A ventilation method and system based on mine production organization and arrangement

By constructing a digital twin model of the mine ventilation system and calculating regional dynamic air demand, autonomous and precise underground air supply was achieved, solving the problems of supply and demand mismatch and high energy consumption, and improving mine production efficiency and safety.

CN122819859BActive Publication Date: 2026-11-17CENT SOUTH UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611308956.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-08-27
Publication Date
2026-11-17
Estimated Expiration
2046-08-27

AI Technical Summary

Technical Problem

Existing underground ventilation systems in mines cannot be dynamically adjusted according to production rhythm and regional needs, resulting in supply and demand mismatch, high energy consumption, low control precision, and failure to effectively couple production organization and ventilation network, causing ventilation methods to lag behind production changes.

Method used

By constructing a digital twin model of the mine ventilation system and combining it with three-dimensional ventilation simulation software, ventilation control levels and independent ventilation areas are divided, a regional dynamic air demand calculation model is established, and a three-dimensional dynamic spectrum of mine air supply is generated to achieve autonomous on-demand air supply control and form a closed-loop control through real-time feedback adjustment.

Benefits of technology

It enables precise air supply according to production rhythm and regional needs, reduces ventilation energy consumption, improves the matching degree between air supply and production, enhances mine management and operation efficiency, and ensures safety and scientific nature.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122819859B_ABST
    Figure CN122819859B_ABST
Patent Text Reader

Abstract

This application relates to the field of mine safety and energy conservation technology, and provides a method and system for air supply based on mine production organization and arrangement. The method includes: constructing a digital twin model of the mine ventilation system; dividing the digital twin model of the mine ventilation system into different ventilation control levels and independent ventilation areas; generating a three-dimensional dynamic spectrum of mine air supply including time, space, and required air volume; dividing the time-series working conditions according to the three-dimensional dynamic spectrum of mine air supply and pre-setting a set of ventilation system operating parameters for each time-series working condition; determining the time-series working condition at the current moment based on real-time time and production execution system trigger signals, and performing autonomous on-demand air supply control according to the time-series working condition; and obtaining the actual air volume for feedback adjustment and rolling correction. This application provides autonomous and precise air supply according to production rhythm and regional needs, reducing ventilation energy consumption by approximately 30%-40% compared to the traditional constant air volume mode, significantly improving the economic efficiency and intelligent level of the mine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the fields of mine safety and energy conservation technology, specifically to a ventilation method and system based on mine production organization and arrangement. Background Technology

[0002] With the increasing depletion of shallow mineral resources, mining is continuously advancing to deeper levels, leading to increasingly prominent problems such as underground heat hazards, increased ventilation resistance, and more complex pollution source distribution. Multi-level and multi-panel coordinated mining has become the norm in modern mines, characterized by numerous and dispersed working faces, with the required ventilation volume dynamically changing according to the timing of drilling, blasting, and ore extraction processes at each working face.

[0003] Currently, traditional mine ventilation systems generally adopt a "one-machine-to-the-end" or constant air volume supply mode. To ensure safety under the most unfavorable conditions, the system typically supplies air continuously at the maximum required volume. This mode has significant drawbacks: First, it suffers from "supply-demand mismatch," failing to dynamically adjust according to production rhythm and actual regional needs, resulting in a large waste of air volume, with ventilation energy consumption accounting for 30%-50% of the total energy consumption of the entire mine; second, it suffers from "extensive control," relying on manual experience to operate structures such as air doors and windows, resulting in low control precision and difficulty in achieving refined and coordinated management of the complex underground ventilation network; third, it suffers from "lack of spatiotemporal coordination," failing to effectively couple production organization arrangements (time dimension) with the ventilation network topology (spatial dimension), causing the air supply method to lag behind production changes.

[0004] In existing technologies, there is a multi-level, multi-panel collaborative mine ventilation control method that calculates the ventilation demand of the mining area and tunneling face to achieve ventilation control, thus improving accuracy. However, this method still focuses on static or quasi-static ventilation demand calculation and fails to form precise dynamic control based on the time-sharing, level-based, and area-based arrangements of the production cycle. Summary of the Invention

[0005] This application aims to solve the problem in the prior art that the air supply is not coordinated with the mine production organization and arrangement to achieve dynamic and precise control, and provides an air supply method and system based on the mine production organization and arrangement.

[0006] To solve the above problems, this application is implemented as follows:

[0007] In a first aspect, this application provides a ventilation method based on mine production organization and arrangement, the method comprising: Obtain production organization and arrangement information and basic information of the mine ventilation system throughout the entire production cycle, and integrate the production organization and arrangement information and basic information of the mine ventilation system based on three-dimensional ventilation simulation software to construct a digital twin model of the mine ventilation system; Based on the digital twin model of the mine ventilation system, ventilation control levels and independent ventilation areas are divided, and the results of the ventilation control level division and the independent ventilation area division are marked in the digital twin model of the mine ventilation system. A time-driven regional dynamic air demand calculation model is established to calculate the air demand of each working face in each independent ventilation area. The air demand of all working faces in each independent ventilation area is accumulated step by step according to the ventilation control level to obtain the calculated air demand of each independent ventilation area. Based on the calculated air demand, a three-dimensional dynamic spectrum of mine air supply including time, space and air demand is generated. Based on the three-dimensional dynamic spectrum of mine air supply, time-series working conditions are divided and a set of ventilation system operating parameters is preset for each time-series working condition; Based on real-time time and production execution system trigger signals, determine the current time sequence condition and perform autonomous on-demand air supply control according to the time sequence condition; The actual air volume of each independent ventilation area in the mine is obtained, and the calculated required air volume is adjusted and corrected based on the actual air volume to form a closed-loop air supply control.

[0008] In one embodiment, the production organization and arrangement information includes daily shift divisions and time nodes, work sequence plans for each section / panel / mining face, the number of personnel for each corresponding work process, and the equipment type / power / time coefficient for each corresponding work process; the basic information of the mine ventilation system includes the ventilation network topology, roadway cross-sectional parameters, performance curves of ventilation power equipment, and the status of ventilation control equipment.

[0009] In one embodiment, the step of dividing ventilation control levels and independent ventilation areas based on the digital twin model of the mine ventilation system, and annotating the results of the ventilation control level division and the independent ventilation area division in the digital twin model of the mine ventilation system, includes: Based on the ventilation power source and network structure, the mine ventilation system is divided into three ventilation control levels: Level I, Level II, and Level III. Based on the division of the middle section of the mine, the distribution of mining faces, and the independence of ventilation, the mine is divided into multiple independent ventilation zones; The results of ventilation control levels and independent ventilation areas are labeled in the digital twin model of the mine ventilation system.

[0010] In one embodiment, the regional dynamic air demand calculation model includes: The rock drilling process requires a quantum model of wind speed, which satisfies the following expression:

[0011] in Air volume required for rock drilling face; The required air volume for personnel at the rock drilling face; Air volume required for rock drilling equipment; The required air volume for dust removal at the rock drilling face; The loading process requires a quantum model that satisfies the following expression:

[0012] in Air volume required for the loading face; Air volume required for personnel at the explosive loading work site; Air volume required for the equipment at the loading face; The required air volume for dust removal at the charging face; The blasting process requires a quantum model and a corresponding blasting type model that satisfy the following expression:

[0013] in, Large-scale blasting requires a large volume of air. Ventilation time, The amount of explosives for a large-scale blast. The coefficient for smoke emission. For the volume of the tunnel filled with gunfire smoke; The ore extraction process requires a wind quantum model that satisfies the following expression:

[0014] in, Air volume required for the ore extraction face; The required ventilation volume for personnel at the mining face; Air volume required for equipment at the ore extraction face; The required air volume for dust removal at the mining face; The quantum model for air demand at the prepared mining face is used to classify and calculate the air demand based on the processes of rock drilling, blasting, slag removal and blasting, using local ventilation model, dust control model and equipment thermal balance model respectively, and the calculation results are superimposed on the air demand spectrum of the area in time axis order. During non-production or shift handover periods, the required air volume is switched from 0.2 m / s to the required air volume to maintain the basic wind speed of the roadway.

[0015] In one embodiment, the step of dividing the time-series operating conditions and pre-setting a set of ventilation system operating parameters for each time-series operating condition includes: The time sequence operating conditions are divided into full-load production conditions, low-load production conditions, no production operations conditions, shift handover conditions, and blasting ventilation conditions. A set of ventilation system operating parameters is preset for each time series operating condition. The set of ventilation system operating parameters includes the main fan frequency, the start / stop status of the middle auxiliary fan, and the opening degree of the area window.

[0016] In one embodiment, the division of time-series operating conditions into full-load production conditions, low-load production conditions, no-production operation conditions, shift handover conditions, and blasting ventilation conditions includes: Based on the changes in the absolute value of total air demand, the logical state of mine production organization and regional events, the time sequence operating conditions are divided into full-load production conditions, low-load production conditions, no production operation conditions, shift handover conditions and blasting ventilation conditions. When the production status marker of a certain independent ventilation area is switched from normal production to blasting alarm, regardless of the current total air volume required by the entire mine, the control mode of the independent ventilation area, its upper intermediate section, and the total return air will be forcibly switched to blasting ventilation mode, while other unaffected independent ventilation areas will continue to operate under their original conditions.

[0017] In one embodiment, the step of determining the current time-series operating condition based on real-time time and production execution system trigger signals, and then performing autonomous on-demand air supply control according to the time-series operating condition, includes: Determine the current time sequence condition; Control commands are issued in the following order: coarse adjustment of total air volume (Level I), mid-section distribution (Level II), and fine adjustment of area (Level III). After the blasting process is completed, switch to blasting ventilation mode; Once the concentration of harmful gases meets the standard, the system will automatically return to normal production conditions.

[0018] In one embodiment, the step of obtaining the actual air volume of each independent ventilation zone in the mine, and performing feedback adjustment and rolling correction on the calculated required air volume based on the actual air volume to form a closed-loop air supply control includes: Install wind speed sensors at key branches at all levels to obtain the actual air volume of each independent ventilation area in the mine in real time. Based on the deviation between the calculated required air volume and the actual air volume, when the deviation exceeds a preset threshold, the actual air volume is adjusted to approach the calculated required air volume through a hierarchical fuzzy PID control model.

[0019] Secondly, this application provides a ventilation system based on mine production organization, comprising: The module for constructing a digital twin model of a mine ventilation system is used to acquire production organization and arrangement information and basic information of the mine ventilation system throughout the entire production cycle, and to integrate the production organization and arrangement information and basic information of the mine ventilation system based on three-dimensional ventilation simulation software to construct a digital twin model of the mine ventilation system. The hierarchical area division module is used to perform ventilation control hierarchical division and independent ventilation area division based on the digital twin model of the mine ventilation system, and to mark the ventilation control hierarchical division results and the independent ventilation area division results in the digital twin model of the mine ventilation system; The air demand calculation module is used to establish a time-driven regional dynamic air demand calculation model, calculate the air demand of each working face in each independent ventilation area, and accumulate the air demand of all working faces in each independent ventilation area according to the ventilation control level to obtain the calculated air demand of each independent ventilation area. Based on the calculated air demand, a three-dimensional dynamic spectrum of mine air supply including time, space and air demand is generated. The mine ventilation plan generation module is used to divide the time sequence working conditions according to the three-dimensional dynamic spectrum of the mine ventilation, and to preset a set of ventilation system operation parameters for each time sequence working condition. The air supply control module is used to determine the current time sequence condition based on real-time time and production execution system trigger signals, and to perform autonomous on-demand air supply control according to the time sequence condition. The feedback adjustment module is used to obtain the actual air volume of each independent ventilation area in the mine, and to perform feedback adjustment and rolling correction on the calculated required air volume based on the actual air volume, forming a closed-loop air supply control.

[0020] Thirdly, this application provides a terminal device including a processor and a memory, wherein the memory stores a program or instructions executable on the processor, and the program or instructions, when executed by the processor, implement the steps of the method described in the first aspect.

[0021] Fourthly, this application provides a readable storage medium on which a program or instructions are stored, which, when executed by a processor, implement the steps of the method described in the first aspect.

[0022] Fifthly, this application provides a chip including a processor and a communication interface, the communication interface being coupled to the processor, the processor being used to run programs or instructions to implement the steps of the method described in the first aspect.

[0023] In a sixth aspect, this application provides a computer program product stored in a storage medium, the program product being executed by at least one processor to implement the steps of the method described in the first aspect.

[0024] Compared with the prior art, this application has the following beneficial effects: (1) This application discloses a ventilation method based on mine production organization and arrangement. By using a three-dimensional dynamic spectrum of mine ventilation including time, space, and required air volume, the ventilation method is deeply coupled with the organization and arrangement of the entire mine production cycle. This achieves autonomous and precise ventilation according to production rhythm and regional demand, significantly improving the matching degree between ventilation supply and actual production needs. From the start of production planning, through the modeling of the digital twin model of the mine ventilation system to the real-time feedback and rolling correction of actual air volume, a complete closed-loop control system is formed. This application has intelligent perception, autonomous decision-making, and continuous optimization capabilities, realizing intelligent and unmanned management of the mine, effectively reducing mine management and operation costs, and improving mine production efficiency and safety.

[0025] (2) This application avoids the huge waste of "excessive air supply" during non-production or low-load periods in the traditional mode by using dynamic control in time, level and region. Reducing the total air volume under working conditions such as shift handover and maintaining only the basic wind speed, thereby significantly reducing the operating energy consumption of equipment such as main fans and auxiliary fans, is a key technology for achieving green and low-carbon operation of mines.

[0026] (3) Through a hierarchical and domain-based spatial control architecture, it is possible to respond quickly and differently to high-risk events such as blasting, ensuring safe airflow in key areas without affecting normal production in other areas. At the same time, the pre-simulation and feedback correction mechanism based on the three-dimensional digital twin model ensures the scientific nature and safety of the control decisions. Attached Figure Description

[0027] To more clearly illustrate the technical solutions in this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0028] Figure 1 This is a schematic flowchart of a preferred embodiment of the ventilation method based on mine production organization and arrangement disclosed in this application; Figure 2 This is a schematic diagram of the hierarchical and zoned structure of a mine ventilation system according to a preferred embodiment of this application; Figure 3 This is a preferred embodiment of the present application, showing the time-series operating conditions and corresponding air volume demand curves. Figure 4 This is a schematic diagram of the structure of the terminal device disclosed in a preferred embodiment of this application. Detailed Implementation

[0029] The technical solutions of this application will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0030] The terms "first," "second," etc., used in this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or apparatus that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to these processes, methods, products, or apparatuses. Additionally, the use of "and / or" in this application indicates at least one of the connected objects, such as A and / or B and / or C, representing seven possibilities: including A alone, B alone, C alone, and the presence of both A and B, both B and C, both A and C, and the presence of A, B, and C.

[0031] In this application, the terms "exemplary" or "for example" are used to indicate that something is an example, illustration, or description. Any embodiment or design described as "exemplary" or "for example" in this application should not be construed as being more preferred or advantageous than other embodiments or designs. Rather, the use of the terms "exemplary" or "for example" is intended to present the relevant concepts in a specific manner.

[0032] The following describes the air supply method based on mine production organization and arrangement provided in this application.

[0033] See Figure 1 , Figure 1 This is a schematic flowchart of an air supply method based on mine production organization and arrangement provided in an embodiment of this application. Figure 1 The air supply method shown, based on the mine production organization arrangement, can be executed by terminal equipment such as computers.

[0034] like Figure 1 As shown, the ventilation method based on mine production organization and arrangement provided in this application may include the following steps: S101. Obtain production organization and arrangement information and basic information of the mine ventilation system throughout the entire production cycle, and integrate the production organization and arrangement information and basic information of the mine ventilation system based on three-dimensional ventilation simulation software to construct a digital twin model of the mine ventilation system.

[0035] In one embodiment, the production organization and arrangement information includes daily shift divisions and time nodes, work sequence plans for each section / panel / mining face, number of personnel for each corresponding process, and equipment type / power / time coefficient for each corresponding process; The specific work sequence plan includes rock drilling, charging, blasting, ore extraction, support, and backfilling.

[0036] The basic information of the mine ventilation system includes the ventilation network topology, roadway cross-sectional parameters, performance curves of ventilation power equipment, and status of ventilation control equipment. The ventilation power equipment specifically includes a main fan, an auxiliary fan, and a local fan.

[0037] The digital twin model of the mine ventilation system was established using three-dimensional ventilation simulation software, serving as the basic platform for subsequent hierarchical and domain-specific planning and dynamic simulation.

[0038] Taking a certain mine as an example, it adopts a three-shift work system: the morning shift (8:00-16:00) is mainly responsible for rock drilling and support; the afternoon shift (16:00-24:00) is mainly responsible for loading explosives and blasting; and the night shift (0:00-8:00) is mainly responsible for ore extraction and transportation. The work sequence plan for each mining face is further refined. For example, in a certain longwall mining face, loading explosives begins at 16:30 and blasting is completed at 17:30. Simultaneously, the personnel allocation (e.g., 2 explosive loading workers) and the operating plan for diesel equipment (e.g., a 120kW powder explosive loading vehicle with a time coefficient of 65%) for this process are obtained.

[0039] Then, basic information about the mine ventilation system is obtained, including the ventilation network topology, roadway cross-sections (such as the 21.631 m² cross-section of the mining face), and main fan performance curves. A digital twin model of the system is then established using 3D ventilation simulation software such as Ventsim.

[0040] S102. Based on the ventilation power hierarchy, the digital twin model of the mine ventilation system is divided into different ventilation control levels.

[0041] In one embodiment, the step of dividing ventilation control levels and independent ventilation areas based on the digital twin model of the mine ventilation system, and annotating the results of the ventilation control level division and the independent ventilation area division in the digital twin model of the mine ventilation system, includes: Based on the ventilation power source and network structure, the mine ventilation system is divided into three ventilation control levels: Level I, Level II, and Level III. The Level I, Level II, and Level III correspond to the mine's main intake / exit air, the mine's mid-section ventilation, and the Level III mining face ventilation, respectively. Each level has its own independent air demand accumulation logic and control priority.

[0042] Based on the division of the mining panel, the distribution of mining faces, and the independence of ventilation, the mine is divided into multiple independent ventilation zones; the ventilation points (stopes, tunnel faces, chambers) in each zone share the zone's ventilation power and control equipment; The results of ventilation control levels and independent ventilation areas are marked in the digital twin model of the mine ventilation system to form a spatial control grid that can be dynamically called.

[0043] Based on the ventilation network structure of a certain mine, it is divided into: Level I (main fans of the south and north return air shafts), Level II (return air roadways and auxiliary fans in each intermediate section), and Level III (local fans and ventilation windows in working faces such as stopes and tunneling faces). Simultaneously, according to the intermediate section panel division, the underground area is divided into multiple independent ventilation control zones, such as "Intermediate Section Panel 1" and "Intermediate Section Panel 2," etc. The required air volume for each zone is calculated independently, and the ventilation windows, local fans, and other equipment within the zone are controlled in a coordinated manner.

[0044] like Figure 2 The diagram shown is a schematic representation of the layered and zoned structure of a mine ventilation system according to a preferred embodiment.

[0045] S103. Establish a time-driven regional dynamic air demand calculation model, calculate the air demand of each working face in each independent ventilation area, and accumulate the air demand of all working faces in each independent ventilation area according to the ventilation control level to obtain the calculated air demand of each independent ventilation area. Based on the calculated air demand, generate a three-dimensional dynamic spectrum of mine air supply including time, space and air demand.

[0046] Specifically, for each independent ventilation control area, the required ventilation quantum model matching the specific process of all work surfaces in the area at different production periods is called according to the time axis (shift node) for calculation, and the results are accumulated by area and by time.

[0047] In one embodiment, the regional dynamic air demand calculation model includes: The rock drilling process requires a quantum model of wind speed, which satisfies the following expression:

[0048] in Air volume required for rock drilling face; The required air volume for personnel at the rock drilling face; Air volume required for rock drilling equipment; The required air volume for dust removal at the rock drilling face; The loading process requires a quantum model that satisfies the following expression:

[0049] in Air volume required for the loading face; Air volume required for personnel at the explosive loading work site; Air volume required for the equipment at the loading face; The required air volume for dust removal at the charging face; The blasting process requires a quantum model and a corresponding blasting type model that satisfy the following expression:

[0050] in, Large-scale blasting requires a large volume of air. Ventilation time, The amount of explosives for a large-scale blast. The coefficient for smoke emission. For the volume of the tunnel filled with gunfire smoke; The ore extraction process requires a wind quantum model that satisfies the following expression:

[0051] in, Air volume required for the ore extraction face; The required ventilation volume for personnel at the mining face; Air volume required for equipment at the ore extraction face; The required air volume for dust removal at the mining face; The quantum model for air demand at the prepared mining face is used to classify and calculate the air demand based on the processes of rock drilling, blasting, slag removal and blasting, using local ventilation model, dust control model and equipment thermal balance model respectively, and the calculation results are superimposed on the air demand spectrum of the area in time axis order. During non-production or shift handover periods, the required air volume is switched from 0.2 m / s to the required air volume to maintain the basic wind speed of the roadway.

[0052] In this step, the required air volume for each region and time segment is accumulated step by step to form a continuous three-dimensional spectrum from the first shift of the day to the end of the last shift. Where t is the time variable, z is the hierarchical level, and r is the region number.

[0053] Taking a mining face within the "No. 1 panel of the first section" as an example, its required air volume is dynamically calculated according to the time axis: Rock drilling stage (8:00-12:00): Use a medium-deep hole drilling rig (55KW, 30%). Calculations: =0.99m³ / s; =0.2m³ / s; =4.33m 3 / s. Taking the maximum value, the required air volume for this stage is 4.33 m³ / s.

[0054] Explosive loading phase (16:30-17:30): Use a 120KW, 65% explosive loading vehicle. Calculations. =5.2m 3 / s; =0.2m 3 / s; =4.33m 3 / s. Take the maximum value; the required air volume for this stage is 5.2 m³ / s.

[0055] Post-blast ventilation phase (17:30-18:00): According to Given that the explosive charge A = 2400 kg and the ventilation time t = 1800 s, the required air volume is calculated to be 15.28 m³ / s.

[0056] Ore extraction stage (0:00-8:00): Use a loader (160KW, 85%). .

[0057] 9.07 m³ / s, taking the maximum value, the required air volume for this stage is 9.07 m³ / s.

[0058] The entire working face in the area (including the preparation working face, the tunneling face, etc.) is calculated and accumulated along the time axis, and then accumulated upwards to Level II and Level I, finally generating a three-dimensional spectrum of "time-space-demand air volume" covering the whole day.

[0059] S104. Based on the three-dimensional dynamic spectrum of mine air supply, divide the time sequence working conditions and preset a set of ventilation system operating parameters for each time sequence working condition.

[0060] In one embodiment, the step of dividing the time-series operating conditions and pre-setting a set of ventilation system operating parameters for each time-series operating condition includes: Identify the total air volume required in the aforementioned spectrum The inflection point of change, combined with the production status logic of each region, defines multiple time-series operating conditions, including: Full-load production conditions: Multiple areas are simultaneously carrying out rock drilling, ore extraction and other operations, and the total air volume of Level I reaches its peak. Low-load production conditions: When only some areas are engaged in drilling, ore extraction, or other operations, the required air volume for Level I and Level II operations can be appropriately reduced. No production operation condition: The area stops operating, and only the minimum guaranteed air volume in the area is maintained; Shift handover / personnel going up and down the mine: When personnel move in a concentrated manner, it is necessary to ensure the basic air volume of the main transport roadways (Level II and Level I), while the air volume of the mining area (Level III) can be appropriately reduced; Blasting ventilation condition: When a blast occurs in a certain area, the air volume required for Level III in that area increases sharply, and it is necessary to temporarily increase the air volume of the branch and the upper middle section of the area. A set of ventilation system operating parameters is preset for each time-series operating condition. The parameter set includes the main fan frequency (Level I control), the start and stop status of the middle auxiliary fan (Level II control), and the opening degree of the zone window (Level III control), etc., to achieve hierarchical control. The time-series operating conditions are divided into full-load production conditions, low-load production conditions, no-production operation conditions, shift handover conditions, and blasting ventilation conditions based on the changes in the absolute value of total air demand, the logical state of mine production organization and arrangement, and regional events. When the production status marker of a certain independent ventilation area is switched from normal production to blasting alarm, regardless of the current total air volume required by the entire mine, the control mode of the independent ventilation area, its upper intermediate section, and the total return air will be forcibly switched to blasting ventilation mode, while other unaffected independent ventilation areas will continue to operate under their original conditions.

[0061] Based on the total air volume demand curve generated in step S3, identify its inflection points. For example, during the period from 17:30 to 18:00, the air volume demand in the panel where the blasting face is located increases sharply, causing the total air volume demand of the entire mine to reach its peak. This period is defined as the "blasting ventilation condition". During the ore extraction stage from 0:00 to 8:00, although there is high-power equipment, the number of working faces is small, and the total air volume is stable, which is defined as the "full-load production condition". During the shift change period (16:00-16:30), personnel move around in a concentrated manner, but the mining operations are suspended, which is defined as the "shift change condition". At this time, the air volume in the mining area can be appropriately reduced to ensure the air volume in the transport roadway. Preset a set of control parameters for each condition. For example, under the "blasting ventilation condition", the main fan frequency is increased to 48Hz, the auxiliary fan on the return air side of the middle section where the blasting area is located is fully opened, and the opening of the area air window is adjusted to 100%.

[0062] like Figure 3 The figure shown is a time sequence operating condition division and corresponding air volume demand curve of a preferred embodiment of this application.

[0063] S105. Based on real-time time and production execution system trigger signals, determine the current time sequence condition and perform autonomous on-demand air supply control according to the time sequence condition.

[0064] In one embodiment, the step of determining the current time-series operating condition based on real-time time and production execution system trigger signals, and then performing autonomous on-demand air supply control according to the time-series operating condition, includes: Determine the current time series condition at time T, and locate the level and region where control needs to be implemented. Through the mine's intelligent ventilation control platform, control commands are issued in the order of "first, coarse adjustment of the total air volume at level I; then, distribution in the middle section at level II; and finally, fine adjustment of the area at level III," so that the air volume at each level follows the target value in the three-dimensional spectrum in real time. Upon receiving a report signal indicating the completion of the blasting process, the ventilation control domain of the blasting area is automatically switched to "blasting ventilation mode," and the air volume setting values ​​of the middle section (Level II) and the total return air (Level I) of the area are increased. Once the blast ventilation time ends and the harmful gas concentration sensor detects that the levels meet the standards, the air volume settings at each level will be automatically restored to normal production conditions.

[0065] The mine's intelligent ventilation control platform reads the system time (e.g., current time T=17:30) and production execution system signals (e.g., "Blasting completed in No. 3 mining area of ​​panel 1 in the first section"). The system automatically identifies the current time sequence as "blasting ventilation condition" and locates the target control area as "panel 1 in the first section". The platform issues instructions according to a preset method: First, the frequency of the main fans in the south and north return air shafts is increased from 42Hz to 48Hz (Level I coarse adjustment); second, the auxiliary fans in the return air roadway of the first section are started (Level II allocation); finally, the ventilation window opening in mining area No. 3 is adjusted from 50% to 100% (Level III fine adjustment). After 30 minutes, the sensor detects that the blasting smoke concentration in the area meets the standard, and the system automatically restores the main fans, auxiliary fans, and ventilation windows to the parameters of normal production conditions.

[0066] S106. Obtain the actual air volume of each independent ventilation area in the mine, and adjust and correct the calculated required air volume based on the actual air volume to form a closed-loop air supply control.

[0067] In one embodiment, the step of obtaining the actual air volume of each independent ventilation zone in the mine, and performing feedback adjustment and rolling correction on the calculated required air volume based on the actual air volume to form a closed-loop air supply control includes: Wind speed sensors are installed in key branches at all levels (Level I main intake / return airway, Level II intermediate airway, and Level III working face branch) to obtain the actual air volume Q in real time. 实 ; Calculate the required air volume setpoint Q for the current period. 设 Compared with actual air volume Q 实 deviation Q; When | Q| When the preset threshold is exceeded, the hierarchical fuzzy PID controller is activated: Level I deviation prioritizes adjusting the main fan frequency, Level II deviation adjusts the mid-section auxiliary fan or main fan, and Level III deviation adjusts the vent opening, so that the actual air volume approaches the required air volume set according to the production rhythm, level and region, forming a closed-loop autonomous air supply system of "production plan driven → spatiotemporal air volume prediction → hierarchical and regional control → real-time feedback correction".

[0068] Install wind speed sensors at key branches at all levels. For example, measure the actual air volume Q in the main return airway of a middle section. 实 =85m³ / s, while the set value Q for the current time period (mining stage) is... 设=90m³ / s, deviation Q=-5m 3 / s. When the deviation exceeds a preset threshold (e.g., 5%), the hierarchical fuzzy PID controller is activated. The system determines it to be a Level II deviation and prioritizes adjusting the frequency of the auxiliary fan in the middle section; if this is still insufficient, the frequency of the main fan is fine-tuned until the actual air volume approaches the target value, thus forming a closed-loop control.

[0069] Through the steps described above in this embodiment, the mine ventilation system achieves autonomous and precise air supply according to production rhythm and regional needs. Calculations show that compared to the traditional constant airflow mode, this method can reduce ventilation energy consumption by approximately 30%-40%, significantly improving the mine's economic efficiency and level of intelligence.

[0070] An embodiment of this application also provides a ventilation system based on mine production organization, including: The module for constructing a digital twin model of a mine ventilation system is used to acquire production organization and arrangement information and basic information of the mine ventilation system throughout the entire production cycle, and to integrate the production organization and arrangement information and basic information of the mine ventilation system based on three-dimensional ventilation simulation software to construct a digital twin model of the mine ventilation system. The hierarchical area division module is used to perform ventilation control hierarchical division and independent ventilation area division based on the digital twin model of the mine ventilation system, and to mark the ventilation control hierarchical division results and the independent ventilation area division results in the digital twin model of the mine ventilation system; The air demand calculation module is used to establish a time-driven regional dynamic air demand calculation model, calculate the air demand of each working face in each independent ventilation area, and accumulate the air demand of all working faces in each independent ventilation area according to the ventilation control level to obtain the calculated air demand of each independent ventilation area. Based on the calculated air demand, a three-dimensional dynamic spectrum of mine air supply including time, space and air demand is generated. The mine ventilation plan generation module is used to divide the time sequence working conditions according to the three-dimensional dynamic spectrum of the mine ventilation, and to preset a set of ventilation system operation parameters for each time sequence working condition. The air supply control module is used to determine the current time sequence condition based on real-time time and production execution system trigger signals, and to perform autonomous on-demand air supply control according to the time sequence condition. The feedback adjustment module is used to obtain the actual air volume of each independent ventilation area in the mine, and to perform feedback adjustment and rolling correction on the calculated required air volume based on the actual air volume, forming a closed-loop air supply control.

[0071] In one embodiment, the production organization and arrangement information and basic information of the mine ventilation system obtained by the digital twin model construction module of the mine ventilation system throughout the entire production cycle are specifically: The production organization and arrangement information includes daily shift divisions and time nodes, work sequence plans for each section / panel / mining face, number of personnel for each corresponding work process, and equipment type / power / time coefficient for each corresponding work process; the basic information of the mine ventilation system includes ventilation network topology, roadway cross-sectional parameters, performance curves of ventilation power equipment, and status of ventilation control equipment.

[0072] In one embodiment, the hierarchical region division module is specifically used for: Based on the ventilation power source and network structure, the mine ventilation system is divided into three ventilation control levels: Level I, Level II, and Level III. Based on the division of the middle section of the mine, the distribution of mining faces, and the independence of ventilation, the mine is divided into multiple independent ventilation zones; The results of ventilation control levels and independent ventilation areas are labeled in the digital twin model of the mine ventilation system.

[0073] In one embodiment, the time-driven regional dynamic air demand calculation model established by the air demand calculation module specifically includes: The rock drilling process requires a quantum model of wind speed, which satisfies the following expression:

[0074] in, Air volume required for rock drilling face; The required air volume for personnel at the rock drilling face; Air volume required for rock drilling equipment; The required air volume for dust removal at the rock drilling face; The loading process requires a quantum model that satisfies the following expression:

[0075] in Air volume required for the loading face; Air volume required for personnel at the explosive loading work site; Air volume required for the equipment at the loading face; The required air volume for dust removal at the charging face; The blasting process requires a quantum model and a corresponding blasting type model that satisfy the following expression:

[0076] in, Large-scale blasting requires a large volume of air. Ventilation time, The amount of explosives used in a large-scale blasting. The coefficient for smoke emission. For the volume of the tunnel filled with gunfire smoke; The ore extraction process requires a wind quantum model that satisfies the following expression:

[0077] in, Air volume required for the ore extraction face; The required ventilation volume for personnel at the mining face; Air volume required for equipment at the ore extraction face; The required air volume for dust removal at the mining face; The quantum model for air demand at the prepared mining face is used to classify and calculate the air demand based on the processes of rock drilling, blasting, slag removal and blasting, using local ventilation model, dust control model and equipment thermal balance model respectively, and the calculation results are superimposed on the air demand spectrum of the area in time axis order. During non-production or shift handover periods, the required air volume is switched from 0.2 m / s to the required air volume to maintain the basic wind speed of the roadway.

[0078] In one embodiment, the mine ventilation plan generation module is specifically used for: The time sequence operating conditions are divided into full-load production conditions, low-load production conditions, no production operations conditions, shift handover conditions, and blasting ventilation conditions. A set of ventilation system operating parameters is preset for each time series operating condition. The set of ventilation system operating parameters includes the main fan frequency, the start / stop status of the middle auxiliary fan, and the opening degree of the area window.

[0079] In one embodiment, the air supply control module is specifically used for: Determine the current time sequence condition; Control commands are issued in the following order: coarse adjustment of total air volume (Level I), mid-section distribution (Level II), and fine adjustment of area (Level III). After the blasting process is completed, switch to blasting ventilation mode; Once the concentration of harmful gases meets the standard, the system will automatically return to normal production conditions.

[0080] In one embodiment, the feedback adjustment module is specifically used for: Install wind speed sensors at key branches at all levels to obtain the actual air volume of each independent ventilation area in the mine in real time. Based on the deviation between the calculated required air volume and the actual air volume, when the deviation exceeds a preset threshold, the actual air volume is adjusted to approach the calculated required air volume through a hierarchical fuzzy PID control model.

[0081] The system is capable of achieving the functions described in this application. Figure 1 The various processes in the method embodiments, and the ways to achieve the same beneficial effects, will not be repeated here to avoid repetition.

[0082] like Figure 4As shown, this application also provides a terminal device, including a processor 401 and a memory 402. The memory 402 stores a program or instructions that can run on the processor 401. When the program or instructions are executed by the processor 401, they implement the various steps of the ventilation method embodiment based on the mine production organization arrangement as described above, and can achieve the same technical effect. To avoid repetition, they will not be described again here.

[0083] It should be noted that the terminal device in this application can be a terminal or other devices besides a terminal. For example, the terminal device can be a mobile phone, tablet computer, laptop computer, etc., and this application does not make any specific limitation.

[0084] This application also provides a readable storage medium storing a program or instructions that, when executed by a processor, implement the various processes of the above-described air supply method embodiment based on mine production organization and achieve the same technical effect. To avoid repetition, these will not be described again here.

[0085] The processor is the processor in the terminal device described in the above embodiments. The readable storage medium includes a computer-readable storage medium, such as a computer read-only memory (Read-Only Memory). Only memory (ROM), random access memory (RAM), magnetic disks or optical disks, etc.

[0086] This application also provides a chip, which includes a processor and a communication interface. The communication interface is coupled to the processor. The processor is used to run programs or instructions to implement the various processes of the above-described air supply method embodiment based on mine production organization and can achieve the same technical effect. To avoid repetition, it will not be described again here.

[0087] It should be understood that the chip mentioned in this application may also be referred to as a system-on-a-chip, system chip, chip system, or system-on-a-chip, etc.

[0088] This application provides a computer program product, which is stored in a storage medium and executed by at least one processor to implement the various processes of the above-described embodiment of the ventilation method based on mine production organization, and can achieve the same technical effect. To avoid repetition, it will not be described again here.

[0089] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element. Furthermore, it should be noted that the scope of the methods and apparatuses in the embodiments of this application is not limited to performing functions in the order shown or discussed, but may also include performing functions substantially simultaneously or in the reverse order, depending on the functions involved. For example, the described methods may be performed in a different order than described, and various steps may be added, omitted, or combined. Additionally, features described with reference to certain examples may be combined in other examples.

[0090] Through the above description of the embodiments, those skilled in the art can clearly understand that the methods of the above embodiments can be implemented by means of software plus necessary general-purpose hardware platforms. Of course, they can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, can be embodied in the form of a computer software product, which is stored in a storage medium (such as a read-only memory). The device includes a number of instructions in a ROM (random access memory), RAM (magnetic disk), or optical disk to cause a terminal (which may be a mobile phone, computer, server, or network device, etc.) to execute the methods described in the various embodiments of this application.

[0091] The embodiments of this application have been described above with reference to the accompanying drawings. However, this application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit and scope of the claims, and all of these forms are within the protection scope of this application.

Claims

1. A method of supplying air based on mine production organization arrangement, characterized by, The method includes: Obtain production organization and arrangement information and basic information of the mine ventilation system throughout the entire production cycle, and integrate the production organization and arrangement information and basic information of the mine ventilation system based on three-dimensional ventilation simulation software to construct a digital twin model of the mine ventilation system; Based on the digital twin model of the mine ventilation system, ventilation control levels and independent ventilation areas are divided, and the results of the ventilation control level division and the independent ventilation area division are marked in the digital twin model of the mine ventilation system. A time-driven regional dynamic air demand calculation model is established to calculate the air demand of each working face in each independent ventilation area. The air demand of all working faces in each independent ventilation area is accumulated step by step according to the ventilation control level to obtain the calculated air demand of each independent ventilation area. Based on the calculated air demand, a three-dimensional dynamic spectrum of mine air supply including time, space and air demand is generated. The regional dynamic air demand calculation model includes: The rock drilling process requires a quantum model that satisfies the following expression: wherein, air required for the rock drilling face; air required for the personnel at the rock drilling face; air required for the equipment at the rock drilling face; air required for dust removal at the rock drilling face; The loading process requires a quantum model that satisfies the following expression: in Air volume required for the loading face; Air volume required for personnel at the explosive loading work site; Air volume required for the equipment at the loading face; The required air volume for dust removal at the charging face; The blasting process requires a quantum model and a corresponding blasting type model that satisfy the following expression: in, Large-scale blasting requires a large volume of air. Ventilation time, The amount of explosives used in a large-scale blasting. The coefficient for smoke emission. For the volume of the tunnel filled with gunfire smoke; The ore extraction process requires a wind quantum model that satisfies the following expression: in, Air volume required for the ore extraction face; The required ventilation volume for personnel at the mining face; Air volume required for equipment at the ore extraction face; The required air volume for dust removal at the mining face; The quantum model for air demand at the prepared mining face is used to classify and calculate the air demand based on the processes of rock drilling, blasting, slag removal and blasting, using local ventilation model, dust control model and equipment thermal balance model respectively, and the calculation results are superimposed on the air demand spectrum of the area in time axis order. During non-production or shift handover periods, the required air volume is switched from 0.2 m / s to the air volume required to maintain the basic wind speed in the roadway according to the quantum model. Based on the three-dimensional dynamic spectrum of mine air supply, time-series working conditions are divided and a set of ventilation system operating parameters is preset for each time-series working condition; Based on real-time time and production execution system trigger signals, determine the current time sequence condition and perform autonomous on-demand air supply control according to the time sequence condition; The actual air volume of each independent ventilation area in the mine is obtained, and the calculated required air volume is adjusted and corrected based on the actual air volume to form a closed-loop air supply control.

2. The method according to claim 1, characterized in that, The production organization and arrangement information includes daily shift divisions and time nodes, work sequence plans for each section / panel / mining face, number of personnel for each corresponding work process, and equipment type / power / time coefficient for each corresponding work process; the basic information of the mine ventilation system includes ventilation network topology, roadway cross-sectional parameters, performance curves of ventilation power equipment, and status of ventilation control equipment.

3. The method according to claim 1, characterized in that, The process of dividing ventilation control levels and independent ventilation areas based on the digital twin model of the mine ventilation system, and annotating the results of the ventilation control level division and the independent ventilation area division in the digital twin model of the mine ventilation system, includes: Based on the ventilation power source and network structure, the mine ventilation system is divided into three ventilation control levels: Level I, Level II, and Level III. Based on the division of the middle section of the mine, the distribution of mining faces, and the independence of ventilation, the mine is divided into multiple independent ventilation zones; The results of ventilation control levels and independent ventilation areas are labeled in the digital twin model of the mine ventilation system.

4. The method according to claim 1, characterized in that, The process of dividing the operating conditions into time-series scenarios and pre-setting a set of ventilation system operating parameters for each time-series scenario includes: The time sequence operating conditions are divided into full-load production conditions, low-load production conditions, no production operations conditions, shift handover conditions, and blasting ventilation conditions. A set of ventilation system operating parameters is preset for each time series operating condition. The set of ventilation system operating parameters includes the main fan frequency, the start / stop status of the middle auxiliary fan, and the opening degree of the area window.

5. The method according to claim 4, characterized in that, The division of time-series operating conditions into full-load production conditions, low-load production conditions, no-production operation conditions, shift handover conditions, and blasting ventilation conditions includes: Based on the changes in the absolute value of total air demand, the logical state of mine production organization and regional events, the time sequence operating conditions are divided into full-load production conditions, low-load production conditions, no production operation conditions, shift handover conditions and blasting ventilation conditions. When the production status marker of a certain independent ventilation area is switched from normal production to blasting alarm, regardless of the current total air volume required by the entire mine, the control mode of the independent ventilation area, its upper intermediate section, and the total return air will be forcibly switched to blasting ventilation mode, while other unaffected independent ventilation areas will continue to operate under their original conditions.

6. The method according to claim 1, characterized in that, The process of determining the current time-series operating condition based on real-time time and production execution system trigger signals, and then performing autonomous on-demand air supply control according to the time-series operating condition, includes: Determine the current time sequence condition; Control commands are issued in the following order: coarse adjustment of total air volume (Level I), mid-section distribution (Level II), and fine adjustment of area (Level III). After the blasting process is completed, switch to blasting ventilation mode; Once the concentration of harmful gases meets the standard, the system will automatically return to normal production conditions.

7. The method according to claim 1, characterized in that, The process of obtaining the actual air volume of each independent ventilation zone in the mine, and then adjusting and rolling the calculated required air volume based on the actual air volume to form a closed-loop air supply control includes: Install wind speed sensors at key branches at all levels to obtain the actual air volume of each independent ventilation area in the mine in real time. Based on the deviation between the calculated required air volume and the actual air volume, when the deviation exceeds a preset threshold, the actual air volume is adjusted to approach the calculated required air volume through a hierarchical fuzzy PID control model.

8. A ventilation system based on mine production organization and arrangement, characterized in that, include: The module for constructing a digital twin model of a mine ventilation system is used to acquire production organization and arrangement information and basic information of the mine ventilation system throughout the entire production cycle, and to integrate the production organization and arrangement information and basic information of the mine ventilation system based on three-dimensional ventilation simulation software to construct a digital twin model of the mine ventilation system. The hierarchical area division module is used to perform ventilation control hierarchical division and independent ventilation area division based on the digital twin model of the mine ventilation system, and to mark the ventilation control hierarchical division results and the independent ventilation area division results in the digital twin model of the mine ventilation system; The air demand calculation module is used to establish a time-driven regional dynamic air demand calculation model, calculate the air demand of each working face in each independent ventilation area, and accumulate the air demand of all working faces in each independent ventilation area according to the ventilation control level to obtain the calculated air demand of each independent ventilation area. Based on the calculated air demand, a three-dimensional dynamic spectrum of mine air supply including time, space and air demand is generated. The regional dynamic air demand calculation model includes: The rock drilling process requires a quantum model that satisfies the following expression: in, Air volume required for rock drilling face; The required air volume for personnel at the rock drilling face; Air volume required for rock drilling equipment; The required air volume for dust removal at the rock drilling face; The loading process requires a quantum model that satisfies the following expression: in Air volume required for the loading face; Air volume required for personnel at the explosive loading work site; Air volume required for the equipment at the loading face; The required air volume for dust removal at the charging face; The blasting process requires a quantum model and a corresponding blasting type model that satisfy the following expression: in, Large-scale blasting requires a large volume of air. Ventilation time, The amount of explosives used in a large-scale blasting. The coefficient for smoke emission. For the volume of the tunnel filled with gunfire smoke; The ore extraction process requires a wind quantum model that satisfies the following expression: in, Air volume required for the ore extraction face; The required ventilation volume for personnel at the mining face; Air volume required for equipment at the ore extraction face; The required air volume for dust removal at the mining face; The quantum model for air demand at the prepared mining face is used to classify and calculate the air demand based on the processes of rock drilling, blasting, slag removal and blasting, using local ventilation model, dust control model and equipment thermal balance model respectively, and the calculation results are superimposed on the air demand spectrum of the area in time axis order. During non-production or shift handover periods, the required air volume is switched from 0.2 m / s to the air volume required to maintain the basic wind speed in the roadway according to the quantum model. The mine ventilation plan generation module is used to divide the time sequence working conditions according to the three-dimensional dynamic spectrum of the mine ventilation, and to preset a set of ventilation system operation parameters for each time sequence working condition. The air supply control module is used to determine the current time sequence condition based on real-time time and production execution system trigger signals, and to perform autonomous on-demand air supply control according to the time sequence condition. The feedback adjustment module is used to obtain the actual air volume of each independent ventilation area in the mine, and to perform feedback adjustment and rolling correction on the calculated required air volume based on the actual air volume, forming a closed-loop air supply control.

9. A terminal device, characterized in that, It includes a processor and a memory, wherein the memory stores a program or instructions that can run on the processor, and the program or instructions, when executed by the processor, implement the steps of the method as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Mine centralized operation partition ventilation control method, device and equipment and ventilation system

    CN111897243A

  • Multi-area ventilation intelligent control method for complex goaf

    CN119041971A