A multi-stage wastewater treatment equipment for FPC production

By introducing data acquisition, location management, and environmental monitoring components into the FPC wastewater treatment equipment, and combining GIS technology with domestically produced databases, the problem of low equipment intelligence has been solved, the reliability of equipment operation and real-time management have been achieved, and precise positioning and comprehensive environmental monitoring of multiple sites have been realized.

CN123105752APending Publication Date: 2026-11-17HUAIAN HUATAI ELECTRONIC TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611310445.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-27
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing FPC wastewater treatment equipment has a low level of intelligence, lacks real-time data monitoring and precise positioning, resulting in lagging operation and maintenance management and difficulty in achieving unified management of multiple sites and visual display of equipment operating status.

Method used

It employs data acquisition components, positioning management components, and environmental management modules, combined with GIS positioning boxes, synchronizers, and environmental monitoring technologies, to achieve real-time data collection and visualization, while using domestically produced databases and encryption technologies to ensure data security.

Benefits of technology

It improves the reliability and stability of equipment operation, enables precise positioning of multiple sites and comprehensive environmental monitoring, and enhances the real-time nature and intelligence of equipment operation and maintenance management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105752A_ABST
    Figure CN123105752A_ABST
Patent Text Reader

Abstract

This invention relates to the field of wastewater treatment equipment technology, specifically a multi-stage wastewater treatment device for FPC production. It includes a main body of the multi-stage wastewater treatment equipment, a data acquisition component fixedly installed on the right side of the main body, a data acquisition box fixedly installed below the data acquisition component, and a second acquisition tank fixedly installed at the input end of the data acquisition box. Through modern technologies such as intelligent control, optimized control, and digital twins, the process control of the decentralized wastewater treatment equipment is further improved. The data acquisition box collects data generated by the wastewater system, as well as sensor data installed in systems lacking management equipment and software. It collects real-time data of the influent and effluent through the outer second acquisition tank and the first acquisition tank, displays corresponding tree diagrams, and simultaneously activates alarms to view the current type and site address, thereby effectively intervening in and treating the wastewater treatment system, improving the reliability and stability of equipment operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of wastewater treatment equipment technology, specifically a multi-stage wastewater treatment device for FPC production. Background Technology

[0002] Flexible printed circuit boards (FPCs), as core components in precision electronics manufacturing, are widely used in consumer electronics, new energy, smart wearables, automotive electronics, and many other fields. With the rapid development of the high-end electronics industry, FPC production scale continues to expand. The industrial wastewater generated during its production process is characterized by complex pollutants, large fluctuations in water quality, high heavy metal content, and persistent organic matter, placing extremely high demands on the treatment precision, operational stability, and real-time control of wastewater treatment equipment. Currently, conventional multi-stage wastewater treatment equipment for FPCs in the industry only focuses on optimizing basic wastewater treatment processes such as physical filtration, chemical precipitation, and biodegradation, emphasizing improved wastewater purification effects. However, it generally neglects digital control, real-time data monitoring, site location management, and environmental status monitoring during equipment operation, resulting in numerous technical shortcomings such as low levels of intelligence and outdated control methods, failing to meet the development needs of modern green and intelligent FPC manufacturing.

[0003] Meanwhile, FPC wastewater treatment equipment generally lacks a precise positioning and comprehensive environmental monitoring and management system. Traditional equipment in the industry only focuses on wastewater treatment itself, without establishing a visual control mechanism for wastewater treatment sites, equipment operating environment, and production conditions. Traditional wastewater treatment sites cannot achieve precise positioning and information synchronization, making it difficult for operation and maintenance personnel to quickly locate the site of each wastewater treatment device, and hindering the coordinated management of multiple sites and devices. Furthermore, existing equipment cannot perform real-time dynamic monitoring of key environmental and operational elements such as site video, meteorological environment, internal water quality parameters, sludge level, equipment air pressure, aeration rate, and membrane flux, and cannot intuitively display equipment operating status, site models, and on-site real-world information. The overall control mode is singular, with low visualization and a lack of environmental monitoring dimensions, resulting in operation and maintenance personnel being unable to comprehensively and in real-time grasp the overall operating conditions of the wastewater treatment system, making it difficult to predict potential equipment malfunctions in advance. This leads to severe lag in equipment operation and maintenance management, making it highly susceptible to problems such as uncontrolled wastewater treatment conditions, rapid equipment wear and tear, and unstable treatment effects.

[0004] In view of this, we propose a multi-stage wastewater treatment equipment for FPC production. Summary of the Invention

[0005] To overcome the above shortcomings, the present invention provides a multi-stage wastewater treatment device for FPC production.

[0006] The technical solution of this invention is:

[0007] A multi-stage wastewater treatment device for FPC production includes a main body of the multi-stage wastewater treatment device. A data acquisition component is fixedly installed on the right side of the main body of the multi-stage wastewater treatment device. The data acquisition component includes: a data acquisition box, a first acquisition tank, a second power pump, a first connecting pipe, a second acquisition tank, an energy consumption monitor, and an alarm. The data acquisition box is fixedly installed below the data acquisition component. The second acquisition tank is fixedly installed at the input end of the data acquisition box. The first acquisition tank is fixedly installed to the right of the second acquisition tank. The second power pump is fixedly installed at the input end of the first acquisition tank. An alarm is fixedly installed above the first acquisition tank. An energy consumption monitor is located on the left side of the alarm.

[0008] As a preferred technical solution, the output end of the energy consumption monitor is fixedly installed with a first connecting pipe, and the side of the data acquisition box is fixedly connected with a positioning management component, which includes: a GIS positioning box, a hydraulic pump, a second connecting pipe, an absorption screen, a synchronizer, and an environmental management module.

[0009] As a preferred technical solution, an environmental management module is fixedly installed above the positioning management component, a GIS positioning box is fixedly installed above the environmental management module, an absorption screen is opened at the front end of the GIS positioning box, a synchronizer is fixedly installed above the GIS positioning box, and a hydraulic pump is fixedly installed on the right side of the synchronizer.

[0010] As a preferred technical solution, a second connecting pipe is fixedly installed at the output end of the hydraulic pump, a protective frame is fixedly installed on the side of the second connecting pipe, and a storage box is provided on the outside of the protective frame.

[0011] As a preferred technical solution, a first power pump is fixedly installed on the left side of the storage box, and an absorption tank is fixedly installed at the output end of the first power pump.

[0012] As a preferred technical solution, a main control box is fixedly installed on the left side of the absorption tank, and a first connection end is provided on the outer side of the main control box.

[0013] As a preferred technical solution, a second connecting end is fixedly installed on the right side of the first connecting end.

[0014] As a preferred technical solution, the main control box includes: a main controller, a heat dissipation end, a mounting base, and a flow guide pipe. The main controller is fixedly installed inside the main control box, and a heat dissipation end is provided on the outside of the main controller. The mounting base is fixedly installed at the bottom of the main control box, and a flow guide pipe is installed at the output end above the mounting base.

[0015] As a preferred technical solution, a power connection frame is installed below the first power pump. The power pump includes: a power connection frame, a stable base, a fixed base plate, a connecting pipe, a first docking pipe, and a stop valve. The power connection frame is installed below the first power pump. A second docking pipe is installed at the left output end of the power connection frame, and a connecting pipe is installed at the right output end of the power connection frame. A first docking pipe is installed on the right side of the connecting pipe, and a stop valve is installed inside the first docking pipe. A stable base is installed below the power connection frame, and a fixed base plate is installed below the stable base. A storage inner wall is fixedly installed inside the storage box, and a storage inner cavity is installed inside the storage inner wall. An outlet pipe is provided at the input end of the storage inner cavity, and an inlet pipe is installed at the other end of the outlet pipe.

[0016] As a preferred technical solution, a power end is fixedly installed at the input end of the second collection tank, a stabilizing plate is provided below the power end, a stabilizing frame is fixedly installed on the side of the stabilizing plate, a tank body protective wall is fixedly installed on the outside of the second collection tank, an installation pipe is provided on the side of the tank body protective wall, and a connecting wire harness is installed on the top of the second collection tank.

[0017] Compared with the prior art, the beneficial effects of the present invention are:

[0018] 1. This invention features a data acquisition component fixedly installed on the right side of the main body of a multi-stage wastewater treatment device. A data acquisition box is fixedly installed below the data acquisition component, and a second acquisition tank is fixedly installed at the input end of the data acquisition box. A first acquisition tank is fixedly installed to the right of the second acquisition tank. Through modern technologies such as intelligent control, optimized control, and digital twins, the process control of decentralized wastewater treatment equipment is further improved. The data acquisition box collects data generated by the wastewater system, as well as sensor data installed in systems lacking management equipment and software. Real-time data of influent and effluent is collected through the outer second and first acquisition tanks, displaying corresponding tree-like charts. Data statistics can be performed by switching between daily, monthly, and yearly data. Simultaneously, it activates alarms to view the current type and site address, thereby effectively intervening in and treating the wastewater treatment system, improving the reliability and stability of equipment operation.

[0019] 2. This invention features an environmental management module fixedly installed above a positioning management component. Above the environmental management module is a GIS positioning box, with an absorption screen at its front end and a synchronizer fixedly installed above it. The GIS positioning box uses a map overlaid with site information, and the synchronizer synchronizes the location information of the wastewater treatment site in real time, accurately locating it on the map for visual display. The absorption screen displays images, models, and other components of the wastewater treatment site, and shows the equipment's operating status on the display interface. The environmental management module monitors the external environment in real time, including video, meteorological data, internal water quality, sludge level, air pressure, aeration rate, and membrane flux, achieving real-time environmental monitoring. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the main structure of the multi-stage wastewater treatment equipment of the present invention;

[0021] Figure 2 This is a schematic diagram of the external component structure of the present invention;

[0022] Figure 3 This is a schematic diagram of the positioning component structure of the present invention;

[0023] Figure 4 This is a schematic diagram of the positioning management component structure of the present invention;

[0024] Figure 5 This is a schematic diagram of the control module structure of the present invention;

[0025] Figure 6 This is a schematic diagram of the power module structure of the present invention;

[0026] Figure 7 This is a schematic diagram of the storage module structure of the present invention;

[0027] Figure 8 This is a schematic diagram of the acquisition module structure of the present invention.

[0028] In the diagram: 1. Main body of multi-stage wastewater treatment equipment; 11. Main control box; 12. First power pump; 13. Absorption tank; 14. First connection end; 15. Second connection end; 16. Protective frame; 17. Storage box; 2. Data acquisition component; 21. Data acquisition box; 22. First acquisition tank; 23. Second power pump; 24. First connecting pipe; 25. Second acquisition tank; 26. Energy consumption monitor; 27. Alarm device; 3. Positioning management component; 31. GIS positioning box; 32. Hydraulic pump; 33. Second connecting pipe; 34. Absorption screen; 35. Synchronizer; 36. 111. Environmental Management Module; 112. Main Controller; 113. Heat Dissipation End; 114. Mounting Base; 115. Flow Guide Pipe; 121. Power Connection Frame; 123. Stabilizing Base; 124. Fixed Base Plate; 125. Connecting Pipe; 126. Connecting Pipe One; 127. Stop Valve; 128. Connecting Pipe Two; 171. Storage Inner Wall; 172. Storage Inner Cavity; 173. Outgoing Pipe; 174. Incoming End; 251. Installation Pipe; 252. Tank Protective Wall; 253. Power End; 254. Stabilizing Plate; 255. Connecting Wiring Harness; 256. Stabilizing Frame. Detailed Implementation

[0029] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0030] Please see Figures 1 to 8 The present invention provides a technical solution:

[0031] A multi-stage wastewater treatment device for FPC production includes a main body 1 of the multi-stage wastewater treatment device. A data acquisition component 2 is fixedly installed on the right side of the main body 1. The data acquisition component 2 includes: a data acquisition box 21, a first acquisition tank 22, a second power pump 23, a first connecting pipe 24, a second acquisition tank 25, an energy consumption monitor 26, and an alarm 27. The data acquisition box 21 is fixedly installed below the data acquisition component 2. The second acquisition tank 25 is fixedly installed at the input end of the data acquisition box 21. The first acquisition tank 22 is fixedly installed on the right side of the second acquisition tank 25. The second power pump 23 is fixedly installed at the input end of the first acquisition tank 22. The alarm 27 is fixedly installed above the first acquisition tank 22. The energy consumption monitor 26 is located on the left side of the alarm 27. The first connecting pipe 24 is fixedly installed at the output end of the energy consumption monitor 26. A positioning management component 3 is fixedly connected to the side of the data acquisition box 21.

[0032] It should be added that the process control of decentralized sewage treatment equipment can be further improved through modern scientific technologies such as intelligent control, optimized control, and digital twins. The data acquisition box 21 is responsible for collecting data generated by the sewage system, as well as sensor data installed in systems lacking management equipment and software. It collects real-time data of influent and effluent through the outer second acquisition tank 25 and the first acquisition tank 22, displays the corresponding tree chart, and can switch between daily, monthly, and yearly data statistics. At the same time, it drives the alarm 27 to view the current type and site address, thereby effectively intervening and treating the sewage treatment system and improving the reliability and stability of equipment operation.

[0033] In a preferred embodiment, the positioning management component 3 includes: a GIS positioning box 31, a hydraulic pump 32, a second connecting pipe 33, an absorption screen 34, a synchronizer 35, and an environmental management module 36. The environmental management module 36 is fixedly installed on the top of the positioning management component 3, and the GIS positioning box 31 is fixedly installed on the top of the environmental management module 36. The absorption screen 34 is opened at the front end of the GIS positioning box 31. The synchronizer 35 is fixedly installed on the top of the GIS positioning box 31. The hydraulic pump 32 is fixedly installed on the right side of the synchronizer 35. The second connecting pipe 33 is fixedly installed at the output end of the hydraulic pump 32. A protective frame 16 is fixedly installed on the side of the second connecting pipe 33. A storage box 17 is opened on the outside of the protective frame 16.

[0034] It is worth noting that the GIS positioning box 31 uses map overlay to display site information, and the synchronizer 35 synchronizes the location information of the sewage treatment station in real time and accurately locates it on the map, achieving a visual display. The absorption screen 34 displays images, models, and other components of the sewage treatment station, and shows the operating status of the equipment on the display interface. The environmental management module 36 monitors the external environment in real time, including video, meteorological data, internal water quality, sludge level, air pressure, aeration rate, membrane flux, and other elements, to achieve real-time environmental monitoring.

[0035] In a preferred embodiment, a first power pump 12 is fixedly installed on the left side of the storage box 17, and an absorption tank 13 is fixedly installed at the output end of the first power pump 12. A main control box 11 is fixedly installed on the left side of the absorption tank 13. The main control box 11 includes a main controller 111, a heat dissipation end 112, a mounting base 113, and a guide pipe 114. A first connection end 14 is provided on the outer side of the main control box 11, and a second connection end 15 is fixedly installed on the right side of the first connection end 14. The main controller 111 is fixedly installed inside the main control box 11. A heat dissipation end 112 is provided on the outside of the main controller 111. A mounting base 113 is fixedly installed below the main control box 11. A guide pipe 114 is installed on the output end above the mounting base 113. A power connection frame 121 is installed below the first power pump 12. The power pump 12 includes: a power connection frame 121, a stable base 123, a fixed base plate 124, a connecting pipe 125, a docking pipe 126, and a stop valve 127. The power connection frame 121 is installed below the first power pump 12. The left side of the power connection frame 121... A second docking pipe 128 is installed at the output end. A connecting pipe 125 is installed at the right output end of the power connection frame 121. A first docking pipe 126 is installed at the right side of the connecting pipe 125. A stop valve 127 is installed inside the first docking pipe 126. A stabilizing base 123 is installed below the power connection frame 121. A fixed base plate 124 is installed below the stabilizing base 123. A storage inner wall 171 is fixedly installed inside the storage box 17. A storage inner cavity 17 is installed inside the storage inner wall 171. 2. The input end of the storage cavity 172 is provided with an outlet pipe 173, and the other end of the outlet pipe 173 is provided with an inlet end 174. The input end of the second collection tank 25 is fixedly installed with a power end 253. A stabilizing plate 254 is provided below the power end 253. A stabilizing frame 256 is fixedly installed on the side of the stabilizing plate 254. A tank body protective wall 252 is fixedly installed on the outside of the second collection tank 25. An installation pipe 251 is opened on the side of the tank body protective wall 252. A connecting wire harness 255 is installed on the top of the second collection tank 25.

[0036] In practical use, the main control box 11 is used to store massive amounts of data during the operation of the sewage treatment system. At the same time, it uses a domestically produced database to maximize the protection of industry data security while ensuring efficiency. The data security adopts symmetric encryption technology and non-heap encryption technology, which makes the software system simple and quick to use, with short keys that are difficult to crack.

[0037] The multi-stage wastewater treatment equipment for FPC production of the present invention, when in use, firstly improves the process control of decentralized wastewater treatment equipment through modern scientific technologies such as intelligent control, optimized control, and digital twins. The data acquisition box 21 is responsible for collecting data generated by the wastewater system, as well as sensor data installed in systems lacking management equipment and software. Through the outer second acquisition tank 25 and the first acquisition tank 22, it collects real-time data of influent and effluent, displays the corresponding tree chart, and can switch between daily, monthly, and yearly data statistics. At the same time, it drives the alarm 27 to view the current type and site address, thereby effectively intervening and treating the wastewater treatment system, improving the reliability and stability of equipment operation. Through the GIS positioning box 31, the site information is overlaid on the map, and the synchronizer 35 synchronizes the location information of the wastewater treatment site in real time and accurately locates it on the map to achieve visualization display. The absorption screen 34 displays images, models, and other components of the wastewater treatment site, and shows the operating status of the equipment on the display interface. The environmental management module 36 monitors the external environment in real time, including video, meteorological data, internal water quality, sludge level, air pressure, aeration volume, membrane flux, and other elements, to achieve real-time environmental monitoring. The main control box 11 is used to store massive amounts of data during the operation of the wastewater treatment system. At the same time, it uses a domestic database to maximize the protection of industry data security while ensuring efficiency. Data security adopts symmetric encryption technology and non-heap encryption technology, making the software system simple and fast to use. The key is short and difficult to decipher.

[0038] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely preferred examples and are not intended to limit the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of the present invention is defined by the appended claims and their equivalents.

Claims

1. A multi-stage wastewater treatment device for FPC production, comprising a main body (1) of the multi-stage wastewater treatment device, characterized in that: A data acquisition component (2) is fixedly installed on the right side of the main body (1) of the multi-stage sewage treatment equipment. The data acquisition component (2) includes: a data acquisition box (21), a first acquisition tank (22), a second power pump (23), a first connecting pipe (24), a second acquisition tank (25), an energy consumption monitor (26), and an alarm (27). The data acquisition box (21) is fixedly installed below the data acquisition component (2). The second acquisition tank (25) is fixedly installed at the input end of the data acquisition box (21). The first acquisition tank (22) is fixedly installed on the right side of the second acquisition tank (25). The second power pump (23) is fixedly installed at the input end of the first acquisition tank (22). An alarm (27) is fixedly installed above the first acquisition tank (22). An energy consumption monitor (26) is provided on the left side of the alarm (27).

2. The multi-stage wastewater treatment equipment for FPC production as described in claim 1, characterized in that: The output end of the energy consumption monitor (26) is fixedly installed with a first connecting pipe (24), and the side of the data acquisition box (21) is fixedly connected with a positioning management component (3). The positioning management component (3) includes: GIS positioning box (31), hydraulic pump (32), second connecting pipe (33), absorption screen (34), synchronizer (35), and environmental management module (36).

3. The multi-stage wastewater treatment equipment for FPC production as described in claim 2, characterized in that: An environmental management module (36) is fixedly installed above the positioning management component (3), a GIS positioning box (31) is fixedly installed above the environmental management module (36), an absorption screen (34) is opened at the front end of the GIS positioning box (31), a synchronizer (35) is fixedly installed above the GIS positioning box (31), and a hydraulic pump (32) is fixedly installed on the right side of the synchronizer (35).

4. A multi-stage wastewater treatment device for FPC production as described in claim 3, characterized in that: The output end of the hydraulic pump (32) is fixedly installed with a second connecting pipe (33), and a protective frame (16) is fixedly installed on the side of the second connecting pipe (33). A storage box (17) is opened on the outside of the protective frame (16).

5. A multi-stage wastewater treatment device for FPC production as described in claim 4, characterized in that: A first power pump (12) is fixedly installed on the left side of the storage box (17), and an absorption tank (13) is fixedly installed at the output end of the first power pump (12).

6. A multi-stage wastewater treatment device for FPC production as described in claim 5, characterized in that: The main control box (11) is fixedly installed on the left side of the absorption tank (13), and a first connection end (14) is provided on the outside of the main control box (11).

7. A multi-stage wastewater treatment device for FPC production as described in claim 6, characterized in that: A second connecting end (15) is fixedly installed on the right side of the first connecting end (14).

8. A multi-stage wastewater treatment device for FPC production as described in claim 6, characterized in that: The main control box (11) includes: a main controller (111), a heat dissipation end (112), a mounting base (113), and a flow guide pipe (114). The main controller (111) is fixedly installed inside the main control box (11). The heat dissipation end (112) is opened on the outside of the main controller (111). The mounting base (113) is fixedly installed below the main control box (11). The flow guide pipe (114) is installed on the output end above the mounting base (113).

9. A multi-stage wastewater treatment device for FPC production as described in claim 5, characterized in that: A power connection frame (121) is installed below the first power pump (12). The power pump (12) includes: a power connection frame (121), a stable base (123), a fixed base plate (124), a connecting pipe (125), a docking pipe one (126), and a stop valve (127). A docking pipe two (128) is installed on the left output end of the power connection frame (121), and a connecting pipe (125) is installed on the right output end of the power connection frame (121). A docking pipe one (126) is installed on the right side of the connecting pipe (125). A stop valve (127) is installed inside the connecting pipe (126). A stabilizing base (123) is installed below the power connection frame (121). A fixed base plate (124) is installed below the stabilizing base (123). A storage inner wall (171) is fixedly installed inside the storage box (17). A storage inner cavity (172) is installed inside the storage inner wall (171). An outlet pipe (173) is provided at the input end of the storage inner cavity (172). An inlet end (174) is installed at the other end of the outlet pipe (173).

10. A multi-stage wastewater treatment device for FPC production as described in claim 1, characterized in that: The input end of the second collection tank (25) is fixedly installed with a power end (253), a stabilizing plate (254) is provided below the power end (253), a stabilizing frame (256) is fixedly installed on the side of the stabilizing plate (254), a tank body protective wall (252) is fixedly installed on the outside of the second collection tank (25), an installation pipe (251) is opened on the side of the tank body protective wall (252), and a connecting wire harness (255) is installed on the top of the second collection tank (25).