All-electric yard bridge relocation power supply control system
By acquiring the transfer trajectory data of the yard crane and combining it with a multi-rigid-body dynamics model to generate a forward-looking power demand curve, the power supply system can be monitored and adjusted in real time, solving the problems of power grid load imbalance and voltage fluctuation, and realizing efficient dynamic resource scheduling and power control for port operations.
Patent Information
- Application Number
- CN202611230398.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-14
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-08-14
AI Technical Summary
Existing all-electric yard crane relocation technology suffers from problems such as grid load imbalance, resource waste, and scheduling lag. It cannot adapt to dynamic changes in port yards, and traditional power supply control systems cannot match changes in power demand in a timely manner, leading to voltage fluctuations and system shutdowns.
The trajectory data acquisition component acquires the preset transfer trajectory of the field bridge. Combined with the multi-rigid-body dynamics model and the resistance mapping of the traveling mechanism, a forward-looking power demand curve is generated. The converter control component adjusts the switching duty cycle in advance and monitors the DC bus voltage change rate in real time to trigger transient energy compensation or absorption, thereby achieving dynamic energy balance.
It effectively eliminates the lag in power regulation of the power system, suppresses DC bus voltage fluctuations, prevents system protection shutdowns, and improves port operation efficiency and resource utilization.
Smart Images

Figure CN122801742B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of non-electric variable control or regulation technology, and relates to a power supply control system for all-electric field bridge transfer. Background Technology
[0002] With the deepening of port automation and green transformation, all-electric yard cranes have become core equipment for material handling in port yards. Modern ports typically deploy dozens or even hundreds of all-electric yard cranes operating collaboratively. These cranes need to frequently move between different container handling areas to match the dynamic task requirements of container loading and unloading. Currently, port yard crane relocation operations are evolving from independent operation of single equipment to clustered collaborative scheduling. The relocation process involves not only the power control of individual yard cranes but also the load balance of the entire port power grid and the efficient allocation of yard operation resources.
[0003] The existing all-electric yard crane transfer technology has the following problems:
[0004] Traditional relocation scheduling employs a centralized, manual command model, which cannot dynamically allocate power quotas based on the real-time capacity of the port power grid, the status of energy storage systems, and the task priorities of multiple yard cranes. When multiple yard cranes simultaneously perform high-power relocation actions such as starting and climbing, it can easily lead to localized overload of the port power grid, causing voltage drops or even large-scale power outages; conversely, when the grid capacity is sufficient, there is a problem of idle and wasted energy storage resources. Furthermore, centralized scheduling carries the risk of single-point failures and has a delayed task response, failing to adapt to the dynamically changing operational needs of the port yard. Although some research has introduced distributed scheduling concepts, it has not adopted smart contract technology to achieve automated negotiation and reliable execution of relocation tasks. The scheduling process is vulnerable to human intervention and data tampering, making it difficult to guarantee the fairness and efficiency of resource allocation.
[0005] Existing power supply control systems for all-electric yard cranes used in relocation often employ a pure feedback regulation mechanism based on DC bus voltage deviation. The system collects the actual DC bus voltage value in real time, compares it with a reference threshold, and then adjusts the converter switching duty cycle. This control logic uses electrical parameter deviation as the sole driving source, causing the converter's action to lag behind sudden changes in mechanical power demand. As heavy equipment with high inertia, all-electric yard cranes undergo dynamic operations during relocation, including acceleration, constant speed travel, deceleration, braking, and changes in path curvature. The power demand of the drive motor can fluctuate several times within milliseconds. Pure feedback regulation cannot match power supply and demand changes in a timely manner, leading to drastic fluctuations in the DC bus voltage. This easily triggers the converter's undervoltage or overvoltage protection mechanisms, causing system shutdown and severely impacting port operation efficiency. Summary of the Invention
[0006] The purpose of this invention is to provide a power supply control system for all-electric field bridges used in field transfers, which can effectively solve the problems mentioned in the background art.
[0007] To achieve the above objectives, the technical solution adopted by the present invention is as follows:
[0008] The all-electric yard bridge relocation power supply control system includes: a trajectory data acquisition component, used to acquire preset relocation trajectory data of the yard bridge;
[0009] The forward-looking power calculation component is used to combine the multi-rigid-body dynamics model of the field bridge with the resistance mapping relationship of the traveling mechanism to solve the preset transfer trajectory data and generate a forward-looking power demand curve for the transfer process.
[0010] A converter control component is used to input the forward-looking power demand curve as a feedforward parameter to the converter pulse width modulation control loop of the power supply, and adjust the switching duty cycle of the converter pulse width modulation control loop in advance according to the forward-looking power demand curve.
[0011] The bus condition monitoring component is used to collect the transient values of DC bus voltage and current in real time, and calculate the DC bus voltage change rate based on the transient values of DC bus voltage and current.
[0012] The transient energy regulation component is used to trigger the bidirectional converter module on the bus side to perform transient energy compensation or transient energy absorption when the DC bus voltage change rate exceeds a set threshold.
[0013] Preferably, the process by which the forward-looking power calculation component combines the multi-rigid-body dynamics model of the field bridge with the resistance mapping relationship of the traveling mechanism to solve the preset transfer trajectory data and generate the forward-looking power demand curve of the transfer process includes: extracting the path curvature and elevation difference from the preset transfer trajectory data;
[0014] Input the path curvature and elevation difference into the field bridge multi-rigid-body dynamics model to solve the work parameters of the internal force coupling between the rigid bodies of the field bridge.
[0015] The internal force coupling work parameter is input into the resistance mapping relationship of the walking mechanism to match the walking resistance torque under the superposition of surface friction coefficient and wind load on different paths.
[0016] Based on the travel resistance torque and the mechanical transmission ratio of the field bridge travel mechanism, a forward-looking power demand curve for the transfer process is generated.
[0017] Preferably, the converter control component inputs the forward power demand curve as a feedforward parameter to the converter pulse width modulation control loop of the power supply, and the process of adjusting the switching duty cycle of the converter pulse width modulation control loop in advance according to the forward power demand curve includes: extracting the power change slope and power extreme points in the forward power demand curve.
[0018] The power change slope is converted into the duty cycle change step size feedforward in the converter pulse width modulation control loop.
[0019] The power extreme point is converted into the duty cycle extreme point feedforward limiting amount;
[0020] Within the carrier period of the converter pulse width modulation control loop, the duty cycle change step size feedforward and the duty cycle extreme value feedforward limiting are superimposed on the original duty cycle given signal to generate an updated switching duty cycle.
[0021] Preferably, the process of the bus status monitoring component acquiring the transient values of DC bus voltage and current in real time and calculating the DC bus voltage change rate based on the transient values of DC bus voltage and current includes: synchronously acquiring the transient values of DC bus voltage and current at a set high-frequency sampling frequency to obtain a voltage discrete sequence and a current discrete sequence;
[0022] Perform sliding window mean filtering on the discrete voltage sequence to extract the filtered voltage sequence;
[0023] Perform adjacent sampling point difference operation on the filtered voltage sequence to obtain the DC bus voltage change rate;
[0024] The transient power fluctuation of the DC bus is calculated based on the current discrete sequence, and the DC bus voltage change rate and the transient power fluctuation of the DC bus are aligned and jointly calibrated on the time axis.
[0025] Preferably, when the DC bus voltage change rate exceeds a set threshold, the transient energy regulation component triggers the bidirectional converter module on the bus side to perform transient energy compensation or transient energy absorption, which includes setting a positive voltage change rate threshold and a negative voltage change rate threshold.
[0026] When the DC bus voltage change rate is greater than the positive voltage change rate threshold, a first switching command is generated to trigger the energy-consuming branch in the bidirectional converter module on the bus side to conduct transient energy absorption.
[0027] When the DC bus voltage change rate is less than the negative voltage change rate threshold, a second switching command is generated to trigger the energy storage branch in the bidirectional converter module on the bus side to perform transient energy compensation.
[0028] The pulse width modulation duty cycle of the energy-consuming branch or the energy-storage branch is adjusted according to the absolute value of the DC bus voltage change rate.
[0029] Preferably, the process of the trajectory data acquisition component acquiring the preset transfer trajectory data of the yard bridge includes: extracting an initial trajectory parameter set through the yard bridge transfer path planning node, wherein the initial trajectory parameter set includes the starting coordinates, the ending coordinates, and the coordinates of the intermediate turning points;
[0030] The initial trajectory parameter set is input into the trajectory smoothing interpolator to generate a continuous spatial coordinate sequence;
[0031] Extract the path attribute labels corresponding to each coordinate point in the continuous spatial coordinate sequence. The path attribute labels include straight sections, curved sections, and uphill sections.
[0032] The continuous spatial coordinate sequence with the path attribute label is integrated into the field bridge preset transfer trajectory data and transmitted to the look-ahead power calculation component.
[0033] Preferably, the process of inputting the path curvature and elevation difference into the multi-rigid-body dynamics model of the field bridge and solving the work parameters of the internal force coupling between the rigid bodies of the field bridge includes: constructing a rigid-body topology diagram that includes the field bridge portal legs, main beam and traveling trolley;
[0034] The transient turning angular velocity of each of the traveling trolleys is allocated according to the path curvature, and the acceleration component of each rigid body along the direction of gravity is allocated according to the elevation difference.
[0035] Input the transient steering angular velocity and the acceleration components into the Lagrange dynamics equations to solve for the constraint reaction forces at the connecting nodes in the rigid body topology diagram.
[0036] Perform a product-integral operation on the constraint reaction force and the corresponding relative displacement of the rigid body to obtain the work parameters of the internal force coupling between the rigid bodies of the field bridge.
[0037] Preferably, the process of superimposing the duty cycle change step size feedforward and the duty cycle extreme value feedforward limiting to the original duty cycle given signal within the carrier period of the converter pulse width modulation control loop to generate the updated switching duty cycle includes: extracting the voltage outer loop feedback difference and the current inner loop feedback difference in the converter pulse width modulation control loop;
[0038] The voltage outer loop feedback difference is added to the current inner loop feedback difference to generate the basic duty cycle adjustment amount;
[0039] The duty cycle change step size feedforward is superimposed with the basic duty cycle adjustment amount at the same frequency to generate the transition duty cycle;
[0040] The transition duty cycle is clipped using the extreme value feedforward limiting of the duty cycle, and the duty cycle output after clipping is used as the updated switch duty cycle.
[0041] Preferably, the process of adjusting the pulse width modulation duty cycle of the energy-consuming branch or the energy-storage branch according to the absolute value of the DC bus voltage change rate includes: establishing a piecewise linear mapping relationship between the absolute value of the DC bus voltage change rate and the pulse width modulation duty cycle;
[0042] When the energy-consuming branch is triggered to conduct, according to the piecewise linear mapping relationship, the conduction duty cycle of the energy-consuming switch in the energy-consuming branch is linearly increased as the absolute value increases;
[0043] When the energy storage branch is triggered to conduct, according to the piecewise linear mapping relationship, the conduction duty cycle of the energy storage switch tube in the energy storage branch is linearly increased as the absolute value increases;
[0044] When the absolute value falls back to within the set threshold, the conduction duty cycle is reset to zero according to the set falling edge slope.
[0045] Preferably, the process of performing sliding window mean filtering on the discrete voltage sequence and extracting the filtered voltage sequence includes: setting a sliding window width that matches the high-frequency sampling frequency;
[0046] The sliding window is moved along the time axis in single-step increments, and the arithmetic mean of all voltage discrete sequence sampling points within the window is calculated.
[0047] The arithmetic mean is used as the filtered voltage value at the current window center time;
[0048] Outlier sampling points in the discrete voltage sequence whose deviation from the arithmetic mean exceeds the allowable fluctuation range are removed, and the outlier sampling points are replaced with the arithmetic mean. The discrete voltage sequence is reconstructed, and a difference operation is performed to extract the reconstructed filtered voltage sequence.
[0049] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0050] 1. This invention acquires the pre-set transfer trajectory data of the field bridge, combines it with the multi-rigid-body dynamics model and the resistance mapping relationship of the traveling mechanism to generate a forward-looking power demand curve, and uses this curve as a feedforward parameter input to the converter pulse width modulation control loop to adjust the switching duty cycle in advance. Before a sudden change in mechanical load occurs, the power system has already adjusted the power output according to the trajectory pre-aiming result, eliminating the lag of pure electric parameter feedback regulation and suppressing DC bus voltage fluctuations caused by sudden changes in large inertia loads.
[0051] 2. This invention collects transient values of DC bus voltage and current in real time to calculate the DC bus voltage change rate. When the voltage change rate exceeds a set threshold, it triggers the bidirectional converter module on the bus side to perform transient energy compensation or absorption. In the early stages of voltage fluctuations, energy throughput is directly triggered based on the voltage change rate to quickly smooth out bus energy imbalance and prevent voltage overshoot from triggering system protection shutdown.
[0052] 3. This invention extracts the path curvature and elevation difference from the preset transfer trajectory data, calculates the work parameters of the internal force coupling between the rigid bodies of the field bridge and matches the travel resistance torque, so that the forward-looking power demand curve fits the actual physical consumption of the transfer; the power change slope in the power demand curve is converted into the duty cycle change step size feedforward quantity, and the power extreme point is converted into the duty cycle extreme value feedforward limiting quantity, realizing the smooth and limited mapping of power demand to switching action within the converter control loop, preventing converter modulation saturation or overcurrent. Attached Figure Description
[0053] Figure 1 This is a flowchart illustrating the overall workflow of the all-electric field bridge transfer power supply control system of the present invention.
[0054] Figure 2 This is a flowchart of the process for acquiring the pre-set transfer trajectory data of the field bridge according to the present invention;
[0055] Figure 3 This is a flowchart illustrating the generation of the forward-looking power demand curve for the transition process according to the present invention.
[0056] Figure 4 This is a flowchart of the converter pulse width modulation switch duty cycle adjustment process of the present invention;
[0057] Figure 5 This is a flowchart of the DC bus voltage change rate calculation and calibration of the present invention;
[0058] Figure 6 This is a flowchart of the transient energy compensation and absorption control on the bus side of the present invention. Detailed Implementation
[0059] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0060] Please refer to Figure 1This embodiment provides a power supply control system for the relocation of an all-electric yard bridge, including a trajectory data acquisition component, a forward power calculation component, a converter control component, a bus status monitoring component, and a transient energy regulation component. The trajectory data acquisition component establishes a communication connection with the yard bridge relocation path planning system to acquire preset relocation trajectory data of the yard bridge moving between different work areas. The forward power calculation component receives the preset relocation trajectory data output by the trajectory data acquisition component and, combined with a pre-constructed multi-rigid-body dynamics model of the yard bridge and the resistance mapping relationship of the traveling mechanism, performs point-by-point calculations on the preset relocation trajectory data to generate a forward-looking power demand curve covering the entire relocation process. The converter control component receives the forward-looking power demand curve output by the forward power calculation component and uses it as a feedforward parameter input to the converter pulse width modulation control loop of the power supply. Based on the forward-looking power demand curve, it adjusts the switching duty cycle of the converter pulse width modulation control loop before power demand changes occur. The bus condition monitoring component acquires the transient voltage and current values of the DC bus in real time using voltage and current sensors, and calculates the DC bus voltage change rate based on the acquired transient values. The transient energy regulation component receives the DC bus voltage change rate output by the bus condition monitoring component. When the DC bus voltage change rate exceeds a set threshold, it generates a corresponding control command to trigger the bidirectional converter module on the bus side to perform transient energy compensation or transient energy absorption operations.
[0061] In this embodiment, the working principle of the power supply control system for the all-electric yard bridge relocation is as follows: Before the yard bridge performs relocation operations, the relocation path planning system generates the optimal relocation path based on the current position of the yard bridge and the target operation area. The trajectory data acquisition component extracts the relevant parameters of this optimal relocation path from the relocation path planning system, integrates them into preset relocation trajectory data, and transmits it to the look-ahead power calculation component. Based on the physical structural characteristics of the yard bridge and the mechanical characteristics of the traveling mechanism, the look-ahead power calculation component performs dynamic calculations on the preset relocation trajectory data, predicts the power demand of the yard bridge at each moment during the relocation process, and generates a look-ahead power demand curve. The converter control component converts the look-ahead power demand curve into a feedforward adjustment amount of the converter switching duty cycle, and superimposes this feedforward adjustment amount into the converter pulse width modulation control loop, enabling the power supply to adjust the output power in advance to match the power demand changes during the yard bridge relocation process. At the same time, the bus status monitoring component continuously monitors the operating status of the DC bus and calculates the DC bus voltage change rate. When the DC bus voltage change rate exceeds the set threshold, it indicates that the DC bus is in an energy imbalance state. The transient energy regulation component immediately triggers the bidirectional converter module on the bus side to operate, quickly suppressing the DC bus voltage fluctuation by absorbing excess energy or supplementing insufficient energy.
[0062] In this embodiment, the trajectory data acquisition component interacts with the field bridge transfer path planning system via an Ethernet interface. The field bridge transfer path planning system uses the A* algorithm to generate the optimal transfer path, which consists of a series of discrete path nodes, each containing coordinate information and path attribute information. The trajectory data acquisition component extracts information from all path nodes in the field bridge transfer path planning system, transforms the discrete path nodes into a continuous spatial coordinate sequence through trajectory smoothing interpolation, and adds a corresponding path attribute label to each coordinate point, ultimately forming complete preset transfer trajectory data. The preset transfer trajectory data is stored in the form of a time series, with each time step corresponding to a spatial coordinate point and its attribute information. The time step setting is consistent with the carrier period of the converter pulse width modulation control loop.
[0063] In this embodiment, the look-ahead power calculation component is implemented using an embedded digital signal processor (DSP). This DSP has floating-point arithmetic capabilities and can complete the solution of the multi-rigid-body dynamics model and the matching of the travel mechanism resistance mapping relationship within a specified time. The look-ahead power calculation component pre-stores a table of parameters of the multi-rigid-body dynamics model of the track bridge and the travel mechanism resistance mapping relationship. The parameters of the multi-rigid-body dynamics model of the track bridge include the mass, moment of inertia, center of mass position of each rigid body of the track bridge, and constraint parameters of the joints connecting the rigid bodies. The travel mechanism resistance mapping relationship table is obtained by fitting a large amount of field test data. The table records the correspondence between the travel resistance torque and the travel speed and acceleration of the track bridge under different path surface friction coefficients and different wind load conditions.
[0064] In this embodiment, the converter control component is connected to the main converter circuit of the power supply, and the main converter circuit adopts a three-phase voltage-source rectifier topology. The converter pulse width modulation control loop adopts a dual closed-loop control structure, including an outer voltage loop and an inner current loop. The outer voltage loop is used to control the DC bus voltage to stabilize at a set value, and the inner current loop is used to control the converter output current to follow a given value. The converter control component converts the forward power demand curve into a duty cycle change step size feedforward and a duty cycle extreme value feedforward limiting, which are superimposed on the original duty cycle setpoint signal of the converter pulse width modulation control loop to achieve advance adjustment of the converter switching duty cycle.
[0065] In this embodiment, the bus condition monitoring component includes a high-precision voltage sensor, a high-precision current sensor, and a signal conditioning circuit. The voltage sensor is a Hall voltage sensor, and the current sensor is a Hall current sensor; both have a response time of less than 1 microsecond. The signal conditioning circuit amplifies, filters, and performs level conversion on the analog signals output by the voltage and current sensors, converting them into voltage signals suitable for acquisition by a digital signal processor. The bus condition monitoring component synchronously samples the DC bus voltage and current at a set high-frequency sampling frequency, converts the sampled analog signals into digital signals, and transmits them to the transient energy conditioning component for further processing.
[0066] In this embodiment, the transient energy regulation component is connected to the bidirectional converter module on the bus side. The bidirectional converter module on the bus side includes an energy dissipation branch and an energy storage branch. The energy dissipation branch consists of an energy dissipation resistor and an insulated-gate bipolar transistor connected in series, used to absorb excess energy on the DC bus. The energy storage branch consists of a supercapacitor bank and a bidirectional DC / DC converter, used to replenish energy to the DC bus. The transient energy regulation component generates a corresponding pulse width modulation signal according to the magnitude and direction of the DC bus voltage change rate, controlling the on and off of the energy dissipation branch or the energy storage branch, thereby achieving rapid regulation of the DC bus energy. The functional correspondence of the power supply control system components for the all-electric field bridge transfer is shown in Table 1.
[0067] Table 1. Functional Correspondence of Components in the Power Supply Control System for the All-Electric Yard Bridge Transfer
[0068] Component Name Input signal Output signal Core Functions Trajectory data acquisition component Path node information output by the transition path planning system Preset transition trajectory data Extract and integrate the field bridge transfer path parameters Forward Power Calculation Component Preset transition trajectory data Forward-looking power demand curve Calculate the power demand changes during the transition process Converter control components Forward-looking power demand curve, voltage outer loop feedback difference, current inner loop feedback difference Converter switch duty cycle signal Adjust the converter output power in advance Busbar Condition Monitoring Components DC bus voltage analog signal, DC bus current analog signal DC bus voltage change rate, DC bus transient power fluctuation Real-time monitoring of DC bus operating status Transient energy regulation components DC bus voltage change rate Energy consumption branch control signal, energy storage branch control signal Rapidly smooth out DC bus voltage fluctuations
[0069] In this embodiment, Table 1 shows the correspondence between the input signals, output signals, and core functions of each component of the all-electric field bridge relocation power supply control system. The trajectory data acquisition component receives path node information from the relocation path planning system and outputs preset relocation trajectory data; its core function is to extract and integrate the field bridge relocation path parameters. The forward-looking power calculation component receives the preset relocation trajectory data and outputs a forward-looking power demand curve; its core function is to calculate the power demand changes during the relocation process. The converter control component receives the forward-looking power demand curve, the voltage outer loop feedback difference, and the current inner loop feedback difference, and outputs the converter switching duty cycle signal; its core function is to adjust the converter output power in advance. The bus status monitoring component receives the DC bus voltage analog signal and the DC bus current analog signal, and outputs the DC bus voltage change rate and the DC bus transient power fluctuation; its core function is to monitor the DC bus operating status in real time. The transient energy regulation component receives the DC bus voltage change rate and outputs the energy consumption branch control signal and the energy storage branch control signal; its core function is to quickly smooth out DC bus voltage fluctuations.
[0070] In this embodiment, the power supply control system for the all-electric field bridge relocation acquires the preset relocation trajectory data of the field bridge through the trajectory data acquisition component. It then generates a forward-looking power demand curve by combining the multi-rigid-body dynamics model with the resistance mapping relationship of the traveling mechanism. This curve is used as a feedforward parameter input to the converter's pulse width modulation control loop to adjust the switch duty cycle in advance. Before a sudden change in mechanical load occurs, the power system adjusts the power output based on the trajectory prediction results, eliminating the lag in pure electric parameter feedback regulation and suppressing DC bus voltage fluctuations caused by sudden changes in large inertia loads. Simultaneously, the system collects the transient values of DC bus voltage and current in real time to calculate the DC bus voltage change rate. When the voltage change rate exceeds a set threshold, it triggers the bidirectional converter module on the bus side to perform transient energy compensation or absorption. In the early stages of voltage fluctuations, energy throughput is directly triggered based on the voltage change rate to quickly smooth out bus energy imbalances and prevent voltage overshoot from triggering system protection shutdown.
[0071] In one embodiment, reference Figure 2 The process by which the trajectory data acquisition component acquires the pre-set transfer trajectory data of the yard bridge includes: extracting an initial trajectory parameter set through the yard bridge transfer path planning node; the initial trajectory parameter set includes the starting coordinates, ending coordinates, and coordinates of intermediate turning points; inputting the initial trajectory parameter set into a trajectory smoothing interpolator to generate a continuous spatial coordinate sequence; extracting path attribute labels corresponding to each coordinate point in the continuous spatial coordinate sequence, including straight sections, curved sections, and uphill sections; integrating the continuous spatial coordinate sequence with path attribute labels into the pre-set transfer trajectory data of the yard bridge, and transmitting it to the look-ahead power calculation component.
[0072] In this embodiment, the initial transfer path generated by the yard bridge transfer path planning system consists of a starting point, an ending point, and several intermediate turning points, which constitute the initial trajectory parameter set. Each point in the initial trajectory parameter set contains two-dimensional plane coordinate information and elevation information. The trajectory smoothing interpolator uses a cubic B-spline interpolation algorithm to process the initial trajectory parameter set, generating a continuous spatial coordinate sequence. The cubic B-spline interpolation algorithm ensures that the generated trajectory curve has continuous first and second derivatives at each node, making the yard bridge travel more smoothly during the transfer process.
[0073] In this embodiment, the mathematical expression for the cubic B-spline interpolation algorithm is:
[0074]
[0075] in, For points on the interpolation curve, For k-th order B-spline basis functions, To control the vertices, To control the number of vertices.
[0076] In this embodiment, k is set to 3, meaning cubic B-spline interpolation is used. The recursive formula for the cubic B-spline basis function is:
[0077]
[0078]
[0079] in, These are the elements in the node vector, which uses a uniform node vector.
[0080] In this embodiment, the trajectory smoothing interpolator uses the starting coordinates, ending coordinates, and mid-course turning point coordinates from the initial trajectory parameter set as control vertices, and generates a continuous spatial coordinate sequence using the aforementioned cubic B-spline interpolation algorithm. The generated continuous spatial coordinate sequence contains three components: x-coordinate, y-coordinate, and z-coordinate, corresponding to the position of the field bridge in three-dimensional space. The time step of the continuous spatial coordinate sequence is set to 1 millisecond, consistent with the carrier period of the converter's pulse width modulation control loop.
[0081] In this embodiment, the process of extracting the path attribute labels corresponding to each coordinate point in a continuous spatial coordinate sequence is as follows: For each coordinate point in the continuous spatial coordinate sequence, the path curvature and elevation change rate at that point are calculated. The formula for calculating the path curvature is:
[0082]
[0083] in, For path curvature, Let x be the first derivative of the x-coordinate with respect to the arc length. The second derivative of the x-coordinate with respect to the arc length. The first derivative of the y-coordinate with respect to the arc length. Let y be the second derivative of the y-coordinate with respect to the arc length.
[0084] The formula for calculating the rate of change of elevation is:
[0085]
[0086] in, The elevation change rate, The elevation difference between two adjacent coordinate points. This represents the arc length between two adjacent coordinate points.
[0087] In this embodiment, path curvature thresholds and elevation change rate thresholds are set. When the path curvature at a coordinate point is less than the path curvature threshold and the elevation change rate is less than the elevation change rate threshold, the coordinate point is marked as a straight section. When the path curvature at a coordinate point is greater than or equal to the path curvature threshold, the coordinate point is marked as a curved section. When the elevation change rate at a coordinate point is greater than or equal to the elevation change rate threshold, the coordinate point is marked as an uphill section. For coordinate points that simultaneously meet the conditions for both curved and uphill sections, they are marked as both curved and uphill sections.
[0088] In this embodiment, a continuous spatial coordinate sequence with path attribute labels is integrated into preset transfer trajectory data for the field bridge. The preset transfer trajectory data is stored in a structured data format, with each data item containing a timestamp, x-coordinate, y-coordinate, z-coordinate, path curvature, elevation change rate, and path attribute label. The preset transfer trajectory data is transmitted to the look-ahead power calculation component via a high-speed serial bus at a transmission rate of no less than 100 Mbps to ensure real-time data transmission.
[0089] In this embodiment, reference Figure 3 The forward-looking power calculation component, combining the multi-rigid-body dynamics model of the field bridge with the resistance mapping relationship of the traveling mechanism, calculates the preset transfer trajectory data to generate a forward-looking power demand curve for the transfer process. This process includes: extracting the path curvature and elevation difference from the preset transfer trajectory data; inputting the path curvature and elevation difference into the multi-rigid-body dynamics model of the field bridge to calculate the work parameters of internal force coupling between the rigid bodies of the field bridge; inputting the internal force coupling work parameters into the resistance mapping relationship of the traveling mechanism to match the traveling resistance torque under the superposition of surface friction coefficients and wind loads on different paths; and generating the forward-looking power demand curve for the transfer process based on the traveling resistance torque and the mechanical transmission ratio of the field bridge's traveling mechanism.
[0090] In this embodiment, the look-ahead power calculation component extracts the path curvature and elevation difference corresponding to each time step from the preset transfer trajectory data. The elevation difference is the difference in z-coordinate between the current coordinate point and the previous coordinate point. The extracted path curvature and elevation difference are input into the pre-constructed multi-rigid-body dynamics model of the field bridge to solve the work parameters of the internal force coupling between the rigid bodies of the field bridge during the transfer process.
[0091] In this embodiment, the process of inputting the path curvature and elevation difference into the multi-rigid-body dynamics model of the field bridge and calculating the work parameters of the coupling of internal forces between the rigid bodies of the field bridge includes: constructing a rigid-body topology diagram containing the field bridge legs, main beams, and traveling trolleys; allocating the transient turning angular velocities of each traveling trolley according to the path curvature, and allocating the acceleration components along the gravity direction of each rigid body according to the elevation difference; inputting the transient turning angular velocities and acceleration components into the Lagrange dynamic equations to solve for the constraint reaction forces at the connecting nodes in the rigid-body topology diagram; and performing a product-integral operation on the constraint reaction forces and the corresponding relative displacements of the rigid bodies to obtain the work parameters of the coupling of internal forces between the rigid bodies of the field bridge.
[0092] In this embodiment, the multi-rigid-body dynamics model of the field bridge decomposes the field bridge into multiple rigid bodies, including the left front traveling trolley, right front traveling trolley, left rear traveling trolley, right rear traveling trolley, left front door leg, right front door leg, left rear door leg, right rear door leg, and main beam. These rigid bodies form a rigid body topology diagram through hinged or rigid connections. Each connection node in the rigid body topology diagram corresponds to the connection relationship between two rigid bodies, and constraint reaction forces exist at the connection nodes.
[0093] In this embodiment, the process of allocating the transient steering angular velocity of each traveling trolley based on the path curvature is as follows: The yard bridge adopts a four-wheel steering system, and the steering angle of the four traveling trolleys is related to the path curvature. According to the Ackermann steering principle, the steering angle of the inner traveling trolley is greater than that of the outer traveling trolley. The relationship between path curvature and traveling trolley steering angle is as follows:
[0094]
[0095] in, The turning angle of the traveling trolley. This refers to the wheelbase of the yard crane. Let be the radius of curvature of the path, and let be the relationship between the radius of curvature of the path and the curvature of the path. .
[0096] In this embodiment, after calculating the turning angle of each traveling trolley according to the above formula, the transient turning angular velocity of each traveling trolley is obtained by differentiating the turning angle with respect to time.
[0097] In this embodiment, the process of distributing the acceleration components of each rigid body along the direction of gravity based on the elevation difference is as follows: The angle between the elevation difference and the travel direction of the bridge is the slope angle, and the formula for calculating the slope angle is:
[0098]
[0099] in, The slope angle, For elevation difference, This represents the horizontal distance between two adjacent coordinate points.
[0100] In this embodiment, the acceleration component of each rigid body along the direction of gravity is the component of gravitational acceleration along the slope angle direction, that is:
[0101]
[0102] in, The acceleration component along the direction of gravity, This is the acceleration due to gravity.
[0103] In this embodiment, the transient steering angular velocity and acceleration components are input into the Lagrange dynamics equations to solve for the constraint reactions at the connecting nodes in the rigid body topology diagram. The general form of the Lagrange dynamics equations is:
[0104]
[0105] in, As the kinetic energy of the system, The potential energy of the system, For generalized coordinates, For generalized speed, For generalized force.
[0106] In this embodiment, the system's kinetic energy This is the sum of the kinetic energies of all rigid bodies, including translational and rotational kinetic energies. The system's potential energy. This is the sum of the gravitational potential energies of the individual rigid bodies. Generalized coordinates. This includes the position coordinates and attitude angles of each rigid body. Generalized forces. This includes external forces and constraint reactions acting on each rigid body.
[0107] In this embodiment, the constraint reaction forces at each connection node in the rigid body topology diagram are obtained by solving the aforementioned Lagrange dynamics equations. The constraint reaction forces include force components and moment components, which act on the three coordinate axes of the connection node, respectively.
[0108] In this embodiment, the product-integral operation is performed on the constraint reaction force and the corresponding relative displacement of the rigid body to obtain the parameter of the work done by the internal force coupling between the rigid bodies of the field bridge. The formula for calculating the work done by the internal force coupling is:
[0109]
[0110] in, Work is done for internal force coupling. To constrain the reaction force vector, Let be the relative displacement vector of the rigid body. and These are the start and end points of the integration interval.
[0111] In this embodiment, the calculated internal force coupling work parameters are input into the travel mechanism's resistance mapping relationship to match the travel resistance torque under the superposition of surface friction coefficients and wind loads on different paths. The travel mechanism's resistance mapping relationship is obtained through fitting a large amount of field test data, and its mathematical expression is:
[0112]
[0113] in, For the walking resistance torque, The friction coefficient of the path surface. The speed of the bridge is the travel speed. For the acceleration of the bridge, For the parameter of work done by internal force coupling, This is the wind load.
[0114] In this embodiment, the coefficient of friction of the path surface The value is preset based on the actual conditions of the port surface, ranging from 0.3 to 0.8. Wind load. The wind load is measured in real time by a wind speed sensor installed on the bridge, and it is proportional to the square of the wind speed.
[0115] In this embodiment, a forward-looking power demand curve for the transfer process is generated based on the traveling resistance torque and the mechanical transmission ratio of the field bridge traveling mechanism. The formula for calculating the forward-looking power demand is:
[0116]
[0117] in, For forward-looking power requirements, For the walking resistance torque, Let be the angular velocity of the walking motor. This refers to the mechanical transmission ratio of the walking mechanism. The mechanical transmission efficiency of the walking mechanism.
[0118] In this embodiment, the angular velocity of the walking motor Speed of the bridge The relationship is:
[0119]
[0120] in, This is the radius of the wheel.
[0121] Substituting the above formula into the formula for calculating forward-looking power demand, we get:
[0122]
[0123] In this embodiment, for each time step during the transfer process, the corresponding forward-looking power demand is calculated according to the above formula. The forward-looking power demands for all time steps are arranged in chronological order to generate a forward-looking power demand curve for the transfer process. The forward-looking power demand curve, with time as the horizontal axis and power demand as the vertical axis, clearly shows the changing trend of the power demand of the field bridge during the transfer process. The forward-looking power demand parameters under different path attributes are shown in Table 2.
[0124] Table 2. Forward Power Demand Parameters under Different Path Attributes
[0125] Path attributes Travel speed (m / s) Acceleration (m / s²) Path curvature (1 / m) Elevation change rate Work done by internal force coupling (kJ) Traveling resistance torque (N・m) Power requirement (kW) Straight section 1.0 0.0 0.001 0.000 2.5 1200 15.0 Straight section 1.0 0.5 0.001 0.000 3.2 1800 22.5 Curve section 0.8 0.0 0.020 0.000 4.8 2400 24.0 Curve section 0.8 0.3 0.020 0.000 5.6 3000 30.0 Climbing section 0.6 0.0 0.001 0.050 6.5 3600 27.0 Climbing section 0.6 0.2 0.001 0.050 7.2 4200 31.5 Curves and uphill sections 0.5 0.0 0.015 0.040 8.9 4800 30.0 Curves and uphill sections 0.5 0.1 0.015 0.040 9.5 5400 33.8
[0126] In this embodiment, Table 2 shows the forward power demand parameters under different path attributes. As can be seen from Table 2, the power demand of the overpass varies significantly under different path attributes. When traveling at a constant speed on straight sections, the power demand is low; when accelerating on straight sections, the power demand increases. When traveling on curved sections, the power demand is higher than on straight sections due to the need to overcome centrifugal force and steering resistance. When traveling on uphill sections, the power demand further increases due to the need to overcome gravity. The power demand reaches its maximum value when traveling on road sections that simultaneously include curves and uphill sections.
[0127] In this embodiment, by extracting the path curvature and elevation difference from the preset transfer trajectory data, the work parameters of the internal force coupling between the rigid bodies of the field bridge are calculated and the traveling resistance torque is matched, so that the forward-looking power demand curve closely matches the actual physical consumption during the transfer. The generated forward-looking power demand curve can accurately predict the power demand of the field bridge at each moment during the transfer process, providing reliable feedforward parameters for the converter control components.
[0128] In one embodiment, reference Figure 4 The converter control component uses the forward-looking power demand curve as a feedforward parameter input to the converter pulse width modulation (PWM) control loop of the power supply. The process of adjusting the switching duty cycle of the PWM control loop in advance based on the forward-looking power demand curve includes: extracting the power change slope and power extreme points from the forward-looking power demand curve; converting the power change slope into a duty cycle change step size feedforward in the PWM control loop; converting the power extreme points into a duty cycle extreme value feedforward limiting value; and superimposing the duty cycle change step size feedforward and the duty cycle extreme value feedforward limiting value onto the original duty cycle setpoint signal within the carrier period of the PWM control loop to generate an updated switching duty cycle.
[0129] In this embodiment, the converter control component receives the forward-looking power demand curve output by the look-ahead power calculation component, analyzes and processes the forward-looking power demand curve, and extracts the power change slope and power extreme points. The power change slope is the ratio of the power demand difference between two adjacent time steps to the time step size, reflecting the rate of change of power demand. Power extreme points include power maximum points and power minimum points, corresponding to the peak and trough values of power demand, respectively.
[0130] In this embodiment, the formula for calculating the slope of the power change is:
[0131]
[0132] in, Let be the slope of the power change at time t. Let be the power demand at time t. for Power requirements at any time For time step.
[0133] In this embodiment, the process of extracting power extrema is as follows: For each point in the forward power demand curve, the power demand at that point is compared with the power demands of the two adjacent points. If the power demand at that point is greater than the power demands of the two adjacent points, then that point is a power maximum point. If the power demand at that point is less than the power demands of the two adjacent points, then that point is a power minimum point.
[0134] In this embodiment, the power change slope is converted into a duty cycle change step size feedforward in the converter's pulse width modulation control loop. The duty cycle change step size feedforward is proportional to the power change slope, and its calculation formula is as follows:
[0135]
[0136] in, Let be the step size feedforward of the duty cycle change at time t. This is the conversion coefficient from the power change slope to the duty cycle change step size.
[0137] In this embodiment, the conversion coefficient The conversion factor was determined through static characteristic tests of the converter. There is an approximately linear relationship between the converter's output power and the switching duty cycle. It is the reciprocal of the slope of the linear relationship.
[0138] In this embodiment, the power extremum point is converted into a duty cycle extremum feedforward limiting amount. The duty cycle extremum feedforward limiting amount includes an upper duty cycle feedforward limiting amount and a lower duty cycle feedforward limiting amount. The upper duty cycle feedforward limiting amount corresponds to the power maximum point, and the lower duty cycle feedforward limiting amount corresponds to the power minimum point. The calculation formula for the duty cycle extremum feedforward limiting amount is:
[0139]
[0140]
[0141] in, The upper limit of the duty cycle feedforward limit at time t. Let be the lower limit of the duty cycle feedforward limiting at time t. Let be the power maximum at time t. Let be the power minimum at time t. This represents the switching duty cycle of the converter when it is unloaded.
[0142] In this embodiment, within the carrier period of the converter pulse width modulation (PWM) control loop, the duty cycle change step size feedforward and the duty cycle extreme value feedforward limiting are superimposed onto the original duty cycle setpoint signal to generate an updated switching duty cycle. The converter PWM control loop adopts a dual closed-loop control structure, including a voltage outer loop and a current inner loop. The input of the voltage outer loop is the difference between the DC bus voltage reference value and the actual DC bus voltage value, and the output is the current reference value of the current inner loop. The input of the current inner loop is the difference between the current reference value and the actual value of the converter output current, and the output is the original duty cycle setpoint signal.
[0143] In this embodiment, the process of generating an updated switching duty cycle by superimposing the duty cycle change step size feedforward and the duty cycle extreme value feedforward limiting amount to the original duty cycle given signal within the carrier period of the converter pulse width modulation control loop includes: extracting the voltage outer loop feedback difference and the current inner loop feedback difference in the converter pulse width modulation control loop; adding the voltage outer loop feedback difference and the current inner loop feedback difference to generate the basic duty cycle adjustment amount; superimposing the duty cycle change step size feedforward amount and the basic duty cycle adjustment amount at the same frequency to generate the transition duty cycle; using the duty cycle extreme value feedforward limiting amount to perform limiting and truncation processing on the transition duty cycle, and using the duty cycle output after limiting and truncation processing as the updated switching duty cycle.
[0144] In this embodiment, the voltage outer loop feedback difference is the difference between the reference value of the DC bus voltage and the actual value of the DC bus voltage, and its calculation formula is as follows:
[0145]
[0146] in, This is the voltage outer loop feedback difference. This is the reference value for the DC bus voltage. This is the actual value of the DC bus voltage.
[0147] In this embodiment, the current inner loop feedback difference is the difference between the current reference value and the actual value of the converter output current, and its calculation formula is as follows:
[0148]
[0149] in, This is the feedback difference in the inner current loop. This is the current reference value. This is the actual value of the converter output current.
[0150] In this embodiment, the voltage outer loop feedback difference and the current inner loop feedback difference are multiplied by their respective proportional coefficients and then added together to generate the base duty cycle adjustment. The formula for calculating the base duty cycle adjustment is as follows:
[0151]
[0152] in, This represents the base duty cycle adjustment at time t. This is the voltage outer loop proportionality coefficient. This is the proportional coefficient of the inner current loop.
[0153] In this embodiment, the duty cycle change step size feedforward and the basic duty cycle adjustment are superimposed at the same frequency to generate the transition duty cycle. Same-frequency superposition means that the duty cycle change step size feedforward and the basic duty cycle adjustment are superimposed within the same carrier period. The formula for calculating the transition duty cycle is:
[0154]
[0155] in, Let t be the transition duty cycle at time t.
[0156] In this embodiment, the transition duty cycle is truncated using the duty cycle extreme value feedforward limiting. The rules for the truncation are as follows: when the transition duty cycle is greater than the upper limit feedforward limiting amount, the transition duty cycle is limited to the upper limit feedforward limiting amount; when the transition duty cycle is less than the lower limit feedforward limiting amount, the transition duty cycle is limited to the lower limit feedforward limiting amount; when the transition duty cycle is between the upper and lower limit feedforward limiting amounts, the transition duty cycle remains unchanged. The mathematical expression for the truncation process is:
[0157]
[0158] in, Let t be the duty cycle of the switch after the update.
[0159] In this embodiment, the updated switch duty cycle is input to the converter pulse width modulator to generate the drive signal for the converter switch. The converter pulse width modulator uses a triangular wave carrier comparison method to compare the updated switch duty cycle with the triangular wave carrier. When the updated switch duty cycle is greater than the triangular wave carrier value, a high-level drive signal is output to turn on the switch; when the updated switch duty cycle is less than the triangular wave carrier value, a low-level drive signal is output to turn off the switch. The duty cycle adjustment parameters under different power change slopes are shown in Table 3.
[0160] Table 3 Duty cycle adjustment parameters under different power change slopes
[0161] Power change slope (kW / ms) Duty cycle variation step size feedforward Basic duty cycle adjustment Transition duty cycle Duty cycle upper limit feedforward limit Updated switch duty cycle 0.01 0.001 0.020 0.021 0.900 0.021 0.05 0.005 0.020 0.025 0.900 0.025 0.10 0.010 0.020 0.030 0.900 0.030 0.20 0.020 0.020 0.040 0.900 0.040 0.50 0.050 0.020 0.070 0.900 0.070 1.00 0.100 0.020 0.120 0.900 0.120 2.00 0.200 0.020 0.220 0.200 0.200 3.00 0.300 0.020 0.320 0.200 0.200
[0162] In this embodiment, Table 3 shows the duty cycle adjustment parameters under different power change slopes. As can be seen from Table 3, as the power change slope increases, the duty cycle change step size feedforward also increases, and the transition duty cycle increases accordingly. When the power change slope is small, the transition duty cycle is less than the upper limit feedforward limit, and the updated switching duty cycle is equal to the transition duty cycle. When the power change slope is large, the transition duty cycle is greater than the upper limit feedforward limit, and the updated switching duty cycle is limited to the upper limit feedforward limit to prevent converter modulation saturation or overcurrent.
[0163] In this embodiment, the slope of power change in the power demand curve is converted into a duty cycle change step size feedforward, and the power extreme point is converted into a duty cycle extreme value feedforward limiting amount. This achieves a smooth and constrained mapping between power demand and switching action within the converter control loop. By adjusting the converter switching duty cycle in advance, the power supply can adjust its output power before sudden changes in mechanical load occur, matching the power demand changes during the field bridge transfer process and eliminating the lag in pure electric parametric feedback regulation.
[0164] In one embodiment, reference Figure 5 The process of the bus condition monitoring component acquiring real-time transient values of DC bus voltage and current, and calculating the DC bus voltage change rate based on these transient values, includes: synchronously acquiring transient values of DC bus voltage and current at a set high-frequency sampling frequency to obtain discrete voltage and current sequences; performing sliding window mean filtering on the discrete voltage sequences to extract the filtered voltage sequence; performing differential calculations on the filtered voltage sequences to obtain the DC bus voltage change rate; calculating the DC bus transient power fluctuation based on the discrete current sequence; and aligning and jointly calibrating the DC bus voltage change rate and the DC bus transient power fluctuation based on their time axes.
[0165] In this embodiment, the bus condition monitoring component synchronously samples the DC bus voltage and current at a set high-frequency sampling frequency. The high-frequency sampling frequency is set to 100kHz, meaning that the transient values of the DC bus voltage and current are collected every 10 microseconds. Synchronous sampling means that voltage sampling and current sampling are performed at the same time to ensure the time consistency of voltage and current data. The sampled transient values of DC bus voltage and current are converted into digital signals by an analog-to-digital converter, forming discrete voltage and current sequences.
[0166] In this embodiment, the discrete voltage sequence is represented as:
[0167]
[0168] in, The voltage value at the nth sampling point. The sampling period is , The sampling frequency.
[0169] In this embodiment, the discrete current sequence is represented as:
[0170]
[0171] in, Let be the current value at the nth sampling point.
[0172] In this embodiment, a sliding window mean filtering process is performed on the discrete voltage sequence to extract the filtered voltage sequence. The sliding window mean filtering process effectively suppresses high-frequency noise in the discrete voltage sequence, improving the accuracy of voltage measurement. The process of performing sliding window mean filtering on the discrete voltage sequence to extract the filtered voltage sequence includes: setting a sliding window width that matches the high-frequency sampling frequency; moving the sliding window along the time axis in single-step increments and calculating the arithmetic mean of all discrete voltage sequence sampling points within the window; using the arithmetic mean as the filtered voltage value at the center of the current window; removing outlier sampling points in the discrete voltage sequence whose deviation from the arithmetic mean exceeds the allowable fluctuation range, replacing the outlier sampling points with the arithmetic mean, reconstructing the discrete voltage sequence, performing a difference operation, and extracting the reconstructed filtered voltage sequence.
[0173] In this embodiment, the sliding window width is set to 11 sampling points, meaning the window includes the current sampling point and five sampling points before and after it. The selection of the sliding window width needs to consider both filtering effect and response speed. A larger window width results in better filtering but a slower response speed; a smaller window width results in a faster response speed but a worse filtering effect. In this embodiment, a window width of 11 sampling points is chosen, which ensures both filtering effect and meets the system's response speed requirements.
[0174] In this embodiment, the sliding window moves along the time axis in single-step increments, moving the position of one sampling point at a time. For each window position, the arithmetic mean of all discrete voltage sequence sampling points within the window is calculated. The formula for calculating the arithmetic mean is:
[0175]
[0176] in, Let n be the arithmetic mean of the nth window's center time. In this embodiment, the window width is half the width. .
[0177] In this embodiment, the arithmetic mean is used as the filtered voltage value at the center of the current window. For the first N sampling points and the last N sampling points of the discrete voltage sequence, a boundary processing method is adopted. That is, for the first N sampling points, the window starts from the beginning of the sequence and gradually increases the number of sampling points in the window; for the last N sampling points, the window starts from the end of the sequence and gradually decreases the number of sampling points in the window.
[0178] In this embodiment, outlier sampling points in the discrete voltage sequence whose deviation from the arithmetic mean exceeds the allowable fluctuation range are removed. The formula for calculating the allowable fluctuation range is:
[0179]
[0180] in, To allow for voltage fluctuations, this embodiment sets it to 1% of the DC bus voltage reference value.
[0181] In this embodiment, when the value of a sampling point in the discrete voltage sequence exceeds the aforementioned allowable fluctuation range, that sampling point is identified as an outlier. The value of the outlier is replaced with the arithmetic mean of the current window to reconstruct the discrete voltage sequence. A sliding window mean filtering process is then performed again on the reconstructed discrete voltage sequence to extract the final filtered voltage sequence.
[0182] In this embodiment, a differential operation is performed on the filtered voltage sequence between adjacent sampling points to obtain the DC bus voltage change rate. The formula for calculating the DC bus voltage change rate is:
[0183]
[0184] in, Let be the rate of change of the DC bus voltage at the nth sampling point.
[0185] In this embodiment, the transient power fluctuation of the DC bus is calculated based on the discrete current sequence. The formula for calculating the transient power of the DC bus is:
[0186]
[0187] in, Let be the transient power of the DC bus at the nth sampling point.
[0188] In this embodiment, the DC bus transient power fluctuation is the difference between the DC bus transient power at the current sampling point and the DC bus transient power at the previous sampling point, and its calculation formula is as follows:
[0189]
[0190] in, This represents the transient power fluctuation of the DC bus at the nth sampling point.
[0191] In this embodiment, the DC bus voltage change rate and the DC bus transient power fluctuation are aligned on the time axis and jointly calibrated. Time axis alignment means mapping the DC bus voltage change rate and the DC bus transient power fluctuation to the same time scale. Joint calibration means establishing the correspondence between the DC bus voltage change rate and the DC bus transient power fluctuation to verify the accuracy of the DC bus voltage change rate calculation. When the DC bus transient power fluctuation is positive, it indicates that the DC bus power demand is increasing, the DC bus voltage should show a downward trend, and the DC bus voltage change rate should be negative; when the DC bus transient power fluctuation is negative, it indicates that the DC bus power demand is decreasing, the DC bus voltage should show an upward trend, and the DC bus voltage change rate should be positive.
[0192] In this embodiment, reference Figure 6 The transient energy regulation component triggers the bidirectional converter module on the bus side to perform transient energy compensation or transient energy absorption when the DC bus voltage change rate exceeds a set threshold. This process includes: setting positive and negative voltage change rate thresholds; generating a first switching command when the DC bus voltage change rate is greater than the positive voltage change rate threshold, triggering the energy-consuming branch in the bidirectional converter module on the bus side to perform transient energy absorption; and generating a second switching command when the DC bus voltage change rate is less than the negative voltage change rate threshold, triggering the energy storage branch in the bidirectional converter module on the bus side to perform transient energy compensation. The pulse width modulation duty cycle of the energy-consuming or energy-storage branch is adjusted according to the absolute value of the DC bus voltage change rate.
[0193] In this embodiment, a positive voltage change rate threshold and a negative voltage change rate threshold are set. The positive voltage change rate threshold is a positive value, corresponding to the situation where the DC bus voltage rises too quickly; the negative voltage change rate threshold is a negative value, corresponding to the situation where the DC bus voltage drops too quickly. The absolute values of the positive and negative voltage change rate thresholds are equal, and in this embodiment, they are set to 50V / ms.
[0194] In this embodiment, the transient energy regulation component continuously receives the DC bus voltage change rate output by the bus status monitoring component and compares it with set positive and negative voltage change rate thresholds. When the DC bus voltage change rate is greater than the positive voltage change rate threshold, it indicates that the DC bus voltage is rising too quickly, posing an overvoltage risk. The transient energy regulation component generates a first switching command, triggering the energy-consuming branch in the bidirectional converter module on the bus side to conduct, performing a transient energy absorption operation to dissipate excess energy on the DC bus in the energy-consuming resistor, thus suppressing the rise in DC bus voltage. When the DC bus voltage change rate is less than the negative voltage change rate threshold, it indicates that the DC bus voltage is falling too quickly, posing an undervoltage risk. The transient energy regulation component generates a second switching command, triggering the energy storage branch in the bidirectional converter module on the bus side to conduct, performing a transient energy compensation operation to release the energy stored in the supercapacitor bank to the DC bus, thus suppressing the drop in DC bus voltage.
[0195] In this embodiment, the pulse width modulation (PWM) duty cycle of the energy-consuming branch or energy-storage branch is adjusted based on the absolute value of the DC bus voltage change rate. The process of adjusting the PWM duty cycle of the energy-consuming branch or energy-storage branch based on the absolute value of the DC bus voltage change rate includes: establishing a piecewise linear mapping relationship between the absolute value of the DC bus voltage change rate and the PWM duty cycle. When the energy-consuming branch is triggered to conduct, the duty cycle of the energy-consuming switch in the energy-consuming branch is linearly increased as the absolute value increases, based on the piecewise linear mapping relationship. When the energy-storage branch is triggered to conduct, the duty cycle of the energy-storage switch in the energy-storage branch is linearly increased as the absolute value increases, based on the piecewise linear mapping relationship. When the absolute value falls back to within a set threshold, the duty cycle is reset to zero according to a set falling edge slope.
[0196] In this embodiment, a piecewise linear mapping relationship is established between the absolute value of the DC bus voltage change rate and the pulse width modulation (PWM) duty cycle. This piecewise linear mapping relationship is divided into three intervals: a dead zone interval, a linear adjustment interval, and a saturation interval. The dead zone interval corresponds to the case where the absolute value of the DC bus voltage change rate is less than a set threshold; in this case, the PWM duty cycle is 0, and neither the energy consumption branch nor the energy storage branch is conducting. The linear adjustment interval corresponds to the case where the absolute value of the DC bus voltage change rate is greater than or equal to the set threshold but less than the saturation threshold; in this case, the PWM duty cycle is proportional to the absolute value of the DC bus voltage change rate. The saturation interval corresponds to the case where the absolute value of the DC bus voltage change rate is greater than or equal to the saturation threshold; in this case, the PWM duty cycle is 100%, and either the energy consumption branch or the energy storage branch is fully conducting.
[0197] In this embodiment, the mathematical expression for the piecewise linear mapping relationship is:
[0198]
[0199] in, Let t be the pulse width modulation duty cycle at time t. In this embodiment, a threshold is set. , The saturation threshold is used in this embodiment. , This is the linear adjustment coefficient.
[0200] In this embodiment, the linear adjustment coefficient The calculation formula is:
[0201]
[0202] In this embodiment, when the energy-consuming branch is triggered to conduct, according to the above-mentioned piecewise linear mapping relationship, as the absolute value of the DC bus voltage change rate increases, the duty cycle of the energy-consuming switch in the energy-consuming branch is linearly increased. When the absolute value of the DC bus voltage change rate reaches the saturation threshold, the duty cycle of the energy-consuming switch reaches 100%, and the energy-consuming branch is fully conducted to absorb excess energy on the DC bus to the maximum extent.
[0203] In this embodiment, when the energy storage branch is triggered to conduct, according to the above-mentioned piecewise linear mapping relationship, as the absolute value of the DC bus voltage change rate increases, the conduction duty cycle of the energy storage switch in the energy storage branch is linearly increased. When the absolute value of the DC bus voltage change rate reaches the saturation threshold, the conduction duty cycle of the energy storage switch reaches 100%, and the energy storage branch is fully conducted, replenishing energy to the DC bus with maximum capacity.
[0204] In this embodiment, when the absolute value of the DC bus voltage change rate falls back to within a set threshold, the duty cycle is reduced to zero according to a set falling edge slope. The set falling edge slope is 10% / ms, meaning the duty cycle decreases by 10% every millisecond. By slowly reducing the duty cycle, secondary fluctuations in the DC bus voltage are avoided. The transient energy regulation parameters under different DC bus voltage change rates are shown in Table 4.
[0205] Table 4 Transient energy regulation parameters under different DC bus voltage change rates
[0206] DC bus voltage change rate (V / ms) Absolute value (V / ms) Interval type Trigger Action Pulse width modulation duty cycle Energy throughput power (kW) 30 30 Dead zone interval none 0 0 60 60 Linear adjustment range Energy absorption 0.067 20 100 100 Linear adjustment range Energy absorption 0.333 100 150 150 Linear adjustment range Energy absorption 0.667 200 200 200 Saturation range Energy absorption 1.000 300 -30 30 Dead zone interval none 0 0 -60 60 Linear adjustment range Energy compensation 0.067 20 -100 100 Linear adjustment range Energy compensation 0.333 100 -150 150 Linear adjustment range Energy compensation 0.667 200 -200 200 Saturation range Energy compensation 1.000 300
[0207] In this embodiment, Table 4 shows the transient energy regulation parameters under different DC bus voltage change rates. As can be seen from Table 4, when the absolute value of the DC bus voltage change rate is less than 50V / ms, the system is in the dead zone and does not trigger any action. When the absolute value of the DC bus voltage change rate is between 50V / ms and 200V / ms, the system is in the linear regulation range, and the pulse width modulation duty cycle is linearly adjusted according to the magnitude of the absolute value of the DC bus voltage change rate, resulting in a linear change in energy throughput power. When the absolute value of the DC bus voltage change rate is greater than or equal to 200V / ms, the system is in the saturation range, the pulse width modulation duty cycle reaches 100%, and the energy throughput power reaches its maximum value.
[0208] In this embodiment, the transient values of DC bus voltage and current are collected in real time to calculate the DC bus voltage change rate. When the voltage change rate exceeds a set threshold, the bidirectional converter module on the bus side is triggered to perform transient energy compensation or absorption. In the initial stage of voltage fluctuation, energy throughput is directly triggered based on the voltage change rate to quickly smooth out bus energy imbalance and prevent voltage overshoot from triggering system protection shutdown. By establishing a piecewise linear mapping relationship between the absolute value of the DC bus voltage change rate and the pulse width modulation duty cycle, precise control of the transient energy regulation process is achieved, enabling the DC bus voltage to quickly recover to stability.
Claims
1. A power supply control system for a fully electric yard bridge during relocation, characterized in that, include: A trajectory data acquisition component is used to acquire preset transfer trajectory data for the yard bridge, including: extracting an initial trajectory parameter set through yard bridge transfer path planning nodes, wherein the initial trajectory parameter set includes start coordinates, end coordinates, and intermediate turning point coordinates; inputting the initial trajectory parameter set into a trajectory smoothing interpolator to generate a continuous spatial coordinate sequence; extracting path attribute labels corresponding to each coordinate point in the continuous spatial coordinate sequence, wherein the path attribute labels include straight sections, curved sections, and uphill sections; and integrating the continuous spatial coordinate sequence with the path attribute labels into the preset transfer trajectory data for the yard bridge. A forward-looking power calculation component is used to combine the multi-rigid-body dynamics model of the field bridge with the resistance mapping relationship of the traveling mechanism to solve the preset transfer trajectory data and generate a forward-looking power demand curve for the transfer process. This includes: extracting the path curvature and elevation difference from the preset transfer trajectory data; inputting the path curvature and elevation difference into the multi-rigid-body dynamics model of the field bridge to solve the internal force coupling work parameters between the rigid bodies of the field bridge; inputting the internal force coupling work parameters into the resistance mapping relationship of the traveling mechanism to match the traveling resistance torque under the superposition of different path surface friction coefficients and wind loads; and mapping and generating the forward-looking power demand curve for the transfer process based on the traveling resistance torque and the mechanical transmission ratio of the field bridge traveling mechanism. A converter control component is used to input the forward-looking power demand curve as a feedforward parameter to the converter pulse width modulation control loop of the power supply, and to adjust the switching duty cycle of the converter pulse width modulation control loop in advance according to the forward-looking power demand curve, including: extracting the power change slope and power extreme points from the forward-looking power demand curve; converting the power change slope into a duty cycle change step size feedforward amount in the converter pulse width modulation control loop; converting the power extreme points into a duty cycle extreme value feedforward limiting amount; and superimposing the duty cycle change step size feedforward amount and the duty cycle extreme value feedforward limiting amount into the original duty cycle given signal within the carrier period of the converter pulse width modulation control loop. The bus condition monitoring component is used to collect the transient values of DC bus voltage and current in real time, and calculate the DC bus voltage change rate based on the transient values of DC bus voltage and current. A transient energy regulation component is used to trigger the bidirectional converter module on the bus side to perform transient energy compensation or transient energy absorption when the DC bus voltage change rate exceeds a set threshold. This includes: setting a positive voltage change rate threshold and a negative voltage change rate threshold; when the DC bus voltage change rate is greater than the positive voltage change rate threshold, generating a first switching command to trigger the energy-consuming branch in the bidirectional converter module on the bus side to conduct transient energy absorption; and when the DC bus voltage change rate is less than the negative voltage change rate threshold, generating a second switching command to trigger the energy storage branch in the bidirectional converter module on the bus side to conduct transient energy compensation.
2. The power supply control system for the all-electric yard bridge relocation according to claim 1, characterized in that, The process of the bus status monitoring component acquiring the transient values of DC bus voltage and current in real time and calculating the DC bus voltage change rate based on the transient values of DC bus voltage and current includes: synchronously acquiring the transient values of DC bus voltage and current at a set high-frequency sampling frequency to obtain a voltage discrete sequence and a current discrete sequence; Perform sliding window mean filtering on the discrete voltage sequence to extract the filtered voltage sequence; Perform adjacent sampling point difference operation on the filtered voltage sequence to obtain the DC bus voltage change rate; The transient power fluctuation of the DC bus is calculated based on the current discrete sequence, and the DC bus voltage change rate and the transient power fluctuation of the DC bus are aligned and jointly calibrated on the time axis.
3. The power supply control system for the all-electric yard bridge relocation according to claim 1, characterized in that, The pulse width modulation duty cycle of the energy-consuming branch or the energy-storage branch is adjusted according to the absolute value of the DC bus voltage change rate.
4. The power supply control system for the all-electric yard bridge relocation according to claim 1, characterized in that, The process of inputting the path curvature and elevation difference into the multi-rigid-body dynamics model of the field bridge and solving the work parameters of the internal force coupling between the rigid bodies of the field bridge includes: constructing a rigid-body topology diagram that includes the field bridge legs, main beams and traveling trolleys; The transient turning angular velocity of each traveling trolley is allocated according to the path curvature, and the acceleration component of each rigid body along the direction of gravity is allocated according to the elevation difference. Input the transient steering angular velocity and the acceleration component into the Lagrange dynamics equations to solve for the constraint reaction forces at the connecting nodes in the rigid body topology diagram. Perform a product-integral operation on the constraint reaction force and the corresponding relative displacement of the rigid body to obtain the work parameters of the internal force coupling between the rigid bodies of the field bridge.
5. The power supply control system for the all-electric yard bridge relocation according to claim 1, characterized in that, Within the carrier period of the converter pulse width modulation control loop, the process of superimposing the duty cycle change step size feedforward and the duty cycle extreme value feedforward limiting to the original duty cycle given signal to generate the updated switching duty cycle includes: extracting the voltage outer loop feedback difference and the current inner loop feedback difference in the converter pulse width modulation control loop; The voltage outer loop feedback difference and the current inner loop feedback difference are added together to generate the basic duty cycle adjustment amount; The duty cycle change step size feedforward is superimposed with the basic duty cycle adjustment amount at the same frequency to generate the transition duty cycle; The transition duty cycle is clipped using the extreme value feedforward limiting of the duty cycle, and the duty cycle output after clipping is used as the updated switch duty cycle.
6. The power supply control system for the all-electric yard bridge relocation according to claim 1, characterized in that, Adjusting the pulse width modulation duty cycle of the energy-consuming branch or the energy-storage branch based on the absolute value of the DC bus voltage change rate includes: establishing a piecewise linear mapping relationship between the absolute value of the DC bus voltage change rate and the pulse width modulation duty cycle. When the energy-consuming branch is triggered to conduct, according to the piecewise linear mapping relationship, the conduction duty cycle of the energy-consuming switch in the energy-consuming branch is linearly increased as the absolute value increases; When the energy storage branch is triggered to conduct, according to the piecewise linear mapping relationship, the conduction duty cycle of the energy storage switch tube in the energy storage branch is linearly increased as the absolute value increases; When the absolute value falls back to within the set threshold, the conduction duty cycle is reset to zero according to the set falling edge slope.
7. The all-electric power supply control system for the relocation of the yard bridge according to claim 2, characterized in that, The process of performing sliding window mean filtering on the discrete voltage sequence and extracting the filtered voltage sequence includes: setting a sliding window width that matches the high-frequency sampling frequency; The sliding window is moved along the time axis in single-step increments, and the arithmetic mean of all voltage discrete sequence sampling points within the window is calculated. The arithmetic mean is used as the filtered voltage value at the current window center time; Outlier sampling points in the discrete voltage sequence whose deviation from the arithmetic mean exceeds the allowable fluctuation range are removed, and the outlier sampling points are replaced with the arithmetic mean. The discrete voltage sequence is reconstructed, and a difference operation is performed to extract the reconstructed filtered voltage sequence.
Citation Information
Patent Citations
Emission management adaptive control method and system based on high-precision map predictability
CN120968837A
Self-adaptive optimization method and system for PWM duty ratio of high-precision power supply module
CN121785444A
High-stability light storage charging control method and system
CN122159331A