Integrated System and Method for Deep Foundation Pit Excavation and Continuous Lifting of Transmission Lines
By using a multi-stage telescopic folding boom, a modular excavation actuator, and a closed spiral lifting and conveying mechanism, combined with an intelligent control unit, efficient and safe integrated operations are achieved in narrow and deep foundation pits. This solves the problems of equipment compatibility and safety warning, and improves operational efficiency and safety.
Patent Information
- Application Number
- CN202611356127.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-03
- Publication Date
- 2026-11-10
AI Technical Summary
Existing technologies face problems such as spatial conflicts between excavation and material hoisting equipment in narrow, deep foundation pits, poor geological compatibility, high error rates in operational safety warnings, and serious material spillage during hoisting, resulting in low operational efficiency and prominent safety hazards.
It employs a multi-stage telescopic folding boom, a modular excavation actuator, a closed spiral lifting and conveying mechanism, and a multi-sensor sensing unit, combined with an intelligent control unit, to achieve integrated excavation and continuous lifting operations in narrow, deep foundation pits.
It solves the problem of interference between multiple mechanisms in narrow spaces, realizes convenient relocation and reliability of equipment, adapts to different geological conditions, improves operation efficiency and safety, and reduces material spillage and cleanup costs.
Smart Images

Figure CN123064210A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of equipment technology for power transmission line foundation construction, and more specifically, to an integrated operation system and method for deep foundation pit excavation and continuous lifting of power transmission lines. Background Technology
[0002] In the construction of ultra-high voltage and extra-high voltage transmission lines, the construction of tower foundation pits is one of the core procedures. Many of these pits along the lines have diameters of less than 1 meter and depths of over ten meters, representing typical narrow and deep pit conditions. Currently, the excavation and cleaning of these pits largely rely on manual labor combined with intermittent material transport using small buckets, resulting in extremely low efficiency. Furthermore, the pits are prone to collapses and the accumulation of harmful gases, posing significant safety hazards for personnel working underground.
[0003] While existing small excavation equipment can achieve partial mechanization, it has significant technical drawbacks: First, the equipment has a large structural size, making it unsuitable for narrow foundation pits with a diameter of less than 1 meter. Furthermore, excavation and material hoisting are handled by two separate mechanisms, resulting in high underground space occupancy and a high risk of mechanical interference. Second, the geological conditions along power transmission lines are complex, encompassing various types such as hard rock, weathered rock, cohesive soil, gravel, and permafrost. Existing equipment cannot quickly replace operating components, resulting in poor geological adaptability. Third, it lacks multi-dimensional perception and early warning capabilities for the environment within the foundation pit, making it difficult to achieve safe, minimally manned operations. Fourth, open-type material hoisting leads to severe spillage, resulting in poor environmental performance and high subsequent cleanup costs.
[0004] In view of this, the present invention is proposed to solve the above-mentioned technical problems. Summary of the Invention
[0005] The purpose of this invention is to provide an integrated operation system and method for deep foundation pit excavation and continuous lifting of power transmission lines, in order to solve the technical problems of spatial conflict between excavation and conveying mechanisms in narrow foundation pits, poor adaptability to various geological conditions, easy blockage during conveying in cohesive soil conditions, insufficient reliability of folded structure docking, and high misjudgment rate of operation safety warning.
[0006] To achieve the above objectives, the present invention provides the following technical solution: The first objective of this invention is to provide an integrated operation system for deep foundation pit excavation and continuous lifting of power transmission lines, including a walking and positioning platform, a multi-stage telescopic folding boom, a modular excavation actuator, a closed spiral lifting and conveying mechanism, a multi-sensor sensing unit, and an intelligent control unit. The bottom end of the multi-stage telescopic folding boom is hinged to the front end of the walking and positioning platform. The multi-stage telescopic folding boom can be folded and stored in the vertical plane around the root hinge axis, and can be extended and lowered vertically. In the stored state, it is placed horizontally above the walking and positioning platform. In the extended working state, the maximum outer diameter of the multi-stage telescopic folding boom is no more than 0.8m, which is used to extend into the deep foundation pit of power transmission lines with a diameter ≤1m. The modular excavation actuator can be detachably installed at the end of the foremost small section of the multi-stage telescopic folding boom, and is used to perform crushing or digging operations for different geological conditions; The enclosed spiral lifting conveyor mechanism is arranged through the internal axis of the multi-stage telescopic folding boom. Its inlet is located on the rear discharge side of the modular excavation actuator, and the discharge outlet extends to the material collection area above the walking positioning platform. It is used to continuously lift and transport the excavated material to the ground along the interior of the multi-stage telescopic folding boom. The multi-sensor sensing units are respectively arranged at the front end of the multi-stage telescopic folding boom, the segments of the multi-stage telescopic folding boom, and the walking positioning platform, and are used to collect the pit space parameters, ambient gas parameters, attitude parameters of the multi-stage telescopic folding boom, and excavation operation parameters. The intelligent control unit is electrically connected to the modular excavation actuator, the enclosed spiral lifting and conveying mechanism, the multi-sensor sensing unit, and the walking and positioning platform, respectively. It is used to control the telescopic and folding action of the multi-stage telescopic and folding boom, the excavation operation parameters, the conveying speed, and the walking and positioning action based on the sensing data, and output safety warning signals.
[0007] Furthermore, the modular excavation actuator includes a quick-change connector and interchangeable hard rock breaking module, cohesive soil digging module, and gravel grabbing module. The quick-change connector is fixed to the end of the front section arm and is equipped with a hydraulic quick connector and a spring mechanical locking component. Each working module is connected to the quick-change connector by plugging in and locked in place by the spring mechanical locking component, enabling quick assembly and disassembly.
[0008] Furthermore, the enclosed spiral lifting conveyor mechanism includes an outer conveying pipe, a spiral conveying shaft, and a drive motor; the outer conveying pipe is segmented and corresponds to each section of the multi-stage telescopic folding boom, extending and retracting synchronously with the multi-stage telescopic folding boom; the spiral conveying shaft is a segmented spline telescopic shaft, with continuous equal-pitch spiral blades welded onto each segment, and the blade ends of adjacent shaft segments adopt an oblique overlapping structure, so that the working surface of the blades at the overlapping point smoothly transitions after extension and retraction; a polyurethane scraping edge is provided on the outer edge of the spiral blades, and wear-resistant lining strips are embedded axially on the inner wall of the outer conveying pipe for scraping. The edge dynamically fits the inner wall of the liner; a pneumatic vibrator is installed on the outer wall of the fixed section at the root of the conveying outer pipe to assist in clearing adhering materials; the pipe wall of the conveying outer pipe is a fully enclosed structure, and the feed inlet is opened at the bottom of the front end and faces the discharge direction of the excavation actuator; a semi-enclosed guide cover is set at the end of the front small arm. The guide cover adopts a split structure of upper fixed section plus lower movable section. The lower movable guide section is configured to match different excavation modules. The lower edge of the guide cover is fitted with a wear-resistant scraper plate that fits against the bottom of the pit to gather the excavated material towards the feed inlet.
[0009] Furthermore, a folding hinge joint is provided between the root fixed section and the first telescopic arm section of the multi-stage telescopic folding boom; corresponding to the folding joint position, the outer conveying pipe adopts a flexible wear-resistant corrugated pipe for transition connection, and the two ends of the corrugated pipe are respectively sealed to the root fixed section pipe body and the first telescopic arm pipe body, which can be bent as the multi-stage telescopic folding boom is folded; the spiral conveying shaft is divided into an upper fixed shaft and a lower telescopic shaft at the folding joint, and the mating end face is provided with a meshing gear coupling with a chamfered guide structure; an arc-shaped positioning stop block is provided on the fixed side of the folding hinge joint, and an elastic positioning pin is provided on the movable side. When the multi-stage telescopic folding boom is unfolded to the vertical state, the positioning pin is embedded in the positioning hole to achieve mechanical locking, ensuring the coaxiality of the two spiral shafts, so that the end face teeth can smoothly mesh to transmit torque, and the two shafts separate synchronously when the multi-stage telescopic folding boom is folded.
[0010] Furthermore, the walking and positioning platform includes a tracked chassis, a multi-leg leveling mechanism, and a slewing support base; a multi-stage telescopic folding boom is mounted on the tracked chassis via the slewing support base, and the multi-leg leveling mechanism is arranged around the tracked chassis to adjust the platform's levelness on sloping terrain; the whole machine's hydraulic power station and electrical control box are integrated and installed at the rear of the walking and positioning platform to provide power and control support for each actuator.
[0011] Furthermore, the multi-sensor sensing unit includes a laser rangefinder, a hazardous gas detection sensor, an attitude tilt sensor, a pressure sensor, and a depth encoder; Laser rangefinders are arranged around the front end and bottom of the boom to detect the distance between the excavator head and the inner wall of the pit, the depth of the pit, and the flatness of the pit bottom. The hazardous gas detection sensor is located in the explosion-proof sensor compartment at the front end of the boom, and is used to collect the concentration of hazardous gases in the pit in real time. Attitude tilt sensors are arranged on each boom section to detect the boom's extension angle and attitude; Pressure sensors are installed on the hydraulic drive circuit of the excavating actuator to collect excavation resistance data; A depth encoder is mounted on the telescopic drive mechanism of the multi-stage telescopic folding boom to collect the axial telescopic length of the multi-stage telescopic folding boom; the intelligent control unit calculates the vertical excavation depth by combining the pitch angle of the multi-stage telescopic folding boom.
[0012] Furthermore, the intelligent control unit has a built-in geological-parameter correlation database. It conducts excavation tests on five typical geological types—hard rock, weathered rock, cohesive soil, sand and gravel, and frozen soil—under standard test conditions in advance, collects steady-state excavation pressure, and forms resistance benchmark intervals for each type of geological type. At the same time, it matches the corresponding set of operating parameters. During operation, it collects the average steady-state pressure of the trial excavation, compares it with the resistance benchmark interval to identify the current geological type, and performs a second trial excavation verification when the resistance value falls within the transition range of ±10% of the upper and lower limits of the two geological benchmark intervals. It then calls the corresponding parameter set to control the excavation feed speed, crushing impact frequency, and screw conveyor speed. The intelligent control unit also has a built-in safety early warning module, which uses multi-level anti-interference judgment logic to identify the risk of collapse and the risk of gas exceeding the limit. The collapse early warning uses a sliding time window to monitor the wall displacement and adaptively adjusts the early warning threshold according to the depth of the pit. After the early warning is triggered, the avoidance actions of stopping excavation, lifting the boom, and emptying the material in the pipe are executed in a fixed sequence.
[0013] The second objective of this invention is to provide an integrated method for deep foundation pit excavation and continuous lifting of transmission lines, based on any of the aforementioned integrated systems for deep foundation pit excavation and continuous lifting of transmission lines, comprising the following steps: S1. Pit positioning and initial environmental inspection: Control the walking positioning platform to move above the pit to be operated, adjust the parallel walking positioning platform, lower the multi-stage telescopic folding boom to the pit opening, collect the initial size of the pit and the environmental gas data at the pit opening through the multi-sensor sensing unit, unfold the multi-stage telescopic folding boom from the folded storage state to the vertical posture, and lower it to the pit opening position. S2. Geological identification and parameter matching: Control the multi-stage telescopic folding boom to lower it slightly, so that the modular excavation execution mechanism can contact the bottom of the pit to conduct trial excavation. Collect steady-state excavation resistance data during the stable stage of the feed speed in the trial excavation process. The intelligent control unit matches the geological-parameter association database, identifies the current geological type and automatically matches the excavation operation parameters and the conveying parameters. S3, Layered Excavation and Continuous Lifting: According to the set layered excavation thickness, the multi-stage telescopic folding boom is controlled to be lowered step by step and excavation operation is performed. During the operation, the slewing support seat drives the multi-stage telescopic folding boom to rotate horizontally. With the multi-stage telescopic folding boom swinging slightly, the full-section excavation of the current layer is completed. The excavated material is collected by the guide hood and sent to the closed spiral lifting conveyor mechanism for continuous lifting and conveying to the ground collection area. S4. Real-time monitoring and dynamic adjustment: During the operation, data on the distance to the pit wall, concentration of harmful gases, boom posture and excavation resistance are collected in real time. The excavation posture and operation parameters are dynamically adjusted. When a risk threshold is detected, an early warning is triggered and risk avoidance actions are executed in sequence. S5. Work Completion and Reset: When the excavation depth reaches the set value and the flatness of the pit bottom meets the standard, stop the excavation and conveying operations, retract the multi-stage telescopic folding boom, and complete the foundation pit operation.
[0014] Furthermore, in step S3, the layer excavation thickness is automatically adjusted according to the identified geological type: the layer thickness for hard rock geological layers is set to 50-100 mm, the layer thickness for cohesive soil geological layers is set to 150-200 mm, and the layer thickness for sand and gravel geological layers is set to 100-150 mm.
[0015] Furthermore, in step S4, the risk of pit wall collapse is continuously determined using a sliding time window: laser ranging data is continuously collected at a sampling frequency of 10Hz, and analyzed using a 30-second sliding time window. If the wall distance data for five consecutive sampling cycles within the window shows a continuous decreasing trend, and the cumulative deformation exceeds the warning threshold for the corresponding depth, it is determined to be a real collapse risk. For pits with a depth exceeding 15m, the warning threshold is adaptively adjusted according to the rule of decreasing by 1mm for every 5m increase in depth. The maximum working depth of the pit is 20m. The warning threshold for pits with a depth of 5-15m is 5mm, and the warning threshold for shallow pits with a depth of less than 5m is adjusted to 8mm. After the risk is determined, the excavation feed is immediately stopped, and the multi-stage telescopic folding boom is controlled to be lifted to the outside of the pit at a constant safe speed of 0.2m / s. During the lifting process, the screw conveyor is kept running at a low speed to empty the material in the pipe, and at the same time, an audible and visual warning is issued.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The integrated design of multi-stage telescopic folding boom with built-in closed screw conveyor integrates excavation and continuous lifting functions into a telescopic folding boom with a diameter ≤0.8m. It can reach into deep foundation pits with a diameter of less than 1m to work without the need for additional hoisting equipment, solving the problem of interference between multiple mechanisms in narrow spaces. The folding joint adopts flexible corrugated pipe and gear coupling with positioning structure to meet the storage and folding requirements, while ensuring the sealing of the conveying pipeline and the reliability of torque transmission during operation. The equipment is convenient to move and has a reliable structure.
[0017] 2. Utilizing plug-in quick-change excavation modules, it allows for the replacement of components for different geological conditions such as hard rock, cohesive soil, and gravel. Combined with a split, replaceable material guide section, it precisely matches the discharge trajectory of different modules, preventing material spillage. The intelligent control unit's built-in geological-parameter correlation database automatically identifies geological types through standardized calibrated resistance benchmark intervals. A secondary verification mechanism is implemented at interval boundaries, resulting in high accuracy and the ability to match optimal operating parameters. This enables adaptive operation under all working conditions and enhances the equipment's versatility.
[0018] 3. It integrates a multi-dimensional sensing system that combines laser ranging, gas detection, attitude perception, and load monitoring. It adopts a multi-level anti-interference judgment logic with a 30-second sliding window and depth adaptive threshold, which can effectively avoid false alarms caused by vibration, falling rocks, and natural deformation of shallow pits. It can identify risks such as pit wall deformation, excessive harmful gases, and abnormal equipment posture in real time, realize the prediction of collapse risks and time-sequential automatic risk avoidance. Combined with the remote and unmanned operation mode, it eliminates the safety hazards of personnel working underground.
[0019] 4. The enclosed spiral conveyor, combined with the module-adaptive guide hood structure, prevents material spillage and leakage, avoiding the costs of cleaning materials around the foundation pit and environmental penalties, while also reducing the amount of secondary pit cleaning work caused by material falling. Attached Figure Description
[0020] The accompanying drawings, which form part of this application, are used to provide a further understanding of the invention. The illustrative embodiments and descriptions of the invention are used to explain the invention, but do not constitute an undue limitation of the invention. Obviously, the drawings described below are merely some embodiments, and those skilled in the art can obtain other drawings based on these drawings without creative effort. In the drawings: Figure 1 This is a structural diagram of the integrated operation system for deep foundation pit excavation and continuous lifting of power transmission lines provided in the embodiments of this application; Figure 2 A flowchart of the integrated operation method for deep foundation pit excavation and continuous lifting of power transmission lines provided in the embodiments of this application. Detailed Implementation
[0021] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.
[0022] See Figure 1 As shown, the integrated operation system for deep foundation pit excavation and continuous lifting of transmission lines is suitable for deep foundation pit operations of transmission line towers with diameters of 0.8 to 1.0m and depths of 0 to 15m. It includes a walking and positioning platform, a multi-stage telescopic and folding boom, a modular excavation actuator, a closed spiral lifting and conveying mechanism, a multi-sensor sensing unit, and an intelligent control unit. The bottom end of the multi-stage telescopic folding boom is hinged to the front end of the walking and positioning platform. The multi-stage telescopic folding boom can be folded and stored in a vertical plane around the root hinge axis, and can also be extended and lowered vertically. In the stored state, it is placed horizontally above the walking and positioning platform. In the extended working state, the maximum outer diameter of the multi-stage telescopic folding boom is no more than 0.8m, which is used to extend into the deep foundation pit of power transmission lines with a diameter ≤1m. In the extended working state, the maximum outer diameter of the multi-stage telescopic folding boom includes all protruding structures such as the boom body, the sensor housing installed on the outer wall, and the outer edge of the guide cover. In the preferred embodiment, the maximum outer diameter is 0.75m. Within the upper limit of the outer diameter of 0.8m, the boom can maintain a safe working gap of at least 100mm with the inner wall of the foundation pit with a diameter of 1m, which meets the requirements for anti-collision and working posture adjustment. Therefore, the outer diameter size in the range of 0.6 to 0.8m can be adapted to the working scenarios of this invention.
[0023] The modular excavation actuator can be detachably installed at the end of the foremost small section of the multi-stage telescopic folding boom, and is used to perform crushing or digging operations for different geological conditions; The enclosed spiral lifting conveyor mechanism is arranged through the internal axis of the multi-stage telescopic folding boom. Its inlet is located on the rear discharge side of the modular excavation actuator, and the discharge outlet extends to the material collection area above the walking positioning platform. It is used to continuously lift and transport the excavated material to the ground along the interior of the multi-stage telescopic folding boom. The multi-sensor sensing units are respectively arranged at the front end of the multi-stage telescopic folding boom, the segments of the multi-stage telescopic folding boom, and the walking positioning platform, and are used to collect the pit space parameters, ambient gas parameters, attitude parameters of the multi-stage telescopic folding boom, and excavation operation parameters. The intelligent control unit is electrically connected to the modular excavation actuator, the enclosed spiral lifting and conveying mechanism, the multi-sensor sensing unit, and the walking and positioning platform, respectively. It is used to control the telescopic and folding action of the multi-stage telescopic and folding boom, the excavation operation parameters, the conveying speed, and the walking and positioning action based on the sensing data, and output safety warning signals.
[0024] The modular excavation actuator includes a quick-change connector and interchangeable hard rock breaking module, cohesive soil digging module, and gravel grabbing module. The quick-change connector is fixed to the end of the front section arm and is equipped with a hydraulic quick connector and a spring mechanical locking device. Each working module is connected to the quick-change connector by plugging in and locked in place by the spring mechanical locking device, enabling quick assembly and disassembly.
[0025] In the above scheme, the modular excavation actuator is installed at the lower end of the foremost small boom section. The quick-change connector is a flange-type plug-in structure with a built-in hydraulic quick connector and a spring-loaded mechanical locking pin. When replacing a module, simply pull out the locking pin and disconnect the hydraulic connector to remove it. After inserting the new module, the locking pin automatically locks in place. A single person can complete the replacement within 5 minutes. The plug-in interface of the quick-change connector uses an H7 / g6 clearance fit. The spring-loaded mechanical locking component is a radial spring locking pin with a locking force of not less than 5kN. To unlock, the working module can be removed by manually pulling out the locking pin using the pull ring. After inserting the new module, the locking pin automatically springs into the locking groove under the action of the spring to complete the fixation. The hydraulic quick connector is a face-sealed quick-connect connector. Both the male and female ends have built-in check valves, and the hydraulic circuit automatically closes during insertion and removal to prevent hydraulic oil leakage.
[0026] The operation module includes three categories, covering typical geological conditions of transmission lines: Hard rock crushing module: It adopts a hydraulic impact crushing head and is suitable for hard rock and weathered rock geology. It crushes rock masses through high-frequency impact. Clay soil excavation module: It adopts an arc-shaped bucket structure with cutting teeth on the cutting edge, which is suitable for clay soil and silty clay soil, and completes cutting and aggregate collection in one go; Gravel and sand grabbing module: It adopts a two-part grab bucket structure, which is suitable for gravel and crushed stone strata and prevents materials from scattering.
[0027] The drive oil circuits of each module are connected to the hydraulic system of the walking positioning platform through quick-change connectors and are uniformly controlled by the intelligent control unit.
[0028] The enclosed spiral conveyor mechanism includes an outer conveying pipe, a spiral conveying shaft, and a drive motor. The outer conveying pipe is segmented to correspond to each section of the multi-stage telescopic folding boom, and extends and retracts synchronously with the multi-stage telescopic folding boom. Sealing grooves are formed on the inner walls of the ends of each segment of the outer conveying pipe, and lip-shaped wear-resistant rubber sealing rings are installed in the grooves. The sealing rings have a Shore hardness of 65-70, and during extension and retraction, the sealing rings remain in contact with the outer wall of the inner pipe, ensuring a complete seal throughout the pipeline. The spiral conveying shaft is a segmented spline telescopic shaft, with continuous, equal-pitch spiral blades welded to each segment. The blade ends of adjacent shaft segments adopt a beveled overlapping structure, ensuring a smooth transition of the blade working surface at the overlapping point after extension and retraction. A polyurethane scraper edge is provided on the outer edge of the spiral blades, and wear-resistant materials are embedded axially on the inner wall of the outer conveying pipe. The lining strips and scraper edges dynamically fit against the inner wall of the lining strips; the wear-resistant lining strips and the outer conveying pipe are set in corresponding segments, and the ends of each segment of the lining strips are joined at a 45° bevel. After extension and retraction, the working surface of the lining strips is smooth and continuous, with no risk of material jamming from steps; a pneumatic vibrator is installed on the outer wall of the fixed section at the root of the outer conveying pipe to help clear the adhering material; the pipe wall of the outer conveying pipe is a fully enclosed structure, and the feed inlet is opened at the bottom of the front end and faces the discharge direction of the excavation actuator; a semi-enclosed guide cover is set at the end of the front small arm. The guide cover adopts a split structure of upper fixed section and lower movable section. The lower movable guide section is configured to match different excavation modules. The lower edge of the guide cover is fitted with a wear-resistant scraper plate against the bottom of the pit to gather the excavated material towards the feed inlet.
[0029] In the above scheme, the outer conveying pipe is divided into three sections corresponding to the three-section boom, which are fixed to the inner wall of each section and nested and slide with the boom's extension and retraction. Wear-resistant rubber sealing rings are installed at the joints to ensure sealing during the extension and retraction process. A discharge port is opened on the upper side of the outer conveying pipe, and a collection area is set below the discharge port on the side of the traveling positioning platform. After the material is lifted to the top by the screw, it is discharged from the discharge port into the collection hopper or transport vehicle. The entire conveying process is fully enclosed, with no material spillage, and it is a continuous conveying system with a conveying capacity of up to 0.5 m³ / h, which is far higher than the intermittent hoisting of traditional buckets. The screw conveyor shaft is a segmented spline telescopic structure, with continuous equal-pitch helical blades welded on each segment. The blade ends of adjacent segments adopt a beveled overlapping structure, and the working surface of the blades at the overlapping point smoothly transitions after the spline extension and retraction is in place, avoiding step jamming. The outer edge of the continuous, uniformly pitched spiral blades is equipped with a polyurethane scraper edge. Multiple wear-resistant lining strips are embedded axially along the inner wall of the outer conveying pipe. The scraper edge dynamically adheres to the inner wall of the lining strips, continuously scraping away material adhering to the pipe wall during rotation. A small pneumatic vibrator is installed on the upper section of the outer wall of the outer conveying pipe. The intelligent control unit collects the operating current of the conveying drive motor in real time. When the current exceeds 120% of the rated value for 2 seconds, the vibrator is intermittently activated to assist in clearing blockages and ensuring the conveying stability of adhesive materials such as clay.
[0030] A feed inlet is located at the bottom of the front end of the outer conveyor pipe, directly facing the discharge direction of the excavating actuator. A semi-enclosed guide cover is installed at the end of the front section boom. The guide cover has a split structure consisting of an upper fixed section and a lower movable section. The upper fixed section is welded and fixed to the end of the multi-stage telescopic folding boom, while the lower movable section is detachably connected by bolts. Three compatible lower movable guide sections are configured for the three excavation modules: a fully enclosed guide section with a wear-resistant baffle curtain for the hard rock crushing module to block flying debris; an arc-shaped guide section for the cohesive soil digging module to match the trajectory of the bucket's rearward unloading; and a large-opening, trumpet-shaped guide section for the sand and gravel grabbing module to catch the granular material falling from the grab bucket. Changing the operating module involves simultaneously changing the corresponding lower movable guide section to ensure that all excavated and stripped material converges towards the central feed inlet, preventing lateral scattering. A wear-resistant scraper is installed at the lower edge of the guide hood, fitting snugly against the bottom of the pit. The scraper is made of high-manganese steel and is detachably connected with bolts. During the rotation of the multi-stage telescopic folding boom, the scraper simultaneously scrapes loose material from the pit bottom into the feed inlet, preventing material residue and ensuring continuous conveying and a smooth pit surface. Torque is transmitted between the sections of the screw conveyor shaft via spline sleeves, and it extends and retracts synchronously with the multi-stage telescopic folding boom, maintaining a continuous material conveying channel at all times. The top of the screw conveyor shaft extends beyond the upper end of the multi-stage telescopic folding boom and is connected to a drive motor mounted on top of the boom via a reducer.
[0031] A folding hinge joint is installed between the root fixed section and the first telescopic arm section of the multi-stage telescopic folding boom. Corresponding to the folding joint position, the outer conveying pipe uses a flexible, wear-resistant corrugated pipe for transitional connection. Both ends of the corrugated pipe are sealed to the root fixed section pipe and the first telescopic arm pipe respectively, allowing it to bend as the multi-stage telescopic folding boom folds. The flexible, wear-resistant corrugated pipe at the folding joint is made of polyurethane wear-resistant material, with an inner diameter consistent with the inner diameter of the outer conveying pipe. The bending angle range is 0–90°, and the inner wall is coated with a polytetrafluoroethylene wear-resistant coating. The inner wall transitions smoothly to avoid material jamming; the screw conveyor shaft is divided into an upper fixed shaft and a lower telescopic shaft at the folding joint, and the mating end face is equipped with a meshing gear coupling with a chamfered guide structure; the fixed side of the folding hinge joint is equipped with an arc-shaped positioning stop block, and the movable side is equipped with an elastic positioning pin. When the multi-stage telescopic folding boom is unfolded to the vertical state, the positioning pin is embedded in the positioning hole to achieve mechanical locking, ensuring the coaxiality of the two screw shafts, so that the end face teeth can smoothly mesh and transmit torque. When the multi-stage telescopic folding boom is folded, the two shafts separate synchronously.
[0032] The meshing gear coupling adopts an involute tooth profile with a module of 2mm. The mating end face is provided with a 30° guide chamfer, and the meshing depth is 15mm. The elastic positioning pin is a spring-driven radial pin. The arc-shaped positioning stop block on the fixed side is provided with positioning holes corresponding to the vertical state of the multi-stage telescopic folding boom. The positioning pin and the positioning hole adopt an H7 / g6 clearance fit. After the multi-stage telescopic folding boom is unfolded into place, the positioning pin automatically springs into the positioning hole, ensuring that the coaxiality error of the two helical shafts is ≤0.05mm, so that the end face teeth can smoothly mesh and transmit torque. When the boom is folded, the hinge joint drives the positioning pin to compress the spring and exit the positioning hole, and the two helical shafts separate synchronously and smoothly.
[0033] It should be noted that the multi-stage telescopic folding boom adopts a three-section nested telescopic structure. A folding hinge joint is set between the fixed section at the base and the first telescopic boom section. When stored, the multi-stage telescopic folding boom can be folded flat on the walking positioning platform around the folding hinge joint; during operation, it is deployed in a vertical position. Each boom section has a circular cross-section, with a maximum outer diameter of 0.75m in the extended operating state, allowing it to reach into a 1m diameter pit while maintaining a safe clearance from the pit wall. The telescopic folding boom is driven by a built-in double-acting hydraulic cylinder, and the telescopic stroke and speed are fed back in real time by a depth encoder for precise control of the lowering depth. The outer wall of the multi-stage telescopic folding boom is made of wear-resistant steel plate, which can withstand impact from gravel from the pit wall, while the inner wall serves as the mounting base for the closed spiral lifting and conveying mechanism.
[0034] The mobile positioning platform includes a tracked chassis, a multi-leg leveling mechanism, and a slewing support. A multi-stage telescopic folding boom is mounted on the tracked chassis via the slewing support. The multi-leg leveling mechanism is arranged around the tracked chassis to adjust the platform's levelness on sloping terrain. The hydraulic power station and electrical control box are integrated at the rear of the mobile positioning platform, providing power and control support for each actuator. The tracked chassis uses a small rubber track chassis with low ground pressure, making it suitable for relocation in complex terrains such as mountains and hills along power transmission lines. Four sets of outrigger leveling mechanisms are hinged to the four corners of the chassis, using hydraulic drive for telescopic movement. Anti-slip pads are installed at the bottom of the outriggers, which extend to support the ground during operation. In conjunction with tilt sensors, the platform is adjusted to a level position, ensuring the boom's verticality and stability during operation. The slewing support is mounted on the upper front of the tracked chassis. The bottom of the multi-stage telescopic folding boom is mounted on the slewing support via a hinged joint, enabling 360° horizontal rotation and vertical pitch swing of the boom to meet the angle requirements of full-section excavation within the pit. The hydraulic power station and electrical control box are integrated and installed at the rear of the walking positioning platform, correspondingly connected to the hydraulic lines and control circuits of the multi-stage telescopic folding boom, modular excavation actuator, and enclosed spiral lifting and conveying mechanism, providing power and control support for the entire machine.
[0035] The multi-sensor sensing unit includes a laser rangefinder, a hazardous gas detection sensor, an attitude tilt sensor, a pressure sensor, and a depth encoder. The laser rangefinder is arranged around the front end and bottom of the boom to detect the distance between the excavator head and the inner wall of the pit, the pit depth, and the flatness of the pit bottom. The hazardous gas detection sensor is arranged in the explosion-proof sensor compartment at the front end of the boom to collect the concentration of hazardous gases in the pit in real time. The attitude tilt sensor is arranged on each boom section to detect the extension angle and attitude of the boom. The pressure sensor is arranged on the hydraulic drive circuit of the excavation actuator to collect excavation resistance data. The depth encoder is arranged on the telescopic drive mechanism of the multi-stage telescopic folding boom to collect the axial telescopic length of the multi-stage telescopic folding boom. The intelligent control unit calculates the vertical excavation depth by combining the pitch angle of the multi-stage telescopic folding boom.
[0036] Laser rangefinders: There are 4 sets arranged circumferentially and 1 set arranged at the bottom. The circumferential sensors are evenly distributed around the front section arm, facing the inner wall of the pit, with a sampling frequency of 10Hz. They detect the distance between the excavator head and the surrounding pit walls in real time, which not only controls the excavation boundary to avoid over-excavation, but also identifies pit wall deformation and predicts the risk of collapse by continuously monitoring the distance changes. The bottom laser rangefinder is facing the bottom of the pit and is used to detect the excavation depth and the flatness of the pit bottom.
[0037] Hazardous gas detection sensor: Integrated into the explosion-proof sensor compartment at the front end of the multi-stage telescopic folding boom, it can simultaneously detect the concentrations of methane, carbon monoxide, and hydrogen sulfide, and monitor the underground air quality in real time. The explosion-proof sensor compartment is an intrinsically safe and explosion-proof structure with an explosion-proof rating of Exib I Mb. The side wall of the compartment is equipped with a vent with a breathable and water-resistant membrane to ensure gas flow while blocking dust and moisture. The hazardous gas detection sensor adopts modular plug-in installation and can be periodically removed for calibration. The calibration cycle does not exceed 6 months, meeting the explosion-proof safety requirements for underground confined space operations.
[0038] Attitude tilt sensor: One set is installed on each section of the multi-stage telescopic folding arm to detect the pitch angle and yaw attitude of the multi-stage telescopic folding arm, ensuring the verticality of the excavation.
[0039] Pressure sensor: Connected in series in the hydraulic drive circuit of the excavation actuator, it indirectly calculates the excavation resistance by collecting the hydraulic system pressure, serving as the core basis for geological identification.
[0040] Depth encoder: Installed at the end of the telescopic hydraulic cylinder of the multi-stage telescopic folding boom, it collects the axial extension length of the multi-stage telescopic folding boom by detecting the piston rod stroke. Combined with the pitch angle of the multi-stage telescopic folding boom detected by the attitude tilt angle sensor, the vertical digging depth is calculated using trigonometric functions. The conversion relationship is that the vertical depth equals the axial stroke multiplied by the cosine of the pitch angle. The system dynamically corrects the depth display and control value in real time based on the attitude of the multi-stage telescopic folding boom, ensuring that the control accuracy of the digging depth meets the construction requirements. The overall measurement accuracy can reach ±10mm.
[0041] The intelligent control unit has a built-in geological-parameter correlation database. It conducts excavation tests on five typical geological types—hard rock, weathered rock, cohesive soil, gravel, and frozen soil—under standard test conditions, collects steady-state excavation pressure, and establishes resistance benchmark intervals for each geological type. At the same time, it matches the corresponding set of operating parameters. During operation, it collects the average steady-state pressure of the test excavation and compares it with the resistance benchmark interval to identify the current geological type. When the resistance value falls within the transition range of ±10% of the upper and lower limits of the two geological benchmark intervals, it performs a second test excavation verification and calls the corresponding parameter set to control the excavation feed speed, crushing impact frequency, and screw conveyor speed. The intelligent control unit also has a built-in safety early warning module, which uses multi-level anti-interference judgment logic to identify the risk of collapse and gas over-limit. The collapse early warning uses a sliding time window to monitor the wall displacement and adaptively adjusts the early warning threshold according to the pit depth. After the early warning is triggered, it executes risk avoidance actions such as stopping excavation, raising the boom, and emptying the material in the pipe according to a fixed sequence.
[0042] The standard test conditions were set as follows: standard excavation feed rate of 50 mm / min, standard cutting depth of 100 mm, and the test soil and rock samples were prepared according to industry geotechnical testing standards, with physical property parameter deviations controlled within ±5%. The feed depth for the second trial excavation was adjusted to 150 mm. A weighted average resistance value was calculated using a weight of 0.4 for the first trial excavation and 0.6 for the second trial excavation, and then the geological type was determined. If a clear distinction could still be made, the operating parameters were matched according to the geological type with higher hardness.
[0043] To address the risk of hazardous gas exceeding limits, a multi-level anti-interference judgment logic is adopted: the first level is moving average filtering, which processes sensor data using a 5-second moving average to eliminate instantaneous peak interference; the second level is redundancy verification, which combines the gas concentration change rate judgment to eliminate misjudgments caused by sensor drift and instantaneous dust; the third level is duration judgment, which triggers a first-level warning if the concentration exceeds the limit for 3 consecutive seconds, and triggers a second-level emergency warning if the concentration exceeds the limit for 10 consecutive seconds.
[0044] The intelligent control unit is installed in the electrical control box of the walking positioning platform. It uses a PLC controller with a human-machine interface touch screen and supports remote wireless control with a distance of up to 500m.
[0045] The geological-parameter correlation database was pre-established using a standard geotechnical test chamber. Under the unified test conditions of a standard excavation feed rate of 50 mm / min and a standard cutting depth of 100 mm, standardized excavation tests were conducted on five typical geological types: hard rock with a uniaxial compressive strength ≥60 MPa, weathered rock with a uniaxial compressive strength of 20–60 MPa, cohesive soil with a plasticity index of 15–25, sand and gravel with a particle size of 20–80 mm, and frozen soil with a temperature ≤-5℃. Twenty sets of hydraulic circuit pressure values during the steady-state excavation stage were continuously collected. The pressure range with a 95% confidence interval was taken as the resistance benchmark range for the corresponding geological type. A corresponding optimal set of operating parameters was matched for each geological type. The parameter set included four core parameters: excavation feed rate, crushing impact frequency, screw conveyor speed, and layered excavation thickness.
[0046] Weathered rock geology: The resistance benchmark range is 8-15MPa, corresponding to an excavation feed rate of 80-120mm / min, a crushing impact frequency of 600-800 times / min, a screw conveyor speed of 60-80r / min, and a layered excavation thickness of 100-150mm; For permafrost geology: the resistance benchmark range is 12-20 MPa, corresponding to an excavation feed speed of 40-60 mm / min, a crushing impact frequency of 800-1000 times / min, a screw conveyor speed of 50-70 r / min, and a layered excavation thickness of 50-80 mm.
[0047] During operation, the control unit collects the average pressure during three steady-state feed phases in the trial excavation process. This value is compared with the resistance benchmark intervals for five geological types one by one. The benchmark interval for which the average resistance falls determines the current geological type. When the average resistance value falls within the transition range between the benchmark intervals of two geological types, the system automatically performs a second trial excavation, adjusting the feed depth to 150mm and collecting steady-state resistance data again. The weighted average of the two tests is then compared. If a clear distinction is still not possible, the operating parameters are matched according to the geological type with higher hardness, and a conservative feed speed is adopted to avoid equipment overload. The system has a self-learning function, which can record the geological and resistance data after on-site verification and automatically optimize the boundary thresholds of the benchmark intervals.
[0048] Meanwhile, the control unit has a built-in safety early warning module, employing multi-level anti-interference judgment logic: For the risk of pit wall collapse, the laser rangefinder collects wall distance data at a frequency of 10Hz, and continuously monitors and analyzes it using a 30-second sliding time window. When five consecutive sets of data within the 30-second window show a continuous increase in radial displacement of the wall, and the cumulative displacement exceeds the warning threshold for the corresponding depth, it is judged as an abnormal deformation trend, triggering a collapse risk warning. This benchmark threshold is applicable to common transmission line pits with depths of 5–15m, with a warning threshold of 5mm; for shallow pits with depths less than 5m, the warning threshold is automatically adjusted to 8mm to avoid misjudging natural relaxation deformation of the pit wall as a collapse risk. For the risk of hazardous gas exceeding limits, when the concentration of any hazardous gas exceeds the limit threshold specified in the "Safety Regulations for Confined Space Operations" for three consecutive seconds, a Level 1 gas warning is triggered; when it exceeds the limit for 10 consecutive seconds, a Level 2 emergency warning is triggered.
[0049] Upon triggering any risk warning, the system executes risk avoidance actions according to a fixed sequence: immediately stopping the feeding and crushing actions of the excavation actuator, then raising the multi-stage telescopic folding boom at a constant safety speed of 0.2 m / s, maintaining the low-speed operation of the screw conveyor during the lifting process to empty residual materials in the pipe and prevent materials from spilling and jamming the boom telescopic structure, while simultaneously triggering on-site audible and visual alarms and remote warning information to ensure the safety of equipment and personnel.
[0050] See some possible implementations. Figure 2 As shown, the integrated operation method for deep foundation pit excavation and continuous lifting of power transmission lines includes the following steps: S1. Pit Positioning and Initial Environmental Inspection: Control the walking positioning platform to move above the pit to be worked on, and adjust its position so that the rotation center of the multi-stage telescopic folding boom is aligned with the center of the pit. Then extend the four outrigger leveling mechanisms, adjust the extension of each outrigger according to the platform tilt angle sensor data, level the walking positioning platform, and lower the multi-stage telescopic folding boom to the pit opening. Collect the initial dimensions of the pit and the ambient gas data at the pit opening through the multi-sensor sensing unit. Unfold the multi-stage telescopic folding boom from the folded storage state to a vertical position and lower it to the pit opening position. After confirming that there are no initial safety hazards, prepare for excavation. S2. Geological Identification and Parameter Matching: The multi-stage telescopic folding boom is lowered slightly (at 50mm / s) to allow the modular excavating actuator to contact the pit bottom for 3-5 trial excavations. Each excavation maintains a standard depth of 100mm. Steady-state excavation resistance data is collected during the stable feed speed phase of the trial excavation. Pressure sensors collect real-time pressure data from the excavation hydraulic circuit and transmit it to the intelligent control unit. The steady-state pressure value during the stable feed speed phase is extracted and its average value is calculated. The intelligent control unit matches the geological-parameter association database, identifies the current geological type, and automatically matches excavation and conveying parameters. The intelligent control unit compares the collected average excavation resistance with the built-in geological-parameter association database to identify the current pit's geological type and automatically calls the optimal operating parameters corresponding to that geological type, including excavation feed speed, crushing impact frequency, screw conveyor speed, and layered excavation thickness, completing automatic parameter matching. If the resistance value falls within the boundary between two geological types, a second trial excavation is automatically performed for verification before determining the parameters. If the geological type identified during the trial excavation does not match the currently installed module, the system issues a prompt, and the operator replaces the corresponding excavation module and matching guide section before commencing formal operation. S3, Layered Excavation and Continuous Lifting: According to the set layered excavation thickness, the multi-stage telescopic folding boom is controlled to be lowered step by step and excavation operation is performed. During the operation, the slewing support seat drives the multi-stage telescopic folding boom to rotate horizontally. With the multi-stage telescopic folding boom swinging slightly, the full-section excavation of the current layer is completed. The excavated material is collected by the guide hood and sent to the closed spiral lifting conveyor mechanism for continuous lifting and conveying to the ground collection area. Taking cohesive soil as an example, the layer thickness is set to 180mm. The boom is lowered by 180mm, and the entire cross-section is excavated by rotating the boom.
[0051] During excavation, the soil cut by the shovel module is pushed backward and, constrained by the corresponding guide hood, all converges towards the central feed inlet. The drive motor continuously rotates the screw conveyor shaft, lifting the incoming soil upward along the outer conveying pipe, and finally discharging it from the top outlet into the collection device in the collection area. Excavation and conveying are carried out simultaneously without interruption of unloading, achieving continuous and uninterrupted operation. During operation, the scraper edge on the outer edge of the blades continuously scrapes away material adhering to the pipe wall. If an increase in motor current is detected, a pneumatic vibrator is activated to assist in clearing blockages and prevent clogging by cohesive soil.
[0052] During the operation, the slewing support base drives the multi-stage telescopic folding boom to rotate horizontally. Combined with the slight pitching of the multi-stage telescopic folding boom, the entire cross-section of the foundation pit is fully excavated, ensuring that the pit walls are regular and the pit bottom is flat. During the rotation of the multi-stage telescopic folding boom, the scraper simultaneously scrapes the loose material remaining at the bottom of the pit into the feed inlet, improving the flatness of the cleared pit.
[0053] S4. Real-time monitoring and dynamic adjustment: During the operation, data on the distance to the pit wall, concentration of harmful gases, boom posture and excavation resistance are collected in real time. The excavation posture and operation parameters are dynamically adjusted. When a risk threshold is detected, an early warning is triggered and risk avoidance actions are executed in sequence. Throughout the entire operation, the multi-sensor sensing unit collects data in real time and feeds it back to the intelligent control unit: The laser rangefinder monitors the distance to the pit wall in real time. If over-excavation is detected, the turning radius is automatically adjusted. A 30-second sliding window is used to monitor wall displacement. If five consecutive sets of data show that the wall displacement continues to increase and the cumulative deformation exceeds the warning threshold for the corresponding depth, a collapse risk is identified. Excavation feed is immediately stopped, and the boom is raised to the outside of the pit at a safe speed of 0.2 m / s. During the lifting process, the screw conveyor maintains a low speed to empty the material in the pipe, while triggering on-site audible and visual alarms and remote warning information.
[0054] Hazardous gas sensors monitor downhole gas in real time. If the concentration of any gas exceeds the standard for 3 consecutive seconds, a level one warning is triggered and ventilation is prompted to be strengthened. If the concentration exceeds the standard for 10 consecutive seconds, a level two emergency warning is triggered and an automatic hoisting and evacuation procedure is executed.
[0055] The pressure sensor monitors the excavation resistance in real time. If the resistance suddenly increases, the feed rate will be automatically reduced. If the resistance continues to deviate from the current geological benchmark range, it will be determined that the geological conditions have changed, and the operation will be suspended and the geological identification and parameter matching will be carried out again.
[0056] S5. Work Completion and Reset: When the excavation depth reaches the set value and the flatness of the pit bottom meets the standard, stop the excavation and conveying operations, retract the multi-stage telescopic folding boom, and complete the foundation pit operation.
[0057] Once the vertical excavation depth, corrected by the depth encoder and tilt angle, reaches the designed depth, the system reduces the excavation feed speed and enters the pit bottom leveling process. The depth of various points on the pit bottom is detected by a laser rangefinder at the bottom, and any protruding areas are leveled until the pit bottom flatness deviation is no greater than 20mm, meeting the construction requirements.
[0058] Once the work is confirmed to be up to standard, stop the operation of the excavation actuator and the screw conveyor. Control the boom to retract and lift in stages. After it is fully retracted, fold it flat on the walking platform and retract the outrigger leveling mechanism to complete the single pit operation. Then you can move to the next pit to continue the operation.
[0059] In step S3, the layer excavation thickness is automatically adjusted according to the identified geological type: the layer thickness for hard rock geology is set to 50-100 mm, the layer thickness for cohesive soil geology is set to 150-200 mm, and the layer thickness for sand and gravel geology is set to 100-150 mm.
[0060] In step S4, the risk of pit wall collapse is continuously determined using a sliding time window: laser ranging data is continuously collected at a sampling frequency of 10Hz, and analyzed using a 30-second sliding time window. If the wall distance data for five consecutive sampling cycles within the window shows a continuously decreasing trend, and the cumulative deformation exceeds the warning threshold for the corresponding depth, it is determined to be a real collapse risk. For pits with a depth exceeding 15m, the warning threshold is adaptively adjusted according to the rule of decreasing by 1mm for every 5m increase in depth. The maximum working depth of the pit is 20m. The warning threshold for pits with a depth of 5-15m is 5mm, and the warning threshold for shallow pits with a depth of less than 5m is adjusted to 8mm. After the risk is determined, the excavation feed is immediately stopped, and the multi-stage telescopic folding boom is controlled to lift to the outside of the pit at a constant safe speed of 0.2m / s. During the lifting process, the screw conveyor is kept running at a low speed to empty the material in the pipe, and at the same time, an audible and visual warning is issued.
[0061] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely preferred examples and are not intended to limit the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of the present invention is defined by the appended claims and their equivalents.
Claims
1. An integrated operation system for deep foundation pit excavation and continuous hoisting of power transmission lines, characterized in that, It includes a walking positioning platform, a multi-stage telescopic folding boom, a modular excavation actuator, a closed spiral lifting and conveying mechanism, a multi-sensor sensing unit, and an intelligent control unit; The bottom end of the multi-stage telescopic folding boom is hinged to the front end of the walking positioning platform. The multi-stage telescopic folding boom can be folded and stored in the vertical plane around the root hinge axis, and can be extended and lowered vertically. In the stored state, it is placed horizontally above the walking positioning platform. In the extended working state, the maximum outer diameter of the multi-stage telescopic folding boom is no more than 0.8m, which is used to extend into the deep foundation pit of the power transmission line with a diameter ≤1m. The modular excavation actuator can be detachably installed at the end of the foremost small section of the multi-stage telescopic folding boom, and is used to perform crushing or digging operations for different geological conditions. The closed spiral lifting and conveying mechanism is arranged through the internal axis of the multi-stage telescopic folding boom. Its inlet is located on the rear discharge side of the modular excavation actuator, and the discharge outlet extends to the material collection area above the walking and positioning platform. It is used to continuously lift and transport the excavated material to the ground along the interior of the multi-stage telescopic folding boom. The multi-sensor sensing units are respectively arranged at the front end of the multi-stage telescopic folding boom, the segments of the multi-stage telescopic folding boom, and the walking positioning platform, and are used to collect pit space parameters, ambient gas parameters, attitude parameters of the multi-stage telescopic folding boom, and excavation operation parameters. The intelligent control unit is electrically connected to the modular excavation actuator, the enclosed spiral lifting and conveying mechanism, the multi-sensor sensing unit, and the walking and positioning platform, respectively. It is used to control the telescopic and folding action of the multi-stage telescopic and folding boom, the excavation operation parameters, the conveying speed, and the walking and positioning action based on the sensing data, and output safety warning signals.
2. The integrated operation system for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 1, characterized in that, The modular excavation actuator includes a quick-change connector and interchangeable hard rock breaking module, cohesive soil digging module, and gravel grabbing module. The quick-change connector is fixed to the end of the front section arm and is equipped with a hydraulic quick connector and a spring mechanical locking component. Each working module is connected to the quick-change connector by plugging in and locked in place by the spring mechanical locking component, enabling quick assembly and disassembly.
3. The integrated operation system for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 1, characterized in that, The enclosed spiral lifting and conveying mechanism includes an outer conveying pipe, a spiral conveying shaft, and a drive motor. The outer conveying pipe is segmented and corresponds to each section of the multi-stage telescopic folding boom, extending and retracting synchronously with the boom. The spiral conveying shaft is a segmented spline telescopic shaft, with continuous, equal-pitch spiral blades welded onto each segment. The blade ends of adjacent shaft segments are joined at an oblique angle, ensuring a smooth transition at the blade working surface after extension and retraction. A polyurethane scraping edge is provided on the outer edge of the spiral blades, and wear-resistant lining strips are embedded axially along the inner wall of the outer conveying pipe for scraping. The edge dynamically fits the inner wall of the liner; a pneumatic vibrator is installed on the outer wall of the fixed section at the root of the conveying outer pipe to assist in clearing the adhering material; the pipe wall of the conveying outer pipe is a fully enclosed structure, and the feed inlet is opened at the bottom of the front end and faces the discharge direction of the excavation actuator; a semi-enclosed guide cover is set at the end of the front small arm, and the guide cover adopts a split structure of upper fixed section plus lower movable section. The lower movable guide section is configured to match different excavation modules. The lower edge of the guide cover is fitted with a wear-resistant scraper plate that fits against the bottom of the pit to gather the excavated material towards the feed inlet.
4. The integrated operation system for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 1, characterized in that, A folding hinge joint is provided between the root fixed section and the first telescopic arm section of the multi-stage telescopic folding boom; corresponding to the folding joint position, the outer conveying pipe is connected by a flexible wear-resistant corrugated pipe, with both ends of the corrugated pipe being sealed to the root fixed section pipe body and the first telescopic arm pipe body respectively, and can be bent as the multi-stage telescopic folding boom is folded; the spiral conveying shaft is divided into an upper fixed shaft and a lower telescopic shaft at the folding joint, and the mating end face is provided with a meshing gear coupling with a chamfered guide structure; The fixed side of the folding hinge joint is equipped with an arc-shaped positioning stop block, and the movable side is equipped with an elastic positioning pin. When the multi-stage telescopic folding boom is unfolded to the vertical state, the positioning pin is inserted into the positioning hole to achieve mechanical locking, ensuring the coaxiality of the two spiral shafts, so that the end face teeth can smoothly mesh to transmit torque. When the multi-stage telescopic folding boom is folded, the two shafts separate synchronously.
5. The integrated operation system for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 1, characterized in that, The walking and positioning platform includes a tracked chassis, a multi-leg leveling mechanism, and a slewing support base. The multi-stage telescopic folding boom is mounted on the tracked chassis via the slewing support base. The multi-leg leveling mechanism is arranged around the tracked chassis to adjust the platform's levelness on sloping terrain. The hydraulic power station and electrical control box are integrated and installed at the rear of the walking and positioning platform to provide power and control support for each actuator.
6. The integrated operation system for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 1, characterized in that, The multi-sensor sensing unit includes a laser rangefinder, a harmful gas detection sensor, an attitude tilt sensor, a pressure sensor, and a depth encoder. The laser rangefinder is arranged around the front end and bottom of the boom to detect the distance between the excavator head and the inner wall of the pit, the depth of the pit and the flatness of the pit bottom. The hazardous gas detection sensor is located in the explosion-proof sensor compartment at the front end of the boom and is used to collect the concentration of hazardous gases in the pit in real time. The attitude tilt sensor is arranged on each section of the boom to detect the extension angle and attitude of the boom; The pressure sensor is arranged on the hydraulic drive circuit of the excavating actuator to collect excavation resistance data; The depth encoder is mounted on the telescopic drive mechanism of the multi-stage telescopic folding boom and is used to collect the axial telescopic length of the multi-stage telescopic folding boom; the intelligent control unit calculates the vertical excavation depth by combining the pitch angle of the multi-stage telescopic folding boom.
7. The integrated operation system for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 6, characterized in that, The intelligent control unit has a built-in geological-parameter correlation database. It conducts excavation tests on five typical geological types—hard rock, weathered rock, cohesive soil, sand and gravel, and frozen soil—under standard test conditions in advance, collects steady-state excavation pressure, and forms resistance benchmark intervals for each type of geological type. At the same time, it matches the corresponding set of operating parameters. During operation, it collects the average steady-state pressure of the trial excavation and compares it with the resistance benchmark interval to identify the current geological type. When the resistance value falls within the transition range of ±10% of the upper and lower limits of the two geological benchmark intervals, it performs a second trial excavation verification and calls the corresponding parameter set to control the excavation feed speed, crushing impact frequency, and screw conveyor speed. The intelligent control unit also has a built-in safety early warning module, which uses multi-level anti-interference judgment logic to identify the risk of collapse and the risk of gas exceeding the limit. The collapse early warning uses a sliding time window to monitor the wall displacement and adaptively adjusts the early warning threshold according to the depth of the pit. After the early warning is triggered, the risk avoidance actions of stopping excavation, lifting the boom, and emptying the material in the pipe are executed in a fixed sequence.
8. A method for integrated excavation and continuous hoisting of deep foundation pits for transmission lines, implemented based on the integrated excavation and continuous hoisting system for deep foundation pits for transmission lines as described in any one of claims 1-7, characterized in that... Includes the following steps: S1. Pit positioning and initial environmental inspection: Control the walking positioning platform to move above the pit to be operated, adjust the parallel walking positioning platform, lower the multi-stage telescopic folding boom to the pit opening, collect the initial size of the pit and the environmental gas data at the pit opening through the multi-sensor sensing unit, unfold the multi-stage telescopic folding boom from the folded storage state to the vertical posture, and lower it to the pit opening position. S2. Geological identification and parameter matching: Control the multi-stage telescopic folding boom to lower it slightly, so that the modular excavation execution mechanism can contact the bottom of the pit to conduct trial excavation. Collect steady-state excavation resistance data during the stable stage of the feed speed in the trial excavation process. The intelligent control unit matches the geological-parameter association database, identifies the current geological type and automatically matches the excavation operation parameters and the conveying parameters. S3, Layered Excavation and Continuous Lifting: According to the set layered excavation thickness, the multi-stage telescopic folding boom is controlled to be lowered step by step and excavation operation is performed. During the operation, the slewing support seat drives the multi-stage telescopic folding boom to rotate horizontally. With the multi-stage telescopic folding boom swinging slightly, the full-section excavation of the current layer is completed. The excavated material is collected by the guide hood and sent to the closed spiral lifting conveyor mechanism for continuous lifting and conveying to the ground collection area. S4. Real-time monitoring and dynamic adjustment: During the operation, data on the distance to the pit wall, concentration of harmful gases, boom posture and excavation resistance are collected in real time. The excavation posture and operation parameters are dynamically adjusted. When a risk threshold is detected, an early warning is triggered and risk avoidance actions are executed in sequence. S5. Work Completion and Reset: When the excavation depth reaches the set value and the flatness of the pit bottom meets the standard, stop the excavation and conveying operations, retract the multi-stage telescopic folding boom, and complete the foundation pit operation.
9. The integrated method for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 8, characterized in that, In step S3, the layer excavation thickness is automatically adjusted according to the identified geological type: the layer thickness for hard rock geology is set to 50-100 mm, the layer thickness for cohesive soil geology is set to 150-200 mm, and the layer thickness for sand and gravel geology is set to 100-150 mm.
10. The integrated method for deep foundation pit excavation and continuous hoisting of transmission lines according to claim 8, characterized in that, In step S4, the risk of pit wall collapse is continuously determined using a sliding time window: laser ranging data is continuously collected at a sampling frequency of 10Hz, and analyzed using a 30-second sliding time window. If the wall distance data for five consecutive sampling cycles within the window shows a continuously decreasing trend, and the cumulative deformation exceeds the warning threshold for the corresponding depth, it is determined to be a real collapse risk. For pits with a depth exceeding 15m, the warning threshold is adaptively adjusted according to the rule of decreasing by 1mm for every 5m increase in depth. The maximum working depth of the pit is 20m. The warning threshold for pits with a depth of 5-15m is 5mm, and the warning threshold for shallow pits with a depth of less than 5m is adjusted to 8mm. After the risk is determined, the excavation feed is immediately stopped, and the multi-stage telescopic folding boom is controlled to lift to the outside of the pit at a constant safe speed of 0.2m / s. During the lifting process, the screw conveyor is kept running at a low speed to empty the material in the pipe, and at the same time, an audible and visual warning is issued.