A method and system for full life-cycle data management of electricity metering boxes

By acquiring material and environmental stress data of the components of the electricity metering box and dynamically correcting the maintenance period based on real-time operating data, the problems of distorted life assessment and mismatched resource scheduling of the electricity metering box are solved, thus improving the accuracy and efficiency of the full life cycle management of the electricity metering box.

CN123069152APending Publication Date: 2026-11-10JIANGXI XINGXIN PLASTIC IND DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611264276.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-20
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing technologies struggle to account for the attenuation differences of different materials under various environmental stresses and the impact of real-time operating conditions on energy metering boxes, leading to distorted lifespan assessments and mismatched maintenance resource scheduling, which affects the accuracy and efficiency of energy metering box lifecycle management.

Method used

By acquiring the material type and historical environmental stress data of each equipment component in the power metering box, the initial degree of loss is determined. Combined with real-time external weather and power load data, the availability period of the maintenance parts is dynamically adjusted, and a maintenance scheduling plan is generated according to the risk level, forming a closed-loop management of status assessment, risk warning and resource scheduling.

Benefits of technology

It enables accurate assessment of the wear and tear status of components in the power metering box, avoids lifespan prediction distortion, improves the timeliness of maintenance response and the rationality of resource allocation, and forms a continuous iterative optimization of the entire life cycle management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069152A_ABST
    Figure CN123069152A_ABST
Patent Text Reader

Abstract

This application relates to the field of power equipment condition monitoring technology, and discloses a method and system for managing the entire life cycle data of an energy metering box. The method includes: determining the initial loss level of each equipment component based on the attenuation characteristics of multiple materials, screening target maintenance locations, and determining the initial usable period; acquiring real-time external meteorological data and transient power load data, determining the theoretical temperature rise reference value, and comparing it with real-time operation monitoring data to obtain thermal deviation characteristics; analyzing the evolution trend of the thermal deviation characteristics according to the monitoring time sequence, determining the nonlinear deterioration trend factor of the target maintenance location, and dynamically correcting the initial usable period to obtain the target usable period; determining the risk level and target maintenance time window when preset risk triggering conditions are met; matching the target maintenance time window with heterogeneous maintenance resources, generating maintenance scheduling early warning information, and updating the life cycle data. This application improves the accuracy of energy metering box life assessment and the efficiency of maintenance resource scheduling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power equipment condition monitoring technology, and in particular to a method and system for managing the full life cycle data of an energy metering box. Background Technology

[0002] As a crucial component of electricity metering equipment, the electricity metering box typically operates outdoors for extended periods. Internally, it comprises various equipment components, including the outer casing, sealing parts, insulation components, and electrical connection parts. These components differ in material and function, exhibiting varying aging and wear patterns under the long-term influence of environmental factors such as temperature, humidity, ultraviolet radiation, and salt spray. Furthermore, the continuous changes in electrical load and external weather conditions during operation cause dynamic variations in the temperature rise of the internal components. Current technologies typically assess equipment wear based on its service life, periodic inspection results, or single operating parameters. This approach struggles to account for the varying degradation levels of different materials and the impact of real-time operating conditions on the actual wear process, leading to discrepancies between the estimated remaining service life and the actual operating status.

[0003] Furthermore, existing maintenance management typically handles equipment status assessment, risk warning, and maintenance resource scheduling separately. After an equipment anomaly is detected, manual coordination is still required, taking into account information such as personnel, spare parts, tools, and spatial location. This makes it difficult to formulate a resource scheduling plan that is appropriate for the maintenance timeframe based on the degree of equipment risk. Moreover, the operational status after maintenance is not effectively fed back into the life assessment process, resulting in a lack of continuous updates to equipment life data and affecting the accuracy and efficiency of the full life cycle management of the electricity metering box. Summary of the Invention

[0004] To address the aforementioned technical problems, this application provides a method and system for managing the full lifecycle data of electricity metering boxes, which solves the problems of distorted lifecycle assessment of electricity metering boxes and mismatch between maintenance timing and resource scheduling.

[0005] In a first aspect, this application provides a method for managing the entire lifecycle data of an electricity metering box, the method comprising: Step S1: Obtain the material type and historical environmental stress data of each equipment component in the power metering box, determine the initial wear level of each equipment component based on the multi-material attenuation characteristics, screen the target maintenance parts and determine the initial usable period. Step S2: Obtain real-time external meteorological data and transient power load data of the power metering box, determine the theoretical temperature rise reference value of the target maintenance part under the current working conditions, and compare the real-time operation monitoring data of the target maintenance part with the theoretical temperature rise reference value to obtain the thermal deviation characteristics. Step S3: Analyze the evolution trend of thermal deviation characteristics according to the monitoring time sequence, determine the nonlinear deterioration trend factor of the target maintenance part, calculate the equivalent life consumption degree of the target maintenance part, and dynamically correct the initial available period to obtain the target available period; Step S4: When the available period of the target meets the preset risk triggering conditions, determine the risk level according to the type and performance degradation status of the target maintenance part, and determine the target maintenance time window according to the risk level; Step S5: Based on the maintenance resource requirement attributes corresponding to the target maintenance part, match the target maintenance time window with the spatial location, available time and maintenance capabilities of heterogeneous maintenance resources, generate maintenance scheduling early warning information, and update the life cycle data of the target maintenance part.

[0006] Secondly, this application provides a full life-cycle data management system for electricity metering boxes, the system comprising: The preliminary screening module is used to obtain the material type and historical environmental stress data of each equipment component in the power metering box, determine the initial wear degree of each equipment component based on the multi-material attenuation characteristics, screen the target maintenance parts and determine the initial usable period. The deviation analysis module is used to acquire real-time external meteorological data and transient power load data of the power metering box, determine the theoretical temperature rise reference value of the target maintenance part under the current operating conditions, and compare the real-time operation monitoring data of the target maintenance part with the theoretical temperature rise reference value to obtain the thermal deviation characteristics. The dynamic correction module is used to analyze the evolution trend of thermal deviation characteristics according to the monitoring time sequence, determine the nonlinear deterioration trend factor of the target maintenance part, calculate the equivalent life consumption degree of the target maintenance part, and dynamically correct the initial available period to obtain the target available period. The risk level determination module is used to determine the risk level based on the type and performance degradation status of the target maintenance part when the available life of the target meets the preset risk triggering conditions, and to determine the target maintenance time window based on the risk level. The early warning update module is used to match the target maintenance time window with the spatial location, available time and maintenance capability of heterogeneous maintenance resources according to the maintenance resource demand attributes corresponding to the target maintenance part, generate maintenance scheduling early warning information, and update the life cycle data of the target maintenance part.

[0007] Compared with the prior art, the beneficial effects of the present invention are at least as follows: This application constructs a full-chain management architecture, from initial benchmark anchoring, real-time deviation perception, dynamic lifespan correction, risk classification and determination to closed-loop resource scheduling. This architecture enables the assessment of the loss status of each component in the energy metering box to take into account the differential attenuation mechanisms of various materials and the coupling effects of multiple environmental stresses, effectively avoiding lifespan prediction distortions caused by using uniform aging standards or ignoring the dynamic impact of real-time operating conditions. Simultaneously, this application quantitatively compares the dynamically corrected target availability period with the risk trigger threshold, and comprehensively determines the risk level and maintenance time window by combining the degree of fault impact and performance degradation rate. Furthermore, it generates an executable scheduling scheme based on the maintenance resource demand attributes and the spatial location, availability, and maintenance capabilities of heterogeneous maintenance resources through multi-constraint matching, achieving a precise mapping from status perception to maintenance decision-making. In addition, this application re-acquires operational monitoring data after maintenance and compares it with pre-maintenance data to determine the degree of maintenance recovery, thereby updating lifespan data. This forms a complete closed loop of status assessment, risk warning, resource scheduling, and maintenance feedback, providing continuous iterative optimization data support for the full lifespan management of the energy metering box, significantly improving the timeliness of maintenance response and the rationality of resource allocation. Attached Figure Description

[0008] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0009] Figure 1 This is a flowchart illustrating a method for managing the entire lifecycle data of an electricity metering box, as described in an embodiment of this application. Figure 2 This is a schematic diagram illustrating the principle of thermal deviation feature extraction in an embodiment of this application. Figure 3 This is a schematic diagram illustrating the process of maintaining resource matching and scheduling early warning in an embodiment of this application; Figure 4 This is a schematic diagram of the structure of a full life cycle data management system for an electricity metering box according to an embodiment of this application. Detailed Implementation

[0010] This application provides a method and system for managing the entire lifecycle data of an electricity metering box. The terms "first," "second," "third," "fourth," etc. (if present) in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments described herein can be implemented in a sequence other than that illustrated or described herein. Furthermore, the terms "comprising" or "having" and any variations thereof are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or device that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or devices.

[0011] For ease of understanding, the specific process of the embodiments of this application is described below. Please refer to [link / reference]. Figure 1 The method for managing the full lifecycle data of an electricity metering box in this application includes: Step S1: Obtain the material type and historical environmental stress data of each equipment component in the power metering box, determine the initial wear level of each equipment component based on the multi-material attenuation characteristics, screen the target maintenance parts and determine the initial usable period.

[0012] In step S1, determining the initial wear level of each equipment component based on the attenuation characteristics of multiple materials includes: matching corresponding environmental sensitivity features to each equipment component according to the material type, and extracting target stress data corresponding to the environmental sensitivity features from historical environmental stress data; converting the target stress data into equivalent damage quantities representing the degree of environmental stress according to the attenuation response relationship corresponding to different materials; fusing the equivalent damage quantities based on the coupling relationship between various types of environmental stresses to obtain the cumulative damage characterization value of each equipment component; and normalizing and mapping the cumulative damage characterization value according to the life attenuation benchmark corresponding to the material type to obtain the initial wear level of each equipment component.

[0013] Specifically, it is necessary to obtain the material type and historical environmental stress data of each component inside the electricity metering box. Since the electricity metering box is exposed to the outdoor environment for extended periods, the different materials used in its internal components—such as the outer plastic casing, sealing strips, internal wiring insulation, and metal connectors—each have varying sensitivities to environmental stresses such as temperature, humidity, ultraviolet radiation, and salt spray. Using a uniform aging assessment standard would fail to accurately reflect the true wear and tear of each component.

[0014] To this end, this application matches corresponding environmentally sensitive characteristics to each equipment component based on its material type, and extracts target stress data corresponding to these environmentally sensitive characteristics from acquired historical environmental stress data. Specifically, the historical environmental stress data is multi-dimensional time-series data collected by environmental monitoring units deployed at or near the installation location of the electricity metering box, including environmental parameters of different dimensions such as temperature, relative humidity, ultraviolet radiation intensity, and salt spray concentration.

[0015] For the outer plastic material, its environmental sensitivity characteristics are mainly ultraviolet radiation intensity and temperature. Therefore, time-series data of ultraviolet radiation intensity and temperature are extracted from historical environmental stress data as target stress data. For the sealing strip material, its environmental sensitivity characteristics are mainly temperature cycle changes and humidity levels. Therefore, time-series data of temperature and relative humidity are extracted from historical environmental stress data as target stress data. For the metal connector material, its environmental sensitivity characteristics are mainly salt spray concentration and humidity levels. Therefore, time-series data of salt spray concentration and relative humidity are extracted from historical environmental stress data as target stress data. The target stress data is a subset of environmental parameters directly related to the aging mechanism of the material, specifically selected from historical environmental stress data based on the sensitivity of the equipment component material to environmental stress. Through this targeted data extraction method, the stress factors that play a dominant role in the aging of each component can be screened from massive amounts of historical environmental data, avoiding interference from irrelevant data.

[0016] Considering the different physical dimensions of stress in different environments, directly performing algebraic operations on stress data with different dimensions would result in calculations lacking physical meaning due to the inconsistency in dimensions. Therefore, this application converts target stress data into equivalent damage quantities representing the degree of environmental stress according to the attenuation response relationship corresponding to different materials, thus unifying different types of environmental stress into a damage measurement space for characterization. Specifically, the equivalent damage quantity refers to the contribution of a specific environmental stress to the material performance degradation of equipment components within a unit time or unit exposure period. The basic idea of ​​the conversion is to use the cumulative value of the ultimate stress that a material can withstand within its design service life as a normalization benchmark, and map the actual monitored real-time or historical stress data to the damage contribution ratio of the current stress relative to this benchmark according to the stress-damage mapping relationship corresponding to that material.

[0017] For the outer plastic material, the ultraviolet radiation intensity time series data are converted into photo-oxidation equivalent damage time series data based on its photo-aging decay response relationship. For the sealing strip material, the temperature cycle change data are converted into thermal fatigue equivalent damage time series data based on its thermo-oxidative aging decay response relationship. For the metal connector material, the salt spray concentration and humidity level data are converted into corrosion equivalent damage time series data based on its electrochemical corrosion decay response relationship. Through the above conversion, the environmental stress data with different dimensions are uniformly converted into equivalent damage quantities with the same physical meaning, creating conditions for subsequent multi-stress fusion.

[0018] In actual operating environments, various environmental stresses do not act independently on equipment components, but rather coexist and influence each other. Simply adding the equivalent damage quantities arithmetically would ignore the aforementioned coupling enhancement effect, leading to a significant deviation of the cumulative damage characterization value from the actual aging process. Therefore, this application further fuses the equivalent damage quantities based on the coupling relationship between various environmental stresses to obtain the cumulative damage characterization value for each equipment component.

[0019] The coupling effect is quantified using a pre-determined coupling influence coefficient, which is determined through comparative experiments. Specifically, for each material type, several test groups are set up. The first group of samples undergoes aging tests under a single environmental stress, while the second group of samples undergoes aging tests under the combined action of a first environmental stress at the same level and a pre-determined second environmental stress. All other test conditions for the two groups are identical. The accelerated aging time required for both groups of samples to reach the same level of performance degradation is recorded. The ratio of the time required for the second group to the time required for the first group is determined as the coupling influence coefficient of the damage caused by the second environmental stress on the first environmental stress. The pre-determined second environmental stress is determined based on the annual average statistical characteristics of the actual installation environment of the power metering box; for example, it is taken as the average value of the annual monitoring data of this environmental stress at the installation location.

[0020] In the specific fusion process, the equivalent damage quantities corresponding to each environmental stress are first normalized to ensure they are at the same dimensional level. Then, weighting coefficients are assigned to each equivalent damage quantity based on the contribution of each environmental stress to the aging of a specific material. The weighted summation result is then added to the coupling correction value to obtain the cumulative damage characterization value. The coupling correction value is jointly determined by the coupling influence coefficient and each equivalent damage quantity; specifically, the coupling influence coefficient is subtracted by 1 and then multiplied by the corresponding combination of equivalent damage quantities. The positive or negative value indicates either coupling amplification or suppression, respectively. The cumulative damage characterization value of each equipment component is obtained through the above fusion calculation.

[0021] After obtaining the cumulative damage characterization values ​​of each equipment component, these values ​​are normalized and mapped according to the lifespan decay benchmark corresponding to the material type, thus obtaining the initial wear level of each equipment component. Specifically, the lifespan decay benchmark is a cumulative damage limit value pre-determined for each material. The cumulative damage characterization value is divided by the corresponding material's lifespan decay benchmark to obtain an initial wear level value ranging from 0 to 1, where 0 indicates no wear has occurred and 1 indicates failure. Through the above processing, each equipment component inside the energy metering box is ultimately assigned an initial wear level value that matches its material characteristics and actual service environment, providing an accurate data basis for subsequent selection of target maintenance locations and determination of initial service life.

[0022] The step S1, which involves screening target maintenance locations and determining their initial availability period, includes: determining the degree of damage propagation impact of each equipment component based on its initial wear level and the damage coupling relationship between different equipment components; determining the maintenance priority of each equipment component based on its initial wear level and the degree of damage propagation impact, and identifying equipment components whose maintenance priority meets the preset screening conditions as target maintenance locations; and determining the initial availability period of the target maintenance location based on its initial wear level and the total operating time from brand new to failure under standard environmental conditions.

[0023] Specifically, after obtaining the initial wear and tear of each equipment component, it is necessary to further screen out the target maintenance locations and determine their initial service life. The equipment components inside the electricity metering box do not operate in isolation, but are interconnected through physical connections, heat conduction, and electrical coupling. Performance degradation in one component may accelerate the damage process of adjacent components. Therefore, when determining maintenance locations, it is not sufficient to rely solely on the initial wear and tear of each individual component; the damage coupling relationships between different equipment components must also be considered.

[0024] Therefore, based on the initial wear level of each equipment component and the damage coupling relationship between different equipment components, the degree of damage propagation impact of each equipment component is determined. The damage coupling relationship between different equipment components is quantified and characterized by a pre-determined damage transfer coefficient. The damage transfer coefficient is determined separately for each pair of equipment components with physical contact, heat conduction, or electrical connection paths. The determination method is as follows: the first component is pre-aged to a preset wear level and then combined with the second component. An aging test is conducted under preset environmental stress conditions. The first accelerated aging time required for the second component to reach the preset performance degradation level is recorded. At the same time, the second component is placed alone under the same preset environmental stress conditions for an aging test. The second accelerated aging time required for the second component to reach the same preset performance degradation level is recorded. The ratio of the first accelerated aging time to the second accelerated aging time is determined as the damage transfer coefficient of the first component to the second component. This coefficient reflects the degree to which the wear state of the first component accelerates the aging process of the second component. The larger the coefficient, the stronger the acceleration effect. After determining the damage propagation coefficient between each pair of components, the product of the initial wear level of each component and its damage propagation coefficient is used as the degree of damage propagation influence of each component on its adjacent components. The damage propagation influence of a particular component is taken as the maximum value of its damage propagation influence on its adjacent components, which is used to calculate the subsequent maintenance priority. The larger the value, the easier it is for the degradation of the component to propagate to adjacent components and cause accelerated damage to the latter.

[0025] After determining the extent of damage propagation impact on each equipment component, the maintenance priority of each component is determined based on the initial loss level and the extent of damage propagation impact. Specifically, the initial loss level and the extent of damage propagation impact are normalized, mapping their values ​​to a range of 0 to 1. After normalization, weight coefficients are assigned to the normalized initial loss level and the normalized extent of damage propagation impact, with the sum of the two weight coefficients being 1. The specific values ​​of the weight coefficients can be determined based on the actual operating conditions of the energy metering box and maintenance strategy preferences. For example, if the impact of the component's own degradation state on maintenance decisions is emphasized, a larger weight coefficient is set for the initial loss level; if the accelerated impact of component degradation on adjacent components is emphasized, a larger weight coefficient is set for the extent of damage propagation impact. Finally, the maintenance priority of each equipment component is obtained.

[0026] After calculating the maintenance priority of each equipment component, the equipment components whose maintenance priority meets the preset screening criteria are identified as target maintenance locations. The preset screening criteria can be components whose maintenance priority exceeds a set threshold, or several components ranked first according to their maintenance priority from high to low. When determining the initial usable life of the target maintenance location, the initial wear level of the target maintenance location is first obtained. This initial wear level is a normalized value obtained by dividing the cumulative damage characterization value by the corresponding material's lifespan attenuation benchmark. Its value ranges from 0 to 1, representing the proportion of the component's consumed lifespan to its total lifespan. Then, the total runtime corresponding to the material operating from a brand-new state to reaching a preset failure state under standard environmental conditions is retrieved. This total runtime is a time-dimensional parameter, obtained in advance through standard accelerated aging tests. The standard environmental conditions refer to constant environmental conditions where temperature and humidity parameters are within the preset standard atmospheric index range and there are no ultraviolet radiation or salt spray corrosion factors. These environmental conditions are set with reference to relevant standard atmospheric conditions and combined with the annual average statistical characteristics of the actual installation environment of the power metering box, and are used as a reference benchmark for uniformly calibrating the total runtime of each material. Subsequently, the initial wear level is subtracted from the value 1 to obtain the remaining lifespan ratio. The remaining lifespan ratio is then multiplied by the total operating time, and the resulting product is the estimated remaining lifespan of the target maintenance part under standard environmental conditions. This estimated value is defined as the initial usable lifespan of the target maintenance part.

[0027] For cases where the initial wear level is 0, such as newly commissioned equipment components, the remaining lifespan ratio is 1. In this case, the initial usable life equals the total operating time of the material under standard environmental conditions, i.e., the design life in its brand-new state. Conversely, an initial wear level of 1 indicates that the equipment component has completely failed. In this case, the remaining lifespan ratio is 0, and the initial usable life is zero, meaning the component has no remaining service life and requires immediate maintenance or replacement. By utilizing the product of the initial wear level and the total operating time under standard environmental conditions, the initial usable life of each equipment component under standard environmental conditions can be quickly and accurately determined, providing a reliable initial baseline value for subsequent dynamic adjustments based on real-time operating conditions.

[0028] Step S2: Obtain real-time external meteorological data and transient power load data from the power metering box, determine the theoretical temperature rise reference value of the target maintenance part under the current operating conditions, and compare the real-time operation monitoring data of the target maintenance part with the theoretical temperature rise reference value to obtain the thermal deviation characteristics.

[0029] In step S2, determining the theoretical temperature rise reference value of the target maintenance part under the current operating conditions includes: extracting environmental characteristics that affect the heat exchange state of the target maintenance part from real-time external meteorological data, and determining the load heating characteristics corresponding to the target maintenance part based on transient power load data; constructing the current operating condition characteristics based on the environmental characteristics and load heating characteristics, and matching the benchmark thermal response corresponding to the current operating condition characteristics from the preset normal thermal response benchmark. Thermal response compensation is performed based on the difference between the current operating conditions and the baseline thermal response to obtain the theoretical temperature rise reference value of the target maintenance part under the current operating conditions.

[0030] Specifically, after determining the target maintenance location and its initial usable life through step S1, considering that external weather conditions and electrical load are constantly changing during the actual operation of the electricity metering box, these real-time changes will significantly affect the actual temperature rise of the target maintenance location, thereby affecting its true wear and tear process. If maintenance decisions are made solely based on the initial usable life determined in step S1 based on historical environmental stress data, the life assessment will be biased because it fails to reflect the dynamic impact of real-time operating conditions. Therefore, this application further obtains real-time external weather data and transient electrical load data of the electricity metering box to perform real-time quantitative assessment of the operating status of the target maintenance location.

[0031] Real-time external meteorological data consists of environmental parameters collected in real time by meteorological monitoring units deployed at or near the installation location of the electricity metering box. These parameters include ambient temperature, wind speed, and solar radiation intensity, which affect equipment heat dissipation and heat exchange efficiency. Transient power load data consists of current time-series data collected in real time by load monitoring units deployed inside the electricity metering box or on the connection line. This data characterizes the Joule heating effect generated by current flowing through the components of the equipment inside the electricity metering box. The theoretical temperature rise reference value refers to the theoretical temperature rise of the target maintenance location under normal operating conditions under current real-time external meteorological and transient power load conditions. This value serves as a benchmark for judging whether the current actual operating state of the target maintenance location deviates from the normal range.

[0032] When determining the theoretical temperature rise reference value, environmental characteristics affecting the heat exchange state of the target maintenance site are first extracted from real-time external meteorological data. These environmental characteristics refer to the combination of real-time external meteorological parameters that influence the heat exchange process between the target maintenance site and the external environment, including real-time wind speed and real-time solar radiation intensity. Real-time wind speed affects the convective heat transfer coefficient, and real-time solar radiation intensity affects the additional external heat radiation received by the target maintenance site. Simultaneously, the load heating characteristics corresponding to the target maintenance site are determined based on transient electrical load data. These load heating characteristics refer to the Joule heating effect generated by the current currently flowing through the target maintenance site; their value is related to the square of the current and the equivalent resistance of the site. The higher the current or the higher the equivalent resistance, the higher the load heating characteristic value.

[0033] After extracting environmental characteristics and load heating characteristics, the two are combined to construct the current operating condition characteristics. Following this, a baseline thermal response corresponding to the current operating condition characteristics is matched from a pre-established normal thermal response baseline. The normal thermal response baseline is a pre-established database or mapping relationship set that records the normal temperature rise reference values ​​of the target maintenance part under various combinations of operating condition characteristics. The normal temperature rise reference value refers to the theoretically expected temperature rise value of the target maintenance part under a specific combination of operating condition characteristics, without any abnormal losses. This normal thermal response baseline can be established using thermal characteristic test data before the equipment leaves the factory. Specifically, before the equipment leaves the factory, the target maintenance part is placed in a controllable temperature and humidity test chamber, and multiple combinations of operating conditions with different wind speeds, different simulated solar radiation intensities, and different current flows are applied. After the temperature rise reaches a steady state, the steady-state temperature rise value under each set of operating conditions is recorded, forming multiple sets of calibration data points. For operating condition combinations not directly tested, a multidimensional linear interpolation method is used to fill the operating condition combinations between the calibration data points. When a parameter in a certain dimension of the actual operating condition exceeds the maximum or minimum value range covered by the calibration test, the normal temperature rise reference value corresponding to the calibration boundary point closest to the actual operating condition is used as the extrapolation benchmark value for that dimension, and no further interpolation extrapolation beyond the calibration range is performed. If multiple parameters in a certain dimension exceed the boundary at the same time, the boundary benchmark value is determined separately for each dimension, and then the normal temperature rise reference value corresponding to the point with the smallest comprehensive distance among the boundary calibration points is selected using the nearest neighbor method.

[0034] The system finds a reference value for the normal temperature rise corresponding to a combination of operating conditions that is the same as or similar to the current operating condition from the preset normal thermal response benchmark, and uses this value as the benchmark thermal response corresponding to the current operating condition. For example, if the current operating condition includes a wind speed of 2 m / s and a solar radiation intensity of 500 W / m², the system will use this reference value. 2 The characteristic value of load heating is 1.2 Ω·A. 2Then, the record that best matches the above combination of operating conditions is found from the normal thermal response benchmark. The corresponding normal temperature rise reference value recorded in this record is 8.5℃. This 8.5℃ is then determined as the benchmark thermal response corresponding to the current operating conditions. Through the above matching method, the normal temperature rise benchmark that the target maintenance part should have under the current real-time operating conditions can be quickly obtained.

[0035] Because real-time external meteorological data and transient power load data change continuously, the current operating condition characteristics may not be completely consistent with the combination of operating condition characteristics recorded in the normal thermal response benchmark. If the benchmark thermal response corresponding to the nearest operating condition is directly adopted, matching errors will be introduced due to the operating condition differences. Therefore, this application further compensates for the thermal response based on the operating condition differences between the current operating condition characteristics and the benchmark thermal response. Specifically, the operating condition differences between the current operating condition characteristics and the operating condition characteristics corresponding to the benchmark thermal response are first determined. The operating condition difference is a multi-dimensional vector, and the value of each dimension represents the difference between the current operating condition characteristics and the benchmark operating condition characteristics of that dimension. Then, the difference of each dimension in the operating condition difference is multiplied by its corresponding sensitivity coefficient to obtain the temperature rise compensation component of each dimension. The sensitivity coefficient is a mapping coefficient pre-calibrated for each dimension of the operating condition parameter. Its value reflects the degree of influence of the unit change of the operating condition parameter in that dimension on the temperature rise of the target maintenance part. This sensitivity coefficient can be pre-determined through theoretical analysis of the thermal characteristics of the target maintenance part or finite element simulation calculation. After the sensitivity coefficients are calibrated, the dimensions of the temperature rise compensation components in each dimension are all in temperature units. The temperature rise compensation components in each dimension are summed to obtain the total compensation. Finally, the total compensation is superimposed on the reference thermal response to obtain the theoretical temperature rise reference value of the target maintenance location under the current operating conditions. Since real-time external meteorological data and transient power load data change continuously over time, the current operating conditions at each sampling moment are different. Therefore, the theoretical temperature rise reference value is essentially a continuous sequence corresponding to the time axis, with each sampling moment having a theoretical temperature rise reference value corresponding to the operating conditions at that moment. Through the above compensation process, the final theoretical temperature rise reference value can accurately match the current real-time operating conditions.

[0036] In step S2, obtaining the thermal deviation characteristics includes: extracting the actual temperature rise change sequence of the target maintenance part from the real-time operation monitoring data, and calculating the difference with the theoretical temperature rise reference value according to the time correspondence to obtain the temperature rise deviation sequence; and extracting the deviation amplitude, deviation duration and thermal response hysteresis degree from the temperature rise deviation sequence to obtain the thermal deviation characteristics of the target maintenance part.

[0037] Specifically, such as Figure 2The diagram illustrates the principle of thermal deviation feature extraction. After obtaining the theoretical temperature rise reference value, real-time operational monitoring data of the target maintenance part is acquired. The actual temperature rise change sequence of the target maintenance part is extracted from this real-time operational monitoring data. The actual temperature rise change sequence is a data sequence composed of multiple actual temperature rise values ​​arranged in chronological order, reflecting the temperature rise trajectory of the target maintenance part over time during recent operation. After extracting the actual temperature rise change sequence, the difference between it and the theoretical temperature rise reference value is calculated according to the time correspondence. Specifically, for each sampling moment, the actual temperature rise value at that moment is subtracted from the corresponding theoretical temperature rise reference value to obtain the temperature rise deviation value at that moment. Arranging the temperature rise deviation values ​​of multiple consecutive sampling moments in chronological order yields the temperature rise deviation sequence. Each value in the temperature rise deviation sequence reflects the degree of deviation between the actual temperature rise state and the theoretically expected temperature rise state at that moment; a positive value indicates that the actual temperature rise is higher than the theoretical expectation, and a negative value indicates that the actual temperature rise is lower than the theoretical expectation.

[0038] After obtaining the temperature rise deviation sequence, three feature parameters are extracted from it: deviation amplitude, deviation duration, and thermal response hysteresis. These three feature parameters are then combined to obtain the thermal deviation characteristics of the target maintenance part. The deviation amplitude is used to characterize the maximum severity of the deviation in the temperature rise deviation sequence. It is extracted by taking the absolute value of the temperature rise deviation value at each sampling time in the temperature rise deviation sequence and selecting the maximum value. This maximum value is determined as the deviation amplitude. The larger the deviation amplitude, the more severe the deviation of the current operating state of the target maintenance part from the normal state. The duration of deviation is used to characterize the duration of the deviation in the temperature rise deviation sequence. It is extracted by statistically analyzing the duration of positive deviations in the sequence. Specifically, the start and end times of consecutive positive deviations are identified, and the time between them is calculated as the duration of that consecutive positive deviation. If the temperature rise deviation value in the sequence is positive and remains positive for more than a preset duration, it indicates that the target maintenance part is in a state of abnormal temperature rise for a long period. The preset duration is based on the thermal time constant of the target maintenance part, specifically 1.5 to 2 times that thermal time constant. The thermal time constant refers to the time required for the temperature rise of the target maintenance part to change from its initial value to 63.2% of its final steady-state temperature rise under a step thermal excitation. It can be obtained in advance through theoretical calculations of the thermal characteristics of the target maintenance part or finite element thermal simulation. Thermal response hysteresis is used to characterize the time delay between the actual temperature rise change of the target maintenance part and the change in operating conditions. It is extracted as follows: after aligning the actual temperature rise change sequence with the theoretical temperature rise reference value in time, the time difference between the peak time of the actual temperature rise change sequence and the peak time of the theoretical temperature rise reference value is calculated. This time difference is determined as the thermal response hysteresis. A larger thermal response hysteresis indicates a slower thermal response speed of the target maintenance part, and its heat dissipation capacity may be degraded. The peak time is determined as follows: the temperature rise change sequence is processed by moving average filtering to eliminate measurement noise. The filter window width is 3 to 5 times the sampling period. The time corresponding to the sampling point with the largest value in the filtered sequence is selected as the peak time. If there are multiple maximum values ​​with the same value in the filtered sequence, the time corresponding to the first maximum value is selected as the peak time.

[0039] Through the above processing, feature parameters in three dimensions—deviation amplitude, deviation duration, and thermal response hysteresis—are extracted and together constitute the thermal deviation characteristics of the target maintenance part. These thermal deviation characteristics comprehensively reflect the degree, duration, and response delay of the actual operating temperature rise of the target maintenance part deviating from the theoretically expected temperature rise, providing a data basis for extracting the nonlinear deterioration trend factor in subsequent steps.

[0040] Step S3: Analyze the evolution trend of thermal deviation characteristics according to the monitoring time sequence, determine the nonlinear deterioration trend factor of the target maintenance part, calculate the equivalent life consumption degree of the target maintenance part, and dynamically correct the initial available life to obtain the target available life.

[0041] In step S3, determining the nonlinear deterioration trend factor of the target maintenance part includes: determining the evolution trend of deviation amplitude, deviation duration and thermal response lag according to the monitoring time sequence; calculating the correlation coefficient between each evolution trend, and determining whether there is a synergistic enhancement relationship between different evolution trends based on the correlation coefficient; weighting and summing the quantitative values ​​of each evolution trend to obtain the basic deterioration trend value, determining the synergistic enhancement coefficient based on the determination result of the synergistic enhancement relationship, and multiplying the basic deterioration trend value by the synergistic enhancement coefficient to obtain the nonlinear deterioration trend factor.

[0042] Specifically, after obtaining the thermal deviation characteristics of the target maintenance part over multiple monitoring cycles through step S2, the evolution of each characteristic parameter is analyzed according to the monitoring time sequence. The thermal deviation characteristics include three dimensions: deviation amplitude, deviation duration, and thermal response hysteresis. A set of three corresponding characteristic parameter values ​​can be extracted for each monitoring cycle. The monitoring cycle refers to the time interval between two consecutive extractions of thermal deviation characteristics, and its duration is predetermined based on the thermal time constant and operating condition change rate of the target maintenance part. The number of monitoring cycles is greater than three. For example, for a target maintenance part with a thermal time constant of 10 minutes, the monitoring cycle is set to 1 to 2 hours to ensure sufficient data samples are collected within each monitoring cycle for effective extraction of temperature rise deviation characteristics. The start time of the monitoring cycle is the time when the previous thermal deviation characteristic extraction is completed, and the end time is the time when the current thermal deviation characteristic extraction is completed.

[0043] The evolution trends of deviation amplitude, deviation duration, and thermal response hysteresis are determined according to the monitoring time sequence. Specifically, the trend of each characteristic parameter can be extracted from the time-series data using linear regression. The slope of the fitted line is used as the quantitative value of the evolution trend of that characteristic parameter. A positive slope indicates that the characteristic parameter is increasing over time, while a negative slope indicates a decreasing trend. The larger the absolute value of the slope, the faster the rate of change. Through the above processing, the quantitative values ​​of the evolution trend of deviation amplitude, deviation duration, and thermal response hysteresis can be obtained for each monitoring period.

[0044] After determining the evolution trends of each characteristic parameter, the synergistic reinforcement relationship between different evolution trends is further identified. Specifically, multiple quantitative values ​​of the evolution trend of the deviation amplitude can be extracted over multiple monitoring periods, forming a sequence of quantitative values ​​of the deviation amplitude evolution trend; the same number of quantitative values ​​of the evolution trend of the deviation duration can also be extracted over the same multiple monitoring periods, forming a sequence of quantitative values ​​of the evolution trend of the deviation duration. The correlation coefficient between the quantitative value sequence of the deviation amplitude evolution trend and the quantitative value sequence of the deviation duration evolution trend is calculated. For example, the Pearson correlation coefficient formula is used to calculate the degree of linear correlation between the two sets of sequences, and the correlation coefficient is obtained. The correlation coefficient ranges from -1 to 1. A positive value indicates that the two sets of sequences are positively correlated, that is, the deviation amplitude and the deviation duration change in the same direction over the same time period, and a negative value indicates that they are negatively correlated. If the calculated correlation coefficient is greater than a preset threshold, it is determined that there is a synergistic reinforcement relationship between the evolution trend of the deviation amplitude and the evolution trend of the deviation duration. The threshold is a dimensionless value ranging from 0.5 to 0.8. Similarly, the correlation coefficients between the quantitative value series of the deviation amplitude evolution trend and the quantitative value series of the thermal response lag degree evolution trend, as well as the correlation coefficients between the quantitative value series of the deviation duration evolution trend and the quantitative value series of the thermal response lag degree evolution trend, can be calculated one by one to determine whether there is a synergistic enhancement relationship between each pair of evolution trends.

[0045] After determining the quantitative values ​​of each evolution trend and the synergistic enhancement relationship, the quantitative values ​​of each evolution trend are weighted and summed to obtain the basic deterioration trend value. The weight coefficients are pre-determined based on the sensitivity of each characteristic parameter to the performance degradation of the target maintenance part. Characteristic parameters with higher sensitivity are assigned larger weight coefficients, and the sum of all weight coefficients is 1. Then, the synergistic enhancement coefficient is determined based on the determination of the synergistic enhancement relationship. Specifically, the number of evolution trend pairs with synergistic enhancement relationships is counted, and this number is mapped to a value greater than or equal to 1 according to a preset mapping rule as the synergistic enhancement coefficient. The synergistic enhancement coefficient takes a value greater than or equal to 1 and less than or equal to 1.8, and increases monotonically with the increase of the number of evolution trend pairs with synergistic enhancement relationships. The above values ​​can be optimized by fitting accelerated aging test data for the material type of the target maintenance part, but the basic constraint of the larger the number of pairs should be followed.

[0046] The more logarithms of synergistic reinforcement relationships exist, the larger the synergistic reinforcement coefficient. If no synergistic reinforcement relationships exist, the synergistic reinforcement coefficient is 1. Finally, the basic deterioration trend value is multiplied by the synergistic reinforcement coefficient to obtain the nonlinear deterioration trend factor. The larger the value of the nonlinear deterioration trend factor, the more obvious the accelerated deterioration of the wear and tear of the target maintenance part.

[0047] In step S3, obtaining the target available life includes: determining the life acceleration factor of the target maintenance part in the current monitoring cycle based on the deviation between the nonlinear deterioration trend factor and the preset deterioration benchmark; determining the equivalent life consumption based on the life acceleration factor and the duration of the current monitoring cycle, and accumulating the equivalent life consumption corresponding to each monitoring cycle to obtain the equivalent life consumption level; and attenuating and correcting the initial available life based on the equivalent life consumption level to obtain the target available life of the target maintenance part.

[0048] Specifically, after obtaining the nonlinear deterioration trend factor of the target maintenance part, the life acceleration factor of the target maintenance part in the current monitoring cycle is determined based on the deviation between the nonlinear deterioration trend factor and the preset deterioration benchmark. The preset deterioration benchmark is a standard deterioration rate pre-set for the material type of the target maintenance part, used to characterize the normal increment of the material's wear level per unit time under normal operating conditions. Its value can be obtained by fitting accelerated aging test data before the equipment leaves the factory, or by statistical calibration of historical monitoring data during the initial normal operation phase of the power metering box. Specifically, the ratio of the nonlinear deterioration trend factor to the preset deterioration benchmark is calculated, and this ratio is determined as the life acceleration factor. If the nonlinear deterioration trend factor is equal to the preset deterioration benchmark, the life acceleration factor is 1, indicating that the deterioration rate of the target maintenance part in the current monitoring cycle is at a normal level; if the nonlinear deterioration trend factor is greater than the preset deterioration benchmark, the life acceleration factor is greater than 1, indicating that the deterioration rate is accelerating and the actual wear rate exceeds normal expectations; if the nonlinear deterioration trend factor is less than the preset deterioration benchmark, the life acceleration factor is less than 1, indicating that the deterioration rate is lower than normal.

[0049] After determining the lifespan acceleration rate, the equivalent lifespan consumption is determined based on the lifespan acceleration rate and the duration of the current monitoring cycle. Specifically, the lifespan acceleration rate is multiplied by the duration of the current monitoring cycle to obtain the equivalent lifespan actually consumed by the target maintenance part within that monitoring cycle. For example, with a current monitoring cycle duration of 30 days and a lifespan acceleration rate of 1.5, the equivalent lifespan consumption within that cycle is 30 × 1.5 = 45 days, indicating that the target maintenance part consumed the equivalent of 45 days of standard lifespan during the actual operation over those 30 days. The equivalent lifespan consumption corresponding to each monitoring cycle is summed to obtain the equivalent lifespan consumption level of the target maintenance part up to the current moment. This equivalent lifespan consumption level reflects the total cumulative lifespan actually consumed by the target maintenance part since its commissioning.

[0050] After determining the equivalent lifetime consumption level, the initial usable life determined in step S1 is attenuated and corrected based on the equivalent lifetime consumption level to obtain the target usable life of the target maintenance part. The initial usable life is the estimated remaining lifetime of the target maintenance part under standard environmental conditions from the current moment until it reaches the preset failure state; based on this, a unified correction formula is used to determine the target usable life, first calculating the excess consumption. , It equals the equivalent lifespan consumption minus the total calendar time since the target maintenance part was put into operation, where the total calendar time is the actual elapsed time from the time the target maintenance part was put into operation to the current time. The positive or negative sign reflects the direction of deviation between the actual aging rate of the target maintenance part and the normal expectation; when A value greater than 0 indicates that the actual aging rate is faster than expected, and the lifetime ΔE has been additionally consumed. In this case, the initial usable lifespan should be subtracted. Obtain the target's available timeframe; when When the value is less than or equal to 0, it indicates that the actual aging rate is slower than or equal to the expected rate, and no excess lifespan has been consumed. In this case, if the lifespan saved due to the slower-than-expected rate is fully compensated for in the remaining lifespan, the target usable lifespan is equal to the initial usable lifespan plus... The absolute value of.

[0051] Through the above attenuation correction, the final target availability period can truly reflect the remaining life of the target maintenance part under the current actual operating condition, providing an accurate basis for risk assessment and maintenance scheduling in subsequent steps.

[0052] Step S4: When the target's available lifespan meets the preset risk triggering conditions, determine the risk level based on the type and performance degradation status of the target maintenance part, and determine the target maintenance time window based on the risk level.

[0053] Step S4 includes: when the target availability period is lower than the corresponding risk trigger threshold, determining the degree of fault impact based on the type of the target maintenance part, and determining the performance degradation rate based on the nonlinear deterioration trend factor; determining the risk characterization value by combining the degree of fault impact, the performance degradation rate and the target availability period, and determining the risk level based on the preset risk interval to which the risk characterization value belongs; determining the maintenance cutoff time based on the maintenance time limit corresponding to the risk level and the target availability period, and forming a target maintenance time window based on the maintenance cutoff time.

[0054] Specifically, after obtaining the target availability period of the target maintenance part through step S3, it is necessary to determine whether a maintenance warning is needed and how to determine the urgency of the maintenance based on this target availability period. For this purpose, risk trigger thresholds are pre-set, and these thresholds are set according to the type of target maintenance part. For example, for electrical connection components, because their failure may lead to poor electrical contact or even an open circuit, the risk trigger threshold is set to a longer time period to allow more time for maintenance response before a failure occurs; for protective and sealed components, because their failure has a relatively indirect impact on electrical safety, the risk trigger threshold is set to a shorter time period. When the target availability period is lower than the corresponding risk trigger threshold, it indicates that the remaining lifespan of the target maintenance part has been shortened to a level requiring attention, triggering the risk assessment process.

[0055] After triggering the risk assessment process, the first step is to determine the degree of impact of the fault based on the type of the target maintenance component. The type of the target maintenance component refers to the functional role that equipment component plays within the energy metering box. For example, the outer plastic casing is a protective component, the sealing strip is a sealing component, the metal connector is an electrical connection component, and the internal wiring insulation layer is an insulation component. Different types of equipment components have varying degrees of impact on the overall operational safety of the energy metering box when they fail. The degree of fault impact is used to quantify the level of harm caused to the overall operational safety of the energy metering box if the target maintenance component fails. Its value can be determined based on a pre-established mapping relationship between component type and fault impact level. For example, failure of a metal connector may lead to poor electrical contact or even an open circuit, which is a high-impact level; failure of a sealing strip may lead to moisture intrusion but will not immediately cause an electrical fault, which is a medium-impact level.

[0056] Simultaneously, the performance degradation rate is determined based on the nonlinear degradation trend factor identified in step S3. The performance degradation rate refers to the rate at which the wear and tear of the target maintenance part accelerates over time. Since the nonlinear degradation trend factor itself comprehensively reflects the evolution trend of each characteristic parameter and their synergistic enhancement relationship, it can be directly used as the quantitative value of the performance degradation rate. The larger the nonlinear degradation trend factor, the faster the performance degradation rate.

[0057] After determining the degree of failure impact and the rate of performance degradation, a risk characterization value is determined by combining these three factors with the target availability period. Since the degree of failure impact, the rate of performance degradation, and the target availability period have different dimensions, direct algebraic operations are not feasible. Therefore, each factor must first be normalized. After normalization, weighting coefficients are assigned to the normalized degree of failure impact, the normalized rate of performance degradation, and the normalized target availability period, respectively. The sum of these weighting coefficients is 1. The degree of failure impact and the rate of performance degradation are positively correlated with the risk characterization value; that is, the larger their values, the higher the risk. The target availability period is negatively correlated with the risk characterization value; that is, the shorter the target availability period, the higher the risk. To ensure that all three factors contribute positively, the normalized target availability period is inverted during weighted summation. Specifically, 1 minus the normalized target availability period is used as the term in the weighted calculation, resulting in a larger value for this term as the availability period shortens. The specific values ​​of the weighting coefficients are predetermined based on the relative strength of each factor's impact on the urgency of maintenance. For example, the weighting coefficient for the degree of failure impact is set to 0.5, the weighting coefficient for the performance degradation rate is set to 0.3, and the weighting coefficient for the target availability period is set to 0.2. The risk characterization value is obtained by multiplying the normalized degree of failure impact by 0.5, the normalized performance degradation rate by 0.3, and the difference between 1 and the normalized target availability period by 0.2.

[0058] The risk level is determined based on the preset risk range to which the risk characterization value belongs. The preset risk range divides the range of risk characterization values ​​into multiple consecutive intervals, each interval corresponding to a risk level. For example, three risk intervals can be set, corresponding to low-risk, medium-risk, and high-risk levels respectively. The risk level of the target maintenance location is determined by the interval in which the risk characterization value falls. A higher risk level indicates a greater urgency in the need for maintenance of the target location.

[0059] After determining the risk level, the maintenance deadline is determined based on the maintenance time limit corresponding to the risk level and the target availability period. Each risk level is pre-associated with a corresponding maintenance time limit, which is the longest allowed time interval from the current moment until the maintenance operation must be completed. For example, the maintenance time limit for a high-risk level is 24 hours, for a medium-risk level it is 7 days, and for a low-risk level it is 30 days. The maintenance deadline is obtained by adding the maintenance time limit to the current moment. However, if this deadline is later than the failure time corresponding to the target availability period, the failure time corresponding to the target availability period is used as the maintenance deadline to ensure that the maintenance operation is completed before the target maintenance component fails. After determining the maintenance deadline, the time period between the current moment and the maintenance deadline is defined as the target maintenance time window. The target maintenance time window provides clear time constraints for matching maintenance resources in subsequent steps.

[0060] Through the above processing, the risk assessment process triggered by the target availability period completes the determination of the risk level and the generation of the target maintenance time window, providing decision-making basis for the scheduling of maintenance resources for the target maintenance location in terms of both risk level and availability time.

[0061] Step S5: Based on the maintenance resource demand attributes corresponding to the target maintenance part, match the target maintenance time window with the spatial location, available time and maintenance capabilities of heterogeneous maintenance resources, generate maintenance scheduling early warning information, and update the life cycle data of the target maintenance part.

[0062] Step S5 includes: determining the maintenance resource requirement attributes based on the type and performance degradation status of the target maintenance part, and screening candidate maintenance resources whose maintenance capabilities meet the maintenance resource requirement attributes from heterogeneous maintenance resources; determining the resource responsiveness within the target maintenance time window based on the spatial location and available time of the candidate maintenance resources, and determining the target maintenance resource based on the resource responsiveness, and generating maintenance scheduling early warning information; acquiring the operation monitoring data of the target maintenance part after maintenance, determining the maintenance recovery degree based on the change in thermal deviation characteristics before and after maintenance, and updating the life cycle data of the target maintenance part based on the maintenance recovery degree.

[0063] Specifically, after determining the risk level and target maintenance time window of the target maintenance location through step S4, it is necessary to select the most suitable resources from the available maintenance resources and generate scheduling warning information based on the specific maintenance needs of the target maintenance location. For this purpose, a heterogeneous maintenance resource library is pre-established. This library records the attribute information of multiple maintenance resources, including their spatial location, available time, and maintenance capabilities. The heterogeneous maintenance resource library records the attribute information of multiple maintenance resource entries. Each maintenance resource entry represents a resource package with complete maintenance operation capabilities. Its attribute information includes the personnel skill level, available spare parts types, equipped tool types, current spatial location, and available time period for allocation. Different resource entries differ in personnel skills, spare parts types, tool equipment, spatial location, and available time, hence the term heterogeneous maintenance resources. Spatial location refers to the current geographical location or storage location of the maintenance resource; available time refers to the time period during which the maintenance resource is in a deployable state; and maintenance capability refers to the types and scope of maintenance operations that the maintenance resource can perform.

[0064] like Figure 3 The diagram illustrates the process of maintenance resource matching, scheduling, and early warning. First, the maintenance resource requirement attributes are determined based on the type and performance degradation status of the target maintenance part. The type of the target maintenance part determines the types of spare parts and tools required for the maintenance operation, while the performance degradation status determines the complexity of the maintenance operation and the required personnel skill level. The more severe the performance degradation or the higher the non-linear deterioration trend factor, the higher the required maintenance personnel skill level and the longer the reserved maintenance operation time. The estimated operation time is determined through a pre-established maintenance operation time lookup table. This table records the mapping relationship between different performance degradation status levels and corresponding maintenance operation times. The performance degradation status levels are pre-divided according to the numerical range of the non-linear deterioration trend factor. The information on spare parts type, tool type, personnel skill level, and estimated operation time is integrated into the maintenance resource requirement attributes.

[0065] After determining the maintenance resource requirement attributes, candidate maintenance resources whose maintenance capabilities meet these attributes are selected from a heterogeneous maintenance resource database. Specifically, the spare parts inventory type, tool availability, and personnel skill level of each maintenance resource are compared with the corresponding requirements in the maintenance resource requirement attributes. If a maintenance resource meets the requirement attributes in all three aspects (spare parts type, tool type, and personnel skill level), it is included in the candidate maintenance resource set. This screening process eliminates resources that lack maintenance capabilities, reducing the computational workload of subsequent matching calculations.

[0066] After determining the set of candidate maintenance resources, the resource responsiveness within the target maintenance time window is determined based on the spatial location and available time of the candidate resources. Resource responsiveness is used to comprehensively quantify the feasibility of the candidate maintenance resources reaching the site and completing maintenance work within the target maintenance time window. Specifically, for each candidate maintenance resource, the travel time required for the resource to reach the site from its current location is estimated based on the distance between the resource's spatial location and the installation location of the electricity metering box, combined with traffic conditions. The intersection of the resource's available time and the target maintenance time window is calculated to determine the time period within the target maintenance time window during which maintenance work can be carried out. When the available time of a candidate maintenance resource intersects with the target maintenance time window, and the length of this intersection is greater than or equal to the estimated work duration, the responsiveness of the resource is classified as high. When the available time of a candidate maintenance resource intersects with the target maintenance time window, but the length of this intersection is less than the estimated work duration but greater than half of the estimated work duration, the responsiveness of the resource is classified as medium. When the available time of a candidate maintenance resource overlaps with the target maintenance time window, but the length of this overlap is less than or equal to half of the estimated operation time, the responsiveness of that resource is judged as low. When the available time of a candidate maintenance resource does not overlap with the target maintenance time window, the resource is directly removed from the candidate set and does not participate in the responsiveness assessment. If the travel time is too long, making it impossible to complete the maintenance operation within the window even if there is a time overlap, the time between the arrival time and the end time of the window is used as the overlap time for the above judgment.

[0067] After calculating the resource responsiveness of each candidate maintenance resource, the candidate maintenance resource with the highest resource responsiveness is determined as the target maintenance resource, and a maintenance scheduling early warning message is generated. The maintenance scheduling early warning message includes at least the target maintenance location information, the target maintenance time window, the target maintenance resource information, and the maintenance operation content, and is used to notify relevant maintenance personnel to perform maintenance operations according to the scheduling arrangement.

[0068] After maintenance is completed, operational monitoring data of the target maintenance area is acquired again, and the degree of maintenance recovery is determined based on the changes in thermal deviation characteristics before and after maintenance. Specifically, after the target maintenance area is put back into operation and reaches a stable state, real-time operational monitoring data is collected in the same manner as in step S2, and the thermal deviation characteristics after maintenance are calculated, including the deviation amplitude, deviation duration, and thermal response hysteresis. The thermal deviation characteristics after maintenance are compared with those before maintenance. If the deviation amplitude after maintenance is reduced to less than 30% of that before maintenance, the deviation duration is shortened to less than 40% of that before maintenance, and the thermal response hysteresis is reduced to less than 50% of that before maintenance, the degree of maintenance recovery is considered high, indicating that the maintenance operation has effectively improved the operational status of the target maintenance area. If two of the above three indicators meet the above conditions, the degree of maintenance recovery is considered medium; if only one or none of them meet the conditions, the degree of maintenance recovery is considered low, indicating that the maintenance operation failed to achieve the expected results or that there are other untreated loss factors in the target maintenance area. The above percentage thresholds can be optimized and adjusted according to the material type of the target maintenance area and the actual repair effect of the maintenance operation.

[0069] The maintenance recovery level is recorded in the life cycle data of the target maintenance part as a reference for subsequent maintenance decisions. At the same time, the target availability period of the target maintenance part is updated according to the maintenance recovery level. If the maintenance recovery level is high, the target availability period is extended accordingly; if the maintenance recovery level is low, the target availability period is maintained or shortened, and the updated target availability period is stored in the life cycle data, thereby realizing closed-loop update management of the entire life cycle data of the electricity metering box.

[0070] Through the above step S5, the risk assessment results are matched with heterogeneous maintenance resources to generate executable maintenance scheduling early warning information. After the maintenance is completed, the maintenance effect is fed back to update the life cycle data, forming a complete closed loop from status assessment, risk warning, resource scheduling to maintenance feedback, providing complete data support and decision-making basis for the full life cycle management of electricity metering boxes.

[0071] The above describes a method for managing the full lifecycle data of an electricity metering box according to an embodiment of this application. The following describes a management system for managing the full lifecycle data of an electricity metering box according to an embodiment of this application. Please refer to [link / reference]. Figure 4 The energy metering box full life cycle data management system in this application embodiment includes: The preliminary screening module is used to obtain the material type and historical environmental stress data of each equipment component in the power metering box, determine the initial wear degree of each equipment component based on the multi-material attenuation characteristics, screen the target maintenance parts and determine the initial usable period. The deviation analysis module is used to acquire real-time external meteorological data and transient power load data of the power metering box, determine the theoretical temperature rise reference value of the target maintenance part under the current operating conditions, and compare the real-time operation monitoring data of the target maintenance part with the theoretical temperature rise reference value to obtain the thermal deviation characteristics. The dynamic correction module is used to analyze the evolution trend of thermal deviation characteristics according to the monitoring time sequence, determine the nonlinear deterioration trend factor of the target maintenance part, calculate the equivalent life consumption degree of the target maintenance part, and dynamically correct the initial available life to obtain the target available life. The risk level determination module is used to determine the risk level based on the type and performance degradation status of the target maintenance part when the target's available life meets the preset risk triggering conditions, and to determine the target maintenance time window based on the risk level. The early warning update module is used to match the target maintenance time window with the spatial location, available time and maintenance capabilities of heterogeneous maintenance resources based on the maintenance resource demand attributes corresponding to the target maintenance part, generate maintenance scheduling early warning information, and update the life cycle data of the target maintenance part.

[0072] In summary, existing lifespan assessments of electricity metering boxes suffer from inaccuracies due to neglecting the differences in attenuation across multiple materials and the dynamic impact of real-time operating conditions. Furthermore, the disconnect between early warning information and maintenance resource scheduling leads to misaligned maintenance timing and inefficient resource allocation. This application addresses this issue by determining the initial wear level of each equipment component based on the attenuation characteristics of multiple materials and selecting target maintenance locations. It then dynamically corrects the initial usable lifespan by incorporating real-time external meteorological data and transient power load data. Based on the target usable lifespan, risk classification is triggered, and the spatial location, available time, and maintenance capabilities of heterogeneous maintenance resources are matched to generate maintenance scheduling early warning information that includes the target maintenance time and target maintenance location. This application makes the attenuation status assessment of each equipment component in the electricity metering box more accurate and reliable, the dynamic correction of the target usable lifespan more aligned with actual operating conditions, and the maintenance scheduling early warning information more executable, effectively achieving full-chain collaborative management from status assessment and risk warning to resource scheduling.

[0073] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0074] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0075] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application.

Claims

1. A method for managing the entire lifecycle data of an electricity metering box, characterized in that, The method includes: Step S1: Obtain the material type and historical environmental stress data of each equipment component in the power metering box, determine the initial wear level of each equipment component based on the multi-material attenuation characteristics, screen the target maintenance parts and determine the initial usable period. Step S2: Obtain real-time external meteorological data and transient power load data of the power metering box, determine the theoretical temperature rise reference value of the target maintenance part under the current working conditions, and compare the real-time operation monitoring data of the target maintenance part with the theoretical temperature rise reference value to obtain the thermal deviation characteristics. Step S3: Analyze the evolution trend of thermal deviation characteristics according to the monitoring time sequence, determine the nonlinear deterioration trend factor of the target maintenance part, calculate the equivalent life consumption degree of the target maintenance part, and dynamically correct the initial available period to obtain the target available period; Step S4: When the available period of the target meets the preset risk triggering conditions, determine the risk level according to the type and performance degradation status of the target maintenance part, and determine the target maintenance time window according to the risk level; Step S5: Based on the maintenance resource requirement attributes corresponding to the target maintenance part, match the target maintenance time window with the spatial location, available time and maintenance capabilities of heterogeneous maintenance resources, generate maintenance scheduling early warning information, and update the life cycle data of the target maintenance part.

2. The method for managing the entire lifecycle data of an energy metering box according to claim 1, characterized in that, Step S1 determines the initial wear level of each device component based on the attenuation characteristics of multiple materials, including: Based on the material type, corresponding environmental sensitivity characteristics are matched for each equipment component, and target stress data corresponding to the environmental sensitivity characteristics are extracted from historical environmental stress data. Based on the attenuation response relationship corresponding to different materials, the target stress data is converted into equivalent damage representing the degree of environmental stress. The equivalent damage quantities are fused based on the coupling relationship between various environmental stresses to obtain the cumulative damage characterization values ​​of each equipment component. The cumulative damage characterization value is normalized and mapped according to the life decay benchmark corresponding to the material type to obtain the initial wear level of each equipment component.

3. The method for full lifecycle data management of an electricity metering box according to claim 1, characterized in that, Step S1 involves screening target maintenance locations and determining the initial available lifespan, including: The degree of damage propagation impact of each equipment component is determined based on the initial wear level of each equipment component and the damage coupling relationship between different equipment components. The maintenance priority of each equipment component is determined based on the initial degree of wear and the degree of damage spread, and the equipment components whose maintenance priority meets the preset screening conditions are identified as target maintenance parts; The initial usability period of the target maintenance part is determined based on the initial wear and tear of the target maintenance part and the total operating time from new to failure under standard environmental conditions.

4. The method for managing the full lifecycle data of an energy metering box according to claim 1, characterized in that, Step S2 involves determining the theoretical temperature rise reference value for the target maintenance area under current operating conditions, including: Environmental characteristics affecting the heat exchange state of the target maintenance site are extracted from real-time external meteorological data, and the load heating characteristics of the target maintenance site are determined based on transient power load data. The current operating condition characteristics are constructed based on environmental characteristics and load heating characteristics, and the benchmark thermal response corresponding to the current operating condition characteristics is matched from the preset normal thermal response benchmark. Thermal response compensation is performed based on the difference between the current operating conditions and the baseline thermal response to obtain the theoretical temperature rise reference value of the target maintenance part under the current operating conditions.

5. The method for managing the full lifecycle data of an energy metering box according to claim 1, characterized in that, The thermal deviation characteristics obtained in step S2 include: The actual temperature rise change sequence of the target maintenance part is extracted from the real-time operation monitoring data, and the difference between the actual temperature rise and the theoretical temperature rise reference value is calculated according to the time correspondence to obtain the temperature rise deviation sequence. The thermal deviation characteristics of the target maintenance part are obtained by extracting the deviation amplitude, deviation duration and thermal response hysteresis based on the temperature rise deviation sequence.

6. The method for full life-cycle data management of an energy metering box according to claim 1, characterized in that, Step S3 determines the nonlinear deterioration trend factor of the target maintenance area, including: The evolution trends of deviation amplitude, deviation duration, and thermal response hysteresis were determined according to the monitoring time sequence. Calculate the correlation coefficient between each evolution trend, and determine whether there is a synergistic enhancement relationship between different evolution trends based on the correlation coefficient; The basic deterioration trend value is obtained by weighted summation of the quantitative values ​​of each evolution trend. The synergistic enhancement coefficient is determined based on the determination result of the synergistic enhancement relationship. The nonlinear deterioration trend factor is obtained by multiplying the basic deterioration trend value by the synergistic enhancement coefficient.

7. The method for managing the full lifecycle data of an electricity metering box according to claim 1, characterized in that, Step S3 obtains the target availability period, including: Based on the degree of deviation between the nonlinear deterioration trend factor and the preset deterioration benchmark, the life acceleration factor of the target maintenance part in the current monitoring cycle is determined; The equivalent lifetime consumption is determined based on the lifetime acceleration rate and the duration of the current monitoring cycle, and the equivalent lifetime consumption corresponding to each monitoring cycle is accumulated to obtain the equivalent lifetime consumption level. The initial available life is adjusted by decaying the equivalent life consumption level to obtain the target available life of the target maintenance part.

8. The method for full life-cycle data management of an electricity metering box according to claim 1, characterized in that, Step S4 includes: When the available life of a target is lower than the corresponding risk trigger threshold, the degree of failure impact is determined according to the type of the target maintenance part, and the performance degradation rate is determined according to the nonlinear deterioration trend factor. The risk characterization value is determined by combining the degree of impact of the failure, the rate of performance degradation and the target availability period, and the risk level is determined according to the preset risk range to which the risk characterization value belongs; The maintenance deadline is determined based on the maintenance time limit corresponding to the risk level and the target availability period, and a target maintenance time window is formed based on the maintenance deadline.

9. A method for managing the entire lifecycle data of an energy metering box according to claim 1, characterized in that, Step S5 includes: Based on the type and performance degradation status of the target maintenance part, determine the maintenance resource requirement attributes, and screen candidate maintenance resources from heterogeneous maintenance resources whose maintenance capabilities meet the maintenance resource requirement attributes. Based on the spatial location and availability of candidate maintenance resources, the resource responsiveness within the target maintenance time window is determined, and the target maintenance resources are determined based on the resource responsiveness, generating maintenance scheduling early warning information; After maintenance is completed, the operation monitoring data of the target maintenance part is obtained, the maintenance recovery degree is determined based on the change of thermal deviation characteristics before and after maintenance, and the life cycle data of the target maintenance part is updated based on the maintenance recovery degree.

10. A full life-cycle data management system for an electricity metering box, used to implement the full life-cycle data management method for an electricity metering box as described in any one of claims 1-9, characterized in that, The system includes: The preliminary screening module is used to obtain the material type and historical environmental stress data of each equipment component in the power metering box, determine the initial wear degree of each equipment component based on the multi-material attenuation characteristics, screen the target maintenance parts and determine the initial usable period. The deviation analysis module is used to acquire real-time external meteorological data and transient power load data of the power metering box, determine the theoretical temperature rise reference value of the target maintenance part under the current operating conditions, and compare the real-time operation monitoring data of the target maintenance part with the theoretical temperature rise reference value to obtain the thermal deviation characteristics. The dynamic correction module is used to analyze the evolution trend of thermal deviation characteristics according to the monitoring time sequence, determine the nonlinear deterioration trend factor of the target maintenance part, calculate the equivalent life consumption degree of the target maintenance part, and dynamically correct the initial available period to obtain the target available period. The risk level determination module is used to determine the risk level based on the type and performance degradation status of the target maintenance part when the available life of the target meets the preset risk triggering conditions, and to determine the target maintenance time window based on the risk level. The early warning update module is used to match the target maintenance time window with the spatial location, available time and maintenance capability of heterogeneous maintenance resources according to the maintenance resource demand attributes corresponding to the target maintenance part, generate maintenance scheduling early warning information, and update the life cycle data of the target maintenance part.