operation decision, the frequency difference between each item P_op and the corresponding segment in the cross-feeder transfer frequency is used as the dual input for weighted ranking. The P_op of the transfer operation decision is taken from S140. The Δf_norm of the cross-feeder transfer frequency is defined as the normalized value of the frequency difference of the current segment. The weighted ranking score Q_rank = P_op·(1-α·Δf_norm). The normalization is divided by the maximum absolute value of the frequency difference of the batch. The range of Δf_norm is -1 to 1. P_op, Δf_norm, and α are all dimensionless. α is the weighting coefficient, between 0 and 1, which is calibrated according to the variance of the overall historical transfer frequency distribution of the main transfer path. When the variance is large, α is small. The range of α and Δf_norm together ensure that (1-α·Δf_norm) is non-negative. Q_rank is a dimensionless ranking key so that the difference in the historical frequency of the high-frequency path does not excessively suppress Q_rank when the frequency is extremely uneven. Q_rank comprehensively reflects the overall priority of each transfer operation across three dimensions: location reliability, capacity margin, and cross-feeder transfer frequency. These are arranged from highest to lowest to form an operation priority sequence. For sections with insufficient sample labels, the measured difference is replaced by the average historical total number of transfers for the same type of section when calculating the Δf_norm of cross-feeder transfer frequency. The operation priority sequence is segmented according to the priority chain determined at the primary transfer path stage (historical verification > pending rectification > verified but not verified > emergency availability), unaffected by Q_rank values. Within the same priority, it is arranged twice by Q_rank. When the same section corresponds to multiple Q_ranks due to multiple path labels, the path with the highest score is taken as the representative path for that section. The remaining related paths are retained in the operation priority sequence as alternative labels. Alternative paths are activated sequentially according to their scores when the representative path fails.

[0066] The circuit breaker control commands are pre-arranged for the margin fast-out path in the operation priority sequence and transfer operation decision. Based on the historical over-limit sequence stored in each section of the capacity margin benchmark, the path whose final over-limit is positively increased in both of the most recent consecutive historical fault events is determined as the margin fast-out path. Sections with fewer than three historical over-limit sequence records (including the current one) are not included in this determination. The margin fast-out path is extracted from its original position in the operation priority sequence and placed at the beginning of the sequence, ensuring that the transfer operation is not interrupted if the path fails after the margin is exhausted. Each item in the transfer operation decision is arranged according to the above operation priority sequence. After the transfer operation decision is corrected, the fault location section determines the fault-side sectionalizing switch number that needs to be disconnected, and the primary transfer path identifier determines the tie switch number that needs to be closed. The circuit breaker control commands are arranged according to the principle of disconnecting before closing. The timing interval is set based on the average historical reset time of the protection device (in time units). The reset time is statistically analyzed from the relay protection action log by device model, and differences between different models are distinguished in the timing interval setting. The circuit breaker control command carries the operating section identifier, switch operation type, execution time, and operation priority sequence ranking. The execution result is fed back to the operation priority sequence to update the execution status. When the execution status is abnormal (switch fails to operate or command times out), the operation priority sequence is rearranged and the circuit breaker control command is regenerated. When multiple sections fail simultaneously and concurrent transfer operations are required, the circuit breaker control commands for concurrent entries are arranged in batches. The execution timing interval of each command within a batch is independently set according to the reset time of each protection device. Each path is triggered independently after the protection status is ready. Commands for different paths within a batch are not forced to be executed synchronously.

[0067] To implement the above-described method embodiment, a feeder transfer control method for an outdoor high-voltage vacuum circuit breaker is provided to achieve the corresponding functions and technical effects. See also... Figure 4 , Figure 4 This paper shows a structural block diagram of an outdoor high-voltage vacuum circuit breaker feeder transfer control system 400 according to an embodiment of this application, including: Feature extraction module 401 is used to collect load data and topology data of each feeder, perform load topology analysis on the load data and topology data to generate a load status table, and implement peak shifting and light load feeder priority labeling according to feeder power supply type to generate a transfer margin table. The baseline construction module 402 is used to determine the candidate fault segment set according to the transfer margin table, and to perform capacity upper limit boundary calibration on the candidate fault segment set based on the transfer margin table to generate a capacity margin baseline. The path filtering module 403 is used to perform cross-feeder transfer frequency statistics on the number of transfers across the same section of the candidate fault section set, and to perform protection frequency path elimination verification on the candidate fault section set based on the capacity margin benchmark and the cross-feeder transfer frequency to generate an available transfer path set. The available transfer path set is then subjected to verified transfer path priority screening to determine the primary transfer path. The fault location module 404 is used to collect the fault location features of the main transfer path, perform switch action timing fault location based on the fault location features to determine the fault location section, identify the location conflict items of the fault location section, perform centralized verification of conflict time periods, and generate transfer operation decision. The instruction output module 405 is used to generate an operation priority sequence by weighting the transfer frequency based on the transfer operation decision and the cross-feeder transfer frequency, and to output circuit breaker control instructions by performing margin fast consumption path pre-arrangement on the operation priority sequence and the transfer operation decision.

[0068] The aforementioned outdoor high-voltage vacuum circuit breaker feeder power transfer control system 400 can implement the outdoor high-voltage vacuum circuit breaker feeder power transfer control method of the above-described method embodiments. The options in the above method embodiments are also applicable to this embodiment, and will not be detailed here. The remaining contents of this application embodiment can be referred to the contents of the above method embodiments, and will not be repeated in this embodiment.

Claims

1. An outdoor high-voltage vacuum circuit breaker feeder transfer control method, characterized by, include: Collect load data and topology data of each feeder, perform load topology analysis on the load data and topology data to generate a load status table, and generate a transfer margin table by prioritizing the light load feeder according to the feeder power supply type. Based on the supply margin table, a set of candidate fault sections is determined, and a capacity margin benchmark is generated by calibrating the upper limit boundary of the set of candidate fault sections based on the supply margin table. The process involves: statistically analyzing the number of cross-feeder transfers across similar sections in the candidate fault segment set to generate cross-feeder transfer frequencies; and verifying and eliminating protection frequency-based transfer paths in the candidate fault segment set based on the capacity margin benchmark and the cross-feeder transfer frequencies to generate a set of available transfer paths. This includes: retrieving historical protection action records for each transfer path in the candidate fault segment set to obtain an action record set; rating the severity of the action record set according to the action interval shrinkage trend to form a path severity table; classifying the path degradation of each path in the candidate fault segment set based on the path severity table and the cross-feeder transfer frequencies to form a degraded path set; eliminating over-limit degraded paths based on the degraded path set and the capacity margin benchmark to generate a set of available transfer paths; and performing a priority screening of verified transfer paths in the set of available transfer paths to determine the primary transfer path. The process involves collecting fault location features of the primary transfer path, and determining the fault location segment based on these features through switch action timing fault location. This includes: analyzing the fault location features to extract the timestamps of each switch action during the fault period to form an action timing set; grouping the action timing set by segmented switches and tie switches and comparing their order to obtain a timing comparison table; identifying the type of the first-action switch based on the timing comparison table to determine the initial fault direction; using the initial fault direction to perform silent boundary reverse delineation on the timing comparison table to determine the fault location segment; and identifying location conflict items within the fault location segment and performing centralized verification of conflict time periods to generate a transfer operation decision. This includes: determining the occurrence time of each location conflict item within the fault location segment to form a conflict time sequence; statistically analyzing the time period distribution of the conflict time sequence to identify concentrated conflict time periods and generate concentrated time period groups; attributing the conflict source type of the concentrated time period groups to determine the cause of the time period anomaly; and correcting the location conflict based on the cause of the time period anomaly to generate a transfer operation decision for the fault location segment. Based on the transfer operation decision and the transfer frequency across feeders, a weighted sorting of transfer frequencies is performed to generate an operation priority sequence. The operation priority sequence and the transfer operation decision are then pre-arranged with margin fast consumption paths to output circuit breaker control commands.

2. The method of claim 1, wherein, The step of generating a transfer margin table by prioritizing light-load feeders in the load status table according to feeder power supply type includes: The load status table is divided into power supply type groups according to the feeder power supply type; The peak load rate sequence is generated by statistically analyzing the peak load rate during the specified power supply type. Based on the peak load rate sequence, feeders with values ​​below the group average are identified to form a set of lightly loaded feeders. The light-load feeder set is marked with priority during adjacent heavy-load peak shift times to generate a transfer margin table.

3. The method according to claim 1, characterized in that, The step of generating a capacity margin benchmark by calibrating the upper limit boundary of the candidate fault segment set based on the transfer margin table includes: Based on the aforementioned power supply margin table, the critical current-carrying feeder set is constructed by analyzing the operating parameters of each feeder. The critical operating parameter set is obtained by analyzing the rate of change of parameters before and after the peak value of each feeder in the critical current-carrying feeder set. Based on the critical operating parameter set, capacity upper limit boundary matching is performed on the candidate fault segment set to obtain the boundary matching result. Based on the boundary matching results, the capacity over-limit amount of each segment is calculated to generate a capacity margin benchmark.

4. The method according to claim 1, characterized in that, The step of performing a verified transfer path priority screening on the available transfer path set to determine the primary transfer path includes: A transfer frequency table is generated by counting the historical transfer counts of each path in the set of available transfer paths. Based on the aforementioned transfer frequency table, unverified paths with a historical transfer count of zero are identified to obtain a set of unverified paths; The unverified path set is subjected to availability verification of the interconnection switch and protection settings to form a mismatch candidate set; The primary transfer path is determined by eliminating unverified mismatched paths based on the mismatch candidate set.

5. The method according to claim 3, characterized in that, The step of performing capacity upper limit boundary matching on the candidate fault segment set based on the critical operating parameter set to obtain the boundary matching result includes: Based on the critical operating parameter group, the peak current of each critical current-carrying feeder and the line voltage drop are read to obtain the critical parameter pair; The critical parameter pairs are compared with the candidate fault segment set to obtain a parameter difference sequence by segment-by-segment fixed difference calculation. The parameter difference sequence is used to identify critical segments where the difference turns from negative to positive, forming a capacity boundary candidate set. Based on the aforementioned capacity boundary candidate set, a bidirectional margin determination across feeders is performed to obtain the boundary matching result.

6. The method according to claim 1, characterized in that, The step of identifying the type of the first-action switch and determining the initial fault direction based on the timing comparison table includes: The earliest action switch record for each fault event is selected from the time sequence comparison table to form the first action switch set. Based on the first-action switch set, millisecond-level time difference switch pairs are identified to obtain near-simultaneous action groups; The protection setting boundary is compared and verified for the near-simultaneous action group to form the setting verification result; Based on the verification results of the set value, the fault direction is corrected for the first-action switch set to determine the preliminary fault direction.

7. A power supply control system for an outdoor high-voltage vacuum circuit breaker feeder, characterized in that, include: The feature extraction module is used to collect load data and topology data of each feeder, perform load topology analysis on the load data and topology data to generate a load status table, and implement peak shifting and light load feeder priority labeling according to feeder power supply type to generate a transfer margin table. The baseline construction module is used to determine the candidate fault segment set based on the transfer margin table, and to perform capacity upper limit boundary calibration on the candidate fault segment set based on the transfer margin table to generate a capacity margin baseline. The path filtering module is used to generate a cross-feeder transfer frequency by statistically analyzing the number of times the same section of the candidate fault segment is transferred across feeders, and to generate a set of available transfer paths by performing protection frequency path elimination verification on the candidate fault segment set based on the capacity margin benchmark and the cross-feeder transfer frequency. This includes: retrieving the historical protection action records of each transfer path in the candidate fault segment set to obtain an action record set; rating the severity of the action record set according to the action interval shrinkage trend to form a path severity table; classifying the path of each path in the candidate fault segment set into a deterioration level based on the path severity table and the cross-feeder transfer frequency to form a deteriorated path set; eliminating over-limit deteriorated paths according to the deteriorated path set and the capacity margin benchmark to generate a set of available transfer paths; and performing a priority screening of verified transfer paths in the set of available transfer paths to determine the primary transfer path. The fault location module is used to collect fault location features of the primary transfer path, and to determine the fault location segment based on the fault location features by performing switch action timing fault location. This includes: parsing the fault location features to obtain the timestamps of each switch action during the fault period to form an action timing set; comparing the action timing set by grouping it into segmented switches and tie switches to obtain a timing comparison table; identifying the type of the first-operated switch based on the timing comparison table to determine the initial fault direction; using the initial fault direction to perform silent boundary reverse delineation on the timing comparison table to determine the fault location segment; and identifying location conflict items in the fault location segment and performing centralized verification of conflict time periods to generate a transfer operation decision. This includes: determining the occurrence time of each location conflict item in the fault location segment to form a conflict time sequence; performing time period distribution statistics on the conflict time sequence to identify concentrated conflict time periods and generate concentrated time period groups; attributing the conflict source type of the concentrated time period groups to determine the cause of the time period anomaly; and performing location conflict correction on the fault location segment based on the cause of the time period anomaly to generate a transfer operation decision. The instruction output module is used to generate an operation priority sequence by weighting the transfer frequency based on the transfer operation decision and the cross-feeder transfer frequency, and to output circuit breaker control instructions by performing margin fast consumption path pre-arrangement on the operation priority sequence and the transfer operation decision.

Citation Information

Patent Citations

  • Inverse time limit protection adaptive differential cooperation protection method for distribution network grounded through small resistor

    CN113224727A

  • Power distribution network power supply recovery method and device, terminal equipment and storage medium

    CN114725940A