Demand Assessment Method and System for Ramp-up Adjustment Adapted to the Market Entry of Distributed New Energy Sources
By combining forecast data and market declaration data, and utilizing the cross-period regulation characteristics of new energy storage, the Monte Carlo simulation method was adopted to solve the problems of inaccurate assessment and redundant reserve capacity in traditional assessment methods. This enabled a more refined assessment of ramp-up regulation demand and reduced system operating costs.
Patent Information
- Application Number
- CN202611254066.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-18
- Publication Date
- 2026-11-10
AI Technical Summary
With the introduction of distributed renewable energy into the market, existing technologies have failed to effectively quantify the cross-period regulation characteristics of new energy storage systems using traditional ramp-up and adjustment demand assessment methods. This has resulted in inaccurate assessments and excessive redundancy in reserve capacity configuration, increasing system operating costs.
By calculating ramp-up risk based on forecast data and market declaration data, and combining the timing adjustment characteristics of new energy storage, the Monte Carlo simulation method is used to solve the timing reserve demand, construct a ramp-up adjustment demand assessment model, correct the deviation of market declaration power, and quantify the cross-time adjustment capability of energy storage.
It improves the accuracy of ramp adjustment demand assessment, reduces the total reserve capacity required for the system to cope with ramp risks, and balances the safety and economy of scheduling.
Smart Images

Figure CN123070575A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power system operation and dispatching technology, specifically to a method and system for assessing ramp-up adjustment needs to adapt to the entry of distributed renewable energy into the market. Background Technology
[0002] With the large-scale integration of distributed renewable energy sources into the grid and their gradual participation in the electricity spot market, the power system faces significant power balance and ramp-up adjustment pressures during the rapid decline in photovoltaic output each evening. Accurately assessing the ramp-up adjustment needs during this period and rationally allocating the system's reserve resources are fundamental tasks for ensuring the safe operation of the power grid and formulating day-ahead dispatch plans.
[0003] Conventional methods for assessing ramp demand typically rely directly on grid-side meteorological model forecasts to determine system power changes. However, under spot market mechanisms, distributed renewable energy power plants often adopt a market strategy of submitting orders at zero or negative prices to ensure power consumption. This market trading behavior results in an objective deviation between the actual day-ahead power submission curve and the physical forecast curve. If traditional forecast data is still used as a benchmark, the ramp constraint boundaries set in the scheduling process will deviate from the actual market operating conditions.
[0004] Existing assessment models for calculating the ramp-up reserve capacity of power systems are primarily limited to conventional power sources such as thermal and hydropower. Conventional units, constrained by their mechanical characteristics, can only provide a fixed ramp-up rate at a single moment. Current assessment systems do not effectively quantify the time-lapse regulation characteristics of new energy storage devices, failing to incorporate them into the overall consideration of ramp-up reserve, resulting in a conservative estimate of the system's available flexible adjustment resources. Furthermore, when dealing with load and various renewable energy output prediction errors, traditional solutions often ignore the temporal correlation differences between prediction errors at adjacent moments, habitually treating errors from different time periods as a completely linear superposition, or pursuing an absolute zero-gap risk target. This approach necessitates the system to retain a large amount of redundant reserve capacity, increasing the overall operating cost and making it difficult to adapt to the refined scheduling requirements following the entry of a high proportion of renewable energy into the market. Summary of the Invention
[0005] To address the shortcomings of existing technologies, this invention provides a method and system for assessing ramp-up and regulation needs for distributed renewable energy entering the market. This method solves the problems of inaccurate assessment of power system ramp-up and regulation needs and excessive redundancy in reserve capacity configuration caused by traditional methods neglecting market-reported power deviations and the cross-time regulation characteristics of new energy storage in the context of distributed renewable energy entering the market.
[0006] To achieve the above objectives, the present invention provides the following technical solution: The first aspect of this invention provides a method for assessing ramp-up adjustment demand to adapt to the entry of distributed renewable energy into the market, comprising the following steps: Based on forecast data and routine unit operation, the period with the highest risk of hill climbing the following evening was calculated and determined; Based on market reporting data, calculate the climbing power demand for the period with the highest climbing risk the following evening; Calculate the ramp-up gap distribution under different new conventional unit opening schemes, and obtain the expected value and standard deviation of the ramp-up gap random variable under each new conventional unit opening scheme; Determine the correlation coefficients between the climbing gaps at different times during the period of greatest climbing risk in the evening of the following day; Based on the timing regulation characteristics of novel energy storage, the timing backup demand during the ramp-up phase is characterized under different gap risk control requirements. The Monte Carlo simulation method is used to solve the timing reserve requirement during the climbing phase, and a comprehensive assessment result of the climbing adjustment requirement is generated.
[0007] Preferably, the calculation and determination of the period with a higher risk of hill climbing the following evening based on predicted data and conventional unit operation specifically includes: The difference between the predicted value of the system load change and the predicted value of the change of each power supply and the planned increment of external power reception between adjacent time points is calculated to obtain the ramp-up power demand of the adjustment resources based on the predicted data. The standard deviation of the prediction error is calculated to obtain the uncertainty index of the ramp-up power demand of the adjustment resources; By summarizing the adjustment capabilities of various conventional generating units at adjacent times during the evening operation, the total ramp-up capability of conventional generating units can be obtained. The uncertainty index is multiplied by the ramp risk assessment parameter to obtain the ramp power reserve margin. When the total ramp capacity of the conventional unit is less than the sum of the ramp power demand of the regulation resource and the ramp power reserve margin, the corresponding time interval is determined to be the period with a higher ramp risk in the evening of the next day.
[0008] Preferably, the step of calculating the climbing power demand during the period with higher climbing risk the following evening based on market reporting data specifically includes: Extract the changes in the total added value of wind power declared power and photovoltaic power declared power between adjacent time points; The original predicted power change was replaced by the extracted total value-added change in declared power. Combined with the predicted value of system load change and the incremental power receiving plan of tie line, the regulated resource ramping power demand based on the actual declared data was calculated.
[0009] Preferably, the calculation of the ramp-up gap distribution under different new conventional unit opening schemes, to obtain the expected value and standard deviation of the ramp-up gap random variable under each new conventional unit opening scheme, specifically includes: Solve the safety constraint unit combination model to extract the conventional units in the newly opened state and generate the set of conventional units that need to be opened; A subset of the conventional unit set is obtained to generate multiple different schemes for opening new conventional units; Based on the ramping capacity of the existing regulating units, the ramping capacity of the newly opened conventional units in the new conventional unit plan, and the ramping power demand of regulating resources based on actual application data, the expected value of the ramping gap random variable is calculated. The uncertainty index of the power demand for adjusting resource ramping is used as the standard deviation of the ramping gap random variable to obtain the expected value and standard deviation of the ramping gap random variable under each new conventional unit scheme.
[0010] Preferably, the process of solving the safety constraint unit combination model extracts the conventional units in the newly activated state and generates a set of conventional units that need to be newly activated, specifically including: Set the required ramp-up reserve capacity for the system, and use the product of the ramp-up risk assessment parameters and the uncertainty index of the ramp-up power demand of the adjustment resources as the ramp-up reserve constraint. The safety-constrained unit combination model is established and solved with the goal of minimizing the system's operating economy or overall cost, and the unit start-up and shutdown states that meet the system's operating constraints are obtained. Extract the conventional units that are in the newly opened state from the model calculation results, and summarize them to generate a set of conventional units that need to be newly opened.
[0011] Preferably, the step of calculating the correlation coefficient between the climbing gaps at different times during the period of higher climbing risk on the evening of the following day specifically includes: Extract the time series of prediction errors and calculate the correlation coefficients between system load prediction errors, wind power output prediction errors and photovoltaic output prediction errors at different times. The comprehensive correlation coefficient between the ramp-up gaps at different times is calculated by multiplying the standard deviations of the prediction errors of system load, wind power, and photovoltaic power at different times with their corresponding correlation coefficients, and then dividing by the product of the uncertainty index of the ramp-up power demand at different times.
[0012] Preferably, the timing regulation characteristics based on novel energy storage characterize the timing reserve demand during the ramp-up phase under different gap risk control requirements, specifically including: A truncation function is used to extract the climbing gaps that are greater than zero at each time point, and these gaps are summed to construct and obtain a random variable for timed backup demand. Set the tolerance probability threshold for the existence of ramp-up gaps in the actual operation of the system as a risk control parameter, and construct a probability distribution inequality condition that requires the statistical probability that the random variable of the time-selective standby demand is less than the standby capacity value is greater than or equal to the system safety probability limit. Find the minimum value of the reserve capacity that makes the probability distribution inequality condition hold, and calculate the timing reserve requirement during the ramp-up phase under the risk control requirements.
[0013] Preferably, the step of extracting the climbing gaps greater than zero at each time point using a truncation function, summing them up, and constructing and obtaining the random variable for timing reserve demand specifically includes: The climbing gaps at all times within the set of time periods with higher climbing risk the following evening are filtered out. Only extract the portion of the climbing gap value that is greater than zero within the time interval, and discard the climbing gap values that are less than or equal to zero; The extracted ramp gap values greater than zero are summed to calculate the time-selective standby demand random variable representing the cross-period regulation capability of the new energy storage.
[0014] Preferably, the step of using Monte Carlo simulation to solve for the timing reserve requirement during the climbing phase and generating a comprehensive assessment result of the climbing adjustment requirement specifically includes: A covariance matrix is constructed using the correlation coefficient between the uncertainty index of the adjustment resource ramping power demand and the ramping gap at different times. The covariance matrix is then subjected to Cholesky decomposition to obtain a lower triangular matrix. By combining the expected value of the random variable of the climbing gap and the lower triangular matrix, the independently generated basic random number sample sequence is transformed into a normal variable sample with time-series correlation. The truncation function is used to filter out the climbing gap values that are greater than zero in each time period and sum them up to obtain the total positive climbing gap demand for each group of simulated samples. After sorting the total demand for the positive ramp gap, the values corresponding to the preset quantile ratio positions are extracted according to the risk control parameters as the solution results for the time-selective backup demand, and the results are summarized to generate a comprehensive evaluation result of the ramp adjustment demand.
[0015] Preferably, the step of combining the expected value of the climbing gap random variable and the lower triangular matrix to convert the independently generated basic random number sample sequence into a normal variable sample with time-series correlation specifically includes: Construct a sample basis matrix for Monte Carlo simulation calculations. Set the number of rows in the sample basis matrix to the number of simulated samples and the number of columns to the total number of periods with high climbing risk, so that each element in the sample basis matrix independently follows a standard normal distribution with a mean of zero and a standard deviation of one. Multiply the standard normal random number element matrix in the sample basis matrix with the lower triangular matrix, and add it to the expected value matrix of the climbing gap random variable to calculate the normal variable sample with time-series correlation.
[0016] A second aspect of this invention provides a ramp-up adjustment demand assessment system adapted to the market entry of distributed renewable energy sources, comprising: The risk assessment module is used to determine the period with a higher risk of ramping up the following evening based on forecast data and the normal operation of the generating units, and to determine the uncertainty index of the corresponding ramping power demand of the regulating resources. The demand adjustment module is used to calculate the adjustable resource ramping power demand based on the market declaration data during the period with higher ramping risk. The gap calculation module is used to calculate the distribution of the ramp gap under different new conventional unit schemes based on the ramping capacity of the existing regulating units and the ramping power demand of the regulating resources based on the declared data, obtain the expected value of the ramp gap random variable, and use the uncertainty index as the standard deviation of the random variable. The correlation analysis module is used to combine the uncertainty index, the standard deviation of the prediction error of each prediction data and its corresponding error correlation coefficient to solve the comprehensive correlation coefficient between the climbing gaps at different times during the period with high climbing risk. The backup characterization module is used to sum up the ramp gaps greater than zero during the period of high ramp risk based on the timing adjustment characteristics of the new energy storage to define a random variable of timing backup demand, characterizing the timing backup demand of the ramp stage under different gap risk control requirements. The simulation evaluation module is used to construct a covariance matrix using the Monte Carlo simulation method, the uncertainty index and the comprehensive correlation coefficient, and the independent standard normal random numbers are converted into relevant normal variable samples by combining the expected value, to solve the timing reserve demand of the ramp-up stage, and generate a comprehensive evaluation result of the ramp-up adjustment demand.
[0017] This invention provides a method for assessing the ramp-up and adjustment demand for distributed renewable energy sources entering the market. It has the following beneficial effects: 1. This invention calculates the power demand for regulating resources by extracting the total added value change of the day-ahead declared power in the spot market environment for distributed renewable energy and replacing the original grid-side predicted power change with this value. This technical feature corrects the objective deviation between the actual curve and the predicted curve caused by the zero-price or negative-price market declaration strategy adopted by renewable energy power plants, making the day-ahead ramp demand output by the evaluation model more consistent with the boundary conditions of actual power system operation.
[0018] 2. This invention introduces a novel cross-period timing regulation characteristic for energy storage. In the evaluation model, a cutoff function is used to extract and sum the ramp-up gaps greater than zero within the high-risk period set. This calculation method breaks through the physical limitation of traditional conventional regulating power sources, which can only provide a fixed ramp-up rate at a single moment. It quantifies the flexible discharge capability of energy storage throughout the entire photovoltaic output decline phase, thereby reducing the total standby capacity required for the system to cope with ramp-up risks.
[0019] 3. In constructing the ramp-up gap model, this invention solves for the time-series comprehensive correlation coefficients of various prediction errors at different times, and constructs probability distribution inequality constraints in conjunction with a set tolerance probability threshold. This mechanism, when solving for timing reserve requirements in Monte Carlo simulation, eliminates the extreme superposition assumption of perfectly linear correlation between errors, enabling schedulers to avoid retaining excessive redundant reserve resources while meeting the probability limits of safe system operation, thus balancing scheduling safety and economy. Attached Figure Description
[0020] Figure 1 This is a flowchart of the method steps of the present invention. Detailed Implementation
[0021] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0022] Please see the appendix Figure 1 This invention provides a method for assessing the ramp-up adjustment demand to adapt to the entry of distributed new energy into the market, including the following steps: S1, calculate the period with the highest ramp-up risk the following evening. Based on the system load forecast, wind power forecast, photovoltaic forecast, and tie-line power receiving plan, calculate the ramp-up power demand of regulating resources and determine the corresponding uncertainty indicators; calculate the current total ramp-up capacity of conventional units; by comparing the ramp-up capacity of conventional units with the ramp-up power demand of regulating resources, screen out the periods with ramp-up risk the following evening and count the total number of high-risk periods; S2, calculate the ramp-up power demand for the next day's high-risk period based on market declaration data. Based on the changes in the total added value of wind power declarations and photovoltaic power declarations, calculate the ramp-up power demand for adjustable resources based on actual declaration data to correct for changes in the calculation benchmark caused by deviations between the distributed renewable energy market entry declaration curve and the provincial forecast curve; S3, calculate the ramp-up gap distribution under different new conventional unit opening schemes. Without considering new energy storage, conduct safety-constrained unit combinations to generate a set of new conventional units that need to be opened; divide different subsets of this set into independent new conventional unit opening schemes, and combine the ramp-up capacity of conventional units with the ramp-up power demand based on the application data to obtain the expected value and standard deviation of the ramp-up gap under each scheme; S4, calculate the correlation coefficients between ramp gaps at different time periods. For the identified periods with higher ramp risk, calculate the correlation coefficients between load forecasting errors, wind power forecasting errors, and photovoltaic forecasting errors, and derive the correlation coefficients between ramp gaps at different times. S5 represents the timed reserve requirement during the ramp-up phase under different gap risk control requirements. The new energy storage system has the characteristic of timed discharge during the ramp-up phase. For the selected new conventional unit scheme, the ramp gaps greater than zero during the high-risk period are summed to define the random variable of the timed reserve requirement. Based on the set risk control parameters, probabilistic constraints are constructed to establish the mathematical expression of the timed reserve requirement. S6. Solve for the timing reserve demand during the ramp-up phase and generate assessment results. The Monte Carlo simulation method is used to calculate the timing reserve demand. Independent standard normal random numbers are converted into relevant normal variables by constructing and decomposing the covariance matrix. Sample values of the ramp-up gap are simulated for each high-risk period, and the total demand for the positive ramp-up gap is calculated. The sample values are sorted to meet risk control probability requirements. The results corresponding to each newly opened conventional unit scheme are summarized to generate the final comprehensive assessment table of ramp-up adjustment demand.
[0023] This invention applies the method to a ramp-up adjustment demand assessment system adapted to the entry of distributed renewable energy into the market, including: The risk assessment module is used to calculate and determine the period with a higher risk of ramping up the following evening based on forecast data and the normal operation of the generating units, and to determine the uncertainty index of the corresponding ramping power demand of the regulating resources. The demand adjustment module, connected to the risk assessment module, is used to calculate the adjustable resource ramping power demand based on the market declaration data for the period with a high ramping risk in the evening of the following day. The gap calculation module, connected to the demand correction module, is used to calculate the distribution of the ramp gap under different new conventional unit opening schemes based on the ramping capacity of the original regulating units, the ramping capacity of the newly opened conventional units, and the ramping power demand of the regulating resources based on the declared data. It obtains the expected value of the ramp gap random variable under each new conventional unit opening scheme and uses the uncertainty index as the standard deviation of the random variable. The correlation analysis module, connected to the risk determination module, is used to combine the uncertainty index, the standard deviation of the prediction error of each prediction data and its corresponding error correlation coefficient to solve the comprehensive correlation coefficient between the climbing gaps at different times during the period when the climbing risk is relatively high on the evening of the next day. The backup characterization module, connected to the gap calculation module, is used to sum up the ramp gaps greater than zero during the period of high ramp risk in the evening of the next day based on the timing adjustment characteristics of the new energy storage, so as to define the random variable of the timing backup demand, thereby characterizing the timing backup demand of the ramp stage under different gap risk control requirements. The simulation evaluation module is connected to the correlation analysis module and the backup characterization module, respectively. It is used to construct a covariance matrix using the Monte Carlo simulation method, the uncertainty index and the comprehensive correlation coefficient, and convert independent standard normal random numbers into relevant normal variable samples in combination with the expected value to solve the timing backup demand of the ramping stage, and generate a comprehensive evaluation result of the ramping adjustment demand.
[0024] The detailed technical solutions and methods in the system are the same, so the system will not be described again here.
[0025] The steps in the technical solution provided by this invention will be described in detail below.
[0026] This invention provides a method for calculating the period of highest uphill risk the following evening (i.e., step S1 of this invention), which specifically includes the following sub-steps: S11, calculate the power demand for regulating resources during the next day's photovoltaic output decline phase based on the predicted data.
[0027] During the evening hours each day, the power system experiences a rapid decline in photovoltaic power generation, requiring the dispatch of additional regulation resources to maintain power balance. Based on the day-ahead dispatch plan, predicted power changes at the system level for the following day are obtained. By calculating the differences between load changes and changes in various power sources and planned increases in external power reception between adjacent time periods, the ramp-up power demand for regulation resources based on the predicted data is determined. The calculation is performed using the following formula: ; In the formula, For a moment and time Adjustable resource ramping power requirements based on predicted data; For a moment and time Predicted values of system load changes between; For a moment and time Predicted values of wind power variation between; For a moment and time The predicted total change in centralized and distributed photovoltaic power between the two; For a moment and time The planned increase in power supply to the interconnecting lines.
[0028] S12 is an uncertainty index for calculating the power demand for regulating resources during the photovoltaic output decline phase on the following day.
[0029] The wind and solar power generation in the system exhibits fluctuating characteristics during operation, and their predicted values often deviate from actual values. In this stage of the evaluation calculation, the prediction errors of wind power and solar power are assumed to be independent, and both prediction error data follow a normal distribution. By synthesizing the standard deviations of load prediction errors, wind power prediction errors, and solar power prediction errors, the uncertainty of the power demand for ramping up resources in the prediction process is quantified. The specific formula for synthesizing the standard deviations is as follows: ; In the formula, For a moment and time The uncertainty index of the power demand for adjusting resource ramping between them. For predicted values The standard deviation of the prediction error For predicted values The standard deviation of the prediction error For predicted values The standard deviation of the prediction error.
[0030] For the construction of the normal distribution model of the day-ahead forecast error of load, wind power and photovoltaic and the fitting and extraction of the standard deviation parameter, those skilled in the art can obtain it by conventional historical data statistical analysis and probability modeling methods. The acquisition of the error probability distribution parameter is a well-known technology in this field and will not be elaborated here.
[0031] S13, calculate the total ramp-up capability of the conventional units based on the operation status of the conventional units this evening.
[0032] Conventional regulating power sources providing basic ramping support in power systems mainly include thermal power units and hydropower units. The ramping capacity of conventional regulating power sources is determined by the inherent mechanical and physical parameters of the units themselves and their operating conditions. By extracting the output parameters of thermal power units and hydropower units operating in the evening of a given day, and summing the regulating capacities of various conventional units at adjacent time points, the total ramping capacity that conventional units can provide during this period can be calculated. The specific calculation formula is as follows: ; In the formula, For a moment and time The total ramping capacity of the regulating units between them For a moment and time The total climbing ability of the thermal power units between them. For a moment and time The total climbing capacity of the hydropower units between them.
[0033] S14, identify the periods with higher climbing risks and count the total number of corresponding periods.
[0034] Ramp-up risk depends on the difference between the system's existing available regulation capacity and the actual ramp-up demand plus a safety margin. A safety margin boundary incorporating predictive uncertainties is established to determine whether the total ramp-up capacity of the conventional units within the system is sufficient to meet the current ramp-up power demand of the regulation resources. The required ramp-up power reserve margin is obtained by multiplying the uncertainty index by the set ramp-up risk assessment parameters, constructing the following judgment relationship: ; In the formula, For a moment and time The total ramping capacity of the regulating units; For a moment and time Adjustable resource ramping power requirements based on predicted data; These are parameters for assessing the risk of hill climbing. For a moment and time The uncertainty index of the power demand for resource ramping between the two.
[0035] If at time and time If the above inequality condition is met, i.e., the total ramping capacity of existing conventional units is less than the sum of the predicted ramping power demand and reserve margin, then the time interval is determined as a period with high ramping risk. This determination logic is then applied to all time intervals by the evening of the following day, and the total number N of high-risk ramping periods meeting this condition is calculated. The set of high-risk periods obtained through the above determination constitutes the basic time boundary for subsequent assessments of ramping power demand and timing reserve demand based on market-reported data.
[0036] This invention provides a method for calculating the ramp power demand during periods of higher risk the following day based on market declaration data (i.e., step S2 of this invention), which specifically includes the following sub-steps: S21, acquire and process the declared power data of distributed renewable energy participating in the electricity spot market.
[0037] Under the electricity spot market mechanism, the marginal operating cost of renewable energy generation approaches zero. To ensure full absorption and settlement according to the marginal market price, distributed renewable energy power plants typically adopt a market strategy of bidding at zero or negative prices.
[0038] Such market reporting behavior, along with the limitations of the forecasting capabilities of distributed generation equipment, results in an objective discrepancy between the total renewable energy reporting power curve obtained by the system and the provincial grid-side predicted power curve based on meteorological models. This directly affects the delineation of system ramp-up constraint boundaries during the market clearing process. The system acquires the day-ahead reporting power data for wind power and various types of photovoltaic power generation in the electricity market trading system for the following day, and then sums up the reporting power of each market participant distributed across different nodes.
[0039] For the period of higher risk of hill climbing the following evening as determined by the aforementioned steps, the changes in the total added value of wind power declared power and the total added value of photovoltaic power declared power between adjacent time periods are extracted respectively.
[0040] S22, calculate the adjustable resource ramping power demand based on the actual declared data.
[0041] To ensure that the ramp-up constraints in the market-clearing model accurately reflect the regulation demand after distributed renewable energy enters the market, the obtained declared power change is used to replace the original predicted power change, and the ramp-up power demand during the high-risk period in the evening of the following day is recalculated. Combining the predicted system load change and the incremental tie-line power receiving plan for the same time interval, the regulation resource ramp-up power demand based on the declared data is calculated. The specific calculation formula is as follows: ; In the formula, For a moment and time Adjustable resource ramping power requirements based on declared data; For a moment and time Predicted values of system load changes between; For a moment and time Increased power supply plan for the interconnection lines; For a moment and time The change in the total added value of wind power declared power between the two periods; For a moment and time The change in the total added value of centralized and distributed photovoltaic power declared between [time]. This falls within the set of periods with higher ramp-up risk identified in the aforementioned steps. The ramp-up power demand determined through this step, based on the declared data, forms the foundational parameters for subsequent quantitative assessment of the ramp-up gap of newly opened conventional generating units.
[0042] This invention provides a method for calculating the distribution of ramp-up gaps under different new conventional unit opening schemes (i.e., step S3 of this invention), which specifically includes the following sub-steps: S31 generates a set of regular units that need to be newly opened.
[0043] During the current dispatch planning phase, new energy storage will not be included in the system regulation resource pool for optimization calculations. A safety-constrained unit combination model will be established with the goal of minimizing system operating economy or overall cost, while simultaneously setting the required ramp-up reserve capacity for the system. The product of the ramp-up risk assessment parameters obtained from the aforementioned calculations and the uncertainty index of the regulation resource ramp-up power demand will be used as the ramp-up reserve constraint condition in this model. By solving this safety-constrained unit combination model, the start-up and shutdown states of units that meet the system operating constraints will be obtained. Conventional units in the newly started state from the model calculation results will be extracted and summarized to generate a set of conventional units that need to be newly started.
[0044] For the construction of the safety-constrained unit combination model and the solution method of mixed integer linear programming, those skilled in the art can set the calculations according to the actual operating parameters of the power system. The model construction and solution process are well-known technologies in this field and will not be elaborated here.
[0045] S32, a separate scheme for newly opened conventional generating units.
[0046] After obtaining the set of new conventional generating units that need to be started, a mathematical combination calculation method is used to obtain all subsets contained in this set. Each calculated subset is defined as an independent start-up combination method, thereby generating multiple different new conventional generating unit start-up schemes. Traversing all possible unit combination subsets can cover the physical boundary states of various conventional power sources being put into operation, providing a basic comparative dimension for subsequent evaluation of the system ramp-up gap distribution characteristics under each scheme.
[0047] S33, calculate the expected value and standard deviation of the random variable of the climbing gap under each scheme.
[0048] For each newly designated conventional generating unit, the ramp-up capacity of existing operating units within the system and the ramp-up power demand revised based on market-reported data are considered to quantify the ramp-up gap during high-risk periods. Due to load and renewable energy forecasting errors, the actual ramp-up gap exhibits a probability distribution characteristic, which is defined as a random variable. The expected value of the ramp-up gap random variable is calculated based on the ramp-up capacity of existing regulating units, the ramp-up capacity of newly designated conventional generating units in the selected schemes, and the regulating resource ramp-up power demand based on the reported data. The uncertainty index of the regulating resource ramp-up power demand is used as the standard deviation of this random variable. The specific calculation formula is as follows: ; ; In the formula, For the plan At any moment and time The random variable of the climbing gap between them; For the random variable of the slope gap Expected value; For a moment and time The total ramping capacity of the existing regulating units between them; For the plan China's newly opened conventional generating units are on time and time The ability to climb hills between them; For a moment and time Adjustable resource ramping power requirements based on declared data; For the random variable of the slope gap Standard deviation; For a moment and time The uncertainty index of the power demand for resource ramping between the two.
[0049] This invention provides a method for calculating the correlation coefficient between climbing gaps at different time periods (i.e., step S4 of this invention), which specifically includes the following sub-steps: S41, obtain the time-series correlation parameters of the error of each prediction data at different times.
[0050] During the physical operation of the system, changes in meteorological conditions and user electricity consumption behavior often exhibit temporal continuity. Therefore, during the daily evening ramp-up phase, although the prediction errors at multiple adjacent times show coupling characteristics, they are not completely linearly correlated. Time series of system load prediction errors, wind power output prediction errors, and photovoltaic output prediction errors, including periods with higher ramp-up risk, are extracted separately.
[0051] By statistically comparing historical operation and prediction deviation data, the correlation coefficients between system load prediction errors, wind power output prediction errors, and photovoltaic power output prediction errors at different times were calculated.
[0052] For the specific mathematical derivation and calculation of the correlation coefficient of the prediction error of a single variable at different times, those skilled in the art can use conventional time series analysis and statistical correlation calculation methods. The calculation process is a well-known technology in this field and will not be elaborated here.
[0053] S42, calculate the comprehensive correlation coefficient between the random variables of the climbing gap at different times.
[0054] Combining the uncertainty index of the ramp-up power demand of regulating resources obtained in the preceding steps with the standard deviation of the error of each prediction data, the time-series correlation parameters of each variable at different times are comprehensively converted. The standard deviations of the system load, wind power, and photovoltaic power at different times are multiplied by their corresponding error correlation coefficients and summed, then divided by the product of the uncertainty index of the total ramp-up power demand of regulating resources at different times to obtain the comprehensive correlation coefficient between the ramp-up gaps at different times. The specific calculation formula is as follows: ; In the formula, For the random variable of the slope gap at different times Random variables of climbing gaps The correlation coefficient; For predicted values and predicted value The correlation coefficient of the prediction error; For a moment and time Predicted values of system load changes between; For a moment and time Predicted values of system load changes between; For predicted values The standard deviation of the prediction error; For predicted values The standard deviation of the prediction error; For predicted values and predicted value The correlation coefficient of the prediction error; For a moment and time Predicted values of wind power variation between; For a moment and time Predicted values of wind power variation between; For predicted values The standard deviation of the prediction error; For predicted values The standard deviation of the prediction error; For predicted values and predicted value The correlation coefficient of the prediction error; For a moment and time The predicted total change in centralized and distributed photovoltaic power between the two; For a moment and time The predicted total change in centralized and distributed photovoltaic power between the two; For predicted values The standard deviation of the prediction error; For predicted values The standard deviation of the prediction error; For a moment and time Uncertainty indicators of the power demand for adjusting resource ramping between; For a moment and time The uncertainty index of the power demand for resource ramping between the two.
[0055] The correlation coefficients of the ramp gaps at different times, calculated using the above formula, are typically less than 1. This numerical characteristic indicates a low probability of extreme superposition of prediction biases at multiple adjacent times. Based on the characteristic that the errors are not perfectly correlated, if ramp reserve adjustment resources between multiple adjacent times can be shared across time periods, overcoming time constraints, the total actual ramp reserve required by the system during these high-risk periods will decrease.
[0056] The clarification of this physical characteristic demonstrates the feasibility and advantages of introducing new energy storage with cross-time scheduling capabilities to participate in ramp-up regulation. Under the same overall ramp-up reserve configuration, unlike the independent and fixed reserve capacity of conventional units at each time, the flexible ramp-up time-selective reserve can provide a greater safety margin for system operation.
[0057] This invention provides a method for characterizing the timing reserve requirement during the ramp-up phase under different gap risk control requirements (i.e., step S5 of this invention), which specifically includes the following sub-steps: S51, clarify the timing regulation characteristics of new energy storage and construct a random variable for timing reserve demand.
[0058] The new energy storage system features time-shifting characteristics. It charges to store energy during midday off-peak hours and peak solar power generation periods, and discharges during the system ramp-up phase caused by the decline in solar power output each evening.
[0059] The characteristics of this equipment enable the new energy storage to overcome the physical limitations of conventional regulating units, which are restricted to a fixed ramp rate at a single moment. It allows for cross-period discharge scheduling based on power shortages throughout the high-risk phase. This method classifies the surplus regulating capacity provided by conventional units as fixed ramp reserve and the cross-period regulating capacity provided by the new energy storage as time-selective ramp reserve.
[0060] Because the timing-based ramp-up backup has the flexibility to be freely allocated at different times, the overall timing-based backup requirement of this scheme during the ramp-up phase is equivalent to the sum of the ramp-up gaps at all times within the aforementioned set of high-risk time periods.
[0061] Regarding the physical operating boundary of the system, the system will only generate an actual backup power call action when the ramp gap value within the time interval is greater than zero; When the gap is less than or equal to zero, the system can meet the ramp-up requirements by relying on existing newly started units. Therefore, a truncation function is used to extract the ramp-up gaps greater than zero at each time point and sum them up. This summation is used to define a random variable representing the timing standby requirement of this scheme. The specific calculation formula is as follows: ; In the formula, For the plan Random variables for timing reserve requirements; This refers to the first time period number among the periods with higher climbing risk calculated in the aforementioned steps. This refers to the total number of periods with higher climbing risk calculated in the aforementioned steps. This is a time sequence number variable used to iterate through the set of high-risk time periods; For the solution cc at time and time The random variable representing the gap between the slopes.
[0062] S52, Based on risk control parameters, construct and establish a probabilistic constraint model for timing reserve requirements.
[0063] In the day-ahead phase, the power system cannot completely eliminate forecasting errors for load and renewable energy. Pursuing zero-gap risk would lead to a large amount of redundant reserves, reducing economic efficiency. Therefore, a tolerance probability threshold for ramp-up gaps in actual system operation is set and used as a risk control parameter in this assessment calculation.
[0064] Based on the random variable of time-sensitive reserve demand established in the above steps, a probability inequality condition oriented towards operational risk management is constructed. A certain reserve capacity value is set, requiring that the statistical probability of the random variable of time-sensitive reserve demand for this scheme being less than this capacity value is greater than or equal to a set system safety probability limit. Under the condition of satisfying the above probability distribution inequality constraint, the minimum value of the reserve capacity that makes this constraint hold is found, and this value is determined as the specific evaluation index of the time-sensitive reserve demand of this scheme under specific risk control requirements. The specific calculation formula is as follows: ; In the formula, For the plan Medium risk control parameters Corresponding timing backup requirements; Auxiliary variables are calculated to satisfy the system probability constraints for reserve capacity calculation; Indicates the statistical probability of an event occurring; For the plan Random variables for timing reserve requirements; This is a risk control parameter used to characterize the probability limit of the actual existence of a climbing gap in the system.
[0065] This invention provides a method for solving the timing reserve requirement during the climbing phase and generating evaluation results (i.e., step S6 of this invention), comprising the following steps: S61, calculate the covariance matrix and perform matrix decomposition.
[0066] The random variable of the climbing gap constructed in the aforementioned steps follows a normal distribution. The random variable of the timing reserve requirement, which includes the sum of climbing gaps at multiple different times, belongs to the sum of truncated normal random variables. Since it is difficult to obtain an exact solution by directly calculating the sum of truncated normal distribution variables using mathematical analytical methods, the Monte Carlo simulation method is used for numerical solution calculation.
[0067] The uncertainty index of the ramp-up power demand obtained in the aforementioned steps is used to construct a covariance matrix with the correlation coefficient of the ramp-up gap at different times. The specific calculation formula is as follows: ; In the formula, Let A be the first covariance matrix. Line 1 Column elements; This is the first time period within the period with the highest risk of climbing. The random variables and correlation coefficients of the climbing gaps at different times; For a moment and time Uncertainty indicators of the power demand for adjusting resource ramping between; For a moment and time The uncertainty index of the power demand for resource ramping between the two.
[0068] Based on the constructed covariance matrix, a Cholesky decomposition operation is performed on it to obtain the corresponding lower triangular matrix, which is used to generate relevant normal variables in subsequent steps. This satisfies the following relationship: ; In the formula, The covariance matrix is constructed using uncertainty indicators and correlation coefficients; The lower triangular matrix is obtained by performing Cholesky decomposition on the covariance matrix; This is the transpose of the lower triangular matrix.
[0069] The underlying mathematical algorithm for solving the Cholesky decomposition of a matrix can be implemented by those skilled in the art using conventional numerical analysis and matrix calculation tools. The decomposition principle is a well-known technology in this field and will not be elaborated here.
[0070] S62 generates independent standard normal random numbers and converts them into relevant normal variable samples.
[0071] Construct a sample basis matrix for Monte Carlo simulation calculations, setting the number of rows in the matrix to the number of simulated samples and the number of columns to the total number of periods with high climbing risk. Ensure that each element in the matrix independently follows a standard normal distribution with a mean of 0 and a standard deviation of 1.
[0072] Combining the expected ramp-up gap value corresponding to the newly opened conventional unit scheme obtained in the preceding steps with the lower triangular matrix obtained from the aforementioned decomposition, the independently generated basic random number sample sequence is converted into a normal variable sample with time-series correlation. Specifically, the conversion is performed according to the following matrix operation formula: ; In the formula, For the first Schemes in group samples At any moment and time Sample values of the slope gap between; For the first Schemes in group samples At any moment and time Sample values of the slope gap between; For the first Schemes in group samples At any moment and time Sample values of the slope gap between; For the plan At any moment and time The expected value of the random variable representing the gap between the slopes; For the plan At any moment and time The expected value of the random variable representing the gap between the slopes; For the plan At any moment and time The expected value of the random variable representing the gap between the slopes; The lower triangular matrix is obtained by performing Cholesky decomposition on the covariance matrix; These are the independent standard normal random number elements generated in the matrix; This represents the total number of periods with a higher risk of hill climbing.
[0073] S63, calculate the total demand for the positive ramp gap in each group of simulated samples.
[0074] Iterate through all generated sample group sequences. For each set of correlated ramp gap sample values, evaluate the backup call volume during high-risk periods in this simulated scenario. Use a truncation function to filter out ramp gap values greater than zero in each period and accumulate them, discarding values less than or equal to zero to obtain the total positive ramp gap demand for that sample group. The specific calculation formula is as follows: ; In the formula, For the first Scheme under group samples The upward slope gap in total demand; This is the first time period within the period with the highest risk of climbing. This represents the total number of periods with a higher risk of hill climbing. This is a time sequence number variable used to iterate through the set of high-risk time periods; For the first Schemes in group samples At any moment and time Sample values of the slope gap between them.
[0075] S64, extract the values of risk control indicators and summarize them to generate the assessment results.
[0076] After obtaining the total demand calculation results for the positive ramp-up gap corresponding to all sample groups, all calculated values are sequentially arranged in ascending order. Based on the aforementioned risk control parameters, values corresponding to specific quantile positions are extracted from the arranged sequence. The value at the [number]th [quantile] in the sorted sequence is then [selected]. The calculated value is determined as the final solution for the timed standby requirement of the newly opened conventional unit scheme under specific risk constraints.
[0077] Based on the above calculation process, parallel calculations are performed on all schemes divided into the set of conventional units requiring new operation, obtaining multiple sets of time-based standby demand data under different schemes and combinations of risk control parameters. The obtained calculation results are integrated and entered into a comprehensive assessment table of ramp-up adjustment demand. The data in the assessment table is directly imported into the spot market clearing model as constraint boundary parameters, providing a clear capacity and time period basis for the dispatch system to call up new energy storage equipment.
[0078] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A method for assessing the ramp-up adjustment demand for distributed new energy vehicles entering the market, characterized in that, Includes the following steps: Based on forecast data and conventional unit operation, the period with higher risk of ramp-up the following evening is calculated and determined, and the uncertainty index of the corresponding ramp-up power demand of regulating resources is determined. Based on market reporting data, calculate the adjustable resource ramping power demand based on the reporting data for the period with higher ramping risk in the evening of the following day; Based on the ramping capacity of the existing regulating units, the ramping capacity of the newly opened conventional units, and the ramping power demand of the regulating resources based on the declared data, the ramping gap distribution under different new conventional unit opening schemes is calculated, the expected value of the ramping gap random variable under each new conventional unit opening scheme is obtained, and the uncertainty index is used as the standard deviation of the random variable. By combining the aforementioned uncertainty indicators, the standard deviation of the prediction error of each prediction data and their corresponding error correlation coefficients, the comprehensive correlation coefficient between the climbing gaps at different times during the period with the highest climbing risk on the evening of the next day is calculated. Based on the timing regulation characteristics of the new energy storage, the random variable of timing reserve demand is defined by summing up the climbing gaps that are greater than zero during the period when the climbing risk is relatively high in the evening of the next day, which represents the timing reserve demand of the climbing stage under different gap risk control requirements. The Monte Carlo simulation method is used to construct a covariance matrix using the uncertainty index and the comprehensive correlation coefficient, and the independent standard normal random numbers are converted into relevant normal variable samples by combining the expected value to solve the timing reserve demand of the ramp-up stage, and a comprehensive assessment result of the ramp-up adjustment demand is generated.
2. The method for assessing the ramp-up adjustment demand for distributed new energy vehicles according to claim 1, characterized in that, Based on predicted data and conventional unit operating conditions, the process calculates and determines the period with the highest risk of ramp-up the following evening, and identifies the corresponding uncertainty indicators for the ramp-up power demand of regulating resources. Specifically, this includes: The difference between the predicted value of the system load change and the predicted value of the change of each power supply and the planned increment of external power reception between adjacent time points is calculated to obtain the ramp-up power demand of the adjustment resources based on the predicted data. The standard deviation of the prediction error is calculated to obtain the uncertainty index of the ramp-up power demand of the adjustment resources; By summarizing the adjustment capabilities of various conventional generating units at adjacent times during the evening operation, the total ramp-up capability of conventional generating units can be obtained. The uncertainty index is multiplied by the ramp risk assessment parameter to obtain the ramp power reserve margin. When the total ramp capacity of the conventional unit is less than the sum of the ramp power demand of the regulation resource and the ramp power reserve margin, the corresponding time interval is determined to be the period with a higher ramp risk in the evening of the next day.
3. The method for assessing the ramp-up adjustment demand for distributed new energy vehicles according to claim 1, characterized in that, The calculation of the adjustable resource ramping power demand based on the reported data for the period with higher ramping risk the following evening specifically includes: Extract the changes in the total added value of wind power declared power and photovoltaic power declared power between adjacent time points; The original predicted power change is replaced by the extracted total power change value. Combined with the predicted system load change value and the tie-line power receiving plan increment, the regulated resource ramp-up power demand based on the actual declared data is calculated.
4. The method for assessing the ramp-up adjustment demand for distributed new energy vehicles according to claim 1, characterized in that, The calculation of the ramp-up gap distribution under different new conventional unit opening schemes, obtaining the expected value of the ramp-up gap random variable under each new conventional unit opening scheme, and using the uncertainty index as the standard deviation of the random variable, specifically includes: Solve the safety constraint unit combination model to extract the conventional units in the newly opened state and generate the set of conventional units that need to be opened; A subset of the conventional unit set is obtained to generate multiple different schemes for opening new conventional units; Based on the ramping capacity of the existing regulating units, the ramping capacity of the newly opened conventional units in the new conventional unit plan, and the ramping power demand of regulating resources based on actual application data, the expected value of the ramping gap random variable is calculated. The uncertainty index of the power demand for adjusting resource ramping is used as the standard deviation of the ramping gap random variable to obtain the expected value and standard deviation of the ramping gap random variable under each new conventional unit scheme.
5. The method for assessing the ramp-up adjustment demand for distributed new energy vehicles according to claim 4, characterized in that, The unit combination model for solving safety constraints extracts conventional units in a newly activated state, generating a set of conventional units that need to be newly activated, specifically including: Set the required ramp-up reserve capacity for the system, and use the product of the ramp-up risk assessment parameters and the uncertainty index of the ramp-up power demand of the adjustment resources as the ramp-up reserve constraint. The safety-constrained unit combination model is established and solved with the goal of minimizing the system's operating economy or overall cost, and the unit start-up and shutdown states that meet the system's operating constraints are obtained. Extract the conventional units that are in the newly opened state from the model calculation results, and summarize them to generate a set of conventional units that need to be newly opened.
6. The method for assessing the ramp-up adjustment demand for distributed new energy vehicles according to claim 1, characterized in that, The calculation of the comprehensive correlation coefficient between the climbing gaps at different times during the period of highest climbing risk on the evening of the following day specifically includes: Extract the time series of prediction errors and calculate the correlation coefficients between system load prediction errors, wind power output prediction errors and photovoltaic output prediction errors at different times. The comprehensive correlation coefficient between the ramp-up gaps at different times is calculated by multiplying the standard deviations of the prediction errors of system load, wind power, and photovoltaic power at different times with their corresponding correlation coefficients, and then dividing by the product of the uncertainty index of the ramp-up power demand at different times.
7. The method for assessing ramp-up adjustment demand for distributed new energy vehicles according to claim 1, characterized in that, The defined random variable for timing reserve requirements represents the timing reserve requirements during the ramp-up phase under different gap risk control requirements, specifically including: The climbing gaps at all times within the set of time periods with high climbing risk on the evening of the next day are filtered out, and only the climbing gaps with values greater than zero within the time interval are extracted and summed to construct and obtain the random variable for time-selective backup needs. Set the tolerance probability threshold for the existence of ramp-up gaps in the actual operation of the system as a risk control parameter, and construct a probability distribution inequality condition that requires the statistical probability that the random variable of the time-selective standby demand is less than the standby capacity value is greater than or equal to the system safety probability limit. Find the minimum value of the reserve capacity that makes the probability distribution inequality condition hold, and calculate the timing reserve requirement during the ramp-up phase under the risk control requirements.
8. The method for assessing the ramp-up adjustment demand for distributed new energy vehicles according to claim 2, characterized in that, The method of using Monte Carlo simulation to solve for the timing reserve demand during the climbing phase and generating a comprehensive assessment result of the climbing adjustment demand specifically includes: A covariance matrix is constructed using the correlation coefficient between the uncertainty index of the adjustment resource ramping power demand and the ramping gap at different times. The covariance matrix is then subjected to Cholesky decomposition to obtain a lower triangular matrix. By combining the expected value of the random variable of the climbing gap and the lower triangular matrix, the independently generated basic random number sample sequence is transformed into a normal variable sample with time-series correlation. The truncation function is used to filter out the climbing gap values that are greater than zero in each time period and sum them up to obtain the total positive climbing gap demand for each group of simulated samples. After sorting the total demand for the positive ramp gap, the values corresponding to the preset quantile ratio positions are extracted according to the risk control parameters as the solution results for the time-selective backup demand, and the results are summarized to generate a comprehensive evaluation result of the ramp adjustment demand.
9. The method for assessing ramp-up adjustment demand for distributed new energy vehicles according to claim 8, characterized in that, The process of combining the expected value of the random variable representing the climbing gap with the lower triangular matrix to transform the independently generated basic random number sample sequence into a normal variable sample with time-series correlation specifically includes: Construct a sample basis matrix for Monte Carlo simulation calculations. Set the number of rows in the sample basis matrix to the number of simulated samples and the number of columns to the total number of periods with high climbing risk, so that each element in the sample basis matrix independently follows a standard normal distribution with a mean of zero and a standard deviation of one. Multiply the standard normal random number element matrix in the sample basis matrix with the lower triangular matrix, and add it to the expected value matrix of the climbing gap random variable to calculate the normal variable sample with time-series correlation.
10. A ramp-up demand assessment system adapted to the entry of distributed renewable energy into the market, applied to the ramp-up demand assessment method adapted to the entry of distributed renewable energy into the market as described in any one of claims 1-9, characterized in that, include: The risk assessment module is used to determine the period with a higher risk of ramping up the following evening based on forecast data and the normal operation of the generating units, and to determine the uncertainty index of the corresponding ramping power demand of the regulating resources. The demand adjustment module is used to calculate the adjustable resource ramping power demand based on the market declaration data during the period with higher ramping risk. The gap calculation module is used to calculate the distribution of the ramp gap under different new conventional unit schemes based on the ramping capacity of the existing regulating units and the ramping power demand of the regulating resources based on the declared data, obtain the expected value of the ramp gap random variable, and use the uncertainty index as the standard deviation of the random variable. The correlation analysis module is used to combine the uncertainty index, the standard deviation of the prediction error of each prediction data and its corresponding error correlation coefficient to solve the comprehensive correlation coefficient between the climbing gaps at different times during the period with high climbing risk. The backup characterization module is used to sum up the ramp gaps greater than zero during the period of high ramp risk based on the timing adjustment characteristics of the new energy storage to define a random variable of timing backup demand, characterizing the timing backup demand of the ramp stage under different gap risk control requirements. The simulation evaluation module is used to construct a covariance matrix using the Monte Carlo simulation method, the uncertainty index and the comprehensive correlation coefficient, and the independent standard normal random numbers are converted into relevant normal variable samples by combining the expected value, to solve the timing reserve demand of the ramp-up stage, and generate a comprehensive evaluation result of the ramp-up adjustment demand.
