Horizontal-vertical combined salt-alkali drainage pipe and saline-alkali soil improvement method thereof

By using a combined horizontal and vertical underground drainage pipe system, and employing vacuum wells and negative pressure suction technology, the problem of salt migration caused by soil warming in saline-alkali land has been solved, achieving long-term improvement of saline-alkali land and reducing soil salinity to below 0.3%.

CN123058129APending Publication Date: 2026-11-10WATER RESOURCES RES INST OF SHANDONG PROVINCE +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610904810.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-23
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In existing technologies, the warming of saline-alkali land causes salt to move upwards, affecting growing plants. Conventional irrigation methods are not effective for long and can easily lead to the reversion of saline-alkali land.

Method used

A combined horizontal and vertical underground drainage system is adopted, including horizontal and vertical pipes, combined with vacuum wells. By using negative pressure to extract saline water, the impermeable layer is broken. The underground pipes are laid and the vacuum wells are built. By combining seepage and extraction technologies, the soil salinity is gradually reduced.

Benefits of technology

It effectively reduces soil salinity, improves the structure of saline-alkali land, ensures that salt does not rise, and achieves a lasting effect in the treatment of saline-alkali land, reducing soil salinity to below 0.3%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123058129A_ABST
    Figure CN123058129A_ABST
Patent Text Reader

Abstract

The present application relates to a kind of transverse and vertical combined salt drainage pipe and its saline-alkali soil improvement method, it relates to saline-alkali soil treatment technical field, including horizontal interval and laid in saline-alkali soil 1.2-1.5 meter deep horizontal pipe, vertical and connected on horizontal pipe vertical pipe, horizontal and vertical connection in the end of horizontal pipe series connection pipe and vertical setting in the end of series connection pipe vacuum well;Adjacent horizontal pipe spacing 8-10 meters, vertical pipe height 0.6-0.9 meters, vertical pipe is along the length direction of horizontal pipe interval arrangement, adjacent vertical pipe spacing 8-10 meters, vertical pipe side end is evenly spaced apart along the length direction of itself and is provided with water-permeable hole;Vacuum well top detachable sealing buckle has sealing cover, vacuum well top side end is provided with vacuum pump to the vacuum inside vacuum well and forms negative pressure, and negative pressure is formed in the inside of vacuum well to extract saline-alkali water in the soil inside saline-alkali soil by the water-permeable hole of horizontal pipe and vertical pipe side end.The beneficial effect is to realize the effect of saline-alkali soil treatment by irrigating saline-alkali soil and draining saline-alkali water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of saline-alkali land management technology, and in particular to a combined horizontal and vertical underground drainage pipe and a method for improving saline-alkali land. Background Technology

[0002] Saline-alkali land is a type of salt accumulation, referring to soil where the salt content affects the normal growth of crops. According to incomplete statistics from UNESCO and FAO, the global area of ​​saline-alkali land is 954.38 million hectares, of which 99.13 million hectares are in my country. The formation of alkaline and alkalized soils in my country is mostly related to the accumulation of carbonates in the soil, resulting in generally high alkalinity. In severely saline-alkali soil areas, plants can hardly survive.

[0003] Because the types, formation causes, and climatic characteristics of saline-alkali land vary from province to province, the technologies and methods for improving and utilizing saline-alkali land also differ. Starting with addressing the causes of saline-alkali land formation, my country has developed over 40 practical technologies across eight major systems—water conservancy engineering, biology, agronomy, and chemistry—applicable to saline-alkali land management and efficient agricultural utilization. Engineering measures include irrigation for salt leaching and drainage projects using open or underground pipes; biological measures include adjusting agricultural structure, rationally distributing crops, and planting salt-tolerant varieties; agricultural measures include land leveling, deep plowing, adding topsoil to suppress salt, and sand compaction; and chemical measures include applying soil conditioners. In practice, each saline-alkali land improvement measure has its own advantages and disadvantages. For example, using water conservancy engineering to drain salt and introducing freshwater for irrigation can reduce soil salinity and accelerate saline-alkali land improvement.

[0004] Conventional irrigation for salt leaching typically involves manual watering of the land. However, if soil temperature continues to rise, the salts washed into the deeper soil layers are reabsorbed to the surface, rendering the process ineffective and potentially leading to the reversion of saline-alkali land, which in turn harms growing plants. Summary of the Invention (a) Technical problems to be solved In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a horizontal and vertical combined underground drainage pipe and a method for improving saline-alkali land, which solves the technical problem of salt moving upward due to soil warming and affecting growing plants.

[0005] (II) Technical Solution To achieve the above objectives, the main technical solutions adopted by the present invention include: In a first aspect, embodiments of the present invention provide a combined horizontal and vertical underground drainage pipe for saline-alkali land, comprising horizontal pipes laid at intervals at a depth of 1.2-1.5 meters in saline-alkali land, vertical pipes connected vertically to the horizontal pipes, a series pipe connected horizontally and vertically to one end of the horizontal pipes, and a vacuum well vertically disposed at one end of the series pipes. The spacing between adjacent horizontal pipes is 8-10 meters, the height of the vertical pipe is 0.6-0.9 meters, the vertical pipes are arranged at intervals along the length of the horizontal pipes, the spacing between adjacent vertical pipes is 8-10 meters, and the side ends of the vertical pipes are evenly spaced with water-permeable holes along their own length. The top of the vacuum well is covered with a detachable sealing buckle and a sealing cover. A vacuum pump is installed on the side of the top of the vacuum well to create a negative pressure inside the vacuum well. The negative pressure inside the vacuum well is used to draw out the saline water inside the saline-alkali soil through the water-permeable hole on the side of the vertical pipe.

[0006] This invention proposes a combined horizontal and vertical underground drainage system for saline-alkali land. When using this system to treat saline-alkali land, the process involves the following steps: Step 1: Deeply tilling the original saline-alkali land to a depth of 1.0-1.2m to break the impermeable layer; Step 2: Laying the underground drainage system and constructing vacuum wells, with horizontal pipes spaced 8-10m apart and buried 1.2-1.5m deep, and vertical pipes vertically connected to the horizontal pipes, with a height of 0.6-0.9m and a spacing of 8-10m between vertical pipes; Step 3: Backfilling the soil; Step 4: In the first year, flooding the field or planting rice, allowing the water to seep into the ground and combine with the salt in the soil, while simultaneously extracting the water from the soil through the vacuum wells; Step 5: Improving the soil structure and applying organic fertilizer, resulting in a soil salinity reduction to below 0.3% in the second year. This method achieves the effect of treating saline-alkali land by irrigating the land with seepage water and draining the saline water.

[0007] Optionally, multiple extension tubes are inclined upward at the side end of the vertical pipe. The multiple extension tubes are evenly spaced from the middle of the vertical pipe to the bottom wall along the length of the vertical pipe and are arranged in a spiral shape from top to bottom. The end of the extension tube away from the vertical pipe is provided with a water absorption hole.

[0008] By installing extension pipes at an upward angle on the side of the vertical pipe and arranging them in a spiral pattern from the middle to the top of the vertical pipe, the infiltrated water can be drawn in through the water suction holes at the ends of the extension pipes, thereby expanding the coverage area of ​​the entire underground pipe, improving the suction effect, and thus improving the treatment effect on saline-alkali land.

[0009] Optionally, the vertical tube has a threaded connection hole at an angle on its side end, and the end of the extension tube is sealed and threadedly connected to the threaded connection hole.

[0010] By opening a threaded connection hole at an angle on the side end of the vertical pipe, the extension pipe can be detachably connected to the threaded connection hole through the sealing thread at the end, making transportation more convenient. At the same time, when installing this concealed pipe, the horizontal pipe and the vertical pipe can be installed first, and the extension pipe can be installed last, which is more convenient.

[0011] Optionally, a grid pipe is horizontally provided on the side end of the horizontal pipe, which is connected to the side end of the adjacent horizontal pipe, and a drain hole is provided at the node on the upper end of the grid pipe.

[0012] By installing a grid pipe between adjacent horizontal pipes, the gaps between the horizontal pipes can be filled. On the one hand, water that has seeped into the soil can be drawn in as completely as possible. On the other hand, the vertical suction of the drainage holes on the grid pipe can improve the integrity of water infiltration and accelerate the efficiency of water infiltration.

[0013] Optionally, the permeable hole and the drain hole are conical holes, and a low-density permeable cork is embedded in each of the permeable hole, the drain hole and the absorbent hole.

[0014] By setting the permeable holes and drain holes as conical holes, and embedding corks in the permeable holes, drain holes and water intake holes, on the one hand, the saline water that permeates the soil layer can smoothly pass through the corks into the pipe, and on the other hand, the holes can be prevented from being blocked.

[0015] Optionally, the two ends of the mesh tube are vertically provided with connecting plugs, and the upper end of the horizontal tube is vertically provided with a connecting hole for the sealing insertion of the connecting plug between adjacent vertical tubes.

[0016] By vertically installing connecting plugs at both ends of the grid pipe, and opening connecting holes on the upper end of the horizontal pipe for sealing insertion of the connecting plugs, the grid pipe can be detachably connected between adjacent horizontal pipes. That is, when installing this concealed pipe, the horizontal and vertical pipes can be installed first, and then the grid pipe can be installed, which is more convenient.

[0017] Optionally, the vacuum well is buried at a depth of 2 meters, the vacuum well is made of a corrosion-resistant high-strength plastic barrel, and multiple support frames are arranged horizontally and vertically inside the vacuum well. A water pump for pumping water to the outside is installed at the bottom of the side end of the vacuum well.

[0018] When water seeps into the soil and combines with salt, it forms saline water, which is highly corrosive. Therefore, a vacuum well is made by using a corrosion-resistant, high-strength plastic bucket, which is supported inside the vacuum well by a support frame. This makes the vacuum well corrosion-resistant and also prevents it from deforming when negative pressure is created inside.

[0019] Optionally, the cross section of the horizontal pipe perpendicular to its own length direction is waist-shaped, and two water inlet channels and one water outlet channel are formed inside the horizontal pipe. The water outlet channel is located between the two water inlet channels. A water inlet pipe is horizontally and vertically arranged at the end of the horizontal pipe away from the series pipe. The water inlet pipe is sequentially connected to the two water inlet channels of each horizontal pipe. A water inlet well is provided at one end of the water inlet pipe. Seepage holes connected to the water inlet channels are evenly spaced along the length direction at the lower end and both sides of the horizontal pipe.

[0020] By setting the cross-section of the horizontal pipe to be waist-shaped, two inlet channels and one outlet channel are formed inside the horizontal pipe. The outlet channel connects to the vertical pipe and the grid pipe. That is, the infiltrated saline water will flow along the vertical pipe, extension pipe and grid pipe into the outlet channel, and then enter the vacuum well from the outlet channel. The inlet channels are located on both sides of the outlet channel. Water is injected into the inlet pipe through the inlet well, and then flows into the inlet channel through the inlet pipe. Finally, it seeps out through the seepage holes at the side and bottom of the horizontal pipe, thereby providing deep irrigation for the soil layer where the horizontal pipe is buried. That is, when the soil temperature rises, shallow saline-alkali land can be irrigated through the underground pipe, and deep saline-alkali land can also be irrigated, ensuring that deeper salts do not rise to the surface.

[0021] Optionally, the horizontal height of the end of the horizontal pipe near the water inlet well is higher than the horizontal height of the end near the vacuum well.

[0022] By setting the horizontal pipe to an inclined style with one end higher than the other, the saline water can flow more smoothly into the vacuum well along the outlet channel when vacuum pumping saline water. At the same time, when the inlet pipe injects water into the inlet channel, the water flow can also flow through the entire inlet channel, which is more convenient.

[0023] Secondly, this invention provides a method for improving saline-alkali land. Step one: Deeply till the original saline-alkali land to a depth of 1.0-1.2m to break the original impermeable layer. Step two: Lay underground pipes and construct vacuum wells, with horizontal pipes spaced 8-10m apart and buried at a depth of 1.2-1.5m. Vertical pipes are vertically connected to the horizontal pipes, with a height of 0.6-0.9m and a spacing of 8-10m between vertical pipes. Step three: Backfill with soil. Step four: In the first year, soak the land or plant rice, allowing the water to seep into the ground and combine with the salt in the soil. Simultaneously, the water that has seeped into the soil is gradually extracted through the vacuum wells. Step five: Improve the soil structure and apply more organic fertilizer; in the second year, the soil salinity drops to below 0.3%.

[0024] This method can effectively improve saline-alkali land, and it is sustainable, more convenient, and more effective.

[0025] (III) Beneficial Effects The beneficial effects of this invention are as follows: The horizontal and vertical combined underground drainage pipes and their method for improving saline-alkali land, when used to treat saline-alkali land, involve the following steps: Step 1: Deeply tilling the original saline-alkali land to a depth of 1.0-1.2m to break the original impermeable layer; Step 2: Laying underground pipes and constructing vacuum wells, with horizontal pipes spaced 8-10m apart and buried at a depth of 1.2-1.5m, and vertical pipes vertically connected to the horizontal pipes, with a height of 0.6-0.9m and a spacing of 8-10m between vertical pipes; Step 3: Backfilling the soil; Step 4: In the first year, soaking the field or planting rice, allowing the water to seep into the ground and combine with the salt in the soil, while simultaneously extracting the water that has seeped into the soil through the vacuum wells; Step 5: Improving the soil structure and applying organic fertilizer, resulting in a soil salinity reduction to below 0.3% in the second year; This scheme achieves the effect of treating saline-alkali land by irrigating the saline-alkali land with seepage water and draining the saline water. Attached Figure Description

[0026] Figure 1 This is a three-dimensional schematic diagram of an embodiment of the present invention; Figure 2 This is a three-dimensional schematic diagram from a second perspective of an embodiment of the present invention; Figure 3 for Figure 2 Enlarged view of point A; Figure 4 This is a cross-sectional view of the horizontal tube in an embodiment of the present invention; Figure 5 This is a cross-sectional view of a vacuum well in an embodiment of the present invention.

[0027] [Explanation of Labels in the Attached Image] 1. Horizontal pipe; 11. Connecting socket; 12. Water inlet channel; 13. Water outlet channel; 14. Seepage hole; 2. Vertical pipe; 21. Water permeable hole; 22. Connecting threaded hole; 23. Cork stopper; 3. Extension pipe; 31. Water suction hole; 4. Series pipe; 5. Vacuum well; 51. Sealing cap; 52. Vacuum pump; 53. Support frame; 54. Water pump; 6. Water inlet pipe; 7. Water inlet well; 8. Grid pipe; 81. Drain hole; 82. Connecting plug. Detailed Implementation

[0028] To better explain and facilitate understanding of the present invention, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

[0029] The present invention proposes a method for improving saline-alkali land using a combination of horizontal and vertical drainage pipes. When using these pipes to treat saline-alkali land, the process involves the following steps: Step 1: Deeply tilling the original saline-alkali land to a depth of 1.0-1.2m to break the impermeable layer. Step 2: Laying the drainage pipes and constructing vacuum wells. The horizontal pipes are spaced 8-10m apart and buried 1.2-1.5m deep. Vertical pipes are vertically connected to the horizontal pipes, with a height of 0.6-0.9m and a spacing of 8-10m between them. Step 3: Backfilling the soil. Step 4: In the first year, soaking the field or planting rice allows the water to seep into the ground and combine with the salt in the soil. Simultaneously, the water that has seeped into the soil is gradually extracted through the vacuum wells. Step 5: Improving the soil structure and applying organic fertilizer. In the second year, the soil salinity drops to below 0.3%. This method achieves the effect of treating saline-alkali land by irrigating the land with seepage water and draining the saline water.

[0030] To better understand the above technical solutions, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the drawings, it should be understood that the present invention can be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that the present invention can be understood more clearly and thoroughly, and that the scope of the present invention can be fully conveyed to those skilled in the art.

[0031] Reference Figures 1-5 A combined horizontal and vertical underground drainage pipe for saline-alkali soil includes horizontal pipes 1 laid at intervals to a depth of 1.2-1.5 meters in saline soil, vertical pipes 2 vertically connected to the horizontal pipes 1, multiple extension pipes 3 inclined at the side of the vertical pipes 2, a series pipe 4 horizontally and vertically connected to one end of the horizontal pipes 1, a vacuum well 5 vertically connected to one end of the series pipes 4, a water inlet pipe 6 horizontally and vertically connected to the other end of the horizontal pipes 1, and a water inlet well 7 vertically connected to one end of the water inlet pipe 6. The spacing between adjacent horizontal pipes 1 is 8-10 meters, the height of vertical pipes 2 is 0.6-0.9 meters, the vertical pipes 2 are arranged at intervals along the length of horizontal pipes 1, the spacing between adjacent vertical pipes 2 is 8-10 meters, and the side ends of vertical pipes 2 are evenly spaced with water-permeable holes 21 along their own length. The top of the vacuum well 5 is covered with a detachable sealing cap 51. A vacuum pump 52 is installed on the side of the top of the vacuum well 5 to create a negative pressure by drawing a vacuum inside the vacuum well 5. The negative pressure inside the vacuum well 5 is used to draw out the saline water inside the saline soil through the water-permeable hole 21 on the side of the vertical pipe 2.

[0032] The extension pipe 3 is detachably connected to the side of the vertical pipe 2 at an angle. Multiple extension pipes 3 are evenly spaced from the middle of the vertical pipe 2 to the bottom wall along the length of the vertical pipe 2 and arranged in a spiral shape from top to bottom. The end of the extension pipe 3 away from the vertical pipe 2 is provided with a water suction hole 31. This allows the infiltrated water to be sucked in through the water suction hole 31 at the end of the extension pipe 3, thereby expanding the coverage area of ​​the entire underground pipe, improving the suction effect, and thus improving the treatment effect on saline-alkali land.

[0033] The vertical pipe 2 has a threaded connection hole 22 at an angle on one side. The threaded connection hole 22 and the water suction hole 31 are located on opposite sides of the vertical pipe 2. The end of the extension pipe 3 is connected to the threaded connection hole 22 with a sealing thread. The extension pipe 3 can be detachably connected to the threaded connection hole 22 through the sealing thread at its end, which makes transportation more convenient. At the same time, when installing this concealed pipe, the horizontal pipe 1 and the vertical pipe 2 can be installed first, and the extension pipe 3 can be installed last, which is more convenient.

[0034] A grid pipe 8 is horizontally installed on one side of the horizontal pipe 1, connecting to the side of the adjacent horizontal pipe 1. A drainage hole 81 is opened at the node on the upper side of the grid pipe 8. By filling the gap between the adjacent horizontal pipes 1 through the grid pipe 8, the water that has infiltrated into the soil can be extracted as completely as possible. On the other hand, the drainage hole 81 on the grid pipe 8 can draw water vertically, which can improve the integrity of water infiltration and accelerate the efficiency of water infiltration.

[0035] The permeable hole 21 and the drain hole 81 are conical holes, and low-density permeable cork plugs 23 are embedded in the permeable hole 21, the drain hole 81 and the water absorption hole 31. On the one hand, this allows the saline water that has permeated the soil layer to smoothly pass through the cork plugs 23 into the pipe, and on the other hand, it prevents the holes from being blocked.

[0036] Both ends of the mesh pipe 8 are vertically fitted with connecting plugs 82. The upper end of the horizontal pipe 1 is vertically opened between the adjacent vertical pipe 2 for the connecting plugs 82 to be sealed and inserted. The mesh pipe 8 can be detachably connected between the adjacent horizontal pipes 1. That is, when installing this concealed pipe, the horizontal pipes 1 and vertical pipes 2 can be installed first, and then the mesh pipe 8 can be installed, which is more convenient.

[0037] The vacuum well 5 is buried at a depth of 2 meters. It is made of a corrosion-resistant, high-strength plastic barrel. Multiple support frames 53 are arranged horizontally and vertically inside the vacuum well 5. A water pump 54 is installed at the bottom side of the vacuum well 5 to pump water outwards. The use of a corrosion-resistant, high-strength plastic barrel for the vacuum well 5, and the support frames 53 supporting it internally, ensures that the vacuum well 5 is corrosion-resistant and does not easily deform when a negative pressure is created inside.

[0038] The cross section of the horizontal pipe 1 perpendicular to its own length direction is waist-shaped. The interior of the horizontal pipe 1 forms two water inlet channels 12 and one water outlet channel 13. The water outlet channel 13 is located between the two water inlet channels 12. The series pipe 4 is connected to multiple water outlet channels 13 in sequence. The water inlet pipe 6 is connected to the two water inlet channels 12 of each horizontal pipe 1 in sequence. The lower end and both sides of the horizontal pipe 1 are evenly spaced along the length direction with seepage holes 14 connected to the water inlet channels 12. The outlet channel 13 connects to the vertical pipe 2 and the grid pipe 8. The infiltrated saline water will flow along the vertical pipe 2, the extension pipe 3 and the grid pipe 8 into the outlet channel 13, and then enter the vacuum well 5 from the outlet channel 13. The inlet channel 12 is located on both sides of the outlet channel 13. Water is injected into the inlet pipe 6 through the inlet well 7, and then the water flows into the inlet channel 12 through the inlet pipe 6. Finally, it seeps out through the seepage holes 14 on the side and bottom of the horizontal pipe 1, thereby providing deep irrigation for the soil layer where the horizontal pipe 1 is buried. That is, when the soil temperature rises, shallow saline-alkali land can be irrigated through the underground pipe, and deep saline-alkali land can also be irrigated to ensure that deeper salts do not rise.

[0039] The horizontal pipe 1 is arranged at a slight inclination, meaning that the horizontal height of the end of the horizontal pipe 1 near the water inlet well 7 is higher than the horizontal height of the end near the vacuum well 5. This allows the saline-alkali water to flow more smoothly to the vacuum well 5 along the water outlet channel 13 when vacuum pumping the saline-alkali water. At the same time, when the water inlet pipe 6 injects water into the water inlet channel 12, the water flow can also pass through the entire water inlet channel 12, which is more convenient.

[0040] When improving saline-alkali land using this combined horizontal and vertical underground drainage system, the process is as follows: Step 1: Deeply till the original saline-alkali land to a depth of 1.0-1.2m to break the impermeable layer. Step 2: Lay underground pipes and install vacuum wells 5 and water inlet wells 7. The vacuum wells 5 are buried 2m below the ground and connected to the series pipe 4. The water inlet wells 7 are at the same depth as the horizontal pipes 1 and connected to the water inlet pipe 6. The horizontal pipes 1 are spaced 8-10m apart and buried 1.2-1.5m deep. The vertical pipes 2 are vertically connected to the horizontal pipes 1, with a height of 0.6-0.9m and a spacing of 8-10m. Extension pipes 3 are then installed sequentially. Step 3: Backfill the soil. Step 4: In the first year, soak the fields or plant rice. The water seeps into the ground and combines with the salt in the soil. At the same time, the water that has seeped into the soil is gradually extracted through the vacuum wells 5. Step 5: Improve the soil structure and apply organic fertilizer. In the second year, the soil salinity drops to below 0.3%.

[0041] In the description of this invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0042] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0043] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first and second features are in direct contact, or that they are in indirect contact through an intermediate medium. Furthermore, "above," "over," or "on top" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," or "beneath" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.

[0044] In the description of this specification, the terms "one embodiment," "some embodiments," "embodiment," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0045] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make modifications, alterations, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. A combined horizontal and vertical underground drainage pipe for salt and alkali removal, characterized in that: It includes horizontal pipes (1) laid horizontally at intervals 1.2-1.5 meters deep in saline-alkali land, vertical pipes (2) vertically connected to the horizontal pipes (1), series pipes (4) vertically connected to one end of the horizontal pipes (1), and vacuum wells (5) vertically set at one end of the series pipes (4). The spacing between adjacent horizontal pipes (1) is 8-10 meters, the height of the vertical pipe (2) is 0.6-0.9 meters, the vertical pipes (2) are arranged at intervals along the length of the horizontal pipes (1), the spacing between adjacent vertical pipes (2) is 8-10 meters, and the side end of the vertical pipe (2) is evenly spaced with water-permeable holes (21) along its own length. The top of the vacuum well (5) is covered with a detachable sealing buckle and a sealing cover (51). A vacuum pump (52) is provided on the top side of the vacuum well (5) to create a negative pressure by drawing a vacuum inside the vacuum well (5). The negative pressure inside the vacuum well (5) is used to draw out the saline water inside the saline soil through the water-permeable hole (21) on the side of the vertical pipe (2).

2. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 1, characterized in that: The vertical pipe (2) has multiple extension pipes (3) that are inclined upwards on the side. The multiple extension pipes (3) are evenly spaced from the middle of the vertical pipe (2) to the bottom wall along the length of the vertical pipe (2) and are arranged in a spiral shape from top to bottom. The end of the extension pipe (3) away from the vertical pipe (2) is provided with a water absorption hole (31).

3. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 2, characterized in that: The vertical tube (2) has a threaded hole (22) at an angle on its side end, and the end of the extension tube (3) is connected to the threaded hole (22) with a sealing thread.

4. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 2, characterized in that: A grid pipe (8) is horizontally provided on the side end of the horizontal pipe (1) and connected to the side end of the adjacent horizontal pipe (1). A drain hole (81) is provided at the node on the upper side end of the grid pipe (8).

5. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 4, characterized in that: The permeable hole (21) and the drain hole (81) are conical holes, and low-density permeable cork plugs (23) are embedded in the permeable hole (21), the drain hole (81) and the absorbent hole (31).

6. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 4, characterized in that: The two ends of the grid tube (8) are vertically provided with connecting plugs (82), and the upper end of the horizontal tube (1) is vertically provided with a connecting hole (11) for the sealing insertion of the connecting plug (82) between adjacent vertical tubes (2).

7. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 1, characterized in that: The vacuum well (5) is buried at a depth of 2 meters. The vacuum well (5) is made of a corrosion-resistant high-strength plastic barrel. Multiple support frames (53) are arranged horizontally and vertically inside the vacuum well (5). A water pump (54) is installed at the bottom of the side of the vacuum well (5) to pump water to the outside.

8. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 1, characterized in that: The cross section of the horizontal pipe (1) perpendicular to its own length direction is waist-shaped. The horizontal pipe (1) forms two water inlet channels (12) and one water outlet channel (13). The water outlet channel (13) is located between the two water inlet channels (12). The end of the horizontal pipe (1) away from the series pipe (4) is provided with a water inlet pipe (6) horizontally and vertically. The water inlet pipe (6) is connected to the two water inlet channels (12) of each horizontal pipe (1) in sequence. One end of the water inlet pipe (6) is provided with a water inlet well (7). The lower end and both sides of the horizontal pipe (1) are provided with seepage holes (14) that are connected to the water inlet channels (12) at even intervals along the length direction.

9. The combined horizontal and vertical salt-alkali drainage conduit as described in claim 8, characterized in that: The horizontal pipe (1) is at a higher level than the end near the water inlet well (7).

10. A method for improving saline-alkali land using a combined horizontal and vertical drainage system as described in any one of claims 1-9, characterized in that: Step 1: Deeply plow the original saline-alkali land to a depth of 1.0-1.2m to break the original impermeable layer of saline-alkali land; Step 2: Lay underground pipes and build vacuum wells (5), with horizontal pipes (1) spaced 8-10m apart and buried at a depth of 1.2-1.5m, and vertical pipes (2) vertically connected to the horizontal pipes (1), with a height of 0.6-0.9m and a spacing of 8-10m between the vertical pipes (2); Step 3: Backfill the soil; Step 4: In the first year, soak the field or plant rice, and the water seeps into the ground and combines with the salt in the soil. At the same time, the water that has seeped into the soil is gradually extracted through the vacuum wells (5); Step 5: Improve the soil structure and apply more organic fertilizer. In the second year, the soil salinity drops to below 0.3%.