Axle heat pack assembly method and device

By employing a two-stage assembly strategy and utilizing coarse positioning and adaptive correction technology, the problem of precision mismatch caused by positioning errors in the hot assembly of axles was solved, achieving an efficient and stable assembly process and improving the assembly success rate and equipment efficiency.

CN123103307APending Publication Date: 2026-11-17CRRC QISHUYAN INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611337112.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

During the hot assembly of axles, the cumulative deviation caused by wear of positioning fixtures, drift of robot positioning accuracy, and equipment vibration leads to a mismatch in precision between the inner hole and the journal, which can easily cause rigid interference, resulting in assembly jamming, scratching, and adhesive wear, affecting the yield and operational stability.

Method used

A two-stage assembly strategy is adopted. First, coarse positioning is used to ensure that the workpiece to be assembled and the axle have a first assembly gap at the assembly station. Then, the self-correction of the workpiece is used to achieve a second assembly gap, avoiding scratches and plastic tearing caused by direct pressing, and ensuring the accuracy and stability of the mating surfaces.

Benefits of technology

It significantly improved the assembly success rate, shortened the operation time, increased the yield rate and operational stability, reduced equipment costs and reliance on high-precision sensors, and ensured the load-bearing capacity and fatigue life of the interference fit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123103307A_ABST
    Figure CN123103307A_ABST
Patent Text Reader

Abstract

This invention relates to a method and apparatus for heat-fitting axles, and pertains to the field of axle assembly technology. The method involves first coarsely positioning the first workpiece to be assembled, ensuring a first assembly gap between the workpiece and the axle when placed on the assembly station. Then, during assembly of the axle and the first workpiece, the adaptive correction of the workpiece achieves the required second assembly gap, avoiding edge chipping, scratching, and plastic tearing caused by direct pressing in an eccentric state, thus ensuring that the roughness and cylindricity of the mating surfaces are not compromised. Therefore, the entire heat-fitting process eliminates the need for repeated centering and real-time correction using precise sensors; assembly can be completed in a single insertion, significantly reducing the assembly time per piece and substantially improving yield and operational stability under mass production conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of axle assembly technology, and in particular to a method and apparatus for heat-fitting axles. Background Technology

[0002] During the hot-fitting assembly of workpieces and large-diameter axles, the progressive wear of positioning fixtures due to long-term heavy loads, the drift in repetitive positioning accuracy caused by the large inertial load of the robotic arm end effector, and the instantaneous vibration disturbance caused by high-frequency start-stop of the equipment—these multi-source errors superimpose in spatial vectors, resulting in a cumulative deviation typically reaching the hundreds of micrometers level. However, the final fit clearance between the inner hole of the workpiece and the journal of the axle is only at the micrometer level, differing by one to two orders of magnitude. If assembly is performed directly under this significant precision mismatch, rigid interference can easily occur between the inner hole and the journal. This can lead to assembly jamming and triggering equipment alarms and shutdowns, or even severe scratching, adhesive wear, and workpiece scrapping, severely restricting the yield rate and operational stability of hot-fitting production. Summary of the Invention

[0003] The present invention provides a method and apparatus for heat fitting of axles, which is used to solve at least one of the above-mentioned technical problems.

[0004] This invention provides a method for assembling a heat-shrink axle, comprising the following steps: S1: Remove the first workpiece to be assembled from the heat source and transfer it to the assembly station after it has been heated to the heat jacket temperature; S2: Position the first workpiece to be assembled and the axle at the assembly station to meet the first assembly gap; S3: At the assembly station, the first workpiece to be assembled is assembled to the first mounting position of the axle with a second assembly gap; S4: Remove the second workpiece to be assembled, heated to the heat fitting temperature, from the heat source and transfer it to the assembly station; S5: At the assembly station, the second workpiece to be assembled is assembled to the second mounting position of the axle with the second assembly gap; Wherein, the first assembly gap is greater than the second assembly gap; The operations from the time the first workpiece to be assembled and the second workpiece to be assembled leave the heat source until they are respectively assembled into the corresponding mounting positions on the axle are all completed within a predetermined time.

[0005] In one implementation, step S2 includes the following steps: S21: At the assembly station, the workpiece positioning device is activated to position the first workpiece to be assembled, so that the first workpiece to be assembled satisfies the first assembly gap. S22: At the assembly station, the axle is inserted into the first workpiece to be assembled and contacts the axle positioning device coaxially arranged in the workpiece positioning device until it reaches the pre-assembly position, so that the axle meets the first assembly gap.

[0006] In one implementation, step S3 includes the following steps: S31: Move one of the first workpiece to be assembled and the axle located in the pre-assembly position relative to the other; S32: The first workpiece to be assembled is unconstrained in the radial and circumferential directions. When it moves relative to the axle, it automatically corrects itself and is assembled to the first mounting position of the axle with the second assembly gap.

[0007] In one implementation, step 21 includes the following operational steps: S211: At the assembly station, the positioning jaws of the workpiece positioning device move along the axial direction of the first workpiece to be assembled until they are inserted into the first workpiece to be assembled. S212: The positioning claws open and contact the inner wall of the first workpiece to be assembled, so as to calibrate the position of the first workpiece to be assembled; S213: After the positioning claw contacts the inner wall of the first workpiece to be assembled, the positioning claw is kept in the open state for a predetermined open time and then closed, so that the first workpiece to be assembled satisfies the first assembly gap. S214: Each of the positioning claws moves in the opposite direction along the axial direction of the first workpiece to be assembled until it leaves the first workpiece to be assembled.

[0008] In one embodiment, in step S212, after the in-situ detection mechanism on the workpiece positioning device detects the first workpiece to be assembled, the positioning jaws open.

[0009] In one implementation, step S31 includes the following steps: S311: Simultaneously move the axle and the axle positioning device, located in the pre-assembly position, downward relative to the first workpiece to be assembled; or S312: The hot lifting mechanism of the assembly station is activated, causing the first workpiece to be assembled to move upward relative to the axle located in the pre-assembly position.

[0010] In one embodiment, the first workpiece to be assembled includes a lower oil baffle ring and a lower bearing, and step S1 includes the following operation steps: S11: Allow the lower oil baffle ring and the lower bearing to enter their respective heat sources; S12: Simultaneously heat the lower oil baffle ring and the lower bearing; S13: Determine whether the lower oil baffle ring and the lower bearing have reached the heat fitting temperature. If one of the lower oil baffle ring and the lower bearing has reached the heat fitting temperature and the other has not, then proceed to step S14. S14: Keep one of the lower oil baffle ring and the lower bearing at the heat-shrinking temperature until both reach the heat-shrinking temperature, and then remove them from their respective heat sources. Specifically, when heat preservation is performed on one of the lower oil baffle ring and the lower bearing that has reached the heat jacket temperature, if the temperature of the lower oil baffle ring and the lower bearing does not reach the lower limit temperature of the heat source, the heat source will not work; if the temperature of the lower oil baffle ring and the lower bearing reaches the lower limit temperature of the heat source, the heat source will work.

[0011] In one embodiment, the first workpiece to be assembled includes a lower oil baffle ring and a lower bearing, and step S1 includes the following operation steps: S15: Allow the lower oil baffle ring and the lower bearing to enter their respective heat sources; S16: First, heat the one that takes longer to heat to the heat fitting temperature between the lower oil baffle ring and the lower bearing. After heating for a certain period of time, then heat the other one between the lower oil baffle ring and the lower bearing, so that the lower oil baffle ring and the lower bearing can reach the heat fitting temperature at the same time.

[0012] In one embodiment, the first assembly gap is less than 0.1 mm, and the second assembly gap is less than 0.07 mm.

[0013] In one implementation, the predetermined time is 50 seconds.

[0014] In one embodiment, the second workpiece to be assembled includes an upper oil baffle ring and an upper bearing, and step S5 includes the following operation steps: S51: At the assembly station, the floating mechanism moves the upper bearing downward from above the axle. When the gap between the inner wall of the upper bearing and the outer wall of the axle does not meet the second assembly gap, the floating mechanism corrects the upper bearing so that the upper bearing can be assembled to the second installation position of the axle with the second assembly gap. S52: At the assembly station, the floating mechanism moves the upper oil baffle ring downward from above the axle. When the gap between the inner wall of the upper oil baffle ring and the outer wall of the axle does not meet the second assembly gap, the floating mechanism corrects the upper oil baffle ring so that the upper oil baffle ring can be assembled to the second mounting position of the axle on which the upper bearing is installed with the second assembly gap and located above the upper bearing. S53: The axle is transferred to the pressing device, which applies pressure from top to bottom along the axial direction.

[0015] In one implementation, the following steps are also included: S6: Remove the third workpiece to be assembled, which has been heated to the heat fitting temperature, from the heat source and transfer it to the press fitting waiting station; S7: At the press-fitting waiting station, the floating mechanism assembles the third workpiece to be assembled to the third mounting position of the axle on which the second workpiece to be assembled is mounted. S8: The axle is transferred to the pressing device, which applies pressure from top to bottom along the axial direction.

[0016] The present invention also provides an axle heat fitting device, comprising: A heat source is used to heat the first and second workpieces to be assembled to the heat jacket temperature, respectively. An assembly station is provided, comprising a workpiece positioning device and an axle positioning device coaxially disposed within the workpiece positioning device; the workpiece positioning device is used to position the first workpiece to be assembled so as to satisfy a first assembly gap, and the axle positioning device is used to position the axle so as to satisfy the first assembly gap. The assembly station also has a relative movement mechanism that moves one of the first workpiece to be assembled and the axle located in the pre-assembly position relative to the other. The relative movement mechanism enables the first workpiece to be assembled to the first mounting position of the axle with a second assembly gap. The assembly station also has a floating mechanism, which enables the second workpiece to be assembled to be assembled to the second mounting position of the axle on which the first workpiece to be assembled is mounted with a second assembly gap.

[0017] Compared with existing technologies, this invention has the following advantages: Firstly, when positioning the first workpiece to be assembled, it is coarsely positioned to ensure a first assembly gap between the first workpiece and the axle when placed on the assembly station. Then, during the assembly of the axle and the first workpiece, the adaptive correction of the workpiece achieves the final second assembly gap requirement, avoiding edge chipping, scratching, and plastic tearing caused by direct pressing in an eccentric state, ensuring that the roughness and cylindricity of the mating surfaces are not damaged. Therefore, the entire hot-fitting process does not require repeated centering or real-time correction using precise sensors; assembly can be completed in a single insertion, significantly reducing the assembly time per piece and significantly improving yield and operational stability. Simultaneously, by fundamentally eliminating jamming and workpiece scrap caused by rigid interference, the first-time assembly success rate is greatly improved. Thus, while ensuring that the final interference fit achieves the designed load-bearing capacity and fatigue life, it also possesses excellent process economy and production reliability. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a three-dimensional structural schematic diagram of the axle heat fitting device used to implement the axle heat fitting method in an embodiment of the present invention; Figure 2 This is a schematic diagram of the process of transferring the axle to the assembly station in this invention; Figure 3 This is a schematic diagram of the bearing assembly process in an embodiment of the present invention; Figure 4 This is a schematic diagram of the process of assembling the oil baffle ring in an embodiment of the present invention; Figure 5 This is a schematic diagram illustrating the process of transferring an axle equipped with a lower oil baffle ring, a lower bearing, an upper oil baffle ring, and an upper bearing into a press-fitting device in an embodiment of the present invention. Figure 6 This is a schematic diagram of the process of transferring the slip ring to the slip ring heater in an embodiment of the present invention; Figure 7 This is a schematic diagram of the assembly process of the slip ring in an embodiment of the present invention; Figure 8 This is a three-dimensional structural diagram of the lower or upper bearing in an embodiment of the present invention; Figure 9This is a three-dimensional structural diagram of the lower or upper oil baffle ring in an embodiment of the present invention; Figure 10 This is a schematic diagram illustrating the process of assembling the lower oil baffle ring and the lower bearing to the first mounting position of the axle with a second assembly gap in an embodiment of the present invention; Figure 11 yes Figure 10 Enlarged view at point A; Figure 12 This is a three-dimensional structural diagram of the workpiece positioning device and the axle positioning device at the assembly station in an embodiment of the present invention; Figure 13 This is a schematic diagram illustrating the process of coarse positioning of the lower oil baffle ring, lower bearing, and axle in an embodiment of the present invention; Figure 14 This is a schematic diagram illustrating the process of the axle and the axle positioning device synchronously descending to the pre-assembly position in an embodiment of the present invention; Figure 15 This is a schematic diagram illustrating the process of relative movement of the axle, the lower oil baffle ring, and the lower bearing to assemble the axle to the first mounting position in an embodiment of the present invention. Figure 16 This is a schematic diagram of the assembly of the axle, lower oil baffle ring, and lower bearing in an embodiment of the present invention.

[0020] In the picture: 1. Axle; 11. Gearbox; 12. Second locating hole; 30. Axle heat fitting device; 301. Lower oil retainer ring; 302. Lower bearing; 303. Upper oil retainer ring; 304. Upper bearing; 305. Slip ring; 306. Assembly station; 307. Press-fitting waiting station; 31. Heat source; 311. Oil baffle ring heater; 312. Bearing heater; 313. Slip ring heater; 314. Oil baffle ring holder; 315. Bearing holder; 316. Slip ring holder; 32. Workpiece positioning device; 321. Support platform; 322. First positioning hole; 323. Positioning chuck; 324. Positioning claw; 33. Axle positioning device; 34. Gantry robot; 341. Fixture; 35. Robotic arm; 351. First robotic arm; 352. Second robotic arm; 36. Floating mechanism; 37. Press fitting device. Detailed Implementation

[0021] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The components of the embodiments of the present invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0022] Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention.

[0023] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.

[0024] In the description of this invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," indicating orientation or positional relationships, are based on the orientation or positional relationships shown in the accompanying drawings, or the orientation or positional relationships commonly used when the product is in use. These are merely for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Furthermore, the terms "first," "second," etc., appearing in the description of this invention are only used for distinguishing descriptions and should not be construed as indicating or implying relative importance.

[0025] Furthermore, the use of terms such as "horizontal" and "vertical" in the description of this invention does not imply that the components are required to be absolutely horizontal or suspended, but rather that they may be slightly tilted. For example, "horizontal" simply means that its direction is more horizontal than "vertical," and does not mean that the structure must be completely horizontal, but rather that it may be slightly tilted.

[0026] In the description of this invention, it should also be noted that, unless otherwise explicitly specified and limited, the terms "set," "install," "connect," and "link" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0027] The axle thermal assembly method of the present invention is used to assemble a workpiece to be assembled on an axle. The axle may be, for example, a gear shaft on which a gearbox 11 is provided, and its weight can reach more than 600 kg, for use in heavy-duty vehicles.

[0028] like Figure 1 As shown, the axle heat fitting method of the present invention can be implemented using an axle heat fitting device, or the axle heat fitting method of the present invention can also be implemented using other heat fitting devices.

[0029] The axle thermal assembly method of the present invention includes the operation of assembling a first workpiece to be assembled, a second workpiece to be assembled, and a third workpiece to be assembled onto the axle 1, respectively.

[0030] The first workpiece to be assembled includes a lower oil baffle ring 301 and a lower bearing 302, and the second workpiece to be assembled includes an upper oil baffle ring 303 and an upper bearing 304 (e.g., ...). Figure 8 and Figure 9 As shown), Figure 13 , Figure 14 , Figure 15 and Figure 16 Since the first workpiece to be assembled is assembled from below the axle 1, and the second workpiece to be assembled is assembled from above the axle 2, in some optional embodiments, the operations of assembling the first workpiece to be assembled onto the axle 1 and the operations of assembling the second workpiece to be assembled onto the axle 1 are performed simultaneously. In other optional embodiments, the operation of assembling the first workpiece to be assembled onto the axle 1 is performed first, and then the operation of assembling the second workpiece to be assembled onto the axle 1 is performed. That is, when the operation of assembling the second workpiece to be assembled onto the axle 1 is performed, the first workpiece to be assembled is already assembled on the axle 1.

[0031] The third workpiece to be assembled includes the slip ring 305. Since the assembly of the slip ring 305 requires cooperation with the upper oil baffle ring 303, the operation of assembling the third workpiece to be assembled onto the axle 1 can only begin after the operation of assembling the second workpiece to be assembled onto the axle 1 is completed. That is, when the operation of assembling the third workpiece to be assembled onto the axle 1 is carried out, at least the second workpiece to be assembled has already been assembled onto the axle 1.

[0032] Specifically, the axle heat fitting method of the present invention includes the following operation steps.

[0033] S1: Remove the first workpiece to be assembled from the heat source 31 and transfer it to the assembly station 306 after it has been heated to the heat jacket temperature.

[0034] S2: Position the first workpiece to be assembled and the axle at assembly station 306 to meet the first assembly clearance.

[0035] S3: At assembly station 306, the first workpiece to be assembled is assembled to the first mounting position of the axle with the second assembly gap.

[0036] Through the above steps S1, S2, and S3, the first workpiece to be assembled can be assembled to the first mounting position of the axle with the second assembly gap. The first workpiece to be assembled includes a lower oil retainer ring 301 and a lower bearing 302. Therefore, for the lower bearing 302, the first mounting position of the axle 1 is the position where the lower end face of the large gear on the axle 1 is located; for the lower oil retainer ring 301, the first mounting position of the axle 1 is the position on the axle 1 that can mate with the lower oil retainer ring 301 and fit against the end face of the lower bearing 302.

[0037] S4: Remove the second workpiece to be assembled from the heat source 31 and transfer it to the assembly station after it has been heated to the heat jacket temperature.

[0038] S5: At the assembly station, the second workpiece to be assembled is assembled to the second mounting position of the axle 1 with the second assembly gap.

[0039] Through the aforementioned steps S4 and S5, the second workpiece to be assembled can be assembled to the second mounting position of the axle 1 with the second assembly gap. As described above, steps S4 and S5 can begin after steps S1, S2, and S3 are completed, or they can be performed simultaneously with steps S1, S2, and S3. The second workpiece to be assembled includes the upper oil retainer ring 303 and the upper bearing 304. Therefore, for the upper bearing 304, the second mounting position is the location of the upper end face of the large gear on the axle 1 that can mate with the upper bearing 304; for the upper oil retainer ring 303, the second mounting position of the axle 1 is the position on the axle 1 that can mate with the upper oil retainer ring 303 and be in contact with the end face of the upper bearing 304.

[0040] The first assembly gap is larger than the second assembly gap. The first assembly gap can be, for example, less than 0.1 mm, and the second assembly gap can be, for example, less than 0.07 mm.

[0041] Furthermore, the operations from the time the first and second workpieces to be assembled leave the heat source 31 until they are respectively assembled into their corresponding mounting positions on the axle are all completed within a predetermined time.

[0042] The axle 1 of this invention has a large mass (over 600 kg) and a large turning diameter (over 100 mm), resulting in significant inertia during the gripping and transfer process by the gantry robot 34. This makes micron-level spatial attitude fine-tuning extremely difficult, making precise alignment correction impossible solely through visual inspection or force feedback. Under these conditions, the gripper 341 of the gantry robot 34 has a static deviation of ±0.05 mm, which, combined with the dynamic drift error caused by the limited repeatability (±0.05 mm) of the robotic arm 35 transferring the workpieces to be assembled, results in a significant cumulative system deviation. During hot fitting, the effective assembly clearance (i.e., the final fit tolerance) between the inner hole of the workpiece to be assembled and the journal of the axle 1 is extremely limited, and this clearance continues to narrow as the workpiece cools in the air. When the combined vector of the aforementioned cumulative deviation in the diameter direction exceeds this instantaneous effective clearance value, it will directly cause the inner hole end face to jam or chip against the journal, preventing smooth sliding into place within the specified process window, ultimately leading to the failure of the hot fitting operation.

[0043] The existing automated assembly logic requires the automated robot to ensure that the deviation between the center point of the workpiece being grasped and the spatial intersection point of the axis of axle 1 is less than the final fit clearance (e.g., 0.07 mm). This necessitates a repeatability accuracy of the robot within ±0.02 mm (micrometer level). To achieve this, expensive high-precision absolute encoders, high-rigidity reducers, and zero-backlash lead screws must be used, along with regular laser calibration, resulting in high costs.

[0044] This invention achieves this by first performing coarse positioning on the first workpiece to be assembled, ensuring that when the first workpiece and axle 1 are placed on the assembly station 306, they have a first assembly gap, meaning the coaxiality between the first workpiece to be assembled, the workpiece positioning device 32 on the assembly station 306, and the axle 1 is maintained below 0.1 mm. Then, when the axle 1 is fitted to the first workpiece, they are assembled with a second assembly gap. This avoids edge chipping, scratching, and plastic tearing caused by direct press fitting in an eccentric state, ensuring that the roughness and cylindricity of the mating surfaces are not damaged. Therefore, the entire hot fitting process does not require repeated centering or real-time correction by close sensors. Assembly can be completed in a single insertion, which greatly reduces the assembly time of a single piece and significantly improves the assembly cycle time and overall equipment efficiency under mass production conditions. At the same time, since the jamming and workpiece scrapping caused by rigid interference are fundamentally eliminated, the first-time assembly success rate is greatly improved. Thus, while ensuring that the final interference fit can achieve the designed load-bearing capacity and fatigue life, it also has excellent process economy and production reliability.

[0045] Furthermore, this two-stage assembly strategy of the present invention can reduce the positioning accuracy requirement of automated equipment from 0.001mm to 0.1mm; at the same time, it utilizes the adaptive correction of the workpiece to be assembled during the assembly process to achieve the final high-precision fit. While ensuring assembly quality, it significantly reduces system cost and dependence on high-precision sensing feedback, and greatly improves the reliability and industrial applicability of the automated assembly process for heavy-duty workpieces.

[0046] Specifically, firstly, the two-stage assembly strategy of coarse positioning and adaptive correction described above in this invention can significantly reduce the dependence on the absolute positioning accuracy of automated equipment, thereby greatly reducing the hardware cost and integration difficulty of the equipment. When the first workpiece to be assembled (such as the lower oil baffle ring 301 and the lower bearing 302) is placed at the assembly station 306, it is not required to directly reach the second assembly gap (i.e., the precision fit gap) required for the final fit. Instead, coarse positioning is only required through the workpiece positioning device 32 to ensure that the coaxiality between it and the axle 1 is within a relatively loose range (e.g., controlled below 0.1mm). This design essentially removes the micron-level positioning accuracy required for final precision assembly from the mandatory hard requirements of automated equipment (such as gantry robot 34, gripper 341, and robotic arm 35). By relaxing the accuracy requirements of the front-end coarse positioning stage, ordinary industrial robots can handle the loading and pre-placement of the first workpiece to be assembled and the axle 1, without relying on high-cost precision positioning components and complex real-time closed-loop control algorithms. While ensuring the quality of the final assembly, it achieves a significant reduction in equipment cost and an effective simplification of system integration difficulty.

[0047] Secondly, this invention utilizes the significant difference in gravity between the first workpiece to be assembled and the axle 1. After coarse positioning, the first workpiece is unconstrained circumferentially and radially. During the mating process with the axle 1, the application of axial pressing force generates a radial component force between the axle 1 and the first workpiece. Since the first workpiece is unconstrained and its weight is much less than that of the axle 1, this radial component force automatically pushes the first workpiece to move radially, thus actively eliminating the eccentricity remaining from coarse positioning. Throughout the pressing stroke, the mating clearance smoothly transitions from the first assembly clearance to the second assembly clearance, with centering and correction achieved entirely through the adaptive adjustment of the first workpiece. This passive and flexible adaptive mechanism improves the invention's tolerance to front-end positioning errors. Even if the repeatability accuracy of the robotic arm 35 fluctuates randomly within a certain range, as long as the fluctuation limit does not exceed the coarse positioning deviation threshold, it can ultimately be actively corrected, thus avoiding assembly failures caused by single positioning anomalies and improving process stability and overall equipment efficiency in mass production.

[0048] Third, the small difference between the first and second assembly gaps used in this invention ensures that the inner hole of the first workpiece to be assembled and the journal of the axle 1 remain in a suspended or slightly contacted state throughout the entire assembly process, without severe edge compression or scraping. This compliant assembly method maximizes the protection of the original machining texture and geometric accuracy of the journal of the axle 1 and the inner hole surface of the first workpiece to be assembled, ensuring the tightness and uniformity of the interference fit surfaces, thereby guaranteeing from the source that the final assembly can achieve the designed load-bearing capacity and expected service life.

[0049] Fourth, this invention is particularly applicable to the situation of assembling a workpiece heated to the heat fitting temperature onto axle 1. During the heat fitting process, the workpiece begins to dissipate heat to the environment after being transferred from the heat source 31, and its inner hole continuously contracts due to the temperature drop, resulting in a decreasing effective fitting clearance over time. If, during this process, positioning difficulties lead to repeated attempts, multiple attitude adjustments, or reliance on complex sensors for real-time correction calculations, the exposure time of the workpiece in the air will inevitably be significantly extended. Once the actual inner hole shrinkage of the workpiece exceeds the required minimum heat fitting clearance, the assembly window closes, and the workpiece will be unable to fit into the journal of axle 1, and may even become stuck halfway due to insufficient thermal expansion caused by uneven cooling. This invention quickly establishes the basic alignment attitude through coarse positioning, and combines this with instantaneous adaptive correction of the workpiece during the assembly process, enabling the critical action chain from the removal of the workpiece from the heat source 31 to the final assembly to be completed in one go. Operators or automated actuators can complete precise loading without relying on external visual feedback or force search, minimizing ineffective operation time and ensuring that the entire assembly process is strictly limited to a preset, extremely short time window (as described above). This effectively reduces the negative impact of the temperature drop rate of the workpiece on its assemblability at the thermal management level, significantly improving the on-site success rate of thermal assembly operations and the operability of process execution.

[0050] Fifth, this invention decouples positional accuracy and dimensional accuracy in the process, forming a highly robust error isolation mechanism that significantly reduces the strong coupling dependence of the entire process chain on the accuracy of upstream and downstream processes. This invention relies on a positioning device for physical limiting coarse positioning and on the adaptive fine positioning of the first workpiece to be assembled. This mechanism ensures that positioning errors in preceding processes, dynamic drift of handling equipment, and even slight wear of the positioning fixture 341, as long as they do not exceed the boundary of the coarse positioning tolerance zone, will not pose a substantial threat to the final precision fit. In other words, this invention transforms the positioning accuracy requirement of automated equipment from a "strongly correlated" state that is strictly locked to the fit accuracy to a "weakly correlated" state that only needs to be within a wide threshold to guarantee the final accuracy. This assembly logic gives the entire assembly system high engineering robustness, effectively isolating various interference factors such as normal fluctuations in incoming material dimensions, long-term equipment performance degradation, and environmental thermal deformation. It significantly reduces the management needs for precision measurement compensation and frequent equipment calibration on the production site, providing an extremely reliable process foundation for the unmanned, intelligent, and continuous production of heavy equipment.

[0051] As described above, the operations from the time the first, second, and third workpieces to be assembled leave the heat source 31 until they are respectively assembled into their corresponding mounting positions on the axle are all completed within a predetermined time. The predetermined time may be, for example, 50 seconds, and preferably 40 seconds.

[0052] Because the workpieces to be assembled need to expand thermally through heating, an assembly gap is created, forming a tiny gap that allows them to smoothly fit into the axle 1. This ensures that the workpieces can smoothly mate with the axle 1. After cooling and shrinking, the workpieces will tightly grip the axle 1, achieving the required interference fit force and ensuring a uniform and reliable interference connection. This guarantees that the connection will not loosen or slip during heavy-load, high-speed vehicle operation. Therefore, each workpiece to be assembled needs to be heated to the heat-fitting temperature before assembly.

[0053] However, since each workpiece to be assembled is made of steel, it conducts heat quickly. Therefore, after being heated to the heat jacket temperature and removed from the heat source 31 for assembly, it will continuously and rapidly dissipate heat and shrink (natural cooling rate is about 0.2~0.3℃ / s). Its expansion margin will continue to decrease, and the inner hole will also shrink accordingly. If the assembly cannot be completed before the inner hole shrinks to a diameter smaller than that of the axle 1, it will lead to increased assembly resistance. In fact, the workpiece to be assembled may even seize up before it has fully reached the designated assembly position. If the assembly is forced, it will seriously damage the workpiece to be assembled and the journal, and axial clearance will be generated after cooling. At the same time, the overall low temperature will lead to insufficient actual interference fit, which may cause slippage, journal wear, abnormal noise, or even axle seizure during vehicle operation. Uneven temperature difference will also cause internal thermal stress in the parts, shortening their service life.

[0054] Therefore, it is necessary to control the time (predetermined time) taken for each workpiece to be assembled from the time it is heated to the heat fitting temperature and leaves the heat source 31 until it is fully assembled into the designated assembly position on the axle 1. That is, the first workpiece to be assembled, the second workpiece to be assembled, and the third workpiece to be assembled all need to be heat-fitted into the axle 1 within the predetermined time after being heated to the heat fitting temperature.

[0055] By controlling the hot assembly time of each workpiece to be assembled, each workpiece can retain sufficient thermal expansion gap, and be assembled to the corresponding installation position on the axle 1 with the second assembly accuracy to complete precise positioning. This ensures that the overall temperature of each workpiece to be assembled is uniform, and after cooling and shrinkage, a complete and uniform design interference clamping force can be formed. The assembly process will not cause squeezing damage to the axle 1 and each workpiece to be assembled, ensuring stable assembly quality and smooth production process.

[0056] The steps of the present invention will now be described in detail.

[0057] In some alternative implementations, step S1 includes steps S11-S14.

[0058] S11: Allow the lower oil baffle ring 301 and the lower bearing 302 to enter the corresponding heat source 31 respectively.

[0059] S12: Simultaneously heat the lower oil baffle ring 301 and the lower bearing 302.

[0060] S13: Determine whether the lower oil baffle ring 301 and the lower bearing 302 have reached the heat fitting temperature. If one of the lower oil baffle ring 301 and the lower bearing 302 has reached the heat fitting temperature and the other has not, then proceed to step S14.

[0061] S14: Keep one of the lower oil baffle ring 301 and the lower bearing 302 at the heat-shrink temperature until both reach the heat-shrink temperature, and then remove them from their respective heat sources 31.

[0062] Specifically, when heat preservation is performed on one of the lower oil baffle ring 301 and the lower bearing 302 that have reached the heat jacket temperature, if the temperature of the lower oil baffle ring 301 and the lower bearing 302 does not reach the lower limit temperature of the heat source 31, then the heat source 31 will not work; if the temperature of the lower oil baffle ring and the lower bearing reaches the lower limit temperature of the heat source 31, then the heat source 31 will work.

[0063] In the method of simultaneously heating the lower oil ring 301 and the lower bearing 302, since the mass (or heat capacity) of the lower oil ring 301 is much smaller than the mass of the lower bearing 302, the lower oil ring 301 will reach the heat-shrinking temperature first. For example, the lower oil ring will reach the heat-shrinking temperature of 120°C in 3 minutes, while the lower bearing 302 will take 5 minutes to reach the same temperature.

[0064] The lower retaining oil ring 301 and the lower bearing 302 need to be assembled onto the axle 1 simultaneously. Therefore, after the lower retaining oil ring 301 reaches the heat-shrinking temperature first, it needs to be kept warm until the lower bearing 302 also reaches the heat-shrinking temperature. Then, they can be transferred from their respective heat sources 31 to the assembly station 306. When keeping the lower retaining oil ring 301 warm, the heat source 31 operates in a more energy-efficient manner. That is, if the temperature of the lower retaining oil ring 301 does not reach the lower limit temperature of the heat source 31 (e.g., 90°C), the heat source 31 does not work; if the temperature of the lower retaining oil ring 301 reaches the lower limit temperature of the heat source 31, the heat source 31 works, thereby achieving the insulation of the lower retaining oil ring 301 through intermittent heating.

[0065] like Figure 1 As shown, the heat source 31 includes an oil baffle ring heater 311. An oil baffle ring placement rack 314 is provided on one side of the oil baffle ring heater 311. A robot 35 (e.g., a first robot 351) can transfer the oil baffle rings (lower oil baffle ring 301 and upper oil baffle ring 303) on the oil baffle ring placement rack 314 to the oil baffle ring heater 311 for heating, and transfer the oil baffle rings (lower oil baffle ring 301 and upper oil baffle ring 303) heated to the heat fitting temperature from the oil baffle ring heater 311 to the assembly station 306.

[0066] like Figure 1 As shown, the heat source 31 includes a bearing heater 312. A bearing placement rack 315 is provided on one side of the bearing heater 312. A robot 35 (e.g., a second robot 352, which is disposed opposite to the first robot 351) can transfer the bearings (lower bearing 302 and upper bearing 304) on the bearing placement rack 315 to the bearing heater 312 for heating, and transfer the bearings (lower bearing 302 and upper bearing 304) heated to the heat fitting temperature from the bearing heater 312 to the assembly station 306.

[0067] Both the oil baffle ring heater 311 and the bearing heater 312 can be induction heaters. They can detect the temperature of the oil baffle ring (lower oil baffle ring 301 and upper oil baffle ring 303) and the bearing (lower bearing 302 and upper bearing 304) in real time during heating and provide feedback to the control device. When the temperature of the oil baffle ring and the bearing reaches the heat fitting temperature and no heat preservation is required, the oil baffle ring heater 311 and the bearing heater 312 are turned on. The first robot 351 and the second robot 352 can respectively transfer the oil baffle ring and the bearing heated to the heat fitting temperature to the assembly station 306.

[0068] In some alternative implementations, step S1 includes steps S15-S16.

[0069] S15: Allow the lower oil baffle ring 301 and the lower bearing 302 to enter the corresponding heat source 31 respectively.

[0070] S16: First, heat the one that takes longer to heat to the heat fitting temperature between the lower oil ring 301 and the lower bearing 302. After heating for a certain period of time, then heat the other one of the lower oil ring 301 and the lower bearing 302, so that the lower oil ring 301 and the lower bearing 302 can reach the heat fitting temperature at the same time.

[0071] In this embodiment, it is not necessary to heat the lower oil ring 301 and the lower bearing 302. Instead, the component that takes longer to heat to the heat jacket temperature is heated for a certain period of time first, for example, the lower bearing 302 is heated for two minutes first, and then the lower oil ring 301 is heated. In this way, the lower oil ring 301 and the lower bearing 302 can reach the heat jacket temperature at the same time, so they can be transferred out of the heat source 31 at the same time without heat preservation.

[0072] The heat fitting temperature of the lower oil baffle ring 301 and the lower bearing 302 should meet the requirement of heating from the assembly workshop temperature (e.g., 20°C) to the temperature required to expand the size of their inner holes to achieve the required second assembly gap. The upper limit of this temperature is the temperature at which the metallographic structure of the metal materials of the lower oil baffle ring 301 and the lower bearing 302 does not change.

[0073] Preferably, the heat fitting temperature is 120°C and the second assembly gap is 0.07 mm.

[0074] After the lower oil retaining ring 301 and the lower bearing 302 have both reached the heat fitting temperature and have been transferred to the assembly station 306, step S2 can be executed.

[0075] In some alternative implementations, step S2 includes the following steps.

[0076] S21: At the assembly station 306, the workpiece positioning device 32 is activated to position the first workpiece to be assembled, so that the first workpiece to be assembled meets the first assembly gap. Specifically, step S21 includes the following steps.

[0077] S211: At the assembly station 306, the positioning jaw 324 of the workpiece positioning device 32 moves along the axial direction of the first workpiece to be assembled until it is inserted into the first workpiece to be assembled.

[0078] S212: After the in-situ detection mechanism of the workpiece positioning device 32 detects the first workpiece to be assembled, it causes the positioning jaws 324 to open. After opening, the positioning jaws 324 contact the inner wall of the first workpiece to be assembled to calibrate the position of the first workpiece to be assembled.

[0079] S213: After the positioning claw 324 contacts the inner wall of the first workpiece to be assembled, the positioning claw 324 is kept in the open state for a predetermined open time and then closed, so that the first workpiece to be assembled meets the first assembly gap.

[0080] S214: Each positioning jaw 324 moves in the opposite direction along the axial direction of the first workpiece to be assembled until it leaves the first workpiece to be assembled.

[0081] The first assembly workpieces are the lower oil baffle ring 301 and the lower bearing 302. Two robotic arms 35 can be used to transfer the lower oil baffle ring 301 and the lower bearing 302 from the heat source 31 to the assembly station 306 respectively.

[0082] like Figure 1 and Figure 12 As shown, the assembly station 306 has a workpiece positioning device 32, which includes a support platform 321 and a positioning chuck 323. The support platform 321 is provided with a first positioning hole 322 that passes through its axial direction. The positioning chuck 323 is located in the first positioning hole 322 and can move along the axial direction of the first positioning hole 322.

[0083] The positioning chuck 323 is provided with a plurality of positioning claws 324, which are spaced apart circumferentially along the positioning chuck 323. On the one hand, the plurality of positioning claws 324 can move axially along the lower oil baffle ring 301 and the lower bearing 302 to insert into or leave the lower oil baffle ring 301 and the lower bearing 302; on the other hand, the plurality of positioning claws 324 can simultaneously move radially outward along the positioning chuck 323 to open or move inward to retract.

[0084] like Figure 1 and Figure 12 As shown, the robot arm 35 first places the lower oil retainer ring 301, heated to the heat-shrinking temperature, on the support platform 321, with a portion of the lower oil retainer ring 301 extending into the first positioning hole 322. There is sufficient clearance between the outer wall of the lower oil retainer ring 301 and the inner wall of the first positioning hole 322, so the positioning hole does not impose any circumferential or radial constraints on the lower oil retainer ring 301, but only provides axial support. Then, the robot arm 35 places the lower bearing 302, heated to the heat-shrinking temperature, on the lower oil retainer ring 301, with their end faces in contact.

[0085] The workpiece positioning device 32 includes an in-place detection mechanism, which may be, for example, a laser emitter and a laser receiver. When the lower oil baffle ring 301 and the lower bearing 302 are placed on the workpiece positioning device 32, they will block the laser emitted by the laser emitter, preventing the laser receiver from receiving a signal. Therefore, the laser receiver will send a signal to the controller, causing it to drive the positioning chuck 323 and its positioning claws 324 to move axially upward until they are inserted into the lower oil baffle ring 301 and the lower bearing 302. Since the axial length of the positioning claws 324 is greater than the axial length of the lower bearing 302, a portion of the positioning claws 324 will also extend into the lower bearing 302, thus ensuring that they can simultaneously conform to the inner walls of the lower oil baffle ring 301 and the lower bearing 302 when they open.

[0086] After the positioning jaws 324 move into position axially, each positioning jaw 324 moves radially outward simultaneously to contact the inner walls of the lower oil baffle ring 301 and the lower bearing 302, thereby achieving coarse positioning of the lower oil baffle ring 301 and the lower bearing 302. The movement of the positioning jaws 324 can be driven by a power source such as a cylinder, electric cylinder, or motor, and the axial movement distance of the positioning jaws 324 is ensured by fixing the stroke of the power source.

[0087] In this process, after the positioning claw 324 contacts the inner walls of the lower oil ring 301 and the lower bearing 302, the positioning claw 324 is held in the open state for a predetermined open time (e.g., 0.5s) before retracting, so that the lower oil ring 301 and the lower bearing 302 meet the first assembly gap. On the one hand, this delay eliminates the impact vibration and elastic rebound generated on the inner walls of the lower oil ring 301 and the lower bearing 302 at the moment the positioning claw 324 opens, so that the contact surfaces of the positioning claw 324 can fully fit together, achieving mechanical self-adaptive centering; on the other hand, this holding process allows the contact stress to be fully relaxed, preventing secondary disturbance to the lower oil ring 301 and the lower bearing 302 due to the sudden release of elastic potential energy when the positioning claw 324 rapidly retracts, thereby ensuring that the coaxiality reference established in the coarse positioning stage is maintained after retraction and release, providing a stable and reliable pre-position for subsequent precision press-fitting with the second assembly gap.

[0088] The number of positioning jaws 324 can be three or more. The radial movement of the positioning jaws 324 can be achieved by driving a power source such as a cylinder, electric cylinder or motor, thereby ensuring that the coaxiality between the positioning chuck 323, the positioning jaws 324 and the lower oil retainer ring 301 and the lower bearing 302 is 0.1mm, which meets the requirements of the first assembly clearance.

[0089] S22: At the assembly station 306, the axle 1 is inserted into the first workpiece to be assembled and comes into contact with the axle positioning device 33, which is coaxially arranged in the workpiece positioning device 32, until it reaches the pre-assembly position, so that the axle 1 meets the first assembly gap.

[0090] like Figure 2 As shown, the assembly station 306 has a gantry robot 34, and the end of the gantry robot 34 is equipped with a gripper 341, which is capable of gripping the axle 1. The gripper 341 of the gantry robot 34 can grip the axle 1, which is placed vertically at the transfer station, and transfer it from the transfer station to the assembly station 306.

[0091] Optionally, such as Figure 2 As shown, the gantry robot 34 first performs the action of transferring the axle 1 from the transfer station to the assembly station 306. After the axle 1 is transferred to the assembly station 306, the first robotic arm 351 and the second robotic arm 352 then perform the actions of transferring the lower oil ring 301 and the lower bearing 302 to the corresponding heat source 31 for heating, and then transferring the lower oil ring 301 and the lower bearing 302, heated to the heat-shrink temperature, from the corresponding heat source 31 to the assembly station 306. That is, the actions of the gantry robot 34 and the first robotic arm 351 and the second robotic arm 352 have a sequential order, thereby ensuring that the movements of the gantry robot 34 and the first robotic arm 351 and the second robotic arm 352 will not interfere with each other.

[0092] Understandably, before the gantry robot 34 performs the action of transferring axle 1 from the transfer station to the assembly station 306, the first robot arm 351 and the second robot arm 352 move to perform the action of transferring the lower oil ring 301 and the lower bearing 302 to the corresponding heat source 31 for heating. Then, the action of the gantry robot 34 transferring axle 1 from the transfer station to the assembly station 306 can be performed immediately after the action of the first robot arm 351 and the second robot arm 352 transferring the lower oil ring 301 and the lower bearing 302, which have been heated to the heat fitting temperature, from the corresponding heat source 31 to the assembly station 306, thereby saving assembly time and making the assembly cycle more compact.

[0093] like Figure 12 and Figure 13 As shown, assembly station 306 has an axle positioning device 33. The axle positioning device 33 can be, for example, an ejector pin. The ejector pin is fixedly mounted on a positioning chuck 323 and located at the center of multiple positioning jaws 324. It has precise coaxiality (e.g., less than 0.01 mm) with the multiple positioning jaws 324 and the positioning chuck 323. The ejector pin has a tapered structure, such as... Figure 13 As shown, when the gantry robot 34 inserts the axle 1 into the lower bearing 302 and the lower oil baffle ring 301 in sequence, the second positioning hole 12 (or auxiliary positioning structure) at the lower end of the axle 1 engages with the ejector pin. After the axle 1 contacts the ejector pin, the axle 1 and the ejector pin descend synchronously until they reach the pre-assembly position. During this process, the axle 1 can align with the ejector pin under its own weight, so that the coaxiality between the two reaches less than 0.1 mm.

[0094] Therefore, by calibrating the positions of the lower bearing 302 and the lower oil baffle ring 301 using the positioning claw 324, and by calibrating the position of the axle 1 using the top pin which has strict coaxiality with the positioning claw 324, it can be ensured that the coaxiality between the lower bearing 302, the lower oil baffle ring 301 and the axle 1 is less than 0.1mm, thereby meeting the requirements of the first assembly clearance.

[0095] After coarsely positioning the lower bearing 302, the lower oil baffle ring 301, and the axle 1, step S3 can be executed, that is, assembling the lower bearing 302 and the lower oil baffle ring 301 to the first mounting position of the axle 1 with the second assembly gap.

[0096] Step S3 includes the following operational steps.

[0097] S31: Move one of the first workpiece to be assembled and the axle 1 located in the pre-assembly position relative to the other.

[0098] S32: The first workpiece to be assembled is unconstrained in the radial and circumferential directions. When it moves relative to the axle 1, it automatically corrects itself and is assembled to the first installation position of the axle 1 with the second assembly gap.

[0099] In some alternative implementations, step S31 includes step S311: synchronously moving the axle 1 and the axle positioning device 33, which are located in the pre-assembly position, downward relative to the first workpiece to be assembled.

[0100] As described above, the axle 1 and the ejector pin move synchronously to the pre-assembly position. In this embodiment, assembly is achieved by moving the axle 1 relative to the lower bearing 302 and the lower oil baffle ring 301.

[0101] After completing the aforementioned coarse positioning process, the present invention actively releases the circumferential and radial constraints of the lower bearing 302 and the lower oil retainer ring 301 through geometric constraint release. Specifically, after the positioning claw 324 completes a 0.5s opening and holding pressure to achieve preliminary alignment with the axis of axle 1 as a reference, it immediately retracts and completely disengages from the inner walls of the lower bearing 302 and the lower oil retainer ring 301. At this time, the lower bearing 302 and the lower oil retainer ring 301 are completely unconstrained in the radial and circumferential directions. The lower oil retainer ring 301 rests on the first positioning hole 322 solely by its own weight, while the lower bearing 302 rests on the lower oil retainer ring 301. There is no interference from any forced positioning elements in the circumferential and radial degrees of freedom.

[0102] In this floating state, the gantry robot 34 drives the axle 1 to descend synchronously with the ejector pin. For example... Figure 14As shown, when axle 1 begins to pass downward through the inner hole of the lower bearing 302 and the lower oil retainer ring 301 from its pre-assembly position, a first-level geometric interference fit is formed between the guide chamfer of its journal and the pre-set guide chamfer on the upper end face of the inner hole of the lower bearing 302. The design of this chamfer pair is based on the wedge-shaped inclined plane guiding principle: when there is an initial eccentricity between the actual spatial orientation of the axis of axle 1 and the axis of the inner hole of the lower bearing 302 (this eccentricity is guaranteed by the aforementioned coarse positioning accuracy and controlled within the first assembly gap), the conical inclined plane of the journal chamfer preferentially contacts the chamfer edge of the upper end face of the bearing inner hole. The normal contact force generated at the contact point can be decomposed into axial and radial components, where the radial component acts on the inner end face of the lower bearing 302. Since the lower bearing 302 is in a free state without radial constraint at this time, the radial component is sufficient to overcome its static friction resistance and drive the lower bearing 302 to generate passive micro-slip in the horizontal plane, thereby realizing the automatic entry and geometric avoidance of the bearing inner hole by the axle guide end.

[0103] As axle 1 continues to feed downwards, the fit between the outer diameter of the journal of axle 1 and the inner wall of the lower bearing 302, as well as the inner wall of the lower oil baffle ring 301, gradually transitions from the initial chamfering guidance stage to the cylindrical surface precision fit transition stage. During this stage, because the weight of the lower bearing 302 and the lower oil baffle ring 301 is much less than the weight of axle 1, their mechanical characteristics exhibit typical of a coupled system of a large-inertia drive body and a low-inertia follower. Axle 1, as a macroscopic motion reference component, has its descent trajectory controlled by the gantry robot 34 according to a preset path, unaffected by contact force disturbances. Meanwhile, the lower bearing 302 and the lower oil baffle ring 301, acting as low-inertia followers, experience radial component of the contact force when local contact occurs between the outer diameter of the journal and the inner wall, which propels them to undergo micron-level secondary sliding on the support plane of assembly station 306.

[0104] This slippage is a fully adaptive, passive, flexible correction behavior. Its physical essence lies in the following: when the local clearance between the journal and the inner hole is less than the current eccentricity, the rigid profile of the outer circle of the journal of axle 1 transmits the geometric constraint force to the center of mass of the lower bearing 302 and / or the lower oil baffle ring 301 through single-point contact with the inner hole wall. This forces the lower bearing 302 and / or the lower oil baffle ring 301 to move radially until their axes tend to coincide. Throughout the entire descent stroke, this dynamic adjustment process of "contact → deviation → slippage → re-contact" repeats at an extremely high frequency. Each contact eliminates part of the residual eccentricity through radial force, ensuring that the inner hole axes of the lower bearing 302 and the lower oil baffle ring 301 always converge towards the axis of axle 1.

[0105] Through the aforementioned mechanical mechanism, this invention ensures that the lower bearing 302 and the lower oil retaining ring 301 can be assembled with a stable second assembly gap value (e.g., 0.07mm) throughout the entire press-fitting stroke of the axle 1. Since the entire alignment process relies entirely on the axle 1's own gravity, contact force distribution, and the geometric drive of the axle 1's downward movement, no additional active servo alignment adjustment mechanism or force feedback control system is required. This greatly simplifies the control system architecture while ensuring fitting accuracy, eliminates additional error sources introduced by sensor delay or actuator overshoot, and significantly improves the reliability and consistency of coaxial assembly of multiple workpieces under heavy-load conditions.

[0106] like Figure 10 and Figure 11 As shown, the lower bearing 302 and the lower oil retainer ring 301 are assembled to the first mounting position of the axle 1 with a second assembly clearance value of 0.07 mm and a single-sided fitting clearance δ of 0.035 mm.

[0107] In some alternative embodiments, step S31 includes step S312: the hot lifting mechanism of the assembly station 306 is activated to move the first workpiece to be assembled upward relative to the axle 1 located in the pre-assembly position.

[0108] In other words, in this embodiment, assembly is achieved by moving the first workpiece to be assembled (lower bearing 302 and lower oil retainer ring 301) relative to the axle 1.

[0109] Assembly station 306 has a thermal lifting mechanism, which is fixedly connected to support platform 321 and used to drive support platform 321 to move axially. The thermal lifting mechanism can be a power source such as a cylinder, electric cylinder, or motor, and is located below support platform 321. There can be two thermal lifting mechanisms, located on opposite sides of support platform 321.

[0110] Similar to the above-mentioned method of active movement of axle 1, after completing the aforementioned coarse positioning process, the positioning claw 324, after opening and holding pressure for 0.5 seconds and achieving preliminary alignment with the axis of axle 1 as a reference, immediately retracts and completely disengages from the inner wall of the lower bearing 302 and the inner wall of the lower oil baffle ring 301. At this time, the lower bearing 302 and the lower oil baffle ring 301 are completely unconstrained in the radial and circumferential directions. The lower oil baffle ring 301 rests on the positioning hole solely by its own weight, while the lower bearing 302 rests on the lower oil baffle ring 301. There is no interference from any forced positioning elements in the circumferential and radial degrees of freedom.

[0111] In this floating state, the piston shaft of the thermal lifting mechanism extends, thereby pushing the support platform 321 and its lower bearing 302 and lower oil baffle ring 301 to move axially upward relative to the axle 1 (e.g., Figure 15As shown, similar to the above-mentioned active movement of axle 1, when the lower bearing 302 and lower oil retainer ring 301 move relative to axle 1, as the inner holes of the lower bearing 302 and lower oil retainer ring 301 pass upward from the pre-assembly position of axle 1, a first-level geometric interference fit is formed between the pre-set guide chamfer on the upper end face of the inner hole of the lower bearing 302 and the guide chamfer on the journal of axle 1. When there is an initial eccentricity between the actual spatial orientation of the axis of axle 1 and the axis of the inner hole of the lower bearing 302 (this eccentricity is guaranteed by the aforementioned coarse positioning accuracy and controlled within the first assembly gap range), the conical inclined surface of the journal chamfer preferentially contacts the chamfer edge of the upper end face of the bearing inner hole. The normal contact force generated at the contact point can be decomposed into axial and radial components. The radial component acts on the inner end face of the lower bearing 302. Since the lower bearing 302 is in a free state without radial constraints at this time, the radial component is sufficient to overcome its static friction resistance and drive the lower bearing 302 to produce passive micro-slip in the horizontal plane, thereby realizing the automatic entry and geometric avoidance of the axle guide end into the bearing inner hole.

[0112] As the lower bearing 302 and lower oil retainer ring 301 continue to feed upwards, the fit between the outer diameter of the journal of axle 1 and the inner wall of the lower bearing 302, as well as the inner wall of the lower oil retainer ring 301, gradually transitions from the initial chamfering guidance stage to the cylindrical surface precision fit transition stage. During this stage, because the weight of the lower bearing 302 and lower oil retainer ring 301 is much less than the weight of axle 1, their mechanical characteristics exhibit typical of a coupled system of a large-inertia drive body and a low-inertia follower. Axle 1, as a stationary component, is unaffected by contact force disturbances; while the lower bearing 302 and lower oil retainer ring 301, as low-inertia follower bodies, experience radial component of the contact force when local contact occurs between the outer diameter of the journal and the inner wall, pushing them to undergo micron-level secondary sliding on the support plane of assembly station 306.

[0113] This slippage is also an adaptive, passive, flexible correction behavior. When the local clearance between the journal and the inner hole is less than the current eccentricity, the rigid profile of the outer circle of the journal of axle 1 transmits the geometric constraint force to the center of mass of the lower bearing 302 and / or the lower oil baffle ring 301 through single-point contact with the inner hole wall, forcing the lower bearing 302 and / or the lower oil baffle ring 301 to move radially until their axes tend to coincide. Throughout the entire descent stroke, this dynamic adjustment process of "contact → deviation → slippage → re-contact" is repeated at a very high frequency. Each contact eliminates part of the residual eccentricity through the radial component force, so that the inner hole axes of the lower bearing 302 and the lower oil baffle ring 301 always converge towards the axis of axle 1.

[0114] In other words, although this embodiment achieves adaptive passive flexible correction by moving the lower bearing 302 and the lower oil ring 301 relative to the axle 1, it still relies on the circumferential and radial unrestraint of the lower bearing 302 and the lower oil ring 301, as well as the fact that the weight of the lower bearing 302 and the lower oil ring 301 is much smaller than that of the axle.

[0115] Understandably, the pre-assembly position of axle 1 refers to the position where the guide chamfer of the journal of axle 1 is close to the pre-set guide chamfer on the upper end face of the inner hole of the lower bearing 302 (for example, the distance between the two is 50mm) or the position where the two just touch.

[0116] like Figure 16 As described above, after the lower bearing 302 and the lower oil ring 301 are installed in the first installation position of the axle 1, the hot lifting mechanism is activated again, and the axle positioning device 33 and the workpiece positioning device 32 move downward along the axial direction, so that the lower bearing 302, the lower oil ring 301 and the axle 1 move downward into place as a whole, which indicates that the assembly of the lower bearing 302 and the lower oil ring 301 with the axle 1 is completed.

[0117] The thermal lifting mechanism is connected to the controller, which can provide real-time feedback of the assembly force-displacement curve to the controller. The controller then controls the movement speed and stroke to ensure a stable and reliable assembly process.

[0118] After the first workpiece to be assembled (lower bearing 302 and lower oil retainer ring 301) is installed on the axle 1, the second workpiece to be assembled (upper bearing 304 and upper oil retainer ring 303) can be assembled, namely steps S4 and S5.

[0119] Alternatively, as mentioned above, the steps of assembling the upper bearing 304 and the upper oil retainer ring 303 can be performed simultaneously with the steps of assembling the lower bearing 302 and the lower oil retainer ring 301. The assembly can be carried out by moving the upper bearing 304 and the upper oil retainer ring 303, as well as the lower bearing 302 and the lower oil retainer ring 301, relative to the axle 1. That is, the axle 1 is fixed on the assembly station 306, and the workpiece to be assembled is moved for installation.

[0120] Specifically, the process of assembling the second workpiece to be assembled is as follows.

[0121] S4: Remove the second workpiece to be assembled from the heat source 31 and transfer it to the assembly station after it has been heated to the heat jacket temperature.

[0122] S5: At the assembly station, the second workpiece to be assembled is assembled to the second mounting position of the axle 1 with the second assembly gap.

[0123] Through the aforementioned steps S4 and S5, the second workpiece to be assembled can be assembled to the second mounting position of the axle 1 with the second assembly gap. As described above, steps S4 and S5 can begin after steps S1, S2, and S3 are completed, or they can be performed simultaneously with steps S1, S2, and S3. The second workpiece to be assembled includes the upper oil retainer ring 303 and the upper bearing 304. Therefore, for the upper bearing 304, the second mounting position is the location of the upper end face of the large gear on the axle 1 that can mate with the upper bearing 304; for the upper oil retainer ring 303, the second mounting position of the axle 1 is the position on the axle 1 that can mate with the upper oil retainer ring 303 and be in contact with the end face of the upper bearing 304.

[0124] Step S5 includes the following operational steps: S51: At the assembly station 306, the floating mechanism 36 moves the upper bearing 304 downward from above the axle 1. When the gap between the inner wall of the upper bearing 304 and the outer wall of the axle 1 does not meet the second assembly gap, the floating mechanism 36 corrects the upper bearing 304 so that the upper bearing 304 can be assembled to the second installation position of the axle 1 with the second assembly gap.

[0125] S52: At the assembly station 306, the floating mechanism 36 moves the upper oil baffle ring 303 downward from above the axle 1. When the gap between the inner wall of the upper oil baffle ring 303 and the outer wall of the axle 1 does not meet the second assembly gap, the floating mechanism 36 corrects the upper oil baffle ring 303 so that the upper oil baffle ring 303 can be assembled to the second mounting position of the axle 1 on which the upper bearing 304 is installed with the second assembly gap and is located above the upper bearing 304.

[0126] S53: Transfer the axle 1 to the pressing device 37, which applies pressure from top to bottom along the axial direction.

[0127] like Figure 3 and Figure 4 As shown, the time and fitting accuracy requirements for installing the upper bearing 304 and the upper oil retainer ring 303 onto the axle 1 are the same as those for installing the lower bearing 302 and the lower oil retainer ring 301 onto the axle 1. The difference is that the axle 1 is in a fixed state when assembling the upper bearing 304 and the upper oil retainer ring 303.

[0128] As described above, before assembling the lower bearing 302 and the lower oil retaining ring 301 with the axle 1, the axle 1 has been coarsely positioned by the axle positioning device 33 to ensure that the coaxiality between the axle 1 and the axle positioning device 33 is less than 0.1 mm. That is, the axle 1 is in an accurate position. The first robotic arm 351 and the second robotic arm 352 can respectively perform the operations of transferring the lower oil retaining ring 301 and the upper oil retaining ring 303.

[0129] It should be noted that the lower oil baffle ring 301 and the upper oil baffle ring 303 have the same structure. They are only referred to as the lower oil baffle ring 301 and the upper oil baffle ring 303 because they are installed on both sides of the gearbox 11 of the axle 1. Therefore, both the lower oil baffle ring 301 and the upper oil baffle ring 303 are oil baffle rings placed on the oil baffle ring placement frame 314, and can be transferred by the first robot arm 351 from the oil baffle ring placement frame 314 to the oil baffle ring heater 311, or from the oil baffle ring heater 311 to the assembly station 306.

[0130] Similarly, the lower bearing 302 and the upper bearing 304 are mounted on both sides of the gearbox 11 of the axle 1. Therefore, both are bearings placed on the bearing mounting bracket 315 and can be transferred from the bearing mounting bracket 315 to the bearing heater 312 by the first robot arm 351, or transferred from the bearing heater 312 to the assembly station 306.

[0131] Understandably, when the lower bearing 302 and the lower oil baffle ring 301 are assembled onto the axle 1, the oil baffle ring heater 311 and the bearing heater 312 are idle. Therefore, the upper bearing 304 and the upper oil baffle ring 303 can be transferred to the bearing heater 312 and the oil baffle ring heater 311 for heating. That is, the heating of the upper bearing 304 and the upper oil baffle ring 303 can be carried out simultaneously with the assembly of the lower bearing 302 and the lower oil baffle ring 301.

[0132] The heating process for the upper bearing 304 and the upper oil baffle ring 303 is the same as the heating process for the lower bearing 302 and the lower oil baffle ring 301 described above, and will not be repeated here.

[0133] like Figure 3 and Figure 4 As shown, the first robotic arm 351 and its end cap are integrated with a floating mechanism 36, which can transfer the upper oil baffle ring 303 and the upper bearing 304, which are heated to the heat-shrink temperature, to the assembly station 306 for assembly. Since the assembly of the upper oil baffle ring 303 and the upper bearing 304 has a specific order, the assembly of the upper bearing 304 is performed first.

[0134] The floating mechanism 36 and the upper bearing 304 move downward from above the axle 1. When the gap between the inner wall of the upper bearing 304 and the outer wall of the axle 1 does not meet the second assembly gap, the floating mechanism 36 corrects the upper bearing 304 so that the upper bearing 304 can be assembled to the second installation position of the axle 1 with the second assembly gap.

[0135] The robotic arm 35 itself has repeatability errors (typically ±0.05), fixture manufacturing and installation errors (coaxiality deviation), and boom extension posture sway (angle error). The combined vector of these errors forms a deviation sphere in three-dimensional space, the radius of which often far exceeds the second assembly gap (0.07 mm).

[0136] Unlike the lower bearing 302 and the lower oil retainer ring 301, which are in a "freely floating horizontal" state during assembly, the upper bearing 304 is held in a rigid suspended state by the clamping mechanism (floating mechanism 36). If there is an angular misalignment between the clamping mechanism and the axis of the axle 1 (i.e., they are not parallel), an angular error will form between the inner bore axis of the upper bearing 304 and the axis of the axle 1. Forcibly lowering it in this state will result in single-point chipping or wedge jamming, leading to assembly failure or severe damage to the mating surfaces.

[0137] Therefore, by setting the clamping mechanism as a floating mechanism 36, the present invention transforms the "rigid connection" into a "flexible compliant connection", making the upper bearing 304 a passive compliant body during the assembly process, and its position can be adaptively adjusted according to the geometric features of the axle 1.

[0138] Specifically, the floating mechanism 36 provides flexible compensation in both translational degrees of freedom (X / Y / Z) and rotational degrees of freedom (yaw angle about the X / Y axes). The floating mechanism 36 integrates a ball cage, on which the balls are rotatably mounted. When the grippers of the floating mechanism 36 clamp onto the upper bearing 304, the upper bearing 304 contacts the balls, and the balls slide in the X / Y / Z directions. The position of the upper bearing 304 is adjusted so that it fits against the plane of the gripper frame of the floating mechanism 36.

[0139] When there is a radial eccentricity between the inner bore of the upper bearing 304 and the journal of the axle 1, the inner bore of the upper bearing 304 is subjected to a radial contact force, which is transmitted to the ball bearing surface of the floating mechanism 36 through the upper bearing 304. Since the rolling friction coefficient of the balls is extremely low (typically μ < 0.005), this radial force is sufficient to overcome the rolling resistance between the balls and the raceway, thereby driving the upper bearing 304 to passively translate and slide in the X / Y plane until its inner bore axis and the axis of the axle 1 tend to coincide in the radial projection. When there is an angular deviation between the clamping mechanism and the axis of the axle 1, the inner bore axis of the upper bearing 304 intersects with the axis of the axle 1. The axle 1 and the inner bore of the upper bearing 304 generate an eccentrically distributed normal contact force, which forms a tilting moment relative to the center of mass of the upper bearing 304. The tilting torque is transmitted to the floating mechanism 36 through the ball bearing support surface, causing the upper bearing 304 to tilt and oscillate slightly (around the X-axis and / or Y-axis) under the ball rolling support until its inner bore axis is completely parallel to the axis of the axle 1. Since the ball bearing also has extremely low rotational friction resistance in the rotational direction, the angular compliance response is extremely rapid and smooth. This angular adaptive capability significantly improves the tolerance of the present invention to the end-effector attitude angle error of the robot arm 35. Even if the robot arm 35 used for gripping has a 0.5°~1° wobble due to arm deformation or guide rail wear, the floating mechanism 36 can completely absorb it, ensuring that the upper bearing 304 always engages with the axle in an attitude parallel to the axle axis.

[0140] Furthermore, the floating mechanism 36 also features a pneumatic balance chamber. During downward feeding, the compressed air within the pneumatic balance chamber applies a controllable and constant axial thrust to the upper bearing 304. When the axial resistance of the axle 1 to the upper bearing 304 exceeds this set thrust (for example, slight interference occurs between the inner bore of the upper bearing 304 and the journal), the air pressure within the pneumatic balance chamber adaptively compresses, allowing the upper bearing 304 to retract slightly in the Z-direction relative to the clamping mechanism, thereby avoiding hard squeezing caused by excessive feed. Conversely, when the resistance disappears, the pneumatic balance chamber resumes pushing the bearing downward, thus converting rigid displacement control into flexible force-controlled displacement, effectively absorbing the Z-direction positioning error of the manipulator 35 and the shoulder height tolerance of the axle 1.

[0141] Furthermore, the air pressure balancing chamber also plays a crucial role in compensating for the gravity of the upper bearing 304. By setting the air pressure within the chamber, an upward buoyancy force can be generated, partially or completely offsetting the self-weight of the upper bearing 304. This ensures that its radial sliding in the X / Y plane will not generate additional frictional resistance due to uneven gravity distribution. In other words, the air pressure balancing chamber creates a "weightless" or "microgravity" environment for the upper bearing 304, ensuring that its radial floating sensitivity is not affected by its own weight. Simultaneously, by adjusting the air pressure in the chamber, the axial compliance stiffness of the floating mechanism can be dynamically changed to adapt to the assembly requirements of bearings of different diameters and masses, demonstrating strong process versatility.

[0142] In summary, the floating mechanism 36 of the present invention has the following significant technical effects: First, by using a six-degree-of-freedom passive compliant system, the hard interference caused by accumulated errors is fundamentally eliminated.

[0143] This invention integrates the irreconcilable multi-source errors inherent in traditional rigid clamping (such as the repeatability error of the robotic arm 35 and the coaxiality error of the clamping mechanism) into the compensation scope of the floating mechanism 36. By endowing the upper bearing 304 with passive compliance capabilities in the X / Y / Z translational degrees of freedom and rotational degrees of freedom around the X / Y axes, any orientation deviation in any direction and of any form can be flexibly absorbed, ensuring that only controllable contact forces conforming to design expectations exist on the assembly interface, rather than destructive impact loads. This fundamentally eliminates the risk of unilateral jamming or shearing caused by error accumulation.

[0144] Secondly, the ball bearing support enables low-friction instantaneous response, ensuring the sensitivity and real-time nature of passive correction.

[0145] This invention differs from existing elastomeric floating mechanisms (such as rubber pads or springs), which suffer from significant displacement hysteresis and frictional dead zones. In contrast, this invention employs ball bearings, transforming sliding friction into rolling friction, thus greatly reducing frictional resistance. This allows even the minute radial force generated by the contact between axle 1 and the bearing's inner bore to immediately trigger the radial sliding action of the floating mechanism, compressing the correction response time to the millisecond level. This real-time matching with the descent feed speed of axle 1 enables dynamic synchronous coordination of descent, correction, and alignment simultaneously.

[0146] Third, the air pressure balance chamber controls the feed to avoid axial impact damage.

[0147] The design of the pneumatic balance chamber removes the self-weight of the upper bearing 304 from the constraints of radial friction, making the sensitivity of radial floating constant and not diminishing with changes in bearing specifications. At the same time, the flexible axial feed force provided by the pneumatic chamber transforms the assembly process from rigid position control to compliant force control, effectively buffering speed fluctuations and overshoots during the robot's descent stroke, protecting the machining accuracy of the end face of the upper bearing 304 and the shoulder of the axle 1, and significantly extending the service life of the clamping mechanism and the axle positioning device 33.

[0148] Fourth, the angle compliance capability ensures the automatic elimination of non-parallelism errors, expanding the engineering tolerance boundary of automated assembly.

[0149] The passive adaptability of the floating mechanism 36 in this invention to the yaw angle around the X / Y axis ensures that the attitude angle drift of the robot arm 35 caused by increased joint clearance or thermal deformation after long-term operation no longer becomes a bottleneck restricting assembly accuracy. This angular adaptability reduces the requirement for motion trajectory accuracy of automated equipment from "absolute precision" to "coarse positioning is sufficient," greatly reducing the frequency of equipment maintenance and calibration difficulty, and providing a solid technological foundation for the long-term stable operation of automated assembly lines for heavy workpieces.

[0150] Furthermore, when the upper bearing 304 begins assembly, the floating mechanism 36 of the second robot arm 35 can transfer the upper oil baffle ring 303 from the oil baffle ring heater 311 to the assembly station for waiting until the upper bearing 304 is assembled, at which point the floating mechanism 36 of the second robot arm 35 performs the operation of assembling the upper oil baffle ring 303. Alternatively, after the upper bearing 304 is assembled, the floating mechanism 36 of the second robot arm 35 performs both the operation of transferring the upper oil baffle ring 303 from the oil baffle ring heater 311 to the assembly station and the operation of assembling the upper oil baffle ring 303.

[0151] like Figure 4 As shown, the operation of assembling the oil baffle ring 303 onto the floating mechanism 36 of the second robotic arm 352 is the same as the operation of assembling the bearing 304 described above, and will not be repeated here.

[0152] The floating mechanism 36 is also connected to the controller, which can provide real-time feedback of the assembly force-displacement curve to the controller, and the controller controls the movement speed and stroke to ensure a stable and reliable assembly process.

[0153] like Figure 5 As shown, after the upper bearing 304 and the upper oil retaining ring 303 are assembled onto the axle 1, the gantry robot 34 transfers the axle 1 to the press-fitting waiting station 307 (please refer to...). Figure 7The bottom of the pressing waiting station 307 is provided with a slide rail mechanism (not shown). The slide rail mechanism can move the pressing waiting station 307 in the forward direction, so that it moves in the direction close to the pressing device 37, thereby sending the axle 1 on the pressing waiting station 307 into the pressing device 37 and placing it directly below the pressing device 37. The pressing device 37 applies pressure to the upper oil baffle ring 303, the upper bearing 304, the gearbox 11, the lower bearing 302 and the lower oil baffle ring 301 from top to bottom along the axial direction.

[0154] Understandably, the operations from when the upper oil ring 303 and the upper bearing 304 leave the heat source 31 until they are respectively assembled into their corresponding installation positions on the axle are all completed within a predetermined time. This allows the upper oil ring 303 and the upper bearing 304 to retain sufficient thermal expansion clearance and be assembled into their corresponding installation positions on the axle 1 with the second assembly precision to achieve accurate positioning, ensuring stable assembly quality and a smooth production process.

[0155] After pressing is completed, the slide rail mechanism at the bottom of the pressing waiting station 307 moves in the opposite direction, moving it away from the pressing device 37, thereby moving the axle 1 to the outside of the pressing device 37. The axle 1 can be on one side of the pressing device 37 and wait in the pressing waiting station 307 for the assembly of the third workpiece to be assembled.

[0156] It should be noted that, since the pressing waiting station 307 and the axle 1 are moved to the pressing device 37 and located directly below the pressing device 37 by means of the slide rail mechanism, the slide rail mechanism is constructed to withstand the pressure load of the pressing device 37.

[0157] The assembly process for the third workpiece to be assembled is as follows.

[0158] S6: Remove the third workpiece to be assembled, which has been heated to the heat fitting temperature, from the heat source 31 and transfer it to the press fitting waiting station 307.

[0159] The third assembly part includes the slip ring 305. Therefore, the third installation position is the position on the axle 1 that can cooperate with the slip ring 305 and fit against the end face of the upper oil baffle ring 303.

[0160] like Figure 6 As shown, the heat source 31 includes a slip ring heater 313 for heating the slip ring 305. A slip ring holder 316 is provided on one side of the slip ring heater 313. A robot 35 (e.g., a first robot 351) can transfer the slip ring 305 on the slip ring holder 316 to the slip ring heater 313 for heating, and transfer the slip ring 305 heated to the heat fitting temperature from the slip ring heater 313 to the press-fit waiting station 307.

[0161] S7: At the press-fitting waiting station 307, the third workpiece to be assembled is assembled to the third mounting position of the axle 1 on which the second workpiece to be assembled is mounted.

[0162] The operation of assembling the slip ring 305 on the floating mechanism 36 of the first robotic arm 351 is the same as the operation of assembling the bearing 304 described above, and will not be repeated here.

[0163] Understandably, the operation from when the slip ring 305 leaves the heat source 31 until it is assembled into the corresponding installation position on the axle 1 is completed within a predetermined time, so that the slip ring 305 can retain sufficient thermal expansion clearance, ensuring stable assembly quality and smooth production process.

[0164] S8: Transfer the axle 1 to the pressing device 37, which applies pressure from top to bottom along the axial direction.

[0165] like Figure 7 As shown, the time and fitting accuracy requirements for installing the upper bearing 304 and the upper oil retainer ring 303 onto the axle 1 are the same as those for installing the lower bearing 302 and the lower oil retainer ring 301 onto the axle 1. The difference is that the axle 1 is in a fixed state when assembling the upper bearing 304 and the upper oil retainer ring 303.

[0166] As described above, the slide rail mechanism at the bottom of the pressing waiting station 307 can move the pressing waiting station 307 in the forward direction, so that it moves in the direction close to the pressing device 37, thereby sending the axle 1 on the pressing waiting station 307 into the pressing device 37 and placing it directly below the pressing device 37. The pressing device 37 applies pressure axially from top to bottom to the slip ring 305, the upper oil baffle ring 303, the upper bearing 304, the gearbox 11, the lower bearing 302, and the lower oil baffle ring 301.

[0167] The reason for pressing with the pressing device 37 after the hot fitting is that pressing is performed while there is still a residual expansion gap between the inner hole of each workpiece to be assembled and the journal of the axle 1. This can significantly reduce axial frictional resistance and avoid scratching of the mating surfaces and off-center shearing caused by cold shrinkage seizing. After pressing is in place, a continuous pressure holding process allows each workpiece to be assembled to complete the subsequent cooling and shrinkage process under a constrained state. This pressure holding action can guide the radial shrinkage of the inner hole of each workpiece to be assembled to form a uniform and stable final interference fit, ensuring that the entire axial dimensional chain consisting of the lower oil retainer ring 301, lower bearing 302, gearbox 11, upper bearing 304 and upper oil retainer ring 303 still maintains the design requirement of zero clearance tight fit after thermal equilibrium.

[0168] like Figure 1 and Figure 2As shown, the present invention also provides an axle heat fitting assembly device 30, including the heat source 31 and assembly station 306 described above. As mentioned above, the heat source 31 can heat each workpiece to be assembled to the heat fitting temperature, and the assembly station 306 can complete the assembly operation of each workpiece.

[0169] The axle heat fitting device 30 also includes the workpiece positioning device 32, axle positioning device 33, gantry robot 34, manipulator 35, floating mechanism 36, and pressing device 37 mentioned above.

[0170] like Figure 1 As shown, an oil baffle ring heater 311 and a bearing heater 312 are respectively installed on the left and right sides of the assembly station 306. An oil baffle ring holder 314 is installed on one side of the oil baffle ring heater 311, and a bearing holder 315 is installed on one side of the bearing heater 312. Press-fitting devices 37 (such as...) are installed on the front and rear sides of the assembly station 306. Figure 5 (as shown) and transfer station (not shown), as Figure 5 , Figure 6 and Figure 7 As shown, a slip ring placement frame 316 is provided on one side of the pressing device 37, and a slip ring heater 313 is provided on one side of the slip ring placement frame 316.

[0171] The specific structure and implementation of the axle heat fitting device 30 have been described in detail above, and will not be repeated here.

[0172] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for assembling a heat-shrink axle assembly, characterized in that, The following steps are included: S1: Remove the first workpiece to be assembled from the heat source and transfer it to the assembly station after it has been heated to the heat jacket temperature; S2: Position the first workpiece to be assembled and the axle at the assembly station to meet the first assembly gap; S3: At the assembly station, the first workpiece to be assembled is assembled to the first mounting position of the axle with a second assembly gap; S4: Remove the second workpiece to be assembled, heated to the heat fitting temperature, from the heat source and transfer it to the assembly station; S5: At the assembly station, the second workpiece to be assembled is assembled to the second mounting position of the axle with the second assembly gap; Wherein, the first assembly gap is greater than the second assembly gap; The operations from the time the first workpiece to be assembled and the second workpiece to be assembled leave the heat source until they are respectively assembled into the corresponding mounting positions on the axle are all completed within a predetermined time.

2. The axle heat fitting method according to claim 1, characterized in that, Step S2 includes the following operations: S21: At the assembly station, the workpiece positioning device is activated to position the first workpiece to be assembled, so that the first workpiece to be assembled satisfies the first assembly gap. S22: At the assembly station, the axle is inserted into the first workpiece to be assembled and contacts the axle positioning device coaxially arranged in the workpiece positioning device until it reaches the pre-assembly position, so that the axle meets the first assembly gap.

3. The axle heat fitting method according to claim 2, characterized in that, Step S3 includes the following operations: S31: Move one of the first workpiece to be assembled and the axle located in the pre-assembly position relative to the other; S32: The first workpiece to be assembled is unconstrained in the radial and circumferential directions. When it moves relative to the axle, it automatically corrects itself and is assembled to the first mounting position of the axle with the second assembly gap.

4. The axle heat fitting method according to claim 2 or 3, characterized in that, Step 21 includes the following steps: S211: At the assembly station, the positioning jaws of the workpiece positioning device move along the axial direction of the first workpiece to be assembled until they are inserted into the first workpiece to be assembled. S212: The positioning claws open and contact the inner wall of the first workpiece to be assembled, so as to calibrate the position of the first workpiece to be assembled; S213: After the positioning claw contacts the inner wall of the first workpiece to be assembled, the positioning claw is kept in the open state for a predetermined open time and then closed, so that the first workpiece to be assembled satisfies the first assembly gap. S214: Each of the positioning claws moves in the opposite direction along the axial direction of the first workpiece to be assembled until it leaves the first workpiece to be assembled.

5. The axle heat fitting method according to claim 4, characterized in that, In step S212, after the in-situ detection mechanism on the workpiece positioning device detects the first workpiece to be assembled, the positioning jaws open.

6. The axle heat fitting method according to claim 4, characterized in that, Step S31 includes the following operations: S311: Simultaneously move the axle and the axle positioning device, located in the pre-assembly position, downward relative to the first workpiece to be assembled; or S312: The hot lifting mechanism of the assembly station is activated, causing the first workpiece to be assembled to move upward relative to the axle located in the pre-assembly position.

7. The axle heat fitting method according to any one of claims 1-3, characterized in that, The first workpiece to be assembled includes a lower oil baffle ring and a lower bearing. Step S1 includes the following operation steps: S11: Allow the lower oil baffle ring and the lower bearing to enter their respective heat sources; S12: Simultaneously heat the lower oil baffle ring and the lower bearing; S13: Determine whether the lower oil baffle ring and the lower bearing have reached the heat fitting temperature. If one of the lower oil baffle ring and the lower bearing has reached the heat fitting temperature and the other has not, then proceed to step S14. S14: Keep one of the lower oil baffle ring and the lower bearing at the heat-shrinking temperature until both reach the heat-shrinking temperature, and then remove them from their respective heat sources. Specifically, when heat preservation is performed on one of the lower oil baffle ring and the lower bearing that has reached the heat jacket temperature, if the temperature of the lower oil baffle ring and the lower bearing does not reach the lower limit temperature of the heat source, the heat source will not work; if the temperature of the lower oil baffle ring and the lower bearing reaches the lower limit temperature of the heat source, the heat source will work.

8. The axle heat fitting method according to any one of claims 1-3, characterized in that, The first workpiece to be assembled includes a lower oil baffle ring and a lower bearing. Step S1 includes the following operation steps: S15: Allow the lower oil baffle ring and the lower bearing to enter their respective heat sources; S16: First, heat the one that takes longer to heat to the heat fitting temperature between the lower oil baffle ring and the lower bearing. After heating for a certain period of time, then heat the other one between the lower oil baffle ring and the lower bearing, so that the lower oil baffle ring and the lower bearing can reach the heat fitting temperature at the same time.

9. The axle heat fitting method according to any one of claims 1-3, characterized in that, The first assembly gap is less than 0.1 mm, and the second assembly gap is less than 0.07 mm.

10. The axle heat fitting method according to any one of claims 1-3, characterized in that, The scheduled time is 50 seconds.

11. The axle heat fitting method according to any one of claims 1-3, characterized in that, The second workpiece to be assembled includes an upper oil baffle ring and an upper bearing. Step S5 includes the following operation steps: S51: At the assembly station, the floating mechanism moves the upper bearing downward from above the axle. When the gap between the inner wall of the upper bearing and the outer wall of the axle does not meet the second assembly gap, the floating mechanism corrects the upper bearing so that the upper bearing can be assembled to the second installation position of the axle with the second assembly gap. S52: At the assembly station, the floating mechanism moves the upper oil baffle ring downward from above the axle. When the gap between the inner wall of the upper oil baffle ring and the outer wall of the axle does not meet the second assembly gap, the floating mechanism corrects the upper oil baffle ring so that the upper oil baffle ring can be assembled to the second mounting position of the axle on which the upper bearing is installed with the second assembly gap and located above the upper bearing. S53: The axle is transferred to the pressing device, which applies pressure from top to bottom along the axial direction.

12. The axle heat fitting method according to claim 11, characterized in that, It also includes the following steps: S6: Remove the third workpiece to be assembled, which has been heated to the heat fitting temperature, from the heat source and transfer it to the press fitting waiting station; S7: At the press-fitting waiting station, the floating mechanism assembles the third workpiece to be assembled to the third mounting position of the axle on which the second workpiece to be assembled is mounted. S8: The axle is transferred to the pressing device, which applies pressure from top to bottom along the axial direction.

13. A heat-fitting device for an axle, characterized in that, include: A heat source is used to heat the first and second workpieces to be assembled to the heat jacket temperature, respectively. An assembly station is provided, comprising a workpiece positioning device and an axle positioning device coaxially disposed within the workpiece positioning device; the workpiece positioning device is used to position the first workpiece to be assembled so as to satisfy a first assembly gap, and the axle positioning device is used to position the axle so as to satisfy the first assembly gap. The assembly station also has a relative movement mechanism that moves one of the first workpiece to be assembled and the axle located in the pre-assembly position relative to the other. The relative movement mechanism enables the first workpiece to be assembled to the first mounting position of the axle with a second assembly gap. The assembly station also has a floating mechanism, which enables the second workpiece to be assembled to be assembled to the second mounting position of the axle on which the first workpiece to be assembled is mounted with a second assembly gap.