Intelligent battery charging management system with load adaptive function
By using an intelligent battery charging management system, which utilizes micro-energy detection and incremental energy activation pulse sequences, deeply depleted batteries can be accurately identified and safely charged. This solves the problems of low-voltage identification and activation safety risks in existing technologies, and achieves safe and efficient battery repair and life extension.
Patent Information
- Application Number
- CN202611411723.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-11
- Publication Date
- 2026-11-10
AI Technical Summary
Existing technologies face challenges in low-voltage identification and activation safety risks when charging deeply depleted batteries. Misjudging the battery as having no connection can lead to irreparable damage or even thermal runaway or fire.
An intelligent battery charging management system with load adaptive function is adopted. The system injects a micro-energy detection pulse sequence through the response acquisition module, analyzes the voltage response sequence through the deep power depletion identification module, constructs an incremental energy activation pulse sequence through the activation and fallback acquisition module, calculates the polarization attenuation characteristic value and energy absorption rate through the parameter calculation module, determines the current flow direction and cuts off the short-circuit load or performs charge accumulation through the output control module, and switches to the normal charging mode through the mode switching module.
Accurately distinguish between deeply discharged batteries and short-circuit faults, avoid the risk of thermal runaway, improve charging efficiency and repair success rate, extend battery life, reduce maintenance costs, and ensure the safety and reliability of the charging process.
Smart Images

Figure CN123074030A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of battery charging management technology, and more specifically, to an intelligent battery charging management system with load adaptive function. Background Technology
[0002] Existing technologies face the challenges of "low-voltage identification dilemma" and "activation safety risks" when charging deeply discharged batteries. When lead-acid batteries experience a voltage drop to extremely low levels due to prolonged storage or over-discharge, or when lithium-ion battery storage systems cut off their output MOSFETs due to undervoltage lockout protection, traditional charging devices, based on safety considerations, misinterpret these extremely low voltage states as "no battery connection," thus refusing to initiate the charging process and wrongly classifying potentially restartable batteries as unusable. Even when chargers employ forced activation strategies to attempt to revive deeply discharged batteries, existing technologies lack effective means to determine in real-time whether the injected activation current flows into the battery or is consumed by potential parallel short-circuit faults in the charging circuit. This blind spot in activation technology is extremely dangerous in complex real-world applications—when the charging port experiences a short circuit due to poor contact, internal short circuit, or external foreign objects, continuous high-current injection not only fails to repair the battery but may also trigger severe thermal runaway or even fires, making the rescue charging of deeply discharged batteries a technical challenge fraught with uncertainty and safety hazards.
[0003] In view of this, the present invention proposes an intelligent battery charging management system with load adaptive function to solve the above problems. Summary of the Invention
[0004] To overcome the aforementioned deficiencies of the prior art and to achieve the above objectives, the present invention provides the following technical solution: an intelligent battery charging management system with load adaptive function, applied to charging management equipment, comprising: The response acquisition module is used to inject a preset micro-energy detection pulse sequence into the charging port and acquire the voltage response sequence of the charging port under the action of the preset micro-energy detection pulse sequence. The deep battery depletion identification module is used to calculate the equivalent impedance state of the charging port based on the waveform characteristics of the voltage response sequence, and to confirm the connection of the deep battery depletion battery component when the equivalent impedance state is in the preset deep battery depletion range. The activation and fallback acquisition module is used to construct an incremental energy activation pulse sequence, sequentially inject each activation pulse in the incremental energy activation pulse sequence into the deeply depleted battery module, and acquire the port fallback voltage sequence of the charging port during the rest period of each activation pulse. The parameter calculation module is used to calculate the polarization attenuation characteristic value based on the port fallback voltage sequence, and to calculate the energy absorption rate of the current pulse period based on the voltage rise slope during the current activation pulse. The output control module is used to determine the current current flow direction to the parallel short-circuit load and cut off the output if the energy absorption rate is lower than the preset safety absorption threshold and the polarization attenuation characteristic value meets the short-circuit equivalent condition. If the energy absorption rate is not lower than the preset safety absorption threshold and the polarization decay characteristic value does not meet the short circuit equivalent condition, then it is determined that the current flows into the deep-discharged battery module to accumulate charge. The mode switching module is used to switch to the normal charging mode based on the energy absorption rate of the current pulse cycle when the real-time voltage of the charging port reaches the preset wake-up voltage threshold.
[0005] The technical effects and advantages of the intelligent battery charging management system with load adaptive function of this invention are as follows: This invention accurately distinguishes between truly deeply discharged batteries and potential short-circuit faulty loads while ensuring charging safety. This avoids the risk of thermal runaway caused by continued power supply due to misjudgment of a short circuit and eliminates the fire hazard during activation charging. Simultaneously, through in-depth analysis of the battery's true state, this invention achieves dynamic optimization and adjustment of charging parameters, significantly improving the repair success rate and charging efficiency of deeply discharged batteries, maximizing the recovery of battery resources that might otherwise be misjudged as unusable. Furthermore, the invention's intelligent adaptability to different battery chemistry systems ensures that lithium-ion energy storage systems and lead-acid batteries are repaired and charged under their respective optimal operating conditions, effectively extending battery life and reducing battery replacement frequency and maintenance costs. The smooth transition mechanism throughout the charging process further reduces damage to the battery's internal structure from current surges, improving charging safety while providing reliable technical support for the mass production and automated rescue charging of deeply discharged batteries. Attached Figure Description
[0006] Figure 1 This is a schematic diagram of the intelligent battery charging management system with load adaptive function of the present invention. Detailed Implementation
[0007] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0008] Please see Figure 1The present invention proposes an intelligent battery charging management system with load adaptive function. The system is applied to charging management equipment and includes the following modules: The response acquisition module is used to inject a preset micro-energy detection pulse sequence into the charging port and acquire the voltage response sequence of the charging port under the action of the preset micro-energy detection pulse sequence. In this embodiment, the charging management device is a dedicated power management device with intelligent identification, safety protection and adaptive adjustment functions, which can provide safe and reliable repair charging services for deeply discharged battery components. It can be a portable charger, vehicle charger or industrial-grade battery maintenance equipment, etc.
[0009] The charging port is the physical connection interface between the charging management device and the battery module to be charged. It features voltage detection, current injection, and signal acquisition functions for power transmission and status monitoring. With a standardized interface design, it is compatible with different types of battery modules. The preset micro-energy detection pulse sequence is a combination of low-power pulse signals injected into the charging port by the charging management device during the detection phase. It has fixed pulse amplitude, duration, and interval, enabling the acquisition of port response characteristics without damaging the battery, and is used to preliminarily determine the electrical status of the connected device. The voltage response sequence is a set of voltage change data generated at the charging port under the action of the preset micro-energy detection pulse sequence, including voltage values during the pulse period and the silent period, reflecting the impedance characteristics and electrochemical state of the connected device.
[0010] In this embodiment, when the battery assembly is connected to the charging port, the response acquisition module first injects a preset micro-energy detection pulse sequence into the charging port. This pulse sequence contains multiple low-power pulses, and the current amplitude of each pulse is controlled within a safe range to avoid impacting the deeply discharged battery. Simultaneously, the response acquisition module acquires the voltage response sequence of the charging port in real time, recording voltage changes during pulse injection and quiet periods, providing basic data for subsequent deep discharge identification.
[0011] The deep battery depletion identification module is used to calculate the equivalent impedance state of the charging port based on the waveform characteristics of the voltage response sequence, and to confirm the connection of the deep battery depletion battery component when the equivalent impedance state is in the preset deep battery depletion range. In this embodiment, the equivalent impedance state is a comprehensive parameter reflecting the electrical characteristics of the charging port access device. It is calculated by analyzing the waveform characteristics of the voltage response sequence and can distinguish different access states such as normal battery, deeply discharged battery, and abnormal load. The preset deep discharge range is a range of equivalent impedance values pre-configured in the charging management device to determine whether the battery module is in a deep discharge state. This range is determined based on the typical electrical characteristics and safe charging requirements of deeply discharged batteries. Deeply discharged battery modules are battery cells or battery packs whose voltage has dropped significantly due to long-term discharge or improper storage. Their internal electrochemical activity is reduced, and special repair charging strategies are required for safe recovery.
[0012] In this embodiment, the deep battery depletion identification module calculates the equivalent impedance state of the charging port by analyzing the waveform characteristics of the voltage response sequence. When the equivalent impedance state is within a preset deep battery depletion range, it is confirmed that the connected battery module is deeply depleted, and a special repair charging process needs to be initiated to avoid potential safety risks that may result from using conventional charging methods.
[0013] The activation and fallback acquisition module is used to construct an incremental energy activation pulse sequence, sequentially inject each activation pulse in the incremental energy activation pulse sequence into the deeply depleted battery module, and acquire the port fallback voltage sequence of the charging port during the rest period of each activation pulse. In this embodiment, the incremental energy activation pulse sequence is a progressive energy input scheme designed for deeply discharged battery modules. It comprises multiple activation pulses, each with an increasing energy intensity, gradually activating the electrochemical activity within the battery and preventing damage from instantaneous high currents. Each activation pulse is a single pulse unit in the incremental energy activation pulse sequence, possessing specific current amplitude, duration, and duty cycle parameters, used to inject controllable energy into the deeply discharged battery module. The pause period is the interval between two adjacent activation pulses, during which energy input is suspended to observe polarization recovery and voltage changes within the battery. The port drop-off voltage sequence consists of charging port voltage change data collected during the activation pulse pause period, reflecting the dynamic process of polarization decay and energy absorption within the battery.
[0014] In this embodiment, after the activation and fallback acquisition module constructs an incremental energy activation pulse sequence, it sequentially injects each activation pulse into the deeply depleted battery module. During the pause period of each activation pulse, the module continuously acquires the port fallback voltage sequence at the charging port, recording the complete process of the voltage falling from the peak to the steady state, providing detailed dynamic data for subsequent parameter calculations.
[0015] The parameter calculation module is used to calculate the polarization attenuation characteristic value based on the port fallback voltage sequence, and to calculate the energy absorption rate of the current pulse period based on the voltage rise slope during the current activation pulse. In this embodiment, the polarization decay characteristic value is a numerical indicator characterizing the recovery speed and mode of polarization phenomena inside the battery. It is calculated by analyzing the decay law of the port fall-off voltage sequence and can distinguish between normal electrochemical polarization and abnormal short circuit phenomena. Energy absorption rate is an efficiency indicator characterizing the battery's ability to absorb and store energy within the current pulse cycle. It is calculated by analyzing the voltage rise slope during the activation pulse and reflects the battery's charge acceptance capability and internal state. The current pulse cycle refers to the complete time period from the start of the current activation pulse injection to the end of the rest period, including both the pulse action period and the rest period. The voltage rise slope is the rate of change of the charging port voltage over time during the activation pulse, reflecting the battery's immediate response capability to injected energy.
[0016] In this embodiment, the parameter calculation module calculates the polarization attenuation characteristic value based on the attenuation characteristics of the port fallback voltage sequence using mathematical analysis methods. At the same time, based on the voltage rise slope during the activation pulse and combined with the injected charge information, it calculates the energy absorption rate of the current pulse cycle, providing a quantitative basis for subsequent safety judgment and control decisions.
[0017] The output control module is used to determine the current current flow direction to the parallel short-circuit load and cut off the output if the energy absorption rate is lower than the preset safety absorption threshold and the polarization decay characteristic value meets the short-circuit equivalent condition; if the energy absorption rate is not lower than the preset safety absorption threshold and the polarization decay characteristic value does not meet the short-circuit equivalent condition, it determines the current current flow direction to the deep-discharged battery module for charge accumulation. In this embodiment, the preset safety absorption threshold is a critical value pre-configured in the charging management device to determine whether the battery's energy absorption capacity is normal. A value below this threshold indicates that the battery cannot effectively absorb the injected energy, potentially indicating an internal short circuit or severe damage. The short-circuit equivalent condition is a criterion used to determine whether the polarization decay characteristic value meets the short-circuit load characteristics. When the characteristic value meets this condition, it indicates that the port fallback voltage sequence exhibits a purely resistive short-circuit pull-down characteristic. A parallel short-circuit load refers to a low-impedance fault path connected in parallel with the battery module, causing the injected current to bypass the battery's interior and flow to the short-circuit point, preventing effective charging and posing a safety hazard. Charge accumulation refers to the normal storage and conversion of injected charge within the battery, indicating that the battery possesses basic charging acceptance capability and can continue to repair the charging process.
[0018] In this embodiment, the output control module makes a safety judgment based on the energy absorption rate and polarization attenuation characteristic value. When the energy absorption rate is lower than the preset safety absorption threshold and the polarization attenuation characteristic value meets the short-circuit equivalent condition, it is determined that there is a parallel short-circuit load, and the output is immediately cut off to protect the device safety; when both indicators are normal, it is determined that the current flows normally into the battery to accumulate charge, and the charging process continues to repair.
[0019] The mode switching module is used to switch to the normal charging mode based on the energy absorption rate of the current pulse cycle when the real-time voltage of the charging port reaches the preset wake-up voltage threshold.
[0020] In this embodiment, the preset wake-up voltage threshold is a voltage reference value pre-configured in the charging management device to determine whether a deeply discharged battery module has recovered basic activity. When the real-time voltage reaches this threshold, it indicates that the battery has met the basic conditions for accepting regular charging. The regular charging mode is a standard charging process for batteries in normal condition, including stages such as constant current charging and constant voltage charging, which has higher charging efficiency and faster charging speed.
[0021] In this embodiment, the mode switching module continuously monitors the real-time voltage of the charging port. When the voltage reaches the preset wake-up voltage threshold, it evaluates the battery's charging acceptance capability based on the energy absorption rate of the current pulse cycle, ensuring the safety and rationality of the switching timing, smoothly transitioning to the normal charging mode, and improving the overall charging efficiency.
[0022] As can be seen from the above, this embodiment effectively solves the problem of safe charging of deeply discharged batteries by constructing a complete charging management process covering detection and identification, repair and activation, parameter calculation, safety control, and mode switching. The system can intelligently identify battery status, adaptively adjust charging parameters, and promptly detect safety hazards, ensuring the safety and effectiveness of the charging process and significantly improving the battery repair success rate and user experience.
[0023] In a preferred embodiment of the present invention, the above-mentioned calculation of the equivalent impedance state of the charging port based on the waveform characteristics of the voltage response sequence, and confirmation of connection of the deeply depleted battery module when the equivalent impedance state is in a preset deep depletion range, includes: Step 2.1 involves extracting the peak voltage at the end of each probe pulse in the voltage response sequence and the open-circuit silence voltage between each probe pulse. Specifically, after the charging management device connects to the battery component to be charged, the response acquisition module injects a preset micro-energy probe pulse sequence into the charging port. This pulse sequence consists of multiple micro-energy probe pulses, with the current amplitude of each pulse set between 10mA and 50mA, and the pulse duration set between 5ms and 20ms to ensure that the detection process does not damage the deeply depleted battery. Simultaneously with the injection of probe pulses, a high-precision voltage acquisition circuit continuously acquires the port voltage changes of the charging port at a sampling frequency of no less than 1kHz, forming a voltage response sequence. The time period of each probe pulse is identified from this voltage response sequence, and the port voltage value at the end of each probe pulse is extracted as the peak voltage. This peak voltage reflects the instantaneous voltage response characteristics of the charging port under the action of the probe pulse. Meanwhile, an open-circuit silence period exists between two adjacent detection pulses. During this silence period, the charging port is in an open-circuit state without applied excitation current. The stable port voltage value during this silence period is extracted as the open-circuit silence voltage, which reflects the open-circuit voltage characteristics of the battery module. By extracting multiple sets of peak voltages and open-circuit silence voltages, basic data is provided for subsequent equivalent impedance state calculations.
[0024] Step 2.2 involves calculating the difference between adjacent peak voltages and open-circuit quiescent voltages to obtain multiple pulse response differences. The average of these differences is then calculated to obtain the port response average. Specifically, this includes calculating the difference between each group of adjacent peak voltages and open-circuit quiescent voltages extracted from the voltage response sequence. Specifically, the peak voltage at the end of the nth probe pulse is subtracted from the open-circuit quiescent voltage before the nth probe pulse to obtain the nth pulse response difference. This difference reflects the voltage rise caused by the probe pulse excitation. Since the preset micro-energy probe pulse sequence contains multiple probe pulses, multiple pulse response differences can be obtained. These pulse response differences are then arithmetically averaged to obtain the port response average. The port response average eliminates the random error of a single measurement, more accurately reflects the typical response characteristics of the charging port to the probe pulse, and provides a stable statistical quantity for the accurate calculation of the equivalent impedance state.
[0025] Step 2.3: Extract the voltage change slope of adjacent sampling points in the voltage response sequence. If the voltage change slope is less than the preset open-circuit cutoff slope and the average port response is within the preset extremely low voltage range, then the equivalent impedance state is confirmed to be within the preset deep voltage deficit range. Specifically, this includes: performing time-domain differentiation on the voltage response sequence and calculating the voltage change slope between adjacent sampling points. The specific calculation method is: voltage change slope... ,in The voltage value at the current sampling point. The voltage value at the previous sampling point is represented by the time difference, which is the sampling interval. The entire voltage response sequence is traversed, and the voltage change slopes of all adjacent sampling points are extracted to form a slope sequence. Each slope value in the slope sequence is compared with a preset open-circuit cutoff slope. The preset open-circuit cutoff slope is determined based on the typical open-circuit characteristics of a deeply discharged battery; for example, it is set to 0.01V / s, indicating that the voltage change is extremely slow and close to a static state. If all slope values in the slope sequence are less than the preset open-circuit cutoff slope, the charging port is determined to exhibit open-circuit or high-impedance characteristics. Simultaneously, the average port response calculated in the previous step is compared with a preset extremely low voltage range. The preset extremely low voltage range is determined based on the typical open-circuit voltage range of a deeply discharged battery; for example, it is set to 0V to 2.0V for lithium batteries and 0V to 1.5V per cell for lead-acid batteries. If the average port response is within the preset extremely low voltage range, it indicates that the open-circuit voltage of the battery module is extremely low, indicating a deep discharge state. When both the voltage change slope criterion and the port response mean criterion are met, the equivalent impedance state of the charging port is determined to be in the preset deep discharge range, confirming that the connected battery module is a deep discharge battery module, and a special activation charging process needs to be started.
[0026] In this embodiment of the invention, by employing the technical means of extracting the peak voltage at the end of each probe pulse in the voltage response sequence and the open-circuit silence voltage between probe pulses, calculating the difference between adjacent peak voltages and open-circuit silence voltages to obtain the pulse response difference and calculating the mean, and extracting the voltage change slope of adjacent sampling points in the voltage response sequence and comparing it with the preset open-circuit cutoff slope and the port response mean as dual criteria, the invention overcomes the technical problems of existing charging devices that cannot accurately identify deep discharge states based solely on the single indicator of open-circuit voltage, cannot distinguish between deep discharge and open-circuit faults leading to incorrect charging strategy selection, and lack of dynamic response characteristic analysis resulting in insufficient identification accuracy. This achieves the technical effect of accurately identifying deep discharge states and effectively distinguishing deep discharge batteries from other abnormal states through multi-dimensional voltage feature extraction and dual physical criteria, providing reliable state judgment for subsequent activation of the charging process, and ensuring the targeted and safe nature of charging management.
[0027] In a preferred embodiment of the present invention, the above-described construction of an incremental energy-activated pulse sequence includes: Step 3.1: Obtain the initial duty cycle and preset duty cycle step size of the initial activation pulse. Specifically, after confirming the connection of the deeply depleted battery module, the activation and fallback acquisition module begins constructing an incremental energy activation pulse sequence for progressive energy injection and activation of the deeply depleted battery module. First, the initial duty cycle of the initial activation pulse is obtained from the configuration parameters of the charging management device. This initial duty cycle is determined based on the safety activation requirements of the deeply depleted battery and is set to a low value to avoid excessive current surges during the initial activation phase, for example, 5% to 10%. The duty cycle is defined as the ratio of the pulse high-level time to the entire pulse cycle time. Duty cycle = t on / (t on +t off ), where t on t is the pulse conduction time. off This refers to the pulse turn-off time. Simultaneously, a preset duty cycle step size is acquired. This step size determines the increment of the duty cycle between adjacent activation pulses in the incremental energy activation pulse sequence. It is set according to the gradual requirements of the activation process, for example, set to 2% to 5%, to ensure a smooth increase in energy injection. The setting of the initial duty cycle and the preset duty cycle step size comprehensively considers the internal resistance characteristics, electrochemical polarization degree, and safe activation speed requirements of the deeply depleted battery, providing initial parameters and incremental rules for the gradual construction of subsequent pulse sequences.
[0028] Step 3.2, setting the initial duty cycle as the current duty cycle for the current pulse being built, specifically involves: at the start of the incremental energy activation pulse sequence construction process, assigning the initial duty cycle obtained in the previous step to the current duty cycle variable for the current pulse being built. This current duty cycle variable is used to record the duty cycle parameter of the activation pulse being built, serving as the baseline value for the current pulse parameter configuration. For example, if the initial duty cycle is set to 8%, then the current duty cycle of the first constructed activation pulse is 8%. By using the initial duty cycle as the starting point, it ensures that the incremental energy activation pulse sequence starts from a safe low energy level, providing a foundation for subsequent duty cycle increments.
[0029] Step 3.3: Generate the current active pulse based on the current duty cycle, and increment the current duty cycle by a preset duty cycle step size to obtain the updated duty cycle. Specifically, this includes configuring the time parameters of the current active pulse based on the current duty cycle value. A fixed pulse period time Tperiod is set in the charging management device, for example, from 100ms to 500ms. The pulse conduction time is calculated based on the current duty cycle: t on = Current duty cycle × Tperiod, and pulse off time: t off=(1-current duty cycle)×Tperiod. Based on the calculated on-time and off-time, the power switch control signal of the charging management device is configured to generate a current activation pulse that conforms to the current duty cycle parameters. During the on-time, the generated activation pulse injects charging current into the deeply depleted battery module; during the off-time, current injection stops, and the device enters a rest period. After generating the current activation pulse, the current duty cycle is incremented based on a preset duty cycle step size: Updated duty cycle = Current duty cycle + Preset duty cycle step size. For example, if the current duty cycle is 8% and the preset duty cycle step size is 3%, then the updated duty cycle is 11%. This increment operation increases the duty cycle, allowing the energy of subsequent activation pulses to gradually increase, meeting the requirements of a gradual activation strategy.
[0030] Step 3.4: Determine if the updated duty cycle is greater than the preset limit duty cycle. If the updated duty cycle is not greater than the preset limit duty cycle, use the updated duty cycle as the new current duty cycle and proceed to the step of generating the current activation pulse based on the current duty cycle. This process continues until all activation pulses in the incremental energy activation pulse sequence are generated. Specifically, this includes checking the upper limit of the updated duty cycle obtained after incrementing and comparing it with the preset limit duty cycle. The preset limit duty cycle is determined based on the safety requirements and activation completion standards of the deeply discharged battery activation process, for example, set to 50% to 70%. This upper limit ensures that the energy of the activation pulse will not be too high, causing battery damage or safety risks. If the updated duty cycle value is not greater than the preset limit duty cycle, it indicates that the duty cycle increment is still within a safe range, and the next activation pulse can be constructed. At this time, the updated duty cycle is assigned to the current duty cycle variable as the duty cycle parameter for the next activation pulse, and then the process returns to step 3.3 to execute the operation of generating the current activation pulse based on the current duty cycle. This process is repeated iteratively. In each iteration, the current duty cycle increases by a preset duty cycle step size, and the energy of the generated activation pulses gradually increases, forming an incremental energy injection sequence. When the updated duty cycle after a certain iteration exceeds the preset limit duty cycle, it is determined that the incremental energy activation pulse sequence has been completed, and the pulse generation loop stops. The final incremental energy activation pulse sequence contains multiple activation pulses with progressively increasing duty cycles, starting from the initial duty cycle and increasing by a preset duty cycle step size until the preset limit duty cycle is reached, thus achieving gradual energy activation of deeply depleted battery modules.
[0031] In this embodiment of the invention, by acquiring the initial duty cycle and preset duty cycle step size of the initial activation pulse, using the initial duty cycle as the current duty cycle of the current construction pulse, generating the current activation pulse based on the current duty cycle, and incrementing the current duty cycle using the preset duty cycle step size to obtain the updated duty cycle, and iteratively judging whether the updated duty cycle exceeds the preset limit duty cycle and continuing to increment the construction if it does not exceed it, the technical means overcome the technical problems of existing battery activation methods that use fixed charging parameters that cannot adapt to the dynamic changes of deeply discharged batteries, that applying a large amount of energy at once may cause battery damage or safety risks, and that the lack of a progressive energy control mechanism leads to a low activation success rate. Thus, it achieves the technical effect of realizing progressive and safe energy injection through incremental duty cycle control, dynamically adjusting the activation intensity according to the battery state, effectively avoiding overcurrent shocks and battery damage during the activation process, and improving the activation success rate and safety of deeply discharged batteries.
[0032] In a preferred embodiment of the present invention, the above-mentioned calculation of polarization attenuation characteristic values based on port fallback voltage sequences includes: Step 4.1: Extract a preset number of sampling voltage points at equal time intervals from the port fallback voltage sequence. Specifically, this includes: after the activation and fallback acquisition module sequentially injects each activation pulse from the incremental energy activation pulse sequence into the deeply depleted battery module, during the pause period of each activation pulse (i.e., the pulse off-time t)... off During this period, the charging port is in an open-circuit or high-impedance state. At this time, the high-precision voltage acquisition circuit continuously acquires the port voltage changes of the charging port, forming a port fallback voltage sequence. This port fallback voltage sequence records the natural fallback process of the battery port voltage after the activation pulse stops, reflecting the polarization decay characteristics inside the battery. To quantitatively analyze the polarization decay law, a preset number of sampling voltage points are extracted from the port fallback voltage sequence at equal time intervals. First, the total duration t of the rest period is determined. off Then, this duration is divided into a preset number of time intervals. For example, if the preset number is set to 10, the time interval is Δt = t. off / 10. Port voltage values were collected at times t=Δt, 2Δt, 3Δt, ..., 10Δt after the start of the pause period, resulting in 10 equally timed sampling voltage points. These sampling voltage points are evenly distributed throughout the entire pause period, comprehensively reflecting the temporal evolution characteristics of the voltage drop process.
[0033] Step 4.2: Using the voltage at the start of the pause period as the initial reference voltage, calculate the voltage attenuation difference between each sampled voltage point and the initial reference voltage to obtain multiple attenuation differences. Specifically, this includes obtaining the port voltage value at the start of the pause period (i.e., the moment the activation pulse just stops) from the port fallback voltage sequence and using it as the initial reference voltage V. refThis initial reference voltage reflects the voltage level at the battery port at the instant the activation pulse ends, including the voltage rise caused by the activation pulse and the superposition of the internal polarization voltage of the battery. For each equally timed sampling voltage point V extracted in the previous step... i (i=1,2,...,10), calculate the difference between it and the initial reference voltage: attenuation difference D i =V ref -V i Because the battery port voltage shows a downward trend during the downtime, the sampling voltage point V... i Typically less than the initial reference voltage V ref Therefore, the attenuation difference is positive, reflecting the voltage attenuation magnitude from the start of the pause period to the i-th sampling time. By calculating the attenuation difference at all sampling voltage points, multiple attenuation differences are obtained: D1, D2, ..., D... 10 These attenuation difference sequences describe the amplitude variation characteristics of the voltage drop process.
[0034] Step 4.3 involves performing a logarithmic transformation on multiple attenuation differences to obtain multiple logarithmic transformation results. The difference between adjacent logarithmic transformation results is then calculated to obtain multiple attenuation difference values. Specifically, this includes performing a logarithmic transformation on the attenuation difference sequence obtained in the previous step. The purpose is to linearize the exponential attenuation law of electrochemical polarization attenuation, facilitating quantitative analysis. The natural logarithm is then calculated for each attenuation difference: the logarithmic transformation result H... i =ln(D i +ε), where ε is a very small positive number (e.g., 1e-6) to avoid numerical instability in logarithmic operations. The resulting logarithmic transformation sequence is: H1, H2, ..., H3. If the internal polarization degradation of the battery follows a typical electrochemical exponential degradation law, the logarithmic transformation result should show a linear decreasing trend. Further calculation of the difference between adjacent logarithmic transformation results is performed to quantify the change in the degradation rate: Degradation Difference F i =H i+1 -H i Where i = 1, 2, ..., 9. Multiple attenuation difference values are obtained: F1, F2, ..., F9. These attenuation difference values reflect the change in attenuation rate between adjacent sampling points in the logarithmic domain. If polarization attenuation follows a stable exponential law, the attenuation difference values should remain relatively stable; if abnormal conditions such as short circuits cause abnormal attenuation patterns, the attenuation difference values will fluctuate significantly.
[0035] Step 4.4 involves statistically analyzing the variances of multiple attenuation difference values to obtain the attenuation difference variance. This variance is then used as a polarization attenuation characteristic value. Specifically, this includes performing statistical analysis on the attenuation difference value sequence obtained in the previous step and calculating its variance to quantify the stability of the attenuation pattern. The variance calculation formula is: Attenuation difference variance = Σ(F i-μF)² / (n-1), where μF is the mean of the attenuation difference, μF=ΣF i / n, where n is the number of attenuation difference values (n=9 in this example). The attenuation difference variance reflects the dispersion of the attenuation difference value sequence: if the polarization attenuation inside the battery follows normal electrochemical laws, the attenuation rate in the logarithmic domain should remain relatively stable, the attenuation difference value fluctuations are small, and the attenuation difference variance is low; if there is a parallel short-circuit load, the voltage drop process does not follow the electrochemical polarization law but exhibits a purely resistive pull-down characteristic, the attenuation difference value fluctuations are large, and the attenuation difference variance increases significantly. The calculated attenuation difference variance is used as a polarization attenuation characteristic value. This characteristic value quantitatively describes the polarization attenuation law characteristics of the port drop-off voltage sequence, providing a key physical quantity for subsequent judgment of short-circuit equivalent conditions.
[0036] In this embodiment of the invention, by extracting a preset number of sampling voltage points with equal time intervals from the port fallback voltage sequence, using the voltage at the start of the rest period as the initial reference voltage to calculate the voltage attenuation difference of each sampling point, performing a logarithmic transformation on the attenuation difference to calculate the difference between adjacent results, and statistically analyzing the variance of the attenuation difference as the polarization attenuation characteristic value, the technical problem that existing charging management systems cannot quantitatively analyze the battery polarization attenuation law, lack effective methods to distinguish between normal electrochemical polarization and short-circuit resistive pull-down, and that traditional voltage monitoring methods only focus on voltage amplitude and cannot identify the physical mechanism of the attenuation process, is overcome. Thus, it achieves the technical effect of quantitatively characterizing the polarization attenuation law through logarithmic domain difference variance analysis, accurately identifying the essential difference between electrochemical polarization and non-polarization resistive attenuation, providing reliable physical characteristic criteria for short-circuit fault diagnosis and normal charging differentiation, and effectively improving charging safety and fault identification accuracy.
[0037] In a preferred embodiment of the present invention, the above-mentioned calculation of the energy absorption rate of the current pulse cycle based on the voltage rise slope during the current activation pulse includes: Step 5.1: Obtain the pulse current amplitude and pulse duration of the current activation pulse, and calculate the product of the pulse current amplitude and pulse duration to obtain the injected charge. Specifically, this includes: during the injection of the current activation pulse into the deeply depleted battery module, the current detection circuit of the charging management device monitors the charging current of the charging circuit in real time. During the conduction period of the activation pulse, the charging current maintains a relatively stable constant current output, and the average current value of this constant current segment is extracted as the pulse current amplitude Ipulse. Simultaneously, the pulse duration is calculated based on the duty cycle and pulse period of the current activation pulse: pulse duration t. on = Current duty cycle × Tperiod, where Tperiod is the preset pulse period time. Based on Coulomb's law, the integral of the charging current over time equals the injected charge, which simplifies to: Injected charge Q = Ipulse × ton For example, if the pulse current amplitude is 200mA and the pulse duration is 50ms, then the injected charge is 200mA × 50ms = 10mC. The injected charge reflects the total amount of charge injected into the deeply discharged battery module by the current activation pulse, providing an input benchmark for evaluating the battery's energy absorption capacity.
[0038] Step 5.2: Obtain the starting and ending port voltages during the current activation pulse, calculate the difference between the ending and starting port voltages to obtain the pulse voltage increment. Specifically, during the conduction period of the current activation pulse, the high-precision voltage acquisition circuit continuously monitors the port voltage change of the charging port. Extract the port voltage value at the very beginning of pulse conduction (t=0) as the starting port voltage V. start And the pulse conduction end time (t=t on The port voltage value at time ( ) is used as the end port voltage V. end Calculate the difference between the two: pulse voltage increment ΔV = V end -V start The pulse voltage increment reflects the rise in the charging port voltage during the current activation pulse. If the deeply discharged battery module absorbs charging energy normally, the injected charge will undergo electrochemical reactions and charge accumulation inside the battery, causing the port voltage to gradually rise, and the pulse voltage increment will be positive. If a short-circuit load exists, the injected charge is mainly consumed by the resistance of the short-circuit loop, the port voltage rise is minimal or even nonexistent, and the pulse voltage increment is close to zero. The pulse voltage increment provides output response data for evaluating the energy absorption effect.
[0039] Step 5.3 calculates the ratio of the pulse voltage increment to the injected charge to obtain the port voltage change rate. Specifically, this includes calculating the ratio of the pulse voltage increment ΔV and the injected charge Q obtained in the previous two steps: Port voltage change rate K = ΔV / Q. The physical meaning of this port voltage change rate is the amplitude of the port voltage change caused by a unit charge injection, expressed in V / C (volts per coulomb). The port voltage change rate reflects the voltage response sensitivity of the deeply depleted battery module to injected charge: if the battery module has good capacitance characteristics and can effectively absorb charge for internal accumulation, a unit charge injection will cause a significant voltage rise, resulting in a large port voltage change rate; if a short circuit path or internal short circuit exists, the injected charge cannot accumulate effectively, and the port voltage change rate is extremely small. The port voltage change rate essentially reflects the equivalent capacitance characteristics of the charging port, providing a normalized benchmark for subsequent energy absorption rate calculations.
[0040] Step 5.4: The ratio of the port voltage change rate to the preset ideal capacitive voltage change rate is used as the energy absorption rate for the current pulse cycle. Specifically, this includes: calculating the ideal capacitive voltage change rate based on the nominal capacity and electrochemical characteristics of the deeply discharged battery module. The ideal capacitive voltage change rate is derived from the basic formula for capacitors: K... ideal =1 / C, where C is the equivalent capacitance of the battery module. The equivalent capacitance can be calculated based on the battery's nominal capacity Ah and rated voltage V: C = (Ah × 3600) / V. For example, for a 3000mAh, 3.7V lithium battery, the equivalent capacitance is approximately 2918 farads. The ideal capacitive change rate represents the voltage change caused by a unit charge injection under ideal lossless and polarization-free conditions, serving as a reference benchmark for evaluating actual energy absorption performance. The actual measured port voltage change rate K is compared with the preset ideal capacitive change rate K... ideal Perform the ratio calculation: Energy absorption rate η = K / K ideal The energy absorption rate is a normalized dimensionless parameter, typically ranging from 0 to 1. A rate close to 1 indicates that the battery's absorption of injected charge is close to ideal capacitive characteristics, demonstrating good energy absorption. A rate much less than 1 indicates that most of the injected charge has not effectively accumulated inside the battery, potentially indicating a short circuit or severe polarization obstruction. The calculated energy absorption rate is used as a key evaluation parameter for the current pulse cycle, in subsequent short-circuit detection and charging control decisions.
[0041] In this embodiment of the invention, by acquiring the pulse current amplitude and pulse duration of the current active pulse and calculating the injected charge, acquiring the starting and ending port voltages during the pulse and calculating the pulse voltage increment, and calculating the ratio of the pulse voltage increment to the injected charge to obtain the port voltage change rate, and using the ratio of the port voltage change rate to the preset ideal capacitive change rate as the energy absorption rate, this invention overcomes the technical problems of existing charging management systems that cannot quantitatively evaluate the battery's absorption of charging energy, lack of normalization indicators leading to inconsistent evaluation between batteries of different capacities, and traditional methods that only monitor single parameters such as voltage or current and cannot comprehensively reflect energy conversion efficiency. This achieves accurate evaluation of energy absorption through quantitative analysis of the charge-voltage response relationship, and unified evaluation standards for different batteries based on normalization processing using an ideal capacitive benchmark. It provides scientifically reliable physical quantities for short-circuit identification and charging quality evaluation, effectively improving the intelligence and accuracy of charging management.
[0042] In a preferred embodiment of the present invention, if the energy absorption rate is lower than a preset safe absorption threshold and the polarization attenuation characteristic value satisfies the short-circuit equivalent condition, then determining that the current current flows to the parallel short-circuit load and cutting off the output includes: Step 6.1: Determine whether the energy absorption rate is less than the first safety threshold and whether the polarization decay characteristic value is greater than the second safety threshold. The second safety threshold is determined based on the upper limit of the electrochemical polarization decay variance under non-short-circuit conditions. Specifically, it includes a dual safety criterion check using the energy absorption rate and polarization decay characteristic value of the current pulse cycle output by the receiving parameter calculation module. First, the energy absorption rate is compared numerically with the first safety threshold. The first safety threshold is determined based on the lowest energy absorption rate of a deeply depleted battery under normal charging conditions. Through extensive experimental statistical analysis of the energy absorption rate distribution of normal deeply depleted batteries, its lower limit is taken as the first safety threshold. For example, setting it to 0.3 indicates that an energy absorption rate below 30% is considered abnormal. If the energy absorption rate is less than the first safety threshold, it indicates that the injected charge has not been effectively accumulated inside the battery, posing a risk of abnormal energy loss. Simultaneously, the polarization decay characteristic value (i.e., the decay difference variance) is compared with the second safety threshold. The second safety threshold is determined based on the statistical characteristics of electrochemical polarization decay under non-short-circuit conditions: during normal electrochemical polarization decay, the decay rate in the logarithmic domain remains relatively stable, and the decay difference variance is small. Through statistical analysis of a large amount of polarization decay data from normally deeply discharged batteries, the upper limit of the decay difference variance under non-short-circuit conditions is determined as the second safety threshold, for example, set to 0.05. If the polarization decay characteristic value is greater than the second safety threshold, it indicates that the voltage drop process does not conform to the electrochemical polarization law, the decay rate fluctuates drastically, and exhibits characteristics of a purely resistive short-circuit pull-down. The two criteria assess the safety of the charging state from two dimensions: energy conversion efficiency and physical decay law.
[0043] Step 6.2: If the energy absorption rate is less than the first safety threshold and the polarization decay characteristic value is greater than the second safety threshold, then it is confirmed that the port fallback voltage sequence conforms to the characteristics of a purely resistive short circuit pull-down. The current current flow is determined to be to the parallel short-circuit load, the output power stage of the charging management device is locked, and a hardware fault alarm is generated. Specifically, when both safety criteria are met simultaneously (i.e., the energy absorption rate is less than the first safety threshold and the polarization decay characteristic value is greater than the second safety threshold), a comprehensive fault diagnosis is performed. A low energy absorption rate indicates that the injected charge has not accumulated effectively, and a high polarization decay characteristic value indicates that the voltage fallback does not follow the electrochemical polarization law. The simultaneous occurrence of both strongly suggests the presence of a parallel short-circuit load: the short-circuit load provides a bypass path for the charging current, causing most of the charge to be consumed on the resistance of the short-circuit loop rather than accumulated inside the battery, significantly reducing the energy absorption rate; simultaneously, the purely resistive characteristics of the short-circuit loop cause the voltage fallback during the rest period to exhibit resistive discharge characteristics rather than electrochemical polarization decay, resulting in an abnormally large differential variance in decay. Based on the above physical mechanism analysis, it was confirmed that the port drop-off voltage sequence conforms to the characteristics of a purely resistive short circuit pulling down, indicating that the current is flowing towards the parallel short-circuited load rather than into the deeply depleted battery module. To ensure charging safety, protection measures were immediately activated: the output power stage of the charging management device was locked, all power switches were turned off to stop current output, and the electrical connection with the charging port was severed; simultaneously, a hardware fault alarm was generated, sending a short-circuit fault alarm to the user or host computer system via indicator lights, buzzers, or communication interfaces, indicating the presence of an external short-circuit risk, prohibiting further charging operations, and requiring a check of the short-circuit fault between the charging port and the battery. Through timely fault diagnosis and output disconnection, equipment damage or safety accidents caused by short-circuit current were effectively avoided.
[0044] In this embodiment of the invention, by employing a technical means of determining whether the energy absorption rate is less than a first safety threshold and whether the polarization decay characteristic value is greater than a second safety threshold determined based on the upper limit of the electrochemical polarization decay variance, and confirming that the port drop-off voltage sequence conforms to the characteristics of a purely resistive short circuit when both criteria are met simultaneously, and determining that the current flows to the parallel short-circuit load, the output power stage is immediately locked and a hardware fault alarm is generated, the technical problems of existing charging devices being unable to accurately distinguish between deeply depleted batteries and short-circuit loads, the ease with which a single voltage or current criterion can lead to misjudgment and charging safety risks, and the lack of a multi-dimensional fault diagnosis method based on physical mechanisms are overcome. This achieves the technical effect of accurately identifying short-circuit faults through dual physical criteria of energy absorption rate and polarization decay characteristic value, effectively distinguishing between normal charging and short-circuit anomalies based on the essential differences between electrochemical laws and resistive characteristics, timely cutting off the output to protect the charging device, and effectively improving the fault diagnosis capability and safety protection level of the charging management system.
[0045] In a preferred embodiment of the present invention, if the energy absorption rate is not lower than a preset safety absorption threshold and the polarization decay characteristic value does not meet the short-circuit equivalent condition, then it is determined that the current flows into the deeply depleted battery module for charge accumulation, further comprising: Step 7.1: Obtain the estimated internal polarization resistance of the deeply depleted battery module before the current activation pulse. Specifically, after determining that the current flows into the deeply depleted battery module for normal charge accumulation, an estimated internal polarization resistance is needed to achieve adaptive optimization for subsequent activation pulses. Deeply depleted battery modules, due to long-term storage or over-discharge, exhibit severe electrochemical and concentration polarization, resulting in a large internal polarization resistance. Before the current activation pulse, the internal resistance is estimated based on the voltage response data of the preceding pulse cycle. A simplified equivalent circuit model is used: at the instant of pulse conduction, the sudden change in port voltage is mainly caused by ohmic resistance; during the duration of pulse conduction, the slow rise in port voltage is mainly caused by polarization resistance. By analyzing the voltage-current response relationship of the previous one or more pulse cycles, the current internal polarization resistance Rpol is estimated using least squares fitting or Kalman filtering algorithms. For example, based on the relationship between the pulse current Ipulse and the steady-state voltage rise rate dV / dt: Rpol≈(dV / dt) / (Ipulse / C eq ), where C eq This is the equivalent capacitance. The estimated current internal polarization resistance reflects the current polarization level of the deeply depleted battery module, providing state parameters for optimizing the duty cycle of the next activation pulse.
[0046] Step 7.2: Based on the energy absorption rate and the current estimated internal polarization resistance, a binary search algorithm is used to find the optimal predicted duty cycle for the next activation pulse within a preset duty cycle search interval. The optimal predicted duty cycle minimizes the absolute value of the difference between the predicted voltage rise slope and the preset safe polarization slope. Specifically, to achieve adaptive adjustment of the repair pulse for deeply depleted battery modules, the duty cycle parameters of the next activation pulse need to be optimized according to the current state of the battery to achieve optimal activation effect and safety. The optimization objective is defined as follows: the predicted voltage rise slope generated by the next activation pulse should be as close as possible to the preset safe polarization slope. The preset safe polarization slope is determined based on the battery's electrochemical characteristics and represents the maximum safe voltage rise rate without causing safety risks such as excessive polarization or lithium dendrite growth; for example, it is set to 50mV / s to 100mV / s. Based on the current energy absorption rate and the current estimated internal polarization resistance, a prediction model is established: Predicted voltage rise slope = f(duty cycle, energy absorption rate, Rpol), where f is a function derived from the battery equivalent circuit model. Since the function relationship may be complex and nonlinear, a binary search algorithm is used to efficiently find the optimal predicted duty cycle within a preset duty cycle search interval. The preset duty cycle search interval is set according to the current activation stage, for example, set as [current duty cycle, current duty cycle + 20%], to ensure that the search range is reasonable and does not exceed the safety limit. The binary search algorithm iteratively approaches the duty cycle value that minimizes |predicted voltage rise slope - preset safety polarization slope|, which is then used as the optimal predicted duty cycle for the next activation pulse.
[0047] Step 7.3 outputs the optimal predicted duty cycle as the duty cycle of the next activation pulse to achieve adaptive adjustment of the repair pulse for deeply discharged battery modules. Specifically, this includes: using the optimal predicted duty cycle obtained through a binary search algorithm as the duty cycle parameter for the next activation pulse, and configuring it to the pulse generation module of the charging management device. Based on the optimal predicted duty cycle and a fixed pulse period Tperiod, the on-time and off-time of the next activation pulse are calculated, and an optimized activation pulse is generated and injected into the deeply discharged battery module. Through this adaptive adjustment mechanism, the energy intensity of the activation pulse can be dynamically optimized according to the battery's current energy absorption rate and internal polarization state: when the battery's energy absorption rate is low or internal polarization is severe, the duty cycle is reduced to decrease the activation intensity and avoid excessive polarization; when the battery state gradually improves and the energy absorption rate increases, the duty cycle is appropriately increased to accelerate the activation process and improve efficiency. Compared with a fixed, incremental duty cycle sequence, adaptive adjustment can more accurately match the dynamic changes of the battery, achieving an optimal balance between safety and efficiency, and effectively improving the repair success rate and activation quality of deeply discharged batteries.
[0048] In this embodiment of the invention, by acquiring the estimated internal polarization resistance of the deeply depleted battery component before the current activation pulse, and using a binary search algorithm based on the energy absorption rate and the estimated internal polarization resistance to find the optimal predicted duty cycle within a preset duty cycle search interval that minimizes the difference between the predicted voltage rise slope and the preset safe polarization slope, and using the optimal predicted duty cycle as the duty cycle output for the next activation pulse, this invention overcomes the technical problems of existing battery activation methods that use a fixed incremental duty cycle sequence that cannot be adaptively adjusted according to the dynamic state of the battery, which may lead to over-polarization or low activation efficiency during the activation process, and lack of duty cycle optimization algorithms based on physical models. This achieves the technical effect of adaptive optimization of the activation pulse based on real-time battery state parameters, precise control of the voltage rise slope through prediction models and optimization algorithms, ensuring that the activation process is both safe and efficient, and effectively improving the repair quality and activation success rate of deeply depleted batteries.
[0049] In a preferred embodiment of the present invention, the above-mentioned method of using a binary search algorithm to find the optimal predicted duty cycle of the next activation pulse within a preset duty cycle search interval includes: Step 8.1: The lower bound of the preset duty cycle search interval is used as the current search lower bound, and the upper bound of the preset duty cycle search interval is used as the current search upper bound. Specifically, this includes: before executing the binary search algorithm, first initializing the boundary parameters of the search interval. Based on the current activation stage and battery state, set the preset duty cycle search interval, for example, set it to [D...]. current D current +0.2], where D current The upper bound of the duty cycle of the currently active pulse is increased by 20% to provide sufficient search range. The lower bound D of the preset duty cycle search interval is also increased. current Assign the value to the current search lower bound variable D low The upper bound D of the preset duty cycle search interval is set. current +0.2 is assigned to the upper bound variable D of the current search. high The current lower bound and the current upper bound define the initial search range of the binary search algorithm. In subsequent iterations, this range will gradually shrink until the optimal predicted duty cycle is found.
[0050] Step 8.2: Calculate the average of the current lower bound and the current upper bound of the search to obtain the current duty cycle to be verified. Specifically, this includes: in each iteration of the binary search algorithm, calculating the midpoint of the current search interval as the test point for this iteration. The calculation formula is: Current duty cycle to be verified D test =(D low +D high ) / 2. This current duty cycle to be verified is located in the middle of the current search interval and will be used as a candidate optimal duty cycle for performance evaluation in this iteration. For example, if the current search lower bound Dlow =0.3, the current upper bound of the search is D high =0.5, then the current duty cycle D to be verified is... test =0.4.
[0051] Step 8.3 calculates the predicted voltage rise slope based on the current duty cycle to be verified and the energy absorption rate. Specifically, this includes establishing a prediction model between the duty cycle, energy absorption rate, and voltage rise slope based on the battery equivalent circuit model and energy conversion relationship. The simplified model is: Predicted voltage rise slope = (Current duty cycle to be verified × Ipulse × Energy absorption rate) / (Ceq × Tperiod), where Ipulse is the pulse current amplitude, Ceq is the battery equivalent capacitance, and Tperiod is the pulse period. The physical meaning of this model is: the duty cycle determines the charging time within a single cycle, the pulse current determines the charging rate, the energy absorption rate determines the effective utilization ratio of the injected charge, and the equivalent capacitance determines the impact of charge accumulation on the voltage. The current duty cycle to be verified, D... test Substitute the current energy absorption rate into the prediction model to calculate the expected voltage rise slope at this duty cycle, which is then used as a predicted value for performance evaluation.
[0052] Step 8.4: If the predicted voltage rise slope is greater than the preset safe polarization slope, then the current duty cycle to be verified is taken as the new upper limit of the current search, and the process jumps to the step of calculating the average of the current lower limit and the current upper limit of the search. Specifically, this includes comparing the calculated predicted voltage rise slope with the preset safe polarization slope. If the predicted voltage rise slope is greater than the preset safe polarization slope, it indicates that the current duty cycle to be verified, D... test If the duty cycle is too large, the voltage rise rate will exceed the safety limit, posing a risk of over-polarization. In this case, the optimal duty cycle should be determined to be in the left half of the current search interval, i.e., [D]. low D test Within the interval. The current duty cycle D to be verified. test Assign the value to the current upper bound D. high D high =D test This narrows the upper bound of the search interval. The current lower bound D is maintained. low The search interval remains unchanged, forming a new search range [D]. low D test Then jump back to step 8.2, recalculate the midpoint of the new search interval as the current duty cycle to be verified in the next iteration, and continue the search process.
[0053] Step 8.5: If the predicted voltage rise slope is not greater than the preset safe polarization slope, then the current duty cycle to be verified is taken as the new current search lower bound, and the process jumps to the step of calculating the average of the current search lower bound and the current search upper bound until the difference between the current search upper bound and the current search lower bound is less than the preset accuracy threshold. The current duty cycle to be verified is then taken as the optimal predicted duty cycle. Specifically, if the predicted voltage rise slope is not greater than the preset safe polarization slope, it indicates that the current duty cycle to be verified, D... test If the safe polarization slope has not been reached or has just been reached, there is still room for improvement or it is close to the optimum. In this case, the optimal duty cycle should be determined to be in the right half of the current search interval, i.e., [D]. test D high Within the interval. The current duty cycle D to be verified. test Assign the value to the current search lower bound D low D low =D test This narrows the lower bound of the search interval. The current upper bound D is maintained. high The search interval remains unchanged, forming a new search range [D]. test D high After each iteration, check the width of the search interval: calculate the difference |D| between the current upper search bound and the current lower search bound. high -D low The result is compared with a preset accuracy threshold, which is set according to the duty cycle control accuracy requirements, for example, 0.01 (i.e., 1%). If the difference is still greater than or equal to the preset accuracy threshold, it indicates that the search interval is still large and needs to be further refined, so the process jumps back to step 8.2 to continue iterating. If the difference is less than the preset accuracy threshold, it indicates that the search interval is small enough and the duty cycle difference between the current search lower bound and the current search upper bound can be ignored. At this time, the current duty cycle to be verified is the optimal predicted duty cycle found. The current duty cycle to be verified is output as the optimal predicted duty cycle, and the binary search process ends. Through the iterative shrinking of the binary search algorithm, the optimal duty cycle value that makes the predicted voltage rise slope closest to the preset safe polarization slope is efficiently found within the duty cycle search interval, achieving precise optimization of the activation parameters.
[0054] In this embodiment of the invention, by using the lower and upper bounds of a preset duty cycle search interval as the current lower and upper bounds of the search, respectively, iteratively calculating the average of the two as the current duty cycle to be verified, and calculating the predicted voltage rise slope based on the energy absorption rate, and dynamically adjusting the upper or lower bound of the search according to the comparison result of the predicted slope and the preset safe polarization slope, until the search interval shrinks to within a preset accuracy threshold to obtain the optimal predicted duty cycle, the technical problems of existing duty cycle optimization methods, such as low efficiency of traversal search, inability to quickly respond to dynamic changes in the battery, and insufficient real-time performance due to the lack of efficient numerical optimization algorithms, are overcome. This achieves the technical effect of efficiently optimizing the duty cycle through a binary search algorithm, finding the optimal parameters within logarithmic iterations, significantly improving the real-time response capability of adaptive control, and providing efficient algorithmic support for the dynamic optimization and activation of deeply depleted batteries.
[0055] In a preferred embodiment of the present invention, after confirming the access to the deeply depleted battery module and before constructing the incremental energy activation pulse sequence, the method further includes: Step 9.1 involves detecting the reverse body diode voltage drop characteristic of the charging port. Specifically, after confirming the connection of a deeply discharged battery module, to implement a targeted activation strategy, it is necessary to identify the type of deeply discharged battery module, primarily distinguishing between lithium-ion battery energy storage systems and lead-acid batteries. First, the presence of a reverse body diode voltage drop characteristic at the charging port is detected. Modern lithium-ion battery energy storage systems typically integrate a protection circuit board (PCM / BMS), which includes a MOSFET power transistor used to control the charging and discharging path. The structural characteristics of the MOSFET determine the presence of a parasitic body diode (also called a reverse body diode), which allows current to flow in a specific direction even when the MOSFET is turned off. The detection method is as follows: Apply a small reverse test current (e.g., 10mA) to the charging port and monitor the port voltage: If a stable voltage drop of approximately 0.3V to 0.7V is detected, which matches the forward conduction voltage drop characteristics of a silicon-based diode, then a reverse body diode voltage drop characteristic is determined to exist; if the port voltage rapidly rises to a higher voltage or exhibits open-circuit characteristics, then a reverse body diode voltage drop characteristic is determined to be absent. The presence of reverse-connected diode voltage drop is a typical characteristic of lithium battery energy storage systems.
[0056] Step 9.2: If a reverse-connection body diode voltage drop characteristic exists and the current voltage of the charging port is within the undervoltage lockout output cutoff range, then the deeply depleted battery assembly is confirmed to be a lithium battery energy storage system that has cut off the output MOSFET due to undervoltage lockout. Specifically, if the reverse-connection body diode voltage drop characteristic was detected in the previous step, the current voltage level of the charging port is further checked. Lithium battery energy storage systems typically have an undervoltage lockout protection function: when the battery voltage drops below the undervoltage threshold (for example, for a 3.7V nominal voltage lithium battery, the undervoltage threshold is usually set to 2.5V to 2.8V), the protection circuit cuts off the output MOSFET to prevent over-discharge damage to the battery. At this time, the battery assembly is in a locked state and cannot be charged by normal means. The undervoltage lockout output cutoff range is defined as the voltage range from 0V to the undervoltage threshold, for example, [0V, 2.8V]. The current voltage of the charging port is compared with this range. If the current voltage is within the undervoltage lockout output cutoff range, combined with the presence of the reverse-connection body diode voltage drop characteristic, it is comprehensively determined that the deeply depleted battery assembly is a lithium battery energy storage system that has cut off the output MOSFET due to undervoltage lockout. This type of battery requires a special wake-up activation process: a small current is injected into the battery through the body diode path to gradually raise the battery voltage to above the undervoltage lockout threshold, triggering the protection circuit to unlock and restore the normal charging and discharging path.
[0057] Step 9.3: If there is no reverse-connection diode voltage drop characteristic and the current voltage at the charging port is within the lead-acid plate sulfation range, then the deeply discharged battery assembly is confirmed to be a deeply discharged lead-acid battery. The base frequency of the incremental energy activation pulse sequence is then corrected according to the preset lead-acid desulfation frequency. Specifically, if no reverse-connection diode voltage drop characteristic is detected, it indicates that the battery assembly does not contain a MOSFET protection circuit and may be a traditional lead-acid battery. Further check whether the current voltage at the charging port is within the lead-acid plate sulfation range. After deep discharge or long-term storage, lead sulfate crystals (sulfation) will form on the surface of the lead-acid plates, leading to a decrease in battery capacity and an increase in internal resistance. Severely sulfated lead-acid batteries typically have extremely low open-circuit voltages. The lead-acid plate sulfation range is defined as 0V to 1.8V per cell (0V to 10.8V for a 12V lead-acid battery). If the current voltage at the charging port is within this range, combined with the absence of a reverse-connection diode voltage drop characteristic, the deeply discharged battery assembly is confirmed to be a deeply discharged lead-acid battery. For sulfated lead-acid batteries, a desulfurization repair strategy is required. Studies have shown that pulse charging at a specific frequency can effectively break down lead sulfate crystals and restore battery activity. A preset lead-acid desulfurization frequency is obtained, determined based on the optimal frequency range for lead-acid battery desulfurization, typically ranging from a few Hz to tens of Hz, for example, set to 10 Hz. The base frequency of the incremental energy activation pulse sequence is then adjusted based on the preset lead-acid desulfurization frequency: the pulse period Tperiod is adjusted to the reciprocal of the desulfurization frequency, for example, Tperiod = 1 / 10 Hz = 100 ms, ensuring the activation pulse sequence operates at the optimal desulfurization frequency, thus improving the repair effect of the lead-acid battery.
[0058] In this embodiment of the invention, by employing the voltage drop characteristics of the reverse-connection diode at the charging port, combined with whether the current voltage is in the undervoltage lockout output cutoff range or the lead-acid plate sulfation range, the deeply discharged battery component is accurately identified as a lithium battery energy storage system or a lead-acid battery. Furthermore, for lead-acid batteries, the basic frequency of the activation pulse sequence is adjusted according to a preset desulfation frequency. Therefore, this overcomes the technical problems of existing charging equipment being unable to automatically identify battery types, using a uniform charging strategy that cannot adapt to the differences in characteristics of different batteries leading to poor activation effects, and lacking targeted repair strategies resulting in unsatisfactory desulfation effects for lead-acid batteries. This achieves the technical effects of automatically identifying battery types based on electrical characteristics, adopting differentiated activation strategies for different battery types, and especially improving the repair success rate of lead-acid batteries through desulfation frequency optimization, thus realizing intelligent and universal charging management.
[0059] In a preferred embodiment of the present invention, the above-mentioned switching to the conventional charging mode based on the energy absorption rate of the current pulse period includes: Step 10.1: Obtain the initial constant current duty cycle corresponding to the normal charging mode and the current active pulse duty cycle of the current pulse cycle. Specifically, this includes continuously monitoring the real-time voltage of the charging port during activation. When the real-time voltage reaches the preset wake-up voltage threshold, it indicates that the deeply discharged battery component has been successfully activated, the internal electrochemical reaction has recovered, and it can be switched to the normal charging mode. The preset wake-up voltage threshold is determined according to the battery type: 3.0V to 3.2V for lithium batteries and 12.6V to 13.0V for lead-acid batteries (taking a 12V battery as an example). Reaching this threshold indicates that the battery has escaped the deep discharge state, the protection circuit has been unlocked, or the plate sulfation has been improved. To achieve a smooth switch, the initial constant current duty cycle corresponding to the normal charging mode is first obtained. This duty cycle is determined according to the battery's standard charging current. For example, for a 1C charging rate, the initial constant current duty cycle is set to 80% to 90% to achieve high-efficiency constant current charging. At the same time, the duty cycle of the current active pulse in the current pulse period is obtained. This duty cycle is the last duty cycle value used in the activation phase and is usually much lower than the initial constant current duty cycle.
[0060] Step 10.2: Calculate the difference between the initial constant current duty cycle and the current active pulse duty cycle to obtain the duty cycle transition difference. Specifically, this includes calculating the difference between the initial constant current duty cycle and the current active pulse duty cycle: Duty Cycle Transition Difference = Initial Constant Current Duty Cycle - Current Active Pulse Duty Cycle. This duty cycle transition difference reflects the duty cycle range required to switch from the active mode to the normal charging mode. For example, if the current active pulse duty cycle is 30% and the initial constant current duty cycle is 85%, then the duty cycle transition difference is 55%. If the duty cycle jumps directly from 30% to 85%, the abrupt change in duty cycle will cause a drastic change in charging current, which may impact the battery or trigger the protection circuit. Therefore, a smooth transition mechanism needs to be designed to gradually increase the duty cycle to complete the mode switch.
[0061] Step 10.3: Approximate the duty cycle of the current active pulse towards the initial constant current duty cycle successively according to the preset ramp step size, and continuously monitor the energy absorption rate during the approximation process. Specifically, this includes setting a preset ramp step size as the increment for the successive increase of the duty cycle. This step size is determined according to the smooth switching requirements, for example, set to 2% to 5%, to ensure the gradual change of the duty cycle. During mode switching, starting from the current active pulse duty cycle, the duty cycle is increased by one preset ramp step size for each pulse cycle: D n =D (n-1) +Preset ramp step length, where D nThis represents the duty cycle of the nth transition pulse. For example, if the current activation pulse duty cycle is 30% and the preset ramp step size is 5%, then the transition sequence is 30%, 35%, 40%, 45%,... gradually approaching 85%. Within each transition pulse cycle, the energy absorption rate is calculated using the same method as in the activation phase: monitoring the voltage rise during the pulse, calculating the injected charge and the pulse voltage increment to obtain the energy absorption rate. Continuous monitoring of the energy absorption rate aims to ensure that the battery can still absorb energy well during the duty cycle increase process, without any abnormal conditions.
[0062] Step 10.4: If the energy absorption rate remains at or above the preset safe absorption threshold during the approximation process, then when the current active pulse duty cycle reaches the initial constant current duty cycle, the system fully transitions to the constant current charging stage of the conventional charging mode. Specifically, this includes: during the gradual increase of the duty cycle, checking the calculated energy absorption rate after each pulse cycle. Comparing it with the preset safe absorption threshold (e.g., the first safe threshold), if the energy absorption rate remains at or above the preset safe absorption threshold, it indicates that the battery can still safely and effectively absorb energy under the current charging intensity, without any abnormal state, and the duty cycle can continue to increase. The duty cycle continues to increase according to the preset ramp step size until the current active pulse duty cycle reaches or exceeds the initial constant current duty cycle. When the duty cycle reaches the initial constant current duty cycle, the transition process is considered complete, and the charging management device fully transitions to the constant current charging stage of the conventional charging mode. During the constant current charging phase, the charging management device charges the battery with a constant current corresponding to the initial constant current duty cycle, continuously monitoring the battery voltage. Once the voltage reaches the constant voltage charging threshold, it switches to the constant voltage charging phase, completing the entire charging process according to the standard lithium battery or lead-acid battery charging curve. Through a smooth duty cycle ramp transition and continuous monitoring of energy absorption rate, a safe and stable switch from activation mode to normal charging mode is achieved, avoiding current surges during mode switching and ensuring the continuity and safety of the charging process.
[0063] In this embodiment of the invention, by acquiring the initial constant current duty cycle and the current activation pulse duty cycle of the conventional charging mode and calculating the difference between the two to obtain the duty cycle transition difference, and by gradually approaching the current duty cycle to the initial constant current duty cycle according to a preset ramp step size while continuously monitoring the energy absorption rate, and fully switching to the conventional charging mode when the energy absorption rate remains safe and the duty cycle reaches the target value, the technical problem of existing charging devices directly switching between the activation mode and the conventional charging mode, which leads to sudden current changes, potentially triggering battery protection or charging interruption, and lacking a smooth transition mechanism resulting in a poor charging experience, is overcome. This achieves a smooth transition of charging modes through an incremental duty cycle ramp, avoids current surges and battery stress during mode switching, and ensures the safety of the transition process through continuous monitoring of the energy absorption rate, thus realizing a seamless connection between activation charging and conventional charging and effectively improving the user experience and system reliability of charging management.
[0064] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
[0065] It should be noted that all formulas in this manual are calculated by removing dimensions and taking their numerical values. The formulas are derived from software simulations based on a large amount of collected data to obtain the most recent real-world results. The preset parameters and thresholds in the formulas are set by those skilled in the art according to the actual situation.
[0066] Although embodiments of the invention have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims
1. An intelligent battery charging management system with load adaptive function, characterized in that, Applications in charging management devices, including: The response acquisition module is used to inject a preset micro-energy detection pulse sequence into the charging port and acquire the voltage response sequence of the charging port under the action of the preset micro-energy detection pulse sequence. The deep battery depletion identification module is used to calculate the equivalent impedance state of the charging port based on the waveform characteristics of the voltage response sequence, and to confirm the connection of the deep battery depletion battery component when the equivalent impedance state is in a preset deep battery depletion range. The activation and fallback acquisition module is used to construct an incremental energy activation pulse sequence, sequentially inject each activation pulse in the incremental energy activation pulse sequence into the deeply depleted battery component, and acquire the port fallback voltage sequence of the charging port during the pause period of each activation pulse. The parameter calculation module is used to calculate the polarization attenuation characteristic value based on the port fallback voltage sequence, and to calculate the energy absorption rate of the current pulse period based on the voltage rise slope during the current activation pulse. The output control module is used to determine the current current flow direction to the parallel short-circuit load and cut off the output if the energy absorption rate is lower than the preset safety absorption threshold and the polarization attenuation characteristic value meets the short-circuit equivalent condition. If the energy absorption rate is not lower than the preset safety absorption threshold and the polarization decay characteristic value does not meet the short-circuit equivalent condition, then it is determined that the current current flows into the deep-discharged battery module for charge accumulation. The mode switching module is used to switch to the normal charging mode based on the energy absorption rate of the current pulse cycle when the real-time voltage of the charging port reaches a preset wake-up voltage threshold.
2. The system according to claim 1, characterized in that, The step of calculating the equivalent impedance state of the charging port based on the waveform characteristics of the voltage response sequence, and confirming the connection of the deeply depleted battery module when the equivalent impedance state is within a preset deep depletion range, includes: Extract the peak voltage at the end of each probe pulse in the voltage response sequence and the open-circuit silence voltage between each probe pulse; Calculate the difference between adjacent peak voltages and open-circuit silent voltages to obtain multiple pulse response differences, and calculate the average of the multiple pulse response differences to obtain the port response average. Extract the voltage change slope of adjacent sampling points in the voltage response sequence. If the voltage change slope is less than the preset open-circuit cutoff slope and the average value of the port response is in the preset extremely low voltage range, then confirm that the equivalent impedance state is in the preset deep depletion range.
3. The system according to claim 1, characterized in that, The construction of the incremental energy-activated pulse sequence includes: Obtain the initial duty cycle and preset duty cycle step size of the initial activation pulse; The initial duty cycle is used as the current duty cycle of the current construction pulse; The current activation pulse is generated based on the current duty cycle, and the current duty cycle is incremented based on the preset duty cycle step size to obtain the updated duty cycle; Determine whether the updated duty cycle is greater than the preset limit duty cycle; if the updated duty cycle is not greater than the preset limit duty cycle, then use the updated duty cycle as the new current duty cycle, and jump to the step of generating the current activation pulse based on the current duty cycle, until all activation pulses in the incremental energy activation pulse sequence are generated.
4. The system according to claim 1, characterized in that, The calculation of polarization attenuation characteristic values based on the port fallback voltage sequence includes: Extract a preset number of equally timed sampling voltage points from the port fallback voltage sequence; Using the voltage at the start of the pause period as the initial reference voltage, the voltage attenuation difference between each sampling voltage point and the initial reference voltage is calculated to obtain multiple attenuation differences; A logarithmic transformation is performed on the multiple attenuation differences to obtain multiple logarithmic transformation results, and the difference between adjacent logarithmic transformation results is calculated to obtain multiple attenuation difference values. The variances of multiple attenuation difference values are statistically analyzed to obtain the attenuation difference variance, which is then used as a polarization attenuation characteristic value.
5. The system according to claim 1, characterized in that, The calculation of the energy absorption rate of the current pulse cycle based on the voltage rise slope during the current activation pulse includes: Obtain the pulse current amplitude and pulse duration of the currently active pulse, calculate the product of the pulse current amplitude and the pulse duration, and obtain the injected charge amount; Obtain the start port voltage and end port voltage during the current activation pulse, calculate the difference between the end port voltage and the start port voltage, and obtain the pulse voltage increment; The ratio of the pulse voltage increment to the injected charge is calculated to obtain the port voltage change rate; The ratio of the port voltage change rate to the preset ideal capacitive change rate is used as the energy absorption rate of the current pulse cycle.
6. The system according to claim 4, characterized in that, If the energy absorption rate is lower than a preset safe absorption threshold and the polarization attenuation characteristic value satisfies the short-circuit equivalent condition, then the current current flow is determined to be to the parallel short-circuit load and the output is cut off, including: It is determined whether the energy absorption rate is less than a first safety threshold and whether the polarization decay characteristic value is greater than a second safety threshold; the second safety threshold is determined based on the upper limit of the electrochemical polarization decay variance under non-short-circuit conditions. If the energy absorption rate is less than the first safety threshold and the polarization attenuation characteristic value is greater than the second safety threshold, then it is confirmed that the port fallback voltage sequence conforms to the characteristics of pure resistive short circuit pull-down, the current current flow is determined to be to the parallel short-circuit load, the output power stage of the charging management device is locked and a hardware fault alarm is generated.
7. The system according to claim 5, characterized in that, If the energy absorption rate is not lower than the preset safety absorption threshold and the polarization decay characteristic value does not meet the short-circuit equivalent condition, then it is determined that the current current flows into the deeply depleted battery module for charge accumulation, further including: Obtain the estimated internal polarization resistance of the deeply depleted battery module before the current activation pulse. Based on the energy absorption rate and the current internal polarization resistance estimate, a binary search algorithm is used to find the optimal predicted duty cycle for the next activation pulse within a preset duty cycle search interval; the optimal predicted duty cycle minimizes the absolute value of the difference between the predicted voltage rise slope and the preset safe polarization slope. The optimal predicted duty cycle is output as the duty cycle of the next activation pulse to achieve adaptive adjustment of the repair pulse for the deeply depleted battery module.
8. The system according to claim 7, characterized in that, The step of using a binary search algorithm to find the optimal predicted duty cycle for the next activation pulse within a preset duty cycle search interval includes: The lower bound of the preset duty cycle search interval is taken as the current search lower bound, and the upper bound of the preset duty cycle search interval is taken as the current search upper bound. Calculate the average of the current search lower bound and the current search upper bound to obtain the current duty cycle to be verified; The predicted voltage rise slope is calculated based on the current duty cycle to be verified and the energy absorption rate. If the predicted voltage rise slope is greater than the preset safe polarization slope, then the current duty cycle to be verified is taken as the new current upper search bound, and the process jumps to the step of calculating the average of the current lower search bound and the current upper search bound; If the predicted voltage rise slope is not greater than the preset safe polarization slope, then the current duty cycle to be verified is taken as the new current search lower bound, and the process jumps to the step of calculating the average of the current search lower bound and the current search upper bound until the difference between the current search upper bound and the current search lower bound is less than the preset accuracy threshold, and the current duty cycle to be verified is taken as the optimal predicted duty cycle.
9. The system according to claim 1, characterized in that, After confirming the access to the deeply depleted battery module, and before constructing the incremental energy activation pulse sequence, the method further includes: Detect the voltage drop characteristics of the reverse connection body diode at the charging port; If the reverse-connection diode voltage drop characteristic exists and the current voltage of the charging port is in the undervoltage lockout output cutoff range, then the deeply depleted battery assembly is confirmed to be a lithium battery energy storage system that cuts off the output MOSFET due to undervoltage lockout. If the reverse-connection diode voltage drop characteristic does not exist and the current voltage of the charging port is in the lead-acid plate sulfation range, then the deeply discharged battery assembly is confirmed to be a deeply discharged lead-acid battery, and the base frequency of the incremental energy activation pulse sequence is corrected according to the preset lead-acid desulfation frequency.
10. The system according to claim 1, characterized in that, The switching of the energy absorption rate based on the current pulse period to the normal charging mode includes: Obtain the initial constant current duty cycle corresponding to the conventional charging mode, and obtain the current active pulse duty cycle of the current pulse period; Calculate the difference between the initial constant current duty cycle and the current active pulse duty cycle to obtain the duty cycle transition difference; The duty cycle of the current active pulse is successively approximated to the initial constant current duty cycle according to the preset ramp step size, and the energy absorption rate is continuously monitored during the approximation process; If the energy absorption rate remains no lower than the preset safe absorption threshold during the approximation process, then when the current active pulse duty cycle reaches the initial constant current duty cycle, the constant current charging phase of the conventional charging mode is fully switched in.