A Smart Grouting Method and System for Dam Foundation Seepage Control Curtain Based on Multivariable Measurement
By using multivariate measurement and intelligent control, the problem of unstable pressure control in grouting of dam foundation anti-seepage curtain is solved, and a more stable grouting process is achieved by distinguishing between short-term reverse fluctuations and continuous changes in the grouting process.
Patent Information
- Application Number
- CN202611577045.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-10
AI Technical Summary
In the process of grouting for seepage prevention curtains in dam foundations, existing technologies using fixed-time or fixed-number control methods cannot distinguish between short-term reverse fluctuations and continuous reverse changes, resulting in frequent switching of grouting pressure control direction or delayed response.
A smart grouting method based on multivariate measurement is adopted. By obtaining representative values of grouting pressure and flow rate, the filling, expansion or neutral direction is determined according to the direction of pressure and flow rate change, forming a continuous change segment. The length of the current change segment is compared with the most recent change segment in the opposite direction, and the grouting pressure set value is adjusted.
This reduces the frequency of pressure control direction switching and response lag, improves the stability and efficiency of the grouting process, and ensures that the control scale is derived from the actual changes in the current grouting section.
Smart Images

Figure CN123067643A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of control and regulation technology, specifically to an intelligent grouting method and system for dam foundation seepage prevention curtains based on multivariate measurement. Background Technology
[0002] During the grouting process of the dam foundation seepage prevention curtain, the grouting pressure and the grout injection rate into the current grouting section continuously change with the filling state of the grout in the fissures and the changes in the grout suction channel. In engineering practice, it is usually necessary to determine whether the current grouting section is suitable for further pressure increase, maintenance, or reduction based on these changes. Existing control methods, to avoid direct pressure adjustments caused by fluctuations in a single sample value, typically employ a fixed duration, a fixed number of consecutive tests, or a delay confirmation method after a single parameter exceeds its limit to determine whether a certain change persists.
[0003] However, the width of fissures, connectivity, filling degree, and grout diffusion conditions in the dam foundation rock mass vary significantly across different borehole sections. The actual duration of the same pressure-flow change state is not the same in different borehole sections. Therefore, the uniformly set confirmation duration is difficult to adapt to different borehole sections simultaneously.
[0004] More specifically, in a borehole section where the overall grout suction is gradually decreasing, the grout injection rate may generally show a downward trend when the actual pressure is maintained or slowly increased. However, due to the influence of grout pump pulsation, valve adjustment, changes in circulation pipeline flow, and short-term changes in local grout suction channels, the grout injection rate may experience a brief increase in the middle. If the control system directly uses this brief increase as the basis for pressure reduction, the originally continuous filling process will be interrupted by a short-term reverse change, easily causing repeated switching between pressure increase, maintenance, and pressure reduction. Conversely, if a fixed confirmation time is uniformly added to filter short-term changes, when another borehole section does experience a continuous increase in the injection rate, it is necessary to wait for the fixed time to expire before stopping the pressure increase or executing the pressure reduction, which can easily cause control actions to lag.
[0005] The fundamental reason is that fixed time or fixed number of consecutive cycles represent a pre-defined, uniform timescale. This fails to utilize the sustained pressure-flow changes already occurring within the current grouting section to determine the judgment criteria. Consequently, it's difficult to distinguish between short-term reverse fluctuations relative to the current section and reverse changes that have persisted long enough to alter the current control state. Therefore, how to utilize the actual sustained pressure-flow changes within the current grouting section to differentiate between short-term reverse fluctuations and sustained reverse changes, and accordingly determine whether to increase, maintain, or decrease pressure, is the core technical problem that needs to be solved in the automatic pressure control of grouting for dam foundation seepage prevention curtains. Summary of the Invention
[0006] This invention provides an intelligent grouting method and system for dam foundation seepage prevention curtain based on multivariate measurement. It solves the technical problem that when the duration of pressure-flow variation varies in different grouting hole sections of the dam foundation, it is difficult to effectively distinguish between short-term reverse fluctuations and continuous reverse changes by using a uniform fixed duration or a fixed number of consecutive times, which can easily lead to frequent switching of grouting pressure control direction or control response lag.
[0007] This invention provides an intelligent grouting method for dam foundation seepage prevention curtains based on multivariate measurement, comprising: acquiring the pressure change direction while the grouting pressure setpoint remains constant; acquiring the flow rate change direction in the same discrimination process corresponding to the pressure change direction; obtaining the pressure-flow rate change direction based on the pressure change direction and the flow rate change direction, wherein when the flow rate change direction is decreasing and the pressure change direction is not decreasing, it is the filling direction; when the flow rate change direction is increasing, it is the expansion direction; and the rest are neutral directions; obtaining the current continuous change segment length based on the continuous unidirectional and non-neutral pressure-flow rate change directions; acquiring the length of the most recent and completed continuous change segment in the opposite direction based on the current pressure-flow rate change direction; obtaining a comparison result of the continuous segment length based on the current continuous change segment length and the length of the continuous change segment in the opposite direction, wherein there is no comparison when there is no continuous change segment in the opposite direction; obtaining the pressure control direction based on the pressure-flow rate change direction and the comparison result of the continuous segment length, wherein when the filling direction and the continuous segment length comparison result is longer than or there is no comparison, the pressure is increased; when the expansion direction and the continuous segment length comparison result is longer than, the pressure is decreased; and the rest are maintained; and adjusting the grouting pressure setpoint according to the pressure control direction.
[0008] Optionally, the direction of pressure change is obtained while the grouting pressure setpoint remains constant; the direction of flow rate change is obtained in the same discrimination process corresponding to the direction of pressure change, including: obtaining a representative value of grouting pressure; obtaining the direction of pressure change based on the changes in adjacent representative values of grouting pressure and the pressure measurement error; obtaining a representative value of grouting flow rate based on the same discrimination process corresponding to the direction of pressure change; and obtaining the direction of flow rate change based on the changes in adjacent representative values of grouting flow rate and the flow measurement error.
[0009] Optionally, obtaining a representative value of grouting pressure includes: obtaining valid grouting pressure sample values within a valid complete discrimination period; and obtaining a representative value of grouting pressure based on the median of the valid grouting pressure sample values.
[0010] Optionally, the representative value of grouting flow rate is obtained according to the same discrimination process corresponding to the direction of pressure change, including: obtaining the grout inlet flow rate sample value in circulating grouting; obtaining the return flow rate sample value according to the sampling time corresponding to the grout inlet flow rate sample value; obtaining the clean grout injection rate sample value according to the grout inlet flow rate sample value and the return flow rate sample value; and obtaining the representative value of grouting flow rate according to the median of the clean grout injection rate sample value.
[0011] Optionally, the length of the current continuous change segment is obtained based on the continuous and non-neutral pressure-flow change direction, including: when the filling direction or the expansion direction appears continuously, the same direction is counted continuously; when a neutral direction appears or the filling direction and the expansion direction change with each other, the current counting is stopped, and the length of the current continuous change segment is obtained.
[0012] Optionally, obtaining the direction of pressure change while the grouting pressure setpoint remains unchanged includes: stopping the determination of the direction of pressure change during active pressure adjustment and obtaining the end time of active pressure adjustment; obtaining the first effective complete discrimination cycle based on the end time of active pressure adjustment; obtaining a new grouting pressure representative value benchmark based on the first effective complete discrimination cycle; and obtaining the direction of pressure change based on the grouting pressure representative value benchmark and the grouting pressure representative value of the next effective complete discrimination cycle.
[0013] Optionally, the length of the most recent and completed continuous change segment in the opposite direction is obtained based on the current pressure-flow change direction; a comparison result of the continuous segment length is obtained based on the current continuous change segment length and the length of the continuous change segment in the opposite direction, and no comparison is made when there is no continuous change segment in the opposite direction, including: obtaining the length of the most recent and completed extended continuous change segment when the current pressure-flow change direction is the filling direction, and obtaining the length of the most recent and completed filling continuous change segment when it is the expansion direction; a comparison result of the continuous segment length is obtained based on the current continuous change segment length and the obtained continuous change segment length, wherein the former is longer than the latter when it is greater than the latter, and not longer than the latter when it is less than or equal to the latter, and no comparison is made when there is no most recent and completed continuous change segment in the opposite direction.
[0014] Optionally, adjusting the grouting pressure setting value according to the pressure control direction includes: obtaining a representative value of uplift deformation; obtaining the uplift change direction based on the change in adjacent representative values of uplift deformation and the uplift measurement error; obtaining the pressure control direction after uplift constraint based on the pressure control direction and the uplift change direction, wherein when the pressure control direction is increasing and the uplift change direction is increasing, it is maintained; when the pressure control direction is maintaining or decreasing and the uplift change direction is increasing, it is decreasing; the rest are consistent with the pressure control direction; and adjusting the grouting pressure setting value according to the pressure control direction after uplift constraint.
[0015] Optionally, adjusting the grouting pressure setting value according to the pressure control direction after the lifting constraint includes: obtaining the pressure setting increase based on the grouting pressure setting value before and after a pressurization operation; obtaining the pressure setting increase without lifting based on the pressure setting increase and the lifting change direction corresponding to the pressurization operation, wherein the pressure setting increase is retained when at least one lifting change direction is formed and none of the lifting change directions are increases; obtaining the pressure adjustment reference step size based on the median of the pressure setting increase without lifting in the current grouting hole section, and using the minimum executable pressure adjustment amount of the equipment when no pressure setting increase without lifting has been formed; and obtaining the next grouting pressure setting value based on the pressure control direction after the lifting constraint and the pressure adjustment reference step size.
[0016] Optionally, adjusting the grouting pressure setting value according to the pressure control direction includes: obtaining the next grouting pressure setting value based on the pressure control direction and the current grouting pressure setting value; when the pressure control direction is pressure increase, updating the next grouting pressure setting value based on the next grouting pressure setting value and the engineering design target grouting pressure, so that it is not higher than the engineering design target grouting pressure; updating the next grouting pressure setting value based on the next grouting pressure setting value and the engineering design maximum grouting pressure, so that it is not higher than the engineering design maximum grouting pressure; and updating the next grouting pressure setting value based on the next grouting pressure setting value and the lower boundary of the engineering allowable pressure, so that it is not lower than the lower boundary of the engineering allowable pressure.
[0017] Optionally, after adjusting the grouting pressure setpoint according to the pressure control direction after the lifting constraint, the method further includes: during the period when the current grouting pressure setpoint continuously reaches the engineering design target grouting pressure, counting continuous discrimination cycles that conform to the neutral direction and whose lifting change direction is not increasing, based on the pressure-flow change direction and the lifting change direction, to obtain the length of the candidate continuous segment for grouting end; recounting when the current grouting pressure setpoint is lower than the engineering design target grouting pressure; obtaining the algorithmic grouting end confirmation based on the length of the candidate continuous segment for grouting end and the length of the most recently completed complete filling continuous change segment; and obtaining the actual grouting end command based on the algorithmic grouting end confirmation and the engineering grouting end conditions.
[0018] A multivariable measurement-based intelligent grouting system for dam foundation seepage prevention curtains is also provided. The system is used to implement an intelligent grouting method for dam foundation seepage prevention curtains based on multivariable measurements. The system includes a multivariable measurement module, a data processing module, an adaptive grouting control module, and a grouting execution module. The multivariable measurement module is used to acquire grouting pressure sampling values; it is also used to acquire grouting flow sampling values; and it is also used to acquire uplift deformation sampling values. The data processing module is used to determine the pressure change direction based on the grouting pressure sampling values; it is also used to determine the flow change direction based on the grouting flow sampling values; and it is used to obtain the pressure-flow ratio based on the pressure change direction and the flow change direction. The data processing module is also used to obtain the current continuous change segment length based on the continuous unidirectional and non-neutral pressure-flow change direction; the data processing module is also used to obtain the length of the most recent and completed continuous change segment in the opposite direction based on the pressure-flow change direction; the data processing module is also used to obtain a comparison result of the continuous segment length based on the current continuous change segment length and the length of the continuous change segment in the opposite direction; the adaptive grouting control module is used to obtain the pressure control direction based on the pressure-flow change direction and the comparison result of the continuous segment length; the adaptive grouting control module is also used to obtain the grouting pressure setpoint based on the pressure control direction; the grouting execution module is used to adjust the grouting pressure of the current grouting hole segment according to the grouting pressure setpoint.
[0019] The beneficial effects of this invention are reflected in:
[0020] This invention obtains representative values of grouting pressure and grouting flow rate while the grouting pressure setpoint remains constant. It then determines the direction of pressure and flow rate changes based on the changes in adjacent representative values relative to their corresponding measurement errors. These directions are then combined to form the filling direction, expansion direction, or neutral direction. Thus, the grouting pressure and grout injection rate always change within their respective physical quantities, eliminating the need for weighted summation, productization, or normalization of pressure and flow rates with different dimensions. This allows subsequent control states to directly correspond to two interpretable engineering measurement results: how the pressure changes and how the grout injection rate changes. Simultaneously, measurement errors are used to eliminate small changes that cannot be reliably resolved within the measurement chain, ensuring that continuous change segments consist primarily of effective data changes, rather than the accumulation of random fluctuations within the measurement error range.
[0021] Furthermore, this invention does not use a pre-fixed number of consecutive cycles as the confirmation condition for pressure increase and decrease. Instead, it forms the current continuous change segment by continuously unidirectional and non-neutral pressure-flow change directions, and compares the length of the current continuous change segment with the length of the most recent and completed continuous change segment in the opposite direction in the current orifice segment. Therefore, the actual duration of the most recent opposite change directly becomes the basis for comparison to determine whether the current change has achieved a longer duration advantage. Pressure increase can begin when the filling direction has no history of the opposite direction in the current orifice segment. After a historical expansion process has occurred, pressure increase can only be resumed if the current filling continuous change segment is actually longer than the most recent expanding continuous change segment. Pressure increase stops as soon as an expansion direction appears, but pressure decrease is only performed after the expanding continuous change segment becomes even longer than the most recent filling continuous change segment. This control relationship allows a short-term reverse flow increase to promptly prevent further pressure rise without immediately causing a pressure drop, while a duration exceeding the recent filling process of the current orifice can further trigger a pressure drop. Thus, the pressure control judgment criterion is derived from the continuous change process that has already occurred in the current orifice itself, reducing the problem of insufficient adaptability of fixed continuous conditions between different orifice segments and frequent switching of pressure control direction caused by short-term reverse fluctuations. Attached Figure Description
[0022] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the accompanying drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn to scale.
[0023] Figure 1 This is a schematic diagram illustrating the steps of the intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to the present invention; Figure 2 This is a schematic diagram of part of step S1 in the intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement of the present invention. Figure 3 This is a schematic diagram of part of step S2 in the intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement of the present invention; Figure 4 This is a schematic diagram of part of step S3 in the intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement of the present invention; Figure 5 This is a schematic diagram of part of step S4 in the intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement of the present invention; Figure 6 This is a schematic diagram of the module structure and data flow of the intelligent grouting system for dam foundation seepage prevention curtain based on multivariate measurement according to the present invention. Detailed Implementation
[0024] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. It should be understood that the described embodiments are only some embodiments of the present invention, and not all embodiments. The components of the embodiments of the present invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.
[0025] Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention.
[0026] It should be noted that similar labels and letters in the following figures indicate similar items; therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. Furthermore, the terms "first," "second," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.
[0027] This invention provides an intelligent grouting method for dam foundation seepage prevention curtains based on multivariate measurement, such as... Figure 1 As shown, in one embodiment, the method includes: S1. During the period when the grouting pressure setpoint remains unchanged, obtain the representative value of grouting pressure and the representative value of grouting flow according to the discrimination cycle, and obtain the direction of pressure change and flow change based on the change of the same type of representative value and the corresponding measurement error in adjacent comparable discrimination cycles within the same grouting pressure setpoint holding period. S2. Obtain the pressure-flow rate change direction based on the pressure change direction and the flow rate change direction. Specifically, obtain the filling direction when the flow rate change direction is decreasing and the pressure change direction is not decreasing, obtain the expansion direction when the flow rate change direction is increasing, and obtain the neutral direction in other cases. Count the continuous pressure-flow rate change directions that are in the same direction and are not neutral to obtain the length of the current continuous change segment. S3. Compare the current continuous change segment length with the length of the most recent and completed continuous change segment in the opposite direction to obtain the continuous segment length comparison result; if there is no continuous change segment in the opposite direction, the continuous segment length comparison result is no comparison; if the current direction is filling and the continuous segment length comparison result is longer than or there is no comparison, obtain the pressure control direction for increasing pressure; if the current direction is expansion, stop increasing pressure and obtain the pressure control direction for decreasing pressure when the continuous segment length comparison result is longer than; otherwise, obtain the pressure control direction for maintaining pressure. S4. Based on the pressure control direction, the engineering pressure boundary of the current grouting hole section, and the lifting constraint and pressure adjustment reference step size in the further implementation, obtain the next grouting pressure setting value, and have the grouting execution equipment adjust the grouting pressure of the current grouting hole section according to the next grouting pressure setting value.
[0028] In S1, the grouting pressure used in this invention is the pressure corresponding to the pressure control position specified in the current engineering design documents, construction technical requirements, or approved on-site grouting tests. In projects where the orifice pressure is used as the control pressure, the grouting pressure sampling value is obtained by a pressure measuring device installed on the orifice control pipeline. When the project requires conversion to the grouting section control pressure, the measured value is converted according to the pressure loss calibration results before construction, and the same pressure reference position is always used for a grouting section from beginning to end, avoiding the mixing of orifice pressure and section conversion pressure between different judgment periods.
[0029] Specifically, the grouting flow rate used in this invention represents the actual amount of grout entering the rock fractures or pores of the current grouting borehole section per unit time, and its engineering meaning corresponds to the grout injection rate of the current grouting borehole section. In pure pressure grouting, all grout entering the borehole section, in principle, enters the borehole section or the grouting rock mass, and the grouting flow rate can be directly obtained from the calibrated grout inlet flow rate. In circulating grouting, some grout returns through the return pipe; therefore, the grout inlet flow rate cannot be directly used as the grouting flow rate. Instead, the net grout injection rate of the current borehole section should be obtained using synchronously measured and overall calibrated grout inlet and return data. When the grouting recording equipment can directly output the calibrated net injection rate, this output result is directly used as the grouting flow rate sampling value. This avoids the erroneous inclusion of the circulating return grout in the actual grout absorption of the rock mass in circulating grouting.
[0030] Furthermore, pressure and flow rate are always processed independently as their respective physical quantities. The representative value of grouting pressure is only compared with the representative value of grouting pressure, and the validity of the change is determined using pressure measurement error; the representative value of grouting flow rate is only compared with the representative value of grouting flow rate, and the validity of the change is determined using flow rate measurement error. This implementation does not directly perform weighted summation, product fusion, or manual normalization scoring on the absolute values of pressure and flow rate, thus eliminating the need to introduce additional pressure and flow rate weights for the two different physical quantities.
[0031] For example, in one optional embodiment, the representative grouting pressure value obtained in the previous comparable discrimination period during the same pressure setpoint holding phase is 2.40 MPa, and the representative grouting pressure value obtained in the current comparable discrimination period is 2.44 MPa, with a current pressure measurement error of 0.02 MPa. The change between the two representative values is 0.04 MPa, which exceeds the pressure measurement error, thus constituting an effective pressure change. Furthermore, the current representative grouting pressure value is relatively high, indicating an increasing pressure change. The representative grouting flow rates obtained in the same two discrimination periods are 13.2 L / min and 12.4 L / min, respectively, corresponding to a change of 0.8 L / min. The current flow rate measurement error is 0.5 L / min, therefore indicating a decreasing flow rate change. The aforementioned values are only used to illustrate the processing relationships; the actual values are obtained based on the real-time sampling data of the current grouting hole section and the current equipment calibration results.
[0032] The reason for adopting the above processing logic is that changes in pressure and slurry injection rate can both be affected by equipment disturbances, but their physical units and engineering meanings are different. By first completing the formation of representative values and filtering of measurement errors within their respective physical quantities, and then using discrete change directions for combined judgment, the control results can be prevented from losing direct engineering interpretation due to dimensional transformation and weight selection. At the same time, it provides S2 with definite pressure change direction and flow rate change direction.
[0033] In S2, the pressure-flow rate change direction is a data change classification name established by this invention for grouting pressure control. It represents the combined state between the pressure change direction and the flow rate change direction in the same effective discrimination process. The pressure-flow rate change direction includes filling direction, expansion direction, and neutral direction. The above names belong to the control classification and are not used to independently determine that underground fissures have undergone definite geometric filling or geometric expansion without other geological and construction information.
[0034] Specifically, when the flow rate changes in a decreasing direction while the pressure changes in an increasing direction or shows no effective change, the current pressure-flow rate change direction is the filling direction. This classification is based on the fact that, even without an effective pressure reduction, a continuous decrease in the slurry injection rate reflects a weakening slurry suction capacity in the current borehole section, serving as input for determining whether subsequent pressure increases are permissible. When the flow rate changes in an increasing direction, regardless of whether the pressure change direction is increasing, decreasing, or showing no effective change, the current pressure-flow rate change direction is determined as the expanding direction to promptly prevent further pressure increases. All other combinations are determined as neutral directions.
[0035] Furthermore, the system forms continuous change segments according to the time sequence of the effective pressure-flow rate change directions. A continuous change segment for filling is formed when filling directions appear consecutively; a continuous change segment for expanding directions appears consecutively; and the current continuous change segment ends when a neutral direction appears, or when the direction changes from filling to expanding and vice versa. The length of a continuous change segment is represented by the number of effective pressure-flow rate change directions contained in the corresponding continuous change segment, and the neutral direction is not defined as a positive or negative value for accumulation.
[0036] For example, when six filling directions are formed consecutively, the current continuous filling variation segment length is 6. If an extension direction is subsequently formed, the aforementioned continuous filling variation segment of length 6 ends and is recorded as a completed continuous filling variation segment, and the new extension continuous variation segment starts from length 1. Here, the length 6 comes from the consecutive count of actual valid discrimination results, rather than a pre-set fixed duration threshold.
[0037] The reason for adopting the above processing logic is that short-term slurry transport fluctuations can only generate a small number of reverse discrimination results, while the actual continuous changes in the orifice section can usually continue for multiple effective discrimination cycles. After converting the discrete change direction into a continuous change segment, the control system can retain two types of information: change direction and duration, providing a data basis for S3 to compare the current state with the most recent opposite state.
[0038] In S3, the most recent consecutive change segment in the opposite direction is a historical state name established by this invention. It represents the consecutive change segment that is closest to the current consecutive change segment in time sequence, has the opposite direction to the current consecutive change segment, and has already ended. When the current continuous change segment is a filling continuous change segment, only the most recently ended extended continuous change segment is read; when the current continuous change segment is an extended continuous change segment, only the most recently ended filling continuous change segment is read. Historical continuous change segments that are farther away from the current segment are not included in the current length comparison.
[0039] Specifically, when the current continuous change segment length is greater than the length of the most recent continuous change segment in the opposite direction, the continuous segment length comparison result is "longer than"; when the current continuous change segment length is less than or equal to the length of the most recent continuous change segment in the opposite direction, the continuous segment length comparison result is "not longer than"; when the current hole segment has not yet formed a continuous change segment in the opposite direction since the start of construction, the continuous segment length comparison result is "no comparison". The continuous segment length comparison result is a custom name used in this invention to describe the relationship between the duration lengths of two continuous change processes. Its value is generated entirely from the actual counting results, and no additional numerical threshold needs to be set.
[0040] Furthermore, if the current direction is filling and the length comparison result of the continuous segment is longer than the specified value, the pressure control direction is to increase pressure; if the current direction is filling and the length comparison result of the continuous segment is not longer than the specified value, the pressure control direction is to maintain pressure. After a new grouting section begins, if a filling direction is formed first before an extended continuous variation segment has been formed, and the length comparison result of the continuous segment is not compared, then an initial pressure increase is allowed. Once at least one complete extended continuous variation segment has been formed in the current section, whether the pressure is increased in the filling direction is determined by comparing the actual length of the current filling continuous variation segment with the most recent complete extended continuous variation segment.
[0041] Furthermore, when the current direction is expansion, the generation of new pressure boosting commands ceases immediately upon the appearance of the first valid expansion direction. If the length of the continuous expansion segment is not yet longer than the length of the most recently completed continuous filling segment, the pressure control direction remains unchanged; if the continuous expansion segment continues to grow and eventually exceeds the length of the most recently completed continuous filling segment, the pressure control direction changes to pressure reduction. When the current direction is neutral, the pressure control direction remains unchanged.
[0042] For example, the length of the recently completed continuous filling section is 6. After the new extended continuous section is formed, the length increases from 1 to 3 but is still not longer than 6. Therefore, the pressure continues to increase but no pressure reduction is performed. As the subsequent extension direction continues to form, when the length of the current extended continuous section increases to 7, 7 is longer than 6, and the pressure control direction changes to pressure reduction.
[0043] The reason for adopting the above processing logic is that if the flow rate increases effectively and the pressure is increased again, the slurry suction in the current hole section may increase further. Therefore, the pressure is stopped when the expansion direction first appears. On the other hand, a single or a few expansion directions may come from local changes in slurry delivery. By waiting for the continuous expansion change section to actually exceed the most recently filled continuous change section before reducing the pressure, the direct formation of pressure reverse regulation due to short-term reverse changes can be avoided.
[0044] In S4, the pressure control direction is first converted to the direction of change of the grouting pressure setpoint, and is further limited by the engineering design pressure boundary, the capacity of the grouting execution equipment, and the safety constraints of uplift deformation. The adaptive judgment of this invention does not change the maximum pressure, allowable uplift deformation, abnormal working condition handling, and grouting termination conditions already specified in the approved design documents, on-site grouting test results, construction technical requirements, and applicable current technical standards.
[0045] Specifically, each time the pressure control direction changes to increase pressure, only one pressure setting adjustment command within the allowable range is sent; no new increase or decrease command is sent until the pressure adjustment is completed, the actual pressure returns to a stable state, a new representative value benchmark is established, and the effective pressure-flow change direction is obtained again. Therefore, the pressure adjustment frequency is jointly limited by the actual actuator response, the pressure stabilization process, and the discrimination cycle, rather than by directly and continuously changing the pressure setpoint based on the sampling frequency.
[0046] Furthermore, if pressure, flow rate, or uplift deformation data (when using the uplift constraint implementation method) is lost due to equipment failure, communication failure, or inability to generate a valid representative value, the control system will not generate a new pressure boosting command based on the missing data. If pressure and flow rate discrimination data are temporarily insufficient, the current pressure control state will be maintained, or manual control will be switched according to the fault handling plan approved for the current project. If uplift monitoring data fails, automatic pressure boosting will be prohibited until uplift monitoring is restored or manual takeover is initiated according to construction safety procedures.
[0047] Furthermore, if the current borehole section experiences grout leakage, grout cross-contamination, abnormally high grout suction, water inrush at the borehole opening, unstable pressure, uplift reaching the allowable value for the project, or other conditions deemed special by the engineering construction technical requirements, the normal adaptive pressure control of this invention will be suspended, and pressure limiting, flow limiting, intermittent operation, waiting for condensation, sealing, or manual handling will be implemented according to the special situation handling procedures approved for the current project. This avoids using the data control algorithm under normal operating conditions for special construction conditions outside its design scope.
[0048] In summary, the entire intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement firstly involves generating representative values for grouting pressure and grouting flow rate reflecting the net grout injection rate of the current borehole section during the same grouting pressure setpoint maintenance phase. This is achieved by utilizing corresponding measurement errors to eliminate minor changes that the measuring equipment cannot reliably identify. Simultaneously, filling, expansion, or neutral directions are formed based on the pressure and flow rate change directions, ensuring that pressure and flow maintain their respective physical meanings without direct cross-dimensional numerical fusion. Furthermore, continuous change segments are formed through continuous unidirectional changes, and the actual duration relationship between the current continuous change segment and the most recent opposite-direction continuous change segment in the current borehole section is used to determine whether to increase, maintain, or decrease pressure. In the initial state without historical opposite-direction continuous change segments, the filling direction is allowed to increase pressure, while the pressure increase is immediately stopped when the expansion direction first appears, and the duration is further confirmed to determine whether to decrease pressure. Thus, the pressure control scale originates from the data process already occurring in the current grouting borehole section itself. During the pressure adjustment execution phase, the discrete control results are converted into pressure setpoints that the grouting equipment can execute through active pressure adjustment data isolation, pressure stability determination, lifting deformation constraints, equipment executable pressure scales, and engineering design boundary limitations. This enables real-time adaptive control to form a complete closed loop with the current engineering design and construction safety conditions.
[0049] In one implementation, such as Figure 2 As shown, S1 includes:
[0050] S11. Determine the measurement benchmarks, data sources, and valid data conditions for grouting pressure, grouting flow rate, and uplift deformation.
[0051] S12. Based on the current data acquisition configuration and a limited number of stable operation tests before construction, determine the data quality requirements, minimum effective sampling quantity, and discrimination period corresponding to the sampling frequency.
[0052] S13. Identify the start and end times of active pressure regulation, exclude pressure and flow data during active pressure regulation, and re-establish the grouting pressure representative value benchmark and grouting flow representative value benchmark after the active pressure regulation ends.
[0053] S14. Generate representative values of grouting pressure and grouting flow rate based on the sampled values in the valid and complete discrimination period, and determine the direction of pressure change and flow rate change based on adjacent comparable representative values and corresponding measurement errors.
[0054] In section S11, pressure measuring devices, flow measuring devices, uplift deformation measuring devices, and automatic grouting recording devices must all undergo verification, calibration, or on-site acceptance as required by the current project before being put into automatic control. If the equipment exceeds its verification or calibration validity period, fails its self-test, or the on-site verification results exceed the allowable range, its data will not be used for automatic pressure increase judgment. This procedure is consistent with the project requirement that grouting construction metering equipment maintain accurate measurement values.
[0055] Specifically, the grout injection rate measurement channel used in circulating grouting is calibrated as a whole before construction. During calibration, under multiple stable operating conditions covering the formal construction flow range, standard flow reference data and the grout injection rate output by the automatic recording equipment are obtained simultaneously. Through a limited number of repeated measurements, it is confirmed that the system can still obtain a stable net injection rate result when grout inlet and return are present simultaneously. The flow measurement error used in formal construction is determined according to the calibration results of the entire net injection rate measurement chain, rather than simply ignoring the combined effect of the inlet flowmeter error and the return flowmeter error after obtaining them separately.
[0056] Furthermore, the uplift deformation is calculated using the relative displacement with respect to the stable reference position before grouting begins, rather than directly using arbitrary absolute readings after the mechanical installation of the sensors as the rock mass uplift amount. Before grouting, uplift monitoring data is continuously acquired when no pressure grouting has been performed and the external operating conditions are stable. When the change in the representative value within a consecutive judgment period does not exceed the uplift measurement error, the representative value of this stable stage is used as the uplift reference for the current borehole segment or the current monitoring area. The representative value of uplift deformation during formal grouting represents the deformation amount relative to this reference position.
[0057] Furthermore, when multiple uplift monitoring points exist, each monitoring point performs its own baseline establishment and safety monitoring. The representative value of uplift deformation used for the directional constraint of this invention adopts the control monitoring point data explicitly specified in the current engineering uplift monitoring scheme; other monitoring points still independently perform engineering allowable uplift deformation checks. When any safety monitoring point reaches the engineering allowable uplift deformation, engineering safety control can be triggered, and automatic pressure will not continue to increase because the algorithm-controlled monitoring point has not yet reached the allowable value.
[0058] In step S12, the sampling frequency is not arbitrarily set by the algorithm of this invention, but is determined based on the output capacity of the measuring equipment, the actual configuration of the automatic grouting recording equipment, the communication cycle, and the equipment acceptance results before construction. The formal control uses the sampling timestamps actually recorded by the data acquisition system to divide the discrimination period, avoiding the fabrication of sampling data that was not actually obtained based solely on the equipment's nominal frequency.
[0059] For example, in one alternative implementation, the current data acquisition equipment is configured to 10Hz after acceptance testing. This value is directly read from the data acquisition configuration before formal construction begins, and is confirmed to stably output the corresponding timestamp data through continuous recording checks before construction. Therefore, subsequent period division directly uses the actual records, rather than using 10Hz as a fixed sampling requirement for all projects.
[0060] Specifically, the minimum effective sampling quantity is determined through pre-construction data integrity verification. The process is as follows: Under stable equipment operation and with complete sampling data, multiple data windows representing the current pressure and flow rate operating range are selected. First, representative values are calculated using all valid data. Then, the number of samples used in the calculation is gradually reduced according to predetermined combinations of missing data, and the difference between the median after the reduction and the median of the complete data is compared. The minimum sampling quantity that ensures the difference in pressure representative values does not exceed the pressure measurement error and the difference in flow rate representative values does not exceed the flow measurement error within all finite verification windows is selected as the minimum effective sampling quantity for the current data acquisition configuration. This verification is re-executed after replacing the sensor, changing the sampling frequency, or changing the recording equipment configuration.
[0061] For example, the current equipment configuration can normally generate 50 valid sampling records within a proposed discrimination period. Before construction, data integrity verification progressively reduces the number of sampling records involved in the calculation. Verification results show that when retaining more than 40 valid sampling records, the differences between the median pressure and flow rate obtained in each verification window and the median of the complete data do not exceed the corresponding measurement error. However, when reduced to 39 records, at least one verification window exceeds the corresponding measurement error. Therefore, 40 is determined as the minimum number of valid samples for the current equipment configuration. The value of 40 comes from the current equipment data integrity verification results and is not a pre-fixed universal value for the algorithm.
[0062] Furthermore, the discrimination period is determined through a pre-construction discrimination period calibration test. This calibration test is conducted under conditions where the grouting pump, grout delivery pipeline, pressure control equipment, and measurement system are connected according to the formal construction method, but the measured flow state remains stable during a cyclic test or an approved stable trial operation. This ensures that the calibration results primarily reflect pumping pulsations, pipeline response, and data acquisition fluctuations, rather than mistakenly treating the continuous grout absorption changes of the grouting rock mass itself as equipment fluctuations. For each valid test, multiple candidate time windows are examined sequentially, divided into consecutive sub-time windows, and the median pressure and net grout injection rate are obtained for each. When the difference in the median pressure between the consecutive sub-time windows does not exceed the pressure measurement error and the difference in the median net grout injection rate does not exceed the flow rate measurement error, the shortest candidate time window that first meets the conditions in this test is recorded as the result for this test. The median of all valid test results specified in the field test plan is obtained after sorting and is used as the discrimination period.
[0063] For example, the current engineering calibration scheme for the discrimination period involves five effective stable trial runs based on the equipment operating conditions. These five trials yielded the shortest qualified candidate time windows of 4s, 5s, 5s, 6s, and 6s, respectively. These five values are all derived from actual records of the first successful fulfillment of pressure and flow stability conditions during each trial run. The median value after sorting is 5s; therefore, 5s is used as the discrimination period for the current equipment and construction configuration. This 5s is not a universally accepted empirical threshold and will be recalibrated if the equipment or pipeline configuration changes.
[0064] In S13, the start time of active pressure regulation is determined by the control timestamp when the grouting controller first changes the current grouting pressure setpoint. The end time of active pressure regulation cannot be solely based on the last change of the pressure setpoint, because even after the control command stops changing, the actual pressure in the grouting pump, pipeline, and borehole may continue to dynamically respond. This implementation also sets a pressure stability judgment condition; the active pressure regulation is only considered complete when the controller has stopped changing the setpoint and the actual control pressure has entered the pressure stability tolerance determined before construction and has remained within a complete judgment cycle.
[0065] Specifically, the pressure stability tolerance is determined through a limited number of pressure step response tests before construction. The tests are conducted with the current combination of grouting pump, valves, pipelines, pressure sensors, and controllers. Small setpoint changes are made to multiple representative pressure states covering the formal construction work area. After the controller stops changing the setpoint, the process of the actual pressure gradually stabilizing is recorded, and the maximum absolute control deviation after each test reaches steady state is obtained. The maximum steady-state absolute control deviation among all valid tests is used to determine the pressure stability tolerance of the current equipment configuration, and this tolerance must not be less than the pressure measurement error. If a test exhibits continuous oscillations or fails to reach a stable range, the control equipment is adjusted first, without artificially increasing the stability tolerance to mask equipment malfunctions.
[0066] For example, after completing five effective pressure step response tests and entering steady state, the maximum absolute control deviations were 0.02 MPa, 0.03 MPa, 0.03 MPa, 0.04 MPa, and 0.03 MPa, respectively, with a maximum value of 0.04 MPa. This value is greater than the current pressure measurement error of 0.02 MPa. Therefore, the current equipment configuration adopts a pressure stability tolerance of 0.04 MPa. During actual construction, after the controller stops changing the setpoint, the active pressure regulation is considered complete only if the actual pressure remains within this stability tolerance for a continuous 5-second discrimination cycle.
[0067] Furthermore, the grouting pressure and grouting flow rate samples generated between the start and end of an active pressure regulation are not used to determine the new direction of pressure or flow rate change. In the first valid complete discrimination cycle after the active regulation ends, only new representative values for grouting pressure and grouting flow rate are established, without comparison with the cross-pressure setpoint of the last cycle before regulation. Only from the second valid complete discrimination cycle after regulation is the comparison of adjacent representative values re-executed.
[0068] For example, after the grouting pressure setpoint is changed from 2.80 MPa to 2.86 MPa, the controller first completes the setpoint change, and then the actual pressure enters a stable state. The first valid complete discrimination cycle after the adjustment ends obtains a new representative value for the grouting pressure, which is saved only as the new baseline; the second valid complete discrimination cycle compares it with the first cycle. This prevents the subtraction of the representative pressure value (approximately 2.80 MPa before pressure increase) with the representative pressure value (approximately 2.86 MPa after pressure increase) from mistakenly interpreting it as an increase in the pressure of the borehole section itself.
[0069] In S14, the median is used for both the representative values of grouting pressure and grouting flow rate. When the number of valid samples within a valid complete discrimination period is odd, the middle sample value after sorting is used as the representative value; when the number of valid samples is even, the average of the two middle samples after sorting is used as the representative value. Using the median can reduce the direct impact of a single local spike or instantaneous abnormal sampling on the periodic representative results.
[0070] Specifically, the pressure measurement error is determined according to the actual working range of the current pressure measurement chain. Before construction, a standard pressure measuring device with metrological traceability is used to simultaneously take readings with the construction pressure measuring equipment under multiple calibration pressure conditions covering the current construction range, and the allowable error specified in the current equipment verification or calibration document is read. The equipment is only allowed to enter automatic control if the on-site calibration deviation is within the allowable range of the equipment. The pressure measurement error used for direction determination adopts an error limit that covers the allowable error of the equipment and the actual deviation of the current qualified on-site calibration; if the on-site deviation exceeds the allowable range of the equipment, recalibration, equipment replacement, or maintenance is performed, rather than simply relaxing the pressure measurement error.
[0071] For example, the current pressure measurement equipment calibration document specifies an allowable error of 0.02 MPa within the scope of the construction work. The maximum absolute deviation obtained by on-site verification using a standard pressure source is 0.01 MPa, and the equipment has passed on-site acceptance. Therefore, 0.02 MPa is used as the current pressure measurement error for direction determination. This value comes from the equipment metrology document and on-site calibration and is not a manually set algorithm sensitivity threshold.
[0072] Furthermore, the flow measurement error is determined for the entire data channel of the final net grout injection rate. Under circulating grouting conditions, the grout inlet, grout return, and final net injection rate records are verified using standard metering devices at multiple stable flow rates. The maximum net injection rate deviation, calibrated and meeting the equipment's allowable error requirements, is compared with the allowable error of the recording system to determine the flow measurement error that can cover the actual error of the qualified measurement chain. When the overall equipment error exceeds the acceptance range, the measurement system is addressed first, and automatic control continues without amplifying the flow measurement error algorithm.
[0073] For example, the current measurement and field calibration results of the grout injection rate recording system indicate that a flow rate of 0.5 L / min is required within the construction work area to cover the overall net injection rate measurement error after acceptance. Therefore, the current flow measurement error is determined to be 0.5 L / min. This value is derived from the calibration of the entire flow measurement chain, rather than being estimated using only the accuracy of a single flowmeter nameplate.
[0074] Furthermore, if the absolute change in the current representative grouting pressure value relative to the previous comparable representative grouting pressure value does not exceed the pressure measurement error, the direction of pressure change is no effective change; if the absolute change exceeds the pressure measurement error and the current representative value increases, the direction of pressure change is increasing; if the absolute change exceeds the pressure measurement error and the current representative value decreases, the direction of pressure change is decreasing. The same three-state discrimination logic is used for grouting flow rate.
[0075] The reason for adopting the processing logic of S11 to S14 is that automatic grouting control needs to first ensure that the input data represents the correct physical object and comes from the same pressure control reference, a calibrated grout injection rate, and a valid data time range. Only after the measurement chain calibration, data integrity, discrimination cycle, and reference reset after pressure adjustment are all clearly defined can the subsequent pressure-flow change direction be stably reproduced by those skilled in the art through ordinary data acquisition and condition judgment procedures.
[0076] In one implementation, such as Figure 3 As shown, S2 includes:
[0077] S21. Determine the filling direction, expansion direction, or neutral direction based on the direction of pressure change and the direction of flow change in the same effective discrimination process.
[0078] S22. Count the continuous, non-neutral pressure-flow rate changes, establish the current continuous change segment, and end the current continuous change segment when the direction changes or a neutral direction is formed.
[0079] S23. During active pressure regulation, the effective direction counting is paused. After the active pressure regulation ends and the direction judgment is restored, the current continuous change segment is continued or terminated based on the restored pressure-flow change direction.
[0080] In S21, the filling direction is a data state name used in this invention to indicate that the slurry injection rate has effectively decreased but the actual pressure has not effectively decreased. The filling direction is determined when the flow rate changes in a decreasing direction and the pressure changes in an increasing direction or without effective change. The extension direction is a data state name used in this invention to indicate that the slurry injection rate has effectively increased, and new pressure increases need to be prohibited first. It can be determined as long as the flow rate changes in an increasing direction. Combinations that do not meet the above two conditions are classified as neutral directions.
[0081] Specifically, when both the pressure and flow rates decrease, it is uncertain whether it is the filling direction, because when the actual pressure decreases simultaneously, the decrease in the slurry injection rate may be mainly affected by the decrease in pressure conditions; when neither the pressure nor the flow rate changes effectively, it is also determined to be the neutral direction, because at this time there is no effective change information that can support the filling or expansion direction.
[0082] Furthermore, in S22, each continuous change segment records only one non-neutral direction. The first filling direction makes the length of the continuous change segment 1, and the length increases by 1 for each subsequent continuous filling direction; the first expansion direction makes the length of the extended continuous change segment 1, and the length increases in the same way for subsequent continuous expansion directions. After a neutral direction or the opposite direction appears, the final length of the current continuous change segment is fixed and saved.
[0083] In S23, the active pressure regulation time does not constitute any pressure-flow change direction, therefore the time occupied by pressure regulation itself does not increase the length of the continuous change segment. The first effective complete discrimination cycle used to establish a new pressure and flow reference after pressure regulation also does not increase the length of the continuous change segment.
[0084] Specifically, after the pressure regulation ends and the first effective pressure-flow change direction is regenerated, if the direction is the same as the last effective pressure-flow change direction before the pressure regulation, the original process is considered to continue in the sense of the effective change direction sequence, and the current continuous change segment is extended based on the original length; if the restored direction is the opposite direction or the neutral direction, the current continuous change segment before the pressure regulation ends.
[0085] For example, if a continuous filling variation segment of length 6 has been formed before pressure regulation, the counting stops during pressure regulation, and the first effective pressure-flow variation direction formed after the pressure regulation ends and the baseline is re-established is still the filling direction, then the length of the current continuous filling variation segment is updated to 7; if the first effective direction after restoration is the expansion direction, then the continuous filling variation segment of length 6 is saved as a complete continuous filling variation segment, and the new expanded continuous variation segment starts from length 1.
[0086] The reason for adopting the above logic is that the data in the active pressure regulation process cannot represent the orifice segment response under constant setting conditions, so it cannot be directly accumulated; on the other hand, pressure adjustment does not necessarily mean that the original change process of the orifice segment has ended. Whether to continue the original segment is determined based on the effective direction obtained again after pressure regulation, which can maintain the continuity of the actual state process while eliminating pressure regulation interference.
[0087] In one implementation, such as Figure 4 As shown, S3 includes:
[0088] S31. Read the current continuous change segment and the most recent and completed continuous change segment in the opposite direction, and obtain the comparison result of the continuous segment length based on the actual count length.
[0089] S32. Based on the comparison results of the pressure-flow change direction and the continuous segment length, obtain the pressure control direction of increasing, maintaining or decreasing pressure, and handle the start-up state where there is no continuous change segment in the opposite direction in the current orifice segment.
[0090] In S31, at least the direction, final length, and end time of the completed continuous change segment are stored. When searching for the nearest continuous change segment in the opposite direction, only the segment closest to the current one is selected based on its end time; multiple historical continuous change segments are not summed, averaged, or weighted. This process avoids introducing additional empirical parameters such as historical weights, attenuation coefficients, or historical window lengths.
[0091] For example, if the history has formed two complete extended continuous change segments of length 3 and length 4, where the end time corresponding to length 4 is closer to the present, and the current filling continuous change segment length is 6, then only 6 and 4 are compared. The result of the continuous segment length comparison is that it is longer than 4, and the earlier extended continuous change segment of length 3 is not included in the current pressure control judgment.
[0092] Furthermore, at the start of a new grouting section, all continuous changing segments, fully filled continuous changing segments, and fully extended continuous changing segments formed by the previous grouting section are cleared. If the new section forms the filling direction before forming an extended continuous changing segment, the comparison result of the continuous segment length is no comparison. This state is a normal initialization state and not a data error.
[0093] Specifically, in the absence of a comparison, only the filling direction is allowed to initiate a pressure increase; when there is no comparison and the current direction is the expansion direction, this is maintained to avoid pressure increases due to the expansion state without a filling history; the same applies when the current direction is neutral. After the current hole segment forms the first complete continuous expansion segment, subsequent filling directions enter the conventional length comparison control.
[0094] The reason for adopting the above logic is that if the no-comparison state is always maintained, the new hole segment may never generate the first automatic pressure boost if it is continuously filled but never expands its history; allowing the filling direction to start the pressure boost in the no-comparison state can eliminate this control deadlock, while not introducing a fixed number of durations as a new start threshold.
[0095] In one implementation, such as Figure 5 As shown, S4 includes:
[0096] S41. Obtain the next grouting pressure setting value based on the pressure control direction, engineering design pressure boundary, equipment pressure regulation capability, and pressure regulation reference step.
[0097] S42. Obtain the lifting change direction based on the representative value of the lifting deformation and the lifting measurement error, and obtain the pressure control direction after lifting constraint based on the pressure control direction and the lifting change direction.
[0098] S43. Based on the continuous pressure increase operation completed in the current grouting section and the corresponding uplift monitoring results, form the pressure setting increase amount without uplift, and update the pressure adjustment reference step size based on the pressure setting increase amount without uplift.
[0099] S44. After the current grouting pressure reaches the target grouting pressure of the engineering design, a candidate continuous segment for grouting termination is formed and an algorithmic grouting termination confirmation is generated; the actual grouting termination also needs to meet the grouting termination conditions specified in the current applicable technical standards, construction design documents, on-site grouting test results and approved construction technical requirements.
[0100] In section S41, the initial grouting pressure designed for the project is the initial pressure setpoint determined by the approved construction design documents or the results of approved on-site grouting tests when normal grouting control begins in the current borehole segment. This parameter is not automatically generated by the real-time algorithm based on the first pressure or flow rate data. The data processing system reads the uniquely corresponding initial grouting pressure designed for the project according to the borehole number, borehole segment depth, construction sequence, and current construction parameter version. Automatic pressure increase is prohibited when there is missing data or multiple contradictory results.
[0101] For example, in an optional project, the approved borehole section construction parameter table specifies that the initial grouting pressure for the current borehole section is 2.40 MPa. This value comes from the approved design and field grouting test results for the current borehole section. Therefore, the control system loads 2.40 MPa when initializing the current borehole section, instead of using the pressure at the end of the previous borehole section.
[0102] Specifically, the engineering design target grouting pressure is the normal grouting pressure that the current borehole segment needs to achieve according to the approved design and grouting test. The data processing system also reads the data according to the current borehole segment identifier and does not change the engineering design target grouting pressure based on the current algorithm's continuous segment length.
[0103] For example, if the approved parameter table for the current project specifies a target grouting pressure of 3.00 MPa, then 3.00 MPa will be directly used as the target pressure for normal pressure increase in this borehole section and the source of the target pressure for subsequent termination judgment.
[0104] Furthermore, the maximum grouting pressure in the engineering design represents the upper limit of the engineering safety pressure that no automatic pressure command in the current borehole section can exceed. It is derived from the approved design documents, on-site grouting test results, and the applicable construction technology requirements for the current project. If the target pressure and the maximum pressure conflict, the algorithm does not automatically select the larger value to continue construction; instead, it reports a parameter anomaly.
[0105] For example, if the current engineering design document gives a maximum grouting pressure of 3.20 MPa and a target grouting pressure of 3.00 MPa, then the normal adaptive pressure control will only increase the pressure to a maximum of 3.00 MPa. 3.20 MPa is the engineering safety boundary that must not be exceeded, and it does not mean that the algorithm can continue to increase the pressure on its own after reaching 3.00 MPa.
[0106] Furthermore, the lower limit of the allowable pressure in the project is derived from the approved pressure control scheme for the current borehole section, and is used to limit the normal algorithm pressure reduction from being reduced indefinitely. This parameter is determined based on the borehole depth, groundwater conditions, grouting method, and on-site grouting tests; if special circumstances require further pressure relief, the project's abnormal handling procedure will take over, and will not be limited by the lower limit of the normal algorithm pressure.
[0107] For example, if the approved pressure control scheme for the current borehole section specifies that the lower limit of the pressure during the normal automatic control phase is 2.00 MPa, then the pressure reduction in the normal expansion direction cannot lower the pressure setpoint below 2.00 MPa; when a safety event occurs, such as reaching the allowable value for uplift deformation, the engineering safety procedure can further reduce the pressure or stop the pump according to the approved measures.
[0108] Furthermore, the upper limit of the single pressure increase allowed by the project is used to avoid excessive automatic adjustment in one step. This parameter is determined through a staged pressure increase process in the field grouting test: the pressure is gradually changed in a representative borehole section according to the approved test plan, and the net grout injection rate, actual pressure stability, and uplift deformation are recorded at each stage; the maximum single-stage increment that can stably reach the target setting under test conditions, without triggering the project uplift limit, and conforming to the approved pressure grading plan is selected as the upper limit of the single pressure increase allowed by the project. This parameter is an engineering execution constraint and does not replace the pressure adjustment reference step size formed by the pressure increase set without uplift in this invention.
[0109] For example, if the approved graded pressure increase results of a grouting test at a certain engineering site confirm that a single increase of 0.10 MPa can be stably executed and meets the lifting control requirements, while larger increments are not approved for automatic control, then 0.10 MPa will be used as the upper limit of the allowable single pressure increase for this type of borehole. When the actual pressure adjustment reference step is less than 0.10 MPa, a smaller pressure adjustment reference step will still be used.
[0110] Furthermore, the next grouting pressure setpoint can be expressed as:
[0111]
[0112] in, This indicates the next grouting pressure setpoint, derived from the final output of the current pressure control cycle, in units of... ; This indicates the upper limit of the pressure allowed during the current normal control phase. It is derived from the current engineering design and approved pressure control parameters, and does not exceed the maximum grouting pressure designed for the project. During the normal pressure increase phase, it should, in principle, not exceed the target grouting pressure designed for the project. The unit is... ; This indicates the lower limit of the allowable pressure during the current normal control phase of the project, derived from the approved borehole pressure control scheme, and the unit is... ; This indicates the current grouting pressure setting, derived from the actual set value currently saved and executed by the grouting controller, in units of... ; This indicates the current pressure adjustment amount. After the pressure control is lifted, a positive adjustment amount is used for increasing pressure, a negative adjustment amount is used for decreasing pressure, and 0 is used for maintaining pressure. The unit is [unit missing]. .
[0113] Specifically, the calculation logic of the mathematical model is as follows: First, the pressure control direction is obtained based on the pressure-flow change process. Then, the direction of the lifting change is used to determine whether to impose a safety constraint on the pressure control direction. Subsequently, the actual pressure adjustment amount that can be executed is determined based on the current pressure adjustment reference step size, the upper limit of the single pressure increase allowed by the project, and the remaining pressure space from the current pressure boundary. Finally, the result of the pressure adjustment is restricted to the area between the upper boundary of the project pressure and the lower boundary of the project allowable pressure.
[0114] The reason for adopting this mathematical model is that the continuous pressure-flow variation segment is responsible for determining the direction of adjustment, the pressure adjustment reference step size is responsible for determining the amount of adjustment under normal conditions, and the engineering pressure boundary is responsible for ensuring that normal adaptive control does not exceed the pressure range already approved for the current project. The direction, scale, and engineering safety boundary each have clearly defined data sources.
[0115] In S42, the uplift measurement error is determined based on the verification or calibration results of the uplift deformation monitoring equipment and the on-site displacement calibration results after installation. Before construction, a zero-point stability check is performed, and multiple known displacement states covering the actual monitoring range are applied using a displacement calibration device with metrological traceability. After the error specified in the equipment documentation and the maximum actual deviation of the on-site calibration both meet the equipment acceptance requirements, the error limit that covers the acceptable measurement chain error is used as the uplift measurement error. If the on-site deviation exceeds the allowable range, the equipment is addressed first, and automatic pressure is not continued to increase by amplifying the uplift measurement error.
[0116] For example, if the allowable error for the current working range of the lifting monitoring equipment is 0.01 mm, and the maximum absolute deviation obtained from the on-site displacement verification does not exceed 0.01 mm, then the current lifting measurement error is 0.01 mm. This value represents the effective change discrimination capability and is not equivalent to the allowable lifting deformation in the project.
[0117] Furthermore, the allowable uplift deformation and the uplift measurement error are two different parameters. The allowable uplift deformation represents the upper limit of cumulative uplift that the current building and foundation are allowed to experience during grouting, and it is derived from the engineering design, structural allowable deformation requirements, on-site grouting tests, and approved uplift monitoring plan. The uplift measurement error is only used to determine whether the change between representative values of adjacent uplift deformations is valid. Under no circumstances should the measurement error be directly substituted for the allowable uplift deformation.
[0118] For example, the current approved uplift monitoring scheme, based on the building's allowable deformation and on-site grouting test specifications, stipulates that the allowable uplift deformation in the current monitoring area is 0.10 mm, while the measurement error of the measuring equipment is 0.01 mm. The system uses 0.01 mm to determine whether an effective increase has occurred in adjacent cycles, while continuously checking whether the cumulative uplift relative to the pre-grouting baseline is close to or reaches 0.10 mm. When the cumulative uplift reaches the allowable value, it directly enters the project safety control phase without waiting for further changes in the pressure-flow continuity.
[0119] Specifically, when the absolute change between adjacent comparable representative values of lifting deformation does not exceed the lifting measurement error, the direction of lifting change is no effective change; when the absolute change exceeds the lifting measurement error and the current representative value of lifting deformation increases, the direction of lifting change is increasing; when the absolute change exceeds the lifting measurement error and the current representative value decreases, the direction of lifting change is falling back.
[0120] Furthermore, when the pressure control direction is increasing and the lifting change direction is increasing, the pressure control direction after the lifting constraint is changed to maintaining; when the pressure control direction is maintaining or decreasing and the lifting change direction is still increasing, the pressure control direction after the lifting constraint is determined to decrease; in other cases, the pressure control direction after the lifting constraint is consistent with the original pressure control direction. When the cumulative lifting reaches the engineering allowable value, the aforementioned ordinary direction rules are no longer used for further step-by-step adjustment, and the corresponding stopping of lifting, depressurization, pump shutdown, or manual handling is executed by the engineering safety procedure.
[0121] The reason for adopting the above-mentioned uplift constraint is that pressure and grout injection rate can reflect the hydraulic process, but cannot replace the actual displacement monitoring of the dam foundation rock mass. Setting the uplift change as a safety constraint after pressure-flow control ensures that even when the normal grout suction state meets the pressure increase conditions, it still needs to be checked for actual deformation.
[0122] In S43, a single pressurization operation is defined as a continuous pressurization phase, rather than a single minimum pressure adjustment command issued by the controller. A continuous pressurization phase begins when the pressure control direction changes to pressurization for the first time after the lifting constraint and the first positive pressure adjustment is executed. During this period, one or more positive pressure adjustments may be executed sequentially. The continuous pressurization phase ends when the pressure control direction changes to hold or depressurize, the upper limit of the current pressure is reached, or the pressurization stops due to the lifting constraint.
[0123] Specifically, the pressure setting increase represents the total increase in the grouting pressure setting at the end of a continuous pressurization phase relative to the grouting pressure setting before the start of that phase. Using a continuous pressurization phase definition allows the pressure setting increase to vary based on the total pressurization actually achieved in a single continuous filling process of the current borehole segment, preventing subsequent pressure adjustment reference steps from being permanently locked at the equipment's minimum executable pressure adjustment amount due to identical minimum pressure adjustment commands in the initial phase.
[0124] Furthermore, for a continuous pressurization phase to be saved as a pressure setting increase without uplift, the following conditions must be met simultaneously: no increase in the direction of uplift change occurs during the continuous pressurization phase; the cumulative uplift does not reach the allowable uplift deformation; and at least one effective uplift change direction is formed between the end of the continuous pressurization phase and the start of the next pressure adjustment, and this direction is not an increase. If any condition is not met, the pressure setting increase for this continuous pressurization phase will not be included in the set of pressure setting increases without uplift.
[0125] Specifically, the minimum executable pressure adjustment of the equipment is determined through repeated verification by the controller and actuator before construction. First, the controller's allowed pressure setting resolution is read. Then, pressure increase and decrease commands are issued sequentially according to candidate pressure increments from smallest to largest. The controller's recorded values and execution results are checked against the limited number of repetitions specified in the current equipment acceptance or commissioning plan to ensure stable changes in the same direction. The smallest candidate increment that can be reliably and repeatedly executed is determined as the minimum executable pressure adjustment of the equipment.
[0126] For example, the current controller allows testing of candidate adjustment values of 0.01 MPa, 0.02 MPa, and 0.05 MPa. After a specified number of repeated verifications according to the current equipment acceptance protocol, 0.01 MPa cannot consistently produce repeatable setpoint changes throughout all verifications, while 0.02 MPa and 0.05 MPa can both be consistently executed. Therefore, the minimum executable pressure adjustment value for the current equipment is determined to be 0.02 MPa. This 0.02 MPa is derived from the current equipment verification and is not part of the preset general algorithm step size.
[0127] Furthermore, before the current borehole segment has formed a pressure setting increase without uplift, the minimum executable pressure adjustment amount of the equipment is used as the pressure adjustment reference step size. After the first pressure setting increase without uplift is formed, the median of the formed pressure setting increases without uplift is used to update the pressure adjustment reference step size; for each subsequent new pressure setting increase without uplift, the data is reordered and the median is obtained. After starting a new grouting borehole segment, the data of the previous segment is cleared, and data is not mixed across borehole segments.
[0128] For example, the first continuous pressurization stage consists of two consecutive 0.02MPa positive adjustments, with a total pressure increase of 0.04MPa. Since no upward pressure increase was observed throughout the stage and subsequent observations, 0.04MPa is retained. The pressure adjustment reference step size is then updated to 0.04MPa. In the next continuous pressurization stage, two more 0.04MPa positive adjustments are executed, satisfying all upward pressure conditions, resulting in a new upward pressure increase of 0.08MPa. With two data points (0.04MPa and 0.08MPa), and the average of these two values being 0.06MPa, the pressure adjustment reference step size is updated to 0.06MPa. Therefore, the pressure adjustment reference step size can change according to the actual duration of the current continuous pressurization stage, avoiding a logic lock-in that permanently remains at 0.02MPa.
[0129] The reason for adopting the above processing logic is that the minimum adjustment command of a single controller mainly reflects the equipment's resolution capability, while the total pressure setting increase of a complete continuous pressurization phase also includes the actual pressurization process that the current orifice segment can continuously complete without forming an effective lifting increase. By forming a median from multiple such actual results, the subsequent normal pressure adjustment scale can be derived from the execution record of the current orifice segment itself.
[0130] In S44, the grouting end candidate continuous segment is a data state name established by this invention to assist in the algorithm's termination judgment. Once the currently executing grouting pressure setpoint has reached the engineering design target grouting pressure, the current valid judgment period is only included in the grouting end candidate continuous segment if the pressure-flow change direction is neutral, the lifting change direction is not increasing, and the grouting pressure setpoint continues to reach the engineering design target grouting pressure.
[0131] Specifically, if in any one of the judgment cycles the filling direction or expansion direction, or the lifting change direction becomes increasing, or if the current grouting pressure setting value is lower than the engineering design target grouting pressure due to pressure reduction, the length of the candidate continuous segment at the end of the current grouting is immediately reset to zero. When the target pressure is reached again and all conditions are met simultaneously, the count restarts from length 1.
[0132] Furthermore, a complete continuous filling segment refers to a segment that has ended due to the appearance of a neutral or expanding direction before reaching the target grouting pressure, and whose final length is already determined. A continuous filling segment that is still ongoing and has not yet ended when the target pressure is reached is not considered for comparison. If multiple complete continuous filling segments exist, only the one whose end time is closest to reaching the target pressure is read.
[0133] Specifically, when the length of the candidate continuous segment at the end of grouting is greater than the length of the most recently completed continuous change segment, an algorithmic grouting end confirmation is generated; when the two are equal or the candidate segment is shorter, an algorithmic grouting end confirmation is not generated; when there is no complete continuous change segment before the target pressure is reached, an algorithmic grouting end confirmation is not generated separately using the candidate continuous segment.
[0134] Furthermore, the algorithm-based grouting completion confirmation is only one of the data control outputs of this invention and does not replace the actual grouting completion conditions specified in the applicable technical standards, design documents, or approved construction technical requirements of the current project. Before actually stopping grouting in the current borehole section, the target or maximum design pressure state specified by the project, the injection rate completion limit, the grout holding or pressure holding time, special geological conditions, and other completion conditions that the current project must meet should also be checked. If the algorithm-based completion confirmation occurs earlier than the statutory or design completion conditions of the project, normal grouting continues; if the project completion conditions have been met but this invention is designed as an additional intelligent control condition, the algorithm-based completion confirmation also needs to be generated simultaneously.
[0135] Specifically, the grouting termination injection rate limit is not calculated automatically by this invention based on historical continuous variation segments, but is determined according to the current grouting type, geological conditions, engineering design, on-site grouting tests, and applicable technical standards, and is written into the approved construction parameters for the current borehole segment. The system only reads and executes the approved parameters and does not use the same fixed termination injection rate across different grouting types.
[0136] For example, in an implementation scenario where the approved end parameter for curtain grouting is 1.0 L / min as the limit for the injection rate at the end of the current borehole section, actual grouting is only permitted to be stopped when the current net grout injection rate reaches this approved limit and other end conditions are met. Here, 1.0 L / min is derived from the applicable specifications and approved construction parameters of the project, not from the pressure-flow rate variation generated by this invention.
[0137] Furthermore, the minimum holding time is also a construction constraint, and its value is determined based on the current grouting type, geological conditions, on-site grouting test results, and applicable specifications and design documents. This invention does not use fixed empirical times to replace engineering specifications. The control system starts accumulating the holding time or grout-holding time according to the approved rules from the moment when the pressure and injection rate conditions specified in the current project are met; if the relevant engineering conditions fail during this period, the time is recalculated according to the approved construction rules.
[0138] For example, in an implementation scenario where grouting continues for 30 minutes after the approved construction parameters require reaching the specified pressure and injection rate, the 30-minute mark is directly read from the approved end parameters of the current project. Even if an algorithmic confirmation of grouting completion has already been established, grouting must not be stopped prematurely.
[0139] The reason for adopting the S44 logic is that the duration of the pressure-flow rate change can provide information on whether the current borehole section's state is stabilizing. However, the actual completion of the dam foundation curtain grouting is a matter of engineering construction quality control and also needs to meet engineering requirements such as injection rate, pressure, duration, and geological conditions. Therefore, this invention positions the continuous change segment algorithm as an additional intelligent judgment, rather than replacing the existing engineering grouting cessation standard with a new algorithm condition.
[0140] In the computer implementation process, the data processing module saves at least the current grouting hole segment identifier, the current grouting pressure setting value, the current pressure control status, the representative value benchmark of the grouting pressure after the most recent pressure adjustment, the representative value benchmark of the grouting flow rate after the most recent pressure adjustment, the current representative value of uplift deformation, the current direction of the continuous change segment, the current length of the continuous change segment, the most recently completed filling continuous change segment, the most recently completed expansion continuous change segment, the current set of pressure setting increases without uplift, the current pressure adjustment reference step size, and the current length of the candidate continuous segment for grouting end.
[0141] Specifically, after each new valid and complete discrimination result is formed, the following steps are executed sequentially: valid data check, representative value generation, pressure change direction determination, flow change direction determination, pressure-flow change direction determination, continuous change segment status update, reading of the most recent continuous change segment in the opposite direction, continuous segment length comparison, pressure control direction determination, lifting constraint, pressure adjustment amount determination, and engineering boundary check. Each process is completed by explicit data comparison, sorting, counting, and conditional branching, without calling prediction models that require training to determine their internal parameters.
[0142] Furthermore, after a new grouting section begins, the representative value benchmark, continuously changing sections, historically complete continuously changing sections, pressure increase without uplift setting, and candidate continuous sections for grouting termination from the previous section are all cleared. Simultaneously, the corresponding design and monitoring parameters are read based on the new section identifier. This avoids directly mixing the historical duration or pressure increase scale without uplift from different geological sections into the new section.
[0143] This invention also provides an intelligent grouting system for dam foundation seepage prevention curtains based on multivariate measurement, such as... Figure 6 As shown, the system includes the following physical and logical modules:
[0144] The multivariable measurement module is used to acquire grouting pressure sampling values, grouting flow rate sampling values reflecting the current grout injection rate of the grouting section, and uplift deformation sampling values; the data processing module is used to generate representative values of grouting pressure, grouting flow rate, and uplift deformation, determine the direction of pressure change, flow rate change, uplift change, and pressure-flow rate change, form the current continuous change segment, and obtain the continuous segment length comparison result; the adaptive grouting control module is used to determine the pressure control result based on the pressure-flow rate change direction, the continuous segment length comparison result, the uplift change direction, the pressure adjustment reference step size, and the engineering pressure boundary; the grouting execution module is used to receive the next grouting pressure setpoint and adjust the grouting pressure of the current section, while outputting the pressure adjustment start status, pressure setting status, and pressure adjustment end status.
[0145] In one embodiment, the pressure measuring device in the multivariable measurement module is set at the grouting pressure control position specified for the current project and establishes a time-synchronized data connection with the automatic grouting recording device. When using cyclic grouting, the flow measurement section can at least obtain the corresponding data for grout inlet and grout return, or directly obtain the overall calibrated net grout injection rate output; when using pure pressure grouting, the calibrated grout inlet flow rate can be used as the grout injection rate for the current borehole section.
[0146] Furthermore, in one embodiment, the uplift deformation measuring device is set at a location specified in the current engineering uplift monitoring scheme, and a stable benchmark is established before grouting. Uplift deformation data, pressure, and flow rate data use timestamps that correspond to a unified construction timeline to ensure that multivariate data from the same judgment process belong to the corresponding time range.
[0147] Specifically, in one implementation, the data processing module receives the active pressure adjustment status generated by the grouting execution module. After the active adjustment begins, the use of pressure and flow data for direction determination is paused; once the actual pressure reaches a stable condition again, the adjustment is determined to be over, and a new representative value benchmark is established using the first subsequent valid complete discrimination cycle.
[0148] Furthermore, in one embodiment, the adaptive grouting control module simultaneously reads the engineering design target grouting pressure, the engineering design maximum grouting pressure, the lower boundary of the engineering allowable pressure, the upper limit of the engineering allowable single pressure increase, the engineering allowable uplift deformation, the engineering end injection rate condition, and the minimum holding time. All of the aforementioned engineering parameters are provided by the approved construction parameters for the current borehole section; the adaptive grouting control module does not have the authority to modify the engineering safety boundaries automatically through online learning.
[0149] Specifically, in one implementation, after receiving a new pressure setpoint, the grouting execution module first changes the control output and continuously provides the current setpoint and actual pressure status to the data processing module. Only after the actual pressure enters the pressure stability tolerance and continues for a complete discrimination cycle does the pressure regulation transition to the end state, thereby preventing the controller command from stopping while the actual hydraulic system is still in the transition process, and thus preventing a re-determination of the direction.
[0150] The following uses a specific application scenario to integrate and verify the calculation logic and data flow process of each step in the above implementation method.
[0151] In this study, it is assumed that the current grouting section of a dam foundation seepage prevention curtain uses circulating cement grouting. Current engineering design documents and approved on-site grouting test results specify the initial grouting pressure for the current section as 2.40 MPa, the target grouting pressure as 3.00 MPa, the maximum grouting pressure as 3.20 MPa, the lower limit of the allowable pressure during normal automatic control as 2.00 MPa, and the upper limit of the allowable single pressure increase as 0.10 MPa. All of the aforementioned pressure values are directly derived from the approved construction parameters for the current section and are not calculated using real-time data in this invention.
[0152] Furthermore, the current uplift monitoring scheme, based on the allowable deformation of the dam foundation structure and on-site grouting tests, determines the allowable uplift deformation to be 0.10 mm. The approved grouting completion parameters for the current project also stipulate that, after meeting the corresponding design pressure conditions, the net grout injection rate of the current borehole section must reach the project-specified completion check limit of 1.0 L / min, and meet the approved pressure holding or grout shielding time condition of 30 minutes before the actual grouting can be considered complete. The values of 0.10 mm, 1.0 L / min, and 30 minutes are all derived from the current project design, on-site grouting tests, and approved construction technical parameters, and are used only to verify the control process in this application scenario.
[0153] Specifically, the pressure measurement error of the current pressure measuring equipment, after verification and on-site calibration, is determined to be 0.02 MPa; the flow measurement error of the circulating grouting inlet, outlet, and clean grout injection rate recording chain, after overall calibration, is determined to be 0.5 L / min; and the uplift deformation measuring equipment, after verification and displacement calibration after installation, has a uplift measurement error of 0.01 mm. The aforementioned three measurement errors are derived from the metrological and on-site calibration results of the accepted measuring chains, respectively.
[0154] Furthermore, the data acquisition equipment was officially configured for 10Hz during construction; this value comes from the actual acquisition configuration after equipment acceptance. Pre-construction data integrity verification indicated that at least 40 valid sampling records were required for the current discrimination cycle to ensure that the median of the cycle after data deletion remained within the corresponding measurement error range across all verification data. Therefore, the minimum number of valid samples was determined to be 40. Five stable trial runs of the discrimination cycle before construction yielded the shortest acceptable time windows of 4s, 5s, 5s, 6s, and 6s respectively, with a median of 5s. Therefore, a 5s discrimination cycle was used in this application scenario. The values of 40 and 5s both come from the aforementioned on-site verification process.
[0155] Furthermore, the maximum steady-state control deviations obtained from the five pressure step response tests of the current equipment were 0.02 MPa, 0.03 MPa, 0.03 MPa, 0.04 MPa, and 0.03 MPa, respectively, with the maximum value being 0.04 MPa. Therefore, the pressure stability tolerance configured for the current equipment is determined to be 0.04 MPa. This value is derived from the pressure control system response test before construction.
[0156] Furthermore, the equipment pressure regulation was repeatedly tested for candidate setting increments of 0.01 MPa, 0.02 MPa, and 0.05 MPa. The 0.01 MPa setting failed to consistently produce a repeatable setting change in all repeated tests specified in the current acceptance protocol, while the 0.02 MPa and 0.05 MPa settings were consistently executed. Therefore, the minimum executable pressure regulation increment for the equipment was determined to be 0.02 MPa. Since there was no pressure setting increase without lifting at the start of construction of the current borehole section, the initial pressure regulation reference step size was 0.02 MPa.
[0157] In S1, the current borehole section first establishes a stable control state according to the initial grouting pressure of 2.40 MPa designed in the engineering project. The data acquisition system obtains records of the actual pressure and the grout injection rate in two adjacent valid complete discrimination cycles, and generates no less than 40 valid data points in each discrimination cycle, representing the minimum number of valid samples. In this scenario, the actual records are complete, therefore the number of valid sampling records generated in each cycle meets the aforementioned data quality requirements.
[0158] Specifically, the pressure sampling values from the previous valid complete discrimination period, after being sorted, yielded a representative grouting pressure value of 2.40 MPa, while the current valid complete discrimination period yielded a representative grouting pressure value of 2.44 MPa. Both values are derived from the median of the valid pressure sampling values within their respective 5-second discrimination periods. The change between the two values is 0.04 MPa, exceeding the current pressure measurement error of 0.02 MPa, and given the relatively high current representative value, the pressure change is in the direction of increase.
[0159] Furthermore, after processing the grout injection rate data from the same two discrimination periods into a single grout inlet and outlet record chain, representative grout flow rates of 13.2 L / min and 12.4 L / min were obtained, respectively. Both values are derived from the median of the effective sampled values of the grout injection rate for their respective discrimination periods. The variation between the two values is 0.8 L / min, exceeding the flow measurement error of 0.5 L / min, and given the current low representative grout flow rate, the flow rate is decreasing.
[0160] Furthermore, the current uplift monitoring equipment has established a relative displacement benchmark before grouting. The representative uplift deformation values obtained from the previous and current effective judgment cycles are both 0.02 mm, and both values represent the cumulative uplift relative to the benchmark before grouting. Neither of these values results in a change exceeding the uplift measurement error of 0.01 mm, therefore the current uplift change direction is considered to be without effective change; at the same time, 0.02 mm is lower than the allowable uplift deformation of 0.10 mm for the current project.
[0161] In S2, since S1 has already determined that the pressure change direction is increasing and the flow rate change direction is decreasing, the current pressure-flow rate change direction is the filling direction. The current hole segment is a new grouting hole segment, and it did not inherit the extended continuous change segment of the previous hole segment. Therefore, the first filling direction forms the current continuous change segment with a length of 1.
[0162] Furthermore, in S3, since the current orifice segment has not yet formed a completed extended continuous change segment, the comparison result for the continuous segment length is no comparison. The current pressure-flow change direction is also in the filling direction, thus satisfying the start-up pressure-boosting condition, and the pressure control direction is pressure boosting. The lifting change direction has no effective change, and the cumulative lifting of 0.02mm is lower than the engineering allowable lifting deformation of 0.10mm; therefore, the pressure control direction after lifting constraint is still pressure boosting.
[0163] Specifically, in S4, since the current borehole section has not yet achieved a pressure increase without uplift, the pressure adjustment reference step size adopts the minimum executable pressure adjustment amount of 0.02 MPa obtained from the equipment verification before construction. The maximum allowable single pressure increase in the project is 0.10 MPa. The current adjustment reference step size of 0.02 MPa does not exceed this maximum limit, and the current pressure has sufficient remaining space from the project's design target grouting pressure. Therefore, the grouting pressure setting value is increased from the initial value of 2.40 MPa to 2.42 MPa. The 2.42 MPa is obtained by increasing the current setting value of 2.40 MPa by 0.02 MPa.
[0164] Furthermore, after the grouting equipment begins executing the new setpoint of 2.42 MPa, it enters active pressure regulation mode. After the controller stops changing the setpoint, it continues to check the actual pressure. Only when the actual pressure deviates from 2.42 MPa within the 0.04 MPa pressure stability tolerance obtained from the pre-construction test, and this condition is met continuously for one 5-second judgment cycle, is the active pressure regulation considered complete. All pressure and flow data during the active pressure regulation period are discarded.
[0165] Furthermore, in the first effective complete judgment cycle after the active pressure regulation ends, only new representative values for grouting pressure and grouting flow are established as benchmarks; after the second effective complete judgment cycle, the direction of change is re-judged. Assuming that the direction of change of the newly obtained effective pressure-flow rate is still the filling direction, the original continuous change segment of the current filling continues to increase, and the system can again increase the pressure according to the current 0.02MPa pressure adjustment reference step during the next allowable adjustment.
[0166] Furthermore, assuming that two consecutive pressure increases of 0.02 MPa belong to the same continuous pressure increase phase, the pressure setpoint before the start of this continuous pressure increase phase (2.40 MPa) eventually increases to 2.44 MPa. The total pressure setpoint increase for this phase is obtained by the difference between 2.44 MPa and 2.40 MPa, which is 0.04 MPa. Throughout the continuous pressure increase phase and after its end, no increase in the direction of uplift was observed, and the cumulative uplift was below the engineering allowable value. Therefore, 0.04 MPa is saved as the first pressure setpoint increase without uplift for the current borehole section, and the pressure adjustment reference step is updated to 0.04 MPa.
[0167] Furthermore, assuming that the subsequent continuous pressurization stage completes two pressurization cycles consecutively according to the updated 0.04 MPa pressure adjustment reference step, with a total pressure increase of 0.08 MPa for the stage, and no effective upward pressure increase occurs within or after the stage, then 0.08 MPa becomes the second pressure increase without upward pressure. At this point, the current orifice segment has already saved two data points: 0.04 MPa and 0.08 MPa. Following the median rule for even-numbered data, the average of the two middle values is 0.06 MPa. Therefore, the current pressure adjustment reference step is updated to 0.06 MPa. This 0.06 MPa is entirely calculated from the two continuous pressurization stages without upward pressure that have actually been executed in the current orifice segment.
[0168] After several pressure adjustment processes during construction, it is assumed that the current actual pressure setting value recorded by the grouting controller is 2.80 MPa. This 2.80 MPa is the actual setting value currently saved by the controller after the aforementioned successive pressure adjustments, not a newly assumed algorithm constant. The most recent complete continuous expansion change segment in the current historical record contains 4 valid expansion directions, therefore the length of the most recent complete continuous expansion change segment is 4; under a 5-second discrimination cycle, the total actual discrimination time length corresponding to the 4 valid discrimination cycles is 20 seconds.
[0169] Furthermore, since six filling directions are subsequently formed consecutively, the current continuous filling change segment length is 6, corresponding to an effective judgment time of 30 seconds under a 5-second judgment cycle. The length 6 is greater than the length 4 of the most recent complete extended continuous change segment, therefore the continuous segment length comparison result is longer, and the pressure control direction is pressurization.
[0170] Specifically, the current representative value of uplift deformation has not yet resulted in an increase in uplift measurement error exceeding 0.01 mm, and the cumulative uplift is below the engineering allowable 0.10 mm. Therefore, the pressure control direction after the uplift constraint continues to be pressure increase. The current pressure adjustment reference step has been updated from the aforementioned no-uplift pressure setting increase to 0.06 MPa. This value is lower than the engineering allowable single pressure increase limit of 0.10 MPa. Therefore, the grouting pressure setting value has increased from the current 2.80 MPa to 2.86 MPa. The 2.86 MPa is obtained by increasing 2.80 MPa by 0.06 MPa, and is still lower than the engineering design target grouting pressure of 3.00 MPa.
[0171] Furthermore, after the pressure adjustment is completed and a new representative benchmark is established, assuming that the subsequent injection rate of the net slurry results in an effective increase in the flow measurement error exceeding 0.5 L / min, the direction of flow rate change becomes increasing, and the direction of pressure-flow rate change becomes expanding. New pressure increases cease from the first expanding direction.
[0172] Furthermore, assume that the new extended continuous variation segment grows to 3 effective discrimination cycles, while the most recent complete filling continuous variation segment has a length of 6. The current length of 3 corresponds to a 15s effective discrimination time, and the historical length of 6 corresponds to a 30s effective discrimination time. Since 3 is not longer than 6, the pressure control direction remains unchanged, neither increasing nor immediately decreasing the pressure.
[0173] Furthermore, if the expansion direction forms four consecutive effective judgment cycles, the total length of the current continuous expansion segment increases from 3 to 7, corresponding to an effective judgment time of 35 seconds. Length 7 is already longer than the length 6 of the most recent complete filling continuous expansion segment, therefore the pressure control direction changes to pressure reduction. If the current lifting state does not trigger a safety event requiring an abnormal pressure relief procedure, normal pressure adjustment uses the current 0.06 MPa pressure adjustment reference step, and the grouting pressure setpoint decreases from 2.86 MPa to 2.80 MPa, where 2.80 MPa is obtained by subtracting 0.06 MPa from 2.86 MPa.
[0174] Continuing construction according to the same rules, the current borehole segment regains pressure through the continuous formation of subsequent filling directions, eventually reaching the target grouting pressure of 3.00 MPa specified in the engineering design documents. Before reaching the target pressure, the data processing module reads the most recent and completed continuous filling transition segment from the historical records. Assuming this transition segment consists of 37 consecutive effective filling directions, the length of the complete continuous filling transition segment is 37. Under the current 5-second discrimination cycle, 37 effective discrimination cycles correspond to 185 seconds of effective discrimination time; the length of 37 is directly derived from the actual direction count.
[0175] Furthermore, after reaching 3.00 MPa, only when the pressure-flow rate change direction remains neutral, the uplift change direction remains non-increasing, and the pressure setpoint consistently reaches 3.00 MPa, is a candidate continuous segment for grouting termination accumulated. Assuming all three conditions are met simultaneously for 37 consecutive valid judgment cycles, the length of the candidate continuous segment for grouting termination is 37, corresponding to an effective judgment time of 185 seconds. Since 37 is not greater than the length of the most recent complete filling continuous change segment (37), grouting termination confirmation is not generated at this time.
[0176] Furthermore, after all conditions are met simultaneously in the 38th valid discrimination cycle, the length of the candidate continuous segment for grouting termination increases to 38, corresponding to an effective discrimination time of 190 seconds. 38 is greater than the historical continuous variation segment length of 37 for complete filling, thus confirming the algorithmic grouting termination. Here, 38 is obtained from the actual number of discrimination cycles that continuously meet the conditions and is not part of the preset termination count.
[0177] Specifically, confirming the completion of grouting according to the algorithm does not mean stopping grouting directly at 190 seconds. This is because the current application scenario's approved completion parameters also require meeting the completion check condition of a grout injection rate of 1.0 L / min and an approved pressure holding or grout shielding condition of 30 minutes. The system continues grouting according to the actual grout injection rate and project time requirements. Only after these project completion conditions and other applicable requirements are met will the system issue an instruction to the grouting execution equipment to actually end the grouting of the current borehole segment.
[0178] Furthermore, if the pressure-flow rate change direction changes back to the expansion direction during the accumulation process of the candidate continuous grouting end segment, causing the grouting pressure setpoint to decrease from 3.00 MPa, the current candidate continuous grouting end segment is immediately reset to zero. When the grouting pressure subsequently rises back to the engineering design target pressure and again meets the conditions of neutral direction and no effective uplift, the count restarts from length 1. This avoids the logical contradiction of continuing to use the original end count even after the pressure has decreased, even if the target pressure has already been reached.
[0179] Furthermore, if the cumulative uplift during construction reaches the 0.10mm allowable uplift deformation approved by the current project, the algorithm will not wait for further comparison of the current continuous change segment length, nor will it process the pressure adjustment stepwise according to the ordinary 0.06MPa reference step. Instead, it will immediately suspend the normal adaptive pressure increase logic and execute the uplift anomaly handling procedure approved by the current project, which includes stopping the pressure increase, reducing the pressure, stopping the pump, or manual verification. This ensures that the patented algorithm is always under the project's safety constraints.
[0180] In summary, the values of 2.40MPa, 3.00MPa, 3.20MPa, 2.00MPa, 0.10MPa, 0.10mm, 1.0L / min, and 30min in the entire application scenario are all derived from the approved design, on-site grouting test, or construction parameters of the current project; 0.02MPa, 0.5L / min, and 0.01mm are derived from the verification and on-site calibration of the current pressure, grout injection rate, and lifting measurement chain, respectively; 10Hz is derived from the actual configuration of the data acquisition equipment; and the minimum effective sampling quantity of 40 is derived from the data before construction. According to integrity verification; the discrimination period of 5s is derived from the median of 5 stable trial operation results; the pressure stability tolerance of 0.04MPa is derived from the maximum qualified steady-state deviation of the pressure step response test; the minimum executable pressure adjustment of 0.02MPa is derived from repeated verification of the actuator; the pressure adjustment reference step sizes of 0.04MPa, 0.08MPa, and 0.06MPa obtained from the two are derived from the actual continuous pressure increase stage and lifting monitoring results of the current orifice section; the lengths of the continuous change section of 4, 6, 7, 37, and 38 are all derived from the actual effective pressure-flow change direction count.
[0181] The preferred embodiments of this disclosure have been described in detail above with reference to the accompanying drawings. However, this disclosure is not limited to the specific details of the above embodiments. Within the scope of the technical concept of this disclosure, various simple modifications can be made to the technical solutions of this disclosure, and these simple modifications all fall within the protection scope of this disclosure.
[0182] It should also be noted that the various specific technical features described in the above embodiments can be combined in any suitable manner without contradiction. To avoid unnecessary repetition, this disclosure will not describe the various possible combinations separately.
[0183] Furthermore, various different embodiments of this disclosure can be combined in any way, as long as they do not violate the spirit of this disclosure, they should also be regarded as the content disclosed in this disclosure.
[0184] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be covered within the scope of the claims and specification of the present invention.
Claims
1. A smart grouting method for dam foundation seepage prevention curtain based on multivariate measurement, characterized in that the method... include: The direction of pressure change is obtained while the grouting pressure setpoint remains constant; the direction of flow rate change is obtained in the same discrimination process corresponding to the direction of pressure change. The pressure-flow rate change direction is obtained from the pressure change direction and the flow rate change direction. Among them, when the flow rate change direction is decreasing and the pressure change direction is not decreasing, it is the filling direction; when the flow rate change direction is increasing, it is the expansion direction; and the rest are neutral directions. The length of the current continuous change segment is obtained based on the continuous and non-neutral pressure-flow change direction; the length of the most recent and completed continuous change segment in the opposite direction is obtained based on the current pressure-flow change direction. The comparison result of the continuous segment length is obtained based on the current continuous segment length and the continuous segment length in the opposite direction. If there is no continuous segment in the opposite direction, there is no comparison. The pressure control direction is determined by comparing the pressure-flow change direction and the continuous segment length. Specifically, in the filling direction, the pressure is increased when the continuous segment length comparison result is longer than or there is no comparison; in the expansion direction, the pressure is decreased when the continuous segment length comparison result is longer than; otherwise, the pressure is maintained. Adjust the grouting pressure setting value according to the pressure control direction.
2. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 1, characterized in that, The direction of pressure change is obtained while the grouting pressure setpoint remains constant; the direction of flow rate change is obtained in the same discrimination process corresponding to the direction of pressure change, including: Obtain representative values of grouting pressure; determine the direction of pressure change based on the changes in adjacent representative values of grouting pressure and the pressure measurement error; The representative value of grouting flow rate is obtained by using the same discrimination process corresponding to the direction of pressure change; the direction of flow rate change is obtained by the change of adjacent representative values of grouting flow rate and the flow rate measurement error.
3. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 2, characterized in that, The representative value of grouting flow rate is obtained based on the same discrimination process corresponding to the direction of pressure change, including: In circulating grouting, obtain the grout inlet flow rate sampling value; obtain the return flow rate sampling value based on the sampling time corresponding to the grout inlet flow rate sampling value; The slurry injection rate is obtained from the slurry inlet flow rate sampling value and the slurry return flow rate sampling value. The representative value of grouting flow rate is obtained from the median of the sampled values of the grout injection rate.
4. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 1, characterized in that, The length of the current continuous change segment is obtained based on the continuous, unidirectional, and non-neutral pressure-flow change direction, including: When filling or expansion directions appear consecutively, count the same directions consecutively. Stop the current count when a neutral direction or the filling direction and the expansion direction change with each other, and obtain the length of the current continuous change segment.
5. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 1, characterized in that, The direction of pressure change is obtained while the grouting pressure setpoint remains constant, including: During active pressure regulation, determine the direction of pressure change and obtain the end time of active pressure regulation; The first effective complete discrimination cycle is obtained based on the end time of active pressure regulation; a new representative value benchmark for grouting pressure is obtained based on the first effective complete discrimination cycle; The direction of pressure change is obtained based on the representative value of grouting pressure and the representative value of grouting pressure in the next effective complete discrimination cycle.
6. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 1, characterized in that, Obtain the length of the most recent and completed consecutive segment of change in the opposite direction based on the current pressure-flow change direction; The comparison results of continuous segment lengths are obtained based on the current continuous segment length and the continuous segment length in the opposite direction, including: When the current pressure-flow change direction is the filling direction, obtain the length of the most recent and completed extended continuous change segment; when it is the expansion direction, obtain the length of the most recent and completed continuous filling change segment. The length comparison result of the continuous segment is obtained based on the current continuous segment length and the obtained continuous segment length. When the former is greater than the latter, it is longer than; when the former is less than or equal to the latter, it is not longer than; when there is no most recent and ended continuous segment in the opposite direction, there is no comparison.
7. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 1, characterized in that, Adjust the grouting pressure setting value according to the pressure control direction, including: Obtain representative values of the lifting deformation; determine the direction of the lifting change based on the changes in adjacent representative values of lifting deformation and the lifting measurement error; The pressure control direction after lifting constraint is obtained based on the pressure control direction and the lifting change direction. Among them, when the pressure control direction is increasing and the lifting change direction is increasing, it is maintained; when the pressure control direction is maintaining or decreasing and the lifting change direction is increasing, it is decreasing; the rest are consistent with the pressure control direction. Adjust the grouting pressure setting value according to the pressure control direction after lifting constraint.
8. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 7, characterized in that, Adjust the grouting pressure setting value according to the pressure control direction after lifting constraint, including: The pressure setting increase is obtained based on the grouting pressure setting value before and after a single pressurization operation; The pressure setting increase is obtained without lifting based on the pressure setting increase and the lifting change direction corresponding to the pressurization operation. When at least one lifting change direction is formed and none of the lifting change directions are increases, the pressure setting increase is retained. The pressure adjustment reference step is obtained based on the median of the pressure increase without lifting in the current grouting hole section. When the pressure increase without lifting has not yet been formed, the minimum executable pressure adjustment of the equipment is adopted. The next grouting pressure setting value is obtained based on the pressure control direction and pressure adjustment reference step size after the lifting constraint.
9. The intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement according to claim 7, characterized in that, After adjusting the grouting pressure setting value according to the pressure control direction after lifting constraint, it also includes: While the current grouting pressure setpoint continues to reach the engineering design target grouting pressure, the length of the candidate continuous segment for grouting termination is obtained by counting the continuous discrimination cycles that conform to the neutral direction and whose uplift change direction is not increasing, based on the pressure-flow change direction and the uplift change direction; the counting is restarted when the current grouting pressure setpoint is lower than the engineering design target grouting pressure. The algorithm confirms the end of grouting based on the length of the candidate continuous segment for grouting completion and the length of the most recent and completed continuous segment of complete filling. The actual grouting end command is obtained based on the algorithm's grouting end confirmation and the engineering grouting end conditions.
10. A smart grouting system for dam foundation seepage prevention curtain based on multivariate measurement, characterized in that, The system is used to implement the intelligent grouting method for dam foundation seepage prevention curtain based on multivariate measurement as described in any one of claims 1 to 9. The system includes a multivariate measurement module, a data processing module, an adaptive grouting control module, and a grouting execution module. The multivariable measurement module is used to acquire grouting pressure sampling values, grouting flow sampling values, and uplift deformation sampling values; The data processing module is used to determine the direction of pressure change based on the grouting pressure sampling value and the direction of flow change based on the grouting flow rate sampling value. The data processing module is also used to obtain the pressure-flow change direction based on the pressure change direction and the flow change direction, and to obtain the length of the current continuous change segment based on the continuous unidirectional and non-neutral pressure-flow change direction; The data processing module is also used to obtain the length of the most recent and completed continuous change segment in the opposite direction based on the direction of pressure-flow change, and to obtain a comparison result of the continuous segment length based on the current continuous change segment length and the length of the continuous change segment in the opposite direction. The adaptive grouting control module is used to obtain the pressure control direction based on the comparison results of the pressure-flow change direction and the continuous section length, and to obtain the grouting pressure setpoint based on the pressure control direction. The grouting execution module is used to adjust the grouting pressure of the current grouting hole section according to the grouting pressure setting value.