A method for dynamically adjusting speed limits for traffic flow control in severe weather

By collecting meteorological and traffic flow parameters in real time, dynamically calculating the speed limit benchmark value and combining it with visibility constraints, a closed-loop optimization model for speed limit decision-making is constructed, which solves the problem of unreasonable speed limits under severe weather conditions and improves both safety and efficiency.

CN123072191APending Publication Date: 2026-11-10YUNNAN COMM INVESTMENT & CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611154797.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-31
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing technologies cannot dynamically adjust speed limits under severe weather conditions, resulting in speed limits that are either too strict or insufficient. They cannot cope with differences in alignment conditions, road surface materials, and drainage capacity on different road sections, and lack a comprehensive assessment of traffic flow status, leading to an increased risk of traffic accidents.

Method used

By collecting meteorological, road surface, and traffic flow parameters in real time, the safe speed limit benchmark value of road sections is dynamically calculated. Combined with visibility constraints and traffic flow dynamic load factors, a closed-loop optimization model for speed limit decision-making is constructed to achieve two-way coupling between speed limit value and traffic capacity.

Benefits of technology

It has improved the scientific rigor and precision of speed limit decisions under severe weather conditions, enhanced driving safety and road traffic efficiency, and avoided the problems of excessively strict or insufficient speed limits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123072191A_ABST
    Figure CN123072191A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of intelligent traffic control technology and discloses a method for dynamically adjusting speed limits in severe weather traffic flow control. It involves real-time collection of meteorological, road surface condition, and traffic flow parameters; dynamic compensation of water film thickness based on rainfall or snowfall intensity and road surface condition; calculation of a safe speed limit benchmark value for a road segment based on the anti-skid coefficient and vehicle dynamics model; determination of a visibility-constrained speed limit value based on visibility classification; obtaining an initial speed limit decision value by taking the smaller value from the benchmark value; constructing a dynamic traffic flow load factor weighted by the flow-load ratio and speed dispersion; dynamically reducing the initial speed limit to output a target speed limit value; calculating traffic capacity and predicting arrival flow based on the target speed limit value; generating ramp control instructions as needed; and finally feeding the target speed limit value back to the traffic capacity calculation module for rolling execution at adaptive time intervals, forming a two-way coupled dynamic closed-loop control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of intelligent traffic control technology, specifically relating to a method for dynamically adjusting speed limits for traffic flow control in severe weather. Background Technology

[0002] Under adverse weather conditions (such as rain, snow, and fog), driving safety on highways and urban expressways is significantly reduced, mainly due to two issues: First, slippery road surfaces reduce tire adhesion, resulting in a substantial increase in vehicle braking distance; second, reduced visibility limits the driver's field of vision, compressing the time for perception and reaction to road conditions ahead, which can easily lead to rear-end collisions, skidding, and other traffic accidents.

[0003] Current speed limit control measures for severe weather mostly employ fixed threshold methods, simply setting a few fixed speed limits based on weather levels. However, this one-size-fits-all static strategy has significant drawbacks: Firstly, under the same rainfall intensity, different road sections have vastly different alignment conditions, pavement materials, and drainage capacities, making fixed speed limits unable to reflect the specificity of each section. Secondly, existing methods mostly consider a single factor in isolated factors such as pavement adhesion or sight distance constraints, lacking a comprehensive assessment of their synergistic effects, and almost never incorporating the traffic flow itself into the feedback loop of speed limit decisions. This results in a lack of dynamic coupling between speed limits and actual traffic capacity, easily leading to a dilemma in severe weather where overly strict speed limits waste road resources or insufficient speed limits increase accident risks. Furthermore, existing solutions lack the ability to predict short-term traffic demand and cannot proactively implement ramp control before saturation levels rise, often responding passively after congestion occurs, resulting in low control efficiency. Summary of the Invention

[0004] The purpose of this invention is to provide a method for dynamically adjusting speed limits in traffic flow control during severe weather, thereby solving the aforementioned technical problems.

[0005] The objective of this invention can be achieved through the following technical solutions: A method for dynamically adjusting speed limits for traffic flow control in severe weather includes the following steps: Step S1, real-time collection of meteorological parameters, road surface condition parameters, and traffic flow parameters of the target road segment; Step S2: Calculate the safe speed limit benchmark value for the road section based on the road surface condition parameters and the rainfall intensity or snowfall intensity in the meteorological parameters; Step S3: Calculate the flow load ratio and speed dispersion index based on the traffic flow parameters, and adjust the weighting coefficients of the flow load ratio and speed dispersion index in the fusion process according to the weather intensity level in the meteorological parameters to construct the traffic flow dynamic load factor. Step S4: Determine the visibility constraint speed limit value based on the visibility value in the meteorological parameters, and take the smaller of the road section safe speed limit benchmark value and the visibility constraint speed limit value as the initial speed limit decision value. Step S5: Dynamically reduce the initial speed limit decision value based on the traffic flow dynamic load factor, and output the target speed limit value; Step S6: Calculate the theoretical capacity of the road segment based on the target speed limit value, and predict the predicted arrival flow in the future time period. When the predicted arrival flow is greater than the product of the theoretical capacity of the road segment and the preset safety redundancy coefficient, generate an entrance ramp flow control instruction and send the target speed limit value and the ramp flow control instruction to the execution terminal. Step S7: Feed back the target speed limit value to step S3 as the update input of the basic traffic capacity on which the flow load ratio calculation is based in the next cycle, and repeat steps S1 to S6 at preset time intervals to form a dynamic rolling optimization control closed loop that couples speed limit value and traffic capacity.

[0006] As a further description of the technical solution of the present invention, the meteorological parameters in step S1 include visibility, rainfall intensity, and snowfall intensity; the road surface condition parameters include the initial value of water film thickness and road surface texture depth; and the traffic flow parameters include the real-time flow rate of the cross section, the instantaneous speed of each vehicle, and the time occupancy rate.

[0007] As a further description of the technical solution of the present invention, the specific method for calculating the road section safe speed limit benchmark value in step S2 is as follows: Based on the initial value of water film thickness and road texture depth in the road surface condition parameters, and the equivalent rainfall intensity calculated from the rainfall intensity or snowfall intensity in the meteorological parameters, the water film thickness at the current moment is dynamically compensated according to the following formula: In the formula, The current water film thickness. This is the initial value for the water film thickness. The intensity of rainfall or equivalent rainfall. The road surface drainage rate; The current water film thickness Substitute into the following formula to calculate the anti-skid coefficient : In the formula, The baseline skid resistance coefficient for dry road surfaces. For road surface texture depth, , , These are the model parameters obtained through calibration experiments; Substitute the real-time anti-skid coefficient into the vehicle dynamics model to calculate the safe speed limit benchmark value for the road section: In the formula, This is the baseline value for the safe speed limit of the aforementioned road section. It is the acceleration due to gravity. This is a pre-set safe braking distance based on the geometric alignment of the target road segment.

[0008] As a further description of the technical solution of the present invention, the specific method for adjusting the weighting coefficient according to the weather intensity level in step S3 is as follows: The flow load ratio weighting coefficient is denoted as The weighting coefficient of the velocity dispersion index is denoted as ,and + =1, and The values ​​of are all within the interval (0, 1); The rainfall intensity or snowfall intensity in the meteorological parameters is converted into the equivalent liquid water precipitation rate, denoted as . ; The and Determine using the following formula: , In the formula, The equivalent liquid water precipitation rate at the current moment. The preset reference precipitation rate, The value is determined based on the precipitation rate threshold calibrated from historical accident data of the target road section; The traffic flow dynamic load factor is obtained by summing the traffic flow load ratio and speed dispersion index after assigning corresponding weights to them. .

[0009] As a further description of the technical solution of the present invention, the flow load ratio is obtained in the following manner: Obtain the design speed of the target road segment, denoted as . ; Obtain the real-time traffic flow through the target road segment section within the current time period, denoted as . The real-time cross-sectional flow rate is obtained by dividing the total number of vehicles passing through the preset time window by the duration of the preset time window. Calculate the actual traffic capacity of the road section under the current severe weather conditions using the following formula. : ,in, The design capacity of the target road section under clear weather conditions. The average speed of all vehicles passing through the target road section within the current time period is denoted by m, which is a preset capacity decay index. The value of m ranges from 1.5 to 2.5. Calculate the flow-load ratio using the following formula. : ,when When ≥1, take =1; The velocity dispersion index is obtained in the following manner: Obtain the instantaneous speed sample set of all vehicles passing through the target road segment section within the current time period, denoted as { , ,..., }, where n is the total number of vehicles passing through the section in the current time period; Calculate the sample standard deviation separately and sample average speed Calculate the velocity dispersion index using the following formula. : ,when When ≥1, take =1.

[0010] As a further description of the technical solution of the present invention, the step S4 of determining the visibility constraint speed limit value based on the visibility value specifically involves: When the visibility is greater than or equal to the first visibility threshold, the visibility constraint speed limit value is the legally mandated maximum speed limit for the road segment; When the visibility is greater than or equal to the second visibility threshold and less than the first visibility threshold, the visibility constraint speed limit value is the first speed limit value; When the visibility is greater than or equal to the third visibility threshold and less than the second visibility threshold, the visibility constraint speed limit value is the second speed limit value; When the visibility is less than the third visibility threshold, the visibility constraint speed limit value is the third speed limit value, and a road closure warning signal is triggered at the same time. Wherein, the first visibility threshold is greater than the second visibility threshold, the second visibility threshold is greater than the third visibility threshold, the first speed limit is greater than the second speed limit, and the second speed limit is greater than the third speed limit.

[0011] As a further description of the technical solution of the present invention, the specific method for dynamically reducing the initial speed limit decision value based on the traffic flow dynamic load factor in step S5 is as follows: In the formula, The target speed limit value, The traffic flow dynamic load factor, For the preset reduction factor, This is the initial speed limit decision value; The dynamic reduction process is protected by a lower limit: if the calculated value is... If the speed limit is less than the preset legal minimum speed limit, then the legal minimum speed limit will be directly taken as the target speed limit.

[0012] As a further description of the technical solution of the present invention, the specific method for calculating the theoretical traffic capacity of the road segment in step S6 is as follows: In the formula, The theoretical traffic capacity of the road section Design speed for the road section; The inlet ramp flow control instructions include the green light duration adjustment value of the ramp traffic lights or the ramp closure trigger signal.

[0013] As a further description of the technical solution of the present invention, the specific method for predicting the predicted arrival flow in the future time period in step S6 is as follows: Based on the current time, capture the passage time and instantaneous speed of each vehicle that passed through the upstream detection section within a preset time window in the past; For each vehicle intercepted, the estimated time of arrival at the target road section is calculated based on the instantaneous speed of the vehicle passing through the upstream detection section and the fixed distance between the upstream detection section and the target road section section. All vehicles whose estimated time falls within a preset future time window after the current time are identified as predicted arriving vehicles. The total number of these vehicles is counted and divided by the duration of the preset future time window to obtain the predicted arrival traffic.

[0014] As a further description of the technical solution of the present invention, the specific method of feeding back the target speed limit value to step S3 as the basic traffic capacity update input in step S7 is as follows: ,in, To improve basic traffic capacity under adverse weather conditions. The target speed limit value from the previous round; In step S7, when steps S1 to S6 are repeated at a preset time interval, the preset time interval is adaptively adjusted according to the weather intensity level in the meteorological parameters: the higher the weather intensity level, the shorter the preset time interval.

[0015] The beneficial effects of this invention are as follows: By dynamically compensating for water film thickness and combining an anti-skid coefficient model with vehicle dynamics equations, this invention enables the speed limit benchmark to adapt to different road segment alignment conditions, road surface materials, and drainage capacity. Simultaneously, it integrates visibility grading constraints with the minimum speed limit based on road surface adhesion, achieving coordinated safety assessment based on both sight distance and road surface adhesion physical constraints. By constructing a traffic flow dynamic load factor with adaptive precipitation rate weighting, it incorporates flow saturation and vehicle speed dispersion into speed limit reduction, and combines short-term arrival flow prediction with active ramp control, forming a two-way coupled dynamic rolling optimization closed loop between speed limit values ​​and traffic capacity. This invention effectively improves the scientific rigor and precision of speed limit decisions under adverse weather conditions, maximizing road segment traffic efficiency while ensuring driving safety, avoiding the dilemma of being "too strict" or "insufficient," and possesses significant socio-economic benefits and application value.

[0016] Of course, any product implementing this invention does not necessarily need to achieve all of the advantages described above at the same time. Attached Figure Description

[0017] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 This is a partial flowchart of the method for dynamically adjusting speed limits in traffic flow control during severe weather according to the present invention. Detailed Implementation

[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0020] like Figure 1 As shown, this embodiment of the invention provides a method for dynamically adjusting speed limits for traffic flow control in severe weather, including the following steps: Step S1, real-time collection of meteorological parameters, road surface condition parameters and traffic flow parameters of the target road segment; The meteorological parameters in step S1 include visibility, rainfall intensity, and snowfall intensity; the road surface condition parameters include the initial value of water film thickness and road surface texture depth; and the traffic flow parameters include real-time cross-sectional flow rate, instantaneous speed of each vehicle, and time occupancy.

[0021] Step S2: Calculate the safe speed limit benchmark value for the road section based on the road surface condition parameters and the rainfall intensity or snowfall intensity in the meteorological parameters; The specific method for calculating the road section safe speed limit benchmark value in step S2 is as follows: Based on the initial value of water film thickness and road texture depth in the road surface condition parameters, and the equivalent rainfall intensity calculated from the rainfall intensity or snowfall intensity in the meteorological parameters, the water film thickness at the current moment is dynamically compensated according to the following formula: In the formula, The current water film thickness. This is the initial value for the water film thickness. The intensity of rainfall or equivalent rainfall. The road surface drainage rate; The current water film thickness Substitute into the following formula to calculate the anti-skid coefficient : In the formula, The baseline skid resistance coefficient for dry road surfaces. For road surface texture depth, , , These are the model parameters obtained through calibration experiments; Substitute the real-time anti-skid coefficient into the vehicle dynamics model to calculate the safe speed limit benchmark value for the road section: In the formula, This is the baseline value for the safe speed limit of the aforementioned road section. It is the acceleration due to gravity. This is a pre-set safe braking distance based on the geometric alignment of the target road segment.

[0022] Through the above technical solution, in this embodiment, the system first uses the initial value of the water film thickness measured by the road surface condition sensor. Starting from this point, and combining it with real-time rainfall intensity (for snowfall, it is converted into equivalent liquid water precipitation rate), With the preset road surface drainage rate Using the integral formula The system dynamically tracks the actual water film thickness at any given moment, where the drainage rate is pre-calibrated based on the road surface's cross and longitudinal slopes and the material's permeability, and a saturation upper limit is set to prevent integral divergence; subsequently, the system dynamically updates... With road surface texture depth Substitute into the anti-skid coefficient model The baseline skid resistance coefficient for dry pavement Texture attenuation parameters , , All values ​​were obtained through calibration experiments using a pendulum friction tester under various wet and slippery conditions. Typical values ​​are as follows: =0.12、 =0.08、 =0.6, this model clearly characterizes the synergistic influence mechanism between the water film lubrication effect and the drainage capacity of the pavement microstructure on anti-skid performance; finally, the calculated anti-skid coefficient is... Substitute into the vehicle dynamics braking model In the formula, gravitational acceleration Taking a fixed value of 9.8 m / s², the safe braking distance The speed limit is pre-set based on geometric alignment parameters such as longitudinal slope, curve radius, and superelevation design of the target road section. For example, 120m can be used for straight road sections, while 150-200m can be used for curved road sections according to specifications. This outputs a safe speed limit benchmark value that is simultaneously constrained by both the slippery road surface condition and the geometric characteristics of the road section. The entire calculation process is driven by measured data, the model parameters are calibrable, and the physical meaning is clear. It can adaptively output a reasonable speed limit for different rainfall intensities, road surface materials, and alignment conditions, providing a reliable mechanical basis for subsequent integration with visibility constraints. It avoids the problem of overly strict or insufficient speed limits due to relying solely on empirical thresholds, and fully embodies the concept of refined and dynamic control.

[0023] Step S3: Calculate the flow load ratio and speed dispersion index based on the traffic flow parameters, and adjust the weighting coefficients of the flow load ratio and speed dispersion index in the fusion process according to the weather intensity level in the meteorological parameters to construct the traffic flow dynamic load factor. The specific method for adjusting the weighting coefficient based on the weather intensity level in step S3 is as follows: The flow load ratio weighting coefficient is denoted as The weighting coefficient of the velocity dispersion index is denoted as ,and + =1, and The values ​​of are all within the interval (0, 1); The rainfall intensity or snowfall intensity in the meteorological parameters is converted into the equivalent liquid water precipitation rate, denoted as . ; The and Determine using the following formula: , In the formula, The equivalent liquid water precipitation rate at the current moment. The preset reference precipitation rate, The value is determined based on the precipitation rate threshold calibrated from historical accident data of the target road section; The higher the precipitation rate, the thicker the water film on the road surface, the more significant the decrease in the skid resistance coefficient, and the more severe the loss of road section traffic capacity. In this case, the weight of the flow-load ratio (reflecting traffic pressure) on driving risk should logically increase. With precipitation rate Monotonically increasing, Follow It decreases monotonically, and its physical meaning is clear.

[0024] The value of is determined through statistical analysis of historical traffic flow and accident data for the target road segment: All rainy-day accident samples from the past three years are collected, and precipitation rate data at the time of the accidents are extracted. A scatter plot is drawn with the accident rate (number of accidents / cross-sectional flow) as the ordinate and precipitation rate as the abscissa. Piecewise linear fitting is performed on the scatter plots, and the precipitation rate value corresponding to the turning point where the accident rate significantly increases is taken as . The calibration values. Different road sections. It can be calibrated independently, with a value range of 3 mm / h to 8 mm / h.

[0025] The traffic flow dynamic load factor is obtained by summing the traffic flow load ratio and speed dispersion index after assigning corresponding weights to them. .

[0026] The flow load ratio is obtained in the following manner: Obtain the design speed of the target road segment, denoted as . ; Obtain the real-time traffic flow through the target road segment section within the current time period, denoted as . The real-time cross-sectional flow rate is obtained by dividing the total number of vehicles passing through the preset time window by the duration of the preset time window. Calculate the actual traffic capacity of the road section under the current severe weather conditions using the following formula. : ,in, The design capacity of the target road section under clear weather conditions. The average speed of all vehicles passing through the target road section within the current time period is denoted by m, which is a preset capacity decay index. The value of m ranges from 1.5 to 2.5. Calculate the flow-load ratio using the following formula. : ,when When ≥1, take =1; The velocity dispersion index is obtained in the following manner: Obtain the instantaneous speed sample set of all vehicles passing through the target road segment section within the current time period, denoted as { , ,..., }, where n is the total number of vehicles passing through the section in the current time period; Calculate the sample standard deviation separately and sample average speed Calculate the velocity dispersion index using the following formula. : ,when When ≥1, take =1.

[0027] Through the above technical solution, the core of this embodiment lies in constructing the traffic flow dynamic load factor FF, which is obtained by weighted fusion of traffic flow load ratio. With velocity dispersion index The system adaptively adjusts weighting coefficients based on weather intensity to quantify the additional impact of traffic flow risks on speed limits under severe weather conditions. In practice, the system first calculates the flow-load ratio. : Obtain the design speed of the target road segment and real-time cross-sectional flow during the current period (Obtained by dividing the total number of vehicles passing through within the preset time window by the window duration), and simultaneously according to the formula Estimate the actual traffic capacity of road sections under the current severe weather conditions, among which Designed for traffic capacity in clear weather. This represents the time-averaged speed of all vehicles within the specified time period. The attenuation index (ranging from 1.5 to 2.5, and 2.0 in the example) is then obtained. The amplitude is limited to the [0, 1] interval. This indicator reflects the saturation level of current traffic demand relative to the actual bearing capacity of the slippery road surface. Simultaneously, the system collects a set of instantaneous speed samples of all vehicles passing through the cross-section during the current time period. , ,..., } Calculate the sample standard deviation With sample average speed ,according to The speed dispersion index is obtained and limited to no more than 1. This index characterizes the degree of speed difference within the traffic flow; the greater the difference, the higher the risk of rear-end collisions and lane-changing conflicts. Then, the weighted adaptive stage is entered: the rainfall intensity or snowfall intensity is converted into the equivalent liquid water precipitation rate. ,according to , Determine the flow load ratio weight With dispersion weight ,in The precipitation rate threshold (typically 3-8 mm / h) is determined based on historical accident data for the target road section. Its physical meaning is that when the precipitation rate far exceeds the historical accident escalation threshold, road surface slippage becomes the dominant risk affecting traffic capacity. The contribution weight of the flow-load ratio monotonically increases, while the weight of speed dispersion decreases accordingly. Finally, the two indicators are weighted and summed to obtain the result. This factor is output to step S5 to dynamically reduce the initial speed limit decision value. Simultaneously, its value reflects the need for compressing the safety margin due to traffic flow turbulence, providing intermediate variables to support the subsequent capacity recalculation in the closed-loop feedback. The entire implementation process is based on measurable traffic flow parameters and calibrable precipitation rate thresholds. The weight changes are continuous and smooth with a clear mechanism, avoiding lag or misjudgment in response to sudden changes in rainfall intensity when fixed weights are used, significantly improving the algorithm's adaptability to different weather scenarios.

[0028] Step S4: Determine the visibility constraint speed limit value based on the visibility value in the meteorological parameters, and take the smaller of the road section safe speed limit benchmark value and the visibility constraint speed limit value as the initial speed limit decision value. In step S4, determining the visibility constraint speed limit value based on the visibility value specifically involves: When the visibility is greater than or equal to the first visibility threshold, the visibility constraint speed limit value is the legally mandated maximum speed limit for the road segment; When the visibility is greater than or equal to the second visibility threshold and less than the first visibility threshold, the visibility constraint speed limit value is the first speed limit value; When the visibility is greater than or equal to the third visibility threshold and less than the second visibility threshold, the visibility constraint speed limit value is the second speed limit value; When the visibility is less than the third visibility threshold, the visibility constraint speed limit value is the third speed limit value, and a road closure warning signal is triggered at the same time. Wherein, the first visibility threshold is greater than the second visibility threshold, the second visibility threshold is greater than the third visibility threshold, the first speed limit is greater than the second speed limit, and the second speed limit is greater than the third speed limit.

[0029] Obtain the legally mandated maximum speed limit for the target road segment in advance, denoted as... The preset sight distance reduction factors for the first speed limit, the second speed limit, and the third speed limit are respectively , and The legally mandated maximum speed limit Multiplying by the corresponding sight distance reduction factor respectively yields the first speed limit, the second speed limit, and the third speed limit, where, , To correspond to the safe stopping sight distance required by drivers under the visibility level, x = 1, 2, 3, representing the actual available visibility distance under the corresponding visibility level.

[0030] Through the above technical solution, this embodiment determines the visibility constraint speed limit value through a visibility grading constraint mechanism, and then takes the smaller value than the road section safety speed limit benchmark value output in step S2 to form an initial speed limit decision value that comprehensively considers both road surface slipperiness and limited visibility. In specific implementation, the system makes a lookup decision based on the real-time collected visibility values ​​according to a preset stepped threshold system: when the visibility is ≥ the first visibility threshold (e.g., 200 m), the visibility constraint speed limit value is directly taken as the legally mandated maximum speed limit for the road section. This indicates good visibility conditions and does not constitute an additional speed limit constraint; when visibility is between the second threshold (e.g., 100 m) and the first threshold, the first speed limit (e.g., ...) is applied. ×0.7); when visibility is between the third threshold (e.g., 50m) and the second threshold, the second speed limit (e.g., ...) is taken. ×0.5); when visibility is below the third threshold, the third speed limit is taken (e.g., ×0.3), and simultaneously triggers a road closure warning signal. The speed limits at each level are calculated using a sight distance reduction factor. Multiply by the legal maximum speed limit to obtain, The required safe stopping sight distance for drivers under the corresponding visibility level (refer to the "Highway Engineering Technical Standards" or "Traffic Engineering Handbook"). To correspond to the actual available visibility distance under the visibility level (usually simplified to the measured visibility value itself), this reduction method ensures that the speed limit matches the driver's safe braking needs under the corresponding visibility distance conditions. After determining the visibility-constrained speed limit, the system compares it with the road segment safe speed limit benchmark value calculated in step S2, and takes the smaller of the two as the initial speed limit decision value. The physical meaning of this smaller-value strategy is that the speed limit decision must simultaneously satisfy the dual constraints of the maximum speed allowed by the road surface adhesion capacity and the driver's perception-reaction-braking safe speed under visibility conditions. Failure to satisfy either one constitutes a safety bottleneck, and the smaller-value operation ensures the safety principle of prioritizing the weakest link. The entire classification threshold and sight distance reduction coefficient can be flexibly calibrated according to the road alignment, design speed and local traffic regulations. For example, in the embodiment of a foggy mountain expressway, the first, second and third visibility thresholds are set to 200m, 100m and 50m respectively, corresponding to speed limits of 100km / h, 70km / h and 40km / h respectively. This ensures compatibility with current regulations and complements the road surface anti-skid speed limit of S2 through the smaller value mechanism. It avoids misjudging safety when visibility is acceptable but the road surface is extremely slippery, or misjudging that high-speed driving is possible when the road surface is dry but covered by dense fog. This provides a scientific and conservative initial decision basis for the subsequent dynamic reduction of traffic flow in step S5.

[0031] Step S5: Dynamically reduce the initial speed limit decision value based on the traffic flow dynamic load factor, and output the target speed limit value; The specific method for dynamically reducing the initial speed limit decision value based on the traffic flow dynamic load factor in step S5 is as follows: In the formula, The target speed limit value, The traffic flow dynamic load factor, For the preset reduction factor, This is the initial speed limit decision value; The dynamic reduction process is protected by a lower limit: if the calculated value is... If the speed limit is less than the preset legal minimum speed limit, then the legal minimum speed limit will be directly taken as the target speed limit.

[0032] Step S6: Calculate the theoretical capacity of the road segment based on the target speed limit value, and predict the predicted arrival flow in the future time period. When the predicted arrival flow is greater than the product of the theoretical capacity of the road segment and the preset safety redundancy coefficient, generate an entrance ramp flow control instruction and send the target speed limit value and the ramp flow control instruction to the execution terminal. The specific method for calculating the theoretical traffic capacity of the road segment in step S6 is as follows: In the formula, The theoretical traffic capacity of the road section Design speed for the road section; The inlet ramp flow control instructions include the green light duration adjustment value of the ramp traffic lights or the ramp closure trigger signal.

[0033] As a further description of the technical solution of the present invention, the specific method for predicting the predicted arrival flow in the future time period in step S6 is as follows: Based on the current time, capture the passage time and instantaneous speed of each vehicle that passed through the upstream detection section within a preset time window in the past; For each vehicle intercepted, the estimated time of arrival at the target road section is calculated based on the instantaneous speed of the vehicle passing through the upstream detection section and the fixed distance between the upstream detection section and the target road section section. All vehicles whose estimated time falls within a preset future time window after the current time are identified as predicted arriving vehicles. The total number of these vehicles is counted and divided by the duration of the preset future time window to obtain the predicted arrival traffic.

[0034] Step S7: Feed back the target speed limit value to step S3 as the update input of the basic traffic capacity on which the flow load ratio calculation is based in the next cycle, and repeat steps S1 to S6 at preset time intervals to form a dynamic rolling optimization control closed loop that couples speed limit value and traffic capacity.

[0035] The specific method for feeding back the target speed limit value to step S3 as the basic traffic capacity update input in step S7 is as follows: ,in, To improve basic traffic capacity under adverse weather conditions. The target speed limit value from the previous round; In step S7, when steps S1 to S6 are repeated at a preset time interval, the preset time interval is adaptively adjusted according to the weather intensity level in the meteorological parameters: the higher the weather intensity level, the shorter the preset time interval.

[0036] Through the above technical solution, this embodiment uses the initial speed limit decision value output in step S4 as a basis, and introduces the traffic flow dynamic load factor constructed in step S3 for reduction, specifically according to the formula. Calculate the target speed limit, where A preset reduction factor (which can be 0.15-0.25 in the embodiment) is set, and a lower limit protection logic is set—if the calculated value is lower than the statutory minimum speed limit (e.g., 40km / h), the statutory minimum speed limit is directly taken as the final target speed limit value, ensuring that the control measures do not violate the bottom line of traffic regulations and guarantee basic traffic needs. This step implements an additional penalty for "traffic flow operation risk" in addition to road surface adhesion and sight distance constraints. When the traffic flow saturation is high or the speed dispersion is large, the speed limit is automatically reduced to mitigate the risk of conflict; then step S6 is based on the target speed limit value. Calculate the theoretical traffic capacity of the road section Simultaneously, based on vehicle trajectory data from upstream detection sections, arrival flow prediction is performed—the passage time and instantaneous speed of each vehicle at the upstream section within a past time window are extracted, and the estimated arrival time of each vehicle at the target section is calculated by combining the distance between upstream and downstream sections. The number of vehicles whose estimated arrival time falls within the future time window is counted and divided by the window duration to obtain the predicted arrival flow. ,when > ( To pre-set a safety redundancy coefficient (which can be between 0.85 and 0.95), the system determines that the road segment is about to enter an oversaturated state. It then generates an entrance ramp flow control instruction (including shortening the green light duration of ramp traffic lights or directly triggering a ramp closure signal). The target speed limit and the ramp control instruction are simultaneously sent to the execution terminals such as variable message signs, lane control signs, and ramp traffic lights. This step proactively reduces upstream demand through predictive ramp adjustment, preventing further deterioration of traffic capacity and secondary congestion after the speed limit is lowered due to undiminished flow. Finally, step S7 sets the target speed limit for the current cycle... Feedback to step S3, according to the formula The basic traffic capacity parameters under severe weather conditions are updated so that the calculation benchmark for the flow load ratio in the next cycle is dynamically adjusted according to the speed limit. At the same time, the entire algorithm is executed in a rolling manner according to a preset time interval, and this time interval is adaptively shortened according to the weather intensity level (e.g., 120 seconds for light rain, 60 seconds for moderate rain, and 30 seconds for heavy rain or dense fog). This forms a two-way coupled dynamic rolling optimization control closed loop between the speed limit value and traffic capacity, ensuring that the system can maintain the foresight, consistency and adaptability of the control strategy as the weather and traffic conditions change rapidly.

[0037] Working principle: The system first collects meteorological parameters (visibility, rainfall / snowfall intensity), road surface condition parameters (water film thickness, texture depth), and traffic flow parameters (flow rate, vehicle speed) of the target road section in real time to build a multi-source perception foundation. Based on this, the core algorithm calculates the speed limit value collaboratively from three dimensions: First, by dynamically compensating for the water film thickness and substituting it into the anti-skid coefficient model, it calculates the safe speed limit benchmark value under the constraint of road surface adhesion capacity by combining the vehicle dynamics braking equation; Second, it determines the sight distance constraint speed limit value by looking up a table based on the visibility classification threshold, and takes the smaller value from the former to form the initial speed limit decision; Third, it constructs a traffic flow dynamic load factor (a weighted fusion of flow rate load ratio and speed dispersion index, with the weight adaptively adjusted according to precipitation intensity) to dynamically reduce the initial speed limit to obtain the final target speed limit value.

[0038] After obtaining the target speed limit, the system further calculates the theoretical capacity of the road segment under that speed limit and predicts future arrival traffic flow by combining the vehicle trajectories of upstream sections. When the predicted traffic flow exceeds the threshold, the system automatically generates entrance ramp control instructions, achieving coordinated management of mainline speed limits and ramp traffic flow. Simultaneously, the target speed limit is fed back to the capacity calculation module in real time, causing the traffic load ratio to update dynamically with the speed limit. The entire process is executed on a rolling basis at adaptive time intervals, forming a closed-loop optimization control that couples speed limits and capacity.

[0039] The above description is merely an example and illustration of the concept of the present invention. Those skilled in the art can make various modifications or additions to the specific embodiments described or use similar methods to replace them, as long as they do not deviate from the concept of the invention or exceed the scope defined in the claims, they should all fall within the protection scope of the present invention.

Claims

1. A method for dynamically adjusting speed limits for traffic flow control in severe weather, characterized in that, Includes the following steps: Step S1: Real-time collection of meteorological parameters, road surface condition parameters, and traffic flow parameters of the target road segment; Step S2: Calculate the safe speed limit benchmark value for the road section based on the road surface condition parameters and the rainfall intensity or snowfall intensity in the meteorological parameters; Step S3: Calculate the flow load ratio and speed dispersion index based on the traffic flow parameters, and adjust the weighting coefficients of the flow load ratio and speed dispersion index in the fusion process according to the weather intensity level in the meteorological parameters to construct the traffic flow dynamic load factor. Step S4: Determine the visibility constraint speed limit value based on the visibility value in the meteorological parameters, and take the smaller of the road section safe speed limit benchmark value and the visibility constraint speed limit value as the initial speed limit decision value. Step S5: Dynamically reduce the initial speed limit decision value based on the traffic flow dynamic load factor, and output the target speed limit value; Step S6: Calculate the theoretical capacity of the road segment based on the target speed limit value, and predict the predicted arrival flow in the future time period. When the predicted arrival flow is greater than the product of the theoretical capacity of the road segment and the preset safety redundancy coefficient, generate an entrance ramp flow control instruction and send the target speed limit value and the ramp flow control instruction to the execution terminal. Step S7: Feed back the target speed limit value to step S3 as the update input of the basic traffic capacity on which the flow load ratio calculation is based in the next cycle, and repeat steps S1 to S6 at preset time intervals to form a dynamic rolling optimization control closed loop that couples speed limit value and traffic capacity.

2. The method for dynamically adjusting speed limits in severe weather traffic control according to claim 1, characterized in that, The meteorological parameters in step S1 include visibility, rainfall intensity, and snowfall intensity; the road surface condition parameters include the initial value of water film thickness and road surface texture depth; and the traffic flow parameters include real-time cross-sectional flow rate, instantaneous speed of each vehicle, and time occupancy.

3. The method for dynamically adjusting speed limits in severe weather traffic flow control according to claim 2, characterized in that, The specific method for calculating the road section safe speed limit benchmark value in step S2 is as follows: Based on the initial value of water film thickness and road texture depth in the road surface condition parameters, and the equivalent rainfall intensity calculated from the rainfall intensity or snowfall intensity in the meteorological parameters, the water film thickness at the current moment is dynamically compensated according to the following formula: In the formula, The current water film thickness. This is the initial value for the water film thickness. The intensity of rainfall or equivalent rainfall. The road surface drainage rate; The current water film thickness Substitute into the following formula to calculate the anti-skid coefficient : In the formula, The baseline skid resistance coefficient for dry road surfaces. For road surface texture depth, , , These are the model parameters obtained through calibration experiments; Substitute the real-time anti-skid coefficient into the vehicle dynamics model to calculate the safe speed limit benchmark value for the road section: In the formula, This is the baseline value for the safe speed limit of the aforementioned road section. It is the acceleration due to gravity. This is a pre-set safe braking distance based on the geometric alignment of the target road segment.

4. The method for dynamically adjusting speed limits in severe weather traffic flow control according to claim 2, characterized in that, The specific method for adjusting the weighting coefficient based on the weather intensity level in step S3 is as follows: The flow load ratio weighting coefficient is denoted as The weighting coefficient of the velocity dispersion index is denoted as ,and + =1, and The values ​​of are all within the interval (0, 1); The rainfall intensity or snowfall intensity in the meteorological parameters is converted into the equivalent liquid water precipitation rate, denoted as . ; The and Determine using the following formula: , In the formula, The equivalent liquid water precipitation rate at the current moment. The preset reference precipitation rate, The value is determined based on the precipitation rate threshold calibrated from historical accident data of the target road section; The traffic flow dynamic load factor is obtained by summing the traffic flow load ratio and speed dispersion index after assigning corresponding weights to them. .

5. The method for dynamically adjusting speed limits for traffic flow control in severe weather according to claim 4, characterized in that, The flow load ratio is obtained in the following manner: Obtain the design speed of the target road segment, denoted as . ; Obtain the real-time traffic flow through the target road segment section within the current time period, denoted as . The real-time cross-sectional flow rate is obtained by dividing the total number of vehicles passing through the preset time window by the duration of the preset time window. Calculate the actual traffic capacity of the road section under the current severe weather conditions using the following formula. : ,in, The design capacity of the target road section under clear weather conditions. The average speed of all vehicles passing through the target road section within the current time period is denoted by m, which is a preset capacity decay index. The value of m ranges from 1.5 to 2.

5. Calculate the flow-load ratio using the following formula. : ,when When ≥1, take =1; The velocity dispersion index is obtained in the following manner: Obtain the instantaneous speed sample set of all vehicles passing through the target road segment section within the current time period, denoted as { , ,..., }, where n is the total number of vehicles passing through the section in the current time period; Calculate the sample standard deviation separately and sample average speed Calculate the velocity dispersion index using the following formula. : ,when When ≥1, take =1.

6. The method for dynamically adjusting speed limits for traffic flow control in severe weather according to claim 1, characterized in that, In step S4, determining the visibility constraint speed limit value based on the visibility value specifically involves: When the visibility is greater than or equal to the first visibility threshold, the visibility constraint speed limit value is the legally mandated maximum speed limit for the road segment; When the visibility is greater than or equal to the second visibility threshold and less than the first visibility threshold, the visibility constraint speed limit value is the first speed limit value; When the visibility is greater than or equal to the third visibility threshold and less than the second visibility threshold, the visibility constraint speed limit value is the second speed limit value; When the visibility is less than the third visibility threshold, the visibility constraint speed limit value is the third speed limit value, and a road closure warning signal is triggered at the same time. Wherein, the first visibility threshold is greater than the second visibility threshold, the second visibility threshold is greater than the third visibility threshold, the first speed limit is greater than the second speed limit, and the second speed limit is greater than the third speed limit.

7. The method for dynamically adjusting speed limits for traffic flow control in severe weather according to claim 6, characterized in that, The specific method for dynamically reducing the initial speed limit decision value based on the traffic flow dynamic load factor in step S5 is as follows: In the formula, The target speed limit value, The traffic flow dynamic load factor, For the preset reduction factor, This is the initial speed limit decision value; The dynamic reduction process is protected by a lower limit: if the calculated value is... If the speed limit is less than the preset legal minimum speed limit, then the legal minimum speed limit will be directly taken as the target speed limit.

8. The method for dynamically adjusting speed limits for traffic flow control in severe weather according to claim 1, characterized in that, The specific method for calculating the theoretical traffic capacity of the road segment in step S6 is as follows: In the formula, The theoretical traffic capacity of the road section Design speed for the road section; The inlet ramp flow control instructions include the green light duration adjustment value of the ramp traffic lights or the ramp closure trigger signal.

9. The method for dynamically adjusting speed limits in severe weather traffic flow control according to claim 1, characterized in that, The specific method for predicting the arrival flow in the future time period in step S6 is as follows: Based on the current time, capture the passage time and instantaneous speed of each vehicle that passed through the upstream detection section within a preset time window in the past; For each vehicle intercepted, the estimated time of arrival at the target road section is calculated based on the instantaneous speed of the vehicle passing through the upstream detection section and the fixed distance between the upstream detection section and the target road section section. All vehicles whose estimated time falls within a preset future time window after the current time are identified as predicted arriving vehicles. The total number of these vehicles is counted and divided by the duration of the preset future time window to obtain the predicted arrival traffic.

10. A method for dynamically adjusting speed limits for traffic flow control in severe weather as described in claim 8, characterized in that, The specific method for feeding back the target speed limit value to step S3 as the basic traffic capacity update input in step S7 is as follows: ,in, To improve basic traffic capacity under adverse weather conditions. The target speed limit value for the previous round; In step S7, when steps S1 to S6 are repeated at a preset time interval, the preset time interval is adaptively adjusted according to the weather intensity level in the meteorological parameters: the higher the weather intensity level, the shorter the preset time interval.