A tooling and method for constructing joints of insulation panels in a liquefied gas carrier cargo tank containment system.
By pre-embedding internal thread inserts on the insulation board and using a combination structure of pressing tool body and pressure-holding bolts, the problems of cold bridge risk and low construction efficiency in the construction of insulation board joints of liquefied gas carriers are solved, achieving high precision, all-condition adaptability and low cost construction results.
Patent Information
- Application Number
- CN202611579114.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-17
AI Technical Summary
Existing construction methods for cryogenic insulation plate joints in liquefied gas carriers suffer from problems such as high risk of cold bridging, low construction accuracy, poor adaptability to all working conditions, low construction efficiency, and serious material waste. In particular, it is difficult to ensure stable compression force and thermal insulation performance when constructing on curved surfaces and corner areas.
The system adopts a combination structure of a support plate with pre-embedded internal thread inserts, a pressing tool body, and a pressure-holding bolt. Through threaded connection, it achieves stable and uniform pressing of the insulation board joints, avoiding on-site drilling and adapting to the construction needs of various working conditions.
It achieves stable and uniform pressing of insulation board joints, avoids the formation of cold bridges, improves construction accuracy and efficiency, meets high standard requirements, and reduces construction costs and safety hazards.
Smart Images

Figure CN123104878A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of marine cryogenic insulation technology, and in particular to a construction tool and method for the joint of insulation board in the containment system of liquefied gas carrier cargo tanks. Background Technology
[0002] Liquefied gas carriers are specialized vessels for transporting cryogenic liquefied gases. Their cargo tanks or cryogenic storage tanks must operate for extended periods in ultra-low temperature environments of -163°C and below. As a core component of the cargo tank containment system, the quality of the insulation layer's installation directly determines the ship's insulation performance, structural safety, and operational economy. The pressing of insulation board joints is one of the most critical processes in insulation layer construction, requiring stable and uniform pressing force, a flat board surface, consistent gaps, and absolutely no cold bridges or damage to the integrity of the insulation and moisture-proof layers.
[0003] Currently, the following two methods are mainly used for the pressing and bonding of cryogenic insulation plate joints on liquefied gas carriers: Vacuum suction cup pressing method: This method uses multiple vacuum suction cups to adhere to the surface of the insulation board, pressing the sealant module together with external force. While this method is usable for flat surfaces, it is prone to failure on vertical, overhead, and curved surfaces due to low temperatures, uneven surfaces, or vibrations. This results in insufficient and unstable pressing force, failing to ensure uniform curing of the sealant. Furthermore, the suction cups leave indentations on the insulation board surface, affecting the appearance quality.
[0004] Timber support pressing method: This method uses a large amount of timber and adjustable support rods to temporarily support and press the insulation board joints together. This method requires the construction of a complex support system, resulting in extremely low construction efficiency and high labor costs. Furthermore, it is impossible to precisely control the pressing force, which can easily lead to deformation of the insulation board or excessive height difference. At the same time, the large number of temporary supports occupies the limited construction space inside the cabin, increasing safety hazards.
[0005] The aforementioned existing technologies all have significant drawbacks. For example, firstly, there is a high risk of cold bridging. The clamping fixtures using suction cups or wooden blocks cannot adapt to construction on curved or corner areas. In these areas, it is necessary to drill holes on-site in the insulation board adjacent to the joint and install additional fasteners to secure the fixtures and prevent them from falling off. Drilling holes on-site and then installing fasteners will directly penetrate the insulation and moisture-proof layers of the insulation board, forming a cold bridge channel, which will increase the LNG evaporation rate and, in severe cases, cause structural corrosion and low-temperature brittle fracture. Secondly, the construction accuracy is low, making it difficult to stably control the height difference of the insulation board joints within the standard requirement of ≤3mm. Thirdly, the adaptability to all working conditions is poor, and it cannot effectively solve the construction problems of vertical, top, and curved surfaces. Fourthly, the construction efficiency is low, with the insulation layer construction cycle for a single large LNG ship lasting as long as 6-8 months. Fifthly, there is serious material waste, with a large amount of wooden blocks and support rods being used only once, resulting in significant material waste and environmental pollution. Summary of the Invention
[0006] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a construction tooling and method for the joint of the insulation board of the liquid cargo tank enclosure system of liquefied gas carrier. The construction tooling and method have the advantages of reducing the risk of cold bridge and having the ability to adapt to all working conditions.
[0007] To achieve the above objectives, the technical solution adopted by the present invention is as follows: First, a construction tool for the joint of insulation panels in a liquefied gas carrier cargo tank containment system is provided. The joint is embedded with a sealant module, and sealant is used to fill the space between the sealant module and adjacent insulation panels. The construction tool includes: Several support pads are provided and distributed at a designed position along the edge region of the insulating plate. The support pads are bonded and fixed to the surface of the insulating plate. A plurality of internal thread inserts are provided and pre-embedded in the support pad according to the design position. The internal thread inserts are flat-bottomed blind hole structures extending along the thickness direction of the insulation plate and having internal threads formed on the inner wall. The pressing fixture body is a long, rigid strip. Both ends of the pressing fixture body are respectively formed with connecting holes. The pressing fixture body spans over the joint and is used to axially align the connecting holes at both ends with the corresponding internal thread inserts in the adjacent insulating plates. A pre-compression pad is placed between the joint filling module and the pressing fixture body. The upper surface of the pre-compression pad protrudes from the upper surface of the adjacent insulating plate, and the surface of the pre-compression pad covers the entire joint filling module to disperse the pressing force. And a pressure-holding bolt, which passes through the corresponding connecting hole and screws into the corresponding internal thread insert, so that the pressing fixture body applies pressure to the sealant module through the pre-pressure pad through the threaded connection until the sealant cures.
[0008] To optimize the above plan, the following measures were also taken: As a preferred embodiment, at least one of the two connecting holes is configured as a strip hole, the length direction of which is parallel to the length direction of the pressing fixture body, and the width of which is configured to be greater than the diameter of the pressure-holding bolt body but less than the diameter of the pressure-holding bolt head.
[0009] As one of the preferred embodiments, both connecting holes are strip-shaped holes, and they are arranged opposite to each other and spaced apart along the length direction of the pressing fixture body; or, both connecting holes are strip-shaped holes, and they are connected as one unit along the length direction of the pressing fixture body; or one of the two connecting holes is a strip-shaped hole.
[0010] As one of the preferred methods, the pressure-holding bolt is a wing bolt or a pan head bolt; the internal thread insert is a pre-embedded nut with circumferential barbs or axial locking wings, made of metal, and the pre-embedded depth does not exceed 1 / 2 of the thickness of the insulation plate.
[0011] As a preferred embodiment, the support pad is made of plywood.
[0012] As one of the preferred methods, the pressing fixture body is a rectangular cross-section square tube structure made of stainless steel. A rubber pad is attached to the bottom of the pressing fixture body. The rubber pad presses against the upper surface of the pre-pressing pad plate to buffer and uniformly transmit force during the pressing process.
[0013] As a preferred embodiment, the support pad is flush with the upper surface of the insulating plate and together they are covered with a moisture-proof layer, and the moisture-proof layer is provided with a clearance hole to avoid the internal thread insert.
[0014] In addition, a method for constructing the joints of insulation panels in a liquefied gas carrier's cargo tank containment system is provided, using the aforementioned construction fixtures for the joints of insulation panels in a liquefied gas carrier's cargo tank containment system, including the following steps: S1. Prefabrication of insulation board: During the production stage of insulation board, support pads are glued and fixed to the edge area of the surface of the insulation board body according to the design position, and the internal thread inserts are pre-embedded in each support pad according to the design position to complete the prefabrication of the insulation board. S2. Insulation board installation: Install the prefabricated insulation board on the corresponding surface of the liquid cargo tank bulkhead and adjust the joint spacing. S3. Sealing module adhesive application and installation: The sealing module is embedded in the joint, and special sealing adhesive is evenly applied to the surface where the sealing module and the adjacent insulation board meet. S4. Pre-compression treatment: Place the pre-compression pad on top of the joint filling module, and perform preliminary pre-compression on the pre-compression pad along the joint length direction to make the joint filling module and the insulation board initially bonded and adhered, while squeezing out excess joint filling adhesive. S5. Fixture installation and fixing: Place the pressing fixture body above the pre-pressing pad, align the connecting hole on the pressing fixture body with the internal thread insert on the corresponding support pad, pass the pressure holding bolt through the connecting hole and screw it into the internal thread insert, so that the pressing fixture body generates a uniform pressing force on the filling module through the pre-pressing pad. S6. Pressure Holding and Curing: Maintain the pressure state until the sealant is completely cured; S7. Tooling Removal: After the sealant has fully cured, unscrew the pressure-holding bolts in sequence, remove the pressing tool body and pre-pressure pad, and the construction is complete.
[0015] As one of the preferred methods, in step S1, the internal thread insert is pre-embedded using a hot-pressing pre-embedding process. After the pre-embedding is completed, a 100% pull-out force test is performed on all internal thread inserts on each insulating board, and the axial pull-out force of a single internal thread insert is not less than 5kN.
[0016] As one of the preferred methods, after step S2, the height difference between any two adjacent insulating boards is controlled to be ≤3mm, and in step S3, the height difference between the filling module and the two adjacent insulating boards is controlled to be ≤2mm.
[0017] Because of the above-described solutions, one or more technical solutions provided in this application embodiment have at least the following technical effects or advantages: First, by pre-embedding blind hole threaded inserts in the support pad during the insulation board production process, and using a dedicated pressing tool body, pressure holding bolts, and pre-pressing pad, not only is stable, uniform, and continuous pressing of the filling module in the joint of the insulation board achieved, but the factory pre-embedding method also avoids on-site drilling, fundamentally eliminating the generation of cold bridges and ensuring the thermal insulation performance and structural safety of the insulation board.
[0018] Secondly, it eliminates the need for traditional suction cups and temporary wooden support structures, providing reliable pressing force through threaded connections. It is suitable not only for flat, vertical, and top surface construction, but also for construction on curved surfaces. The strip-shaped hole design of the connection hole allows the pressure-holding bolt to tilt at a certain angle or flexibly adjust its stroke position within the connection hole, so as to align and connect with the corresponding internal thread insert in the inclined insulating plate on the curved bulkhead. This also makes it suitable for construction on corners, curved surfaces, etc., solving the problem of difficult construction in complex positions in existing technologies and improving the adaptability to working conditions.
[0019] Third, the threaded connection of the internal threaded insert and pressure-holding bolts allows for precise control of the pressurization process of the sealant module. The pre-pressure pad evenly distributes the pressure throughout the joint area, ensuring uniform curing of the sealant, expelling air bubbles, and preventing cold leakage channels, thus guaranteeing the stability and consistency of construction quality. Furthermore, the standardized construction tools and procedures ensure that the height difference between the insulation board and the joint installation is precisely controlled within ≤3mm, meeting high standards such as those of GTT and classification societies.
[0020] In addition, the tooling is easy and quick to install and dismantle, requiring no large amount of temporary support structures or traditional suction cup structures, which can improve construction efficiency and reduce safety hazards. Furthermore, the pressing tooling body can be reused multiple times, further reducing construction costs. Attached Figure Description
[0021] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings of the embodiments will be briefly described below. Obviously, the drawings described below only involve some embodiments of this application and should not be construed as limiting this application.
[0022] Figure 1 This is a schematic diagram of the assembly structure of the pressing tool body in this embodiment.
[0023] Figure 2 This is a schematic diagram of the installation of the insulating board and the pre-compression pad in this embodiment.
[0024] Figure 3 This is a schematic diagram of the construction and assembly process under one scenario in this embodiment.
[0025] Figure 4 This is a schematic diagram of construction and assembly under another scenario in this embodiment.
[0026] Figure 5 This is a schematic diagram showing the distribution of the internal thread insert in one scenario in this embodiment.
[0027] Figure 6 This is a schematic diagram showing the distribution of the internal thread insert in another scenario in this embodiment.
[0028] Figure 7 This is a cross-sectional schematic diagram of the insulating plate, support pad, and internal thread insert in this embodiment.
[0029] Figure 8 This is a three-dimensional structural diagram of the internal thread insert in this embodiment.
[0030] Figure 9 This is a schematic diagram of the internal structure of the insulating board and the caulking module in this embodiment.
[0031] Figure 10 This is a schematic diagram of the on-site installation of the construction tooling in one scenario in this embodiment.
[0032] Figure 11 This is a schematic diagram of the on-site installation of the construction tooling in another scenario in this embodiment.
[0033] Figure label: 1. Pressing fixture body; 2. Pressure holding bolt; 3. Rubber pad; 4. Connecting hole; 5. Insulation board; 6. Sealing module; 7. Pre-pressing pad; 8. Internal thread insert; 9. Support pad; 10. Butyl tape; 11. Moisture-proof layer. Detailed Implementation
[0034] To enable those skilled in the art to better understand the technical solutions of this invention, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings, so as to more clearly understand the purpose, features and advantages of this invention. It should be understood that the embodiments shown in the drawings are not intended to limit the scope of this invention, but are only for illustrating the essential spirit of the technical solutions of this invention. Obviously, the described embodiments are only a part of the embodiments of this invention, and not all of them. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of this invention.
[0035] Unless the context requires otherwise, throughout the specification and claims, the word “comprising” and its variations, such as “including” and “having”, shall be understood to have an open, inclusive meaning, that is, to be interpreted as “including, but not limited to”.
[0036] Throughout this specification, references to "an embodiment" or "an embodiment" indicate that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment. Therefore, the appearance of "in an embodiment" or "an embodiment" in various places throughout the specification does not necessarily refer to the same embodiment. Furthermore, a particular feature, structure, or characteristic may be combined in any manner in one or more embodiments.
[0037] The singular forms “a” and “the” used in this specification and the appended claims include plural references unless otherwise expressly stated herein. It should be noted that the term “or” is generally used to mean “and / or” unless otherwise expressly stated herein.
[0038] In the following description, in order to clearly demonstrate the structure and working method of the present invention, a number of directional terms will be used. However, terms such as "front", "back", "left", "right", "outside", "inside", "outward", "inward", "up", and "down" should be understood as convenient terms and not as limiting terms.
[0039] The implementation details of the embodiments of the present invention will be described in detail below with reference to the accompanying drawings. The following content is only for the convenience of understanding the implementation details and is not necessary for implementing this solution.
[0040] The specific structure, working principle, and beneficial effects of each component in this embodiment, as well as the specific steps of the construction method using the tooling of this embodiment, will be described in turn with reference to the accompanying drawings.
[0041] refer to Figures 1 to 11 In this embodiment, a construction tooling for the joint of the insulation board in the containment system of a liquefied gas carrier's cargo tank is first provided, wherein the insulation board 5, as shown in the example... Figure 9 As shown, rigid insulation panels, such as the plywood insulation box of the GTTNO96 type enclosure system and the foam glass insulation board of the MARKIII type enclosure system, etc., are characterized by high compressive strength and low thermal conductivity, and can maintain structural stability for a long time at service temperatures of -163℃ and below. The joint is embedded with a joint filler module 6, and the gap between the joint filler module 6 and the adjacent insulation board 5 is filled with joint filler. In one case, the joint filler module 6 is made of flexible insulation material, including EVA / PE flexible foam, melamine foam block, etc., and the size is determined according to the joint width measured on site. The specific structure of the joint filler module 6 has been described in the prior art and will not be elaborated here.
[0042] In this embodiment, the construction fixture includes a support pad 9, an internal thread insert 8, a pressing fixture body 1, a pre-pressing pad 7, and a pressure-holding bolt 2. Several support pads 9 are provided and distributed along the designed position of the edge region of the insulating plate 5. The support pads 9 are bonded and fixed to the surface of the insulating plate 5. In one case, they can be embedded in a groove opened on the surface of the insulating plate 5 and flush with the surface of the insulating plate 5, or they can be directly placed against the surface of the insulating plate 5. No limitation is imposed here. Figure 5 As shown, the insulating plate 5 is a rectangular plate, and the supporting pad 9 is a square plate, distributed at the four corners of the insulating plate 5, as follows. Figure 6 As shown, the support plate 9 is a long strip of material distributed on the four sides of the insulating plate 5. Several internally threaded inserts 8 are pre-embedded in the support plate 9 according to the design positions. Each internally threaded insert 8 is a flat-bottomed blind hole structure extending along the thickness direction of the insulating plate 5, avoiding the formation of cold bridges by penetrating the insulating plate 5. The inner wall is formed with internal threads, and the upper end is flush with the surface of the support plate 9, facilitating subsequent connection with the pressure-holding bolts 2. The flush upper end of the blind hole with the surface of the insulating plate 5 prevents protrusions on the surface of the insulating plate 5, avoiding the risk of lifting or puncturing the subsequently laid secondary shielding layer. The pre-embedded internally threaded inserts 8 provide reliable fixing points for the pressing fixture body 1, avoiding the hassle of drilling holes on-site as in traditional methods, while ensuring the integrity and insulation performance of the insulating plate 5.
[0043] like Figure 1As shown, in this embodiment, the pressing fixture body 1 is a long, rigid strip. Connecting holes 4 are formed at both ends of the pressing fixture body 1. The pressing fixture body 1 spans above the joint, aligning the connecting holes 4 at both ends with the axially aligned internal thread inserts 8 of the adjacent insulating plates 5. A pre-pressing pad 7 is placed between the sealant module 6 and the pressing fixture body 1. The upper surface of the pre-pressing pad 7 protrudes from the upper surface of the adjacent insulating plates 5, and the surface of the pre-pressing pad 7 covers the entire sealant module 6 to disperse the pressing force. A pressure-holding bolt 2 passes through the corresponding connecting hole 4 and screws into the corresponding internal thread insert 8, so that the pressing fixture body 1 maintains a pressing force on the sealant module 6 via the pre-pressing pad 7 through the threaded connection until the sealant cures.
[0044] See Figures 2 to 4 , Figures 9 to 11 After two adjacent insulating boards 5 are installed, a continuous seam remains between them. This seam serves as an expansion joint, primarily to accommodate the temperature contraction of the insulating board 5 itself, providing necessary compensation space. During service, the seam needs to repeatedly open and close with temperature fluctuations. In this embodiment, a filler module 6 made of flexible insulating material is embedded within the seam. This module can be stretched when the seam widens and compressed when it narrows, thus absorbing dimensional changes through its elastic deformation, allowing the seam to retain its compensation function even after being filled. After the filler module 6 is embedded in the seam, an assembly gap remains between it and the opposite wall of the adjacent insulating board 5. This gap is filled with sealant. The sealant serves to bond the filler module 6 to the insulating boards 5 on both sides as a whole. On one hand, it positions the filler module 6 within the seam, preventing it from loosening or sinking during service. On the other hand, it seals the interface between the filler module 6 and the board wall, expelling air bubbles generated within the sealant and blocking any potential cold leakage channels at the interface. In practical implementation, a special epoxy sealant suitable for low-temperature operation down to -163℃ can be selected.
[0045] See Figures 5 to 8 In this embodiment, several internally threaded inserts 8 are distributed on the support pad 9 at the edge region of the insulating plate 5. These internally threaded inserts 8 are pre-embedded in the support pad 9 to provide definite and reliable anchoring points for the pressing fixture body 1 on the construction site. The support pad 9 is bonded and fixed to the surface of the insulating plate 5. Figure 7As shown, in this embodiment, a rigid support plate 9 is used as the pre-embedded base for the internal thread insert 8. On the one hand, since the structural strength of the support plate 9 is much higher than that of the insulating plate 5, the tensile strength during threaded connection can be greatly increased. On the other hand, structural damage to the insulating plate 5 is avoided to the greatest extent. Here, the pre-embedding depth of the internal thread insert 8 does not exceed 1 / 2 of the thickness of the insulating plate 5. That is to say, the internal thread insert 8 is allowed to extend downward into the interior of the insulating plate 5, but it cannot exceed 1 / 2 of the thickness of the insulating plate 5. Of course, it can also be completely pre-embedded inside the support plate 9. By distributing the internal thread insert 8 on the edge area of the insulating plate 5 through the support plate 9, the connecting holes 4 at both ends of the pressing tool body 1 can be aligned and connected with the internal thread insert 8 on the support plate 9 inside the insulating plate 5 on both sides of the joint when it spans above the joint. This shortens the transmission path of the pressing force and concentrates the area of action of the pressing force on the joint, preventing the pressing force from being dispersed to areas far from the joint and thus failing to play the role of the pressing and filling module 6.
[0046] In practical implementation, the internally threaded insert 8 is a metal component, and its pre-embedded depth does not exceed 1 / 2 the thickness of the insulation plate 5. It does not penetrate the insulation layer, thus avoiding the establishment of a continuous metal heat conduction path between the -163℃ low-temperature environment inside the cargo hold and the normal-temperature environment inside the hull. In this way, while providing anchoring capability for pressing, the internally threaded insert 8 fundamentally avoids the problem of cold bridges formed by post-drilling through-type fasteners in existing technologies, which leads to increased LNG evaporation rates and causes structural corrosion and low-temperature brittle fracture.
[0047] In practice, the pre-compression pad 7 is made of rigid sheet material, such as 9mm thick birch plywood or other materials of equivalent strength, and cut to a suitable size to cover the entire joint area. The pre-compression pad 7 is placed above the joint filling module 6 to distribute the pressing force, prevent the pressing fixture body 1 from directly pressing on the joint filling module 6 and causing local deformation of the joint filling module 6, while ensuring that the joint filling adhesive can cure evenly.
[0048] In this embodiment, during construction, the joint filling module 6 is first installed and the joint filling adhesive is filled. After the joint filling is completed, the pre-pressure pad 7 is placed on the joint filling module 6, and the position of the pressing fixture body 1 is adjusted. The connecting holes 4 of the adjacent insulating plates 5 on both sides of the joint are axially aligned with the internal thread inserts 8. Then, the pressure holding bolts 2 at both ends of the pressing fixture body 1 are screwed into the corresponding internal thread inserts 8. Pressure is applied to the pre-pressure pad 7 through the threaded connection between the internal thread inserts 8 and the pressure holding bolts 2, thereby applying pressure to the joint filling module 6 until the joint filling adhesive cures.
[0049] In this embodiment, in one aspect, by pre-embedding a blind hole threaded insert 8 in the support pad 9 during the production process of the insulation board 5, and cooperating with a dedicated pressing tool body 1, pressure holding bolt 2 and pre-pressing pad 7, not only is stable, uniform and continuous pressing of the joint filling module 6 in the joint of the insulation board 5 achieved, but also the factory pre-embedding of the insert avoids on-site drilling, fundamentally eliminating the generation of cold bridges and ensuring the thermal insulation performance and structural safety of the insulation board.
[0050] In this embodiment, in another aspect, the threaded connection between the internal threaded insert 8 and the pressure-holding bolt 2 allows for precise control of the pressurization process of the sealant module 6. The pre-pressure pad 7 evenly distributes the pressure throughout the joint area, expelling air bubbles from the sealant and preventing cold leakage channels. This ensures uniform curing of the sealant and guarantees the stability and consistency of the construction quality. Furthermore, the standardized construction tools and procedures allow for precise control of the height difference between the insulation board 5 and the joint installation within ≤3mm, meeting high standards such as those of GTT and classification societies.
[0051] As a preferred option, the pressing fixture body 1 is made of stainless steel, which is sturdy and durable and can be reused multiple times, further reducing construction costs.
[0052] In addition, the tooling is easy and quick to install and dismantle, requiring no large amount of temporary support structures or traditional suction cup structures, which can improve construction efficiency and reduce safety hazards.
[0053] like Figure 1 and Figure 10 As shown, in order to adapt to the construction of curved bulkheads, the connecting hole 4 is a strip hole. The length direction of the strip hole is parallel to the length direction of the pressing tool body 1. The width of the strip hole is configured to be greater than the diameter of the body of the pressure holding bolt 2 but smaller than the diameter of the head of the pressure holding bolt.
[0054] like Figure 10 As shown, in this embodiment, a reliable pressing force is provided through a threaded connection, and the connecting hole 4 is a strip-shaped hole, allowing the pressure-holding bolt 2 to tilt at a certain angle within the connecting hole 4 or flexibly adjust its travel position within the hole, so as to align and connect with the internally threaded insert 8 on the inclined insulating plate 5 on the curved bulkhead, thereby performing pressing construction on the sealant module 6, solving the problem of difficult construction on curved surfaces in the prior art. This construction fixture is not only suitable for construction on planes, vertical surfaces, or top surfaces, but also for construction in corners, curved surfaces, and other situations, possessing full-condition adaptability.
[0055] like Figure 10As shown, in one scenario, to accommodate curved surface construction, the construction fixture also includes a spherical washer. This spherical washer is fitted over the outside of the pressure-holding bolt 2 and rests between the pressing fixture body 1 and the pressure-holding bolt 2 during the threaded connection. The spherical washer consists of a pair of mating spherical components, one of which has a convex spherical surface, and the other has a corresponding concave spherical surface. The two spherical surfaces are in contact with each other and can rotate relative to each other. After the spherical washer is installed, the pressure-holding bolt 2 can deflect within a certain angle range with the relative rotation of the spherical washer, and its axis can be automatically aligned with the axis of the internal thread insert 8. The threaded pair is thus in a normal meshing state, and the pressing force can be correctly transmitted along the axial direction of the internal thread insert 8. Based on this, the sliding stroke provided by the strip hole along the length of the pressing fixture body 1 and the angular deviation degree of freedom provided by the spherical washer complement each other. The former compensates for the positional deviation between the internal thread inserts 8, and the latter compensates for the angular deviation between the internal thread inserts 8. Together, they enable the construction fixture of this embodiment to adapt to the construction requirements of curved surfaces and corner areas.
[0056] In other ways, such as Figure 10 As shown, the pre-compression pad 7 is constructed in a wedge shape to accommodate the tilted posture of the pressing tool body 1 during curved surface construction.
[0057] like Figure 3 , Figure 4 as well as Figure 11 As shown, the pressing fixture body 1, which uses strip-shaped holes as connecting holes 4, can be installed not only perpendicular to the joint but also at an angle. This not only compensates for the positional deviation between the internal thread inserts 8 of adjacent insulating plates 5, but also reduces the number of pressing fixture bodies 1 used by adopting figure-eight angled installation or other forms of installation, while meeting the on-site pressing construction requirements. This adapts to the pressing construction at the cross joint, reduces construction costs, and improves construction efficiency.
[0058] In specific implementation, such as Figure 1 , Figure 10 , Figure 11 As shown, both connecting holes 4 are strip-shaped holes, and they are arranged opposite to each other and spaced apart along the length direction of the pressing fixture body 1; or, both connecting holes 4 are strip-shaped holes, and they are connected as one unit along the length direction of the pressing fixture body 1; or one of the two connecting holes 4 is a strip-shaped hole.
[0059] In this embodiment, the strip-shaped hole design of the connecting hole 4 allows the pressure-holding bolt 2 to be adjusted within a certain range, thereby adapting to the connection of the internal thread insert 8 corresponding to different spacing joints and the construction requirements of curved bulkheads, and improving the versatility of the tooling.
[0060] In specific implementation, the pressure-holding bolt 2 is a wing bolt. Of course, in other embodiments, the pressure-holding bolt 2 can also be a pan head bolt, and there is no limitation here.
[0061] In this embodiment, the pressure-holding bolt 2 matches the internal threaded insert 8 and is made of low-temperature resistant stainless steel. The head of the pressure-holding bolt 2 has a butterfly-shaped design, which makes it easy to tighten by hand without the need for additional tools, thus improving construction efficiency. The pressure-holding bolt 2 passes through the connecting hole 4 on the pressing fixture body 1 and is screwed into the internal threaded insert 8. The threaded connection achieves a fixed connection between the pressing fixture body 1 and the insulating plate 5, thereby providing a stable and uniform pressing force.
[0062] like Figure 8 As shown, in specific implementation, the internal thread insert 8 is a pre-embedded nut with circumferential barbs or axial locking wings, made of low-temperature resistant metal, and the pre-embedded depth does not exceed 1 / 2 of the thickness of the insulating plate 5.
[0063] Furthermore, the internal thread diameter is M6 to M12, the pre-embedded depth does not exceed 1 / 2 of the insulation board thickness, and does not penetrate the insulation layer of the insulation board 5.
[0064] Furthermore, the internal thread insert 8 is tapered, which increases the tensile strength of the internal thread after pre-embedding, as well as the structural robustness of the internal thread insert 8 itself.
[0065] In specific implementation, the pressing fixture body 1 is a rectangular cross-section square tube structure, made of low-temperature resistant stainless steel, which has the advantages of high strength, corrosion resistance and not easy deformation. A rubber pad 3 is attached to the bottom of the pressing fixture body 1. The rubber pad 3 presses against the upper surface of the pre-pressing pad 7, which plays a role in buffering and uniform force transmission during the pressing process.
[0066] Furthermore, the pressing fixture body 1 is a rectangular cross-section square tube structure, made of low-temperature resistant stainless steel, with a strip hole length of 100-150mm and rounded transitions at both ends.
[0067] Furthermore, a low-temperature resistant rubber pad 3 is attached to the bottom of the pressing fixture body 1. The rubber pad 3 can play a role in buffering and uniformly transmitting force during the pressing process, avoiding excessive local pressure caused by the pressing fixture body 1 directly contacting the pre-pressure pad 7, and also protecting the pressing fixture body 1 and the pre-pressure pad 7 from damage.
[0068] Furthermore, the rubber pad is made of silicone rubber or fluororubber, with an applicable temperature range of -200℃ to +120℃ and a thickness of 1 to 2 mm. It is attached to the bottom of the pressing fixture body 1 using a low-temperature resistant adhesive.
[0069] Furthermore, such as Figure 9As shown, the support pad 9 is flush with the upper surface of the insulating plate 5 and together they are covered with a moisture-proof layer 11. The moisture-proof layer 11 is made of stainless steel sheet or aluminum sheet and has a clearance hole to avoid the internal thread insert 8.
[0070] Furthermore, after the joint pressing construction is completed, a layer of butyl tape 10 is laid on the upper wall surface of the moisture-proof layer 11 to cover the opening of the internal thread insert 8.
[0071] In addition, this embodiment also provides a method for constructing the joints of the insulation panels in the containment system of a liquefied gas carrier's cargo tank. Using the aforementioned construction fixture for the joints of the insulation panels in the containment system of a liquefied gas carrier's cargo tank, the method includes the following steps: S1. Prefabrication of Insulation Board: During the production stage of insulation board 5, support pads 9 are bonded and fixed to the edge area of the insulation board 5 body according to the design position. Internally threaded inserts 8 are pre-embedded in each support pad 9 according to the design position, completing the prefabrication of insulation board 5. Preferably, as follows... Figure 9 As shown, the support pad 9 is flush with the upper surface of the insulating plate 5 body; Specifically, at the insulation board 5 production plant, according to the three-dimensional positioning diagram of the enclosure system, a special pre-embedded mold is used to hot-press and pre-embed the internal thread insert 8 at the designated position of the support pad 9 on the insulation board 5. During pre-embedding, it is ensured that the head of the insert is flush with the surface of the support pad 9, and the internal thread hole is clean and free of debris. After pre-embedding, a 100% pull-out force test is performed on the internal thread insert 8 to ensure that the axial pull-out force of a single insert is not less than 5kN, and to ensure that the insert is firmly installed.
[0072] S2. Insulation board installation: Install the prefabricated insulation board 5 on the corresponding surface of the liquid cargo tank bulkhead and adjust the joint spacing. Specifically, the prefabricated cryogenic insulation board body 5 is transported to the dock, and a special hoisting tool is used to install it in the corresponding position inside the liquid cargo tank. A laser level and feeler gauge are used to adjust the position and joint gap of the insulation board 5 to ensure that the joint width between adjacent insulation boards 5 is uniform.
[0073] It should be noted that there are various ways to connect and fix the insulating plate 5 to the inner wall of the liquid cargo tank, such as bonding, anchoring, and mechanical pressing. The connection and fixing methods between the insulating plate 5 and the tank wall are existing technologies and will not be described in detail here.
[0074] S3. Sealing module adhesive application and installation: The sealing module 6 is embedded in the joint, and special sealing adhesive is evenly applied to the surface where the sealing module 6 and the adjacent insulating board 5 are joined. Specifically, a sealant module 6 is installed at the joint of the insulation board 5. The size of the sealant module 6 is determined according to the joint width. After installation, a special epoxy sealant suitable for low-temperature operation at -163℃ is evenly applied to the surface of the sealant module 6 using a special glue gun. The coating thickness is controlled between 1.5 and 2.5 mm to ensure uniform application without any missed areas or accumulation.
[0075] S4. Pre-compression treatment: Place the pre-compression pad 7 on top of the joint filling module 6, covering the entire joint filling module 6, and perform preliminary pre-compression on the pre-compression pad 7 along the joint length direction to make the joint filling module 6 and the insulation board 5 initially bonded together, while squeezing out excess joint filling adhesive. Specifically, the pre-pressed pad 7 is placed on top of the joint filling module 6, completely covering the entire joint area. Then, the pre-pressed pad is pressed evenly along the length of the joint by hand to perform preliminary pre-pressing, so that the joint filling module 6 and the insulation board 5 are initially bonded together, while squeezing out excess sealant.
[0076] S5. Fixture installation and fixing: Place the pressing fixture body 1 above the pre-pressing pad 7, align the connecting hole on the pressing fixture body 1 with the internal thread insert 8 on the insulating plate 5, pass the pressure holding bolt 2 through the connecting hole and screw it into the internal thread insert 8, so that the pressing fixture body 1 generates a uniform pressing force on the filling module 6 through the pre-pressing pad 7. Specifically, on each pressing fixture body 1, the pressure-holding bolts 2 are tightened gradually in an alternating sequence at both ends, so that the pressing fixture body 1 generates a uniform and stable pressing force on the joint filling module 6. For a 1m long joint, at least two pressing fixture bodies 1 should be arranged. Alternatively, an oblique fixing method can be used according to the actual situation to obtain a better pressing effect.
[0077] S6. Pressure Holding and Curing: Maintain the pressure state until the sealant is completely cured; Specifically, maintain the pressure state for no less than 24 hours until the sealant is completely cured. During the curing process, the ambient temperature inside the chamber should be controlled between 15 and 25°C, and the relative humidity should be ≤60%. A designated person should regularly check the tightness of the tooling, tightening it promptly if any loosening occurs to ensure stable pressure.
[0078] S7. Tooling Removal: After the sealant has fully cured, unscrew the pressure-holding bolts 2 in sequence, remove the pressing tool body 1 and the pre-pressure pad 7, and the construction is complete. After removing the pressing tool body 1 and the pre-pressure pad 7, use butyl tape 10 to seal the opening of the internal thread insert 8 to prevent low-temperature moisture from entering the blind hole and causing frost heave damage. At the same time, butyl tape 10 has pressure-sensitive adhesive properties, and while sealing the hole, it can also serve as an adhesive transition layer between the secondary shielding layer and the board surface.
[0079] Specifically, after the sealant has fully cured, each pressing fixture body 1 is sequentially unscrewed with the pressure-holding bolts 2 in alternating order from both ends, and the pressing fixture body 1 and the pre-pressure pad 7 are removed. Excess sealant at the joint is cleaned using a special scraper to complete the construction. The removed pressing fixture body 1 and pre-pressure pad 7 can be reused, reducing construction costs.
[0080] Throughout the construction process, a 2m straightedge and feeler gauge were used to check the height difference of the insulation board 5 at any time to ensure that the height difference was controlled within ≤3mm, meeting the high standards of GTT, classification societies, etc.
[0081] The construction tools and methods in this embodiment are applicable to the construction of the plane, elevation, top surface and curved surface with a radius of curvature ≥ 5m of the cargo tank of liquefied gas carriers, and can effectively solve the problem of construction difficulties in complex locations using traditional processes.
[0082] Furthermore, for an insulating board 5 with a specification of 1m×1m, three internal thread inserts 8 are evenly arranged on each edge. When fixing the pressing fixture body 1, it is allowed to fix and press at an angle, and at least two pressing fixture bodies 1 are arranged within a 1m interval.
[0083] Furthermore, in step S1, the internal thread insert 8 is pre-embedded using a hot-pressing pre-embedding process. After the pre-embedding is completed, a 100% pull-out force test is performed on all internal thread inserts 8 on the inner support pad 9 of each insulating plate 5. The axial pull-out force of a single internal thread insert 8 is not less than 5kN.
[0084] See Figure 5 , Figure 6 The distribution of the internally threaded inserts 8 on the insulating plate 5 can be determined according to the layout requirements of the enclosure system. In one embodiment, such as Figure 5 As shown, the insulating plate 5 is rectangular, the supporting plate 9 is square, and the internal thread inserts 8 are distributed in the square corner areas of the supporting plate 9, while the supporting plate 9 is distributed in the rectangular corner areas of the insulating plate 5.
[0085] In another implementation, such as Figure 6 As shown, the support pad 9 is elongated, and the internally threaded inserts 8 are evenly spaced along the length of the support pad 9. This distribution is suitable for situations where multiple pressing tool bodies 1 need to be continuously arranged along a straight joint. It is understood that the above quantity and distribution are only given as an illustration for ease of implementation. In actual implementation, the number of internally threaded inserts 8 and their spacing can be adjusted according to the specifications of the insulating plate 5, the length of the joint, and the required pressing force.
[0086] In summary, by using this construction tooling and method, the internally threaded insert 8, which is pre-embedded in the support pad 9 within the edge area of the insulation board 5 at the factory stage, serves as the anchor point for the pressing reaction force. The pressing tool body 1, which spans above the joint, serves as the load-bearing component. The threaded connection between the pressure-holding bolt 2 and the internally threaded insert 8 serves as the means of generating and maintaining the pressing force. The pre-pressurizing pad 7 disperses the concentrated pressing force into a pressure load that is evenly distributed along the length of the joint. Thus, pressure-holding and curing of the sealant can be achieved without drilling on the construction site or damaging the integrity of the insulation layer.
[0087] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the invention can be implemented in other specific forms without departing from its spirit or basic characteristics. Therefore, the embodiments should be considered illustrative and non-limiting in all respects. The scope of the invention is defined by the appended claims rather than the foregoing description. Therefore, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the present invention, and no reference numerals in the claims should be construed as limiting the scope of the claims.
[0088] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.
Claims
1. A construction tool for the joint of an insulation panel in a liquefied gas carrier cargo tank containment system, wherein a joint-filling module is embedded in the joint, and joint-filling adhesive is used to fill the space between the joint-filling module and the adjacent insulation panel, characterized in that... The construction equipment includes: Several support pads are provided and distributed at a designed position along the edge region of the insulating plate. The support pads are bonded and fixed to the surface of the insulating plate. A plurality of internal thread inserts are provided and pre-embedded in the support pad according to the design position. The internal thread inserts are flat-bottomed blind hole structures extending along the thickness direction of the insulation plate and having internal threads formed on the inner wall. The pressing fixture body is a long, rigid strip. Both ends of the pressing fixture body are respectively formed with connecting holes. The pressing fixture body spans over the joint and is used to axially align the connecting holes at both ends with the corresponding internal thread inserts in the adjacent insulating plates. A pre-compression pad is placed between the joint filling module and the pressing fixture body. The upper surface of the pre-compression pad protrudes from the upper surface of the adjacent insulating plate, and the surface of the pre-compression pad covers the entire joint filling module to disperse the pressing force. And a pressure-holding bolt, which passes through the corresponding connecting hole and screws into the corresponding internal thread insert, so that the pressing fixture body applies pressure to the sealant module through the pre-pressure pad through the threaded connection until the sealant cures.
2. The construction tooling for the joint of the insulating board in the liquefied gas carrier cargo tank containment system according to claim 1, characterized in that, At least one of the two connecting holes is configured as a strip hole, the length direction of which is parallel to the length direction of the pressing tool body, and the width of which is configured to be greater than the diameter of the body of the pressure holding bolt but smaller than the diameter of the head of the pressure holding bolt.
3. The construction tooling for the joint of the insulating board in the liquefied gas carrier cargo tank containment system according to claim 2, characterized in that, Both connecting holes are strip-shaped holes, and they are arranged opposite to each other and spaced apart along the length direction of the pressing fixture body; or, both connecting holes are strip-shaped holes, and they are connected as one unit along the length direction of the pressing fixture body; or one of the two connecting holes is a strip-shaped hole.
4. The construction tooling for the joint of the insulation board in the liquefied gas carrier cargo tank containment system according to claim 1, characterized in that, The pressure-holding bolt is a wing bolt or a pan head bolt; the internal thread insert is a pre-embedded nut with circumferential barbs or axial locking wings, made of metal, and the pre-embedded depth does not exceed 1 / 2 of the thickness of the insulation plate.
5. The construction tooling for the joint of the insulating board in the liquefied gas carrier cargo tank containment system according to claim 1, characterized in that, The support pad is made of plywood.
6. The construction tooling for the joint of the insulating board in the liquefied gas carrier cargo tank containment system according to claim 1, characterized in that, The pressing fixture body is a rectangular cross-section square tube structure made of stainless steel. A rubber pad is attached to the bottom of the pressing fixture body. The rubber pad presses against the upper surface of the pre-pressing pad plate to buffer and uniformly transmit force during the pressing process.
7. The construction tooling for the joint of the insulation board in the liquefied gas carrier cargo tank containment system according to claim 1, characterized in that, The support pad is flush with the upper surface of the insulating plate and together they are covered with a moisture-proof layer. The moisture-proof layer is provided with avoidance holes to avoid the internal thread insert.
8. A method for constructing joints of insulation boards in a liquefied gas carrier's cargo tank containment system, characterized in that... The construction tooling for the joint of the insulation panel of the liquefied gas carrier cargo tank containment system as described in any one of claims 1 to 7 includes the following steps: S1. Prefabrication of insulation board: During the production stage of insulation board, support pads are glued and fixed to the edge area of the insulation board body according to the design position, and the internal threaded inserts are pre-embedded in each support pad according to the design position to complete the prefabrication of the insulation board. S2. Insulation board installation: Install the prefabricated insulation board on the corresponding surface of the liquid cargo tank bulkhead and adjust the joint spacing. S3. Sealing module adhesive application and installation: The sealing module is embedded in the joint, and special sealing adhesive is evenly applied to the surface where the sealing module and the adjacent insulation board meet. S4. Pre-compression treatment: Place the pre-compression pad on top of the joint filling module, and perform preliminary pre-compression on the pre-compression pad along the joint length direction to make the joint filling module and the insulation board initially bonded and adhered, while squeezing out excess joint filling adhesive. S5. Fixture installation and fixing: Place the pressing fixture body above the pre-pressing pad, align the connecting hole on the pressing fixture body with the internal thread insert on the corresponding support pad, pass the pressure holding bolt through the connecting hole and screw it into the internal thread insert, so that the pressing fixture body generates a uniform pressing force on the filling module through the pre-pressing pad. S6. Pressure Holding and Curing: Maintain the pressure state until the sealant is completely cured; S7. Tooling Removal: After the sealant has fully cured, unscrew the pressure-holding bolts in sequence, remove the pressing tool body and pre-pressure pad, and the construction is complete.
9. The construction method for the joint of the insulating board in the containment system of a liquefied gas carrier cargo tank according to claim 8, characterized in that, In step S1, the internal thread insert is pre-embedded using a hot-pressing pre-embedding process. After the pre-embedding is completed, a 100% pull-out force test is performed on all internal thread inserts on each insulating board. The axial pull-out force of a single internal thread insert is not less than 5kN.
10. The construction method for the joint of the insulating board in the containment system of a liquefied gas carrier cargo tank according to claim 8, characterized in that, After step S2, the height difference between any two adjacent insulating boards is controlled to be ≤3mm. In step S3, the height difference between the filling module and the two adjacent insulating boards is controlled to be ≤2mm.