Ecological restoration risk intelligent early warning method and system

CN122658066APending Publication Date: 2026-08-28CHINA UNIV OF GEOSCIENCES (BEIJING) +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611133209.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-29
Publication Date
2026-08-28

AI Technical Summary

Technical Problem

[0004]本申请的主要目的在于提供一种生态修复风险智能预警方法及系统,旨在解决现有的生态风险预警方式依赖于实时监测数据与静态阈值的对比,导致预警时效性不足的技术问题

Benefits of technology

[0017]Because this application can execute the first risk assessment process based on the LSTM time-series prediction model and the second risk assessment process based on a pre-configured rule set in parallel, it can both use the LSTM model to predict the potential deterioration trend of ecological indicators in advance and generate predictive early warning signals, and use the rule set to make immediate judgments on real-time monitoring data and respond quickly to sudden abnormal fluctuations to generate real-time alarm signals. Compared with traditional methods that rely solely on ex-post threshold judgments, this application achieves complementary synergy between predictive early warning and real-time alarms, covering various scenarios such as slowly changing cumulative risks and sudden abnormal risks, significantly improving the comprehensiveness and timeliness of risk identification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122658066A_ABST
    Figure CN122658066A_ABST
Patent Text Reader

Abstract

The application discloses an ecological restoration risk intelligent early warning method and system, the method comprises the following steps: acquiring real-time monitoring data of a current ecological restoration area; executing a first risk judgment process and a second risk judgment process in parallel, the first risk judgment process comprises the following steps: inputting the real-time monitoring data into a preset LSTM time sequence prediction model, and generating a predictive early warning signal based on the output prediction result, the second risk judgment process comprises the following steps: matching the real-time monitoring data according to a preconfigured rule set, and generating a real-time alarm signal according to the matching result; generating a current early warning event according to the predictive early warning signal and / or the real-time alarm signal, and pushing the current early warning event to a corresponding target person in charge. Compared with the traditional method which only relies on post-threshold judgment, the application realizes the complementary cooperation of predictive early warning and real-time alarm, can cover various risk scenarios, and thus significantly improves the comprehensiveness and timeliness of risk identification.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of risk warning technology, and in particular to an intelligent early warning method and system for ecological restoration risks. Background Technology

[0002] Ecological restoration projects, such as mine environmental remediation and coastal ecological restoration, are important means to address ecosystem degradation and ensure regional ecological security. During project implementation and subsequent management, continuous monitoring and risk warning of key ecological indicators such as soil erosion, water quality changes, and slope stability are crucial for timely detection of safety hazards and ensuring restoration effectiveness. With the widespread adoption of technologies such as the Internet of Things and remote sensing, the ability to acquire ecological monitoring data has significantly improved, providing a data foundation for building intelligent early warning systems.

[0003] Current mainstream methods for early warning of ecological restoration risks primarily rely on comparing real-time monitoring data with preset static thresholds. When the monitored value exceeds the threshold, the system triggers an alarm. The limitation of this method lies in its inherently reactive nature; it only issues an alert when the risk has already occurred or become apparent, making it difficult to identify and intervene in potential risks early. Specifically, due to a lack of ability to analyze the inherent evolutionary patterns of the data, this method is slow to react to risk types with gradual changes, such as persistent soil acidification and slow accumulation of pollutants. It often only detects problems after they have already caused substantial impact, resulting in a severely insufficient early warning window and inadequate timeliness of warning signals. Summary of the Invention

[0004] The main purpose of this application is to provide an intelligent early warning method and system for ecological restoration risks, which aims to solve the technical problem that existing ecological risk early warning methods rely on the comparison of real-time monitoring data and static thresholds, resulting in insufficient timeliness of early warning.

[0005] To achieve the above objectives, this application proposes an intelligent early warning method for ecological restoration risks, the method comprising: Obtain real-time monitoring data of the current ecological restoration area; The first risk assessment process and the second risk assessment process are executed in parallel. The first risk assessment process includes: inputting the real-time monitoring data into a preset LSTM time series prediction model and generating a predictive early warning signal based on the output prediction result. The second risk assessment process includes: matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result. A current warning event is generated based on the predictive warning signal and / or the real-time alarm signal, and the current warning event is pushed to the corresponding target responsible person.

[0006] In one embodiment, the step of inputting the real-time monitoring data into a preset LSTM time-series prediction model and generating a predictive early warning signal based on the output prediction results includes: Acquire historical monitoring data within a specified historical time window before the current time point of the real-time monitoring data, and package the historical monitoring data and the real-time monitoring data into the current monitoring data; The current monitoring data is input into the preset LSTM time series prediction model. The preset LSTM time series prediction model is used to extract time series data corresponding to different ecological indicators from the current monitoring data, and to make predictions based on the time series data corresponding to each ecological indicator to obtain several ecological indicator prediction values ​​within a preset future time window. Predictive early warning signals are generated based on the predicted values ​​of each of the aforementioned ecological indicators.

[0007] In one embodiment, the step of generating predictive early warning signals based on the predicted values ​​of each of the ecological indicators includes: The current risk index is calculated based on the predicted values ​​of each of the aforementioned ecological indicators according to the preset risk index formula. The current risk index is compared with the risk level threshold, the current risk level is determined based on the comparison result, and a corresponding predictive early warning signal is generated. The formula for the preset risk index is as follows:

[0008] In the formula, The current risk index, The predicted value of the aforementioned ecological indicator. The safety thresholds corresponding to each of the aforementioned ecological indicators. The future time point corresponding to the predicted value of the ecological indicator within the preset future time window.

[0009] In one embodiment, before the step of inputting the current monitoring data into the preset LSTM time series prediction model, the following steps are included: Ecological monitoring data within a preset historical time range were collected as training samples; The initial LSTM neural network model is trained using the training samples to obtain the preset LSTM time series prediction model. The initial LSTM neural network model includes two LSTM layers and a fully connected output layer.

[0010] In one embodiment, the step of matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result includes: Load a pre-configured rule set associated with real-time monitoring data. The pre-configured rule set contains at least one early warning rule based on a threshold or pattern, and each early warning rule corresponds to a rule level. The current monitoring data is matched with each of the early warning rules in the pre-configured rule set. The current monitoring data includes the real-time monitoring data and the historical monitoring data within a specified historical time window before the time point of the real-time monitoring data. If a match is successful, a real-time alarm signal is generated based on the rule level corresponding to the matched warning rule.

[0011] In one embodiment, the step of generating a current warning event based on the predictive warning signal and / or the real-time alarm signal includes: Obtain a preset event report template, which includes at least: warning location item, warning type item, and warning level item; Obtain the first warning point corresponding to the predictive warning signal and / or the second warning point corresponding to the real-time alarm signal, and fill in the warning location item according to the first warning point and / or the second warning point; Abnormal ecological indicators are determined based on the predictive early warning signal and / or the real-time alarm signal, and the early warning type item is filled in based on the abnormal ecological indicators; The current warning level is determined according to the real-time alarm signal priority strategy and filled into the warning level item. The real-time alarm signal priority strategy is to use the rule level corresponding to the real-time alarm signal as the current warning level when both the predictive warning signal and the real-time alarm signal exist at the same time. The current warning event is generated based on the completed preset event report template.

[0012] In one embodiment, the step of pushing the current warning event to the corresponding target responsible person includes: Analyze the current warning location and current warning level corresponding to the current warning event; Based on the current warning location and the current warning level, a preset notification strategy mapping table is queried to determine the target responsible person and the current notification channel. The preset notification strategy mapping table maintains the association between different warning locations and responsible persons, as well as the mapping relationship between different warning levels and notification channels. The current early warning event will be pushed to the target responsible person based on the current notification channel.

[0013] In one embodiment, after the step of pushing the current warning event to the corresponding target responsible person, the following steps are included: The lifecycle state of the current warning event is updated to the processing state, which is generated synchronously and initialized to the pending determination state when the current warning event is generated. Upon receiving feedback information regarding the handling of the current warning event, the lifecycle status of the current warning event is updated to the processed status.

[0014] In one embodiment, the step of updating the lifecycle state of the current warning event to the processed state further includes: The monitoring data associated with the current warning event will be continuously monitored within a preset continuous monitoring period. If no warning event with the same abnormal ecological indicators as the current warning event is detected within the preset continuous monitoring period, the lifecycle status of the current warning event will be updated to closed.

[0015] Furthermore, to achieve the above objectives, this application also proposes an intelligent early warning system for ecological restoration risks, the system comprising: The real-time data acquisition module is used to acquire real-time monitoring data of the current ecological restoration area; The risk assessment module is used to execute the first risk assessment process and the second risk assessment process in parallel. The first risk assessment process includes: inputting the real-time monitoring data into a preset LSTM time series prediction model and generating a predictive early warning signal based on the output prediction result. The second risk assessment process includes: matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result. The event push module is used to generate a current warning event based on the predictive warning signal and / or the real-time alarm signal, and push the current warning event to the corresponding target responsible person.

[0016] This application discloses an intelligent early warning method for ecological restoration risks. The method includes: acquiring real-time monitoring data of the current ecological restoration area; executing a first risk assessment process and a second risk assessment process in parallel. The first risk assessment process includes: inputting real-time monitoring data into a preset LSTM time series prediction model and generating a predictive early warning signal based on the output prediction results. The second risk assessment process includes: matching real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching results; generating a current early warning event based on the predictive early warning signal and / or the real-time alarm signal, and pushing the current early warning event to the corresponding target responsible person.

[0017] Because this application can execute the first risk assessment process based on the LSTM time-series prediction model and the second risk assessment process based on a pre-configured rule set in parallel, it can both use the LSTM model to predict the potential deterioration trend of ecological indicators in advance and generate predictive early warning signals, and use the rule set to make immediate judgments on real-time monitoring data and respond quickly to sudden abnormal fluctuations to generate real-time alarm signals. Compared with traditional methods that rely solely on ex-post threshold judgments, this application achieves complementary synergy between predictive early warning and real-time alarms, covering various scenarios such as slowly changing cumulative risks and sudden abnormal risks, significantly improving the comprehensiveness and timeliness of risk identification.

[0018] This application also generates current warning events based on predictive warning signals and / or real-time alarm signals, and pushes these events to the corresponding responsible parties, thus achieving automatic generation and targeted delivery of warning information. This allows risk signals from different sources and of different types to be integrated into a unified warning event and directly reach specific responsible parties, avoiding delays or omissions caused by scattered information or ineffective notification channels, thereby ensuring the effective transmission of warning information and the timely initiation of subsequent actions. Attached Figure Description

[0019] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 This is a flowchart illustrating the first embodiment of the intelligent early warning method for ecological restoration risks in this application. Figure 2 This is a flowchart illustrating the second embodiment of the intelligent early warning method for ecological restoration risks in this application. Figure 3 This is a flowchart illustrating the third embodiment of the intelligent early warning method for ecological restoration risks in this application. Figure 4 This is a schematic diagram of the module structure of the intelligent early warning system for ecological restoration risks in this application.

[0021] The purpose, features, and advantages of this application will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0022] It should be understood that the specific embodiments described herein are merely illustrative of the technical solutions of this application and are not intended to limit this application.

[0023] To better understand the technical solution of this application, a detailed description will be provided below in conjunction with the accompanying drawings and specific implementation methods.

[0024] This application provides an intelligent early warning method for ecological restoration risks, referencing... Figure 1 , Figure 1 This is a flowchart illustrating the first embodiment of the intelligent early warning method for ecological restoration risks according to this application. In this embodiment, the method includes steps S10 to S30: Step S10: Obtain real-time monitoring data of the current ecological restoration area.

[0025] It should be noted that the method of this embodiment can be applied to risk monitoring and early warning scenarios in ecological restoration projects such as mines, coastal zones, and watersheds. The executing entity of the method in this embodiment can be a computing electronic device with functions such as data processing, network communication, and program execution, such as a server, industrial control computer, or cloud computing platform. Here, we take an ecological restoration risk intelligent early warning device (hereinafter referred to as "device") that can log into the ecological restoration management and control system as an example to illustrate this embodiment and the following embodiments.

[0026] It should be understood that the real-time monitoring data of the current ecological restoration area can be multi-dimensional time-series monitoring data obtained through various sensing methods. Sensing methods can include at least one of the following: satellite remote sensing, drone aerial photography, IoT sensors, and mobile manual data collection terminals. The types of monitoring data can include time-series data of key parameters reflecting the status of ecological restoration projects, such as water quality indicators (e.g., pH, dissolved oxygen, turbidity), soil indicators (e.g., moisture content, erosion modulus, heavy metal content), vegetation indicators (e.g., vegetation cover, growth index), and deformation indicators (e.g., surface displacement, slope settlement).

[0027] In practice, the device can continuously receive real-time monitoring data streams from various sensing terminals. The received raw monitoring data can undergo standardization processing, such as data cleaning, format conversion, and outlier removal, to eliminate the heterogeneity of data from different sources, form real-time monitoring data in a unified format, and write it into the device's multi-source spatiotemporal database for persistent storage.

[0028] Step S20: Execute the first risk assessment process and the second risk assessment process in parallel. The first risk assessment process includes: inputting the real-time monitoring data into a preset LSTM time series prediction model and generating a predictive early warning signal based on the output prediction result. The second risk assessment process includes: matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result.

[0029] It should be understood that the first and second risk assessment processes can operate independently and in parallel. The first risk assessment process can be used to predict future trends based on historical patterns, while the second risk assessment process can be used to make immediate judgments on the current real-time situation. Working together, they constitute a dual-driven risk assessment mechanism of "prediction + real-time."

[0030] In the first risk assessment process, the equipment can input the time series data of specified ecological indicators from real-time monitoring data into a preset LSTM time series prediction model for inference and prediction.

[0031] The preset LSTM time series prediction model can be a Long Short-Term Memory (LSTM) neural network pre-trained based on historical monitoring data. The gating structure of LSTM (including forget gate, input gate, and output gate) can learn the dynamic evolution of ecological indicators as external conditions change from historical time series and capture the long-term dependence of indicators in the time dimension.

[0032] After training, the network parameters of LSTM (including the weight matrices and bias terms of each gate structure) can be adjusted to the optimal state. Thus, based on the time series data of the input specified ecological indicator, it can output the predicted data sequence of the ecological indicator in the future. The predicted data sequence can contain the expected values ​​of the ecological indicator at each time point in the future.

[0033] Next, the device can analyze the predicted data sequence output by the model to determine whether there is a risk trend that the predicted value of ecological indicators will exceed the preset safety threshold at a future time.

[0034] Specifically, the device can iterate through each time point in the predicted data sequence and its corresponding predicted ecological indicator value, comparing each value with a pre-set safety threshold for that indicator. If one or more future time points have predicted values ​​that reach or exceed the safety threshold, it indicates a potential risk of exceeding the limit.

[0035] In addition, the device can further analyze the speed at which the predicted value approaches the threshold, i.e., the slope or rate of change of the predicted data sequence, to determine whether the risk is deteriorating rapidly or evolving slowly.

[0036] It should be understood that, based on the above analysis results, if a risk trend is identified, the equipment can generate a corresponding predictive early warning signal. This predictive early warning signal can at least identify the monitoring point that triggers the warning, the monitoring indicator, the expected time of exceeding the standard, the predicted value of exceeding the standard, and the warning level determined according to the degree of risk.

[0037] In the second risk assessment process, the equipment can immediately trigger a rule matching process for each new piece of real-time monitoring data entering the warehouse.

[0038] It should be noted that the pre-configured rule set can be a set of logical conditions predefined by the user through a graphical configuration interface to identify abnormal states. This rule set can contain multiple alert rules set from different dimensions, such as threshold-based rules and pattern-based rules. Each alert rule can be a conditional expression in the form of "WHEN-THEN".

[0039] It should be understood that the device can load a pre-configured rule set associated with the current monitoring data. This association can be pre-established based on dimensions such as the region where the monitoring point belongs and the type of monitoring indicator. Subsequently, the device can perform a one-by-one matching and calculation between the current monitoring data (including indicator values, collection time, point information, etc.) and the conditional expression of each early warning rule in the configured rule set.

[0040] In practice, if the current monitoring data satisfies the conditional expression of a certain early warning rule, it is considered a successful match. At this point, the device can generate a corresponding real-time alarm signal based on the matched early warning rule. This real-time alarm signal can at least identify the monitoring point that triggered the alarm, the ecological indicator, the current measured value, and the specific rule that triggered the alarm.

[0041] Step S30: Generate a current warning event based on the predictive warning signal and / or the real-time alarm signal, and push the current warning event to the corresponding target responsible person.

[0042] It should be noted that predictive warning signals and real-time alarm signals can be generated separately or simultaneously. Therefore, the device can integrate signals from these two sources into a unified, structured current warning event for subsequent unified management and push notifications.

[0043] It should be understood that the device can acquire the aforementioned generated predictive early warning signals and / or real-time alarm signals, and then associate the acquired predictive early warning signals and / or real-time alarm signals with the pre-stored governance patches, monitoring points, and responsible person information in the multi-source spatiotemporal database.

[0044] For example, based on the location ID in the signal, you can query the treatment section to which the location belongs, its geographical location, and information such as the supervisor and construction manager responsible for that section.

[0045] Specifically, the device can generate a complete record of the current warning event, including the warning location (such as latitude and longitude, and patch number), warning type (such as trend prediction or real-time alarm), warning level (such as alert, warning, or severe), risk indicator value (such as predicted or measured value), recommended measures (such as "on-site verification of the discharge outlet" or "addition of neutralizing agent"), and information on the responsible party. This record can then be pushed to the corresponding responsible party to ensure timely arrival and effective communication of information.

[0046] Furthermore, in order to completely eliminate risks and trace management responsibilities, the follow-up handling process of early warning events can be tracked and managed. Therefore, after step S30, the process also includes: steps S401~S404: Step S401: Update the lifecycle state of the current warning event to the processing state. The lifecycle state is generated synchronously and initialized to the pending determination state when the current warning event is generated.

[0047] It should be noted that while generating the current warning event, the device can also create an associated lifecycle status identifier for that event to characterize the current handling stage of the warning event. Furthermore, the device can provide a unified warning event management portal to centrally display all warning events and their corresponding lifecycle statuses (e.g., pending confirmation, in progress, processed, closed).

[0048] The initial lifecycle state can be set to a pending state, which indicates that the warning event has been generated and pushed, but has not yet received confirmation feedback from the responsible person.

[0049] In its implementation, after pushing the current warning event to the corresponding responsible party, the device can receive a confirmation command from the responsible party via their terminal. This confirmation command indicates that the responsible party has been informed of the warning information and has begun to take action. Upon receiving this confirmation command, the device can update the lifecycle status of the current warning event from "pending determination" to "processing," indicating that the warning event has been received by the responsible party and that the handling work is underway.

[0050] Step S402: Upon receiving feedback information on the handling of the current warning event, update the lifecycle status of the current warning event to the processed status.

[0051] It should be noted that after completing on-site verification and risk management, the responsible person can log in to the aforementioned early warning event management portal through their own terminal to report specific handling measures and results, generating handling feedback information. This feedback information may include the handling time, the personnel involved, a description of the handling measures, a comparison of indicators before and after the handling, and attachments such as on-site photos.

[0052] For example, the feedback information could be "Neutralizing agent has been added, pH value has begun to rise" or "Isolation layer has been repaired, leakage has been stopped".

[0053] In practical implementation, when the device receives the feedback information, it indicates that the responsible person has completed the substantive handling of the warning event. At this time, the device can update the current lifecycle status of the warning event from "processing" to "handled," which indicates that the responsible person has completed the handling measures and submitted feedback.

[0054] Step S403: Continuously monitor the monitoring data associated with the current early warning event within the preset continuous monitoring duration.

[0055] It should be understood that, in order to confirm whether the risk has been completely eliminated, the device can initiate subsequent continuous monitoring and verification processes.

[0056] It should be noted that the device can be pre-configured with a continuous monitoring duration parameter, such as 24 hours, 48 ​​hours, or 72 hours. This duration can be set according to the risk type and engineering management requirements. Simultaneously or subsequently, after updating the current warning event status to "processed," the device can initiate continuous monitoring tasks for the monitoring points and indicators associated with that warning event.

[0057] Understandably, continuous monitoring can involve periodically reading real-time monitoring data and comparing it with the warning rules or risk conditions triggered by the warning event to verify whether the risk has been eliminated and whether repeated warning events occur at the same warning point.

[0058] Step S404: If no warning event with the same abnormal ecological indicators as the current warning event is detected within the preset continuous monitoring period, the life cycle status of the current warning event is updated to the closed state.

[0059] It should be noted that the equipment continuously performs monitoring and judgment within the preset continuous monitoring period: if no new early warning event with the same abnormal ecological indicators as the current early warning event is detected within the entire continuous monitoring period, that is, the same location and the same ecological indicators do not trigger the generation of early warning events again, it indicates that the risk has been effectively controlled and there has been no rebound.

[0060] In this situation, the device can update the lifecycle status of the current warning event from "processed" to "closed." The "closed" status indicates that the warning event has been handled and verified, confirming that the risk has been completely eliminated, and the entire warning handling process has officially ended.

[0061] Furthermore, if the same abnormal ecological indicator is detected again during the continuous monitoring period, it indicates that the risk has not been completely eliminated or has recurred. The device can regenerate the warning event or keep the original event in the processing state and notify the responsible person to take further action.

[0062] It should also be noted that throughout the entire early warning process, the device can continuously record all operation logs, handling actions, and corresponding timestamps generated from the generation of the early warning event to the lifecycle status update, thereby forming a structured closed-loop archive and storing it persistently for subsequent statistical analysis, model optimization, and audit verification.

[0063] This embodiment enables the parallel execution of a first risk assessment process based on an LSTM time-series prediction model and a second risk assessment process based on a pre-configured rule set. This allows for both learning evolutionary patterns from historical data using the LSTM model to predict potential deterioration trends in ecological indicators and using the rule set to instantly assess real-time monitoring data for rapid response to sudden abnormal fluctuations. This achieves complementary synergy between predictive early warning and real-time alerts. Furthermore, by integrating early warning signals into a unified early warning event and pushing it to the responsible parties, and by implementing full lifecycle tracking management of the handling process, a complete closed loop from risk identification to handling feedback is formed. This improves the comprehensiveness and timeliness of risk identification while ensuring the effective transmission of early warning information and the timely initiation and traceability of subsequent handling.

[0064] Based on the first embodiment of this application, in the second embodiment of this application, the content that is the same as or similar to that in Embodiment 1 above can be referred to the above description, and will not be repeated hereafter. Based on this, please refer to... Figure 2 , Figure 2 This is a flowchart illustrating the second embodiment of the intelligent early warning method for ecological restoration risks in this application.

[0065] In this embodiment, to specifically illustrate how to generate predictive early warning signals based on a preset LSTM time-series prediction model in the first risk assessment process, the step of inputting the real-time monitoring data into the preset LSTM time-series prediction model and generating predictive early warning signals based on the output prediction results specifically includes: steps S201~S203: Step S201: Obtain historical monitoring data within a specified historical time window before the time point of the real-time monitoring data, and package the historical monitoring data and the real-time monitoring data into the current monitoring data.

[0066] It should be noted that since the LSTM time series prediction model needs to infer future trends based on a certain length of historical sequence, the device can determine a specified historical time window length for each monitoring point and each monitoring indicator in the real-time monitoring data, such as the past 7 days, 30 days or 90 days. This window length can be preset according to the fluctuation characteristics of the indicator and the prediction requirements.

[0067] After obtaining the real-time monitoring data at the current moment, the device can query the historical monitoring data of the monitoring point on the same monitoring indicator, before the current moment and within the specified historical time window from the multi-source spatiotemporal database. Then, the historical monitoring data and the real-time monitoring data together constitute a complete time series segment.

[0068] In its implementation, the device can arrange and encapsulate the data points in a time series segment according to chronological order, forming a current monitoring data packet that conforms to the model input format requirements. This data packet can contain monitoring values ​​at multiple time points and their corresponding timestamp information.

[0069] Step S202: Input the current monitoring data into the preset LSTM time series prediction model. The preset LSTM time series prediction model is used to extract time series data corresponding to different ecological indicators from the current monitoring data, and make predictions based on the time series data corresponding to each ecological indicator to obtain several ecological indicator prediction values ​​within a preset future time window.

[0070] It should be noted that the preset LSTM time series prediction model can be a pre-trained LSTM. The training process of this model may include: collecting ecological monitoring data within a preset historical time range as training samples; using the training samples to train an initial LSTM neural network model to obtain the preset LSTM time series prediction model, wherein the initial LSTM neural network model includes two LSTM layers and a fully connected output layer.

[0071] It should be understood that the equipment can collect ecological monitoring data within a preset historical time range, such as data from the past year, two years, or longer. This time range can be long enough to cover the indicator change patterns under different seasons and operating conditions. The collected training samples can include time series data from multiple monitoring points and various ecological indicators. For each set of time series, it can be sliced ​​according to the requirements of model training, forming multiple input-output pairs. Each input pair contains a historical window sequence, and the corresponding output pair contains the actual observations of future windows after that historical window as labels for model learning.

[0072] The initial LSTM neural network model can consist of two stacked LSTM layers and a fully connected output layer. The first LSTM layer receives the input sequence and returns the complete output sequence to the second LSTM layer; the second LSTM layer can return only the output of the last time step, or return the complete sequence; the fully connected output layer maps the output of the last LSTM layer to a sequence of predicted values ​​within a preset future window.

[0073] For example, let the input sequence at time t be... , For the current moment, For counting backwards from the current moment At any given moment, the core computation process of LSTM is as follows: Forgotten Gate: ; Input Gate: ; Candidate memory units: ; Memory unit update: ; Output gate: ; Hidden output: ; In the formula, This is the output vector of the forget gate. It is the sigmoid activation function. Here is the weight matrix for the forget gate. To obtain the hidden state vector from the previous time step Input at the current moment To splice, For the bias term of the forget gate; The output vector of the input gate. Here is the weight matrix of the input gate. This is the bias term for the input gate; The candidate unit state vector. The weight matrix represents the candidate unit states. The bias term for the candidate cell state; This is the cell state vector at the current moment. This represents historical memory filtered through the forgetting gate. This indicates the current new information after being filtered by the input gate; The output vector of the output gate. This is the weight matrix of the output gate. This is the bias term for the output gate; This is the hidden state vector at the current time step.

[0074] W and b are the parameters to be trained. This represents element-wise multiplication. The hidden state vector of the last LSTM layer. After mapping with a fully connected layer, a predicted sequence for the next T time steps (e.g., T=72 hours) can be output. .

[0075] Specifically, the device can input the aforementioned collected training samples into the initial LSTM neural network model to perform forward propagation calculations and obtain the predicted output. Then, the predicted output is compared with the true observations (labels) in the training samples to calculate the loss function value, such as the mean squared error (MSE) loss. Next, the gradient of the loss function with respect to each parameter of the model is calculated using the backpropagation algorithm, and the trainable parameters in the model, such as the weight matrix and bias terms, are updated using an optimization algorithm (such as the Adam optimizer).

[0076] Finally, through multiple iterations of training, the model parameters are continuously optimized until the loss function converges or the preset number of training epochs is reached, at which point training is complete. At this point, the model parameters are fixed, forming a preset LSTM time-series prediction model that can be used for inference and prediction. This preset LSTM time-series prediction model can also be encapsulated as an independent RESTful microservice, so that devices can directly call and execute the first risk assessment process when they acquire real-time monitoring data.

[0077] Accordingly, when the device acquires real-time monitoring data and triggers the execution of the first risk assessment process, the model can process the data at each time point in the current monitoring data input to the model point by point through its gating mechanism (including forget gate, input gate, and output gate). During the processing, the model can selectively retain or forget historical information and update the current cell state and hidden state, thereby achieving the capture and memorization of long-term and short-term dependencies in the time series data.

[0078] After stacking multiple LSTM layers, the model can extract high-dimensional feature representations that characterize the evolutionary patterns of the data. Finally, the fully connected output layer maps these high-dimensional features to predicted values ​​of several ecological indicators within a preset future time window. This preset future time window can be 24 hours, 72 hours, or longer, and the specific duration can be preset according to the prediction requirements and model capabilities. The output sequence of predicted values ​​corresponds to the expected values ​​of the ecological indicator at each future time point.

[0079] It should also be noted that since real-time monitoring data can contain monitoring data corresponding to different ecological indicators, the model can first split the real-time monitoring data into time series data corresponding to each ecological indicator according to the ecological indicators; then predict each time series data separately, and thus obtain prediction sequences corresponding to different ecological indicators. Each prediction sequence contains the predicted values ​​of ecological indicators corresponding to each future time point within a preset future time window.

[0080] For example, if the real-time monitoring data is collected from the pH value of the reservoir in mining area A, that is, if the real-time monitoring data includes the ecological indicator "pH value", and the real-time monitoring data shows that the sensor reports a real-time pH value of 6.8, then the device can perform the first risk assessment procedure: read the pH value sequence X of the monitoring point over the past 30 days. t The input is fed into the preset LSTM time series prediction model for inference, and the output is the predicted sequence Y. t The predicted sequence Y t It can show that the pH value will continue to decrease over the next 72 hours and is expected to drop to 5.9 after 60 hours.

[0081] Step S203: Generate predictive early warning signals based on the predicted values ​​of each of the ecological indicators.

[0082] It should be noted that the device can directly compare the predicted values ​​of ecological indicators at each time point with the pre-set safety thresholds for those ecological indicators (e.g., setting the safety threshold for pH to 6.0). If the predicted values ​​at one or more future time points reach or exceed the safety thresholds, it indicates a potential risk of exceeding the limits, thereby generating a predictive early warning signal.

[0083] In addition, the device can further analyze the trend of the predicted values, such as calculating the slope or rate of change of the predicted sequence, to determine whether the risk is deteriorating rapidly or accumulating slowly.

[0084] Furthermore, to specifically illustrate how to quantify and evaluate the predicted values ​​of ecological indicators, step S203 also includes: steps S2031~S2032: Step S2031: Calculate the current risk index according to the predicted values ​​of each ecological indicator and the preset risk index formula.

[0085] It should be understood that this risk index formula comprehensively considers two core factors: the predicted magnitude of exceeding the limit and the predicted urgency of exceeding the limit. The predicted magnitude of exceeding the limit can be characterized as the relative degree to which the predicted value of the ecological indicator exceeds the safe threshold, for example, the absolute difference between the predicted value and the threshold divided by the threshold. The predicted urgency of exceeding the limit can be characterized as the imminent time of the expected first exceedance, for example, the reciprocal of the expected exceedance time or a negative correlation function.

[0086] Accordingly, the formula for the preset risk index can be expressed as:

[0087] In the formula, The current risk index, The predicted value of the aforementioned ecological indicator. The safety thresholds corresponding to each of the aforementioned ecological indicators. The future time point corresponding to the predicted value of the ecological indicator within the preset future time window.

[0088] It should be understood that, based on the above example, the risk index is calculated as follows: =60 hours, and the safe threshold for pH can be set to 6.0. Then, substitute it into the above preset risk index formula to calculate the current risk index R.

[0089] Step S2032: Compare the current risk index with the risk level threshold, determine the current risk level based on the comparison result, and generate a corresponding predictive early warning signal.

[0090] It should be understood that, unlike the safety thresholds corresponding to the aforementioned ecological indicators, this risk level threshold can be one or more, such as a prompt level threshold, a warning level threshold, a severe level threshold, etc., used to map continuous risk index values ​​to discrete warning levels.

[0091] In practice, the device can compare the calculated current risk index with the threshold values ​​for each risk level in sequence. If the current risk index is less than the alert level threshold, no warning can be generated or the risk can be considered zero. If the current risk index is greater than or equal to the alert level threshold but less than the warning level threshold, the current risk level is determined to be alert. If it is greater than or equal to the warning level threshold but less than the severe level threshold, it is determined to be warning. If it is greater than or equal to the severe level threshold, it is determined to be severe.

[0092] Furthermore, to specifically illustrate how real-time alarm signals are generated based on a pre-configured rule set in the second risk assessment process, step S20 also includes: steps S204~S206: Step S204: Load a pre-configured rule set associated with real-time monitoring data. The pre-configured rule set contains at least one early warning rule based on a threshold or pattern, and each early warning rule corresponds to a rule level.

[0093] It should be noted that the pre-configured rule set is a set of logical conditions pre-defined by the user through a graphical configuration interface to identify abnormal states. Each warning rule in the rule set can be dynamically adjusted by the user according to different stages of the ecological restoration project and the characteristics of different regions, without modifying the code.

[0094] A rule set can contain multiple alert rules, and each alert rule can be expressed in a "WHEN-THEN" format. Rule types can include: Rules based on static thresholds: for example, "when the value of the monitored indicator is greater than the upper limit threshold A" or "when the value of the monitored indicator is less than the lower limit threshold B".

[0095] Rules based on statistical fluctuations: for example, "when the value of a monitored indicator exceeds twice the standard deviation of the historical average for the same period three times in a row".

[0096] Rules based on compound conditions: for example, "when indicator A is higher than threshold X and at the same time the rate of change of indicator B exceeds Y%".

[0097] Rules based on change patterns: for example, "when a monitoring indicator shows a continuous upward / downward trend over N consecutive monitoring periods".

[0098] It should be understood that, in order to achieve tiered response, each early warning rule can also be configured with preset rule levels, such as alert level, warning level, and critical level. Different levels are associated with different visual identifiers, handling procedures, and notification strategies. For example, the alert level can be marked in blue, the warning level in yellow, and the critical level in red; the alert level only requires an in-site message notification, the warning level requires a WeChat notification, and the critical level requires both SMS and WeChat notifications.

[0099] In practical implementation, after receiving real-time monitoring data, the device can determine the associated pre-configured rule set based on information such as the monitoring point location, monitoring indicators, and region to which the data belongs. For example, if a monitoring point is located in a coastal ecological restoration area, then a salinization monitoring rule set configured for the coastal area will be loaded; if a monitoring point is a water quality monitoring point, then a rule set for water quality-related indicators such as pH value and dissolved oxygen will be loaded.

[0100] Step S205: Match the current monitoring data with each of the early warning rules in the pre-configured rule set.

[0101] It should be noted that the device can perform a one-by-one matching calculation between the current monitoring data and the conditional expression of each early warning rule in the aforementioned pre-configured rule set. The matching process can be a real-time calculation at the millisecond level.

[0102] Specifically, for rules based on static thresholds, the matching calculation can be to compare the current monitored value with the preset threshold in the rule to determine whether the relationship conditions such as greater than, less than, or equal to are met.

[0103] For rules based on statistical fluctuations, matching calculations can be performed in conjunction with historical data: the device can query the historical monitoring data of the monitoring point over a period of time, calculate its statistical characteristics (such as mean and standard deviation), and then determine whether the current value exceeds the preset statistical range.

[0104] For rules based on multiple conditions, matching requires that multiple conditions be met simultaneously. The device can check each condition sequentially, and a match is considered successful only when all conditions are met.

[0105] For rules based on change patterns, matching calculations can combine data from multiple recent consecutive monitoring periods at that location to perform trend analysis and determine whether they conform to the pattern characteristics defined by the rules, such as continuous rise, continuous fall, or violent fluctuation.

[0106] For example, if the real-time monitoring data includes the ecological indicator "pH value", then for water quality pH value monitoring, the pre-configured rule set may include the following rules: Rule R1 (prompt level): pH value is below 6.5 and lasts for more than 2 hours; Rule R2 (warning level): pH value is below 6.2; Rule R3 (severe level): pH value is below 6.0 and the rate of change exceeds 0.5 / hour.

[0107] When the device receives new real-time monitoring data, if the sensor reports a real-time pH value of 5.9 at 10:00 AM, the device can first load the rule set associated with that water quality monitoring point, and then match the current data pH=5.9 with each rule: For rule R1: It is necessary to determine whether the pH value has been below 6.5 for more than 2 hours. The device can query historical data for this location from 8:00 AM to 10:00 AM. If the pH value has been consistently below 6.5 during this period, then rule R1 matches successfully; otherwise, it fails.

[0108] For rule R2: directly determine 5.9 < 6.2, the condition is true, rule R2 is successfully matched.

[0109] For rule R3: two conditions need to be determined simultaneously: 5.9 < 6.0 must be true; and the rate of change must be calculated. The device can query the pH value at this location at 9:00 AM, assuming it is 6.2. The rate of change is (6.2 - 5.9) / 1 hour = 0.3 / hour, which is less than 0.5 / hour. Therefore, the second condition is not true, and rule R3 fails to match.

[0110] Step S206: If the match is successful, a real-time alarm signal is generated according to the rule level corresponding to the matched warning rule.

[0111] It should be noted that a match is considered successful when the current monitoring data meets the conditional expression of a certain early warning rule. The device can then generate a corresponding real-time alarm signal based on the matching result.

[0112] It should be understood that, considering the possibility of multiple rules matching successfully simultaneously—for example, in the above example, rules R1 and R2 might both be true—the device can determine the final real-time alarm signal level based on a preset strategy. Common strategies may include: a highest-level strategy, where the rule with the highest level among multiple matching rules is used as the final alarm level; a priority strategy, where certain warning rules are pre-defined as having priority (e.g., R1), and their levels are prioritized; and a merging strategy, which generates a single alarm signal but carries multiple level labels or multiple trigger rule information.

[0113] It should also be noted that when generating a real-time alarm signal, the signal may include at least the following: Monitoring point identifier: the specific monitoring point that triggered the alarm; Monitoring indicator type: the ecological indicator that triggered the alarm, such as pH value, soil moisture content, etc.; Current measured value: the real-time monitoring value at the time the alarm was triggered, for example, pH value = 5.9; Specific triggering rule: the name or identifier of the successfully matched rule, for example, R2; Warning level: the rule level determined according to the matching rule, for example, the warning level corresponding to R2; Trigger time: the timestamp of alarm generation, for example, the collection time 10:00 AM.

[0114] This embodiment executes the first and second risk assessment processes in parallel. It utilizes an LSTM time-series prediction model to learn the evolutionary patterns of ecological indicators from historical monitoring data, identifying potential future risks in advance and generating predictive early warning signals. Simultaneously, it uses a pre-configured rule set to instantly match real-time monitoring data, rapidly responding to sudden abnormal fluctuations and generating real-time alarm signals. This achieves complementary synergy between predictive early warning and real-time alarms, enabling the device to simultaneously cover both slowly accumulating risks and sudden abnormal risks. It avoids the limitations of a single mechanism in risk identification, thereby improving the comprehensiveness and timeliness of risk identification.

[0115] Based on the first and second embodiments of this application, in the third embodiment of this application, the content that is the same as or similar to the first and second embodiments described above can be referred to the above description, and will not be repeated hereafter. Based on this, please refer to... Figure 3 , Figure 3 This is a flowchart illustrating the third embodiment of the intelligent early warning method for ecological restoration risks in this application.

[0116] In this embodiment, to specifically illustrate how to generate the current warning event based on the predictive warning signal and / or the real-time alarm signal, step S30 includes: steps S301~S305: Step S301: Obtain a preset event report template, which includes at least: warning location item, warning type item, and warning level item.

[0117] It should be noted that the device can pre-define standardized warning event report templates to convert warning signals of different formats into warning event records with a uniform format. This template can contain several predefined required fields, such as a warning location field to record the geographical location of the risk, a warning type field to record the corresponding ecological indicator category, and a warning level field to record the severity level of the risk.

[0118] In addition, the template can be expanded with other fields according to actual needs, such as warning time, monitoring point, risk value, recommended measures, and responsible person information. This embodiment does not impose any restrictions on this.

[0119] Step S302: Obtain the first warning point corresponding to the predictive warning signal and / or the second warning point corresponding to the real-time alarm signal, and fill in the warning location item according to the first warning point and / or the second warning point.

[0120] It should be noted that both predictive warning signals and real-time alarm signals can carry the identifier of the monitoring point that triggered the warning when they are generated. The device can extract the first warning point from the predictive warning signal and / or extract the second warning point from the real-time alarm signal.

[0121] After acquiring the location information, the device can query a multi-source spatiotemporal database to obtain detailed geographical location information corresponding to that location, such as latitude and longitude coordinates, the corresponding governance patch number, administrative region, and specific place name. This geographical location information is then filled into the warning location field of the preset event report template.

[0122] It should also be noted that if both predictive warning signals and real-time alarm signals exist simultaneously and they correspond to the same warning location, then the location information will be filled in; if they correspond to different locations, then different warning events can be generated separately, or multiple locations can be marked in the same event.

[0123] For example, assuming the second warning point carried by the real-time alarm signal is "Water Reservoir in Mining Area B, City A - Monitoring Point A", the device queries the database to obtain detailed information about this point: longitude 121.2°, latitude 37.5°, the corresponding treatment patch number "YT-2025-003", and the geographical location description "East side of Water Reservoir No. 3 in Mining Area B, City A". The device then fills the above detailed information into the warning location field of the template.

[0124] Step S303: Determine abnormal ecological indicators based on the predictive early warning signal and / or the real-time alarm signal, and fill in the early warning type item based on the abnormal ecological indicators.

[0125] It should be noted that both predictive early warning signals and real-time alarm signals carry the type of ecological indicator that triggered the warning, such as pH value, soil moisture content, and surface displacement. The device can extract this abnormal ecological indicator information from the signal and then fill the early warning type field in the preset event report template with this abnormal ecological indicator.

[0126] It should also be noted that if both predictive early warning signals and real-time alarm signals exist simultaneously, and the two involve different abnormal ecological indicators, then the different abnormal ecological indicators can be filled into the early warning type field of the template at the same time.

[0127] For example, continuing the above example, if the abnormal ecological indicator carried in the real-time alarm signal is "pH value", then the device can fill "abnormal pH value" into the warning type field of the template.

[0128] Step S304: Determine the current warning level according to the real-time alarm signal priority strategy and fill it into the warning level item. The real-time alarm signal priority strategy is a strategy that uses the rule level corresponding to the real-time alarm signal as the current warning level when both the predictive warning signal and the real-time alarm signal exist simultaneously.

[0129] It should be understood that when the same monitoring point generates both predictive early warning signals and real-time alarm signals simultaneously, there may be two different early warning levels (e.g., LSTM prediction is at the warning level, while the rule engine real-time alarm is at the critical level). To ensure priority response to urgent risks, the device can adopt a real-time alarm signal priority strategy to determine the current early warning level, and then fill the current early warning level into the early warning level field of the template.

[0130] The logic of this real-time alarm signal priority strategy is as follows: when two signals exist simultaneously, the rule level corresponding to the real-time alarm signal is used as the final level of the current warning event. If only a single signal exists, the level carried by that signal is directly used as the current warning level.

[0131] For example, if the generated predictive warning signal level is "Warning Level" and the real-time alarm signal level generated by the rule engine is "Severe Level", the device determines the current warning level as "Severe Level" according to the real-time alarm signal priority policy and populates it into the warning level field of the template.

[0132] Step S305: Generate the current warning event based on the completed preset event report template.

[0133] It should be noted that once all required fields in the template have been filled in, the device can generate a complete and structured record of the current warning event based on the template. This record can include detailed information such as warning location, warning type, warning level, trigger time, monitoring point, risk value, responsible party, etc., and is assigned a unique event identifier.

[0134] In addition, the generated current warning events can be persistently stored in the history of a multi-source spatiotemporal database.

[0135] It should be understood that after generating the warning event, the device can push the current warning event to the corresponding responsible person. Further, to illustrate the warning event push process in detail, step S30 also includes: steps S306~S308: Step S306: Analyze the current warning location and the current warning level corresponding to the current warning event.

[0136] It should be noted that after generating the current warning event, the device can extract key information from the structured data of the event to determine the push target and push method.

[0137] Specifically, the device can parse the current warning location (i.e., the geographical location of the risk) and the current warning level recorded in the current warning event.

[0138] Step S307: Based on the current warning location and the current warning level, query the preset notification strategy mapping table to determine the target responsible person and the current notification channel. The preset notification strategy mapping table maintains the association relationship between different warning locations and responsible persons, as well as the mapping relationship between different warning levels and notification channels.

[0139] It should be noted that the device can be pre-configured with a notification policy mapping table to associate warning events with specific responsible persons and notification channels. This mapping table can contain two dimensions of mapping relationships: Correspondence between warning points and responsible persons: Users can pre-assign different monitoring points, remediation patches, or areas to specific responsible persons based on the organizational structure and management responsibilities of the ecological restoration project. For example, a pH monitoring alarm in a reservoir in a mining area can be sent to the supervising engineer and the person in charge of the construction unit responsible for that section.

[0140] Mapping relationship between warning levels and notification channels: Different combinations of notification channels are configured according to the urgency of the warning. For example, a prompt warning is only notified via in-app messages; a warning warning is notified via in-app messages and WeChat Enterprise Account; a severe warning is notified via in-app messages, WeChat Enterprise Account, and SMS simultaneously to ensure timely information delivery.

[0141] In practical implementation, the device can query the list of responsible persons (including primary responsible persons, backup responsible persons, and superior managers) associated with the current warning location in the mapping table based on the parsed current warning location. It can also query one or more current notification channels corresponding to the current warning level in the mapping table.

[0142] For example, if the device resolves the current warning location to "Water Reservoir in Mining Area B, City A - Monitoring Point A", and the current warning level is "Severe", then query the preset notification strategy mapping table: the responsible persons associated with this location are supervising engineer Li and construction unit manager Wang; the notification channels corresponding to the severe level are internal messages, WeChat enterprise account, and SMS.

[0143] Step S308: Push the current early warning event to the target responsible person based on the current notification channel.

[0144] It should be noted that the device can pre-integrate interfaces for various notification channels, such as SMS gateway APIs, WeChat Enterprise Account APIs, and in-system messaging systems. Furthermore, the content format of the push notifications can be adapted for different channels: for example, SMS messages can contain only key information and a brief description; WeChat push notifications can include richer formats and links to guide responsible personnel to view details in the system; and in-system messages can display the complete record of the warning event.

[0145] In practice, the device can push the content (or key summary) of the current warning event to the terminal device corresponding to the responsible party based on the aforementioned determined current notification channel. After the push is completed, the device can also record a push log, including information such as push time, responsible party, notification channel, and push status, for subsequent delivery confirmation and statistical analysis.

[0146] For example, the device can send a text message to Li and Wang's mobile phones via a text message gateway: "[Ecological Restoration Warning] The pH value of monitoring point A in the reservoir of B mining area in City A is seriously exceeding the standard. Please log in to the system immediately to check and take action." At the same time, it can also send a detailed warning card to the two via WeChat Enterprise Account, including information such as location, level, and measured value; and generate a complete warning event pending record in each of their system inboxes.

[0147] This embodiment integrates predictive early warning signals and real-time alarm signals into a structured current early warning event through a preset event report template. It also employs a real-time alarm signal priority strategy to determine the early warning level, thus ensuring a prioritized response to urgent risks while integrating multi-source early warning information. Furthermore, by parsing early warning locations and levels to query a preset notification strategy mapping table, it achieves precise delivery of early warning events to specific responsible parties and differentiated configuration of notification channels, ensuring that early warning information reaches the correct personnel in a timely manner through appropriate means.

[0148] It should be noted that the above examples are only for understanding this application and do not constitute a limitation on the intelligent early warning method for ecological restoration risks in this application. Any simple modifications based on this technical concept are within the scope of protection of this application.

[0149] In addition, this application also provides an intelligent early warning system for ecological restoration risks, such as Figure 4 As shown, Figure 4 This is a schematic diagram of the module structure of the intelligent early warning system for ecological restoration risks in this application. Figure 4 It can be seen that the system includes: The real-time data acquisition module 401 is used to acquire real-time monitoring data of the current ecological restoration area. The risk assessment module 402 is used to execute the first risk assessment process and the second risk assessment process in parallel. The first risk assessment process includes: inputting the real-time monitoring data into a preset LSTM time series prediction model and generating a predictive early warning signal based on the output prediction result. The second risk assessment process includes: matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result. The event push module 403 is used to generate a current warning event based on the predictive warning signal and / or the real-time alarm signal, and push the current warning event to the corresponding target responsible person.

[0150] The early warning tracking module 404 is used to update the lifecycle status of the current early warning event to a processing state. This lifecycle status is generated synchronously and initialized to a pending state when the current early warning event is generated. Upon receiving feedback information regarding the handling of the current early warning event, the module updates the lifecycle status of the current early warning event to a processed state. It continuously monitors the monitoring data associated with the current early warning event within a preset continuous monitoring period. If no early warning event with the same abnormal ecological indicators as the current early warning event is detected within the preset continuous monitoring period, the lifecycle status of the current early warning event is updated to a closed state.

[0151] This system can execute a first risk assessment process based on an LSTM time-series prediction model and a second risk assessment process based on a pre-configured rule set in parallel. This allows it to both learn evolutionary patterns from historical data using the LSTM model to predict potential deterioration trends in ecological indicators in advance, and use the rule set to make immediate judgments on real-time monitoring data for rapid response to sudden abnormal fluctuations. This achieves complementary synergy between predictive early warning and real-time alerts. Furthermore, by integrating early warning signals into a unified early warning event and pushing it to the responsible parties, and by implementing full lifecycle tracking management of the handling process, a complete closed loop from risk identification to handling feedback is formed. This improves the comprehensiveness and timeliness of risk identification while ensuring the effective transmission of early warning information and the timely initiation and traceability of subsequent handling.

[0152] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or system. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other elements in the process, method, article, or system that includes that element.

[0153] The above embodiment numbers are for descriptive purposes only and do not represent the superiority or inferiority of the embodiments. They are only some embodiments of this application and do not limit the scope of this application. All equivalent structural transformations made under the technical concept of this application and using the content of this application specification and drawings, or direct / indirect applications in other related technical fields, are included within the protection scope of this application.

Claims

1. A method for intelligent early warning of ecological restoration risks, characterized in that, The method includes: Obtain real-time monitoring data of the current ecological restoration area; The first risk assessment process and the second risk assessment process are executed in parallel. The first risk assessment process includes: inputting the real-time monitoring data into a preset LSTM time series prediction model and generating a predictive early warning signal based on the output prediction result. The second risk assessment process includes: matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result. A current warning event is generated based on the predictive warning signal and / or the real-time alarm signal, and the current warning event is pushed to the corresponding target responsible person.

2. The method as described in claim 1, characterized in that, The step of inputting the real-time monitoring data into a preset LSTM time-series prediction model and generating a predictive early warning signal based on the output prediction results includes: Acquire historical monitoring data within a specified historical time window before the current time point of the real-time monitoring data, and package the historical monitoring data and the real-time monitoring data into the current monitoring data; The current monitoring data is input into the preset LSTM time series prediction model. The preset LSTM time series prediction model is used to extract time series data corresponding to different ecological indicators from the current monitoring data, and to make predictions based on the time series data corresponding to each ecological indicator to obtain several ecological indicator prediction values ​​within a preset future time window. Predictive early warning signals are generated based on the predicted values ​​of each of the aforementioned ecological indicators.

3. The method as described in claim 2, characterized in that, The step of generating predictive early warning signals based on the predicted values ​​of each of the ecological indicators includes: The current risk index is calculated based on the predicted values ​​of each of the aforementioned ecological indicators according to the preset risk index formula. The current risk index is compared with the risk level threshold, the current risk level is determined based on the comparison result, and a corresponding predictive early warning signal is generated. The formula for the preset risk index is as follows: In the formula, The current risk index, The predicted value of the ecological indicator is given. The safety thresholds corresponding to each of the aforementioned ecological indicators. The future time point corresponding to the predicted value of the ecological indicator within the preset future time window.

4. The method as described in claim 2, characterized in that, Before the step of inputting the current monitoring data into the preset LSTM time series prediction model, the following steps are included: Ecological monitoring data within a preset historical time range were collected as training samples; The initial LSTM neural network model is trained using the training samples to obtain the preset LSTM time series prediction model. The initial LSTM neural network model includes two LSTM layers and a fully connected output layer.

5. The method as described in claim 1, characterized in that, The step of matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result includes: Load a pre-configured rule set associated with real-time monitoring data. The pre-configured rule set contains at least one early warning rule based on a threshold or pattern, and each early warning rule corresponds to a rule level. The current monitoring data is matched with each of the early warning rules in the pre-configured rule set. The current monitoring data includes the real-time monitoring data and the historical monitoring data within a specified historical time window before the time point of the real-time monitoring data. If a match is successful, a real-time alarm signal is generated based on the rule level corresponding to the matched warning rule.

6. The method as described in claim 1, characterized in that, The step of generating the current warning event based on the predictive warning signal and / or the real-time alarm signal includes: Obtain a preset event report template, which includes at least: warning location item, warning type item, and warning level item; Obtain the first warning point corresponding to the predictive warning signal and / or the second warning point corresponding to the real-time alarm signal, and fill in the warning location item according to the first warning point and / or the second warning point; Abnormal ecological indicators are determined based on the predictive early warning signal and / or the real-time alarm signal, and the early warning type item is filled in based on the abnormal ecological indicators; The current warning level is determined according to the real-time alarm signal priority strategy and filled into the warning level item. The real-time alarm signal priority strategy is to use the rule level corresponding to the real-time alarm signal as the current warning level when both the predictive warning signal and the real-time alarm signal exist at the same time. The current warning event is generated based on the completed preset event report template.

7. The method as described in claim 6, characterized in that, The step of pushing the current warning event to the corresponding target responsible person includes: Analyze the current warning location and current warning level corresponding to the current warning event; Based on the current warning location and the current warning level, a preset notification strategy mapping table is queried to determine the target responsible person and the current notification channel. The preset notification strategy mapping table maintains the association between different warning locations and responsible persons, as well as the mapping relationship between different warning levels and notification channels. The current early warning event will be pushed to the target responsible person based on the current notification channel.

8. The method as described in claim 1, characterized in that, Following the step of pushing the current warning event to the corresponding responsible person, the following steps are included: The lifecycle state of the current warning event is updated to the processing state, which is generated synchronously and initialized to the pending determination state when the current warning event is generated. Upon receiving feedback information regarding the handling of the current warning event, the lifecycle status of the current warning event is updated to the processed status.

9. The method as described in claim 8, characterized in that, The step of updating the lifecycle status of the current warning event to the processed status further includes: The monitoring data associated with the current warning event will be continuously monitored within a preset continuous monitoring period. If no warning event with the same abnormal ecological indicators as the current warning event is detected within the preset continuous monitoring period, the lifecycle status of the current warning event will be updated to closed.

10. An intelligent early warning system for ecological restoration risks, characterized in that, The system includes: The real-time data acquisition module is used to acquire real-time monitoring data of the current ecological restoration area; The risk assessment module is used to execute the first risk assessment process and the second risk assessment process in parallel. The first risk assessment process includes: inputting the real-time monitoring data into a preset LSTM time series prediction model and generating a predictive early warning signal based on the output prediction result. The second risk assessment process includes: matching the real-time monitoring data according to a pre-configured rule set and generating a real-time alarm signal based on the matching result. The event push module is used to generate a current warning event based on the predictive warning signal and / or the real-time alarm signal, and push the current warning event to the corresponding target responsible person.