An Adaptive Hierarchical Early Warning and Degradation Control Method and System for Railway Shunting Scenarios

By adjusting multidimensional environmental constraint parameters and slope perception, an adaptive early warning and hierarchical degradation control system is constructed, which solves the problems of a single early warning mechanism and insufficient environmental adaptability in railway shunting operations, and achieves safe and reliable control in complex environments.

CN123104733APending Publication Date: 2026-11-17武汉钢铁有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611218276.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-12
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing safety protection system for railway shunting operations suffers from problems such as a single early warning mechanism, unclear boundaries between human and machine intervention, insufficient environmental adaptability, imperfect degradation control, and lack of gradient perception capabilities, resulting in significant safety hazards in complex environments.

Method used

The adaptive early warning distance is calculated using multi-dimensional environmental constraint parameters and combined with slope sensing adjustment to construct a multi-level protection boundary area, thereby realizing hierarchical progressive closed-loop early warning control and real-time monitoring of the health of external support systems to trigger hierarchical degradation control.

Benefits of technology

It improved the environmental adaptability of the early warning distance, constructed a reasonable human-machine collaborative intervention mechanism, established a system degradation operation network, reduced the safety risks caused by equipment failure, and improved the safety and efficiency of shunting operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123104733A_ABST
    Figure CN123104733A_ABST
Patent Text Reader

Abstract

This invention discloses an adaptive hierarchical early warning and degradation control method and system for railway shunting scenarios, relating to the field of automatic protection technology for railway trains. It aims to solve the technical problems of single early warning mechanisms and imperfect degradation control in existing technologies. The method includes: acquiring the target train's operating status and multi-dimensional environmental constraint parameters; calculating the basic braking distance through a dynamic conversion model and performing perception adjustment based on real-time gradient attributes to determine the final early warning distance; constructing multi-level protection boundaries and triggering multi-level progressive early warnings such as prompts, speed limits, and emergency braking based on relative relationships; and simultaneously monitoring external support systems and triggering corresponding hierarchical degradation control strategies when anomalies occur. This invention effectively balances the dynamic adjustment of safety boundaries under different operating conditions and the needs of human-machine collaboration, and provides a reliable degradation protection mechanism when equipment failures occur, effectively improving the overall safety and reliability of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of automatic protection and safety control technology for railway trains, and in particular to an adaptive hierarchical early warning and degradation control method and system for railway shunting scenarios, which is applicable to shunting operation safety management scenarios under complex working conditions such as railway marshalling yards and shunting yards. Background Technology

[0002] Railway shunting is a crucial part of railway transportation production, involving the coupling, marshalling, disassembly, and transport of wagons. Because shunting involves the coupling and uncoupling of multiple wagons, and given the complex working environment, dense network of switches, and frequent operator activity, the safety risks of shunting operations are relatively high. Traditional shunting safety protection relies primarily on manual observation and the driver's individual experience and judgment. However, some existing automated shunting safety protection systems still have the following technical problems in practical applications:

[0003] First, the early warning mechanism is simplistic. Existing shunting safety protection systems generally adopt a fixed-distance early warning mode. This static distance setting fails to fully consider the impact of different operating environments on train braking distance. Under weather conditions such as rain, snow, and fog, or on special track conditions such as long gradients and curves, the wheel-rail adhesion coefficient and stress state of the train will change significantly, and fixed-distance early warning often cannot guarantee sufficient braking safety margin.

[0004] Second, the boundary between manual intervention and automatic control is unclear. Some existing systems adopt a strategy of directly triggering emergency braking when encountering dangerous conditions, lacking a graded and progressive warning process, resulting in drivers lacking the necessary reaction time and operational space; at the same time, some systems rely too much on human judgment, and in emergency situations, the appropriate braking opportunity may be lost due to driver misjudgment or reaction delay.

[0005] Third, insufficient environmental adaptability. The overall braking performance of trains varies significantly under different weather conditions, track conditions, and train load conditions. Existing systems typically use uniform braking parameter configurations and fail to dynamically adjust warning strategies according to the actual operating environment, resulting in a significant reduction in protective effectiveness in complex environments.

[0006] Fourth, the system's degradation control is inadequate. When the vehicle positioning system, vehicle-to-ground communication system, or interlocking equipment malfunctions, the existing system lacks a clear tiered degradation strategy. This may lead to the system continuing to operate aggressively according to normal operating parameters even in abnormal conditions, or directly causing a complete system shutdown. The lack of a fault-oriented safety transition mechanism poses a safety hazard.

[0007] Fifth, it lacks slope perception capability. Under slope conditions, the force state of the train differs significantly from that under flat slope conditions. When going uphill, the component of gravity hinders motion, shortening the actual braking distance; when going downhill, the component of gravity accelerates motion, lengthening the actual braking distance. Existing systems typically ignore or fail to adequately handle the nonlinear effects of slope on braking distance. Summary of the Invention

[0008] In view of the technical defects in the prior art, such as the single early warning mechanism, unclear human-machine intervention boundary, insufficient environmental adaptability, imperfect degradation control strategy and lack of slope perception capability, this invention provides an adaptive hierarchical early warning and degradation control method and system for railway shunting scenarios. It aims to solve the technical problems that the existing technology cannot dynamically adjust the safety boundary according to the multi-dimensional environment and lacks a reliable degradation mechanism under abnormal operating conditions of key equipment.

[0009] To solve the above-mentioned technical problems, in a first aspect, the present invention provides the following technical solution:

[0010] An adaptive hierarchical early warning and degradation control method for railway shunting scenarios includes the following steps: real-time acquisition of the operating status parameters of the target train during shunting operations, and acquisition of multi-dimensional environmental constraint parameters of the current operating scenario of the target train; based on the operating status parameters and combined with the multi-dimensional environmental constraint parameters, calculation of the basic braking distance of the target train through a dynamic conversion model, thereby determining the scenario adaptive early warning distance; acquisition of the real-time gradient attribute of the track ahead of the target train, and independent gradient perception adjustment of the scenario adaptive early warning distance based on the real-time gradient attribute to determine the final early warning distance; construction of a multi-level protection boundary region based on the final early warning distance and the position of the forward protection target; determination of the real-time relative relationship between the position of the target train and the multi-level protection boundary region, and triggering corresponding multi-level progressive closed-loop early warning control based on the relative relationship.

[0011] By employing multi-dimensional environmental constraint parameters to calculate adaptive warning distances and combining this with independent slope sensing and adjustment techniques, this invention effectively overcomes the limitations of traditional fixed-distance warning systems. It achieves dynamic adaptive calculation of warning and protection distances, ensuring a reasonable braking safety margin even in complex environments. Furthermore, by introducing a tiered degradation control strategy, it avoids systemic safety risks caused by localized equipment failures, thereby improving the overall system's fault tolerance.

[0012] As a preferred embodiment of the present invention, the operating status parameters include the current driving speed. Braking deceleration under standard operating conditions The multidimensional environmental constraint parameters include the wheel-rail adhesion coefficient. Weather condition parameters and train load parameters; the step of determining the scene adaptive warning distance specifically includes: according to the formula Calculate the basic braking distance Match the corresponding weather correction coefficient based on the weather state parameters. Match the corresponding load correction coefficient according to the train load parameters. According to the formula Calculate the adaptive warning distance for the scenario ,in This is a preset safety margin coefficient. By further employing rigorous physical and dynamic conversion formulas, this invention can objectively quantify macroscopic conditions such as weather and load into correction coefficients, accurately reflecting the physical correspondence between train kinetic energy and braking performance, and improving the accuracy of the distance prediction algorithm.

[0013] As a preferred embodiment of the present invention, the step of performing independent slope perception adjustment on the scene adaptive warning distance based on the real-time slope attribute to determine the final warning distance specifically includes: if the target train is on an uphill section, determining that the direction of gravity along the slope component is opposite to the direction of movement, and reducing the scene adaptive warning distance according to a first reduction ratio to obtain the final warning distance; if the target train is on a flat slope section, keeping the scene adaptive warning distance unchanged as the final warning distance; if the target train is on a downhill section, determining that the direction of gravity along the slope component is the same as the direction of movement, and extending the scene adaptive warning distance according to a second extension ratio to obtain the final warning distance. By further adopting differentiated processing logic for uphill, flat, and downhill sections, the present invention executes the slope compensation module independently, ensuring that the protection distance can be actively extended in dangerous downhill sections, while the warning distance is appropriately shortened in uphill sections, so as to better balance safety and shunting operation efficiency.

[0014] As a preferred embodiment of the present invention, the method further includes a processing rule for gradient change points: when the target train is within a preset distance range before and after the gradient change point, it is determined that the target train is simultaneously affected by two adjacent different gradient sections; a first warning distance and a second warning distance are calculated respectively when the target train is in the two adjacent different gradient sections; the maximum value of the first warning distance and the second warning distance is selected as the final warning distance of the target train in the gradient change point area. By further adopting a maximum value conservative evaluation strategy to process gradient change points, the present invention solves the problem of ambiguous force boundaries when a train crosses two sections of track with different gradients, conforms to the design principle of fault-oriented safety, and reduces the risk of insufficient braking safety margin.

[0015] As a preferred embodiment of the present invention, the construction of a multi-level protection boundary region based on the final warning distance and the position of the forward protection target specifically includes: setting the boundary at a first predetermined distance from the forward protection target as the outer ring boundary; setting the boundary at a second predetermined distance from the forward protection target as the inner ring boundary; and setting the boundary at a third predetermined distance from the forward protection target as the core area boundary; wherein the first predetermined distance is equal to the final warning distance, the first predetermined distance is greater than the second predetermined distance, and the second predetermined distance is greater than the third predetermined distance. By further adopting a three-level nested spatial protection region design, the present invention provides a quantitative triggering basis for subsequent progressive warnings, transforming abstract security control algorithms into concrete spatial distance barriers.

[0016] As a preferred embodiment of the present invention, the multi-level progressive closed-loop early warning control triggered according to the relative relationship specifically includes: when the target train enters the outer ring boundary but not the inner ring boundary, a first-level warning is triggered, outputting a warning message to the operating terminal and granting manual confirmation to clear the warning; when the target train enters the inner ring boundary but not the core area boundary, a second-level speed limit intervention is triggered, calculating and sending a target speed limit value to the train control system, and blocking manual overriding commands for the target speed limit value; when the target train enters the core area boundary, a third-level emergency braking is triggered, sending an emergency braking command to the braking system and locking the braking state until the target train stops. By further adopting a three-level progressive logic of warning, speed limit, and forced braking, the present invention better balances the human-machine collaboration relationship. The first-level warning prioritizes manual intervention; the second-level warning implements system-assisted speed limiting; and the third-level warning serves as the last line of defense, enforced by the system. This provides the driver with necessary reaction time while ensuring the reliable issuance of braking commands in emergency situations.

[0017] As a preferred embodiment of the present invention, the operational health of the external support system associated with the target train is monitored in real time. When an abnormality is detected in the operational health, a corresponding graded degradation control strategy is triggered according to the type of abnormality to restrict the operation authorization of the target train. The external support system includes a positioning system, a communication link system, and interlocking equipment. The step of triggering the corresponding graded degradation control strategy according to the type of abnormality specifically includes: when the duration of data loss in the positioning system exceeds a first threshold, entering a positioning degradation state and forcibly limiting the speed of the target train to a first safe speed; when the duration of data loss in the positioning system exceeds a second threshold, or the duration of interruption in the communication link system exceeds a third threshold, controlling the target train to stop urgently, wherein the second threshold is greater than the first threshold. By further employing state transition logic based on time tolerance, the present invention avoids false stops caused by brief signal jitter, while ensuring decisive stops when critical signals are lost for a long time, achieving a balance between equipment availability and operational safety.

[0018] As a preferred embodiment of the present invention, the method further includes: when the duration of the communication link system interruption exceeds a fourth threshold but is less than the third threshold, entering a communication degradation state and triggering a conservative protection mode; in the conservative protection mode, using the known position of the last valid communication confirmation of the target train as a reference, a restricted area is constructed with a set radius radiating outward, and a prohibited entry zone is set in the direction in front of the target train, and a speed-limited reversing zone is set in the direction behind. By further adopting a conservative protection strategy based on the "last known coordinates", the present invention effectively addresses the problem of unknown vehicle status during communication interruption, and by setting a limited activity space, enables the train to maintain a minimum level of safety under controlled constraints.

[0019] As a preferred embodiment of the present invention, the method further includes: when the interlocking device reports abnormal information, entering an interlocking degradation state, prohibiting the target train from entering the critical area under the jurisdiction of the interlocking device, and forcibly requesting manual confirmation; when at least two of the positioning system, the communication link system, or the interlocking device are simultaneously detected to be abnormal, entering a composite degradation state, extracting degradation control strategies corresponding to all concurrent abnormalities, and executing comprehensive degradation control according to the most stringent constraint condition among the strategies. By further adopting the most stringent constraint principle under multi-system composite abnormalities, the present invention establishes a fault-tolerant baseline for the system, prevents chain reactions that may be caused by multi-point failures, and meets the design standards for industrial control safety.

[0020] To solve the above-mentioned technical problems, in a second aspect, the present invention provides the following technical solution:

[0021] An adaptive hierarchical early warning and degradation control system for railway shunting scenarios includes: a train status monitoring module for real-time acquisition of operating status parameters of a target train during shunting operations; an input parameter acquisition module for acquiring multi-dimensional environmental constraint parameters of the current operating scenario of the target train; a basic braking distance calculation unit for calculating the basic braking distance of the target train based on the operating status parameters and the multi-dimensional environmental constraint parameters using a dynamic conversion model, thereby determining the scenario adaptive early warning distance; and a gradient-sensing braking strategy module for acquiring the real-time gradient attributes of the track ahead of the target train and providing adaptive early warnings based on the real-time gradient attributes. The system includes a distance-based independent slope sensing adjustment module to determine the final warning distance; a protection zone setting module to construct multi-level protection boundary zones based on the final warning distance and the position of the forward protection target; a warning decision unit and warning execution module to determine the real-time relative relationship between the position of the target train and the multi-level protection boundary zones, and trigger corresponding multi-level progressive closed-loop warning control based on the relative relationship; and an anomaly handling module to monitor the operational health of the external support system associated with the target train in real time, and when an anomaly is detected, trigger a corresponding graded degradation control strategy based on the anomaly category to restrict the operation authorization of the target train.

[0022] By providing a system architecture corresponding to the method described in the first aspect, the present invention achieves efficient decoupling of functional modules (e.g., making environmental calculation and slope perception independent of each other), which facilitates the engineering deployment, debugging and subsequent iterative upgrades of the system, and improves the maintainability of the system.

[0023] In a preferred embodiment of the present invention, the early warning execution module comprises independent primary, secondary, and tertiary early warning execution modules. The primary early warning execution module is configured to perform a prompt operation prioritizing manual confirmation. The secondary early warning execution module is configured to perform a speed-limiting operation requiring mandatory system intervention. The tertiary early warning execution module is configured to perform an emergency braking operation. The execution status data of the primary, secondary, and tertiary early warning execution modules, as well as the anomaly handling module, are fed back to the early warning decision unit in real time for closed-loop status verification. By further employing a closed-loop communication mechanism that verifies both instructions and feedback, the present invention ensures that the issued intervention instructions can be reliably executed by the system and confirmed upon return, effectively reducing the risk of control link failure and improving the overall reliability of the system.

[0024] In summary, compared with the prior art, the present invention has the following beneficial effects:

[0025] 1. Improved environmental adaptability of warning distance. This invention adaptively calculates and adjusts the train's warning boundary by collecting multi-dimensional objective parameters such as weather, load, and gradient. This dynamic adjustment strategy overcomes the safety hazards of fixed warning distances in extreme environments.

[0026] 2. A reasonable human-machine collaborative intervention mechanism has been established. The three-level early warning mechanism provides drivers with information and operational authority in the early stages, corrects deviations by limiting speed in the middle stages, and takes over authority to execute emergency braking in critical situations in the later stages. This mechanism protects operational safety while retaining the flexibility of manual operation and reducing excessive system intervention.

[0027] 3. A degraded operation network for the system was established and refined. By monitoring the status of the three key subsystems—positioning, communication, and interlocking equipment—and by pre-setting multi-level degraded transfer models, the system can orderly reduce speed, isolate, or stop when faced with sudden equipment failures, thus better reflecting the fault-oriented safety design concept in the rail transit field. Attached Figure Description

[0028] To more clearly illustrate the technical solutions of the embodiments disclosed in this invention, the accompanying drawings of the embodiments will be briefly described below. These drawings are for illustrative purposes only and are not intended to limit the scope of protection of this invention.

[0029] Figure 1 This is a flowchart of the three-level early warning closed loop provided by the present invention in one embodiment.

[0030] Figure 2 This is a logic diagram for calculating the environmental adaptive early warning distance provided by the present invention in one embodiment.

[0031] Figure 3 This is a logic diagram of the slope-sensing braking strategy provided by the present invention in one embodiment.

[0032] Figure 4 This is a degradation control state transition diagram of the present invention in one embodiment. Detailed Implementation

[0033] In railway marshalling yard operations, shunting locomotives frequently face changing weather conditions and track profiles when pushing or pulling trains for dismantling and marshalling. Existing shunting safety protection equipment typically relies on pre-set rigid distances (e.g., a fixed 100-meter warning and 50-meter braking). This static control mechanism is prone to exceeding safety boundaries due to the sudden drop in wheel-rail friction during rain or snow; and under heavy-load downhill conditions, the fixed distance cannot provide sufficient physical braking space due to the train's enormous inertia and the acceleration component of gravity along the slope. Furthermore, existing equipment often resorts to direct emergency braking to stop the train when encountering intermittent wireless communication interruptions or brief obstructions to satellite positioning signals, disrupting normal shunting efficiency; or it loses its protective capability after a fault, lacking a smooth degradation and protection mechanism with time gradients.

[0034] To facilitate understanding of this application, the following definitions and explanations are provided for some technical terms appearing herein:

[0035] Basic braking distance ( : refers to the physical braking safety distance of a rail vehicle under standard weather, flat slope and nominal adhesion coefficient conditions, which is determined purely by wheel-rail friction and braking system deceleration.

[0036] Protection and early warning distance ( : This refers to the braking distance above the base braking distance, taking into account the weather correction factor ( ), slope correction factor ( ), load correction factor ( ) and safety margin factor ( After that, the outer ring early warning trigger boundary distance is calculated in real time by the system.

[0037] Level 3 protection zone: Three spatial control zones are defined by extending backward from the protected target (such as stopped trains, turnout areas, and stop devices), namely the outer ring zone (triggers warning), the inner ring zone (triggers mandatory speed limit intervention), and the core zone (triggers emergency braking).

[0038] Conservative protection mode: When the system loses its real-time communication capability, a safety protection space with no-entry and speed-limited reverse constraints is virtually defined in the forward and backward directions, using the last successfully received valid vehicle position as the anchor center.

[0039] Composite degradation state: When both bit system anomaly and communication link anomaly occur simultaneously, the system integrates multiple degradation strategies and selects the control state that is most stringent in terms of rate limiting and area constraints.

[0040] Multidimensional environmental constraint parameters: refer to external objective condition variables that change the physical stress state or friction coefficient of the train, including but not limited to precipitation patterns and the actual load mass of the vehicle.

[0041] Hierarchical degradation control: A term in the field of industrial control. It refers to the proactive switching of a system to a restricted but safe operating mode (e.g., degrading from high-speed operation to low-speed operation) when a partial functional failure occurs, in order to prevent a complete system failure.

[0042] Existing shunting protection technologies typically use a uniform, fixed distance as the protection distance. However, when a heavily loaded train is traveling downhill in rainy weather, its physical inertia is high and wheel-rail friction is reduced. If the same fixed warning distance as in clear weather is used, insufficient braking distance could easily lead to a collision. This invention is proposed to overcome this deficiency in the existing technology.

[0043] Example 1

[0044] This embodiment provides a specific application of a railway shunting graded early warning and scenario adaptive degradation control method under normal weather and flat slope conditions.

[0045] (a) Work scenario and initial parameter input

[0046] In a railway marshalling yard, a shunting locomotive is pulling shunting car train A in a pushing operation, with the parked car train B as the forward protection target. The following initial operating parameters are collected in real time by the car train status monitoring module 1 and the input parameter acquisition module 10:

[0047] Current speed of train A: ;

[0048] System braking deceleration under standard operating conditions: ;

[0049] Standard wheel-rail adhesion coefficient: ;

[0050] Current weather: Sunny;

[0051] Current route gradient: level, gradient value ;

[0052] The current total load of train A: .

[0053] (II) Dynamic Calculation of Environmental Adaptive Early Warning Distance and Level 3 Boundary

[0054] Step 1: Basic Braking Distance Calculation. The basic braking distance calculation unit 11 calls the formula to perform the calculation:

[0055]

[0056] As an alternative refined calculation mode for this application (e.g., for long-distance routes without complex gradient changes), the system can directly incorporate the gradient as a correction factor into the unified formula. In this case, step two: determining each correction factor.

[0057] Unit 12: Determining the Weather Correction Factor for Sunny Days by Looking Up Tables ;

[0058] Slope correction coefficient determination unit 13: Flat slope ( Under these conditions, the slope correction factor ;

[0059] Load Correction Factor Determination Unit 14: Train Load In Range, load correction factor ;

[0060] Safety margin factor set to .

[0061] Step 3: Final protection and early warning distance calculation. The integrated calculation unit 15 calls the integrated formula: In this mode, the system does not need to call a separate slope-sensing braking strategy module.

[0062] The calculated final protection warning distance Send to the protection zone setting module 2.

[0063] Step 4: Constructing the Level 3 Protection Zone Boundary. The protection zone setting module 2 sets the level 3 boundary based on the location of the protection target (the rear of the stationary train B):

[0064] Outer ring boundary: set 95.6 meters behind position B of the stationary train;

[0065] Inner ring boundary: based on the distance from the outer ring. The setting is that it is located behind position B of the stationary train. Place;

[0066] Core area boundary: based on the distance from the outer ring road The setting is that it is located behind position B of the stationary train. (actually rounded down) ).

[0067] (III) Three-level progressive early warning execution control process

[0068] The early warning decision unit 3 receives the absolute position data sent by the train status monitoring module 1 in real time and compares it geometrically with the three-level boundary set by the protection zone setting module 2:

[0069] Level 1 alert triggering and response:

[0070] When the head of train A reaches a distance of 95.6 meters from the position of the stationary train B, the early warning decision unit 3 determines that the train has entered the outer ring boundary and outputs a Level 1 early warning command to the Level 1 early warning execution module 4. The Level 1 early warning execution module 4 immediately displays a Level 1 early warning yellow indicator on the driver's operating terminal, with the text prompt "Attention ahead, 96 meters from the protected target," and plays a voice warning "Attention, vehicle ahead" through the audio unit. At this time, if the driver presses the confirmation button on the terminal within 5 seconds, the Level 1 early warning execution module 4 sends a cancellation signal back to the early warning decision unit 3, the early warning prompt is cleared, and the system resumes silent monitoring. If the driver does not press the confirmation button, the prompt message remains, and the system continues real-time monitoring.

[0071] Level 2 speed limit intervention triggering and response:

[0072] If the driver fails to take sufficient deceleration measures after the warning is lifted, train A continues to approach the target. When the front of train A moves to a distance of 64 meters behind the stationary train B, the warning decision unit 3 determines that the train has entered the inner ring boundary and outputs a secondary warning command to the secondary warning execution module 5. The secondary warning execution module 5 calculates a safe recommended speed limit of 8 km / h based on the current load of 800 tons and issues a mandatory speed limit command to the train control system. The driver's terminal simultaneously displays "Mandatory Speed ​​Limit 8 km / h". In this state, the driver cannot manually cancel the speed limit command. The train control system automatically commands the brake electro-pneumatic valve to adjust the brake cylinder pressure, forcibly reducing the train speed to below 8 km / h.

[0073] Level 3 Emergency Braking Triggering and Response:

[0074] If the train fails to decelerate smoothly and cross the inner ring for some reason, when the front of train A moves to 38 meters behind the stationary train B, the early warning decision unit 3 determines that the train has entered the core area boundary and outputs the highest priority emergency braking command to the level 3 early warning execution module 6. The level 3 early warning execution module 6 sends an emergency braking electrical signal to the train braking system through an independent hardware safety circuit, and the braking system implements exhaust braking with the maximum effective braking rate. At this time, all manual overlay permissions of the human-machine interface terminal are completely locked, and no manual command can interrupt the emergency braking process. Train A decelerates smoothly and stops under the action of emergency braking, eventually stopping 15 meters behind the stationary train B, safely avoiding a collision accident.

[0075] Example 2

[0076] This embodiment provides a railway shunting graded early warning and scenario adaptive degradation control system structure. Combined with... Figure 1 and Figure 2 The system's module architecture and signal interaction relationships are as follows:

[0077] (I) System Module Composition and Hardware Connection

[0078] Train Status Monitoring Module 1: Includes a dual-frequency Beidou / GPS positioning receiver, wheel speed sensors, and an inertial measurement unit (IMU) for real-time high-frequency acquisition of the two-dimensional coordinate position, speed, and direction vector of motion of the rail vehicles. This module is connected to the early warning decision unit 3 via a bidirectional CAN bus.

[0079] Input parameter acquisition module 10: Includes a meteorological data receiving terminal, a line database interface, and a train axle load sensor interface. It is used to collect current weather conditions (sunny, rainy, snowy, foggy) and current line gradient values. (‰, positive for uphill, negative for downhill) and train load capacity. (ton).

[0080] Computational layer unit structure (environmentally adaptive early warning distance calculation module):

[0081] Basic braking distance calculation unit 11: The hardware adopts an industrial-grade MCU with built-in algorithm logic. ;

[0082] Weather correction factor determination unit 12: Built-in weather state and correction factor comparison table, sunny day takes 1.0, rainy day takes 1.3, snowy day takes 1.5, foggy day takes 1.2;

[0083] Slope correction coefficient determination unit 13: Built-in slope calculation logic, uphill ( )implement flat slope ( )implement ,downhill( )implement ;

[0084] Load correction factor determination unit 14: Built-in load segmentation logic, Take 1.0, Take 1.1, Take 1.2;

[0085] Integrated Calculation Unit 15: Combines the outputs of the above units with the solidified safety margin factor. Multiply to output the final warning distance. To output module 16.

[0086] Protection Zone Setting Module 2: Receives the final warning distance sent by Output Module 16 In conjunction with the location of the protected targets in the station's GIS electronic map, the three-dimensional coordinate range of the outer ring boundary, inner ring boundary, and core area boundary is calculated and generated in real time.

[0087] Early warning decision unit 3: As the main control core, it adopts a dual-mode redundancy architecture. It receives boundary data from the protection zone setting module 2 in one direction and performs real-time spatial matching with the position of the train status monitoring module 1.

[0088] Early warning execution modules (4, 5, 6):

[0089] Level 1 warning execution module 4: Connected to the driver's human-machine interface terminal in the cab, with a feedback transmission line for canceling the signal by pressing a button;

[0090] Level 2 Early Warning Execution Module 5: Connected to the locomotive integrated wireless communication equipment (CIR) and the microcomputer-controlled constant speed / braking system;

[0091] Level 3 Early Warning Execution Module 6: It is directly connected to the locomotive's emergency braking air valve circuit via a safety relay hard wire, and has the highest physical intervention priority.

[0092] Anomaly handling module 7 includes a positioning status monitor, a communication heartbeat detector, and an interlocking status decoder, used to detect the health status of external systems in real time and issue degradation control commands to the early warning decision unit 3.

[0093] Example 3

[0094] This embodiment is used to explain in detail the processing logic of the slope-sensing braking strategy module for slope change points (such as abrupt slope changes).

[0095] In actual railway lines, the longitudinal profile of the line often shows gradient change points (change points) where the slope suddenly changes from downhill to uphill or from steep to gentle. If the gradient is directly calculated using point location, the calculated warning distance will change abruptly when the vehicle crosses the change point, which can easily lead to erroneous intervention by the control system.

[0096] Combination Figure 3 In this embodiment, the slope change point processing strategy 23 executes the following smoothing algorithm:

[0097] Delineation of the affected area of ​​slope change point: The slope sensing braking strategy module delineates the 50-meter range before and after the slope change point as the slope transition zone, namely the 50-meter range before the slope change point and the 50-meter range after the slope change point.

[0098] Parallel calculation of dual-gradient warning distance: When the head or tail of the train enters the 100-meter-long gradient transition section, the system simultaneously calls the track gradient before the gradient change point. Gradient of the line after the slope change point Two parameters are used to calculate two warning distances in parallel by the environment adaptive warning distance calculation module:

[0099] Based on slope Calculated warning distance ;

[0100] Based on slope Calculated warning distance .

[0101] Maximum decision-making logic: Within the transition zone at the slope change point, the comprehensive decision-making logic adopts a safety-oriented maximum selection algorithm.

[0102]

[0103] For example, when the train departs from Downhill section (calculate warning distance) It will soon be running. Uphill section (calculate warning distance) When crossing the slope change point, within the area of ​​50m before and 50m after the change point, the system automatically selects the larger value. This serves as the protective warning distance for the area. Only after the train has completely moved 50 meters away from the gradient change point does the system smoothly transition to a 140-meter warning distance for the uphill section. This maximum value selection strategy ensures that the system maintains the highest level of safety margin in areas of abrupt gradient changes, avoiding blind spots at the gradient change point.

[0104] Example 4

[0105] This embodiment illustrates in detail a processing flow under normal operating conditions corresponding to the present invention.

[0106] Suppose that in a railway marshalling yard, a target train is being pushed and shunted at a speed of 15 km / h, and another train (the protected target) is parked in front of it.

[0107] like Figure 1 and Figure 2 As shown, after the system starts, the train status monitoring module 1 obtains the travel speed of the target train through the onboard sensors. The direction is forward. Simultaneously, the input parameter acquisition module 10 obtains the current load as 800 tons, the weather as sunny, and the wheel-rail adhesion coefficient... Braking deceleration is .

[0108] Subsequently, the basic braking distance calculation unit 11 calculates the basic braking distance according to the formula: .

[0109] Next, the system calls each correction unit. The weather correction coefficient determination unit 12 outputs the coefficient based on the sunny day conditions. The load correction factor determination unit 14 outputs a factor based on 800 tons (located in the 500-1500 ton range). Under the macro-control model for dealing with complex gradient changes at marshalling yards, the basic formula does not include a gradient correction coefficient. Additionally, the preset safety margin coefficient is obtained. The integrated calculation unit 15 calculates the scene adaptive warning distance without considering slope as follows: .

[0110] like Figure 3 As shown, the slope sensing braking strategy module independently detects that the current track is straight, calls the flat slope section braking strategy 21, keeps the warning distance unchanged, and determines the final warning distance to be 95.6 meters, which is then transmitted by the output module 16.

[0111] Based on the final warning distance, the protection zone setting module 2 sets three levels of boundaries with the protection target as the benchmark: the outer ring boundary is 95.6 meters away from the protection target; the inner ring boundary is 64 meters away from the protection target (approximately 67% of 95.6 meters); and the core area boundary is 38 meters away from the protection target (approximately 40% of 95.6 meters).

[0112] When the target train enters the outer ring boundary, the early warning decision unit 3 triggers the first-level early warning execution module 4. The on-board terminal displays a "Caution Ahead" prompt. At this time, following the principle of manual confirmation, if the driver presses the confirmation button, the warning is canceled.

[0113] If the driver fails to take action and the train continues to approach and enter the inner ring boundary, the early warning decision unit 3 triggers the secondary early warning execution module 5. The system calculates the target speed limit (e.g., 8 km / h) and issues a speed limit command to the braking system. This command cannot be manually canceled by the driver, and the train speed is forcibly suppressed below the speed limit.

[0114] If the train continues to slide and enters the core area boundary, the early warning decision unit 3 triggers the level 3 early warning execution module 6 to issue the highest priority emergency braking command to the system. This command cannot be manually released until the target train comes to a complete stop at a safe distance from the protected target.

[0115] Example 5

[0116] This embodiment focuses on illustrating the implementation process of the degradation control of the present invention in complex environments and when equipment malfunctions.

[0117] Assume another target train is operating at a speed of 20 km / h (approximately 5.56 m / s) with a load of 1800 tons. The target area ahead is the turnout area. The current weather is moderate rain. ).

[0118] The basic braking distance calculated by the basic braking distance calculation unit 11 is approximately 128.8 meters.

[0119] The route data indicates that the road ahead is downhill (gradient G = -8‰). For example... Figure 3 As shown, the system invokes downhill braking strategy 22, determining that the component of gravity causes the braking distance to increase. The system adjusts the distance according to a set ratio (extension coefficient 1.30).

[0120] Therefore, the final warning distance after comprehensive calculation is: Compared to Example 4, the outer ring warning boundary has been significantly and reasonably advanced.

[0121] In particular, such as Figure 3 As shown in the slope change point handling strategy 23, if the train happens to be in the 50-meter area of ​​the transition from flat slope to downhill, the system calculates the flat slope warning distance and the downhill warning distance respectively, and takes the maximum value of the two as the warning distance at the current moment, thus ensuring the safety of the boundary transition stage.

[0122] As the train approaches the switch, such as Figure 4 As shown, the anomaly handling module 7 detected data loss in the vehicle positioning system.

[0123] When the location loss lasts for 10 seconds, the system transitions from normal operation state 30 to location degradation state 31, forcibly limiting the train speed to the first safe speed (e.g., 3 km / h or 5 km / h, to ensure that the physical conditions for stopping at any time are met in the location loss state).

[0124] Subsequently, the communication link was also interrupted. When the communication interruption lasted for 30 seconds, the system met the criteria for multiple simultaneous failures, and the state machine transitioned to the composite degradation state 34.

[0125] Under the composite degradation state 34, the system enforces strict constraints: it retrieves the last valid location, sets a 500-meter restriction zone outward, establishes a no-entry zone in front of the vehicle, and sets a speed-limited reversing zone behind it. The train is constrained by this logic and can only stop or reverse at speeds below 3 km / h.

[0126] If the communication interruption lasts for more than 60 seconds, the system will switch to emergency shutdown state 35 and execute the final safety fallback action. Normal operation can only be restored 30 after manual troubleshooting and repair of the equipment and unlocking with authorization.

[0127] Example 6

[0128] In modern factory railways equipped with 5G private network communication, the input parameter acquisition module 10 involved in this invention no longer relies entirely on the onboard database, but instead receives weather status parameters from ground weather stations in real time via a wireless network. Simultaneously, the alert information from the first-level early warning execution module 4 is not only displayed in the locomotive driver's cab but can also be simultaneously pushed to the monitoring screen of the ground centralized dispatch center. For the interlocking downgrade state 33, in addition to the onboard system actively restricting train movement, the ground signal can also be forcibly displayed as a red light through vehicle-to-ground communication, forming a dual vehicle-to-ground protection system. These variations based on different communication link architectures can all realize the core control logic of this invention and are equivalent implementations of this invention.

[0129] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, various improvements and modifications can be made, such as parameter adjustments, module merging, or process fine-tuning, without departing from the core technical concept of the present invention. These improvements and modifications also fall within the protection scope of the present invention.

Claims

1. An adaptive hierarchical early warning and degradation control method for railway shunting scenarios, characterized in that, Includes the following steps: Real-time acquisition of the operating status parameters of the target train during shunting operations, and acquisition of multi-dimensional environmental constraint parameters of the current operating scenario of the target train; Based on the operating status parameters and combined with the multidimensional environmental constraint parameters, the basic braking distance of the target train is calculated through a dynamic conversion model, and then the scene adaptive warning distance is determined. The real-time gradient attributes of the track ahead of the target train are obtained, and the adaptive warning distance of the scene is adjusted independently based on the real-time gradient attributes to determine the final warning distance. Based on the final warning distance and the location of the forward protection target, a multi-level protection boundary area is constructed; The real-time relative relationship between the position of the target train and the multi-level protection boundary area is determined, and the corresponding multi-level progressive closed-loop early warning control is triggered based on the relative relationship.

2. The method according to claim 1, characterized in that, The operating status parameters include the current driving speed. Braking deceleration under standard operating conditions The multidimensional environmental constraint parameters include the wheel-rail adhesion coefficient. Weather condition parameters and train load parameters; The step of determining the scene adaptive early warning distance specifically includes: According to the formula Calculate the basic braking distance ; Match the corresponding weather correction coefficient based on the weather state parameters. Match the corresponding load correction coefficient according to the train load parameters. ; According to the formula Calculate the adaptive warning distance for the scenario ,in This is the preset safety margin factor.

3. The method according to claim 2, characterized in that, The step of performing independent slope-aware adjustments on the scene adaptive warning distance based on the real-time slope attributes to determine the final warning distance specifically includes: If the target train is in an uphill section, it is determined that the component of gravity along the slope is opposite to the direction of motion. The scene adaptive warning distance is reduced according to the first reduction ratio to obtain the final warning distance. If the target train is in a flat slope section, the scene adaptive warning distance is kept unchanged as the final warning distance; If the target train is in a downhill section, it is determined that the direction of the gravity component along the slope is the same as the direction of motion. The adaptive warning distance of the scenario is then extended according to the second extension ratio to obtain the final warning distance.

4. The method according to claim 3, characterized in that, The method also includes rules for handling slope change points: When the target train is within a preset distance range before and after the gradient change point, it is determined that the target train is simultaneously affected by two adjacent gradient sections. Calculate the first warning distance and the second warning distance when the target train is located in the two adjacent sections with different gradients, respectively; The maximum value between the first warning distance and the second warning distance is selected as the final warning distance of the target train in the gradient change area.

5. The method according to claim 1, characterized in that, The construction of a multi-level protection boundary area based on the final warning distance and the location of the forward protection target specifically includes: The boundary at a first predetermined distance from the forward protected target is defined as the outer ring boundary; The boundary at the second specified distance from the forward protected target is set as the inner ring boundary; The boundary at a third specified distance from the aforementioned forward protected target is set as the core area boundary; Wherein, the first specified distance is equal to the final warning distance, the first specified distance is greater than the second specified distance, and the second specified distance is greater than the third specified distance.

6. The method according to claim 5, characterized in that, The multi-level progressive closed-loop early warning control triggered according to the relative relationship specifically includes: When the target train enters the outer ring boundary but does not enter the inner ring boundary, a level one warning is triggered, a warning message is output to the operation terminal, and the permission for manual confirmation to clear the warning is granted. When the target train enters the inner ring boundary but does not enter the core area boundary, a secondary speed limit intervention is triggered. The target speed limit value is calculated and sent to the train control system, and manual overwrite instructions for the target speed limit value are blocked. When the target train enters the boundary of the core area, a level three emergency braking is triggered, an emergency braking command is sent to the braking system, and the braking state is locked until the target train stops.

7. The method according to claim 1, characterized in that, Also includes: The operational health of the external support system associated with the target train is monitored in real time. When an abnormality is detected in the operational health, a corresponding graded degradation control strategy is triggered according to the abnormality category to restrict the operation authorization of the target train. The external support system includes a positioning system, a communication link system, and interlocking equipment; The specific steps of triggering corresponding hierarchical degradation control strategies based on anomaly categories include: When the data loss of the positioning system is detected to last for more than a first threshold, the positioning is degraded and the target train is forced to limit its speed to a first safe speed. When the duration of data loss in the positioning system exceeds a second threshold, or the duration of interruption in the communication link system exceeds a third threshold, the target train is controlled to stop urgently, wherein the second threshold is greater than the first threshold; When the duration of the communication link system interruption exceeds the fourth threshold but is less than the third threshold, the system enters a communication degradation state and triggers a conservative protection mode. In the conservative protection mode, a restricted area is constructed with a set radius radiating outward from the known position of the last valid communication confirmation of the target train as a reference. A no-entry zone is set in front of the target train, and a speed-limited reversing zone is set in the rear.

8. The method according to claim 7, characterized in that, The method further includes: When the interlocking device reports abnormal information, it enters an interlocking downgrade state, prohibiting the target train from entering the critical area under the jurisdiction of the interlocking device, and forcibly requests manual confirmation. When at least two of the positioning system, the communication link system, or the interlocking device are detected to be abnormal at the same time, a composite degradation state is entered, all degradation control strategies corresponding to concurrent abnormalities are extracted, and comprehensive degradation control is executed according to the most stringent constraint condition among the strategies.

9. An adaptive hierarchical early warning and degradation control system for railway shunting scenarios, characterized in that, include: The train status monitoring module is used to collect the operating status parameters of the target train in real time during shunting operations; The input parameter acquisition module is used to acquire multi-dimensional environmental constraint parameters of the current working scenario of the target train. The basic braking distance calculation unit is used to calculate the basic braking distance of the target train based on the operating state parameters and combined with the multi-dimensional environmental constraint parameters, through a dynamic conversion model, and then determine the scene adaptive warning distance. The gradient sensing braking strategy module is used to obtain the real-time gradient attributes of the track ahead of the target train, and to perform independent gradient sensing adjustments on the scene adaptive warning distance based on the real-time gradient attributes in order to determine the final warning distance. The protection zone setting module is used to construct a multi-level protection boundary zone based on the final warning distance and the position of the forward protection target; The early warning decision unit and early warning execution module are used to determine the real-time relative relationship between the position of the target train and the multi-level protection boundary area, and trigger the corresponding multi-level progressive closed-loop early warning control based on the relative relationship; The anomaly handling module is used to monitor the operational health of the external support system associated with the target train in real time. When it is determined that there is an anomaly in the operational health, the module triggers a corresponding hierarchical degradation control strategy according to the anomaly category to restrict the operation authorization of the target train.

10. The system according to claim 9, characterized in that, The early warning execution module includes independent first-level early warning execution module, second-level early warning execution module and third-level early warning execution module; The first-level warning execution module is configured to perform a prompt operation that prioritizes manual confirmation; the second-level warning execution module is configured to perform a speed-limiting operation that requires mandatory system intervention; and the third-level warning execution module is configured to perform an emergency braking operation. The execution status data of the first-level early warning execution module, the second-level early warning execution module, the third-level early warning execution module, and the exception handling module are fed back to the early warning decision unit in real time for status closed-loop verification.