By setting up a transverse water flow channel connecting the arc-shaped plate to the longitudinal bulkhead in the gap area of the double bottom longitudinal frame of the ship, the stability risk of cruise ships, passenger ships, and ro-ro passenger ships has been solved, achieving the effects of material saving and simple construction.
Patent Information
- Application Number
- CN202611233992.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-14
- Publication Date
- 2026-11-17
AI Technical Summary
How to provide a transverse structure and construction method for a U-shaped cabin on ships that reduces the stability risks of cruise ships, passenger ships, and ro-ro passenger ships, saves materials and space, and is easy to construct and economical.
An arc-shaped plate is installed in the gap area of the longitudinal frame of the double bottom of the ship. The two ends of the arc-shaped plate are connected to the port longitudinal bulkhead and the starboard longitudinal bulkhead through the gradual transition section. A transverse water flow channel is formed between the arc-shaped plate and the double bottom. The arc-shaped plate adopts a variable thickness cylindrical thin plate structure. The connection is provided with a three-stage transition structure and trapezoidal flow holes, and is coated with a wear-resistant coating. Sacrificial anodes are used for anti-corrosion treatment.
It increases the area and efficiency of water flow across the channel, reduces stability risks, saves materials and space, and is simple, economical and effective to construct.
Smart Images

Figure CN123104849A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of ship design technology, and specifically relates to a transverse structure of a ship's U-shaped compartment, its construction method, and the ship itself. Background Technology
[0002] Cruise ships, passenger ships, and ro-ro passenger ships are all vessels with high centers of gravity, requiring stringent stability measures. To improve the stability of cruise ships, passenger ships, and ro-ro passenger ships in the event of a breach, installing a U-shaped hull is the most effective measure. When one side of the ship is breached, the U-shaped hull allows water to flow to the other side, helping to right the ship and thus improving its stability. However, to achieve this effect, the water flow needs to reach the other side quickly, which is a very demanding requirement; regulations stipulate that it must be within 60 seconds. To meet this rapid requirement, it is necessary to ensure sufficient cross-sectional area of water flow within the U-shaped hull and to guarantee sufficient pressure head. Therefore, the best approach is to have sufficient water flow area at the bottom of the U-shaped hull, and the lower the cross-sectional channel, the better.
[0003] To improve water flow speed, some designs incorporate steel pipes connecting the port and starboard compartments on the double bottom of a ship. However, due to factors such as large ship deformation and the fact that the steel pipes run through the entire port and starboard sides of the double bottom, this significantly impacts the layout of the double bottom, and many modern ship designs have abandoned this practice.
[0004] For large cruise ships, passenger ships, and ro-ro passenger ships, the bottom and double bottom are usually longitudinally framed. Due to strength requirements, longitudinal girder and longitudinal bulkheads are typically used to obstruct water flow. Openings in the longitudinal girder are generally used to increase the flow area. However, to meet structural strength and cabin division requirements, the required flow area is often insufficient. To meet the area requirements, the common practice is to raise the height of the double bottom, either entirely or partially. While this method ensures the transverse area, it also raises the ship's center of gravity, leading to adverse effects.
[0005] Therefore, how to provide a transverse structure, construction method, and vessel for a U-shaped cabin to reduce the stability risks of cruise ships, passenger ships, and ro-ro passenger ships, while saving materials and space, has become an urgent technical problem to be solved. Summary of the Invention
[0006] This invention provides a transverse structure for a ship's U-shaped cabin, a construction method, and a ship, which can reduce the stability risks of cruise ships, passenger ships, and ro-ro passenger ships, save materials and space, and is easy to construct, making it economical and effective.
[0007] In one embodiment of the present invention, a transverse structure for a ship's U-shaped compartment is provided. The transverse structure includes: an arc-shaped plate 2 disposed in the gap area of the longitudinal frame of the ship's double bottom 1, with both ends of the arc-shaped plate 2 connected to the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4 respectively through a gradual transition section 2a, forming a transverse water flow channel 5 between the arc-shaped plate 2 and the double bottom 1. The arch height H of the curved plate 2 satisfies:
[0008] Where L is the spacing between adjacent strong deck longitudinal girder. The inclination angle for the transverse passageway should be 3° or less. ≤8°, the connection width W between the arc plate 2 and the double bottom 1 of the ship is ≤400mm.
[0009] Furthermore, the arc-shaped plate 2 adopts a variable thickness cylindrical thin plate structure, and its plate thickness t is calculated according to the formula... It is confirmed that, among them, Minimum thickness at the end ≥8mm, R is the radius of curvature of the arc plate, and r is the radial distance from the center line of the arc plate; At the connection between the arc-shaped plate 2 and the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4, a locally thickened area 2b is provided, with a thickness of t+2mm.
[0010] Furthermore, a three-stage transition structure is provided at the connection between the arc-shaped plate 2 and the double-layer bottom 1; The first section is a circular arc transition 6a with a radius of R1=50mm, the middle section is a sloped transition 6b with an inclination of 1:8, and the last section is a planar transition 6c with a width of W1=200mm; the connection weld 7 between the arc plate 2 and the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4 adopts a Y-shaped bevel, with a root gap of b=3mm and a blunt edge of p=2mm.
[0011] Furthermore, in the intersection area of the arc-shaped plate 2 and the inner shell longitudinal bulkhead 8, the inner shell longitudinal bulkhead 8 is provided with a trapezoidal flow hole 9. The upper bottom width of the flow hole 9 is a=150mm, the lower bottom width is b=250mm, the height is h=300mm, the center distance between adjacent flow holes is d=600mm, and the angle γ between the normal direction of the flow hole 9 and the generatrix of the arc-shaped plate 2 is 15°.
[0012] Furthermore, the lower edge of the transverse water flow channel 5 is flush with the lower surface of the double bottom 1, and the cross-sectional area S of the channel 5 satisfies:
[0013] Where V is the maximum water inflow when a single compartment is damaged, in m³, T is the righting time required by regulations, in seconds, and C is the flow velocity correction factor, with a value ranging from 1.2 to 1.5.
[0014] Furthermore, the projected area of the arc-shaped plate 2 covers at least one transverse area of a cargo hold or cabin, and the inner surface of the arc-shaped plate 2 is coated with a gradient wear-resistant coating 10, which consists of three layers: a bottom layer is a Ni-Cr-Al alloy base layer with a thickness of 200μm, a middle layer is a WC-Co hard alloy transition layer with a thickness of 500μm, and a top layer is a diamond-reinforced composite ceramic surface layer with a thickness of 300μm.
[0015] Furthermore, a sacrificial anode 11 is provided at the connection node between the arc plate 2 and the double-layer bottom 1. The sacrificial anode 11 is made of Al-Zn-In-Sn alloy, and its installation density is no less than 3 per square meter. A local densification zone is provided at the weld toe position of the arc plate 2.
[0016] In another embodiment of the present invention, a method for constructing a transverse U-shaped cabin structure for a ship is provided, based on a transverse U-shaped cabin structure for a ship as described in any of the preceding claims, the method comprising: S101. A base is installed at a predetermined position on the double-layer base 1 using a prefabricated arc-shaped plate 2 made by plasma cutting. The surface roughness of the base Ra ≤ 6.3 μm. S102. Use CO2 gas shielded welding to connect the arc plate 2 and the double bottom 1. The welding parameters are: current 220 A-240 A, voltage 28 V-30 V, welding speed 32 cm / min-35 cm / min, and interpass temperature controlled below 120℃. S103. An X-shaped bevel is opened at the connection between the arc plate 2 and the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4, with a root gap b=4mm and a blunt edge p=3mm. Multi-layer and multi-pass welding is carried out, and the temperature between weld passes is controlled ≤150℃. S104. Perform 100% UT inspection on the welded area. The weld qualification level shall not be lower than Level II. Unqualified parts shall be repaired by carbon arc gouging. S105. Apply a wear-resistant coating 10 to the inner side of the arc plate 2 using a supersonic flame spraying process. The spraying distance is 350mm, the oxygen flow rate is 550L / h, and the kerosene flow rate is 120L / h. S106. Install the sacrificial anode 11 and complete the anti-corrosion treatment. Apply conductive paste to the contact surface between the anode and the arc plate 2.
[0017] In one embodiment of the present invention, a segmented back-welding process is adopted in S102, with each weld segment having a length ≤500mm and the welding direction being radial along the arc plate 2; in S103, the X-shaped bevel angle α = 65° ± 5°, the blunt edge thickness p = 3 mm ± 0.5mm, and the root gap b = 4 mm ± 0.5mm.
[0018] In another embodiment of the present invention, a ship is provided, wherein the U-shaped cabin area of the ship is provided with a transverse structure comprising any of the above-described ship U-shaped cabins.
[0019] The beneficial effects of this invention are as follows: As can be seen from the above scheme, the embodiments of the present invention provide a transverse structure of a ship's U-shaped compartment, a construction method, and a ship. The transverse structure includes: an arc-shaped plate 2 disposed in the gap area of the longitudinal frame of the double bottom 1 of the ship, the two ends of the arc-shaped plate 2 being connected to the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4 respectively through a gradual transition section 2a, forming a transverse water flow channel 5 between the arc-shaped plate 2 and the double bottom 1; the dome height H of the arc-shaped plate 2 satisfies: Where L is the spacing between adjacent strong deck longitudinal girder. The inclination angle for the transverse passageway should be 3° or less. The angle is ≤8°, and the connection width W between the arc-shaped plate 2 and the double bottom 1 of the ship is ≤400mm. This invention reduces the stability risks of cruise ships, passenger ships, and ro-ro passenger ships, saves materials and space, and is easy to construct, making it economical and effective. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the transverse structure of a ship's U-shaped compartment according to an embodiment of the present invention; In the diagram, 1 represents the ship's double bottom, 2 represents the curved plate, 3 represents the port longitudinal bulkhead, 4 represents the starboard longitudinal bulkhead, and 5 represents the transverse water flow channel. Detailed Implementation
[0021] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this invention.
[0022] like Figure 1 As shown, Figure 1 This is a schematic diagram of the transverse structure of a ship's U-shaped compartment according to an embodiment of the present invention.
[0023] Figure 1 In the present invention, a transverse structure of a U-shaped compartment of a ship includes: an arc-shaped plate 2 disposed in the gap area of the longitudinal frame of the double bottom 1 of the ship, the two ends of the arc-shaped plate 2 being connected to the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4 respectively through a gradual transition section 2a, forming a transverse water flow channel 5 between the arc-shaped plate 2 and the double bottom 1. The arch height H of the curved plate 2 satisfies:
[0024] Where L is the spacing between adjacent strong deck longitudinal girder. The inclination angle for the transverse passageway should be 3° or less. ≤8°, the connection width W between the arc plate 2 and the double bottom 1 of the ship is ≤400mm.
[0025] In this embodiment of the invention, a transverse structure for a ship's U-shaped cabin, while raising the double bottom as a whole satisfies the requirement for stable transverse area, raises the center of gravity of the empty ship, increases the structural weight, which is detrimental to stability and economical. Raising the double bottom partially requires consideration of the continuity of the double bottom structure, and the addition of stiffeners to meet strength requirements increases the coefficient of friction, resulting in poor transverse effect. At the same time, it occupies space and affects the space on the outfitting double bottom, which is detrimental to the layout of equipment and piping systems on the entire double bottom.
[0026] By setting an arc-shaped structure on the double bottom, and opening the arc-shaped space in the longitudinal bulkhead of the double bottom to connect with the transverse space under the double bottom, the area under the arc-shaped structure is connected with the transverse space under the inner bottom, thereby increasing the transverse area, solving the problem of insufficient transverse opening area in longitudinal frame passenger roll-on / roll-off ships, and improving the stability of passenger roll-on / roll-off ships.
[0027] In one embodiment of the present invention, the arc-shaped plate 2 adopts a variable thickness cylindrical thin plate structure, and its plate thickness t is calculated according to the formula It is confirmed that, among them, Minimum thickness at the end ≥8mm, R is the radius of curvature of the arc plate, and r is the radial distance from the center line of the arc plate; At the connection between the arc-shaped plate 2 and the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4, a locally thickened area 2b is provided, with a thickness of t+2mm.
[0028] In this embodiment of the invention, the theory of variable thickness cylindrical thin plate is applied to the transverse structure of a ship for the first time, and the optimal material distribution is achieved through parameterized formulas.
[0029] In one embodiment of the present invention, a three-level transition structure is provided at the connection between the arc-shaped plate 2 and the double-layer bottom 1; The first section is a circular arc transition 6a with a radius of R1=50mm, the middle section is a sloped transition 6b with an inclination of 1:8, and the last section is a planar transition 6c with a width of W1=200mm; the connection weld 7 between the arc plate 2 and the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4 adopts a Y-shaped bevel, with a root gap of b=3mm and a blunt edge of p=2mm.
[0030] In this embodiment of the invention, a graded transition connection (circular arc + inclined plane + plane) and X-shaped bevel design are adopted, which increases the fatigue life of the weld by 3 times. The addition of an arc-shaped transverse channel, compared to a partially raised double-bottom structure, eliminates the need for internal structural reinforcement. Therefore, the entire area of the arc can be used as the transverse flow area, more effectively increasing the transverse flow area. Because of this efficient increase in transverse flow area, the reuse of space on the double bottom is reduced, making it more user-friendly for pipeline outfitting and equipment layout on the double bottom. Furthermore, the arc-shaped transverse channel has better strength, so only steel plates are needed, eliminating the need for aggregates. This results in a simpler structure, less steel usage, and less construction work. Utilizing the advantages of the cylindrical plate, the transverse area of the U-shaped compartment is economically and effectively increased, solving the stability problems of cruise ships, passenger ships, and ro-ro passenger ships.
[0031] In one embodiment of the present invention, in the intersection area of the arc-shaped plate 2 and the inner shell longitudinal bulkhead 8, the inner shell longitudinal bulkhead 8 is provided with a trapezoidal flow hole 9. The upper bottom width of the flow hole 9 is a=150mm, the lower bottom width is b=250mm, the height is h=300mm, the center distance between adjacent flow holes is d=600mm, and the angle γ between the normal direction of the flow hole 9 and the generatrix of the arc-shaped plate 2 is 15°.
[0032] In one embodiment of the present invention, the lower edge of the transverse water flow channel 5 is flush with the lower surface of the double-layer bottom 1, and the cross-sectional area S of the channel 5 satisfies:
[0033] Where V is the maximum water inflow when a single compartment is damaged, in m³, T is the righting time required by regulations, in seconds, and C is the flow velocity correction factor, with a value ranging from 1.2 to 1.5.
[0034] In one embodiment of the present invention, the projection area of the arc-shaped plate 2 covers at least one transverse area of a cargo hold or cabin, and the inner surface of the arc-shaped plate 2 is coated with a gradient wear-resistant coating 10, which consists of three layers: a bottom layer is a Ni-Cr-Al alloy base layer with a thickness of 200μm, a middle layer is a WC-Co hard alloy transition layer with a thickness of 500μm, and a top layer is a diamond-reinforced composite ceramic surface layer with a thickness of 300μm.
[0035] In this embodiment of the invention, wear-resistant coating, sacrificial anode and flow field optimization technology are creatively integrated to achieve multiple functions such as corrosion prevention, wear resistance and efficient water delivery.
[0036] In one embodiment of the present invention, a sacrificial anode 11 is provided at the connection node between the arc plate 2 and the double-layer bottom 1. The sacrificial anode 11 is made of Al-Zn-In-Sn alloy, and its installation density is no less than 3 per square meter. A local densification zone is provided at the weld toe position of the arc plate 2.
[0037] In one embodiment of the invention, an arc-shaped plate is provided on the bottom of the transverse region, extending through the left and right compartments. The strength of the arc-shaped plate meets the theoretical requirements for thin cylindrical plates, and the plate thickness meets the strength requirements to withstand the design pressure head without the need for reinforcing ribs. The height of the arc from the inner bottom does not exceed half of the spacing between the reinforcing frames, and the width at the junction of the arc and the inner bottom is less than 400mm. The arc and the inner bottom are connected by welding, and the inner bottom structure under the arc remains continuous and intact. The opening in the inner bottom of the arc communicates with the space under the inner bottom, serving as a drainage channel and construction hole. At the connection between the arc and the inner shell or longitudinal bulkhead, the inner shell or longitudinal bulkhead within the arc has an opening, and the inner bottom structure under the arc remains continuous.
[0038] Compared to existing technologies, the embodiments of this invention effectively increase the transverse flow area and solve stability issues. The newly added transverse area is connected to the transverse opening under the double-layer bottom, resulting in a lower overall flow area centroid, which is more conducive to stability. The arc-shaped design avoids the need for internal reinforcement structures, effectively reducing the coefficient of friction and improving transverse efficiency. The newly added arc structure is closely connected to the double-layer bottom, which is more conducive to the outfitting of pipelines and equipment layout on the double-layer bottom, with minimal impact. The newly added arc structure has minimal impact on the inner bottom structure, maintaining its integrity well. The structure is simple, adds little weight, is easy to construct, and is economical and effective.
[0039] In another embodiment of the present invention, a method for constructing a transverse U-shaped cabin structure for a ship is provided, based on a transverse U-shaped cabin structure for a ship as described in any of the preceding claims, the method comprising: S101. A base is installed at a predetermined position on the double-layer base 1 using a prefabricated arc-shaped plate 2 made by plasma cutting. The surface roughness of the base Ra ≤ 6.3 μm. S102. Use CO2 gas shielded welding to connect the arc plate 2 and the double bottom 1. The welding parameters are: current 220 A-240 A, voltage 28 V-30 V, welding speed 32 cm / min-35 cm / min, and interpass temperature controlled below 120℃. S103. An X-shaped bevel is opened at the connection between the arc plate 2 and the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4, with a root gap b=4mm and a blunt edge p=3mm. Multi-layer and multi-pass welding is carried out, and the temperature between weld passes is controlled ≤150℃. S104. Perform 100% UT inspection on the welded area. The weld qualification level shall not be lower than Level II. Unqualified parts shall be repaired by carbon arc gouging. S105. Apply a wear-resistant coating 10 to the inner side of the arc plate 2 using a supersonic flame spraying process. The spraying distance is 350mm, the oxygen flow rate is 550L / h, and the kerosene flow rate is 120L / h. S106. Install the sacrificial anode 11 and complete the anti-corrosion treatment. Apply conductive paste to the contact surface between the anode and the arc plate 2.
[0040] In one embodiment of the present invention, a segmented back-welding process is adopted in S102, with each weld segment having a length ≤500mm and the welding direction being radial along the arc plate 2; in S103, the X-shaped bevel angle α = 65° ± 5°, the blunt edge thickness p = 3 mm ± 0.5mm, and the root gap b = 4 mm ± 0.5mm.
[0041] In another embodiment of the present invention, a ship is provided, wherein the U-shaped cabin area of the ship is provided with a transverse structure comprising any of the above-described ship U-shaped cabins.
[0042] In one embodiment of the present invention, a transverse structure of a ship's U-shaped compartment, a construction method thereof, and a ship are provided. The transverse structure includes: an arc-shaped plate 2 disposed in the gap area of the longitudinal frame of the double bottom 1 of the ship; the two ends of the arc-shaped plate 2 are respectively connected to the port longitudinal bulkhead 3 and the starboard longitudinal bulkhead 4 through a gradual transition section 2a, forming a transverse water flow channel 5 between the arc-shaped plate 2 and the double bottom 1; the dome height H of the arc-shaped plate 2 satisfies: Where L is the spacing between adjacent strong deck longitudinal girder. The inclination angle for the transverse passageway should be 3° or less. The angle is ≤8°, and the connection width W between the arc-shaped plate 2 and the double bottom 1 of the ship is ≤400mm. This invention reduces the stability risks of cruise ships, passenger ships, and ro-ro passenger ships, saves materials and space, and is easy to construct, making it economical and effective.
[0043] The above are preferred embodiments of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.
Claims
1. A transverse structure for a ship's U-shaped compartment, characterized in that, The transverse structure includes: an arc-shaped plate (2) disposed in the gap area of the longitudinal frame of the double bottom (1) of the ship, the two ends of the arc-shaped plate (2) being connected to the port longitudinal bulkhead (3) and the starboard longitudinal bulkhead (4) respectively through a gradual transition section (2a), forming a transverse water flow channel (5) between the arc-shaped plate (2) and the double bottom (1). The arch height H of the arc-shaped plate (2) satisfies: Where L is the spacing between adjacent strong deck longitudinal girder. The inclination angle for the transverse passageway should be 3° or less. ≤8°, the connection width W between the arc-shaped plate (2) and the double bottom (1) of the ship is ≤400mm.
2. The transverse structure of a ship's U-shaped compartment according to claim 1, characterized in that, The arc-shaped plate (2) adopts a variable thickness cylindrical thin plate structure, and its plate thickness t is calculated according to the formula. It is confirmed that, among them, Minimum thickness at the end ≥8mm, R is the radius of curvature of the arc plate, and r is the radial distance from the center line of the arc plate; A local thickened area (2b) is provided at the connection between the arc-shaped plate (2) and the port longitudinal bulkhead (3) and the starboard longitudinal bulkhead (4), with a thickness of t+2mm.
3. The transverse structure of a ship's U-shaped compartment according to claim 1, characterized in that, The connection between the arc-shaped plate (2) and the double-layer bottom (1) is provided with a three-level transition structure; The first section is a circular arc transition with a radius of R1=50mm (6a), the middle section is a slope transition with an inclination of 1:8 (6b), and the last section is a planar transition with a width of W1=200mm (6c). The connection weld (7) between the arc plate (2) and the port longitudinal bulkhead (3) and the starboard longitudinal bulkhead (4) adopts a Y-shaped bevel, with a root gap of b=3mm and a blunt edge of p=2mm.
4. The transverse structure of a ship's U-shaped compartment according to claim 1, characterized in that, In the intersection area of the arc plate (2) and the inner shell longitudinal bulkhead (8), the inner shell longitudinal bulkhead (8) is provided with a trapezoidal flow hole (9). The upper bottom width of the flow hole (9) is a=150mm, the lower bottom width is b=250mm, the height is h=300mm, the center distance between adjacent flow holes is d=600mm, and the angle γ between the normal direction of the flow hole (9) and the generatrix of the arc plate (2) is 15°.
5. The transverse structure of a ship's U-shaped compartment according to claim 1, characterized in that, The lower edge of the transverse water flow channel (5) is flush with the lower surface of the double bottom (1), and the cross-sectional area S of the channel (5) satisfies: Where V is the maximum water inflow when a single compartment is damaged, in m³, T is the righting time required by regulations, in seconds, and C is the flow velocity correction factor, with a value ranging from 1.2 to 1.
5.
6. The transverse structure of a ship's U-shaped compartment according to claim 1, characterized in that, The projected area of the arc-shaped plate (2) covers the transverse area of at least one cargo hold or cabin. The inner surface of the arc-shaped plate (2) is coated with a gradient wear-resistant coating (10), which consists of three layers: a bottom layer is a Ni-Cr-Al alloy with a thickness of 200μm, a middle layer is a WC-Co hard alloy transition layer with a thickness of 500μm, and a top layer is a diamond-reinforced composite ceramic surface layer with a thickness of 300μm.
7. The transverse structure of a ship's U-shaped compartment according to claim 1, characterized in that, A sacrificial anode (11) is provided at the connection node between the arc plate (2) and the double bottom (1). The sacrificial anode (11) is made of Al-Zn-In-Sn alloy and its installation density is no less than 3 per square meter. A local densification zone is set at the weld toe position of the arc plate (2).
8. A method for constructing a transverse U-shaped cabin structure for a ship, based on a transverse U-shaped cabin structure as described in any one of claims 1 to 7, characterized in that, The method includes: S101. A base is installed at a predetermined position on the double-layer bottom (1) using plasma cutting of a prefabricated arc plate (2), with a base surface roughness Ra≤6.3μm; S102. The arc plate (2) and the double bottom (1) are connected by CO2 gas shielded welding. The welding parameters are: current 220 A-240 A, voltage 28 V-30 V, welding speed 32 cm / min-35 cm / min, and interpass temperature controlled below 120℃. S103. An X-shaped bevel is opened at the connection between the arc plate (2) and the port longitudinal bulkhead (3) and the starboard longitudinal bulkhead (4), with a root gap of b=4mm and a blunt edge of p=3mm. Multi-layer and multi-pass welding is carried out, and the temperature between weld passes is controlled to ≤150℃. S104. Perform 100% UT inspection on the welded area. The weld qualification level shall not be lower than Level II. Unqualified parts shall be repaired by carbon arc gouging. S105. A wear-resistant coating (10) is sprayed on the inner side of the arc plate (2) using a supersonic flame spraying process. The spraying distance is 350mm, the oxygen flow rate is 550L / h, and the kerosene flow rate is 120L / h. S106. Install the sacrificial anode (11) and complete the anti-corrosion treatment. Coat the contact surface between the anode and the arc plate (2) with conductive paste.
9. A method for constructing a transverse U-shaped cabin structure for a ship according to claim 8, characterized in that, In S102, a segmented back-welding process is adopted, with each weld length ≤ 500 mm and the welding direction along the radial direction of the arc plate (2); in S103, the X-shaped bevel angle α = 65° ± 5°, the blunt edge thickness p = 3 mm ± 0.5 mm, and the root gap b = 4 mm ± 0.5 mm.
10. A ship, characterized in that, The U-shaped compartment area of the vessel is configured with a transverse structure for a vessel's U-shaped compartment as described in any one of claims 1-7.